PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 1 PWD BUILDINGS DIVISION BUDGET WORK - PROGRESS REPORT UNDER PWD BUILDINGS DIVISION, MALAPPURAM- JANUARY 2017

NAME OF PROJECT Present stage Sl.No. Division Remarks S.H.O Date Department Actual DOC Agreed PAC Estimte PAC Date of tender current month current Extended DOC Extended Estimate amount Estimate LA Constituency Head of Account Head Physical Progress Physical Expenditure upto upto Expenditure Tender percentage Name of contractor Name Agreement No. & date TS No. Date & Amount Date No. TS D.O.C as per agreement as D.O.C Stages of Electrification Stages AS No. Date & Amount Date No. AS Budget provision in lakhs in provision Budget Budget page No./Item No. page No./Item Budget Period of completion in months in of completion Period Amount required upto financial year financial upto required Amount 123456 7 89 10 111213141516171819202122 23 2425262728 AGRICULTURE DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED o.146 NN

Returned by Construction of Secretary , 1 Building for Krishi

Tirur PWD. RE Bhavan Thirunavaya Agriculture 15.50Lakhs submitted. Malappuram budget-2013-14. vol-I Page 19Sl. Page vol-I budget-2013-14. ANIMAL HUSBANDRY DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED

Construction of Estimate submitted Building for for AS on 2 Veterinary 21.02.2015. Dispensary Revised on 35 Lakhs

Malappuram 09.03.2015. Animal Husbandry Animal AYURVEDA (ISM) DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 2 PWD BUILDINGS DIVISION MALAPPURAM Constrction of Estimate for AS building for submitted to 3 Kannamangalam Govt. on 55 lakhs Vengara Ayurveda Ayurveda Hospital 18.07.2014 Malappuram

Tanur Kunnumpuram Estimate to be 4 Ayurveda Dispensary submitted Tanur Ayurveda Malappuram

Construction of OP Estimate Cum Administrative submitted for AS Block for District

5 II on 01.11.2013.

Tirur Ayurveda Hospital, Revised estimate 67 Lakhs Ayurveda Valavannur, Tirur in Malappuram to be submitted. MLPM Dist get-2013-14. vol-I Annexure- vol-I get-2013-14. g d bud

-I Proposed land is l paddy field. e 310 . vo g Hence 14 - Construction of permission to be 6 Ayurveda Hospital, 2013 got from Tirur Tirur 70 Lakhs

Ayurveda Revenue get- Malappuram d

u Department for b Annexure-II Pa conversion of land

Construction of building for IP Block Land not 7 for Government identified Ayurveda Dispensary Ayurveda 200 lakhs Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 3 PWD BUILDINGS DIVISION MALAPPURAM Construction of building for Estimate to be 8 Government submitted Ayurveda Dispensary Ayurveda 200 lakhs Tirurangadi Malappuram Tirurangadi Construction of building for Govt. Land to be 9 Ayurveda identified. Dispensary, Ayurveda Tirurangadi Malappuram Mundiyankavu. EDUCATION DEPARTMENT 4059-01-051-86 f

Kondotty. /BLDS/2011- otty 688 055 836 nths Construction of Class hs Work -051-86 t 2012 t t ationa bove ERb akhsa ed Ashra e puramp .2012. .2012. .2012. 41/2012/PWD 41/2012/PWD 4 ili 2 2012 For Rs 56 Rs 2012 For Dt: 14.09.2012 Dt: EE 12 Rs. 50Lakhs 12 Rs. 1 dd 44 55 44 oo kk e c 1 a p 9 5 5 10 2 nn L m

Rooms for GVHSS, la Completed 503 472 523 8 m 56 L Kon Educ

Kondotty 22.09 21.05 21.05 Malap Budge 4059-01 6.15 % a 6.15 % Mohamm Reg No 177/C No Reg G.O. (Rt) No.2 dated 16.02.20 dated EE(M) 7/12-13 EE(M) 7/12-13 2012 DT 31.03. 2012 DT

Vazhakkad. 5 Class Work 11 Room For nil

lakhs Completed 5278914 GVHSS,Vazhakkad 4471726 5093296 8 months 50 Lakhs Kondotty Education 10.01.2013 09.09.2013 06.07.2013 16.08.2012 Malappuram Budget 2012 Budget Mohammed Ali 4059-01-051-86 13.9 % above ER 13.9 % Reg No 178/CE/BLDS/2011- No Reg G.O. (Rt) No.241/2012/PWD No.241/2012/PWD (Rt) G.O. dated 16.02.2012 Rs. 50Lakhs 16.02.2012 Rs. dated 2012 DT 31.03.2012 For Rs 50 Rs 31.03.2012 For 2012 DT EE(M) 14/12-13 Dt: 05.01.2013 Dt: EE(M) 14/12-13 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 4 PWD BUILDINGS DIVISION MALAPPURAM

Thadathilparambu. 5 Dt: 14 Class Room For - Work 12 nil

HSS, GHSS, 6/13 Completed 52 lakh ) 5194236 7116106 7124000 8 months Kondotty Education G.O. (Rt) 20.05.2013 19.01.2014 10.01.2014 13.05.2013 16.08.2012

Thadathilparambu M Malappuram Budget 2012 Budget Shuhaib M E Shuhaib ( 37 % above ER 37 % 4059-01-051-86 DR 10/2012-13 dt dt 10/2012-13 DR EE 16.02.2012 Rs. 50Lakhs 16.02.2012 Rs. 02.07.2012 Rs.52 Lakhs 02.07.2012 Rs.52 No.241/2012/PWD dated dated No.241/2012/PWD t.18.07.2014 2 Omanoor. Building ER 68Lakhs -86 dated 27.11.2012 for 38 dated 16.02.2012 for 30 lakhs 16.02.2012 for 30 lakhs 1 mm hh 44 5 5 5 5 5 5 o ons Kozhikkode ons 3 3 - - - - - 1 s e nn s 1 y DD a k for Govt HSS, D Work 13 Omanoor,

lakhs lakhs Completed Malappuram Dist 8 months Kondotty 4907840- Educatio 6672158/ 7306013/ 23.12.201 69.50 Lak 18/07/201 17/03/201 30/04/201 28/04/201 Malappura Budget 201 Budget (Phase 1 ) 4059-01-051 9.50 % above 9.50 % DR 81/2013-14 Rs Rs 81/2013-14 DR EE(BM) 15/2014-15 15/2014-15 EE(BM) Ansam () Constructi (India) Ansam and G.O. (Rt) No.1989/2012/PWD No.1989/2012/PWD (Rt) and G.O. G.O. (Rt) No.241/2012/PWD dated dated No.241/2012/PWD (Rt) G.O.

Niramaruthur. Plus Civil & Electrical 14 Two Block for

Tirur completed GHSS, Niramaruthur 25746757 30896108 Musthafa 300 lakhs 18 Months 20% above G.O. (Rt) Education 20.01.2014 19.07.2015 31.01.2016 Malappuram Budget 2012 Budget 4059-01-051-86 3/6/2013 Rs30Lakhs 3/6/2013 6/CE/BL/2013-14 DT DT 6/CE/BL/2013-14 16.02.2012 Rs.30Lakhs No.241/2012/PWD dated dated No.241/2012/PWD quotation date 12.11.2013 date quotation SE(K)41/2013-14dt.22/2/14 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 5 PWD BUILDINGS DIVISION MALAPPURAM

Tirur. School Civil & Electrical 15 Building For Govt

Tirur completed

BHSS, Tirur 9.9.2013 18 months 300 lakhs Education G.O. (Rt) 08.01.2014 07.07.2015 26731175/- 30489578/- Malappuram Budget 2012 Budget 4059-01-051-86 Abdu.k,Kottakal 9/CE/BL/2013-14 DT DT 9/CE/BL/2013-14 14.06% above estimate 14.06% 14/6/2013 Rs300Lakhs 14/6/2013 16.02.2012 Rs.300Lakhs No.241/2012/PWD dated dated No.241/2012/PWD SE(K)38/13-14 dt 14.02.2014 dt SE(K)38/13-14

Edarikkode. Civil and Building for Govt 16 Electrical work HSS, Puthuparambu, Tanur

185 Lakh completed. 14529499 15139686 17625821 G.O. (Rt) Education 12 months 15.10.2012 14.12.2013 Edarikkode 19/09/2012 Malappuram Budget 2012 Budget 4059-01-051-86 4.20% above ER 4.20% Bava Malappuram Bava CR 1/2012-13 DT DT 1/2012-13 CR SE(K) 34/12-13 dt dt 34/12-13 SE(K) 9.06.2012 Rs185Lakhs 6.02.2012 Rs.170Lakhs o.241/2012/PWD dated dated o.241/2012/PWD 22 11 NN

Peruvallor. Construction of New Civil & Electrical 17 Block to GHSS completed 3.11.12 132 lakh 5% above 5% 12304165 10962684 11510818 Education G.O. (Rt) 10 months Vallikunnu 02.09.2013 Manikandan Malappuram Budget 2012 Budget SE(K) 42/12-13 SE(K) 4059-01-051-86 CR 3/2012-13 DT DT 3/2012-13 CR No.241/2012/PWD dt dt No.241/2012/PWD 16.02.2012 Rs.115Lakhs 24.07.2012 Rs.132Lakhs

d ate d

14

Construction of - Civil & Electrical 18 Additional Block for

Tirur completed 68 lakhs

GMUP School, Tirur )49/13 8 months Education 6147795/- 7065046/- 6380446/- 21.02.2014 24.10.2013 27.12.2013 26.08.2014 26.11.2014 Malappuram 4059-01-051-86 BM ( Abdu.k,(po)Kottakal DR-59/2013-14 dated dated DR-59/2013-14 14.06% above estimate 14.06% EE 20.08.2013for Rs.64.92Lakhs G.O. (Rt) No.1973/2012/PWD No.1973/2012/PWD (Rt) G.O. dated 26.11.2012 for Rs.68 lakhs 26.11.2012 for Rs.68 dated PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 6 PWD BUILDINGS DIVISION MALAPPURAM

d ate

Construction of Clss d

5 Civil work 1

Rooms for GMLP - completed.

19 School, Pachattiri ..

Tirur Electrical to be

Tirur in Malappuram )22/14 6 months Education 2275597/- 2831980/- 13.10.2014 21.10.2014 25.02.2014

Malappuram arranged

District above 24.45% 4059-01-051-86 BM ( Mohammedali.K.V DR-50/2013-14 dated dated DR-50/2013-14 16.08.2013 for 23 lakhs EE G.O. (Rt) No.1973/2012/PWD No.1973/2012/PWD (Rt) G.O. dated 26.11.2012 for Rs.23 lakhs 26.11.2012 for Rs.23 dated d d

Civil work d 60 32 015 015 013 % 73- 012/PWD dated dated 012/PWD uram uram truction & developers. truction t tion tion t ete nths n tendere 051-860 2 2Rs50L 3 dt 19.11.2012 3 dt 3 ubmitteu akhsa Lakhs /08/2013Rs57.5 / LL 2015 2 66 77 22 22 22 00

PPookotturookottur. BBuildinguilding completedcompleted.. l s - 1 22 a p p s o e 7 20 L

for GHSS, Pookottur Electrical to be 30 19.4 4876 5822 30531 Educa 10 mo 57.5 L 01.01. 31.10. 31.08. compl 31-10-

Malapp Malapp arranged 4059-01- 16.02.201 Final bill s Final Work to be EE(M) 11/2012-1 G.O. (Rt) No.241/ (Rt) G.O. M/s ANsam(India) Cons ANsam(India) M/s DR 55/2013 14 dated 17 14 dated 55/2013 DR

Construction of 12 Civil work Nos of Class rooms completed. 21 and 3 Nos Lab for Electrical 90L 7817467- 14926964 19405053 Education Education 15 months 20.10.2014 19.01.2016 GHSS Pookkottur 06-03-2014 Malappuram Malappuram 2012Rs180L arranged 188.0 Lakhs 29.99% above 29.99% 4059-01-051-86 100% completed Final Bill Submitted Bill Final Work to be tendered SE(K)22/2014-15 dt 10.10.2014 dt SE(K)22/2014-15 . (Rt) No.1973/2012/PWD dated 26-11- dated No.1973/2012/PWD . (Rt) CR/31/2013-14 dt 31.12.2013Rs180L dt CR/31/2013-14 te Engineers & Developers Kacheeripadi, & Developers te Engineers O PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 7 PWD BUILDINGS DIVISION MALAPPURAM t d 5 1 Construction of a - Civil & GMLPS, - 22 electrical work /2014

Keezhu Muri- 100L 7 19.20% Vengara 192.50 L completed 20080453 19095021 )3 Education Education G.O. (Rt) 8110649/- 12 months Completed 03.12.2014 02.12.2015 Nelliparamba 30.12.2014 Malappuram K ( 4059-01-051-86 E CR/20/2013-14 dt dt CR/20/2013-14 05.11.2013Rs185L 31-12-2012Rs167L Work to be tendered to Work S No.213990/2012/PWD dated dated No.213990/2012/PWD M/S Maliyeakkal construction 5- 0 - 31

Othukkungal. New Civil & Block Construction 23 electrical work 2015 for Govt GHSS, 110L 17.48% 234.00L Vengara completed complete 19986428 23480055 Education Education 8113370/- 15 months

Othukkungal 17-09-2015 05-11-2013 o.241/2012/PWD dated dated o.241/2012/PWD Malappuram 9.05.2012Rs234L CE/BL/2012-13 CE/BL/2012-13 5 059-01-051-86 g granted upto 17/09/2015 upto granted .02.2012Rs234L . 3 i 3/2013-14 26/10/2011 3/2013-14 i. Mohammed .K // 11 NN 1 44 6 16 Sr 29 201 - dtd. 02 - SE(K)2 04 Extension Extension G.O. (Rt) - 01 7- 2

d Construction of ate Civil d

building for GMLP completed, 14

24 School Keezmuri, -

2014 electrical to be 6.83% for Rs. 132.5 L

Vengara Kuttaloor in Education Education 115 lakhs 12 months 12206175/- 03-02-2014 02-02-2015 Malappuram 15-10-20123 re tendered /2013 5 work completed work 4059-01-051-86 3 24-12-2012 for Rs.

) K ( E S G.O (Rt)No. 2139/12/PWD dated dated 2139/12/PWD (Rt)No. G.O CE/05/2013-14 dated 19-08-2013 19-08-2013 dated CE/05/2013-14 Sri.Shanavas.K.S, PWD Contractor PWD Sri.Shanavas.K.S, 4059-60-051-89 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 8 PWD BUILDINGS DIVISION MALAPPURAM

Kalpakanchery. 11 - Construction of new

25 block for Completed. 1 8/2010 1000

Tirur lakhs ) 47/232

Kalpakanchery 9717495 150 lakhs Education 12 months K 05.06.2010 04.06.2011 1,28,30,636 1,34,33,676 ( Malappuram 4.70% above 4.70% K.T.Musthafa

G.H.S.S. E dtd. 29.05.2010 dtd. 4059-60-051-89 S 121/CE/B&LW/2009-10 121/CE/B&LW/2009-10 dtd.31.12.09 Rs.150Lakhs dtd.31.12.09 G.O.(Rt) No.1184/09/PWD G.O.(Rt) dated 14.08.2009 for Rs.150 14.08.2009 for Rs.150 dated

4202-01-201-99 r

Construction of 10 Class Room building / Civil & 26 for Government UP electrical work )2/2015-16 )2/2015-16 013-14 dated 013-14 dated Tirur 14082/- 70027/- months t.TVM 21.01.2013 t.TVM te29/10/2104 0 lakhs 0 lakhs O(Rt)8 , (PO)Kurumpathu lappuram -01-201-99 10.4.2015 13 for 80 lakhs .01.2015 r70 lakhs r 091058/- 0 - -07-2015 % above ER % % d ducation ll . 22 22 88 00 aa aa dd 8 8 MM 2 0 School Koodasseri 8 o 0

GG completed E 7 6 1 08 10 11 fo M Tirur dtd. 4202 39.88 EE(B Qtm d DR-86/ 31.12.20 2013/PWD 2013/PWD V.Venugopa

d ate d

Construction of five

14 Work class room building - for Govt - Upper completed, 27 Primary school at Ernad electrical work 5114547 8 months 8 months Education Education 5290894/- )36/2013 21/01/2014 10/05/2012 50.00 lakhs 50.00 lakhs 30-01-2014 29-09-2014 26-12-2014 24-10-2013

Chundathpoyil in 5605544.00 Malappuram started 9.6% above E/R 9.6% 4202-01-201-99

Malappuram District BM for Rs .56.50 lakhs .56.50 lakhs for Rs ( Final bill submitted Final Shaiju A.P Pannikkode. A.P Shaiju EE DR 48/2013-14 dated 13.08.2013 dated 48/2013-14 DR GO ( Rt) No .837/2012 PWD dated dated PWD .837/2012 No ( Rt) GO PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 9 PWD BUILDINGS DIVISION MALAPPURAM t d Construction of five 14 - class room building Civil & for Govt - Upper 28 /2013 electrical work Primary school at 5 Ernad )4 5143824 8 months 8 months completed Education Education 10/02/2014 56.50 lakhs 56.50 lakhs 19-02-2014 18-10-2014

Vettilappara in 5359865.00 Malappuram BM 4202-01-201-99 ( dated 10/05/2012 dated

Malappuram District above E/R 4.20 % final bill submitted DR 49/2013-14 dated dated 49/2013-14 DR 56.50 lakhs re-tendered re-tendered 56.50 lakhs Mujeeb N.K,Areacode. EE GO ( Rt) No .837/2012 PWD PWD .837/2012 No ( Rt) GO 13.08.2013 for Rs . 56.50 lakhs . 56.50 lakhs 13.08.2013 for Rs 4202-01-202-91 HS ram 02-91 73 tty THS 016 017 ion Construction of Developers, New biock slab ve E/R ve v /2016 FOR Rs. 230 Rs. /2016 FOR / ss 0160 khsk DT 02/03/2016 DT D uu KK t 55 11 22 oo 2 2 d o 1 h N 29 Building for GHSS a casted, old block Kottappuram lakh FF slab casted 24478 11.02.2 Kond Educat 03-04-2 02-04-2 200 la 230 LA 12 MON Malapp 16.4% abo 4202-01- SE(K)90/2015-16 SE(K)90/2015-16 95/2015-16 dated 13/01 dated 95/2015-16 M/s Kites Engineers and and Engineers Kites M/s GO(Rt)No.152/2015 GO(Rt)No.152/2015 G.Edn.dated13.01.201

Construction of building for GHSS Civil work 30 Nll

Irimbiliyam-3rd completed 30% 8991610 C.Rajeev G.O.(Rt) 10330460 26/9/2015 Education 2015-16 dt 14.01.2016 12 months 100,00,000 phase 23-01-2016 22-01-2017 Malappuram 4202-01-202-91 Work not Started 14.89% above of ER 661/2015-16dtd29/7/2015 No.152/2015/GI/Edn.dated 13.01.2015 for Rs.100 lakhs EE(BM) 57/ PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 10 PWD BUILDINGS DIVISION MALAPPURAM

Construction of Civil work building for Govt. completed, 31 Higher secondary electrical to be Tanur Abdu.K (PRICE) 300lakhs 250lakhs 08.7.2015 Education 12 months 07.07.2016 21140645/- 23233569/- school, Kattilangadi 29-06-2014 tendered Malappuram 4202-01-202-91 9.9% above of E/r above of E/r 9.9% 209/2015-16 dt 12.06.2015 dt 209/2015-16 TVM Dtd 13-01-2015 for RS 13-01-2015 for RS Dtd TVM GO( Rt)no: 152/2015 GL.EDN GL.EDN 152/2015 Rt)no: GO( SE(K) 51/2015-16 dt 30.11.2015 dt 51/2015-16 SE(K)

BUDGET WORK - CONSTRUCTION OF CLASS ROOM GF slab right k BUILDING FOR Govt side shuttering 32 BOYS HIGHER in progress,

H Edn SECONDARY med Rafeeque .T Rafeeque med (B) NC Kozhikkode NC (B) 18154019 16066307 alappuram 016-17 dt 03.09.2016 016-17 o.176/2016/Gl. Edn. o.176/2016/Gl. 18 months left side inthalmanna % Below of ER of % Below 02-01-202-91 29.03.2016 016 Dated:16-02-2016 of of 016 Dated:16-02-2016 0 -01-2016 20000000- eposit wore 22 DD mm rr 5 22 NN 2 SCHOOL 6 MM 4 completed DD Pe 11.5 Moha IN MALAPPURAM DT SE PW Dated:16 GO(Rt) SE(K) 37/ 3329/2015-2

HSE Annual plan d 2014-15 Infrastructure Date Work not

Development of 2016 started, Revised 33 higher secondary 5- plan to be schools Construction 400 Lakh Education Education 12 Months 29.01.2016 03.03.2016 35289985/- 33461964/- Tirurangadi approved. 13-01-2015. Malappuram KT Musthafa 5.18 % Below 5.18 % of Class Room Block 92/201

4202-01-202-91 ) K for GHSS 18.08.2015 16 Dated (

Tirurangadi. E S GO(Rt)No.152/2015/GI Edn dated Edn dated GO(Rt)No.152/2015/GI SE(B) NC KKD /PRICE/885/2015- NC SE(B) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 11 PWD BUILDINGS DIVISION MALAPPURAM

HSE Annual plan 2014-15 7 201 Infrastructure - Development of foundation work 34 higher secondary in progress 22/2016 Vengara

200 Lakh Education Education 18 months ) 28.03.2016 schools. Construction 21123995/- 18470821/- Malappuram K V.Venugopalan ( 4202-01-202-91 SE(B) NC KKD of Class Room Block Dated17.06.2016 E S 16.01.2016 for Rs 200 L 16.01.2016 for Rs for GGHSS Vengara 220 L 17.02.2016 for Rs /PRICE/3374/2015-16 Dated Dated /PRICE/3374/2015-16 GO(Rt)No.176/2016/GI Edn dated Edn dated GO(Rt)No.176/2016/GI

HSE Annual plan 2014-15 d Infrastructure K Development of 7 Date GF slab 201

higher secondary - completed, FF onths Below 016/GI Edn dated Edn dated 016/GI 2082/- 7231/- Lakh for Rs 190 L for Rs cation cation 1-202-91 ppuram 35 3.2016 5.2016 rnadr / /PRICE/3588/2015- r rahman N .2016 for Rs 190 L .2016 for Rs 22 88 00 mm 00 66 uu 00 aa %% 0 0 schools. Construction 016 column work in EE /20 19 Ed 15 31.0 17.0 167 151 of building for Govt: 5 progress Mal 9.98 0

4202- higher Secondary ) Mujeeb K (

School 16.01.201 E Keezhuparamba. S 16 Dated 25.02. 16 Dated GO(Rt)No.176/ SE(K) NC KKD HSE Annual plan 2014-15 Infrastructure Development of Work not higher secondary tendered due to 36 schools. Construction site is not MPM

of class room 75 Lakh Kondotty Education Education hindrance free. Malappuram building for Govt: 4202-01-202-91 higher Secondary School Olavattur 75 L 16.01.2016 for Rs Thadathilparamba GO(Rt)No.176/2016/GI Edn dated Edn dated GO(Rt)No.176/2016/GI 1107/2016-17 dt 24.06.2016 fo EE dt 1107/2016-17 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 12 PWD BUILDINGS DIVISION MALAPPURAM HSE Annual plan 2014-15 Infrastructure Development of higher secondary 37 put on tender schools. Construction 75 Lakh 7016512 Kondotty Education Education 12 months

of class room 04.02.2017 Malappuram

building for Govt: 4202-01-202-91 higher Secondary GO(Rt)No.176/2016/GI Edn GO(Rt)No.176/2016/GI dated 16.01.2016 for Rs 75 L 16.01.2016 for Rs dated School Omanoor 09.01.2017 DT 3753/2016-17

HSE Annual plan

2014-15 t d

Infrastructure 7 1 Development of - higher secondary Finishing work

38 /2016 schools. Construction 7 in progress )0 Manjeri 100 Lakh Education Education 9354493/- 8419044/- 12 Months 26.05.2016 02.02.2016 19.02.2016

of building for Govt: below 10 % M Malappuram o.3024/2015-16 dt dt o.3024/2015-16 202-01-202-91 No.176/2016/GI Edn No.176/2016/GI N 6.01.2016 for Rs 75 L 6.01.2016 for Rs 6 Sasikumaran T Sasikumaran S B ) 44 NN hihigher h SSecondary d ffor (B

Boys Manjeri, EE Reg GO(Rt) Malappuram 1 dated

HSE Annual plan 2014-15 Infrastructure Development of higher secondary 39 put on tender schools. Construction 200 Lakh Education Education of class room Malappuram 4202-01-202-91

building for Govt: 25.01.2016 TVM higher Secondary RegNo.3418/2016 - 17 dt - 17 dt RegNo.3418/2016 13.12.2016 for Rs.200 Lakh 13.12.2016 for Rs.200

Chettiyamkinar dt GO(Rt)No.326/2016/G.Edn 4202-01-202-91(P) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 13 PWD BUILDINGS DIVISION MALAPPURAM

Additional Building CR/48/13 5 1

for GHSS - -14 dtd. Civil & Thirurangadi in 40 15.12.20 electrical work

Malappuram District )39/14

13 for K

224 lakhs completed Education ( 8559605- 18 Months 04.12.2014 03.06.2016 20730396/- 23839955/- Tirurangadi (Provisional list of Malappuram E ed 12.11.2013.

224 lakhs dtd.12.01.2015 S DHSE, TVM) above E/R 15 % 4202-01-202-91(P) M.Ahammedkutty, Vengara M.Ahammedkutty, GO(Rt)No.4781/13/G.Endat

Merged with the work 5 1 Omanoor. Building - Omanoor. for Govt HSS, Building for /2014

41 Omanoor, 5 Govt HSS, )1

Malappuram Dist 38Lakhs 8 months Kondotty

68 lakhs Omanoor, Education 6672158/- 7306013/- 4907840- 20.05.2014 18.07.2014 17.03.2015 30.04.2015 28.04.2015 Malappuram BM 9.50% above 9.50% ( (Phase 2) dtd.18.07.2014 Malappuram DR 81/2013-14 81/2013-14 DR M/s Ansam (India) 4202-01-202-91(P) EE d 27.11.2012 Rs.38Lakhs d (Rt) No.1989/2012/PWD No.1989/2012/PWD (Rt)

e Dist (Phase 1

date and 2) G.O. - 01 - 29 TED

Construction of Class A room building for D Finishing work 42

GHSS in 2016 2016 in progress 11-2015 200 lakhs 17616204 17614443 Education 5-

Malappuram Dt. 31.12.2015 Malappuram 16 MONTHS Perinthalmanna 4202-01-202-91(P) 0.01% BELOW E/R BELOW 0.01% 2015Rs.200.00 Lakh 2015Rs.200.00 2/201 7 ) K ( M. AHAMMEDKUTTY HAJI E S REG:NO.1780/2015-16 DATED 27- DATED REG:NO.1780/2015-16 GO(Rt)No.152/15 G.Edn dated 13-01- dated G.Edn GO(Rt)No.152/15 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 14 PWD BUILDINGS DIVISION MALAPPURAM

Construction of 43 building for GHS completed

Alipparamba 9209989 Education 12483219 12Months 4548466/- 28.02.2014 2014-15 Dt.17.11.2014 Malappuram 12-09-2014 11-09-2015 11-09-2015 Perinthalmanna 35.54% above ER 4202-01-202-91(P) 21.12.2013 Rs97.5Lakhs D.R./85/2013-2014 dated 12.11.2013 Rs.100.00 Lakh Sri. V Abdul Majeed, Edayattur GO(Rt)No.4781/13 G.Edn dated EE(BM)35/ r r ove akhs T 31/12/2013 05 Construction of a 014 ths 3 Rs71Lakhs /2013/Gl Edn 493 oo uram -15 Dt.27.10.14 tiont akhsa 20142 20152 02-91(P)0 bb e ed akba 66 22 nn LL 1 DD 1 a - - d p 2 4 2 44 building ildi for f GHSS L CldCompleted Wand

Pullangode 7825 Educa 8 Mo 10352 8.13 L 40% a 28.02. Malapp 04-11- 04-09- Rs81.3 Mohamm 4202-01-2 dated 12.11.201 GO.(Rt)No.4781 DR 84/2013-14 EE (BM) 29/2014

Malappuram. Civil & Building for Govt 45 electrical work Boys HSS, Nil

completed, 7987189 Education Education 12 months 115 Lakhs completed 30-07-2013 Malappuram 26-12-2013 25-12-2014 25-12-2014 Malappuram Malappuram 2013Rs115L 10467811.00 11928071.00 13.95% above 13.95% 16.02.2012Rs100L 4202-01-202-91(P) CR/12/2013-14 dated 23-09- dated CR/12/2013-14 SE(K) 01/14-15 dt 05/05/2014 dt 01/14-15 SE(K) G.O. (Rt) No.241/2012/PWD dated dated No.241/2012/PWD (Rt) G.O. M/s: DYBRO Construction, Pannippara Construction, DYBRO M/s: PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 15 PWD BUILDINGS DIVISION MALAPPURAM

Construction of Civil work school building for . completed, 46 Govt Rajah's HSS 150L 228 L electrical work Kottakal 18months Education Education 20080453 24478073 31-1-2015 01.09.2015 Kottakal in MLPM 31-02-2017

Malappuram on going 21.9% above E/R 21.9% 12.11.2013Rs228L 4202-01-202-91(P) GO.(Rt)No.4781/2013/Gl Edn dated Edn dated GO.(Rt)No.4781/2013/Gl SE(K) 53/2015-2016 Dated 04-12-2015 Dated 53/2015-2016 SE(K) M/s Malickkal constructiion, Vergara.P.O constructiion, Malickkal M/s REG:NO:CR/02/2014-2015 Dtd 27-05-2014 for Dtd REG:NO:CR/02/2014-2015 Rs240 lakhs (PRICE) of SE PWD (B) North Circle Circle North (B) PWD of SE (PRICE) lakhs Rs240 16 00

Consruction of DR- building for Seethi 90/2014 Agreement 47 Haji memmorial -2015

Ernad executed GHSS at dtd-31- 12months Education 9432512/- 24%above 98.00 lakhs 11696315/- Malappuram Kunduthodu 03-2015 4202-01-202-91(P) 26-02-2016( Re-tender) V.P Mohammed Ayoob dated TVM 13/01/2015 Go(Rt.)No.152/2015/G l edn EE(BM)46/2016-17 dt 09.09.2 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 16 PWD BUILDINGS DIVISION MALAPPURAM - 02 HSE Annual plan - 19 Intermediate 2014-15 d Infrastructure retaining wall Development of Date works 48 higher secondary

2016 completed, 2016

schools (Works) - 5-

154 lakhs right side Education Education 18 Months 02.02.2016 13434810/- 12642156/- 13-01-2015. Malappuram VMC Govt. HS /201 shuttering for 5 4202-01-202-91(P) 5.9 % below of E/R school ,Wandoor 8 slab in progress )

,Malappuram DT. K Sri: Mohammed safarulla kk ( E S GO(Rt)No.152/2015/GI Edn dated Edn dated GO(Rt)No.152/2015/GI SE(B) NC KKD /PRICE/2458/2015- NC SE(B) 16 Dated 11-01-2016 RS 154/- Lakhs 154/- 11-01-2016 RS 16 Dated

Budget work 2015- 16:- HSE Annual New block

r Plan 2015-16 - earth work Construction of class excavation puram 3075 6977 .2016 obakaer below onths /2016/G.Edn dt 3/2015-16 dt 202-91(P) mbu r Rs. 200 Lakh 17 dt 03.07.2016 SE KKD for rs. Lakhs L Lakhs cation cation c get 2015-16 get g

49 pp 33 66 -- 33 -- oo aa 66 22 oo 0 f u mm d rooms fGtfor Govt. %% startettdd, second Nil Edu 181 156 18 200 5000 Higher Seconday 08.0 Mala block column 13.6 School, Sri.Ab work started. 4202-01 State Bud Pookkottumpadam. Reg.No. 36 25.01.2016 f 26.02.2016 of GO(Rt) No.32 SE(K) 32/2016 t d Construction of first 16

floor to the Higher 5- Secondary class room Plastering 50 building GHSS work started )80/201 Manjeri 4968060 4366925 10.01.17 Education Education 02.03.2016 02.02.2016 19.02.2016 10 months Karakkunnu in 54.00 lakhs Malappuram 11-03-2016 Sulfikarali.N BM

Malappuram District ( 4202-01-202-91(P) 12.1% below of ER EE 3027/2015-16 (PRICE) dt dt (PRICE) 3027/2015-16 dt TVM16.01.2016 for 54 L TVM16.01.2016 dt GO(RT) No.176/2016 /GL Edn /GL No.176/2016 GO(RT) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 17 PWD BUILDINGS DIVISION MALAPPURAM Budget work 2015- 16:- HSE Annual Plan 2015-16 - Infra structure devolopemnt -

2016/G.Edn dt TS estimate 51 Construction of class submitted to SE roomsBuilding for Education Education 200 Lakhs Malappuram Malappuram Govt. Boys Higher TVM 03.05.2016

Seconday School, 4202-01-202-91(P) Malappuram at Kottappadi. GO(Rt) No.973/ 4202-01-202-92 (P) - 01 5- 1

d t d 5 1

Construction of s50Lakhs Civil & - 3.00 lEdn dated dated lEdn ove E.R 2-92- (P) uram 5 ada tion khs 21/- dt30.05.2014 20142 20152 20152 ed Kutty Haji nths n 4 RR 10.00 44 1 bb aa 00 aa - - - pp 11 kk 1 GG o

52 bu ilding f or GVHS, GVHS m ElElectr ti cal work Makkaraparamba 20 completed 50 L Man 8 Mo Educ 34621 09-10- 08-06- 22-04- 45962 55904 Malap 42/2014

) 21.63% a 21.63% 4202-01-2 30.10.2013 BM ( No.4583/13/ DR 2/2014-15 2/2014-15 DR Sri. M Ahamm EE PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 18 PWD BUILDINGS DIVISION MALAPPURAM

Special fund - Construction of building for Govt Civil work 53 boys higher completed 100lack Manjeri 12months Education Education secondary school 9354493/- 8419044/- Malappuram 100.00 lakhs 100.00 lakhs 10% below E/R below 10% Manjeri 19-2-2016, 4202-01-202-92- (P) Sasi Kumaran . T Payyanadu (P.O) Sasi EE(BM)07/2016-2017dtd-26-05-2016 M/2015-2016/2015/1433 ofEE PWD(Bn)Dvn MLPM MLPM ofEE PWD(Bn)Dvn M/2015-2016/2015/1433 Reg.No 3024/2015-2016 dtd02-02-2016 TS order TS dtd02-02-2016 3024/2015-2016 Reg.No Go(Rt.)No.176/2016/GI.Edn.dated 16-01-2016 Go(Rt.)No.176/2016/GI.Edn.dated G PP TS No.ML

4202-01-202-93 5 1 - Civil & Construction of 54 Electrical work Tirur )21/2014

GMLPS Cheruvannur 487/2013/

29 lakhs completed 8 months o. Education 3425561/- 2836576/- 3777752/- 19.03.2014 16.08.2014 Malappuram BM N 33.18% above 33.18%

( for Rs 29 lakhs dtd.30.08.2014 4202-01-202-93 EE DR/60/2013-14 dated dated DR/60/2013-14 (Rt) PWD dated 03.03.2013 dated PWD . O 20.08.2013for Rs.30,70lakhs . V.Venugopal, (po)Kurumpathur V.Venugopal, G PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 19 PWD BUILDINGS DIVISION MALAPPURAM 5 1 - Construction of work additional block for 55 completed, no Tirur class rooms for )24/2014 16 lakhs

6 months electrical fund Education 1683814/- 2093823/- 25.02.2014 GLPS, Thekkummuri. 22-10-2014 21-.04-2015 Malappuram BM 24.35% above 24.35% ( dtd.13.10.2014 4202-01-202-93 GO(Rt)487/2013/ K.V.Mohammedali EE DR/47/2013-14 dated dated DR/47/2013-14 13.08.2013for 17.26 lakhs PWD dt.30/3/13 for16lakhs dt.30/3/13 PWD /

Construction of Civil & 56 Office Room for Electrical work Tirur lakhs above of ER dt.30/3/13 t)487/ 2013 t)487/ months 272/65 ducation 5 lakhs -.05-2014 13-14 dtd 19.05.2014 13-14 dtd alappuram a or 5 lakhs 2-01-202-932 9.11.2014 9 P P)41/2013-14 P)41/2013-14 2 GS,vuGMLPS, Paravannur .75 2013 for Rs.5 comcop peedleted 567616/- 666949/- sa,(po) Melmuri sa,(po) 5 6 DD s 66 %% RR 00 ffo EE 0

2 3 MM 420 PW GO( SDR( 17.50 K.Moo dated 30.08. dated AEE(P)05/20 5 1 - Work Construction of Class completed, no 57 Room for GLPS, Tirur lakhs )23/2014 fund for

Thekkenkuttur 11 lakhs 6 months Education 1169897/- 1074410/- 1380617/- 25.02.2014 21.04.2015 22-10-2014 GO(Rt)487/ for 11 lakhs Malappuram BM 28.5% above 28.5% electrical ( dtd.13.10.2014 4202-01-202-93 DR(P)77/2013-14 K.V.Mohammedali. EE 2013/PWD dt.30/3/13 2013/PWD dated 13.09.2013for Rs.11.15 13.09.2013for Rs.11.15 dated PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 20 PWD BUILDINGS DIVISION MALAPPURAM

Work Construction of completed, 58 GUPS Klari electrical to be 274/77 125 lakhs Education 9305592/- 12 Months 07.04.2014 06.04.2015 17.12.2014 12515725/- 11196832/- Tirurangadi Malappuram

Rs.125Lakhs retendered SE(K)15/2014 4202-01-202-93 12.8% above E/R 12.8% dated 30.03.2013 30.03.2013 dated CR/17/2013-14 dated dated CR/17/2013-14 25.01.2014 for 110 lakhs K.Manikandan, K.Manikandan, GO.(Rt)No.487/2013/PWD GO.(Rt)No.487/2013/PWD

GF, FF finishing Construction of work in 59 class room for progress, KMBR 274/78 05.12.14

400 lakhs excemption to be 46516698 12 months Education 01.09.2015 31.03.2016 09.10.2013 34662219/- Tirurangadi GUPS Trikkulam 34.2% above Malappuram obtained. 4202-01-202-93 )27/2015-16 dtd.26.08.2015 )27/2015-16 O.(Rt)No.487/2013/PWD O.(Rt)No.487/2013/PWD ed 30.03.2013 Rs.400Lakhs ed e el Industries Limited. Kerala Industries el e .No.25/CE/Bl/2013-14 dated dated .No.25/CE/Bl/2013-14 . t KK e g GG dat Ste Reg SE( 5- 0 7- 0

d t d

Construction of 16 finishing work 60 building of a 5-

2015 in progress /201

Govt.LPS Mankada 8723919 Mankada 10276777 Education 10 Months 7 95.00 Lakh 16-05-2015 15-03-2015 Malappuram 0

4202-01-202-93 ) 17.8% above ER 17.8% BM Dasan M P, Kozhikkode M P, Dasan ( DR 1/2014-15 dt 9/5/2014 dt 1/2014-15 DR dated 11.7.2013 Rs 95 lakhs 11.7.2013 Rs dated GO(Rt) No. 2859/2013/Gedn 2859/2013/Gedn No. GO(Rt) EE 4202-01-202-93(P) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 21 PWD BUILDINGS DIVISION MALAPPURAM : d t d

Construction of 5 work completed, School Building /201

61 7 electrical to be

Tirur GMLPS )6 arranged 30 lakhs 8 Months Rs.30 Lakhs Rs.30 12.02.2016 02.02.2016 29,58,914/- 28,95,298/-

Malappuram Valavannur 2.15% below 2.15% BM ( 4202-01-202-93(P) EE K.V Divakaran, Divakaran, K.V dated 31.07.2014 dated GO.(Rt)No.3027/2014/G.Edn. GO.(Rt)No.3027/2014/G.Edn. for Rs.30 Lakhs for Rs.30 2323/2015-16 dtd: 04.01.2016 dtd: 2323/2015-16

GF Construction of superstructure High School completed

61 lakhs Dated:22-02-2016 .Edn. Dtd.04.08.2015. ndotty 6 dtd 17.05.2016 16642 elow E/R M Months o. , Kozhikode o. Ramanattukara, o 03.2016 2 0 0 0 232949 05.2016 05.2017 a appuram 66 1-202-93(P) 1 00 1 55 oo b Building in GG and FF slab C 9 10 K 12 27. 26. 31. 11 Mal GVHSS, Kondotty 7% b shuttering in

4202-0 progress. SE(K)03/201 3480/2015-201 M/s S K Construction C Construction K S M/s GO(Rt)No,3224/2015/ PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 22 PWD BUILDINGS DIVISION MALAPPURAM

Construction of class room, kitchen block, compound TS Estmate wall, drainage at 62 submitted to Cherur Govt: Vengara Education

315 Lakh SE Malappuram Mappila UP Lakh Rs.315 Budget 2016-17 Budget

School. 4202-01-202-93(P) Kannamangalam. G.O (Rt) No.3365/2016/G.Edn dated TVM TVM dated No.3365/2016/G.Edn (Rt) G.O 14.10.2016 of General Education (P) Dept for Dept (P) Education 14.10.2016 of General

4202-01-202-99 f

Cheriyamundam. Construction of 18 classrooms Plus-2 Civil and block for Govt.

63 Electrical work 1 1000 Tirur Higher Secondary 47/231 completed. 14300000 18536837 Education 12 months

School at 05.07.2010 04.07.2011 Malappuram Rs.125 lakhs Rs.125 Ele. 18,74,298 Ele. Rs.14.35Lakhs 35% above ER 35% Ele - 13,88,369 Ele in 4202-01-202-99 Civil - 1,25,23,269 Civil - 1,69,06,413 Civil Malappuram District the CE (Bldg), Trivandrum Trivandrum (Bldg), CE the Sri V.Mohammed, P.O. Kodur V.Mohammed, P.O. Sri G.O (Rt) No.1048/09 /PWD dtd. dtd. /PWD No.1048/09 (Rt) G.O SE(K) 15/2010-11 dtd.30.06.2010 15/2010-11 SE(K) 14.7.09 of PWD (G) Department for Department (G) 14.7.09 of PWD 123/CE/B&LW/09-10 dtd. 31.12.09 of dtd. 123/CE/B&LW/09-10 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 23 PWD BUILDINGS DIVISION MALAPPURAM

Tanalur. Constructionof 21 Civil and class room building 64 Electrical work at Govt Devadar HSS Lakhs Tanur 66640

110 lakh completed. 11330190 11330190 Education 10 months 25.08.2012 25.06.2013

in Grama Anil Kumar Malappuram Estimate rate Rs126.5Lakhs Panchayath. 4202-01-202-99 G.O(Rt)No.852/2011/HIGHER G.O(Rt)No.852/2011/HIGHER SE(K)31/2012-13 DT 22.08.2012 DT SE(K)31/2012-13 25/CE/BL 2012-13 DT 16.05.2012 2012-13 DT 25/CE/BL EDUCATION Dated 01.03.2011 Rs 110 01.03.2011 Rs Dated EDUCATION 4202-01-203-87 - 11 - Edn. s. 200 L s. 24

ed puram 44 tt HH RR dd p

CollegiateCollegiate Ed Educationucation - 7

Annual plan 2013-14- ate finishing work in d Construction of progresss, 65 16 5- 90% 2015 200L library complex at electrical to be 150L 12.20% 12months 16597642 18622554 Education Education 18-06-2015 Govt College 17-09-2015 16-03-2017 arranged Malappuram Malappuram 4202-01-203-87 48/201

Malappuram 09-01-201 Dated

) 1st part bill submit K ( E V.Mohammed Malapp V.Mohammed G.O (RT) No. 53/2014/ No. (RT) G.O S 135/2015-16 dt 23-5-15 dt 135/2015-16 4202-01-203-99 5 1 - Construction of Civil Work

Hostel building for /2014 completed,

66 5

girls in PTM college )3 electrical to be Education 18 Months 21.12.2013

Perinthalmanna 22-01-2015 21-04-2016 retendred Malappuram BM 13796558.00 17162918.00 Dt.17.11.2014 ( Perinthalmanna 4202-01-203-99 24.4% Above ER Above 24.4% EE P. Ahammed kutty Vellila D.R./85/2013-2014 dated dated D.R./85/2013-2014 G.O. (Rt) No.356/2013/PWD No.356/2013/PWD (Rt) G.O. dated 14-03-2013 Rs.150Lakhs dated 4202-02-103-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 24 PWD BUILDINGS DIVISION MALAPPURAM

d ate d 5 Construction of 201

- Civil & building for Govt 67 electrical Work Tehnichal High

Manjeri completed 10 month 10 month 11544021 Education Education 02.09.2014 02.07.2015 21/08/2013 16/12/2014 27-05-2014 School Manjeri 02-11-2015 14-09-2015 34/2014 Malappuram 150.00 lakhs 150.00 lakhs 12149318.00 13971716.00

) 4202-02-103-99 K ( 20.01.2014 for 135 lakhs 20.01.2014 for 135 lakhs E Reg No . CR/37/2013-14 dt dt . CR/37/2013-14 No Reg S Sasi Kumaran .T,, Payyanadu. Kumaran Sasi Go(Rt.)No.1725/2013/H. edn dated edn dated Go(Rt.)No.1725/2013/H. 4202-02-104-99

Construction of Electronics Block for L 5Rs319L L (Rt) (Rt)

Government womens dated /H.Edn / submitted to SE -104-99- akala ation ation a puramp 99 1 t 0 5 68 c 2 Polytechnic, for TS 50 31 Kott Educ Kottakkal in G.O. Malap

Malappuram district 4202-02 11-07-201 No.1773/2015

Construction of compound wall, water tank platform, borewell and 69 `finishing stage provision of interlock 20L 20.50 L 20.50 L 8 months Kottakal Education Education 1947338/- 1939549/-

tiles for the staff 19-02-2016 20-04-7210 Malappuram 0.4% below ER below 0.4% 4202-02-104-99

quarters of Kottakkal educationRs20.5L Mohammed Kutty P.K Mohammed Kutty

Polytechnic Directorate of technical D4/37632/14 dt 07/05/2015 of 07/05/2015 dt D4/37632/14 EE(BM) 01/2016-17 dated 20-05-16 dated 01/2016-17 EE(BM) DR/2226/2015-16 dt 29.12.2015 for rs 29.12.2015 for rs dt DR/2226/2015-16 4202-02-105-96 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 25 PWD BUILDINGS DIVISION MALAPPURAM t d

Construction of 5 1 G.H.S.S building at - Civil & Pookkottumpadam in 70 /2014 electrical work 7 )2 Rs. 90 L Rs.

completed 2649328 8 months Nilambur Education Education 27.11.2013 20.102.014 26-07-2014 26-09-2014 Constituency. (2012- 29-10-2013 Rs. 8348541 Rs. Malappuram Rs. 10257017 Rs. BM Excess 22.86% Excess 4202-02-105-96 ( 13) 26.11.2012 dated EE DR/34/13-14 dt 03.08.2013 dt DR/34/13-14 GO(Rt) No. 1973/2012/PWD 1973/2012/PWD No. GO(Rt) ASHTEC Contractors Pvt. Ltd., Contractors ASHTEC 4202-02-202-93

Construction of building for GUP 71 GF slab casted () Months dated s 100 lakhs 100 s ondotty udheen kp udheen 210933/- 015 Dtd 29-12-2014 29-12-2014 015 Dtd lappuram -02-202-93- 5 (RE-TENDER)5 School,, .08.2014 2014 G.Edn 2 00 lakhs 0 % % above E/R % above D(B)DvnD for MLPM d 1 ducation 16-17 dtd 20-05-2016 16-17 5 540537/- rr 55 / 2 a 2 RR 1 2 1 2 9 KK 1 E 12 22 Ma Chaliapuram. Nu for 4202 27.99 3371/ 21-05-201 of the EE PW the of DR/48/2014-2 EE(BM)03/20 4202 - Education

Construction of Hall cum Cllass Room Block for finishing work 72

Government UP KKD in progress Vengara 165 lakhs Education 12 months 05.03.2016 04.03.2017 11.02.2016 School 14943300/- 14001872/- Malappuram 4202-Education

Mundothuparambu E/R below 6.30% Sri.M Ahammed Kutty Haji Reg No.2774/2015-16 dated dated No.2774/2015-16 Reg 04.08.2015 of Rs.165,00,000/- GO(Rt)No.3229/2015/G.Edn. Dtd Dtd GO(Rt)No.3229/2015/G.Edn. 22.01.2016 for Rs.165/- lakhs of SE of SE lakhs 22.01.2016 for Rs.165/- SE(K)89/2015-2016 dated 01.03.2016 dated SE(K)89/2015-2016 4210-03-101-86 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 26 PWD BUILDINGS DIVISION MALAPPURAM

Construction of examination hall on the first floor of Civil work Vaidyaratnam P.S. completed, 73 50L Varriers Kottakkal electrical work 80% 8971114 9868225 Kottakal 12months Education Education 1.00 crore 10% above 10% 29-09-2015 28-09-2016 Ayurveda College at 28-07-2015

Malappuram on going 100L (PRICE) Kottakkal in 4210-03-101-86

Malappuram district 1st part bill submitted dated 0410312014Rs100L dated CSN issued on 28.09.2015 issued CSN Go(Rt) No.783/2014II{&FWD No.783/2014II{&FWD Go(Rt) 2015 - 16 - 2014 - 15 - 1613 for Sri.N.Ganeshan PWD Contractor PWD Sri.N.Ganeshan 4059-01-051-86

Constructing building civil & electrical onths .- /Bldgs/2014-15 /Bldgs/2014-15 7839/- 7855/- dtd.24.04.2015 for 325.00 Lakh above cation lakhs 1-051-86 ppuram 3.2015 9.2016 8.2016 74 for GVHSS (Boys) Dt. 0/2012/PWD 1.2014 ngara ontractor, Vengarao 12 Rs.320.00 Lakhs 12 Rs.320.00 1 77 44 66 mm 44 EE uu 00 aa e 00 0 0 0 4 1 work completed %% C

Ve Vengara 30 Ed 18 27 27.0 26.0 10.0 06.1 287 365 Mal 4059- SE(K)3/15-1 Reg No.14/C Reg dtd.12.08.201 GO(Rt)No 214 GO(Rt)No Susanth, PWDC Susanth, TVM 24-12-20 TVM

Work Construction of class Completed, 75 room for GUPS electrical and Vengara

Cholakkundu 132Lakh electronics to be 18months 13339315 Education 19.12.2014 11010684/- Malappuram Rs.132Lakhs 11.03%above started. 4059-01-051-86 dated 24.12.2012 24.12.2012 dated CR/04/2013-14 dated dated CR/04/2013-14 M.Ahamed kutty, Maliyekkal GO.(Rt)No.2138/2012/PWD GO.(Rt)No.2138/2012/PWD Tvm Bldgs 26.07.2013 of CE SE(K)2/14-15 dtd.08.05.2014 SE(K)2/14-15 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 27 PWD BUILDINGS DIVISION MALAPPURAM

Construction of civil & buildings for electrical 76 Govt.Mappila UP Work Vengara 05.01.16 18 Months 18 Months Bldgs Tvm Bldgs Education 09.09.2013 19.05.2014 School, Cherur 26407195/- 31020532/- Rs.290Lakhs Malappuram 25.01.2014 18.11.2015 Completed

Kannamangalam 4059-01-051-86 Dt. TVM 24-12-2012 24-12-2012 TVM Dt. 14 dated 10.06.2013 of CE CE of 10.06.2013 14 dated 17.47% above estimate rate estimate 17.47% above GO(Rt)No 1973/2012/PWD 1973/2012/PWD GO(Rt)No Register No.07/CE/BL/2013- Register A.M.Mohammedali, Manjeri. A.M.Mohammedali, SE(K)39/13-14dtd.020.02.2014 HEAD OF ACCOUNT NOT MENTIONED L

Budget work - 2013- s 5 for Rs.57.50Lakh 2.09.2014 for Rs. 50.00 2.09.2014 for Rs. medm mm .2017 5 5 ss ve v 1-861 aa hh 1

14- Construction of 00 a 0 5 h building for m Agreement 77 Govt>Ayurveda executed Vengara 5596630 6318595 Ayurved 10 month 18.04.201 Dispensary at 50.00 lak Malappura 12.9% abo 12.9% T.Kunhaham in MPM dist 4059-01-05 DR/57/2014-15 dt 23.01.201 dt DR/57/2014-15 GO(Rt) No. 1245/2014/PWDdt 1245/2014/PWDdt No. GO(Rt) EE9BM) 69/2016-17 dt 03.01

Revised estimate Construction of submitted for AS 78 School Building for

Tirur returned to AE

GLPS Annara 30 lakhs Education for correction. Malappuram

Balance work of 3rd Estimate floor of new building 79 submitted for AS and Toilet Block at Tanur on 01.11.2013 Education Devadhar School Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 28 PWD BUILDINGS DIVISION MALAPPURAM Construction of new Estimate block for GMUP 80 submitted for AS School, Meenadathur Tanur on 22.08.2014 160 lakhs Education in TanalurGP Malappuram Construction of building for Devadhar to be done new 81 Govt.Higher master plan Tanur secondary Education Malappuram school,Tanalur Gramapanchayath Construction of building for Devadhar Estimate under 82 preparation Tanur Govt.Higher 200lakhs Education secondary Malappuram school,Tanalur GP mm nn a Construction of Estimate to be 83 GHHSS Kattingal submitted Tanur Building Educatio Malappura

GHSS Devadar, Estimate to be 84 Tanur Building submitted Tanur Education Malappuram

land GHSS 85 conversation not Building Tanur done Education Malappuram

Meendathur GHS Estimate to be 86 Buildings submitted Tanur Education Malappuram Estimate under Niramaruthur GHSS preparation for 87 Building first floor of Tanur

Education existing building Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 29 PWD BUILDINGS DIVISION MALAPPURAM 55 2

Construction of

nnexure-II Page nnexure-II Page Additional Block for Estimate

88 A GMHSS submitted for AS -I Tirur l

Sl.No.33 Kalpakanchery in on 24.09.2013. Education 150 Lakhs Malappuram . vo MLPM Dst. 14 - 2013 get- d u b

Construction of New Block for Govt.GHS Estimate Puthuparamba in 89 submitted. AS Malappuram District - not obtained 180 lakhs Education

Tirurangadi Provisional list of Malappuram DHSE, TVM-2013-14

Construction of Estimate 90 Building for GHSS Submitted for Kottappuram A.S. 96 Lakhs Kondotty Education Malappuram

GMLPS Estimate to be 91 Kanjirathinkal, submitted. Kondotty 50 Lakhs Kondotty Education Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 30 PWD BUILDINGS DIVISION MALAPPURAM Estimate submitted to Director,HigherS Construction of econdary 93 Building for GHSS Education Peruvallur. videletter Education 230 lakhs Malappuram No.CE/BL/PL3/ MLPM/PR/2545 dtd 19 09 2015 Constructing building Estimate 94 for GMUPS submitted for AS

Vengara Kolappuram 18.06.2014 Education Malappuram

Construction of Estimate 95 building G.G.H.S.S submitted for AS

Vengara ,Vengara Block-I 200 lakhs Education Malappuram m ss nn Construction of aa a estimatei building for Otism 96 submitted for AS centre at GUPS

Vengara on 27.11.2013 175 lakh Educatio Valiyora Malappur

Construction of Estimate 97 building for submitted for AS

Vengara GLPS Kilinakkode on 01.07.2015 Education Malappuram

Construction of Estimate 98 building for G LPS submitted for AS

Vengara Edakkaparamba on 23.06.15 Education Malappuram

Construction of Estimate 99 building for submitted for AS

Vengara GLPS Nottampuram on 06.07.2015 Education Malappuram Construction of Estimate building for stage 100 submitted for AS cum class room at

Vengara 20.05.14 14 lakhs Education GLPS Iringallur Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 31 PWD BUILDINGS DIVISION MALAPPURAM Land not Construction of available 101 building for AEO included in Mini

Vengara Office Vengara Civil Station, Education

Malappuram Vengara

Constrction of Land not 102 building for GLPS available LSGD

Vengara Padapparamba work in progress Education Malappuram Construction of Estimate building for 103 submitted for AS Government GHS,

Vengara on 29.12.2014 300 lakhs Education Kuruka in Vengara Malappuram

GMUP School am a 16 ) hsh G.Edn dt dt G.Edn G on o rr rr / 0 k Cheroor-Kitchen, T Estimate 104 Dinning, Class room submitted for TS Venga GO(RT Educati 315 lak

and Compound wall. 14.10.20 Malappu No.3365/2016/

Construction of laboratory block for Estimate Government Higher 150 submitted 105 150L Secondary School at L through PRICE Vengara Education Education Othukkungal in for TS Malappuram Malappuram district Budget work of 2015- 16 Construction of GLP School Kodalikundu at Estimate 80 L Oorakam Panchayat submitted to AS

Education Education in Vengara VENGARA Malappuram

Page 120,No:17 Page Constituency at 106 Malappuram Dist FINANCE DEPARTMENT PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 32 PWD BUILDINGS DIVISION MALAPPURAM

Functional Improvements to Sub 107 requirement not Treasury Tirurangadi

Finance obtained 200 lakhs Tirurangadi Malappuram FIRE & RESCUE DEPARTMENT 4059-01-051-86-16

Tirur. Construction of new building for 108 Completed. Fire 1000 Tirur fire and rescue lakhs 47/228 178 lakhs 18548743 23835135 25860430

Station,Tirur 25.11.2011 25.08.2012 Malappuram 28.5 % above ER 28.5 % K.Abdu, Kottakkal K.Abdu, 4059-01-051-86-16 54CE/B&LW/10-11 dated dated 54CE/B&LW/10-11 12.7.2010 for Rs.178 lakhs 12.7.2010 for Rs.178 G.O.(Rt) No.1184/09/PWD G.O.(Rt) dated 14.07.2009 for Rs.178 14.07.2009 for Rs.178 dated SE (K) 30/2011-12 dtd. 16.11.11 dtd. 30/2011-12 (K) SE HEAD OF ACCOUNT NOT MENTIONED

Land not 109 Fire Station, Vengara Fire available Vengara GO(MS) 25.01.2016 Malappuram 26/2016/Home dt dt 26/2016/Home

Budget work 2015- 16 Construction of Estimate 110 Fire and Resque submitted for AS Manjeri station. Manjeri Malappuram 248.00 lakhs 248.00 lakhs Fire & Rescue GENERAL EDUCATION DEPARTMENT 4202-01-202-92- (P) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 33 PWD BUILDINGS DIVISION MALAPPURAM

Construction of 03-15 for Rs. 50

nadu (P.O), Manjeri. civil & building for Govt 111 electrical work

Tehnichal High lakhs

Manjeri completed 10 months 14% above 16/10/2014 50.00 lakhs 08-07-2015 11-09-2015 10-07-2016

School Manjeri 4484945.00 Malappuram 4202-01-202-91 ( p) General education (SC) Department Go(Rt.)No.4213/14 Gl edn dated TVM DT/79/2014-15 dated 30- Sasi Kumaran . T Payya HIGHER EDUCATION DEPARTMENT 4202-01-203-964202 01 203 96

d ate d

Tirur. Construction 11 112 of staff quarters in - Completed. Tirur 53000 H Edn 363/111 95 lakhs

Govt.college,Tirur. 9382405 11728006 12282363 )40/10 08.12.2010 15.12.2010 14.10.2011 Malappuram K 25 % above ER 25 % 4202-01-203-96 ( E S dt 30.07.09 Rs.95 lakhs 30.07.09 Rs.95 dt 03.05.2010 Rs.103Lakhs Sri K.Abdu, K.Abdu, Sri 11/CE/B&LW/2010-11 dated dated 11/CE/B&LW/2010-11 GO (RT) No.1164/09 /HEDN /HEDN No.1164/09 (RT) GO 4202-01-203-99

Perinthalmanna. Construction of staff civil & 113 quarters at PTM electrical work Lakh 11000 H Edn 357/23 College

4 Months completed 21450055 28957574 14877977/- 23-05-2013 22-09-2014 29-01-2015 1,50,00,000 Malappuram Perinthalmanna. SE(K)09/13-14 SE(K)09/13-14 Perinthalmanna 4202-01-203-99 Ahammed Kutty 31/CE/BL/11-12 dtd. dtd. 31/CE/BL/11-12 ed 18.02.2010 for Rs 205 ed 18.02.2010 for Rs .06.2011 Rs.235.75Lakhs . (Rt) No.2394/2010 H.Edn H.Edn No.2394/2010 . (Rt) t 0 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 34 PWD BUILDINGS DIVISION MALAPPURAM

Perinthalmanna. Construction of buildings for depart Work ment and providing completed, 114 2013 2013 infrastructure lakhs electrical to be H Edn 10904442 14393863 24/5/2014 10 Mpnths

facilities at PTM 25/07/2013 retendered Malappuram 32% above ER 32% Perinthalmanna college 4202-01-203-99

Perinthalmanna. KT, Arecode. Musthafa SE(K)13/2013-14 dtd 16-07- dtd SE(K)13/2013-14 GO.(Rt)No.553/2012/H.Edn GO.(Rt)No.553/2012/H.Edn SE(K)13/2013-14 dtd 16-07- dtd SE(K)13/2013-14 dated 16.03.2012 for Rs 106.5 16.03.2012 for Rs dated 4202-02-103-99

Nannamukku. -99 17.12.2011 m Dept. (J) ducation . 07.09.2011 for 1 2 0 ER HEdn. Dated H akha tooly. tooly. t hs. h 44 44 33 / dd l i aa e dd 9 1 1 0 EE o CConstruction t ti of f k 115 Building for THS, Completed. 369/6 10000 H Edn

Nannamukku. 1614909 1737642 1731481 21.12.201 20.12.201 360,00,00 Malappur (KOKKUR)) lak Rs.184 for Rs.160 l for Rs.160 7.6 % above 7.6 % 4202-02-10 K.Harish , Ko K.Harish SE(K)39/11-12 date SE(K)39/11-12 G.O.(Rt) No.1424/09/ G.O.(Rt) 67/CE/BLDS/2011-12 dt 67/CE/BLDS/2011-12 09.09.2009 of the Higher Higher 09.09.2009 of the 4202-02-104-98

Construction of Administrative Cum Office Block for TENDER 116 AKNM Government APPROVED H Edn Polytechnic College, 1085 lakhs Vallikkunnu Malappuram CE Bldgs TVM Bldgs CE 4202-02-104-98 Tirurangadi. 30.06.2015 dated Reg No. 3235/2015-16 dt dt 3235/2015-16 No. Reg G.O(Rt)No.1641/2015/H.Edn. G.O(Rt)No.1641/2015/H.Edn. 11.02.2016 for Rs. 1085 Lakh of 11.02.2016 for Rs. PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 35 PWD BUILDINGS DIVISION MALAPPURAM

12

Thirurangadi. - MHRD. Construction Civil and 117 of Ladies hostel at Electrical work Lakhs H Edn )29/2011

Polytechnic,Thirurang 150 lakh completed. 12368048 12961714 15248817 K Vallikunnu 25.11.2011 24.11.2012 16.11.2011 Malappuram (

adi. K.Manikandan 4.8% above ER 4.8% E 4202-02-104-99 S G.O(Rt)No.1922/2010 G.O(Rt)No.1922/2010 27.06.2011 Rs.150Lakhs Dated 04.10.2010 Rs 150 04.10.2010 Rs Dated No.23/CE/BL/11-12 Dated Dated No.23/CE/BL/11-12

d Perinthalmanna. ate d Cunstruction of work 11

Library for - completed, 118 Polytechnic electrical to be H Edn 376/58 234000 5321418 5794492 2526067 Mankada 53,00,000 )33/10 22.06.2012 21.12.2012 College,Perinthalman 25.11.2011 arranged Malappuram K.T.Musthafa K 4202-02-104-99 ( na. above ER 8.89% E S 28.06.2011 Rs.53Lakhs .O(Rt) No.1869/09 dated dated No.1869/09 .O(Rt) 28/CE/BL/2011-12 dtd. dtd. 28/CE/BL/2011-12 2 2.11.2009 for Rs.53 lakhs lakhs 2.11.2009 for Rs.53 2 1 GG 7- 0 7- 1

d Construction of t d waiting room for Civil and 13 119 Girls in Polytechnic - Electrical work 2012 H Edn

College , 1189548 1468858 completed. 4 months Mankada 24.07.2012 23.11.2012 150,00,000 27-12-2013 4/2012 Malappuram Rs.150Lakhs

32% above ER 32%

Perinthalmanna ) 4202-02-104-99 BM ( AS NoD4/10456/2011 dt dt NoD4/10456/2011 AS K.T Musthafa, Areakode. K.T Musthafa, 27/07/2011 for Rs. 150 Lakh for Rs. 27/07/2011 EE DR3/2011-12 dated 22/07/2011 22/07/2011 dated DR3/2011-12 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 36 PWD BUILDINGS DIVISION MALAPPURAM - 01 - 19

Construction of Civil TED- A Masonry and

Block in Govt. D 120 finishing work 16 2015 Polytechnic College, 2016 250 L H Edn 5-

Mankada in progress 23693529 23314432 12 months 11.06.2014 23-06-2015 Perintalmanna. 27-01-2016 26-01-2017 Malappuram 1.6%Below E/R 1.6%Below 4202-02-104-99 M Kunhimuhammed )68/201 K ( GO.(Rt)No.1132/2014 dated dated GO.(Rt)No.1132/2014 E S TSNO:92/2015-16 DATED-13-05- TSNO:92/2015-16

Construction of Silver Jubile Memorial Academic Investigation 121 Block,Government works tendered H Edn .550Lakhs .1641/2015/H.Edn .1641/2015/H.Edn alappuram 2-02-104-992 .06.2015. For .06.2015. For . MankadaM ss oo 0 PolytechnicPolytechnic,P Perithalmerithalm 0 MM R

annna 420 dt 30 dt GO.(Rt)N 4202-03-800-91

Construction of Administrative Block building (Training Academy) Ground Work 122 floor of 29(K) Bn, completed H Edn 282/21 52979909 18 months 12.08.2015 11.02.2017 12.08.2015 45989500/- Vallikunnu

NCC, Calicut 15.2% above 487 lakhs Malappuram University Campus, 4202-03-800-91

Malappuram - Phase I 487 lakhs 28.10.2014 for No.53/2015-16 dtd 21.04.2015 No.53/2015-16 G.O(Rt)NO.2569/14/H.Edn. dated dated G.O(Rt)NO.2569/14/H.Edn. SE(K)81/2015-16 dtd 10.02.2016 dtd SE(K)81/2015-16 Suresh Gopinath, Ammu Constructions. Ammu Gopinath, Suresh PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 37 PWD BUILDINGS DIVISION MALAPPURAM

Construction of Training Academy (Parade Ground and Training Area) of 123 29(K) Bn. NCC, Work completed 2017 28.05 336/1 H Edn

Calicut University 400 lakh 12 Months Vallikunnu 27.06.2015 29.05.2016 37473884/- 36499563/- 2.6% below 2.6% Malappuram

Campus, Dtd24.07.2014 4202-03-800-91 Malappuram - Phase II G.O(Rt)No.1742/2014/H Edn. G.O(Rt)No.1742/2014/H SE(K)14/2015 -16 dt 21.05.2015 -16 dt SE(K)14/2015 35/CE/BL/2014-2015 dtd 05.02.2015 dtd 35/CE/BL/2014-2015 Suresh Gopinath, Ammu Constructions. Ammu Gopinath, Suresh HEAD OF ACCOUNT NOT MENTIONED khs khs .2009 hs ram 6/09/PWD 6/09/PWD nin nn aa 77 kk uu 44 a d PolytechnicPolytechnic 124 work cancelled Nannamukku H Ed Ponna 250 la Rs250L Malapp dated 14.0 dated G.O.(Rt) No10

TMG College, Tirur, 125 Two additional floor Not feasible. Tirur H Edn

289/103 existing building. Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 38 PWD BUILDINGS DIVISION MALAPPURAM , 269

Estimate Construction of submitted for AS nnexure-II Page nnexure-II Page

126 A Library block at on 28.12.2013. -I Tirur l H Edn

Sl.No.67 TMG college,Tirur Revised estimate 160 Lakhs Malappuram . vo to be submitted. 14 - 2013 get- d u b

264

Estimate

nnexure-II Page nnexure-II Page Construction of New submitted for AS

127 A block at TMG on 01.11.2013. -I Tirur l H Edn college, Tirur Revised estimate Sl.No.112 390 Lakhs Malappuram . vo to be submitted. 14 - 2013 get- d u b

TTC Centre, Land to be 128 Chettippadi. identified. H Edn Tirurangadi Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 39 PWD BUILDINGS DIVISION MALAPPURAM

Out of 12 College quality Works, 4 improvement works 129 programme in PTM completed and H Edn Govt College Rs150Lakhs Malappuram 8 works in Perinthalmanna Deposit work Perinthalmanna dtd. 31.10.2013 dtd. progress. GO (Rt) 2163/2013/HEdn 2163/2013/HEdn (Rt) GO HEALTH DEPARTMENT 2210-01-110-30-34OC Plan r t

d Compound 7

Additional 1 wall work in - facilities for progress and 130 345/7

Health W&C Hospital reataining Ponnani 360 lakhs 44849872 18 months )24/2016 02.07.2016 23.06.2016 .75% above E/R .75% above -01-110-30-34OC Plan -01-110-30-34OC avas K.S Nilambu K.S avas 35951802/- Malappuram .03.2013 Rs.360 Lakhs .03.2013 Rs.360 dt .15/CE/B2/2014-15 )No.1070/2013/PWD )No.1070/2013/PWD ) 8.2015 (Quotation) 8 K 2014 for Rs.360 Lakh Rs.360 2014 for 2 Ponnani 00 wall t 44 nn ((K 5 o 0 2 E 221 S 07.0 Sha completed 12.08. GO.(Rt Reg. No Reg. dated 25 dated 2210-80-800-83 (NP)

Renovation work to Old TB ward for shifting TB 131 work in progress clinic and GLCU Health Ponnani (PRICE) 6 months K.Moossa 2515780/- 08.01.2016 23.09.2016 Ponnani 28.00 Lakh Malappuram 24,37,308.71 3.12% Below of ER of 3.12% Below 2210-80-800-83 (NP) 2210-80-800-83 2296/2016-2017 dt 26.08.2016 2296/2016-2017 GO(rt) No 109/2016/H& FWD dt FWD 109/2016/H& No GO(rt) EE(BM)60/2016-17 dt 28.10.2016 EE(BM)60/2016-17 4202-01-202-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 40 PWD BUILDINGS DIVISION MALAPPURAM

Ponnani. Construction of a building for Taluk 132 work completed Nil Govt. Hospital in the Health 403/48 Ponnani 77191804 90978260 83928706 730,00,000 TB Clinic compound, 12.01.2011 11.07.2012 30.11.2013 25.11.2013 Malappuram Rs.730 lakhs Rs.730

Ponnani 4202-01-202-99 17.86% above E/R 17.86% 12.7.10 for Rs.839 lakhs 12.7.10 for Rs.839 K.J. Varghese, Angamali Varghese, K.J. 55/CE/B&LW /2010-11 dtd. /2010-11 55/CE/B&LW SE(K)13/11-12 dated 14.07.2011 dated SE(K)13/11-12 G.O (Rt) No.1048/09 /PWD dtd. dtd. /PWD No.1048/09 (Rt) G.O 14.7.09 of PWD (G) Department for Department (G) 14.7.09 of PWD

4210-01-110-65(plan)(one time ACA) me i one t FWD dt FWD Lakhs 6.09.2016 03.20150 nn ER 22 . 00 )()( f && e m an l New building for )

p Agreement (

133 PHC, 5 6 ACA -

Health executed 4973739/- 5917755/- Kondotty 10 months 28.07.2015 Malappuram 52.00 Lakh Malappuram 110 KP Noorudhee KP - 18.98% above of of 18.98% above 01 - 29.03.2014 for Rs.5 29.03.2014 for DR/70/2014-15 dt 30. DR/70/2014-15 GO (Rt) 1085/2014/H (Rt) GO EE(BM)45/2016-17 dt EE(BM)45/2016-17 4210

Budget 2016-17- Estimate submitted for Construction of 133 AS vide letter New Building for 74 No.CE/BL/PL3/MLPM/1 Health 7481/16 dtd 18.05.2016 100 lakh 4973739 6758317 Kondotty PHC Cheekode Malappuram 4210-01-110-

Construction of New Block Buildig 134 put on tender for Taluk Hospital Health GO(Rt) Malappuram 345 Lakh Malappuram Malappuram 3903/2016-17 dt dt 3903/2016-17 TVM 18.11.2015 TVM 4210-01-110-93 1.2017 for rs 345 Lakh 1.2017 for rs 17/2015/H&FWD dt dt 17/2015/H&FWD 0 7 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 41 PWD BUILDINGS DIVISION MALAPPURAM HEAD OF ACCOUNT NOT MENTIONED Constructing New Estimate building for Iringallur 135 submitted for AS PHC in Parappur Health

Vengara on 09.12.2014. Panchayath 300 lakhs Malappuram TS issued for Construction of a investigation 136 Building for work to be Tanur Health PHC,Ozhur tendered Malappuram

Tanur CHC Impatient Estimate to be 137 Block submitted Tanur Health Malappuram DPR prepared Construction of Mini and submitted 128 RCC in District

Tirur for AS on Health alappuram Hospitalp Tirur 900Lakhs

11 15. 02. 2014. MM

Construction of Estimate under 139 Thennala PHC preparation Health building 200 lakhs Tirurangadi Malappuram

Ayurveda Hospital in Estimate under 140 Cerukavu Kondotty preparation Health 20 Lakhs Kondotty Malappuram Construction of building for PHC Estimate 141 Kannamangalam submitted for AS. Health Vengara Grama Panchayath Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 42 PWD BUILDINGS DIVISION MALAPPURAM t d 7 201 Construction of - foundation work 142 building for Dialisis in progress Health

Vengara Unit at CHC Vengara 400 lakhs 04/2016 12 months

17.05.2016 20.01.2016 37235910/- 34852812/- 6.4% below 6.4% ) Malappuram K 4059-01-051-86 ( Ahamed kutty haji E S 2716/2015-2016 (PRICE) dt dt (PRICE) 2716/2015-2016 dated 11.11.2015 Rs.400 Lakhs 11.11.2015 Rs.400 dated GO.(Rt)No.3669/2015/H & Fwd & Fwd GO.(Rt)No.3669/2015/H

Construction of Women & Children civil work ward building at completed, onths alth ted 7/8/2013 for Rs for Rs 7/8/2013 ted almanna 6954 /2014 /2014-2015 50,0005 R Rs. 425.00 Lakhs Rs. 0 0 Lakhs ppuramp 60302 6/2016 6 6 , Nirman Constructions , Nirman 143 TalukuedQues Head Quarters F&HWD datedF TVM, , above ER a ee , aa hh 77 66 / 9 MM a electricalelectrical un underder H

Hospital 46 472 27/ 24 26/0

4,88, progress Mala Perinthalmanna in 488.5 Perint Malappuram District. 10.5% SE (K) 09 05.10.2012 for 15/CE/BL/2013 d 15/CE/BL/2013 GO(Rt)No.3292/12/ A.M. Mohammedali A.M.

Construction of a Estimate building for General submitted for AS Health

Manjeri Hospital. Manjeri

144 Malappuram 800.00 lakhs 800.00 lakhs HOME DEPARTMENT

Construction of Land not 145 building for Police identified Home

Vengara station ,Vengara Malappuram HOMOEO DEPARTMENT 4210-02-110-89 Nabard PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 43 PWD BUILDINGS DIVISION MALAPPURAM

d ate d

Vattamkulam. Civil & 10

Building for Homeo - 146 electrical Nil

411/1 Hospital,Vattamkulam 100%

Homoeo completed )3/09 5 Months Complted 50,00,000.00 04.07.2009 .. 06-07-2009 05-12-2009 09-12-2009 Malappuram Rs.140Lakhs Rs.10,21,319 M 11,39,555.00/- Rs.11,39,498/- K.Manikandan 15% above ER 15% ( EE 4210-02-110-89 Nabard GO (Rt) No 1046/09/PWD 1046/09/PWD No (Rt) GO Dtd.14/07/2009 Rs.140Lakhs Dtd.14/07/2009 DR-1/09-10 dated 26.05.2009 dated DR-1/09-10 HEAD OF ACCOUNT NOT MENTIONED

Ponmundam Homoeo Estimate to be 147 Dispensary Block submitted Tanur Homoeo Malappuram Estimate Submitted to Director,Director, Construction of a Homeopathy on building for 148 10.09.2014. Government Homeo Vide letter 361/15 Ponnani 50 lakhs Homoeo Dispensary Alamcode No.CE/BL/PL3/ MLPM/PR/305/1 4 dated 10 09 2014 Construction of buildig for IP Block Estimate 149 for Government submitted for AS

Homoeo Homeo Dispensary on 25.03.2015 105 lakhs Tirurangadi Malappuram Parappanangadi JUDICIAL DEPARTMENT 4059-01-051-90 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 44 PWD BUILDINGS DIVISION MALAPPURAM

Tirur. Construction 150 of Court complex Completed. Yes. Tirur 27/19 Judicial 50% css 50%

1450000 Tirur. 20222785 23019602 25.02.2010 24.08.2011 1,64,41,289 1,90,00,000 Malappuram Rs.190 lakhs Rs.190 4059-01-051-90 Sri A.P. Beeran Koya Sri A.P. Beeran 23% above estimate rate above estimate 23% 07.11.2009 Rs.190Lakhs G.O. (Rt) No. 1046/09/PWD dtd. dtd. 1046/09/PWD No. (Rt) G.O. TS No.83/CE/BL/2009-2010 dated dated No.83/CE/BL/2009-2010 TS 3/SEJ/EKM/09-10 dated 17.07.2010 dated 3/SEJ/EKM/09-10 14.7.09 of PWD (G) Department for Department (G) 14.7.09 of PWD

4059-60-051-73 (75% CSS) ated TVM -16 Rs. 17.06.2016 CSS) 1530 dated 1530 dated C dd 5 R

Construction of Court Earth work 151 Complex Manjeri started judicial Manjeri 30 months 112100000 21.05.2015 111374024 124738907 09.12.2016 08.06.2019 07/11/2014 Malappuram Abdul Vahid Abdul 1600.00 lakhs 1600.00 lakhs 12% above of ER 12% 4059-60-051-73 (75% 4059-60-051-73 (75% 21-04-15 vide ref 54/2015 21-04-15 vide No.1/SE(J)/EKM/2016-17 dt dt No.1/SE(J)/EKM/2016-17 Go(Rt.)No.2948/2014/home Go(Rt.)No.2948/2014/home Order No.2015-2016/2014-15 No.2015-2016/2014-15 Order 4059-60-051-98 5 1 - Perinthalmanna. Civil work

Construction of Court /2014 completed and 152

28/27 complex electrical in 145000 Judicial EKM 50% CSS 50% / 30 Months 06.09.2013 30.05.2014 29.11.2016 28.03.2017 25041456/- Perinthalmanna. 77910901/- 84377505/-

Malappuram progress 1000.00 Lakh Dt.23.05.2014 8.30 above ER EJ Perinthalmanna 4059-60-051-98 1/S Nirman Constructions Nirman 95/CE/BL 2012- 2013 dt dt 2012- 2013 95/CE/BL 30/03/2013 for 1000 Lakhs 30/03/2013 .O(Rt)No.565/2012/PWD/TVM .O(Rt)No.565/2012/PWD/TVM 930 Lakhs 31.03.2012 Rs Dated G PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 45 PWD BUILDINGS DIVISION MALAPPURAM t d 7 1 - BT renewal work to work in 153 internal road at civil 1/2016 PWD

5 progress ) Manjeri

station malappuram (PRICE) 6 months 6208316/ 4948028/ 03.10.2016 70.00 Lakh 23.09.2016 Basheer.PM Malappuram 20.3% below 20.3% BM 2059-60-051-86 ( TVM 27.06.2016 TVM EE 2211/2016-17 dt 22.08.2016 dt 2211/2016-17 GO(rt) No.1008/2016/PWD dt dt No.1008/2016/PWD GO(rt) HEAD OF ACCOUNT NOT MENTIONED

Judicial Quarters Land not 154 Ponnani identified. Judicial Ponnani Malappuram

Construction of Court

ngadi Architectural puram lakhs iciali aa

155 pp Complex,Complex, d drawing obtained

jud Parappanangadi 1200 Tirur Mala Construction of Judicial Officers 156 submitted for AS Quarters ( Duplex judicial Manjeri and sigle ) Manjeri Malappuram 465.00 lakhs 465.00 lakhs PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 46 PWD BUILDINGS DIVISION MALAPPURAM

As per LetterNo. B2-11739/2013 dated of District judge, Manjeri, Construction of Court 157 Rough cost complex Nilambur

Judicial estiate for Rs. Nilambur

Malappuram 675 Lakhs proposed for 2015-16 Budget. Investigation estimate for 4 Lakhs submitted on 13/1/2015. submitted 4 Lakhs for estimate Investigation

PUBLIC WORKS DEPARTMENT 22132213-00-112-60 00 112 60 - 02 - 21

d t d

Construction of 5

1 Plastering building for THS - 158 work in 2015

PWD Perinthalmanna(IHRD 67lakh 6383780 6856180 Mankada progress 10 Months

) 03-03-2015 02-01-2016 Malappuram 48/2014

7.4% above ER 7.4% 2213-00-112-60 ) Dasan M ,Kozhikkode Dasan 21-02-2013 rs.67Lakhs BM ( DR 3/2014-15 dt 30/05/2014 dt 3/2014-15 DR EE G.O. (Rt) No.1725/2013/PWD dt dt No.1725/2013/PWD (Rt) G.O. 4059-01-051-71 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 47 PWD BUILDINGS DIVISION MALAPPURAM

d ate d 5 1 - Tanur. New Building 159 Work completed

PWD for IB, Tanur Tanur 8170134 9847463 92 Lakhs 9131751/- 24.10.2013 18.02.2014 17.10.2014 24.05.2014 )03/2014 Rs.92Lakhs Malappuram Budget 2012 Budget 20.53% above 20.53% 4059-01-051-71 BM ( EE DR 27/2013-14 dt 2/8/2013 2/8/2013 dt 27/2013-14 DR dated 16.02.2012 Rs80Lakhs dated G.O. (Rt) No.241/2012/PWD No.241/2012/PWD (Rt) G.O. K.Anil kumar,(po)Karuvasseri K.Anil

4059-01-051-86 r

Construction of structural work

D building for PWD completed and onths below an Ariyallu an Lakhs. .2016 : 14.01.2016 for : 14.01.2016 for angadi 5913/- 1402/- 6 dtd: 22.02.2016. 1-051-86 lakhs 7.20157 2.20162

160 ppuramp /2015/PWD dated dated /2015/PWD / rr WW dd 00 33 dd 44 77 0 1 %% MM 0 0 0 a masonry workwork inin P RtRest House 500 2.0 18 02.0 05.0 467 448 Tiru progress 4.01 Mala 4059-0 Parappanangadi Rs.50 K.Manikan 2515/15-16 dt 2515/15-16 GO(Rt) No.931 SE(K)86/2015-1 t d 7 Construction of First Floor of PWD Rest structure 161 4/20161 5 PWD House at Kondotty in completed ) 5555226 5666331 6500000 Kondotty 2% above 2% 12 months

Malapuram 15.10.2016 Hassan sha Malappuram BM 4059-01-051-86 ( dated22.01.2016 dated 31.07.2015 dated EE 2788/2015-2016(PRICE) 2788/2015-2016(PRICE) 26-02-2016(RE-TENDER) GO(Rt) No.1134/2015/PWD No.1134/2015/PWD GO(Rt) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 48 PWD BUILDINGS DIVISION MALAPPURAM 5

Budget work 2015- 16(special sanction):- :28-09-2015 GF Slab D dated 04/05/201 Construction of shuttering 162 DATED-03-03-2016

PWD building for Rest work in Manjeri 18 months 18.12.2015 17.06.2017 26600592/- 27103343/- House Manjeri in 11-11-2015 progress Malappuram 300.00 lakhs Shanavas KS

Malappuram 4059-01-051-86 1.89 % Above E/R District ORDER No.MLPM/2015- 2016/2015/3150 Dated SE(K)93/2015-2016. Go(Rt.)No.596/2015/PW 4059-01-051-86(P) )) 5 dt d 5/P 15. 1 h P Construction of building for PWD Grade beam 163 WD

PWD Complex at completed 1275 lakhs Tirurangadi Parappanangadi 18 Months 21.01.2016 103611260 Malappuram 3.6% above Suresh Gopinath 4059-01-051-86(P No.2755/2015-16 dated.Tvm.19.11.20 GO(Rt)No.1295/201 4059-60-051-86

d ate d

Kondotty. Work 2011 164 Construction Rest - completed.Final 1000 47/229 5264484 house,Kondoty. 5900000 bill paid Kondotty PWD large 07.05.2010 14.05.2010 13.03.2011 4/2010 Malappuram Rs.51,26,091 Rs.51,19,427

) 4059-60-051-86 Sri K.Abdul Salam K.Abdul Sri K ( 14.8.09 for Rs.59 lakhs lakhs 14.8.09 for Rs.59 19.03.2010 Rs.62Lakhs E 0.13% below estimate rate estimate below 0.13% S GO (Rt) No.1187/09/PWD dtd. dtd. No.1187/09/PWD (Rt) GO 189/CE/B&LW/2009-2010 dated dated 189/CE/B&LW/2009-2010 HEAD OF ACCOUNT NOT MENTIONED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 49 PWD BUILDINGS DIVISION MALAPPURAM

Constructing building Land not 165 for Rest House

PWD identified 50 lakhs Vengara Vengara Malappuram

Construction of Rest Estimate to be 166 House, Tanur- 2nd

PWD submitted Tanur floor Malappuram Estimate Construction of New submitted on

167 Block for Rest 04.08.2014 for a Tirur PWD House, Tirur AS & RE under 855 Lakhs Malappuram preparation REGISTRATION DEPARTMENT 4059-01-051-95 . WD s d Lakhs D dtd. dtd. D D t PP hh 22 dt

W Kondotty. 2010

Construction of - Work 168 Building for Sub- completed.Final 16/14 114000 1944646 Registrar Office, 2000000 bill paid 8 months Kondotty 07.12.2009 07.12.2009 06.08.2010 30/09/2010 15/09/2010 22/2009 Registration Malappuram Estimate rate Rs.19,88,595 Rs.19,88,595

Kondotty ) 4059-01-051-95 Sri K.Manikandan Sri K ( 14.7.09 for Rs.49 lak 14.7.09 for Rs.49 E S CR 16/2009-2010 of SE, of SE, 16/2009-2010 CR (B&LW) Kozhikode Rs.2 Kozhikode (B&LW) G.O. (Rt) No. 1047/09/PW No. (Rt) G.O. REVENUE DEPARTMENT 4059-01-051-72 1

Construction of TS Village office cum Accorded,hindra 169 Residential Quarters nce free to be 50.00L Ponnani Revenue at obtained. Malappuram 4059-01-051-72 5/RD d t04.06.2015 5/RD GO(RT)No.2888/201 TS No. 1933/2015-20 No. TS PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 50 PWD BUILDINGS DIVISION MALAPPURAM a

Budget work - 2015 - 16. Construction of Village office cum FF column 170 Twin Quarters for completed Ernad 50.00L

Revenue Vettilappara Village 10 months 04.06.2015 23.09.2016 46,49,803/- Malappuram Office in 39,99,718.54 4059-01-051-72

Malappuram District. of E/R below 13.98% 2779/2015-2016 (PRICE) 2779/2015-2016 EE(BM)59/2016-17 dt 27.10.2016 dt EE(BM)59/2016-17 GO(RT)No.2888/2015/RD Dated Dated GO(RT)No.2888/2015/RD MK.Abdul Hameed, Keezhuparamb 0

Budget work -2015 - 16. Construction of Village office cum uram nths ICE) dated 27.07.2 dated ICE) 23.28 0L nue b.MEb ada 20152 Below 20162 863/- 8 2015/RD Dated Dated 2015/RD 2 1 17 dt 01.11.2016 17 dt Agreementg -051-72- pp . i . oo , / 00 e 0 n 171 ResidentialResidential Q Quartersuarters RR % executed Ern 50.0

Reve for Keezhuparamba 10 m 04.06. 23.09. 42,58, Shuhai Malap Village Office in 37,67, 11.55 % 11.55 % 4059-01 Malappuram District. EE(BM)64/2016- GO(RT)No.2888/ 1778/2015-2016 (P 1778/2015-2016 4059-01-051-72(P)PWD - 1

Construction of a 5 0 bulding for twin - PWD ) 172 01 Put on tender - Quarters & Village P ( 9 50.00L Revenue 5 Mankada 4359639/- 10 Months 72 office at Moorkanad 04.02.2017 Malappuram 40 3623/2016-17 dt dt 3623/2016-17 /RD d t04.06.2016 /RD 28.12.2016 (PRICE) GO(RT)No.2888/2015 4216-01-106-98 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 51 PWD BUILDINGS DIVISION MALAPPURAM

Construction of Residential Quarters for Sub Collector Land not 173 Tirur at

Tirur available Lakhs

Revenue Naduvilangadi in

Malappuram Tirur Municipality 4216-01-106-98 Malappuram District. 30.06.2015. dated G.O(Rt)No.659/2015/PWD G.O(Rt)No.659/2015/PWD TS Register No.346/2015-2016 No.346/2015-2016 Register TS Dated 15.05.2015 Rs 42 15.05.2015 Rs Dated 4259-01-051-86(P)

Construction of four storied building for Initial levels 174 Mini Civil Station submitted to Crore 11-15 alappuram

Revenue Nilambur in 15/pwd dated 12- dated 15/pwd -01-051-86(P) Nilambur SE for approvel 016 for Rs.15.25 016 for Rs.15.25 .1544/2016-17 dt dt .1544/2016-17 hanavas.KS .O (RT) No. .O (RT) . 15.25 crore 1 00 99 22 MM oo SS

MMalappuram l DiDistrict- t i t GG 425 14.07. Reg.N 1671/2

HEAD OF ACCOUNT NOT MENTIONED Estimate -II, l submitted for

Vo AS on Sl.19 Construction of Mini , 12 175 - Civil Station Block II 30.07.2013. Tirur e 39 g

Revenue TIRUR

2011 Revised 1000 Lakhs Malappuram Pa estimate to be get get d

u submitted.

Functional Eadarikode Village 176 requirement Office

Revenue not obtained 200 lakhs Tirurangadi Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 52 PWD BUILDINGS DIVISION MALAPPURAM Proposed land for construction is paddy field. Civil Station, 177 Land not Kondotty handed over. Revenue Kondotty

Malappuram Filling permission not obtained.

Mini Civil Station, Vengara-In Block Land not 178 Panchayath feasible Vengara Revenue Compound Malappuram

Annual plan 2015-16 Construction of Hinderance free /2015 Rs Rs /2015 1-72

Residential QQuarters 16-17 dt 1 land certificate ama e s e s s s 8/15/RD 8/15/RD 8 66 1 16 or r 5 Building and Reccord 0 to be obtained 179 room in from village 50 lakh 50 lakh Revenu Wandoo

Karuvarakundu 28.10.20 officer for Malappur

village office in 4059-01-05 tendering. Malappuram district. GO(Rt) No.288 Reg.no.2964/20 Dated TVM 04/0 TVM Dated

Construction of First floor to village office 180 roof slab casted Manjeri in Manjeri Revenue 1384640 1690647/- 28.09.2016 Malappuram District 19.00 lakhs Malappuram 18.1% below 18.1% Sasikumaran.T 4059-01-051-96 Commissionar TVM Commissionar Proceedings of Land Revenue of Land Revenue Proceedings EE(BM)66/201617 dt 02.11.2016 dt EE(BM)66/201617 LRM2/1644/16 dated 30.03.2016 dated LRM2/1644/16 2393/2016-2017 (PRICE) dated 01.09.2016 dated (PRICE) 2393/2016-2017 SOCIAL JUSTICE DEPARTMENT PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 53 PWD BUILDINGS DIVISION MALAPPURAM

Social security and welfare department construction of a work building for ICDS completed, 181 Nll

Sub centre at lakhs electrical to be Kottakal 8,00,000 6 Months A7/662/14 Dtd.03.03.2014 7,53,038/- 8,65,994/- 15 Dtd.11.02.2015 Rs.8.00 Rs.8 Lakh 09.09.2015 Kuttippuram 01-12-2015 arranged 2015-16 Dtd.09.09.2015 Malappuram 8,65,994.00/- Social Justice panchayath Sector 15% above ER 4235-02-102-94(P) No.99 Naduvattam Sri.Aboobacker A. P EE(BM)25/ Order No. ICDS No.DR/60/2014- 014 t TVM ppup 08.2016 0 lakhs lakhs er)e )) 22 dd

aa CONSTRUCTION OF a NEW BUILDING FOR ANGANAVADI IN 182 KURUVA Completed.

ICDS GRAMMA 743152/- 780310/- 6 months 8.00 Lakhs PANCHAYATH 11.02.2014 Malappuram 5% above of E/r of 5% above Deposit work Perinthalmann 4235-02-102-94(P 10.06.2016 (Re tend 10.06.2016 (Re Mohammaed koya Ba koya Mohammaed DR/35/2014-15dt 06.11. DR/35/2014-15dt Dated:11-02-2014 for 8 for Dated:11-02-2014 GO(Rt) No.99/2014/SJD No.99/2014/SJD GO(Rt) EE(BM) 36/201617 dt 30. EE(BM) 4235-02-102-95(P)

Social Justice department ICDS construction of model finishing work 183 Anganavadi at Nil

2015 in progress 12-2014

Kuttippala south in 1790072 2237590 20 Lakhs 8 Months Thavanur 20,00,000 30-01-2015 Malappuram Social Justice

Vattamkulam M Velayudhan 25% Above E/R Above 25% Work not Started Work DR/2015/2014-15 DR/2015/2014-15 panchayath 4235-02-102-95(P) 17.10.2013 for Rs.20 lakhs 17.10.2013 for Rs.20 EE(BM) 48/2015-16 dt21-12- 48/2015-16 EE(BM) (PRICE)201/2014-15 Dated 24- Dated (PRICE)201/2014-15 G.O.(Rt) No.520/2013/SJDdated No.520/2013/SJDdated G.O.(Rt) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 54 PWD BUILDINGS DIVISION MALAPPURAM

Social justice department ICDS construction of model Main slab 184 Anganvadi building shuttering work at Oravankunnu in in progress 20 Lakhs Wandoor 8 Months Aneesh.T.P 22-12-2015 Malappuram 16,47,138.00 22,23,636.00 Social Justice chokkad panchayath Dt 15 12 2015 for Rs.19.40 Lakhs for Rs.19.40 in wandoorLAC 4235-02-102-95(p) EE (BM) 44/2015-16 44/2015-16 EE (BM) 35% above esimate rate above esimate 35% Quatation dt 28-04-2015 dt Quatation 17.10.2013 Rs20.00Lakhs GO(Rt)No.520/2013 SJD dtd. dtd. SJD GO(Rt)No.520/2013 DR/45/2014-15 dtd 09-12-2014 dtd DR/45/2014-15 4235-02-102-96 - 02 - 24

Social justice d

department ICDS Dt r 2015-16 Construction

2016 finishing work in -102-96 nths doo puram 16 Lakh - lakhs 969/- 969/- (Re-tender) 5 dtd 16/06/2015 16/06/2015 5 dtd 5 6(PRICE)of EE 6(PRICE)of 6 LPMfor 13 lakhs LPMfor L TP hullah h Justice a ate rate 22 oo nn pp 00

185 l of Anganavadi 00 55 3 6 6 6 1 a 2 M progress

Building( No.98) in 6m Wa 1066 1066 13.0 Rs 13 Mala Estim Social ward VIII at 4/201 4235-0 7 ) Edappatta GP sri: Sana 28-01-2016 BM ( 1412/2015-201 PWD(B)Dvn M EE ICDS A7 -7755/1 A7 ICDS 4235-02-102-96(P)

Social Justice Department-Plan 03/03/2016 fund 2014-15- E/R Construction of roval 2016 2016 DATED ‐ ‐ 186 Building for Work completed pp above 16

04 03 ‐ MONTHS ‐ ‐

1062470 1153842 1166000 Anganwadi No.100 %

6 28.01.2016 Kondotty for a 03 09 Malappuram

in Muthuvallur 8.6 LMR Submitted Rs.11.66 Lakhs 4235-02-102-96(P)

Panchayath in 82/2015

Malappuram district Muthuvallur K, Ramakrishnan ICDS-A7-18498/14 dated 13.09.2014 dated ICDS-A7-18498/14 EE(BM) 1101/2015-16 dated 13/09/2015 for Rs. Rs. 13/09/2015 for dated 1101/2015-16 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 55 PWD BUILDINGS DIVISION MALAPPURAM Social Justice

Department-Plan d 16 fund 2014-15- ‐ E 2016 E/R tte

i /

M FOUNDATION

Construction of m 02 roval 2016 2016 / b ‐ ‐

187 u Building for WORK IN pp below 65/2015 06 S

04 03 MONTHS ‐ ‐

1082717 1190989 %

Anganwadi Centre 6

13.09.2014 PROGRESS Kondotty Shuhaib for a 03 09 Malappuram Keezhuparamba 8.6 for 11.60 Lakhs for No.05 in LMR LMR Rs.11.66 Lakhs DATED EE(BM)

Panchayath in 4235-02-102-96(P) 09-2015 for Rs. 1166000 09-2015 for Rs. ICDS-A7-18498/14 dated dated ICDS-A7-18498/14 Malappuram district Dated:12- 1098/2015-2016 Construction of 17 - building at ‐ 102 ) -

Charamkulam P finishing work in ( 02

188 E) 24/2016

Anganvady No. 79 in 96 progress 5- 23.06.2016

1112955 1355245 13 Lakhs Nilambur ICDS/A7- 16/6/2015 09.10.2015

Niilambur Saju Joseph dt Malappuram Social Justice 423 7755/15 dated dated 7755/15 1117/2015-16 dt dt 1117/2015-16 14.09.2015(PRIC 21.77%above E/R 21.77%above Municipality EE(BM) 6 months 4235-02-102-90 1.2016 2016 2 tedt RR nn . 1 a PlPlan ffund d -2015-16 2015 16 - E 02.1 construction of dt Anganavadi No. 131 masonry work in 17

189 ‐ at ward No.16 in progress MONTHS

(PRICE) 1154518 6 23.06.2015 28.09.2016 13.00 Lakh

othukkungal 9,82,400.71 Malappuram Social Justice

panchayat 4235-02-102-90 VV Sakkir Hussai 14.91% below of E below 14.91% ICDS/A7-7756/15 da ICDS/A7-7756/15 2409/2016-17 dt 03.09. dt 2409/2016-17 EE(BM)67/2016 4210-02-110-98 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 56 PWD BUILDINGS DIVISION MALAPPURAM

construction of 06.01.2017 building for dt Nirannaparambu Agreement 17 190 ‐

Anganavadi in months executed

6 1073437/- 30.11.2016 13.00 Lakh 8,20,089.24 Vettathur Grama kumar Sanil Malappuram 23.6% below 23.6% Social Justice Perinthalmanna Dtd.03.03.2015 4210-02-110-98 70/2016

Panchayat of Director of Social justice 2996/2016-17 dt 28.10.2016 dt 2996/2016-17 Order No. ICDS A7/18498/14 A7/18498/14 ICDS No. Order EE(BM)

HEAD OF ACCOUNT NOT MENTIONED Construction of building for Cancelled. akhsa J Justice

puramp Mohamed Abdul garag

191 p Entrusted with n Rahiman Sahib L

Ven LSGD Smaraka 75 L Malap Social SamskarikaNilayam Construction of building for Chakkiri Land not 192 Moideenkutty identified Vengara Smarakam 75 Lakhs Malappuram Social Justice Improvements to V.C.Balakrishnan Land not 193 Smaraka nilayam at identified 10 lakhs Vengara Oorakam Gramma Malappuram Social Justice Panchayath Construction of building for Kannamangalam Land not 194 Ambedkar SC identified 25 lakhs Vengara Colony Malappuram Social Justice Samskrikanilayam PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 57 PWD BUILDINGS DIVISION MALAPPURAM Constructing building for Angan wadi Centeres at Cholakkundu, Potti Cancelled. 195 ppara Laksham veedu Entrusted with

Vengara colony Kuzhippuram LSGD Malappuram Social Justice Koppam laksham veedu colony in Parappur GP

Constructing bldg for Angan wadi Centeres Cancelled. at Azad Nagar 196 Entrusted with Parampil padi

Vengara LSGD poonkudaya,kannattip Malappuram Social Justice padi at Vengara GP Constructing building

e for AnganAngan wadi cc mm Centeres at Cancelled. 197 Pukayoor,Valiyapara Entrusted with

Vengara mba,Kalathingal LSGD Malappura Social Justi puraya,Ullatupara in AR Nagar GP

Constructing bldg for Anganwadi Centeres at Cancelled. 198 kottasseripuraya,mooc Entrusted with

Vengara hithottam,K.T Para LSGD Malappuram Social Justice Muthuvinkundu in Kannamangalam G P

Constrction of building for Work not Deshaprabha 199 feasible as per Vayanasala

Vengara KBR ,Muthalamadu in Malappuram Social Justice Vengara G P PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 58 PWD BUILDINGS DIVISION MALAPPURAM Constrction of building for Kannattippadi 200 Yuvajanasangam Library at Vengara 38 lakhs Vengara

Malappuram GP Vayanasala Social Justice ,Muthalamadu in Vengara G P

Social security and 5 1 welfare department - Civil work construction of completed.electri /2014 5

201 building for ICDS 4 cal work not

) 77517 sub centre 778451 included in the Wandoor 6 Months k.mammad 8.00 Lakhs 12-02-2015 12-08-2015 05-08-2015 Malappuram BM Social Justice Dt.09.02.2014 22vellayam(Anganva ( estimate. di) For Rs.8.00Lakh EE dated 3.3.2014 Rs.8.00Lakh dated Order No.ICDS A&/662/14 A&/662/14 No.ICDS Order D DR-28/2014-15 dtd 04.09.2014 04.09.2014 dtd DR-28/2014-15

Social justice t d

department ICDS 7 1 2015-16 Construction - of Anganavadi 202 finishing stage Building( No.25) at 961821 )42/2016 1058003 Wandoor 6 Months 10% above 10% 03.09.2016 13.00 Lakh Chokkad 16.02.2016 04.06.2016 Malappuram Social Justice BM 4235-02-102-98 Gramapanchayath in ( Abdul Kareem.CK Abdul EE 16/06/2015 Rs 13 lakhs Rs 16/06/2015 Malappuram District dtd -7755/15 A7 ICDS 3320/2015-16 (PRICE) dt dt (PRICE) 3320/2015-16

Social justice t d

department ICDS 7 1 2015-16 Construction - of Anganavadi 203 finishing stage Building( No.93) at )28/2016 6Months 961893/- Wandoor Favas PT 4% below 4% 1001972/- 08.07.2016 Mambad 13.00 Lakh 14.06.2016 Malappuram Social Justice BM ( Gramapanchayath in 04.02.2016 of EE EE 23/06/2015 Rs 13 lakhs Rs 23/06/2015

Malappuram District dtd -7756 /15 A7 ICDS 3082/2015-2016(PRICE)dt 3082/2015-2016(PRICE)dt PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 59 PWD BUILDINGS DIVISION MALAPPURAM

Construction buildingfor Sub 204 Put on tender Tax

registrar ofice Lakh 4911121 10 Months 55.00 Lakh Melattur 04.02.2017 Malappuram Perinthalmanna 4059-01-051-95 3706/2016-17 dt dt 3706/2016-17 dtaed 26.02.2016 dtaed 06.01.2017 fo rRs.55 06.01.2017 fo rRs.55 GO (Rt) 168/2016TD 168/2016TD (Rt) GO

TECHNICAL EDUCATION DEPARTMENT 4202-02-800-95-Civil works

Construction of 205 building for ITI, work started Tvm. Tanur Cheriyamundam 359 lakhs 13.08.2015 Malappuram echnical Education 015-16 dtd.15.07.2015 015-16 dtd.15.07.2015 hief Engineer, .Bldgs. hief Engineer, .Bldgs. -02-800-95-Civil works works -02-800-95-Civil 8 8.09.2014. 359 lakhs Rt)No.1289/2014/LBR Rt)No.1289/2014/LBR R 22 TT ( 2 CC of GO( 4202 dtd.1 494/

il v Ci 5-

Govt. 9 - Estimate to be 206 Cheriyamundam ITI

800 submitted - Tanur Building works 118 lakhs 02 - Malappuram Dtd.08.07.2015 Technical Education 4202 GO(Rt)No902/2015/LBR. GO(Rt)No902/2015/LBR. 4225-01-800-91 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 60 PWD BUILDINGS DIVISION MALAPPURAM

Keraladeeswarapuram Civil and . ITC, 207 Electrical work

Keraladeeswarapuram lakhs 100% Tanur 70000 490/11

1000000 completed. 60,00,000 54,54,759 70,91,187 26.08.2010 25.04.2011

. Rs.60Lakhs Malappuram K.Anilkumar 4225-01-800-91 Technical Education 30% above estimate rate rate above estimate 30% SE (K) 26/2010-11 dtd. 16.08.10 dtd. 26/2010-11 (K) SE 60/CE/B&LW/09-10 dtd. 08.10.2009 dtd. 60/CE/B&LW/09-10 SC ST Development department for Rs.60 for Rs.60 department Development ST SC AS No.GO (Rt) 313/09 dtd. 03/03/09 of the of the 03/03/09 dtd. 313/09 (Rt) No.GO AS

d ate CST DD ,37,881 d e rate akhsa 9 dtd. 9 dtd. 9 ioni 1 1

t 00 SS 11 t 0 a L

2010 Civil and

Pandikkad. - 207 Electrical work ITC,. 100% 490/14 1000000 5582858 6080291 completed. Wandoor 50,00,000.0 0812.2009 10 Months 14-12-2009 13-10-2010 30-10-2010 Malappuram K.T.Musthafa )24/2009 4225-01-800-9 K Technical Educat ( 07.02.2009 Rs.63L E 8.91% above esimat 8.91% S 112/CE/B&LW 08-0 112/CE/B&LW dtd. 19.03.08 for Rs.5 dtd. AS No.GO (Rt) 343/08 343/08 (Rt) No.GO AS HEAD OF ACCOUNT NOT MENTIONED

Construction of a Hostel building for land to be 208 Govt. ITI (SCDD) available Tanur Keraladeeswarapuram

Malappuram Tanur Technical Education OTHERS 2059-60-053-99-Non plan PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 61 PWD BUILDINGS DIVISION MALAPPURAM t d 7 1

Repair works of - Mahakavi Moinkutty 209 Vaidyar Mappila Finishing stage Others 959874 )02/2016 30 lakhs 30 lakhs

Kala Academy 2167944 8 months Kondotty 2076890/- 20.05.2016 04.01.2016 Ummer KP Malappuram Kondotty BM 4.2% Below E/R Below 4.2% ( dated 25.05.2015 dated 23.02.2016(Re-tender) EE 2059-60-053-99-Non plan 2059-60-053-99-Non TS No:2314/2015-2016 dt dt No:2314/2015-2016 TS GO(Rt)No,710/2015/PWD GO(Rt)No,710/2015/PWD

HEAD OF ACCOUNT NOT MENTIONED AR Nagar Panchayth .Mini Stadium Estimate 210 renovation submitted for AS Others 90 lakhs Vengara Construction of on 18.10.2013

Malappuram sports complex Functional

ii rerequirementquirement not mm s d obtained. Karimbil National 211 Agriculture land Library, Tirurangadi Others filling 100 lakhs Tirurangad Malappura permission to be obtained. Extension of a Building of Estimate Mahakavi Moinkutty 212 submitted for AS Vaidiar Mapplila Others on 25.02.2015 Kondotty Kala Academy, 275 Lakhs Malappuram Kondotty Improvements to Mini Stadium at Land not 213 Parappur Grama identified Others Vengara Panchayath Malappuram LEGISLETIVE ASSEMBLY CONSTITUENCY -ASSET DEVELOPMENT SCHEME - PROGRESS REPORT UNDER PWD BUILDINGS AGRICULTURE DEPARTMENT 4401-001-98-projects under LAC-ADS(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 62 PWD BUILDINGS DIVISION MALAPPURAM 214 - AC er L d Cheriyamundam: WORK Construction of ) COMPLETED. NP ects un ects ( Building for j REVISED Tanur -pro Cheriyamundam 28Lakhs

ADS ESTIMATE 10 months 22.04.2015 21.02.2016 30.09.2014 Agriculture 24,73,417/- 32,77,278/- DR/8/14-15 Malappuram 98 dt.05/06/2014 - Krishi Bhavan 13.04.2015 dtd Abdu Kottakkal Abdu SUBMITTED. 32.50% above E/R 32.50% EE(BM)5/2015-16 GO(Rt)No.417/2014/ 001 - 4401 AD/Tvm dtd 01.03.2014 forRs.27.50 lakhs 01.03.2014 forRs.27.50 dtd AD/Tvm ASHWAS 4059-60-051-72-projects underLAC-Ads(NP) 215 - m of vv ACA

erL Estimate for TS d submitted on

Construction of ) 02.02.2015. ects un ects j

Public Amenity NP Revised drawing (

Centre at Tirur -pro to be obtained 2 Ads ASHWAS 32,00,000.00 -7

(ASHWAS) 17.12.2014. from ASHWAS 1 5 with necessary 0 - permission. 60 - 9 5 40 GO(RT)No.1739/2014/PWD dated T dated GO(RT)No.1739/2014/PWD AYURVEDA (ISM) DEPARTMENT 4210-02-800-95 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 63 PWD BUILDINGS DIVISION MALAPPURAM 216

Construction of structural work Building for Govt.Ayurveda completed,finis Lakhs

Hospital in Tennala 40 lakhs

Ayurveda hing work in 8 months 12.08.2015 29,53,640/- 42,99,538/- Tirurangadi 06.02.2016 05.10.2016 Malappuram Gramapanchayath Ummerkoya .U Ummerkoya

4210-02-800-95 progress GO(Rt)No.1626/2013/ EE(BM)61/15-16 dtd 30.01.2016 dtd EE(BM)61/15-16 H&FWD dated Tvm 13.05.2013 for 40 dated H&FWD DR/65/13-14 dtd: 03.09.2013 for 36.59 dtd: DR/65/13-14 Lakhs k 217 for Rs 50la for Rs 26.09.2015 77

Government Ayurveda Dispensary ### 10months put on tender Building, Perumanna, Ayurveda 50,00,000.00 04-02-2017 Tirurangadi Klari Malappuram for 50 Lakhs 4210-02-800-95 GO(RT)No3128/2015/H&FWD dtd dtd GO(RT)No3128/2015/H&FWD Reg No .370/2016-17dtd06/01/201 No Reg 4515-00-800-96 project under LAC-ADF(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 64 PWD BUILDINGS DIVISION MALAPPURAM 218 - AC Construction of er L

Building for d Govt.Ayurveda Work completed ect un Hospital in j 50 lakhs 8 months Ayurveda 4987015/- 5533093/- 03.03.2014 02.11.2014 Tirurangadi

Tirurangadi pro Malappuram 10.95% above 10.95% 96 EE(BM)53/13-14

Gramapanchayath 01/03/2014 dated - P.M.Mohammed Ali P.M.Mohammed GO(Rt)No.1626/2013/ Applied on 30.03.2015 Applied dated Tvm 13.05.2013 dated 800 ) - 00 NP DR/37/2013-14 dated 12.08.2014 dated DR/37/2013-14 ( 5- 1 5 ADF 4 HEAD OF ACCOUNT NOT MENTIONED 219 The proposal has been submitted to the Director , Indian Systems of Medicine vide Construction of file building for No.CE/BL/PLG/ Kannamangalam LAC- 30 lakhs Vengara Ayurveda Ayurveda Hospital ADS/MLPM/PR/ Malappuram 1373/15 dtd.26.10.2015 for Estimate amount Rs.30.00 lakhs. 220 LAC ADS 2013- 14:Construction of building for AS not obtained 2500000

Wandoor Govt.Ayurveda Ayurveda Malappuram Hospital Kalikavu EDUCATION DEPARTMENT 4050-60-051-86 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 65 PWD BUILDINGS DIVISION MALAPPURAM 221

Civil and Wandoor: electrical work Construction of completed. Building for DEO Lakhs

5000000 Final bill 8 months Wandoor Education 4476795/- 5345293/- 07.06.2014 07.02.2015 25.04.2015 20.04.2015 office, Wandoor 05-09-2013 Malappuram 19.4% above 19.4% submitted 4050-60-051-86 DR /22/2013-14 DR M. Kunhimohammed EE(BM) 05/14-15 dated 27.05.2014 dated 05/14-15 EE(BM) 08/2013 of the EB PWD(B)Dn.Malappuram for Rs.50 for Rs.50 PWD(B)Dn.Malappuram EB of the 08/2013 O (Rt) No.1141/2013/G.Edn Dtd.TVM 08.03.2013 Dtd.TVM No.1141/2013/G.Edn (Rt) O // GG dt 01 dt

4202-01-201-99 222

14 - Constructing /2013

Buildings for AR 5 Work completed Edn )3 14.77%

Vengara Nagar GUPS 8 months 100 lakhs Education 8624739/- 9898613/- 27.01.2014 26.08.2015 dt 18/04/13 dt BM ( dtd.21.01.2014 4202-01-201-99 EE Extention on 10.09.2014 Extention G.O (Rt.) No. 1731/2013/ G. G. 1731/2013/ No. (Rt.) G.O DR/18/2013-14 DT 18/07/2013 DT DR/18/2013-14 K.Ahammedkutty Haji, Vengara Haji, K.Ahammedkutty PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 66 PWD BUILDINGS DIVISION MALAPPURAM 223

Karuvarakundu: 5 DTD Civil work 1 Construction of - completed, Building for GHSS , electrical 15month Wandoor 15000000 Education 30.09.2014 27-01-2014 Karuvarakundu 13-10-2014 12-01-2016 tendered Malappuram )16/2014 4202-01-201-99 K Rs.1,34,06,833/- Rs.1,86,79,740/- 39.33% above ER 39.33% ( B Dtd.TVM 27.02.2013 Dtd.TVM S 30.11.13 for Rs 150Lahks 30.11.13 for Rs Reg No.CR/21?2013-14 dtd dtd No.CR/21?2013-14 Reg Manzil constructions, . Kochi. constructions, Manzil GO (Rt) No.962/2013/G.Edn No.962/2013/G.Edn (Rt) GO

224 developers , Kottoli. developers R 99

ed 29/08/2014 e n dated 19/03/2013 n dated n 1 13 for Rs 30.00lakhs 30.00lakhs 13 for Rs -- s s 44 55 44 && mm EE s t n Construction of d Civil & building for GUPS electrical Work Eranadu

Pathappiriyam 2816629 3520786 completed Education 10 months 10 months 30.00 lakh 03-09-201 02-07-201 12-06-201 Malappura 25% above 25% 4202-01-201 EE(BM)18/2014-15 dat EE(BM)18/2014-15 GO ( Rt) No 1300/2013 G ed G 1300/2013 No ( Rt) GO DR 35/2013-14 dated 03/08/20 dated 35/2013-14 DR M/s Ansam(India) Construction Construction Ansam(India) M/s 4202-01-201-99 Elementry school building NP PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 67 PWD BUILDINGS DIVISION MALAPPURAM 225

Construction of Civil & tec contractors ,Areacode tec contractors building for GMUPS electrical Work Eranadu

Areacode 2463613 completed 8 months 8 months Education 30.00 lakhs 30.00 lakhs 24-10-2013 3267353.00 Malappuram 44.67 % above E/R 44.67 % GO ( Rt) No 906/2013G edn dated 23/02/2013 edn dated 906/2013G No ( Rt) GO Agt. No EE(BM)44/2013-14 dated 10/02/2014 dated EE(BM)44/2013-14 No Agt. 4202-01-201-99 Elementry school building NP building school 4202-01-201-99 Elementry DR 44/2013-14 dated 13/08/2013 for Rs 30.00lakhs 30.00lakhs for Rs 13/08/2013 dated 44/2013-14 DR The managing director , Ash 4202- 01- 201- 99 SecretarySecretary S Schoolchool B Buildingsuildings (NP) un underder 5054 -80 -800 -67(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 68 PWD BUILDINGS DIVISION MALAPPURAM 226 - 800 - 80 - 4 5 0 er 5 d un ) NP (

Constrction of ngs ) Building for GMUPS ildi Civil & NP Bu Parakadavu, ( electrical Work Nil Nil l 67 90 lakhs

Munniyoor Grama oo completed 8 months Education 8021952/- 47% above 47% h 17.12.2013 16.08.2014 11526335/- Vallikkunnu Malappuram Panchayath c S EE(BM)51/13-14 dated 21.12.2014 dated N.Ganeshan, Ariyallur AS.No.GORt)No.7441 3/G.Edn.dtd.21.02.2013 ecretary S

9999 - 201 - 01 - 4202

4202--01-202-92(PLAN) 227

Construction of building for GVHS work completed 28.06% Eranadu Keezhuparamba 50 lakhs Education 10 months 24/07/2013 50.00 lakhs 50.00 lakhs 08-07-2015 07-10-2015 06-08-2016 Malappuram 4202--01-202-92(PLAN) EE(BM)37/2015-16 dt 05.12.2015 dt EE(BM)37/2015-16 DR/15/14-15 dated 11-06-2014 for dated DR/15/14-15 Govt : letter No 42123/SC3/ GI Edn GI 42123/SC3/ No letter : Govt P.P Nujeeb Rahuman, Keezhuparamba Rahuman, Nujeeb P.P 4202-01-202-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 69 PWD BUILDINGS DIVISION MALAPPURAM 228

d ate d 5 1

Chullikode:Constructi - Civil & on of Building for electrical Work 50Lakhs 6000000 5091997 )01/14

GHSS Chullikkode 12/05/14 completed 8 months Kondotty Education 10-05-2013 06-05-2014 09-05-2014 09-04-2014 Malappuram DR/52/2013-14 4202-01-202-99 BM dated 18.03.2013 dated E.Mohammed Ali dated 17.08.2013 dated ( EE 27.30% above Estimate rate above Estimate 27.30% GO(Rt)No.1286/2013/G.Edn. GO(Rt)No.1286/2013/G.Edn. 229

d ate d Muthuvallur: 14

- Civil & Construction of electrical Work

Building for GHSS 6/13 5 50Lakhs 5210216 ) 5000000 5195997

06/03/14 completed 8 months Kondotty Education Yasar. K.K Yasar.

Muthuvallur 10-03-2013 06-02-2014 09-01-2014 09-01-2014 Malappuram DR-53/13-14 DR-53/13-14 4202-01-202-99 BM % above Estimate rate above Estimate % 8.03.2013 dated 17.08.2013 dated )No.1285/2013/G.Edn. )No.1285/2013/G.Edn. ) 00 t 11 E( EE 29.9 GO(Rt dated 230

Irimbiliyam: Civil & Construction of 34/2014 electrical Work Building at GHSS, 100%

GO (Rt) completed 8 Months Kottakkal Education 50,00,000.00 47,63,105.00 63,54,935.00 24.11.2014 23.07.2015 23.07.2015 Irimbiliyam 14.11.2014 Malappuram dt 31/12/2013 dt 38,79,882.00/- 24,75,053.00/- P.Abdul Azeez P.Abdul 4202-01-202-99 DR 88/2013-14 88/2013-14 DR 15 Dtd.14.11.14 Work not strarted 33.42% above ER 33.42% EE(BM) Dtd.TVM 03.08.2013 Dtd.TVM No.3255/2013/G.Edn No.3255/2013/G.Edn

231

14 - Makkaraparmbu: Civil &

Construction of /2013 electrical Work 55

Building for GHSS, ) 100 L completed 8 months Mankada 10000000 Education 6784656/- 9735657/-

Makkaraparambu 13.03.2014 12.11.2014 11.12.2014 11.12.2014 Malappuram BM 18.5% above 18.5% dt 28/06/2013 dt ( dtd.05.03.2014 DR 10/2013-14 DR 4202-01-202-99 Dt.TVM 22/02/2013 Dt.TVM EE M.Ahamed kutty Haji O(Rt) No.877/2013/G.Edn No.877/2013/G.Edn O(Rt) G PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 70 PWD BUILDINGS DIVISION MALAPPURAM 232

14 - Mankada: work completed, Construction of electrical to be

Building for GVHSS )32/2013 100 L arranged 8 months Mankada 10000000 Education 9887724/-

, Mankada 22.01.2014 21.09.2014 Malappuram BM 8.97% above 8.97% dt 28/06/2013 dt K.Aboobacker ( dtd.13.01.2014 DR 09/2013-14 09/2013-14 DR 4202-01-202-99 Dt.TVM 22/02/2013 Dt.TVM EE GO(Rt) No.880/2013/G.Edn No.880/2013/G.Edn GO(Rt)

233

14 r - Kadungapuram, civil work Construction of completed,electri

Building for GHSS , )31/2013 81.20L alappuram

8500000 cal tendered 8 months o.805/2013/G.Edn o.805/2013/G.Edn Mankada M Education 1798298/- 8733317/- .Aboobacke 02-01-202-99 d.13.01.2014 08.10.2013 20.01.2014 19.09.2014 18.06.2015 11.06.2015 VM 19/02/2013 VM 9.85% above 9.85% 9

Kadungapuramgp 08/2013-14 R R tt MM NN B 22 11 T KK (B d D D 4 Dt.T EE GO(Rt)

234

14 Perinthalmanna: - Civil & Construction of electrical Work Building at GHSS 0.2295 )34/2013 completed 15000000 13445500 16531242 Education 4834345/- 18 months K

Perinthalmanna 31-03-2014 30-11-2015 30-05-2015 Malappuram ( dtd.13/1/2014 Perintalmanna K. Aboobacker K. E 4202-01-202-99 for Rs 150Lakhs for Rs S Dtd.TVM 12/02/2013 Dtd.TVM GO(Rt) No.627/2013/G.Edn. No.627/2013/G.Edn. GO(Rt) CR 06/2013-14 dt 19/08/2013 19/08/2013 dt 06/2013-14 CR PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 71 PWD BUILDINGS DIVISION MALAPPURAM 235

Elamkulam: Construction of Civil & Building at GHSS electrical Work Kunnakavu, completed 8% above 8% 12085386 13052217 15000000 Education 2139904/- 18 months 03-03-2014 02-09-2015 Malappuram

Perintalmanna Elamkulam 4202-01-202-99 for Rs 137 Lakhs for Rs Dtd.TVM 19/02/2013 Dtd.TVM GO(Rt) No.810/2013/G.Edn. No.810/2013/G.Edn. GO(Rt) CR 07/2013-14 dt 19/08/2013 19/08/2013 dt 07/2013-14 CR SE(K)42/2013-14 dtd.12/2/2014 SE(K)42/2013-14 V.S.Noushad, NobleEngineering, NobleEngineering, V.S.Noushad,

236 - 11 - 30 . d t d Vettathur: civil work 14 Construction of - completed,

Building at GHSS 2013 electrical on alappuram 5000000 4477693 4477693 8 months 12/2013-14 12/2013-14 o.907/2013/G.Edn. o.907/2013/G.Edn. Education VM 23/02/2013 VM 1715391/- stimate rate stimate orudheen.K.P 02-01-202-99 t 28/06/2013 t erintalmanna Vettathur 02-01-2013 01-08-2013 gggoing RR MM oo TT NN EE 22 dd 20/2013 PP )2 4 D N Dtd. BM ( GO(Rt) EE 237 5 ons i 1 Edappal: - Civil & Construction of Plus /2014 electrical Work 5 onstruct

Two Block at GHSS, 0.75 C Kochi )4 completed Thavanur 12500000 il 11784804 18207522 Education K 12 Months 26.02.2015 25.02.2016 19.08.2013 09.07.2014 Edappal 11/02/2013 ( GO (Rt) No Malappuram 26,48,568.00/- E Dtd.16.02.2015 4202-01-202-99 1,55,58,954.00/- CR/8/2013-14 dt dt CR/8/2013-14 S 54.50 % above ER 54.50 % 615/2013/G.Edn dt dt 615/2013/G.Edn Manz 2 MONTHS APPLIED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 72 PWD BUILDINGS DIVISION MALAPPURAM 238

d ate d

Thuvvur: 14 - Civil & Construction of electrical Work

Building for GHSS , /2013 5000000 4394183 completed 8 months Wandoor 57 Education 20/11/203 4833162/- 06.03.2014 ) Thuvvur 15-03-2014 14-11-2014 15-02-2015 02-02-2015 Malappuram 9.99% above 9.99% 4202-01-202-99 K.P.Noorudheen BM ( Dtd.TVM 13.02.2013 Dtd.TVM EE EE Malappuram, 50 Lakhs 50 Lakhs EE Malappuram, GO (Rt) No.671/2013/G.Edn No.671/2013/G.Edn (Rt) GO DR 79/2013-14 dtd. 03.102013, dtd. 79/2013-14 DR 239

d ate d 5

r Thiruvali: civil work 1 Construction of - completed, andoo 9% above 9%

Building for GHSS , 49.00 electrical on .957/2013/G.Edn .957/2013/G.Edn lappuram -01-202-99 314761 .01.2015 000000 .06.2014 M 27.02.2013 08/14 months -06-2014 -02-2015 -08-2013 navas K .S K navas n ducationd Rs 14 dt18.07.2013 608758/- 6

99 aa oo 22 - 44 88 55 44 88 a 5 4 9 WW ) EE VV 5 0 2 19 Thiruvalihi li 05 04 goingi M 29. Sha 420 BM ( Dtd.T EE GO (Rt) N DR/17/2013- 240

d ate d Wandoor: 14

- civil work and Construction of new electricalcomplet Block Building for 8/13 5 8 month

5000000 ed Wandoor ) Education 06.03.2014 12.05.2014 11.01.2015 30.04.2015 29.04.2015 T.P Aneesh GGVHSS , Wandoor 26-08-2013 Malappuram 29% above ER 29% 4202-01-202-99 BM Rs.4291788.00/- Rs.5536407.00/- ( Dtd.TVM 23.02.2013 Dtd.TVM EE GO (Rt) No.889/2013/G.Edn No.889/2013/G.Edn (Rt) GO DR/24/2013-14 dtd 02.08.13 of dtd DR/24/2013-14 the EB, PWD(B)Dn,Malappuram EB, the 4202-01-202-99 secondary school building PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 73 PWD BUILDINGS DIVISION MALAPPURAM 241

l oo h ary sc d

Construction of g Civil & building for GHSS electrical Work secon 99 Manjeri buildin

Karakkunnu 5448513 6115956 completed 8 months 8 months - Education 60.00lakhs 60.00lakhs 27/02/2013 60.00 lakhs 60.00 lakhs 26-02-2014 25-10-2014 31-11-2014 25-06-2014 Malappuram 202 - 01 - V. Abdul Rasheed,west kodur .p.o kodur Rasheed,west Abdul V. 4202 EE(BM)46/2013-14 dated 18/02/2014 dated EE(BM)46/2013-14 DR 25/2013-14 dated 02/08/2013 for Rs for Rs 02/08/2013 dated 25/2013-14 DR GO ( Rt) No 963/2013 G Edn dated TVM TVM Edn dated G 963/2013 No ( Rt) GO 4202-01-202-99- Secondary School Building (NP) 242 ng ildi u 014 /03/2013 /03/2013 / 22 BB 8

LAC -ADF- l oo

Construction of h c building for Gov. S

Higher Secondary ary Civil work ) d School in completed, NP ( 100% Malappuram in econ electrical started S 8 Months Nilambur 50 Lakhs 50 Lakhs Education 01-07-2014 28-02-2015 20-03-2015 30-10-2013 4.9% above 4.9% Rs. 5085726 Rs. Malappuram Nilambur - for Rs 50 Lakhs 50 Lakhs for Rs Sri. Noushad N.A Noushad Sri. 99 - Constituency. (2012- Final Bill submitted. No electrification works

13). 202 - 01 - EE(BM)11/2014-15 dated 30-06- dated EE(BM)11/2014-15 4202 GO(Rt) No. 1144/2013/G.Edn dated 08 dated 1144/2013/G.Edn No. GO(Rt) 4202-01-202-99 (NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 74 PWD BUILDINGS DIVISION MALAPPURAM 243

d ate d

14

- Civil work Construction of completed, building for GHSS electrical Eranadu

Kavanur 4363577 8 months 8 months Education )39/2013 27/01/2014 50.00 lakhs 50.00 lakhs 29-01-2014 28-09-2014 09-09-2013

4787117.00 completed Malappuram 9.50% above 9.50% dated 16/03/2013 dated for Rs .50.00lakhs .50.00lakhs for Rs BM ( 4202-01-202-99 (NP) M.Sajeed , Areacode. EE GO ( Rt) No 1264/2013 G edn G 1264/2013 No ( Rt) GO DR 36/2013-14 dated 03/08/2013 03/08/2013 dated 36/2013-14 DR 4202-01-202-99 Secondary School Building (NP) 244 ng ildi Bu l oo 3 Rs. 33.60 3 Rs. LAC- ADF - d.22.03.2013 26.05.2014 2 tt 1 chc AA

Construction of S Work

Higher Secondary ary )

d completed, No School Building for NP

( fund for

Ponnani GH School Palapetty econ 30,97,000 34,68,640 Education 33.6 lakhs S 12% above 12% 26/05/2014 25/04/2015 23-07-2015 20-07-2015 electrical work

Malappuram in Malappuram Sri. Asharaf T. Sri. Asharaf 99 District - 202 - 01 - EE (BM) 4/2014-15 dated dated 4/2014-15 EE (BM) 4202 GO(Rt)No.1362/2013/G. Edn.d GO(Rt)No.1362/2013/G. for Rs.33,60,000/- 17.08.201 dated DR-58/2013-14 Lakhs PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 75 PWD BUILDINGS DIVISION MALAPPURAM 245 ng ildi Bu l oo h

LAC - ADF c Construction of S

ary Civil & )

Building for d electrical Work NP

PCNGHSS, ( econ Ponnani 50 lakhs completed 8% above 8% 44,12,467 47,65,464 Education S 21.09.2014 21.12.2015 Mookkuthala in 22/01/2014

Malappuram

Malappuram District 99 - Sri. Nandakumar U.V 202 - GO(Rt)No.1363/2013/G.Edn. 01 dtd.22.03.2013 for Rs.50,00,000/- dtd.22.03.2013 - EE (BM) 38/2013-14 dated 22.01.2014 dated 38/2013-14 EE (BM) 4202 DR-56/2013-14 dated17.08.2013 Rs. 50 Lakhs Rs. dated17.08.2013 DR-56/2013-14 246 ng - 014 3 Lakhs // uildiu 2 5 B l oo h c

LAC - ADF S

Construction of ary Civil & ) Building for GHSS d electrical Work NP ( Ponnani econ , in 53 lakhs completed 48,18,695 54,21,032 Education S 22.01.2014 21.09.2014

Malappuram Malappuram District above 12.5% 99 - Sri.Anil kumar P.K 202 GO(Rt)No.1361/201G.Edn. - 01 dtd.22.03.2013 forRs.53,00,000 dtd.22.03.2013 - EE (BM) 37/2013-14 dated 22.01.2 dated 37/2013-14 EE (BM) 4202 DR-57 /2013-14 dated17.08.2013 Rs.5 dated17.08.2013 /2013-14 DR-57 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 76 PWD BUILDINGS DIVISION MALAPPURAM 247 ng ildi Bu l oo h c

LAC - ADF S

Construction of Plus ary Civil & ) Two Block at d electrical Work NP (

Thavannur Kelappaji econ completed Thavanur 125 lakhs Education 12 months S 10.05.2015 05-11-2014

Malappuram 49.8% above 49.8% GVHSS 1,08,87,598/- 1,63,09,622/- 13 for Rs.125.L 99 - Sri. K. Manikandan. Kozhikode RS.125 Lakhs RS.125 Kozhikode 202 - 01 - SE (K)44/2014-15 dated 13-02-2015 dated (K)44/2014-15 SE CR /03/2013-14 dated 19.06.2013 of SE, 19.06.2013 of SE, dated /03/2013-14 CR 4202 AS.No.GO(Rt)No.959/013/G.Edn.dtd.27.02.20 4202-01-202-99 Secondary school Buildings (NP) 248 gs gs 13, n 0 ildin Bu l

LAC -ADF- oo Construction of h G.H.S.S building at Civil & ary sc ) Moothedam in d electrical Work NP ( 1000%

Nilambur econ completed 8 Months Nilambur 50 Lakhs 50 Lakhs 50 Lakhs 50 Lakhs Education 03.12.2013 S 47.66396 L 28-10-2013 02-07-2014 30-09-2014 30-09-2014 Malappuram

Constituency (2012- Estimate rate Noorudheen K.P. Noorudheen 99 13). - Malappuram, 50 Lakhs 50 Lakhs Malappuram, Electrification completed 202 - 01 - DR/16/2013-14 dated 18/7/2013, EE 18/7/2013, dated DR/16/2013-14 EE (BM) 21/2013-14 dtd 30-11-2013 dtd 21/2013-14 EE (BM) 4202 GO(Rt) No. 670/2013/G.Edn dated 13.2.20 dated 670/2013/G.Edn No. GO(Rt) 4202-01-202-99(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 77 PWD BUILDINGS DIVISION MALAPPURAM 249 14 - Civil & GMUPS -Kizhissery-

)62/13 electrical Work

Kuzhimanna lakhs 30lakhs 291790-

2500000 completed 8 months BM Education 2846740/- 15/10/2014 15/10/2014 ( 12-12-2013 08-11-2014 Malappuram DR/14/13-14 dated 25/2/14 dated EE Ahammedkutty.E.K 4202-01-202-99(NP) dated 18.07.2013 for 25 dated G. Edn dt 16.03.2013 G. Edn dt 29.80% above Estimate rate above Estimate 29.80% G.O (Rt.) No.1262/2013/ No.1262/2013/ G.O (Rt.) 4202-01-202-99-55 bldgs(NP) towards LAC-ADF under 5054-80-800-67(NP) 250 5 1 Tirur: Construction - Civil & of Building for electrical Work /2/2014

Tirur GVHSS for Girls, completed 8 months 50 Lakhs Education 4940658/- 6571075/- 33% above 33% 18.07.2013 24.10.2013 27.11.2014 26.07.2014 BM

Tirur for 50L /02/2013 9/2013-14 dated dated 9/2013-14 td.12.05.2014 Malappuram o.954/2013/Gen/ Edn o.954/2013/Gen/ A Anilkumar.V / -202-99-55 bldgs(NP) -202-99-55 bldgs(NP) - 77 11 dd E/ NN EE DR dt.2 4202-01 GO(Rt) 251 5 1 - Civil work Additional Block completed, no Tirur GHSS, Paravanna /30/2014 fund for 8 months Education 9991944/- 100 Lakhs 40% above 40% 06.11.2014 05.07.2015 13988722/- electrical work Malappuram BM dt.27/02/2013 dt.27/02/2013 / dtd.30.10.2014 Mohammedali.K.V EE quotation date 17.12.2013 date quotation 4202-01-202-99-55 bldgs(NP) 4202-01-202-99-55 bldgs(NP) GO(Rt)No.952/2013/Gen/ Edn GO(Rt)No.952/2013/Gen/ DR23/2013-14 dated 18.07.2013 dated DR23/2013-14 4202-01-202-99-SS Bldgs towards LAC-ADF under 5094-80-800-67(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 78 PWD BUILDINGS DIVISION MALAPPURAM 252 - 800 - 80 - 094 er 5 d DF un A - Cheriyamundam: AC )

Construction of s L NP d

( Work completed Compound Wall at Tanur 67 8 Months Education 68% above 68% GHS Cheriyamundam 04.10.2014 03.12.2015 Malappuram Rs.3170226/- Rs.5325980/- dtd 10.07.2014 dtd gs towar gs EE(BM)12/2014-15 ld 8 months / 03.06.2015 / 8 months B DR/29/2013-14 dt.2/8/2013 dt.2/8/2013 DR/29/2013-14 Abdul Latheef .V Kodoor P.O Kodoor .V Latheef Abdul SS - Under 5054-80-800-67(NP)45Lakhs Under 99 o. 11114/2013/gen.edn. dt.17/03/2013 Rs.45 lakhs Rs.45 dt.17/03/2013 o. 11114/2013/gen.edn. - 2 NN 202 - 01 - GO(Rt) 4202

4202-01-800-83 Project under LAC -ADS (NP) P 253

Construction of Civil & building for GVHSS electrical Work lakhs lakhs 05-13

Arimbra 4451969 completed 8 months 8 months Education 50.00 lakhs 50.00 lakhs 03-10-2013 13-12-2013 12-08-2013 12-11-2014 4401662.00 Malappuram Malappuram Malappuram 1.13% below 1.13% Yasar .K.K,( Po) Alukkaparamba Alukkaparamba Po) .K.K,( Yasar DR-68/2013-14 dated 09-09-2013 for Rs. 50 09-09-2013 for Rs. dated DR-68/2013-14 Agt. No EE(BM)23/2012-14 dated 05/12/2013 dated EE(BM)23/2012-14 No Agt. GO ( Rt) No 2236/2013 G Edn Tvm dated 28- Edn Tvm dated G 2236/2013 No ( Rt) GO 42-02-01-800-83 Project under LAC -ADS (N -ADS under LAC 42-02-01-800-83 Project Balance work of Rs. 15 lakhs approved by MLA approved by MLA 15 lakhs of Rs. work Balance PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 79 PWD BUILDINGS DIVISION MALAPPURAM 254 t d 7 1

2013- - Finishing work 14MALAPPURAM - in Construction of

80L progress,electrica )29/2016

building for GGHSS 7076061 7366179 10Months Education Education 18.07.2016

23-02-2016 l to be tendered (PRICE TS) AS obtained AS Malappuram Malappuram, BM Shamsudheen K Shamsudheen 4202-01-800-88 ( 4.1% Above for E/R Above 4.1% EE 2256/2015-16 dt 31.12.2015 dt 2256/2015-16 GO(Rt) 2481/2015/G.Edn dt dt 2481/2015/G.Edn GO(Rt) TVM 20.06.2015 for Rs 80 L 20.06.2015 for Rs TVM 255

Construction of 16 5- building for finishing work in /201

Government HSS, 7 progress ) Thavanur K Education 14652466 14652466 150 Lakhs 18 Months Kozhikode 21.12.2015 07.02.2016 06.08.2017 Purathur ( Malappuram Estimate Rate K.Anilkumar, E dtd 28.01.2016 dtd 4202-01-800-88 S O(Rt)11941/2015/G.E dn. Dated 22.05.2015. dn. Dated GG 256

d t d

Construction of 16 civil and 5- Building for Govt. electrical High School, completed )2/201 Education 12 months 10.02.2015 09.02.2016 21.04.2015 10813379/- 12705721/- Tirurangadi 116,00,000.00 Malappuram K 17.50% above 17.50% ( dtd 14.11.2014 dtd CR/20/2014-15 CR/20/2014-15 4202-01-800-88 for Rs.116 lakhs for Rs.116 E S dated .Tvm, 29.09.2014 dated V.Venugopal, Kurumbathur V.Venugopal, GO(Rt)No.3908/2014/G.Edn GO(Rt)No.3908/2014/G.Edn 257 1

Construction of class Civil work room building for completd, Government LP electrical to be 3696037 4065641 Ariyallur Education 10 months 40,00,000.00 10% above 10% 07.09.2015 26.09.2015 16.02.2016 15.12.2016 08/05/2015

School Olakara K Sudheesh arranged Vallikkunnu Malappuram 4202-01-800-88 Reg.No.1004/2015-16 dt dt Reg.No.1004/2015-16 GO(Rt)1712/2015/G Edn Dt Edn Dt GO(Rt)1712/2015/G EE(BM)69/2015-16 dt 16.02.20 dt EE(BM)69/2015-16 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 80 PWD BUILDINGS DIVISION MALAPPURAM 258 Construction of Class room building for Transferred to Government UP LSGD. /G.Edn /G.Edn Education School Ariyallur 30,00,000.00 Vallikkunnu Malappuram dtd.12.03.2015 4202-01-800-88 GO(Rt)No.973/2015 259 7 1 - LAC ADS 2013- 2014 construction for Masonry work in

building for GMLPS )32/2016 progress 25.00L Kottakal 8 months Education 2270012/- 2232103/-

Vallanchery 05.08.2016 Malappuram Jasir Pathiyil BM ( dtd.23.08.2016 4202-01-800-88 1.67% below E/r below 1.67% EE Dt.16/09/14 for Rs.25Lakh Dt.16/09/14 DR/74/2014-15 dt 30.03.2015 dt DR/74/2014-15 GO(Rt) No:3612/2014/G.Edn No:3612/2014/G.Edn GO(Rt)

260 hh 16

LAC ADS 2013- 5- civil work 2014 construction for completed, building for GHSS 8/201 5

) electricaldcomple 25.00 L GO(Rt) Kottakal

Irimbiliyam (2nd 2394429 2860385 8 Months Education 29.07.2015 12.08.2015 28.01.2016 27.09.2016 ted BM Malappuram Dtd.18.01.16 (

phase) Abdul Azeez P 4202-01-800-88 660/2015-16 dtd dtd 660/2015-16 19.46% above ER 19.46% EE No:2587/2014/G.Edn No:2587/2014/G.Edn Dt.01/07/14 for Rs.25Lak Dt.01/07/14 261

16

LAC ADS 2013- 5- civil work 14:Construction of completed,

building for GMUPS )26/201 electrical to be Manjeri 3000000 Education 2749244/- 3599860/- Oravampuram 10 months arranged Malappuram BM dt15.09.2015 30.94% above 30.94% ( 4202-01-800-88 26.09.2014 re tender EE Muhammed Musthafa.M DR- 7/14-15 Dt.30.06.14 7/14-15 DR- GO(Rt) No 1179/2014/G.Edn 1179/2014/G.Edn No GO(Rt) Dt 04/03/2014 for Rs 30 Lakhs for Rs 04/03/2014 Dt PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 81 PWD BUILDINGS DIVISION MALAPPURAM 262

16

LAC ADS 2013- 5- civil work 14:Construction of completed,

building for GMUP )09/201 electrical to be Manjeri 2500000 Education 2432675/- 2841364/- 10 months

School, Vettikkattiri 26-05-2015 26-03-2016 arranged Malappuram BM 16.8% above 16.8% dt26.05.2015 ( 4202-01-800-88 EE M. kunhi muhammed M. kunhi 26.09.2014 (Re-Tender) DR- 15/14-15 Dt.30.06.14 15/14-15 DR- GO(Rt) No 1180/2014/G.Edn 1180/2014/G.Edn No GO(Rt) Dt 04/03/2014 for Rs 25 Lakhs for Rs 04/03/2014 Dt 263 t r d

LAC ADS 2013- 16

5- civil work 14:Construction of completed, building for electrical to be )29/201 Manjeri

Govt.High School, 4500000 Education 4426546/- 6197164/- 10 months 40% above 40% 03.10.2015 07-10-2015 07-08-2015 arranged Malappuram

Edappatta BM .03.2015 re tende 5/2014 for Rs 45 Lakhs for Rs 5/2014 uhammedakbar .V 4202-01-800-88 ( ) No 1730/2014/G.Edn 1730/2014/G.Edn ) No ) /2014-15 dt 26.09.2014 dt /2014-15 / t 00 00 2 MM 2 EE DR/32 GO(Rt Dt 06/ Dt 264 t d

16

KAPPU - 5- Construction of work completed building for GHS )49/201 5500000 Education 5022533/- 6375603/- 28.12.2015 Kappu, Vettathur. 12 months Malappuram 05-01-2016 04-01-2017 26.94% above 26.94% Perintalmanna BM K. Aboobacker K. 4202-01-800-88 ( 10.03.2015 re tender EE 21/02/2014 for Rs 55 Lakh for Rs 21/02/2014 DR/33/2014-145dt 28.10.2014 DR/33/2014-145dt GO(Rt) 918/2014 /G Edn dated Edn dated /G 918/2014 GO(Rt) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 82 PWD BUILDINGS DIVISION MALAPPURAM 265 7- 0 - 08 . d t d ANAMANGAD -

16 civil and Construction of 5- electrical

building for GHSS 2015 5500000 5203885 6796274 completed /201 Education 12 months 5 Anamangad 16-07-2015 15-07-2016 Malappuram 30.6% above 30.6% dt 10/07/2014 dt Perintalmanna K. Aboobacker K. )1 DR 10/2014-15 10/2014-15 DR 4202-01-800-88 BM ( 01/03/2014 for Rs 55 Lakh for Rs 01/03/2014 EE GO(Rt) 1116/2014 /G Edn dated Edn dated /G 1116/2014 GO(Rt)

266 - 06 7- 2 . d t d PERINTHALMANN

16 Civil & A - Construction of 5- electrical work

building for Central 2015 alappuram 2500000 2272160 2931086 completed 6 months 4-07-2015 3-04-2016 14 for Rs 25 Lakh 14 for Rs 14 for Rs. 23.5 lakhs 14 for Rs. 11/2014-15 11/2014-15 Ummer.K Education 6/2014 /G Edn dated Edn dated /G 6/2014 2 29% above 29% 02-01-800-880 erintalmannae 2/201 00 00 00 LPS PerinthalmannPerinthalmannaa 00 RR MM 3 2 P )12 42 D BM ( 24/02/2 EE GO(Rt) 93 dt 14/07/2 dt 267

VALAPURAM- Construction of Finishing work

building for GMUPS Lakh in progress 6000000 PP.Subair Education 5615731/- 7468922/- 12 months 28% above 28%

Valapuram 28-12-2015 27-12-2016 Malappuram Perintalmanna 4202-01-800-88 12.08.2015 (Quatation) GO(Rt) 1737/2014 /G Edn /G 1737/2014 GO(Rt) dated 06/05/2014 for Rs 60 for Rs 06/05/2014 dated DR/27/2014-15 dt 30.08.2014 dt DR/27/2014-15 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 83 PWD BUILDINGS DIVISION MALAPPURAM 268 t 16d

VETTATHUR- 5- Construction of Work Completed Compound wall at )06/201 2500000 Rs24.5 L Rs24.5 9 months Education 2383136/- 2546619/- 18.04.2015 Govt. HSS, Vettathur 09-01-2105 08-10-2015 18-02-2015 Malappuram 6.86% above 6.86% Perintalmanna BM 4202-01-800-88 ( Abdu rahiman.K Abdu dated 21/02/2014 21/02/2014 dated EE GO(Rt) 919/2014 /G Edn /G 919/2014 GO(Rt) DR/06/2014-15 dt 26.06.2014 dt DR/06/2014-15

269 t 2014 . d

11 . LAC ADS 2013- 16 14:Construction of 5 Civil & dtd25

new block buildng s electrical work ER for 15 01/201

- 8 month )

for Govt L P School 2500000 completed Wandoor Education 10.04.2015 10.12.2015 04/04/2015 09-03-2015 Malappuram

at Mampattumoola (B)Dvsn,Mlpm.25Lakh Veeran Kutty C BM 4202-01-800-88 Rs.2385513.00/- Rs.2385513.00/-

) No. 2409/2014 G.Edn. G.Edn. 2409/2014 ) No. 25 lakhs 19.6.2014 Rs. ) 1 (( DD /2014 EE dated dated DR/42/2 GO (Rt EE,PW 270

16

LAC ADS 2013- 5- 14:Construction of Civil & building for VMC electrical work 023/201

Govt.Boys HSS 5000000 completed Wandoor 10 month Education 07.09.2015 07.07.2016 08/05/2014 30-01-2015 Malappuram BM dtd01.09.2015

Wandoor ( 4202-01-800-88 21.6%above ER 21.6%above Rs.4789049.00/- Rs.5823484.00/- EE of EE,PWD(B)Dvsn,Mlpm GO(Rt) 1773/2014/G.Edn dt dt 1773/2014/G.Edn GO(Rt) ANZAM(INDIA)Constuctions DR/29/2014-15 Dt 05.09.2014 Dt DR/29/2014-15 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 84 PWD BUILDINGS DIVISION MALAPPURAM 271 7 1 LAC ADS 2013- - 14:Construction of Foundation building for

)13/2016 Work completed

Govt.HSS 4000000 Wandoor 10 month Education 46,17,959.00 06/05/2014 19-12-2015 375,13,888.00 Malappuram BM 23.10% above 23.10% dtd08.16.2016 Vaniyambalam ( 4202-01-800-88 Sri Aboothahir K Aboothahir Sri EE of EE,PWD(B)Dvsn,Mlpm GO(Rt) 1728/2014/G.Edn dt dt 1728/2014/G.Edn GO(Rt) DR/36/2014-15 Dt 07.11.2014 Dt DR/36/2014-15 272

16

LAC ADS 2013- 5- 14:Construction of New block building work completed )46/201

for GUPS, 2500000 Wandoor 8 months Education 23,55,400.00 27,67,595.00 o. 2562/2014/G.Edn o. 2562/2014/G.Edn 22.04.2015 26.12.2015 25.08.2015 td18.12.2015 14-15 dtd 23.01.2015 14-15 dtd Malappuram

BM ,PWD(B)Dvn,MpM , 202-01-800-882 mmed Abdul Razak m 7.50%above ER 7.50%above 7 6 6/2014 for Rs.25Lakh 6/2014 dd NN (( Neelanchery.Neelanchery. 00 a 44 E 1 EE Moha for EE Dt.30/0 GO(Rt) DR/56/2 273

LAC -ADS- t d

Construction of a 7 1 building for GLP - 25 School at Lak Roof slab casted

Kurumbalangode in 49/2016 PRICe

)

hs 2244156 2468572 8 months Nilambur Education 10% above 10% 29.09.2016 Nilambur 19.02.2016 Malappuram dtd 28/05/2015 dtd 4202-01-800-88 BM ( Constituency. (2014- kutty Ahmaed EK

15) EE 1975/2015-2016 dt 10.10.2015 dt 1975/2015-2016 G.O.(Rt) No. 2082/2015/G.Edn 2082/2015/G.Edn No. G.O.(Rt) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 85 PWD BUILDINGS DIVISION MALAPPURAM 274

t Inag

COSTRUCTION OF 16d urat 5- BUILDING AT ion 40 L completed

G.M.U.P.SCHOOL )08/1 9- GO(RT) 10 month Education 3982697/- 4561781/- 26.09.2015 KOTTAKKAL 25.05.2015 12- BM Malappuram ( 14.54% above 14.54% KOTTAKKAL 4202-01-800-88

TVM 20/03/2015 TVM 15 EE NO:1106/2015/G.Edn NO:1106/2015/G.Edn Abdu ( ARK Construction) ( ARK Abdu DR/88/52015 dt 31.03.2015 dt DR/88/52015

275 r

COSTRUCTION OF BUILDING Civil & FORG.M.L.P electrical Work

SCHOOL IN 48 L completed Education completed 23% above 23% O:1132/2014 G.EDN G.EDN O:1132/2014 18/12/2014 03/03/2014 06-11-2015 04-10-2016 1/15-16dt 04.03.2017 1/15-16dt OORAKAM 4470749.00 5499021.00 VENGARA Malappuram 202-01-800-882 PWD contractor Mattathu PWD 14-15 dated 05/08/2014 14-15 dated 1 99 NN 44 0 ,MELMURIMELMURI K EE(BM) GO(RT) DR-18/20 Mammudu.K Mammudu.K 10 months

276 - 03 - 04 t d

Construction of

Higher Secondary 16

5- Finishing work in Building for GHSS progress 2016 lakhs. /201 Ponnani

Kokkur in 8442188 70 Lakhs 70 Lakhs Education 6481526/- 7 10 months 26.09.2015 10.03.2016 09.01.2017 Velayudhan Malappuram

Malappuram District )8 4202-01-800-88 BM 30.25% Above for E/R Above 30.25% ( Dated 10.06.2014 for Rs.70 10.06.2014 for Rs.70 Dated EE DR/83/2014-15 dt 31.03.2015 dt DR/83/2014-15 G.O(Rt)No.2265/2014/G Edn. G.O(Rt)No.2265/2014/G PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 86 PWD BUILDINGS DIVISION MALAPPURAM 277 t d 000.00

16

Construction of 5- civil work School building for completed, Kelappaji Memorial electrical to be )88/201 3171667 8 months Thavanur Education 2439745/- 04.03.2016 29.09.2015 11.03.2016 10.11.2016

GUPS Thavanur Velayudhan arranged Malappuram BM 30% above E/R 30% 4202-01-800-88 ( dated 06.05.2014 dated EE GO(Rt)No.1721/2014/G.Edn GO(Rt)No.1721/2014/G.Edn DR/34/2014-15 dt 30.10.2014 dt DR/34/2014-15 25,00, 278 7 1 - Construction of a School Building for work completed

GMLPS Pallikkara in )43/2016 Ponnani 4389825 Education 3375750/- 10 months 04.07.2015 24.02.2016 23.12.2016

Malappuram District Velayudhan Malappuram BM dt.05.09.2016 N430/2014G.Edndated N430/2014G.Edndated 35,00,000.00 1.2014 for Rs. 35 L 1.2014 for Rs. 2014-15 dt 18.07.2014 2014-15 dt 2 4202-01-800-884 0 0.04% above E/R 0.04% )) / 0 E(E 3 E 28.0 DR/14/

G.O.(Rt

279 - 09 5. 0

Construction of a t. d

Building for GHSS 7 1 Pookkottumpadam - finishing work in

(Second Floor) in 2016 progress Education 4848706/- 4771127/- 10 months

Nilambur LAC) 24.02.2016 29.07.2016 50.00 lakhs 50.00 lakhs Shanavas. K Shanavas. Malappuram 1.60% Below 1.60% )43/2016 Malappuram District 4202-01-800-88 BM ( 3563/2015-16 (PRICE) dt dt (PRICE) 3563/2015-16 EE G.O.(Rt)No. 210/2016/ G.edn G.edn 210/2016/ G.O.(Rt)No. dt TVM 19.01.2016 for 50 Lakh TVM dt PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 87 PWD BUILDINGS DIVISION MALAPPURAM

280 - 02 - 000.00 12

d

Construction of Class Date

room building for 16

5- work completed

Government HSS 2016 Education 5849579/- 10 months 4999640.5 17.02.2016 16.12.2016 Peruvallur 17-07-2015 Vallikkunnu Malappuram 17% above E/R 17% 68/201 4202-01-800-88

) Sri: Mohammed Ashraf Sri: BM 30.06.2015 for Rs.50 lakhs 30.06.2015 for Rs.50 ( dated 30.03.2015 Rs.50 lakhs 30.03.2015 Rs.50 dated 2015-2016/2013-2014-56 dated dated 2015-2016/2013-2014-56 EE GO(Rt)No.1284/ 2015/G.Edn 2015/G.Edn GO(Rt)No.1284/ 50,00, 281 LAC-ADS 2015-16 CONSTRUCTION

FOR CLASS ROOM - BUILDING FOR

KADUNGAPURAM 2/2016 Agreement 7 80374 18424 bdu.k % below 63/2016-17 dt dt 63/2016-17 ucation 01-800-88 appuram ankada 10.2016 0000000 02.20160 11.2016 months 6 680/2016/ Gedn dt dt Gedn 680/2016/

Govt: 10/01/2017 1 executed ll -- . 22 66 . . M)M 99 99 dd AA 0 5 d 9 7 MM B E 10 15 28. 30. 18. HIGH SCHOOL IN ( Ma 17. 4202 17dtd MANKADA LA EE CONSTITUENCY Reg.no.2 GO(RT0 No. 282 LAC -ADF-

Construction of t d

building for Gov. 7 1 Manavedan Higher - Secondary School at Column work in

Nilambur in 14/2016 progres

) Nilambur 40 Lakhs 40 Lakhs Education 3909798/- 3753015/- 10 months 09.06.2016 Malappuram in 11.02.2016 Malappuram Sebastian VJ Sebastian dated 22/5/15 dated 4202-01-800.88 BM

Nilambur ( 4.01% below of ER below 4.01%

Constituency. (2013- EE

14) 09-09-15 dated 1040/2015-16 G.O (Rt) No. 1954/2015/G. Edn 1954/2015/G. No. (Rt) G.O PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 88 PWD BUILDINGS DIVISION MALAPPURAM 283 t

LAC -ADS- d 7 1

Construction of - G.H.S.S. building at Reached up to Edakkara in roof level )68/2016

Nilambur 3771494 4141101 8 months Nilambur 40 Lakhs 40 Lakhs Education 08.11.2016 9.8% above 9.8% Malappuram Constituency. (2014- VJ Sebastian BM 4202-01-800-88 3871/2015-16 dt dt 3871/2015-16 ( Dated 22/05/2015 Dated 03.03.2016(PRICE) 15) 29.07.2016 retender EE G.O (Rt) No. 1939/2015/G.Edn 1939/2015/G.Edn No. (Rt) G.O 4202-01-800-88 projects under LAC-ADS 284

COSTRUCTION OF bottil ated 23-05-2016 ated 15/G.Edn dtd dtd 15/G.Edn n s E/R under LAC-ADS /- /-

BUILDING IN akhs ama ama 16 16 of the EE PWD 16 of the EE PWD 25 Lakhs. l l Education(M)Dpt eted e dd mm ss 00 oo hh r r 8 6 0 0 ww L

G.M.U.P SCHOOL 25 M MELMURI AT L 8 Mont Educati 2439858 2300786

MALAPPURAM(201 02-11-20 Malappur Malappur work copl work for Rs 25 L for Rs 3-14) belo 5.7% Moosa Kada Moosa (Bn)Dvn MLPM MLPM (Bn)Dvn G.O.(Rt) No. 2865/2 No. G.O.(Rt) EE(BM)05/2016-2017 EE(BM)05/2016-2017 4202-01-800-88 project 16/07/2015 of the Genera of the 16/07/2015 TS Reg. No.2895/2015-20 Reg. TS 4202-01-800-88 (NP) 285 Dt 16

5- work Construction of completed, building for GMLPS

Tirur electrical

Edakkulam )22/201 8 months 1.11.2014 Education 4.07.2015 2078840/- 1787802/- 25,00,000.00 14% below 14% 26.08.2015 25.04.2016

for 25 lakhs arranged Malappuram BM dated 18.11.2014 dated ( N. Kunhimuhammed N. 4202-01-800-88 (NP) EE DR/65/2014-15 Dt24.3.2015 Dt24.3.2015 DR/65/2014-15 GO(Rt)No.5067/2014/G.Edn GO(Rt)No.5067/2014/G.Edn PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 89 PWD BUILDINGS DIVISION MALAPPURAM 286 t d

LAC ADS 2013- 16 14:Construction of 5- Civil works New block building 1//201 completed

for GLPS, Tuvvur, 7 8 months Wandoor ) Education 2413425/- 3097872/- 25.00Lakh 26.09.2015 23/02/2015 Rahmathulla Malappuram Malappuram BM 28.36% above E/R 28.36% ( 4202-01-800-88(NP) EE Dt.02/07/2014 for Rs.25Lakh Dt.02/07/2014 DR/54/2014-15 dt 22.01.2015 dt DR/54/2014-15 GO(Rt) No. 2608/2014/G.Edn 2608/2014/G.Edn No. GO(Rt)

287 t LAC - ADS - 2014- d 7 1 15. Construction of - School building to site to be GHSS Veliyankode

0/12016 changed above of ER 5 alappuram . 3170/2015/G.Edn . 3170/2015/G.Edn 015 for Rs.44 Lakh 015 for Rs.44

in Malappuram 1.01.2016 2.02.2016 0.09.2016 1,14,823/- 3,48,956/- 01-800-88(NP) 2016 (PRICE) dated dated 2016 (PRICE) ) Education 44.00Lakh E 4 1 10 months .Velayudhan %% oo - - 22 00 22 33

44 44 MM M)

District.(Ponnani M. BM ( 5.69

LAC) 4202- EE Dt.01.08. GO(Rt) N 2273/2015 - 2273/2015 4202-01-800-88- LAC ADS (NP) 288 - AC er L LAC-ADF 2014-15 d

Construction of a ) ect un j

First floor Building NP ( Work completed -pro for Govt Higer 25L 8month 2498868 2663793 88 ADS Education Education - secondary school 28.01.2016 MANKADA Shamsudheen K Shamsudheen

mankada pallipuram 800 - 6.6% Above for E/R Above 6.6% 01 - MLPM/2015-16/2015/5942 GO(Rt)NO:2867/2015/D.Edn EE(BM)11/2016-17 dt 06.06.2016 dt EE(BM)11/2016-17 4202 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 90 PWD BUILDINGS DIVISION MALAPPURAM

289 S D A

AC er L Construction of d Building for GHSS ) Masonry in

,Marancheri (First un ects j NP

( progress Ponnani

floor) in Malappuram 4792177 5209096 Education 10 months 50,00,000.00 -pro 30.06.2016 30.06.2015 28.01.2016 8.7% above 8.7% Malappuram District 88 - KV. Muhammedali KV. 800 - 01 - EE(BM)21/2016-17 Dt 23.06.2016 Dt EE(BM)21/2016-17 GO(Rt) No.2602/2015/G Edn dated Edn dated No.2602/2015/G GO(Rt) 2317/2015-16 dt 04.01.2016 (PRICE) dt 2317/2015-16 4202

290 S D A

2.20152 ated a 1 d ACAC er L d Construction of ) transffered to

GFLPS Ponnani in un ects j NP

( COSTFFORD

Ponnani Malappuram District Education 53,50,000.00 -pro 11.08.2015 Malappuram 88 - 800 - 01 - GO(Rt) No.3362/2015/G Edn d No.3362/2015/G GO(Rt) PRICE No.1935/2015-16 dtd.07.1 No.1935/2015-16 PRICE 4202 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 91 PWD BUILDINGS DIVISION MALAPPURAM

291 S D A -

Construction AC

ofAdditional block er L d (Balance portion II

nd floor) for ) ects un ects

j FF slab casted NP

Government ( Tanur 4829882 5308040 Education pro 10 months 50,00,000.00 01.03.2016 Devadhar Higher 20.08.2016 Malappuram K.Anilkumar 88 9.9% above ER 9.9% Secondary School, -

Tanur 800 - 22.05.2015 for Rs.50 lakhs 22.05.2015 for Rs.50 2781/2015-16 dtd 22.01.2016 dtd 2781/2015-16 01 - EE(BM)31/2016-16 dt 11.08.2016 dt EE(BM)31/2016-16 GO(Rt)No1942/2015/G.Edn. Dated Dated GO(Rt)No1942/2015/G.Edn. 4202

292 S D A - ated 016 ss 16 1 22 DD ACA h er L d Construction of Civil work Building for ) ects un ects

j completed NP

Government High ( Tanur

4840072 4713746 electrical tenderd Kottakkal Education pro 12 months Abdulla.K 50,00,000.00 09.10.2015 School, Meenadathur 04.03.2016 03.03.2017 Malappuram 2.61% below 2.61% 88 - 800 - 15.07.2015 for Rs.50 lakh 15.07.2015 for Rs.50 2878/2015-16 dtd 27.01.20 dtd 2878/2015-16 01 - EE(BM)79/2015-16 dt 01.03. dt EE(BM)79/2015-16 GO(Rt)No.2846/2015/G.Edn. GO(Rt)No.2846/2015/G.Edn. 4202 1 293

Construction of building for Seethi Agreement haji memmorial executed Eranadu

GHSS Edavanna at 4823050 Education 5527215/- 10 months 26.02.2016 50.00 lakhs 50.00 lakhs Malappuram kunduthodu above 14.6% dated 17/11/2014 dated VP Muhammed Ayoob VP R/91/2014-15 dt 31.03.2015 dt R/91/2014-15 O ( Rt) No 5020/2014G edn 5020/2014G No ( Rt) O 202-01-800-88 LAC - ADS NP - ADS 202-01-800-88 LAC E(BM)47/2016-17 dt 09.09.20 dt E(BM)47/2016-17 D G 4 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 92 PWD BUILDINGS DIVISION MALAPPURAM

294 - 02 - 24 t d

Construction of 16

5- civil work building for GHS

2016 completed Eranadu 40 lakhs

Vadasseri 3809504 6/201 Education 47729228 10 months 04.03.2016 03.01.2017 40.00 lakhs 40.00 lakhs Malappuram 7 AbdualSalam 25.29% above 25.29% ) dated 04/03/2014 dated 4202--01-800-88(NP) BM 26-09-2015 Re tender 26-09-2015 Re ( EE GO ( Rt) No 1182/2014 G edn G 1182/2014 No ( Rt) GO DR/81/14-15 dated 31-03/15 for 31-03/15 dated DR/81/14-15 295 r

Construction of plinth beam building for GHS 01617 completed Eranadu

Perakamanna, Othai 3629784 8 months Education 4462819/- 28/11/2014 Malappuram AbdualSalam 22.95% above 22.95% /85/14-15 dated 31- dated /85/14-15 02--01-800-88(NP) edn dated TVM TVM edn dated .01.2016 Re tende .01.2016 Re 40.00 lakhs(50 L) 40.00 lakhs(50 03/15 for 40 lakhs 03/15 ( ( Rt) No 5303/2014 G G 5303/2014 No ( Rt) 22 RR 88 4 2 D GO 296 0

2013-14 Construction of building for Work completed, Manjeri

GVHSS Nellikuth 4406684 5265987 Education 10 months 26.12.2015 13/08/2014 50.00 lakhs 50.00 lakhs 21-05-2015 25-10-2016 Malappuram 19.50% above 19.50% Asik Ahammed Yasuin Ahammed Asik 4202-01-800-88 LAC -ADS (NP) -ADS 4202-01-800-88 LAC GO ( Rt) No 3254/2014 G Edn dated TVM TVM Edn dated G 3254/2014 No ( Rt) GO Agt No. EE (BM)45 / 2015-16 dated 16.12.2 dated 2015-16 / EE (BM)45 No. Agt DR 41/2014-15 dated 19-11-2014 for 50 lakhs 19-11-2014 dated 41/2014-15 DR PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 93 PWD BUILDINGS DIVISION MALAPPURAM 297 1

Construction of civil and building for GBHSS electrical 529955 Manjeri

Manjeri 4848632 completedd Education 10 months 50.00 lakhs 50.00 lakhs 29-12-2015 28-10-2016 26-09-2015 9.3% above 9.3% Malappuram TVM 01/06/2015 TVM 4202-01-800-88 LAC -ADS (NP) -ADS 4202-01-800-88 LAC Ansam (India) construction & Devp construction (India) Ansam GO ( Rt) No 2128/2015 G Edn dated Edn dated G 2128/2015 No ( Rt) GO 908/2015-16 dated 24-08-2015 (price) dated 908/2015-16 Agt No. EE (BM)50/ 2015-16 dated29-12- EE (BM)50/ No. Agt

298 - AC

LAC -ADF- er L Construction of d 13 13/G.Edn. 13/G.Edn. 31-03-15 15-12-15 un 23.02.2015- rr t 00 00 ee dd t mm building ildi ffor Gov. G WkWork ect Upper Primary j completed, 16 NP pro School Pallikkuth in 25 L electrical to be Ansari 2172807 2366187 88 8 months Nilambur Education -

Nilambur abov 8.9% arranged Malappura dated 20/12/2 dated

Constituency. (2013- 800 -

14) 01 - 26-09-2015 Retende DR/82/2014-15 date DR/82/2014-15 G.O (Rt) No. 55545/2 No. (Rt) G.O EE(BM) 72/2015-16 dt dt 72/2015-16 EE(BM) 4202

299 - AC er L

LAC - ADS - 2014 - d 15. Construction of ect un

class room building j for Govt. High FF slab casted NP pro 2016

School Cheriyam 88 Mankada Education 10 months - 15% below below 15% 01.09.2016 28.09.2016 50.00 lakhs 50.00 lakhs 46,07,379/- Malappuram Mankada in 39,16,271.79 800 Malappuram Dt - 01 Sasikumaran.T, Payyanad Sasikumaran.T, - 2392/2016-2017 (PRICE) Dated Dated (PRICE) 2392/2016-2017 EE(BM)62/2016-17 dt 28.10.2016 dt EE(BM)62/2016-17 4202 G.O(Rt)No.672/2016/Gedn dtd 18-02- dtd G.O(Rt)No.672/2016/Gedn PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 94 PWD BUILDINGS DIVISION MALAPPURAM

300 - AC er L d LAC - ADS - 2014 - ect un

15. Construction of a j first floor Building work started NP pro 02-2016

for Scout Hall at 88 Education 10 months - 23.09.2016 20.00 lakhs 20.00 lakhs 18,99,905/- Malappuram Malappuram Malappuram. 16,31,913.86 Dated28.06.2016 800 - 14.11% below of ER below 14.11% 01 - 1169/2016-2017 (PRICE) (PRICE) 1169/2016-2017 Moideen.PK, Malappuram Moideen.PK, EE(BM)63/2016-17 dt 01.11.2016 dt EE(BM)63/2016-17 G.O(Rt)No.821/2016/GEdn dtd 27- dtd G.O(Rt)No.821/2016/GEdn 4202 301

LAC -ADF- Construction of building for Gov. 013, for Rs 50 013, for Rs L -85

ed 30-01-2014 5000000

Highergy Secondary 44 n ntractors Pvt. Ltd., ntractors 3 3 22 tt mm 33 ss 11 ss 00 4 r n 9 School 4 Civil & Pookkottumpadam in Electrical Lakhs Lakhs Amarambalam in 9.25% workcompleted Nilambur 26-Jul-14 Education 8 moonth 14-Sep-14 50 Lakh 27.11.201 30-11-201 Rs. 484829 Rs. Malappura (Nilambur Rs. 52.9676 Rs. Constituency) 42302-02-80

Malappuram District. Dated:18-02-2016 (2012-13). EE (BM) 42/2013-14 da 42/2013-14 EE (BM) DR 40/2013-14 dtd. 12/8/ dtd. 40/2013-14 DR Mehaboob. C,.ASHTEC Co Mehaboob. C,.ASHTEC 302 LAC-ADS Construction of Audio Vsual Theater 25 work dropped at Kottakkal Rajas L GO(RT) Education 88(project)

Higher secondary 20-11-15 dt Malappuram 4202-01-800- KOTTAKKAL school . NO:5462/2015/G Edn NO:5462/2015/G 4202-02-800-85-projects under LAC ADF (NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 95 PWD BUILDINGS DIVISION MALAPPURAM 303 DF A

AC er L Karingappara: d Construction of Civil and ) ects un ects

Building at GUPS j electrical NP ( Tanur gen.edn. Karingappara Ozhoor 50Lakhs completed 8 months 3.10.2013 Education 5418970/- 4709083/- Abdulla.K Kottakkal 21.02.2014 20.10.2014 dt.9/9/2013 dt.9/9/2013 Malappuram 5-pro 14.9% above 14.9% Rs.4716249/-

grama Panchayath 20.02.2014 dtd 8 DR/67/2013-14 DR/67/2013-14 - EE(BM)48/2013-14 EE(BM)48/2013-14 GO(Rt) No. 3017/2013/ No. GO(Rt) 800 dt.20/07/2013for 50Lakhs dt.20/07/2013for - 02 - 4202 304 - dn ankadaa 20132 0140 EE . 2 ACAC LAC-ADF-Tirur M er L

Constituency- d Renovation works to Government Schools completed ects un ects j Tirur

in Tirur Constituency 15.40% 6 months Education 425 Lakhs 17.05.2014 16.11.2014 15.06.2015 40687899/- 46953836/- Malappuram in Malappuram 5-Pro 8 - District dtd.Tvm.23/05/2013 800 ) - SE(K)3/2014-15 dtd.08.05.2 SE(K)3/2014-15 GO(Rt)No.2151/2013/Gen/ GO(Rt)No.2151/2013/Gen/ 02 NP 19/CE/BL/2013-14 dtd.10.09. 19/CE/BL/2013-14 - ( P.Ahammedkutty.Vellila PO, M 4202 ADF PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 96 PWD BUILDINGS DIVISION MALAPPURAM 305 DF A - LAC -ADF- AC Construction of er L

building for Gov. d Manavedan Higher

Secondary School at ) Masonry in ects un ects j NP

Nilambur in ( progress 4999199 8 months Nilambur 50 Lakhs 50 Lakhs 5761557/-

Malappuram in 12.08.2015 5- Pro P.Mohammed 15.25% above 15.25% 8 - General education education General Nilambur General Education Constituency. (2012- 800 - 28/05/2013 for Rs 50 Lakhs 50 Lakhs for Rs 28/05/2013

13). 30.03.2015 dt DR/77/2014-15 02 - EE (BM) 25/2016-17 dt 25.06.2016 dt 25/2016-17 EE (BM) GO(Rt) No. 2235/2013/G.Edn dated dated 2235/2013/G.Edn No. GO(Rt) 4202

4210-01-800-88 306 dn 5dt 5dt 110 nn EE t s 1

PULAMANTHOLE - work completed Construction of electrical

building for GHSS Lakh tendered 11000000 Education 10 months 07.07.2014 30.04.2015 18.09.2015 10430691/- 13695497/- Pulamanthole 26-09-2015 25-06-2016 31.3%above Malappuram Perintalmanna 4210-01-800-88 Ansam Constructio Ansam SE(K)31/2015-16dt SE(K)31/2015-16dt Reg.No. CR/11/2014-1 Reg.No. GO(Rt) 1188/2014 /G /G 1188/2014 GO(Rt) dated 04/03/2014 for Rs for Rs 04/03/2014 dated 5054-80-800-67 307

d ate d

14

Vazhakkad: Govt - HSS Vazhakkad, Completed. 25Lakhs 2500000 )34/13

Ground Development 13/01/14 8 months Kondotty Education 23/2/2014 2302413/- 22/10/2014 03-05-2015 03-05-2015 Malappuram DR/15/2013-14 BM dated 27.02.2013 dated E.Mohammed Ali dated 18.07.2013 dated ( EE 6.40% above Estimate rate above Estimate 6.40% GO(Rt)No.956/2013/ G.Edn G.Edn GO(Rt)No.956/2013/ 5054-80-800-67 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 97 PWD BUILDINGS DIVISION MALAPPURAM 308

14 - Civil & Porur: Construction electrical work of Building for 26/2013 completed. ) 8month

GHSS Porur 2500000 Wandoor Education 18.10.2013 17.06.2014 02.08.2014 02.07.2014 Malappuram BM 6% above ER 6% dtd11/12/2013 For 23.50lakhs For ( 5054-80-800-67 Rs.2079055.00/- Rs.2163074.00/- C.K Abdul Kareem Abdul C.K EE Dtd.TVM 08.03.2013 Dtd.TVM DR /6/2013-14 dtd28/06/2013 dtd28/06/2013 /6/2013-14 DR GO (Rt) No.1142/2013/G.Edn No.1142/2013/G.Edn (Rt) GO 309

d ate d

Mambad: 5 Civil & 1 Construction of - electrical work Building for GVHSS completed. 13/14

Rs.25 L Rs.25 alappuram o.946/2013/G.Edn o.946/2013/G.Edn 2500000 8 months 5-02-2014 4% above ER 4% Wandoor Education VM 27.02.2013 VM 2180602/- 2810289/- 13-14dt 20.08.2013 13-14dt 54-80-800-675 Kareem Abdul 17.07.2014 16.03.2015 31.04.2015 28.04.2015 1 1 3 2 1 10.07.2014 22 77

MampadMampad NN MM 0 TT M)M K 50 B 42. ( C.K Dtd. EE GO (Rt) DR/61/20

310 t d

14

COSTRUCTION OF - Civil & BUILDING AT electrical work 16/13

GOVT: RAJAS HSS 25 L completed. ) 8month Education completed completed 25/10/2013 27/02/2013 04-11-2013 05-07-2014 27-09-2013

KOTTAKKAL 2367313.00 2367313.00 Mammudu.K BM Malappuram KOTTAKKAL ( 5054-80-800-67 H&FWD DT TVM EE GO(RT) NO:953/2013 NO:953/2013 GO(RT) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 98 PWD BUILDINGS DIVISION MALAPPURAM 311

COSTRUCTION OF Civil & BUILDING IN electrical work GVHSS AT 75 L completed 8 month

PULLANUR (2012- 02/08/13 Education 09-02-2015 08-10-2015 07-01-2016 28-12-2013 7156706.00 Malappuram 10096681.00 Malappuram 13) 5054-80-800-67 G.EDN 27/02/2013 G.EDN Meersa , west kodur , west Meersa DR 26/2013-14 DT DT 26/2013-14 DR GO(RT) NO:949/2014 NO:949/2014 GO(RT) Finishing work on progress work Finishing EE(B)28/14-15 dt 21-10-14 dt EE(B)28/14-15 312 NDED A K COSTRUCTION OF Civil & ND H A BUILDING FOR electrical work

GHSS MANKADA 90 L completed. OVER 8 month alappuram Education completed completed LETED boobacker. 54-80-800-67 22/01/2014 21/09/2014 19-08-2013 3.97% above 3.97% 8513268.00 9702572.00

PALLIPURAM 02/08/2013 13-14 DT 33/13-14 dt 13/01/14 dt 33/13-14 3 5 53/2013 G.Edn 27/02/2013 G.Edn 53/2013 MANKADAM PP 00 MM 11 ) 0 AA 5 M CO EE(BM) DR 30/20 DR RK O W GO(RT) NO:9

5054-80-800-67(NP) 313 er d

Kuzhimanna: Construction of Structure Building for GHSS , e-ten Re- completed Eranad 40 lakhs Education 3668089/- 6639241/- 10 months 19.11.2015 19.03.2013 24.10.2013 Kuzhimanna 21.11.2015 20.09.2016 2013 Malappuram . DR 31/2013-14 31/2013-14 DR K P Noorudheen P K 08 . EE(BM)36/2015-16 dt dt EE(BM)36/2015-16 81% above estimate rate above estimate 81% 26 dated 03.08.2013. 40 lakhs dated G.O (Rt.) No.1289/213/ G. Edndt Edndt G. No.1289/213/ (Rt.) G.O 5054-80-800-67(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 99 PWD BUILDINGS DIVISION MALAPPURAM 314 5 1 - Construction of Civil & Building for electrical works

Trikkulam GUP )26/2014

50 lakhs completed. 8 months K.Moosa Education 3355572/- 4386068/- 20.10.2014 19.06.2014 18.08.2015 30.06.2015 23.05.2013

Tirurangadi School Auditorium Malappuram BM 30.71% above 30.71% ( dated 18.10.2014 dated 03.09.2013 45 lakhs Gnl/Edn.dated Tvm Gnl/Edn.dated EE GO(Rt)No.2152/2013/ DR-66/2013-14 EE, Mlpm EE, Mlpm DR-66/2013-14 5054-80-800-67(NP) 315 14 - Construction of Civil & 0/13 5

building for GHSS ) electrical works 98 lakhs Peruvallur 98 lakhs completed. 8 months BM Education 9087141/- 19% above 19% 12.12.2013 11.08.2014 ( DR/03/2013 Vallikkunnu Malappuram EE dated 24.02.2014 dated 14dated10.04.2013 5054-80-800-67(NP) 3/G.Edn.dtd.21.02.2013 AS.No.GO(Rt)No.848/01 K.Manikandan, Ariyallur 316

d ate d

Pattikkad: 5 1

- civil and Construction of electrical Building for GHSS Manjeri

)10/14 completed 8 months 8 months 10000000 Education 9167553/- 23.06.2014

Pattikkad 27-06-2014 26-02-2015 Malappuram 114585524/- dt 28/06/2013 dt 24.99% above 24.99% BM ( DR 11(A)/2013-14 DR 5054-80-800-67 (NP) Dtd.TVM 04/03/2013 Dtd.TVM K.Aboobacker Manzil K.Aboobacker EE GO(Rt) No.1061/2013/G.Edn. No.1061/2013/G.Edn. GO(Rt) 5054-80-800-68 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 100 PWD BUILDINGS DIVISION MALAPPURAM 317

COSTRUCTION OF BUILDING IN Civil & GVHSS AT 50L electrical works

IRUMBHUZI (2012- 8 month completed. Education completed completed 27/02/2014 21/06/2014 17-12-2013 20-03-2015 31-08-2015 21-08-2015 4916916.00 7947703.00 Malappuram Malappuram

13) above 61.64% 5054-80-800-68 DR 20/2013-14 DT 28/06/13 DT 20/2013-14 DR EE(BM)09/14-15 dt 17-06-14 dt EE(BM)09/14-15 GO(RT) NO:947/2014 G.EDN G.EDN NO:947/2014 GO(RT) Lathhef .v PWD Contracor , Wesat kodur , Wesat Contracor .v PWD Lathhef HEAD OF ACCOUNT NOT MENTIONED 318 Construction of AS obtained. Building for Land conversion Government Higher

######## permit to be Tanur lappuram d ducation ##

aa Secondary School , E obtained. M

Ponmundam ### 319 Additional Block Cancelled GVHSS, Tirur Kalpakanchery Education 100 Lakhs

320 t d 7 1 University Campus: - Construction of Civil & /2016

Building for GMHSS 7 electrical works Nil )1

,Calicut University 13.06.2016 completed. 8 months Education 5114539/- 6239738/- 22% above 22% 10.12.2013 17.08.2014 61.66 lakhs BM DR/01/2013 Vallikkunnu

Campus ( 14dated10.04.2013 EE AS.No.GO(Rt)No.8851 3/G.Edn.dtd.23.02.2013 K.Anilkumar, Karuvasseri. K.Anilkumar, PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 101 PWD BUILDINGS DIVISION MALAPPURAM 321 000.00 7 1 - Construction of a

School Building for /2016 7 Main slab casted )1

GLPS Alankode in Babu Ponnani 3978510 8 months Education 2693643/-

Malappuram District 08.07.2015 BM Malappuram ( dated13.06.2016 10.01.2014 for 30 L EE 47.7% Above for E/R Above 47.7% DR/13/14-15 dt 13.07.2014 dt DR/13/14-15 30,00, G.O.(Rt)No.189/2014 G.Edn dated dated G.Edn G.O.(Rt)No.189/2014 322

d ate d Thavannur: 16 r

Construction of 5- Civil and Higher Secondary electrical .90% /2014/G.Edn dated dated /2014/G.Edn 33897 15 dt 14.11.2014 15 dt avanu 21627/- udhan .M ,00,000.00 Months M ucationu appurama 05.2014 12.2015 03.2017 1 0 0 0 12/2015 1 03.2015 44 -- 66 l 1 / hh 3 3/201 y 0 d 3

SSchool h l BBuilding ildi 91 completedltd T Ed 15 )43 18. 17. 08. 05. 11/ 123 100 Mal GHSS, Kadanchery Velay BM ( EE DR/39/2014 GO(Rt)No.178 323 LSGD Construction of Thenhipalam Auditorium for Panchayath Government LP taken over the Education School, University Vallikkunnu Malappuram ########### work 324 Construction of class room building for Transferred to Government LP LSGD. School Education 30.00 lakhs 30.00 lakhs Vallikkunnu Malappuram Melodiparamba 325 Construction of class Land not room building for identified Government LP Work cancelled Education

School Koomanna 30.00 lakhs Vallikkunnu Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 102 PWD BUILDINGS DIVISION MALAPPURAM 326 Estimate submitted on Construction of Class 04.06.2014 room building for returned from Government UP Circle for want School of Panchayath Education 25.00 lakhs 25.00 lakhs Vallikkunnu Malappuram Chenakkalangadi resolution. Panchayth taken over the work 327 Estimate Construction of Class submitted on room building for 20.08.2014 Government UP return from School Chalil in Circle to Assistant Education Munniyoor Grama 40,00,000.00 Vallikkunnu Malappuram

Panchayath Engineer for Panchayth resolution 328 Estimate prepared and submitted on Construction of Class 25.06.2014.Retur room building for ned from SE VHSS Chelari Office to Re- Education 65,00,000.00 Vallikkunnu Malappuram calculate with cost index & Panchayth resolution 329 Estimate for Administrative Construction of Class Sanction Room Building for submitted Government LP 09.07.2014 & Education School Karippur 25,00,000.00 Vallikkunnu Malappuram

Resubmitted on 08.01.2015 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 103 PWD BUILDINGS DIVISION MALAPPURAM 330 Estimate for Construction of Administrative Dining hall cum class Sanction room building for submitted on GMLPS 17.07.2014 & Education 25,00,000.00 Vallikkunnu Malappuram Kumminiparamba

Resubmitted on 08.01.2015 331 Construction of Informed to building for GLPS MLA School, Vallikkunnu Education Vallikkunnu Malappuram ########### 332 t d

Construction of 7 r building for PCNGHS Second floor

Mookkuthala (First & 44/20161 slab casted

below E/ ducation -2017 (PRICE)dt for Rs 51.50 Lakh for Rs uthan Kutty uthan 052285/- 0 months 1,50,000.00 Ponnani alappuram 9.06.20169 6.09.20166 4749148 4 9.07.20169 .922/2016/G.Edn dt dt .922/2016/G.Edn 66 66 hh EE 55 11 5 5 %% 22 00 SecondSecond fl floor)oor) i inn 22 M)M MM 6 B Ac Malappuram District ( EE 1252/201 02.03.201 GO(Rt) No. 333

d ate d LAC ADF 2012-

14 Civil & 13:Construction of - electrical work

Building for GHSS 9/13

8month Manjeri ) completed Education 07.09.2013 Pandikkad 13-09-2013 12-05-2014 12-05-2014 Malappuram 1%below ER 1%below dt 02.08.2013 dt RS.86,51,255/- DR 28/2013-14 DR BM RS.8738641.00/- ( Dtd.TVM 15.02.2013 Dtd.TVM EE Manzil constructions, Kochi. Kochi. constructions, Manzil GO (Rt)No.726/2013/G.Edn. (Rt)No.726/2013/G.Edn. GO PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 104 PWD BUILDINGS DIVISION MALAPPURAM 334

Pangu: Construction Civil work of Building for completed GHSS , Pangu, electrical 125 L 42324 42689 GO(Rt) 12month Mankada 12500000 12500000 20337591 Education

Kuruva Gp: above 75% arranged Malappuram Reg No, 15/2014 dt dt 15/2014 No, Reg Dt.TVM 22/02/2013 Dt.TVM No.879/2013/G.Edn No.879/2013/G.Edn M.Ahamed kutty Haji 20.08.2014 of SE KKD 20.08.2014 of SE Quatation Date 02.02.2015. Date Quatation 335 0

LAC ADS 2013- Civil & 2014 construction for electrical work building for GHSS Kottakal

2399671 completed 8 months Education 2637238/-

Peressanoor 22.06.2016 Malappuram 9.90% above 9.90% V.Venugopal, V.Venugopal, 9.9% above ER 9.9% t) No:2932/2015/G.Edn No:2932/2015/G.Edn t) ) 19/2016-17 dt 15.06.2016 dt ) 19/2016-17 25,00,000.00 3.02.2016 (Retender) 15-2016 (PRICE) dt 04.01.2 dt 15-2016 (PRICE) 2 21/07/15 for Rs.25Lakh 21/07/15 RR 2 2 0 M Dt. GO( EE BM

2321/20 336 As per Govt. circular LAC ADS 2013- No.54/2014/Fin 2014 construction for dtd. 03.06.2014 building for GUPS 25.00 L

Kottakal this works to be Education Painkannur Malappuram done by the LSG engneering wing 337

16

LAC ADS 2013- 5- 14:Construction of civil work 4/201 5

building for Govt. ) completed 8 month 2500000 Wandoor Education 25.09.2015 Bazar UPS, Kalikavu. 12.01.2016 11.09.2016 Malappuram BM Rs.2627212/- dtd04.01.2016 ( Mohammed .A 9.30%above ER 9.30%above Rs.2403671.00/- EE Dt.01/07/2014 for Rs.25 Lakh for Rs.25 Dt.01/07/2014 DR/59/2014-15 dt 10.02.2015 dt DR/59/2014-15 GO(Rt) No: 2590/2014/G.Edn 2590/2014/G.Edn No: GO(Rt) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 105 PWD BUILDINGS DIVISION MALAPPURAM 338 Site levelling started.The proposed building site is situated in the valley side of a hill.A school building has constructed by the same contractor on the top side of this

r proposed site.So a retaining wall LAC ADS 2013- may be 14:Construction of constructed in building for between the two 5000000 Wandoor 10 month Education 40% above 40% Govt.HSS Pullengode 07.10.2015 06.08.2016 Malappuram Rs.4859409/- Rs.6803173/- ohammed Akba builldings.Letter 91/2014/G.Edn Dt.01/07/2014 Dt.01/07/2014 91/2014/G.Edn 2 28/2015 16 dt 03/10/2015 16 dt 28/2015 9.12.2014 of EE,PWD(B)Dvsn,Mlpm 9 55 MM 2 hitthhas given to the HM for constructing a EE(BM) EE(BM) retaing wall by

GO(Rt) No. 2 using the fund of District

DR/49/2014-15 dtd2 DR/49/2014-15 Panchayath.They assured that the retaining wall will construct the Dist.Panchayath. But there is no furteher action.If PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 106 PWD BUILDINGS DIVISION MALAPPURAM 339 LAC-ADS MANKADA CONSTITUENCY- MARKABLE MANKADA- SAMAGRA VIDYABHYASA PADHATHI- Estimate RENOVATION TO submitted for AS

THE SCHOOLS 8955946 Mankada Education

Malappuram UNDER "ONE MODEL SCHOOL IN EACH GRAMA PANCHAYATH & ONNAM CLASS ONNAM THARAM "PROGRAMMES 6 5 0

340 // LAC ADF 2014- 15 0 construction of Building for A E O office cum tendered Comstuency Mankada Education Education Center Malappuram Mankada in Mankada

LA Constituency GO(Rt)NO:2869/2015 40,00,000.0 MLPM/2015-2016/2015 341 LAC- ADS 2015-16 (MANKADA LA CONSTITUENCY) CONSTRUCTION OF FIRST FLOOR AS obtained, TS BUILDING AT to be obtained GO(Rt) Mankada 10000000 Education

TALUK HOSPITAL 10.08.2016 Malappuram

MANKADA IN 4210-01-800-88 MALAPPURAM DT No.2217/2016/H&FWD dt dt No.2217/2016/H&FWD PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 107 PWD BUILDINGS DIVISION MALAPPURAM 342 LAC -ADS 2015-16 RENOVATION OF AUDITORIUM AT GOVT.POLY ts estimate TECHNIC under GO(Rt) 4000000 Mankada COLLEGE preparation Education 22.07.2016 Malappuram PERINTHALMANN 4202-01-800-88 A IN MANKADA LA CONTITUENCY dt No.1943/2016/Hedn 343 Construction of Estimate building for GHSS submitted for AS

Eranadu Keezhuparamba Education 90.00 lakhs 90.00 lakhs 21-06-2014 Malappuram 344 ollector , ted dated 12.00 3 for Rs ted 05/02/2015 ted t kodur. t t CC aa 11 a Balance work for s newly constructed building for GHSS Work completed lakhs lakhs Manjeri

Karakkunnu in 1199508 1199508 6 months 6 months Education 26-06-2014 12.00 lakhs 12.00 lakhs Malappuram Estimate rate Malappuram District Malappuram. V. Abdul Rasheed ,Wes Rasheed Abdul V. 11/09/2014 of the District District of the 11/09/2014 Order No .G2- 46147/14 d 46147/14 .G2- No Order Agt. No EE(BM)43/2014-15 da EE(BM)43/2014-15 No Agt. DR 37/2014-15 dated 02.08.20 dated 37/2014-15 DR 345 LAC-ADS-2014-15 Balance works to the newlay constructed AS notobtained.

buildings GVHSS 15 lakhs Education

Malappuram Malappuram Arimbra.

346 Construction of building for Estimate Premetric Hostal at submitted for AS

Education Odakkayam Malappuram 176.00 lakhs 176.00 lakhs Eranadu 24-06-2014 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 108 PWD BUILDINGS DIVISION MALAPPURAM 347

LAC -ADF- d ate d

Construction of

building for Govt. 16 M.L.P School 5- Nearing

Chandakkunnu in /201 completion 2494197 2972335 8 months Nilambur 77 Education 25 Lakhs 25 Lakhs saju joseph 24.02.2016 22.01.2016 21.09.2016 Nilambur ) Malappuram

Constituency. (2013- 7/12/2013 dated BM ( 19.17% above of ER 19.17%

14) on 12-8-15 Re-tendered EE DR/50/14-15 dated 29-12-14 dated DR/50/14-15 G.O (Rt) No. 5324/2013/G.Edn. 5324/2013/G.Edn. No. (Rt) G.O

348 LAC -ADF- - 30

Construction of d

building for Gov. ate d

r Higher Secondary

16 Civil &

School 5- electrical work 50% 2014 Eranhimangad in 1015 ilambu .Varghese -06-2015 -04-2016 -10-2014 ducation 0 Lakhs 0 Lakhs 0 months 0 . 5324/2013/G.Edn. . 5324/2013/G.Edn. d 7/12/2013 d 5 740548 s. s 5289628.48 alappuram a 20-09- 014-15 dated 0 0 0% above 0% completedcompleted 77 66 88 NN DD 55 EE e 11 o 0/201 2 4 RR 1 1 ChChaliyar li GP iin EErnad d 2 MM C. )30/ Rs. LA Constituency in date BM

Malappuram Dt. (

(2013-14) EE Price /109/2 Price G.O (Rt) No 349

LAC -ADS- t d

Construction of a 7 1 building for GLP - School at work completed

Karimpuzha in P Ali )06/2016 2497009 2721240 8 months Nilambur Education 25 Lakhs 25 Lakhs 23.05.2016 01.02.2016 31.10.2016 Nilambur 26.09.2015 Malappuram BM

Constituency. (2014- ( Edn dated 21/03/15 Edn dated 8.98% above for E/R 8.98%

15) EE 987/2015-16 gt 06-09-2015 gt 987/2015-16 G.O. (Rt) No. 1118/2015/G. 1118/2015/G. No. (Rt) G.O. PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 109 PWD BUILDINGS DIVISION MALAPPURAM

LAC -ADS- Construction of G.H.S. building at TS to be 350 Marutha in Nilambur accorded Nilambur 40 Lakhs 40 Lakhs Education

Constituency. (2014- 24.03.2015 GO(Rt) No. Malappuram

15) 4201-01-800-88 1162/2015/G.Edn dt TVM TVM dt 1162/2015/G.Edn

LAC-ADS- Construction of a building for GLP school at Estmated 351 Mamamkara in submitted for AS 15 lakhs Nilambur Education Nilambur Malappuram constituency (2015- at estimation to be optained to estimation at a 2016) y Panchay 352

LAC-ADS- Construction of a building for GUP School Pulliyil in put on tender 2017 936326 6monyh

Nilambur 10Lakhs Nilambur Education 04-02-2017 Malappuram constituency (2015- 4202-01-800-88 2016) Tvm 26/11/2016 GO(Rt) No.4057/2016/Gedn dtd dtd No.4057/2016/Gedn GO(Rt) Reg No.3764/2016-17 dtd 11-01- dtd No.3764/2016-17 Reg Panchayat estimation to be optained to estimation Panchayat PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 110 PWD BUILDINGS DIVISION MALAPPURAM 353

LAC-ADS- Construction of a building for Government

Estimate estimate ace for theis Manavedan submitted for AS

Vocational Higher 50Lakhs Nilambur Education Malappuram Secondary school constituency (2015- 2016) Checking whether sp Checking 354 COSTRUCTION OF BUILDING AT AS G..U.P.SCHOOL 25L obta

alappuram NAYADIPPARA ined Education OTTAKKAL MM KK KOTTAKKAL 355 1

COSTRUCTION OF BUILDING IN A.U.P AT completed 25 L 2014 26.60% PANDALLUR (213- 8 month Education 07.01.2016 06.09.2016 09-03-2015 2350688.00 2925971.00 Malappuram Malappuram

14) Veerankutty .C G.EDN 05/05/2014 G.EDN GO(RT) NO:1714/2014 NO:1714/2014 GO(RT) DR/30/2014/15 dated 05-09- dated DR/30/2014/15 EE(BM)/2015-16 dated 30-12- dated EE(BM)/2015-16 HEALTH DEPARTMENT 2059-01-053-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 111 PWD BUILDINGS DIVISION MALAPPURAM 356

Soil Kuttippuram: investigation Construction of Report submitted Building for CHC for Structural Health GO (Rt) Kottakkal Kuttippuram 47,00,000.00 Design from Malappuram 2059-01-053-99

DRIQ Work not strarted Dtd.TVM 18.10.2013 Dtd.TVM No.3518/2013/H&FWD No.3518/2013/H&FWD

4210-02-103-95 (NP) 357

d r ate d Edapatta: 14 Construction of - civil & electrical

Building for PHC 4/13 work completed above ER M 16/04/2013 Health /2013/H&FWD. /2013/H&FWD. 2-103-95 (NP) 5 Manjeri 8 month mmaed Akbem GO(Rt) alappuram a 84,29,672/- 42/2013-14 8 7 7 3.03.20143 8.03.2014 7.11.2014 7000000 1 12/08/2013 9-10-2013 9 .6021194.00 66 )) . %% 00 VV a 1 00 1 2

EdapattaEdapatta R MM dt dt Rs. 40 DR Rs. BM ( Moha 4210- Dtd.T EE No.1356

4210-02-104-95 358

Kondotty: Completed. Construction of Final bill Dialysis unit building nill Health 50Lakhs

5000000 4861553 submitted 8 months Kondotty

at CHC Kondotty 19/09/2013 18/05/2014 21/02/2014 Malappuram DR/54/2013-14 dated 20.03.2013 dated dated 17.08.2013 dated 6.25% above Estimate rate above Estimate 6.25% GO(Rt)No.953/2013/H&FWD GO(Rt)No.953/2013/H&FWD Ashtec Constructions Areacode Constructions Ashtec EE(BM)40/13-14 dated 30/01/14 dated EE(BM)40/13-14 4210-02-104-95 4210-02-110-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 112 PWD BUILDINGS DIVISION MALAPPURAM

359 5 1 -

Valanchery: 41/2014

Construction of ) column work in

Building for PHC BM progress ( Dtd.27.12.2014 Health GO (Rt) 8 Months Kottakkal 50,00,000.00 17.12.2013 EE Malappuram dt 03/08/2013 dt 42,47,873.00/- 56,41,175.00/- 4210-02-110-99 DR 33/2013-14 33/2013-14 DR P K Kunhammad K P 32.80 % above ER 32.80 % Dtd.TVM 12.03.2013 Dtd.TVM No.816/2013/H&FWD No.816/2013/H&FWD

360

Edayoor: Civil and Construction of electrical work Building at 30/2013 14 completed. 100% Health

Vadakkumpuram for GO (Rt) 8 Months Kottakkal 45,90,193.00 51,41,016.00 50,00,000.00 29.10.2013 31.01.2014 30.09.2014 31.08.2014 Malappuram Dtd.09.01.14 dt 03/08/2013 dt

PHC Edayoor 29,63,284.00/- 21,77,732.00/- DR 32/2013-14 DR 4210-02-110-99 K.Subramannyan td.TVM 25.03.2013 td.TVM 12.00 % above ER 12.00 % .1040/2013/H&FWD .1040/2013/H&FWD oo EE(BM) E DD N

4210-02-800-95

361 t d 7 1 -

Construction of PHC )04/2016 20.05.2016 E W started

building, Kuzhimanna BM Health ( Eranad 2421057 2663163 8 months 25,00,000.00 G.O (Rt.) 10% above 10% 26.11.2014 EE 4210-02-800-95 21.05.2015 retender No.3810/2014/H&PWD dt dt No.3810/2014/H&PWD DR/61/2014-15 dt 25.02.2015 dt DR/61/2014-15 Abdul Majeed.M.T Chathallur Majeed.M.T Abdul PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 113 PWD BUILDINGS DIVISION MALAPPURAM 362

Marakkara: Construction of

43/2013 14 work completed

Building for PHC 90% Health K.Rayu GO (Rt) 8 Months Kottakkal 50,00,000.00 44,79,941.00 55,96,790.00 27.03.2014 26.11.2014 30.10.2013 26-02-2015 Malappuram Work strarted 32,44,620.00/- 23,52,170.00/- dated 3.2.2014 dated 4210-02-800-95 24.93 % above ER 24.93 % EE(BM) Dtd.TVM 02.05.2013 Dtd.TVM No.1512/2013/H&FWD No.1512/2013/H&FWD DR 76/2013-14 dt10/9/2013 76/2013-14 DR

363 - 10 - 31 . d t

PERINTHALMANN d 5

A - Construction of 1 Mortury building at - Work Completed 2014 Health 4900000 THQH 3876372 5155575 8 months 33% above 33% 08-10-2014 07-06-2014 Malappuram oorudheen.K.P 81/2013 /H FWD dated dated FWD /H 81/2013 Perintalmanna Perinthalmanna 2013-14 dt 31.12.2014 2013-14 dt /2013 for Rs 49 Lakh for Rs /2013 / ) 4210-02-800-954 77 NN // 1 M)31/2014 BM ( 12/11 DR/87 EE GO(rt) 3 364

LAC ADS 2013- Column work 14:Construction of work in building for CHC Health 5000000 Wandoor progress 4743437/- 5839171/- 10 months

Kalikavu 28.11.2015 Malappuram 23.1% above 23.1% Dt.05.07.2014 4210-02-800-95 GO(Rt) No.2280/2014/H&FWD No.2280/2014/H&FWD GO(Rt) EE,PWD(B)Dvsn,Mlpm.50Lakhs EE(BM)12/2016-17 dt 08.06.2016 dt EE(BM)12/2016-17 DR/55/2014-15 dtd23.01.2015 for dtd23.01.2015 DR/55/2014-15 Aboothahir K,MANZIL Constructions. K,MANZIL Aboothahir PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 114 PWD BUILDINGS DIVISION MALAPPURAM 365

LAC ADS 2013- 14:Construction of Work completed building for CHC Health 5000000 Wandoor 10 month 18.09.2015 18.07.2016 Karuvarakundu 04.11.2014 Malappuram 4210-02-800-95 Dt.24.06.2014 30.36%above ER 30.36%above Rs.46,42,594.00/- Rs.60,52,086.00.00/- EE,PWD(B)Dvsn,Mlpm DR-19/2014-15 Dt.07.08.14 of Dt.07.08.14 DR-19/2014-15 EE(BM)24/2015-16 dated 08.09.2015 dated EE(BM)24/2015-16 Aboothahir K,MANZIL Constructions. K,MANZIL Aboothahir GO(Rt) No.2059/2014/H& FWD FWD No.2059/2014/H& GO(Rt) 366

d ate d

r LAC ADF 2012- 16 oo uram for 7/2014 5- nths 08/- 07/2014/H& 07/2014/H& 0L mmed . M 2016 2016 392 000 08.01.2015 dt 2016 bove ERb LakhL (Re tender) (Re 13:Construction of ( -800-95- a ation dd -- -- pp 00 . 1 oo 00 aa 44 55 2 0 5 a /1 0 WorkWork comp completedleted New block building 5 6 Rs.

5912 5000 Wan ) Educ 4541 10 m Rs.50 01.02. for CHC at wandoor 08-01 07-11 Malap 4210-02 BM 30.20% a 30.20% ( Kunhimoh 19.08.2015 FWD Dt.17/ EE GO(Rt) No. 2 DR/51/2014-15

367

COSTRUCTION OF BUILDING PHC 25 L Work completed Health

PONMALA(2012-13 8 month 30/7/2013 completed completed 30/08/2013 29/04/2014 2318076.00 2197536.00 Malappuram KOTTAKKAL 4210-02-800-95 TVM 02/05/2013 TVM EE(BM) 08/13-14 dt 20/08/2013 dt 08/13-14 EE(BM) DR 13 /12013-14 DT 18/07/2013 DT 13 /12013-14 DR GO(RT) NO:1515/2013 H&FWD DT DT H&FWD NO:1515/2013 GO(RT) T.Ebrahim PWD Contractor Chappanagadi Contractor PWD T.Ebrahim PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 115 PWD BUILDINGS DIVISION MALAPPURAM 368

COSTRUCTION OF BUILDING GOVT: HOMOEO Plastering in

DISPENSARY AT 25 L progress 8month 2350847 3013316 Health Dpt

SARHIND NAGAR 07-08-2015 KOTTAKKAL 4210-02-800-95

IN KOTTAKKAL 16/09/2014 TVM 28.18% Above E/R Above 28.18% EE PWD(B) Division MLPM DR/69/2014-15 dt 30-03-2015 of the 30-03-2015 of the dt DR/69/2014-15 EE(BM)84/2015-2016,dt-04-03-2016 GO(RT) NO:3075/2014 H&FWD DT DT H&FWD NO:3075/2014 GO(RT) Mammudu.K PWD contractor Mttathur contractor PWD Mammudu.K 369 1 COSTRUCTION OF K t BUILDING FOR PHC VENGALUR foundation work bove E/R 15 madu O:3790/2014/ O:3790/2014/ 57913 33704 ted 25/11/2014 ted 02-800-95 appuram 09-2015 month m altha Dp

30 L /2015-16 dt 4-3- dt /2015-16 / PANAYI AT 6-9- 15-16 dated in pgprogress AA ll -- 77 00 aa mm - NN e 88 3 0 2 3 He

ANAKKAYAM(2013 26- Ma Ma 4210 -14) 10% GO(RT) H&WD d EE(BM)83 DR-988/20 1 370

COSTRUCTION OF BUILDING FOR GOVT: HOMOEO 25 L Completed DISPENCERY AT Health Rawther 8 months 2449258/- 3037080/- 24% above 24%

ANAKKAYAM(2013 12-08-2015 Malappuram Malappuram

-14) 4210-02-800-95 H&FWD 17/09/2014 H&FWD GO(RT) NO:3082/2014 NO:3082/2014 GO(RT) DR-68/2014-15 dated 30-3-15 dated DR-68/2014-15 EE(BM15/2016-17 dt 10.06.20 dt EE(BM15/2016-17 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 116 PWD BUILDINGS DIVISION MALAPPURAM 371

COSTRUCTION OF BUILDING FOR work complete PHC IN 35 L bill under ATHANIKKAL AT Health preparation 10 month 24/7/2016 24/10/2014 22/04/2015 25/09/2015

POOKOTTUR(2013- 3234364.00 4366391.00 Malappuram Malappuram

14) 4210-02-800-95 DR/58/2014-15 dated 2/02/15 dated DR/58/2014-15 GO(RT) NO:3456/2014 H&FWD H&FWD NO:3456/2014 GO(RT) EE(BM)27/2015-16 dated 23.09/15 dated EE(BM)27/2015-16 M.Hussain PWD Contractor , Melmuri Contractor PWD M.Hussain 4210-02-800-95 LAC ADS(NP) 372 t d

16

LAC ADS 2013- 5- /2014 for /2014 16 0 3 0 15 kh of ER usthafa.M ram t 30.08.2014 t thst 0160 0160 dad AC ADS(NP)A 6 6/2014/H& 6/2014/H& hh 22 00 00 33 00 aa 00 ee t 01 uu dd a n 2 2 L

14: Construct t tiion of MM work completed building for CHC 9/20 5 Healt ) 36577 47184 40000 Manka 10 mon Rs.40L 22.01.2 Mankada 22.04.2 Malapp 30-01-2 29-11-2 BM ( 29% Abov 29% EE Muhammed FWD Dtd.06/0 FWD GO(Rt) No. 195 DR/25/2014-15 DR/25/2014-15 4210-02-800-95 L

373 - 03 - 03 t d

Construction of 16

5- roof slab building for PHC

2016 completed

Morayoor 6941864 8750914 10Months Rs75 Lakh Rs75 Health Dpt 12-08-2015 75.00 lakhs 75.00 lakhs Malappuram Malappuram Malappuram )81/201 dated 26/11/2014 dated 26.06% above E/R 26.06% Mohammed Ashraf BM ( EE D8-89/2014-15 dt-31-03-2015 dt-31-03-2015 D8-89/2014-15 4210-02-800-95 LAC ADS(NP) 4210-02-800-95 LAC GO ( Rt) No 3811/2014 H&fwd H&fwd 3811/2014 No ( Rt) GO PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 117 PWD BUILDINGS DIVISION MALAPPURAM 1 374

Construction of building for PHC Poovathikkal in 3% ab work completed Health Eranadu

urangattiri 2382136 8 months 05.0.2015 2916449/- 25.00 lakhs 25.00 lakhs for 25 lakhs Malappuram gramapanchayath Abdul Hameed MK Hameed Abdul DR/86/14-15 dated 31-03/15 31-03/15 dated DR/86/14-15 GO ( Rt) No 3455/2014 H & H 3455/2014 No ( Rt) GO FWD dated TVM 24/10/2014 TVM dated FWD EE(BM)09/2016-17 dt 04.06.20 dt EE(BM)09/2016-17 4210-02-800-95 LAC ADS(NP) 4210-02-800-95 LAC 4515-00-850-96 1 375 K Construction of building Govern work completed

ment Ayrveda 2015 akrishnan akrishnan % Above E/R Above % alappuram alappuram alappuram 5.00 lakhs 5.00 lakhs 5-00-850-96 2091429 3658745 o 1219/2013 LSGD LSGD o 1219/2013 8 months 0-06-2014 14-15 dated 20-03- 14-15 dated A dt04-03-20 /2015-16 / Ayurveda d 06/05/2013 d 44 22 mm 11 3 3 0

dispensary Morayoor e

5 NN MM MM 45 Ra date 74.9 DR/63/20 GO ( Rt) GO ( Rt) EE(BM)85 5054-80-800-67 376

d ate d

14

Thuvvur: - Construction of Civil work

Building for PHC, /2013 completed. a Health 8 month 2114064 2500000 8 Wandoor

05.09.2013 05-11-2013 04-07-2014 30-07-2013 Thuvvur ) Malappuram 5054-80-800-67 Kalathil Hussain Rs.2172490.00/- 3.60% below ER below 3.60% BM ( Dtd.TVM 12.03.2013 Dtd.TVM EE DR-7/2013-14 dtd 28.06.2013 dtd DR-7/2013-14 GO (Rt) No.817/2013/H&FWD No.817/2013/H&FWD (Rt) GO

HEAD OF ACCOUNT NOT MENTIONED 377 Alamkode: Construction of Cancelled Building for Land not onnani 5 lakhs lappuram Health P a Alamkode Homeo 2 available PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 118 PWD BUILDINGS DIVISION MALAPPURAM 378 Estimate to H & Construction of FWD on Building for Govt. 20.10.2014 for Health PHC Thennala

Tirurangadi AS. Malappuram ########### 379 Construction of Transferred to Building for Govt. LSGD. Health PHC Edarikkode Tirurangadi Malappuram ############ 380 The proposal for Rs.50.0 lakhs Construction of was submitted to Building for Director,DHS,vid Mortury,Taluk e lr Health 50,00,000.00

Tirurangadi Hospital,Tirurangadi no.CE/BL/PLG/ Malappuram

MLPM/PR/853/1 5 DT 19/3/15 381 Construction of building for LSGD taken Ayurveda Hospital, over the work Health Anayarangadi Vallikkunnu Malappuram ########### 382 Construction of Additional Block for Transferred to Primary Health LSGD. Health Centre, Peruvallur Vallikkunnu Malappuram ########### 383 As per Govt. circular LAC ADS 2013- No.54/2014/Fin 2014 construction for dtd. 03.06.2014 building for PHC Health Kottakal

2500000 this works to be Marakara (2nd phase) Malappuram done by the LSG engneering wing 384 LAC ADS 2013- 2014 construction for Work cancelled

ottakal building for PHC lappuram 500000 Health a K 2 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 119 PWD BUILDINGS DIVISION MALAPPURAM 385 t

LAC-ADS d 7

construction of a 1 - building for Ayurveda hospital at Agreement 4/2016 Executed Health Kaukkad in Edakkara 7 50 lakhs ) Nilambur 4499526/- 3999693/- 10 months 15.11.2016 26.11.2016 10.01.2017 Malappuram

Panchayath at Varghese CD 11.11%below BM TVM 18.07.2016 TVM Nilambur ( EE constituency (2015- dt Reg.no.3115/2016-17 GO(Rt)No. 343/2014/Ayur dt dt 343/2014/Ayur GO(Rt)No.

2016) ADS 4210-02-800-95 (01) LAC 386 - AC

LAC-ADS- er L Construction of a d r building for Koran ects un ects j put on tender

ealth nair Memorial /2016 H& FWD dtd dtd FWD H& /2016 58488 Lakhs Lakhs ror m months 17 dt 09.01.2017 17 dt 016 for Rs 25 Lakh 016 for Rs 0 ilambui lappuram l 44 .02.2017 33 HH 55 - P 2 2 8 P 2

NN GtPiGovernment Primary 04. 2 Ma health centre -7 1

Kavalamukkatta in 5 0 Nilambur - 3754/2016- 60 - TVM 30.11.2 TVM

constituency (2015- 9 5 2016) GO(Rt) No.320 40 ADS 387 0

COSTRUCTION OF BUILDING AT roof truss work AYURVEDA

25 L in progress DISPENCERY GO(RT) 8 months 2399203/- 2589219/- Health Dpt 31.12.2015 28.01.2016 AKKAPARAMBA 20/08/2015 KOTTAKKAL K.Abdul Rahim K.Abdul 4210-02-800-95 7.92 % above E/R 7.92 % NO:2695/2015/H&FWD NO:2695/2015/H&FWD 2254/2015-2016 (PRICE) dt dt (PRICE) 2254/2015-2016 EE (BM) 22/2016-17 dt 23.06.2 dt 22/2016-17 EE (BM) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 120 PWD BUILDINGS DIVISION MALAPPURAM 388 LAC -ADF- Construction of building for Govt. Primary Health Estimate Centre Karunechi in submitted on 26- 50 L Health 11-2013 for A.S. Nilambur Nilambur Malappuram Constituency (2013- 14). 389 2014-15Construction of building for 33 Estimate Ayurveda Dispensary L submitted for AS health

Vengara at Othukkungal in

Malappuram Malappuram district

390 LAC -ADF- t

Construction of d 7 Dated 1 95 . JJ dt ee

bbuildinguilding for ICE) I - DD - mm 5 6 o 6 6 v V Govt.Ayurveda R Agreement

Hospital Mamankara /2016-

25 L Executed 57 Health )

at Vazhikkadavu in 2441823 8 months Nilambur 2350619/- 27.10.2016 29.07.2016 29/06/2015 Malappura Sebastian V Sebastian 3.88% abov 3.88% Nilambur G.O (Rt) No BM 4210-02-800- ( 3814/2015-16 3814/2015-16

Constituency (2014- 02.03.2016(PR EE

15). 2012/2015/H&FW

HIGHER SECONDARY EDUCATION DEPARTMENT 4202-01-800-88 projects under LAC-ADS (NP) 391

d ate d

Construction of

building for Govt 16 Civil & Arts and Science 5- nil electrical Work H.Edn. )04/1 College,Kondotty 4027488 4973948 Completed. 8 months Kondotty 42,00,000.00 13/04/2015 20/01/2015 19/09/2015 19/09/2015 Malappuram Phase -I DR-20/14-15 4202-01-800-88 BM Higher Education Higher E.Mohammed Ali ( Dated 12.06.2014013 Dated GO(Rt)No.1126/2014/ GO(Rt)No.1126/2014/ EE 23.5% below Estimate rate Estimate below 23.5% dated 08.08.2014 for 42 lakhs dated PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 121 PWD BUILDINGS DIVISION MALAPPURAM 392 LAC

16 5- under LAC-ADS-2014- 2015-Construction of Semi-permanent )40/201 Completed K projects (

Tanur

building Government E 6 Months 14063521 14710495 ADS (NP) S 4.6%above 08.07.2015 29.06.2015 150,00,000.00 Malappuram College, Tanur. dtd.17.10.2015. Higher Education Higher gt.No. A 22.05.2015 for Rs.50 lakhs 22.05.2015 for Rs.50 2878/2015-16 dtd 27.01.2017 dtd 2878/2015-16 K.Abdu Kuttippuram, Kottakkal GO(Rt)No1942/2015/G.Edn. Dated Dated GO(Rt)No1942/2015/G.Edn. 4202 01 800 88

393 l 06-02-2016 n n TVM dated dated n TVM 25,00,000.00 -09-2015 Rs 25 -09-2015 Rs - 8 8 E DD oo EE i dd Construction of 0 Bed concrete Toilet Block in footing Govt.Arts & Science 8 Month

2432821 2634745 completed Kondotty 16.01.2016 College, Kondotty 09/06/2015 Malappuram 8.30% ABOV 8.30% 4202-01-800-8 Higher Educati Higher Muhammed Ali Muhammed Ali EE(BM)64/2015-16 DATE EE(BM)64/2015-16 G.O RT No.1331/2015/H.E RT G.O

1044/2015-2016(PRICE)dt 10 1044/2015-2016(PRICE)dt PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 122 PWD BUILDINGS DIVISION MALAPPURAM 394 - AC er L

Additioanl facilities d to exisiting class

room building for un ects j Work completed Government Arts & 733826 863325/- 6 months Kondotty -Pro Alavi kutty 15% below below 15% 07.09.2016 Science College, 29.07.2016 Malappuram 88 -

Higher Education Higher Kondotty. 800 04.12.2015 for 10 lakhs. - 1106/2016-17 dt 24.06.2016 dt 1106/2016-17 01 - GO(Rt)No.4013/2015/Edn. Dated Dated GO(Rt)No.4013/2015/Edn. EE(BM) 38/2016-17 dt 31.08.2016 dt 38/2016-17 EE(BM) ADS. 4202 4202-02-800-85 395

d t FOUNDATION d

.00 khs

Construction of rea code tion -85 E/R for 250 6 6.01.2016 COMPLETED. mm 6 6 6 6 6 6 ss 14/H.Edn 14/H.Edn 1 161 00 aa FF aa 00 0 y 4 a AA w

building for Govt 5- GROUND Arts and Science FLOOR

College,Kondotty Lakhs COLUMN Kondotty 2277266 18 month 250 LAK 20.05.201 02.02.201 )91/201 03.03.201 250,00,00 Malappura WORKS IN

Phase -II K 4202-02-800 ( for Rs.250 L for Rs.250 Higher Educ Higher 2.29 % below below 2.29 % PROGRESS E S Dated 10.06.2014 10.06.2014 Dated M Abdusamad, M Abdusamad, GO(Rt)No.1125/20 2586/2015-16 dtd:1 2586/2015-16 4202-02-800-88 396 t d 7 1

LAC-ADS- 2015-16. - Construction of class reached up to room building for /2016 7

3 plinth beam level

)

Govt: Arts & science 6618484 5936780 Kondotty 12 months 29.07.2016 72.00 Lakh 31.08.2016 07.09.2016 Malappuram

College Kondootty Alavikutty KV 4202-02-800-88 BM 10.3 below of ER 10.3 below Higher Education Higher ( 03.12.2015 for 72 Laks EE GO(Rt) 4003/2015/Hedn dt dt 4003/2015/Hedn GO(Rt) 1251/2016-17 dt 20.06.2016 dt 1251/2016-17

GO(Rt)No.39/2015/H Edn dtd.07.01.2016 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 123 PWD BUILDINGS DIVISION MALAPPURAM 397 0

Construction of Main TS obtained, to Academic Block for be tendered Tanur Govt. college Tanur. 500 lakhs Malappuram dtd.07.01.2016 Higher Education Higher GO(Rt)No.39/2015/H Edn GO(Rt)No.39/2015/H 322/2016-2017 (PRICE) dt 24.05.2 dt (PRICE) 322/2016-2017 HOME DEPARTMENT 4059-60-051-7216-Project under LAC ADF (NP) 398 DF A

AC 013 l L 0.2013 0 rr 22 aa 3/3 e d Construction of ) ect un

building for Police j Civil works NP

Dispensary at Klari ( completed. Home -Pro 50 lakhs 8 months 4101956/- 4908811/- 19.08.2014 18.04.2015 Not applied Tirurangadi MSP Malappuram 19.67% above 19.67% 216 dated 26.09.2014 dated -7 EE(BM)20/2014-15 EE(BM)20/2014-15 1 P.P.Mohammed Faiz GO(Rt)No.2132/201 5 0 - Home dated Tvm 31.07. dated Home 60 DR 78/2013-14 dated 03.1 dated 78/2013-14 DR - 9 5 40 HOMOEO DEPARTMENT 4202-01-800-88 399 LAC ADS 2013- 14:Construction of building for Chethana Homoeo

Homeo Cancer 5000000 Wandoor

Malappuram Hospital, Wandoor 4202-01-800-88 LSG DEPARTMENT 2210-01-110-79 (NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 124 PWD BUILDINGS DIVISION MALAPPURAM

400 - 12 LAC -ADF- - 09

Construction of d

building for ate d Work 14 Gramapanchayath - completed. Bill 2013 100% LSGD office in Nilambur submitted 8 Months Nilambur 50 Lakhs 50 Lakhs 10.12.2013 07.09.2014 09-08-2014 08-10-2013 Malappuram Estimate rate Shanavas K.S. Shanavas

Constituency 24/2013 Rs. 49.70925 L Rs. 49.70925 L Rs.

Malappuram District. ) 2210-01-110-79 (NP) Malappuram, 50 Lakhs 50 Lakhs Malappuram, No electrification works BM

(2012-13). ( Tvm. 06-04-2010, 50 Lakhs Tvm. 06-04-2010, 50 Lakhs CC 1st & Final Bill submitted GO (Rt ) 922/2013/LSGD dated dated ) 922/2013/LSGD (Rt GO EE DR 74/2013-14 dtd. 10/9/2013, EE 10/9/2013, dtd. 74/2013-14 DR 4515-00-800-96 401 Work not Cheekode: Grama started. panchayath Mini Agreement not ondotty o.1215/2013/ o.1215/2013/ nt not executed not nt n 5Lakhs5 lappuram l .09.2013. .05.2013. 800-968 LSGD L / /13-14 dated dated /13-14 GD dated dated GD G - e a 22 0 Stadium, Cheekode 6 executed by KK N 10 16 Ma LS contractor. DR/73 Agreeme GO(Rt)N 4515-00- 402

d ate d

Eikkarapadi: Grama 14

Panchayath Stadium, - Completed. Eikkarapadi, Final bill nill LSGD 25Lakhs 2500000 2452812 )13/13

Cherukavu Grama 18/10/14 submitted 8 months Kondotty 20/2/2014 18/10/2013 17/06/2014 Malappuram Panchayath DR/72/2013-14 BM dated 03.05.2013 dated E.Mohammed Ali dated 10.04.2013 dated ( EE 1.10% below Estimate rate Estimate below 1.10% GO(Rt)No.1193/2013/ LSGD LSGD GO(Rt)No.1193/2013/ 4515-00-800-96 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 125 PWD BUILDINGS DIVISION MALAPPURAM 403 5 Construction of building for /201 55

) Work completed Panchayath office LSGD 15.90% Vengara 44 Lakhs BM 3912759/- 4534883/- 2014/LSG 2014/LSG 24.01.2015 (

Parappur 10 Months Malappuram dtd: 11.01.2016 dtd: 4515-00-800-96 dated 25.02.2014 dated EE G.O(MS)No.534/ DR/16/14-15 dtd: 22.07.2014 dtd: DR/16/14-15 K.Ahammedkutty Haji, Vengara Haji, K.Ahammedkutty 4515-00-800-96 Projects under LAC ADS

404 AC er L d r

Edapatta: un ects j S LOW ER LOW nth jeri 000 5,918/- 013-14 105.00/- 6/2013/LSGD. 6/2013/LSGD. 05.12.2013 dated 8/2013 puramp .2013 .2014 .2014 .2014 aed Akbea G GD ror 1 15/05/2013 EE oo nn 00 DD 55 22 44 8 44 0 p

Construction of Mini 2 8 7 7 work completed P m P A LS 8m Ma

Stadium, Edapatta 300 96 13.12 12.08 25.07 25.07 - Malap dt 20/0 dt RS.24, DR 62/ DR RS.298 800 Mohamm - 17.70% B 17.70% Dtd.TVM 00 5- GO(Rt) No.128 1 5 EE(BM) 22/13-1 EE(BM) 4

5054-80-800-67 405

d

Karad: Grama ate d panchayath Mini 14

- Completed. Stadium Final bill Reconstruction, nill LSGD 25Lakhs 2496104 2496104 )12/13

11/10/13 submitted 8 months Kondotty

Karad, Vazhayoor 10-11-2013 06-10-2014 02-12-2014 Malappuram Estimate rate DR/71/2013-14 BM dated 10.09.2013 dated

Grama Panchayath ( EE Mohammed Asharaf Kondotty Mohammed Asharaf 5054-80-800-67 GO(Rt)No.1151/2013/ 24.04.2013 dated LSGD 8443-00-108-PWD Deposit Head PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 126 PWD BUILDINGS DIVISION MALAPPURAM d 406 1 LAC - ADS -2014- 15,Construction of Eppikkad Mini stadium (2nd phase) and concrete road in work completed LSGD

Manjeri Edappatta Grama 10 months 41,98,953.00 43,98,403.00 19-02-2016 42.00 Lakh Malappuram

panchayath (Manjeri 05-02-2016 dt 9.99% above E/R 9.99%

LAC) in Malappuram V Mohammed Akbar Dtd.TVM 23/06/2015 Dtd.TVM District GO(Rt) No.1868/2015/LSGD No.1868/2015/LSGD GO(Rt) MLPM/2015-2016/2015/3695 MLPM/2015-2016/2015/3695 EE(BM)48/2016-17 dt 28.09.20 dt EE(BM)48/2016-17 8443-00-108-PWD Deposit Hea Deposit 8443-00-108-PWD HEAD OF ACCOUNT NOT MENTIONED 407

K d ate d

Kottappuram Ground 5 1 Development in - Completed Pulikkal Grama LSGD med Asharaf. alappuram 25Lakhs 2500000 5.12.2013 4.08.2014 29/05/14 8 months .899/2014/ LSGD LSGD .899/2014/ Kondotty R/70/13-14 7.2013 2989108/- 2 ed 18.09.2013e mm 15.01.2015 15.01.2015 00 00 1 1 oo

PPanchayathanchayath t M)6/14 M 00 MM DD B ( dat Moha EE GO(Rt)N 18. dated 408

Construction of Building for Work tranferred to LSGD LSGD Gramapanchayth 5765416/- 09.05.2013 Tirurangadi Malappuram Samskarika Nilayam LSGD dated Tvm dated LSGD GO(Rt)No.1245/2013/

409 Construction of Building for Transferred to Samskarika LSGD. LSGD Nilayam,Klari Grama Tirurangadi Malappuram Panchayath ########### 410 Construction of Panchayath Building for resolution to be Samskarika Nilayam LSGD alappuram allikkunnu ######### obtained

Peruvallur Panchayath # V M PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 127 PWD BUILDINGS DIVISION MALAPPURAM 411 Abdu Rahiman Sahib Smaraka Samskarika Transfer to Nilayam in AR Nagar LSGD LSGD Vengara Panchayath 50 Lakhs Malappuram 412 t d 7 1 - Parappur Yuvajan foundation work /2016

Sangam Library in 7

2 in progress

LSGD )

Vengara Parappur Panchayath 8 months 25 Lakhs 2428005/- 2279897/- 05.07.2016 6.1% below 6.1% Malappuram Noushadali P Noushadali BM ( GO(Rt)No.2312/15 GO(Rt)No.2312/15 14.06.2016 re tender EE 3095/2015-16 dt 05.02.2016 dt 3095/2015-16 dtd.28.01.2015 of Rs.2,50,000/- dtd.28.01.2015 413 LAC -ADF- Construction of buildingg for mm Snehatheeram Project Estimate of Nilambur submitted on 30- 25 L LSGD BlockPanchayath 05-2014 for A.S. Nilambur

Malappura Nilambur Constituency (2013- 14). PW DEPARTMENT 4059-60-051-72

414 - 02 - 10 .

Perinthalmanna: d t Construction of Civil d 5 1 Station(PWD - Work completed 2015

PWD Complex, Village 9395745 10000000 10325924 12 months

Office etc)at 18-02-2015 17-01-2016 Malappuram Perintalmanna 9.9% above ER 9.9% )46/2014 4059-60-051-72 Perinthalmanna Noorudheen.K.P Dtd.TVM 13/05/2013 Dtd.TVM BM ( GO(Rt) No.713/2013/PWD. No.713/2013/PWD. GO(Rt) DR 80/2013 14 dt 13/11/2013 14 dt 80/2013 DR EE REGISTRATION DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 128 PWD BUILDINGS DIVISION MALAPPURAM 415

16

Perinthalmanna: 5- Construction of finishing stage for

Building for Sub )16/201 5000000 4570651/- 6704304/- 10 months 47% above 47%

Registrar Office 24-07-2015 01-07-2016 Registration Rs 50 Lakhs Rs Malappuram BM Perintalmanna ( dtd.16.07.2015 Abdul Nazer.K EE Dtd.TVM 15/03/2013 Dtd.TVM GO(Rt) No.227/2013/T.D No.227/2013/T.D GO(Rt) DR 28/2043-15 dt 30/08/2014 30/08/2014 dt 28/2043-15 DR 416

LAC-ADS Construction of Building for Sub- plinth beam

Registrar Office at onths % below 015/T.D 11-12-2015 015/T.D t 05.09.2016 (PRICE) 6-17 dt 02.11.2016 6-17 dt ssain,Pappinippara 51536 00000 istration 01.051-64 7,190.16 appurama ankadaa 09.20160 mm 99 22

dd completedcompleted - l 11 uu 33 55 gg 8 2 MkdMkdMoorkanad Mankada 2 8 MM 28. Re Mal 19,8

Constituency in 15.4 4059- Malappuram Dt VV. Sakkir H EE(BM) 65/20 EE(BM) GO(Rt) No.909/ GO(Rt) 2425/2016-2017 REVENUE DEPARTMENT 4059-60-051-72-projects underLAC-Ads(NP) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 129 PWD BUILDINGS DIVISION MALAPPURAM 417

Civil work Tanur: Construction completed of Tanur Mini Civil 13 electrical on Tanur

Revenue Station Building 29548487 39698392 10Months 350Lakhs 350Lakhs for 343.5L going Malappuram Manikandan.K 48/CE/BL/ 2013-14 48/CE/BL/ 34.35% above for E/R 34.35% dt.2/12/2013 for 343.5lakhs dt.2/12/2013 SE(K)28/2015-16,dt 31-08-2015 SE(K)28/2015-16,dt 4059-60-051-72-projects underLAC-Ads(NP) 4059-60-051-72-projects GO(Rt)No.11185/2013/PWDdt.TVM05/08/20 418 -

AC 0,000.00 L d Tvm -2016- ) Dept.) 15 1 rr 00 e 2 e E d ) ects un ects

Extension of Mini j

NP finishing wo9rk Civil Station, (

-pro in progress 2 Revenue

Tirurangadi Ads 12Months 8165763/- 8892516/- -7 15-12-2015 Tirurangadi Malappuram 1 Manikandan.K 5 8.9% above E/R 8.9% 0 - 60 - 9 1294/2015-16 DT.25-09-20 1294/2015-16 5 EE(BM)75/2015-16 DT 24-02 DT EE(BM)75/2015-16 40 04.06.2015 of Public Works (E Works 04.06.2015 of Public GO(RT)No.781/2015/PWD date GO(RT)No.781/2015/PWD 100, HEAD OF ACCOUNT NOT MENTIONED 419 AS received. Permission for Kondotty: paddy field Construction of Mini conversion and Civil Station filling to be Revenue Kondotty Building Stage 1 200Lakhs

Malappuram obtained(land to be handed over GO(Rt)No.768/2013/

PWD dated 29.05.2013 dated PWD to PWD) SC ST DEPARTMENT PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 130 PWD BUILDINGS DIVISION MALAPPURAM 420 LAC -ADS- Construction of Govt. Tribal H.S. building Selection Notice at Munderi in issued SC/ST GO(Rt)

Nilambur 3511663 Nilambur 40 Lakhs 40 Lakhs 10 months 26.11.2016 14.10.2016. 3251119.98 7.42%below Malappuram Constituency. (2014- varghese CD 4202-01-800-88 15) 24.03.2015 TVM No.1149/2015/G.Edn dt dt No.1149/2015/G.Edn Reg.No. 2781/2016-17 dt dt 2781/2016-17 Reg.No. SOCIAL JUSTICE DEPARTMENT 4235-02-102-92 LAC ADS (NP) 1 421 1 r Construction of building for Anganavadi / reached up to Samskarika Nilayam first floor slab alappuram alappuram alappuram 2487550 5.00 lakhs 5.00 lakhs 8 months 4-15 dated 31-03-20 4-15 dated -2015 Retende /2016-17 dt 25.06.20 dt /2016-17 asikumaran 2487799/- .01% above .01% ocialo Justice TVM 18/03/2015 TVM T No 149/2015 SJD SJD 149/2015 No 02-92 LAC ADS (NP) ADS 02-92 LAC 0 22 11

in PulpettaPulpetta Grama 99 66 ) MM MM SS 0 0 SS Panchayath 26-0 dated dated GO ( Rt) GO ( Rt) DR/87/20 4235-02-1 EE(BM)2 OTHERS HEAD OF ACCOUNT NOT MENTIONED 422 Constrction of building for The proposal has Kannattippadi been submitted to Yuvajanasangam Secretary to Govt. LSGD vide file Library at Vengara No.CE/BL/PL3/LAC-

Others GramaPanchayath ADF/MLPM/PR/150 12 lakhs Vayanasala 7/15 dtd.07.10.2015 ,Muthalamadu in of Estimate of Vengara Grama Rs.12.00 Lakhs. Panchayath OTHERS HEAD OF ACCOUNT NOT MENTIONED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 131 PWD BUILDINGS DIVISION MALAPPURAM 423 The proposal has Constrction of been submitted building for to Secretary to Kannattippadi Govt. LSGD Yuvajanasangam vide file Library at Vengara No.CE/BL/PL3/L GramaPanchayath AC- Others Vayanasala 12 lakhs ADF/MLPM/PR/ ,Muthalamadu in 1507/15 Vengara Grama dtd.07.10.2015 Panchayath of Estimate of Rs.12.00 Lakhs. DEPOSIT WORK-PROGRESS REPORT- DIVISION, MALAPPURAM -JANUARY 2017 EDUCATION DEPARTMENT 2225-02-102-93- - 08 - 5 5 1 25

d ate d

Various Works at 16 424 5- work in progress.

IGMMRS Nilambur 2015 2 months Nilambur Education 18.7 Lakhs 04-08-2015 0/201 Malappuram C.D. Varghese C.D. 5 2225-02-102-93- ) M ( D. 6672/2013 dated 27/2/1 dated 6672/2013 D. EE A 2225-02-277-52 - 06 7- 2

d

Construction of ate d Toilet Block ( 2 nos, 16

425 15 work completed.

Boys & Girls) at 5- 3 months Nilambur Education 6.75 Lakhs Rs. 674487 Rs. 653578 Rs. 15-05-2015 IGMMRS Nilambur below 3.1% Malappuram 14/1

C.D. Varghese C.D. ) 2225-02-277-52 BM Director dated 9-1-2014 dated Director D3-6210(1) of ST Dvpt Dvpt of ST D3-6210(1) ( E DR/64/14-15 dated 21-03-15 dated DR/64/14-15 E PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 132 PWD BUILDINGS DIVISION MALAPPURAM 4202-01-202-93(P)

d

Construction of New ate d

Building for GMUP 14 426 School, Kakkad in - Completed Malappuram District Rs.190 L Rs.190 Education 12 Months Completed )31/13 0.10 below 27.09.2012 26.12.2013 31.12.2013 30.12.2014 20.12.2014 16362473/- 16346111/- 16896708/- Tirurangadi Malappuram K K.Manikandan ( dated 18.03.2013 dated 4202-01-202-93(P) E (B) Dvn.Mlpm dated dated Dvn.Mlpm (B) S CE/14/2013-14 of EE, PWD of EE, PWD CE/14/2013-14 GO(Rt)No.1271/13Edn.Tvm, GO(Rt)No.1271/13Edn.Tvm,

Improvements to the existing 2-storied 427 work completed school building in Rs.40 L Rs.40 alappuram irurangadi 0.09.2014 d 11.06.2014 rk completed -01-202-93(P) 4.96 avove Education -15 dated 10.07.2014 -15 dated o.2291/2014 GED GED o.2291/2014 o 3 4 3524568/- 4404300/- ngadi Labour Society ngadi n 1 M M)21/15-16 dtd dtd M)21/15-16 10 months ee 1 18.08.2015 33 TT oo GGMUPSMUPS KKakkadakkad 22 22 MM 4 a N w dat 420 EE(B GO(Rt)N Parappana DR/9/2014 t d Construction of 14 building for Govt. - Work L.P School 428 completed. Final

Veettikuth in Lakh 100%

)29/2013 Bill submitted. 8 months Nilambur education 3743560/- 3842922/- 22.12.2013 03.12.2013 37.62221 L 08-02-2014 2.1% below 2.1%

Nilambur LA 40 Lakh Rs. Malappuram BM

Constituency. ( 4202-01-202-93(P) EE dated 18/03/2013 for Rs. 40 for Rs. 18/03/2013 dated Noushad N.A, Vellikulangara. N.A, Noushad DR/41/2013-14 dtd. 12.8.2013 dtd. DR/41/2013-14 GO(Rt) No. 1270/2013/G.Edn 1270/2013/G.Edn No. GO(Rt) 4202-01-202-93(P) PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 133 PWD BUILDINGS DIVISION MALAPPURAM

Deposit work- urgent repairs to compound wall of IGM model 429 Residintial School,

education Nilambur in Malappuram district.

HIGHER EDUCATION DEPARTMENT 2202-03-800-52-02 or Rs.22 lakhs or Rs.22 .02.2013 of Principal, .02.2013 of Principal, .07.2012 amount Rs.25 Rs.25 .07.2012 amount 8 8.10.2014 22 UpgUpgradationradation woworksrks to ff 22 3 Main Block and Canteen under 430 CQIP(College quality Completed Tirur 100% H.Edn

improved L Rs.25 K.Moosa 2179274/- 1902506/- 2376256/- 21/10/2013 03-04-2014 03-04-2014 TMG ,Tirur. Malappuram

programme) at TMG below 12.70% Work completed Work

College Tirur 2202-03-800-52-0 EE(BM)14/2013-14 dated 1 dated EE(BM)14/2013-14 DR-51/2013-14 dtd.16.08.2013 dtd.16.08.2013 DR-51/2013-14 lakhs ofOrderNo.A1/620/012(P)dated 0 ofOrderNo.A1/620/012(P)dated lakhs OrderNo.P3/20797/2012/Coll.Edndated03 2203-00-104-90 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 134 PWD BUILDINGS DIVISION MALAPPURAM - 12 - 29

Construction of t Fitness Centre at 16d

Govt Poly Technic 5- 431 Work completed

College 2015 H.Edn MLPM Section 2500000 2225829 2132344 8 months Mankada 1/201

perinthalmanna in 26-09-2015 5 Malappuram )

Malappuram dt 2203-00-104-90 4.2% Below of E/R Below 4.2% BM K Muhammed Ashraf K ( NO.D4/45736/14 dtd DTE DTE dtd NO.D4/45736/14 EE Reg.NO:1116/2015-16 dt.14- Reg.NO:1116/2015-16 09-2015(PRICE)of EE(B)Dn EE(B)Dn 09-2015(PRICE)of dt.16-12-2014 ofpurchase(D) ofpurchase(D) dt.16-12-2014 2203-00-112-60 /

r Construction of College of Applied D Dtd.25.09.2011 Dtd.25.09.2011 D onths 2.2011 for Rs.120 2.2011 for Rs.120 03.05.2012 3 dtd. Shaji /BLDS ,336.00/- vanu 0-112-600 akha below ER 049.00/- 0 6-20126 2-2013 2 2-2013 2 2-2013 2 ppuramp 3-20123 00000 432 0 work completedp 120 Lakh 1 5689/- 5 .Edn RR , 11 11 a 5 EE MM 0 a 0 0 LL

ScienceScience V Vattamkulamattamkulam MM % H. Tha 120 C. 886 18 25-0 19-1 23-1 20-1 (IHRD) 03-0 Mala 86/C 95,01, for Rs. 2203-0 1,06,75 11.00 % 11.00 % SE(K)10/2012- 2011-12 Dtd.28. CN/1440/2005/H 5

Construction of College of Applied civil & electrical 433 Science Vattamkulam

lakhs work completed H.Edn (IHRD) main Thavanur 18000000 18 Months 04-03-2015 03-09-2016 30-08-2014

Malappuram st 23.59% above 23.59% building I floor M.Velayudhan 2203-00-112-60 ₹ 207,39,877.00 1,67,81,193.00 /- 363 Dtd.03.07.2014 dated 23.12.2013 for Rs.180 23.12.2013 for Rs.180 dated G.O.(Rt) No.2497/2013/H.Edn No.2497/2013/H.Edn G.O.(Rt) SE(K)46/2014-15 dtd. 25.02.201 dtd. SE(K)46/2014-15 Order No.2014-2015/2013-2014- Order 4202-01-203-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 135 PWD BUILDINGS DIVISION MALAPPURAM

Construction of 434 compound wall in Work completed 99) Tirur H.Edn Rs.40 L Rs.40

TMG College,Tirur 4497029 5171583 8 months for Rs.45 L for Rs.45 Malappuram Labour Society 15 % aboveE/R 15 % 4202-01-203-99 Parappanangadi Parappanangadi 978/2013/H.Edn dated dated 978/2013/H.Edn EE(M)36/14-15 dtd 08.12.2014 dtd EE(M)36/14-15 DR 92/2013-14 dtd 24.02.2014 24.02.2014 dtd 92/2013-14 DR 31.05.2013 (H.A/c 4202-01-203- 31.05.2013 (H.A/c 4202-02-105-99 t Construction of a building for Institute of Career nearing 435 4-2015 dated Rs.297.80 Lakhs Rs.297.80 .297.80L onnani -08-2015 -02-2017 -16 dated 07/08/2015 dated -16 .Velayudhan

Studies and 204/09/H.Edn.dated 4 Rs. 230 Lakhs 4 lappuraml 9964684 9 46364214 completionp 40% above 4 8 months 8 108-PW Deposi 108-PW 1 ss 99 11 77 66 5 PP 1 22 a 1 M R 1 1

Research Centre , 23. Ma ponnani. Sri.M 176/20 8443-00- 17/11/200 26/11/201 GO (MS)No. SE(K)23/2015 8443-00-108-PW PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 136 PWD BUILDINGS DIVISION MALAPPURAM

Upgradation works to Maths Block under CQIP (College 436 Work completed

Tirur quality improved 100% H.Edn Rs.5 L Rs.5 MLPM. 498821/- 443352/- 918544/- 3 months

programme) at TMG 17.08.2013 16.11.2013 08.11.2013 Malappuram 11.12% below 11.12% Purushothaman Work completed Work 8443-00-108-PW

College Tirur 08.07.2013. dated SDR(P)35/2013-14 SDR(P)35/2013-14 AEE(P)31/2013-14 dtd 12.08.2013 dtd AEE(P)31/2013-14 No.A5-339/2013 dated 27.06.2013 of EE, PWD (B) (B) of EE, PWD 27.06.2013 dated No.A5-339/2013 ASNo.P(IT)22740/2012 Coll. Edn dated 07.07.2012. FS 07.07.2012. FS Edn dated Coll. ASNo.P(IT)22740/2012 A PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 137 PWD BUILDINGS DIVISION MALAPPURAM 07.2012. FS order No.A5- 07.2012. FS Renovation works to EDUSAT Class 437 Room at TMG Completed Tirur 100% H.Edn Rs.3 L Rs.3 Muneer College Tirur MLPM. 203585/- 246925/- 218529/- 3 months 07.08.2013 06.11.2013 03.10.2013 Malappuram 11.5% below 11.5% Work completed completed Work dated 08.07.2013 dated 8443-00-108-PW SDR(P)34/2013-14 SDR(P)34/2013-14 AEE(P)2013-14 dated 05.08.2013 dated AEE(P)2013-14 ted 27.06.2013of Executive Engineer, PWD (B) Dvn. Dvn. (B) PWD Engineer, 27.06.2013of Executive ted 2740/2012/Coll.Edn dated 07. dated 2740/2012/Coll.Edn aa 2 339/2013 d 339/2013 AS.No.P(IT)2 8443-00-108-PW Deposit

Construction of

boundary wall of -PW t ground filling of play osi 108 - 438 p

Tirur ground at TMG H.Edn 00 De College, Tirur under - Re-tendered Malappuram Rs.3,00,000 L Rs.3,00,000

CIUP 8443 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 138 PWD BUILDINGS DIVISION MALAPPURAM

Deposit Work - NAAC-TMG Collage Tirur in Malappuram 439 District -Painting of Work completed Tirur Lakhs H.Edn

collage building and L Rs.18 6 months 1741008/- 1530346/- 16-02-2016 Malappuram urgent maintanence Sri:Moosa- K Works E/R Below 12.1% 8443-00-108-PW Deposit 8443-00-108-PW EE(BM)86/2015-16 Dated 04-03-2016 Dated EE(BM)86/2015-16 Reg:No:2563/2015-16 Dated 15-01-2016 Dated Reg:No:2563/2015-16 principal, TM Govt.Collage,Tirur for Rs 18 for Rs TM Govt.Collage,Tirur principal, Order No:A1-816/2015 dated 24-11-2015 of the 24-11-2015 of the dated No:A1-816/2015 Order irector r Rs.3 r Rs.3 r s o DD

Upgradation works in Commerce block at 440 Work in progress Tirur TMG College, Tirur lakhs H.Edn 281775/- 281775/- under CIUP 3 months Malappuram Estmate Rate Estmate Rs.3,00,000 L Rs.3,00,000 Work in progress in Work K.Purushothaman 8443-00-108-PW Deposit 8443-00-108-PW AEE(P)3/2015-16 dtd 17.08.2015 dtd AEE(P)3/2015-16 Agt.No.445/2015-16 for Rs.3 lakhs for Rs.3 Agt.No.445/2015-16 of Collegiate Education dtd.04.07.2013 fo dtd.04.07.2013 Education of Collegiate No.P2/17131/Coll.Edn dtd 04.07.2013 of dtd No.P2/17131/Coll.Edn PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 139 PWD BUILDINGS DIVISION MALAPPURAM , Construction of kitchen and work 441 area in Womens Work completed

H.Edn Politechnic College, 269817/- 269817/- 3 months 23.06.2015 24.07.2015 18.08.2015 17.11.2015 12.11.2015 Vallikkunnu Malappuram Estmate Rate Estmate Rs.2,70,000/- Purushothaman Kottakkal 21.02.2015 of . Thrikkandiyoor EE(B)Dvn.Mlpm. K Order No.A5-537/15 dtd dtd No.A5-537/15 Order Reg.No.297/2015-16 dtd dtd Reg.No.297/2015-16 8443-00-108-PW Deposit 8443-00-108-PW AEE(P)2/2015-16 dtd 13.08.2015 AEE(P)2/2015-16 t

Deposit work repair Deposi E/R s 0/- am am 16 ussain Dated TVM 06-06-2013 TVM Dated er no:MLPM /2015- er no:MLPM /-/ /-/ /-/ ated 04-03-2016 ated a 6-of the EE PWD (B)Dn (B)Dn EE PWD 6-of the 6 rr rr hh 00 WW 00 nn ww and maintanence d 6 4 7 HH d MM 442 work of officers mess Work completed H.Ed at MSP camp MLP 849286 780494 269817 6 mont 02-11-2 Malappu Malappu Malappuram 8500 RS 8.1% belo 8.1% Sri:Anwar 8443-00-108-P EE(BM)90/2015-16 d EE(BM)90/2015-16 Reg:No:2881/2015-16 ord Reg:No:2881/2015-16 GO(RT)NO:1528/2013/Home GO(RT)NO:1528/2013/Home 16/2015/5613 dated 27-01-201 dated 16/2015/5613 - 12 - 30

d

Construction of -Date Building for College plastering work in 16 5-

of Applied Science, - 2015 progress H.Edn 2621231 8 months Kondotty 04.03.2016 03.11.2016 10-03-2015

IHRD-Muthuvallur 2867867.58 Rs.30 Lakhs Rs.30 Malappuram 3/201 E.Mohammadali E.Mohammadali 5 ) 28.06.2013 for rs 30.L 28.06.2013 for rs 8.6% below estimate rate estimate below 8.6% 8443-00-108-PW Deposit 8443-00-108-PW BM ( O(Rt0 No.1357/2013/Hedn dt dt No.1357/2013/Hedn O(Rt0 R/1045/2015-16 dt 10.09.2015 dt R/1045/2015-16 E G D PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 140 PWD BUILDINGS DIVISION MALAPPURAM 8782-00-102-97-PW-OR(iii)

Construction of r Canteen Building under infrastructure 13.08.2013 of finishing work in 444 progress

Tirur upgradation Rs.15 L 6% below 1324808/- 1314739/- 8 months programme at TMG 19.08.2015 Malappuram

College Tirur Tiru Muthur P.O, Ibrahim, Puthuthottil (H) Ibrahim, 27.06.2012 for Rs.15 Lakh Rs.15 27.06.2012 for Up-gradation Programme (Plan)2012-13. Programme Up-gradation P2-16644/2012/Coll Edn Dated Edn Dated P2-16644/2012/Coll 2202-03-103-75-01 (College Infrastructure 2202-03-103-75-01 EE, (B) Dvn, Mlpm for 15 Lakhs Mlpm EE, (B) Dvn, DR/45/2013-14 dtd: DR/45/2013-14 EE(BM)63/2015-16 dated 06.02.2016 dated EE(BM)63/2015-16 HEAD OF ACCOUNT NOT MENTIONED 1

Deposit work - TE dated TE dated ram r .V 2 0 ni 56/- PRICE)P 0150 0160 01.09.20 17 dt 1 nn elow e thst 08-PW 0 2017 dt 2017 dt 2 aa uu DD ( 99 00 aa 1 - 2 2 d ConstructionConstruction o off cyc cyclele n MainMain s slablab 445 shed and Kitchen at completed T.Ed 9266 8697 Ponn 6 mon 04.11.2 THS Kokkur 29.07.2 Malapp 9281 RS Marakk 6.15% b 6.15% 8443-00-1 1333/2016- 02.07.2016( D4-25499/15/ EE(BM) 39/2016- EE(BM) 1

Deposit work -Plan fund 2015-16. Govt: Medical College work 446 Manjeri - Providing completed 714940 (PRICE)

Manjeri waiting area in 6 months 6,07,699/- RS 1 Crore RS 15% below 15% 29.07.2017 Malappuram between CCU and Sasikumaran .T Sasikumaran

Pharmacy No.2797/15 GO(Rt) H&FWDDt 01.09.2015 H&FWDDt 1331/2016 -17 dt 02.07.2016 -17 dt 1331/2016 EE(BM)40/2016-17 dt 03.09.20 dt EE(BM)40/2016-17 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 141 PWD BUILDINGS DIVISION MALAPPURAM

Deposit work - Maintanence work 447 under CIUP at TMG Work completed Tirur Lakhs H.Edn Collage Tirur in 996043/- 996043/- 6 months 10 Lakhs 16-02-2016 Malappuram RS 10 Lakhs RS Malappuram DT Rate Estmate EE(BM) 89/2015-16 Dated 04-03-2016 Dated 89/2015-16 EE(BM) Reg:2880/2015-2016 dated 27-01-2016 dated Reg:2880/2015-2016 principal TM Govt. Collage Tirur for Rs 10 for Rs Tirur Collage TM Govt. principal (PRICE) of the EE (B) Dn Malappuram for RS for RS Malappuram Dn EE (B) of the (PRICE) The Precident ,Parappanangadi Labour Contract Labour Contract ,Parappanangadi The Precident Order No: A1-840/240 dated 26-11-2014 of the 26-11-2014 of the dated A1-840/240 No: Order t 010 d ,TVM

22 GO(Rt)2 E 14 80/2010/ - Construction of Hgr.Edn

448 Ladies Hostel in /2013 Completed 7

Tirur dated 100% H.Edn )0 TMG College, Tirur K.Abdu 6 months 3547753/- 5510200/- 6069126/- Rs.48.50 L Rs.48.50 32% above 32% 26.06.2013 31/12/2013 06.02.20 07-01-2013 02-10-2014 Malappuram BM Work completed Work 11 ( EE CE/BL/MLPM/3065/ dated 27.04.2012 of CE dated

Construction of Students Amenities Building under 449 infrastructure Completed Tirur H.Edn Rs.25 L Rs.25 upgradation L Rs.25 8 months 2349993/- 2338243/- Completed 25.01.2014 24.09.2014 08.01.2015 0.5% below 0.5% Malappuram programme at TMG College Tirur Mohammed Shereef.O.P of Principal, TMG College, Tirur for of Principal, TMG College, EE(BM)18/2013-14 dated 19.11.2013 dated EE(BM)18/2013-14 S No.A1-656/2012(P) dated 05.10.2012 dated No.A1-656/2012(P) S A PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 142 PWD BUILDINGS DIVISION MALAPPURAM

Construction of Toilet Block, RCC Well, Compound 450 gate, water supply Completed Tirur 100% H.Edn sanitary works and Uthaman 466192/- Rs.12.3 L Rs.12.3 L Rs.12.3 1202868/- 1059092/- 01.09.2011 31.12.2011 27.06.2013 Malappuram

compound wall of below 13.99% Diet, Tirur completed Work EE, Mlpm Rs.12.3 lakhs Rs.12.3 EE, Mlpm 22.02.2010 of the DPI, TVM TVM DPI, 22.02.2010 of the AS.No.NEP2/12054/08 dated dated AS.No.NEP2/12054/08 EE(M)3/2011-12 dtd 22.08.2011 dtd EE(M)3/2011-12 DR 01/2011-12 dated 02.06.2011 of dated 01/2011-12 DR Construction of Car & Scooter parking 451 building at TMG Re-tendered Tirur H.Edn College, Tirur under Malappuram CIUP & NAAC L Rs.4,25,000 Construction of ThTiiTeachers Training Centre at Govt. LP School compound, Fund not 452 Parappanangadi at received H.Edn Chettippadi- Tirurangadi Malappuram Construction of class Rs.100Lakhs room,Office room and Hostel Construction of obstacle course at fund not 453 proposed NCC deposited H.Edn Complex Calicut Rs.98,000/- Vallikkunnu Malappuram University t d 7 1

Construction of - Toilet block at Govt 454 Poly Technic College Completed 2015 H.Edn 900000 perinthalmanna in )16/2016 877752/- 4 months Mankada .895665/- 30.11.2015 10.06.2016 02.02.2016 Malappuram Malappuram dt ER below 2% BM ( 8443-00-108-PW M.kunhimohammed 4/4243/14 dtd Tvm 29-01- dtd 4/4243/14 EE 798/2015-16(PRICE) dt dt 798/2015-16(PRICE) D PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 143 PWD BUILDINGS DIVISION MALAPPURAM

Deposit work - IHRD t

Construction of d 7 1

Building for PG - Academic Block at Ground levelling 455 College of Applied 8/2016 started 5 )

Sceinces Vazhakkad 6300000 Kondotty 12 months 27.10.2016 23.09.2016 05.11.2016 56,82,199/- 22.08.2016 Malappuram in Kondotty in 47,55,432.02 BM ( dated 01.09.2015 dated

Kondotty LA of ER below 16.31% EE 8443-00-108-PWdeposit

Constiuency. Mampad Latheef. M. Abdul GO(Rt) No.2253/2015/H.Edn No.2253/2015/H.Edn GO(Rt) 2193/2016-2017 (PRICE) dated dated (PRICE) 2193/2016-2017 t t d 7 1

Deposit works - - Urgent reoair work to 456 District Stationary work completed 6/2016 5

Office, Civil Station ) 3 months 5,73,380/- 4,30,034/- 25.10.2016 08.09.2016 28.03.2016 63,50,000.00 ated 22.08.2016 ated -00-108-PWdeposi 2016-2017 (PRICE) 2016-2017 (PRICE)

Malappuram. of ER below 5% BM o ohammed Ali, Melmuri ohammed Ali, 9 902/16/H.Edn dated dated 902/16/H.Edn // 33 ((B 22 DD EE 844 No. 2190 PM. M t

Deposit work - d 7 1

Construction of - Compound wall for

457 Ladies Hostel at /2016 work started 55

Govt: Poly Technic ) 6 months 18,59,476/ 28.05.2016 22.08.2016 25.10.2016 23.09.2016 25,29,899/-

College below 26.50% BM 4202-02-104-99 Perinthalmanna. ( KM.Lukose, Kolathur KM.Lukose, EE D4-5183/16/DTE dated dated D4-5183/16/DTE 2215/2016-2017(PRICE) dt dt 2215/2016-2017(PRICE)

HEALTH DEPARTMENT 8443-00-108-PW Deposit PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 144 PWD BUILDINGS DIVISION MALAPPURAM

Annual plan 2012- 2013 Construction of building for new finishing work in

458 maternity wing to ONSTRUCTION progress, Health 359/16

Taluk Head quarters (B)TVM exclude ramp 322 lakhs 12 months 25772919/- 22932744/- 02-11-2016 Tirurangadi Malappuram Hospital Tirurangadi

in Malappuram DT. E/R Below 11.02% 8443-00-108-PW Deposit 8443-00-108-PW dated 05.10.2013 Rs.322Lakhs dated GO.(Rt)No.3292/2012/H & Fwd & Fwd GO.(Rt)No.3292/2012/H 2016 for RS 322.00 Lakhs of EE 322.00 Lakhs 2016 for RS M/S ANJANA C Reg: 2697/2015-2016 Dated 19-01- Dated 2697/2015-2016 Reg: SE (K) 88/2015-16 Dated 22-02-2016 Dated 88/2015-16 (K) SE 8443-PW Deposit

H&FWD t Homeopathy Civil work s ove posi 8 0 t.21.05.2015 dtd. Rs.150 Rs.150 dtd. 25.11.2014 15 16 ama khsk 14 H&FWD oo 00.000 hh ee bb oro r 99 33 dd a d s 0 0 nearing 0 e annualplan2014-15annualplan2014-15 mm 459 pain and paliative completion, Lakhs Ansa

Homoe care centre at Wando

12mont electrical 134645 160767 08-09-20 08-09-20 150,00,0 Malappur for 150La Wandoor in A 19.40% tendered Malappuram district d 8443-PW dtd 30.5.2014 SJD 30.5.2014 SJD dtd CR/21/2014-15 dtd dtd CR/21/2014-15 SE(K)13/2015-16 SE(K)13/2015-16 GO(Rt)No.1771/20 HOME DEPARTMENT 8483-108-PW Deposit PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 145 PWD BUILDINGS DIVISION MALAPPURAM

Construction of a New building forPoplice Hospital 460 at RRRF (SRAF) Completed

Home compound 8 months Wandoor 32800000 2907393/- 3343502/- 15% above 15% 30.09.2015 Malappuram

Pandikkad, T Sasikumaran Malappuram. 8483-108-PW Deposit 8483-108-PW 29/03/2012for Rs 500000 Rs 29/03/2012for EE(BM)56/2015-16dt.13-01-2016 2000000.00 and GO(RT)976/2012/home/tvpm dt dt 2000000.00 and GO(RT)976/2012/home/tvpm TS No DR 13/2012-13 DT 02/07/2012, cancelled) 02/07/2012, DT 13/2012-13 DR No TS GO(RT)824/2011/home/tvpm dt 5/03/2011 for Rs for Rs 5/03/2011 dt GO(RT)824/2011/home/tvpm 44/2014-15 (revised) DT 04/12/2014 Rs 3280000 (Old (Old 3280000 Rs 04/12/2014 DT (revised) 44/2014-15 RR D 8782-00-102-97-PW-OR(iii)

Construction of balance portion of 461 Completed Compound Wall at Home 8 months 3141966/- Rs.33.80L 30.03.2013 27.09.2014 26.05.2015 30070019/- Tirurangadi MSP Camp, Klari Not applied Malappuram Work completed Work K.Abdu……………….. dated Thiruvananthapuram dated EE/19/2014 dtd 09.09.2014 dtd EE/19/2014 GO(Rt)No.860/2013/Home GO(Rt)No.860/2013/Home 8782-00-102-97-PW-OR(iii)

HEAD OF ACCOUNT NOT MENTIONED PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 146 PWD BUILDINGS DIVISION MALAPPURAM 1

Construction of 462 Cylinder room in sub Completed Tirur 100% Home 56714/- jail, Tirur 56714/- 56714/- Rs.0.60 L Rs.0.60 dt.25/9/13 10.02.2014 09.04.2014 10.03.2014 dt4/10/2013 Malappuram Estmate Rate Estmate Purushothaman Work completed Work SDR (P)46/2013-14 (P)46/2013-14 SDR Or.No. A5-6854/2012 A5-6854/2012 Or.No. AEE(P)53/13-14 dtd 04/02/20 dtd AEE(P)53/13-14

Increasing toilet 463 facilities in Sub Jail Work completed Tirur Home Prison

Tirur 53000/- 53000/- 2 Months stmate Rate (P)11/2014-15 s.2,89,660 L s.2,89,660 6-10991/2011 dated dated 6-10991/2011 ork completed /14-15 dtd 05/09/2014 dtd /14-15 / of Director General of td 02.08.2014 td t urushothaman u M Malappuram EE RR RR 1 2 dd PP MM WW SD Or.No. AEE(P)31 07.03.2012

Construction of 464 Compound Wall Work completed Lakhs Home MSP Camp, Klari Rs.38.60L Tirurangadi Malappuram Work completed Work Yasir, PWD Contractor, Areacode Contractor, PWD Yasir, Commandant, MSP Malappuram for Rs.38.60 for Rs.38.60 Malappuram MSP Commandant, Order No.G2/2534/2007M dated 09.03.2011 of dated No.G2/2534/2007M Order JUDICIAL DEPARTMENT PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 147 PWD BUILDINGS DIVISION MALAPPURAM 4059-01-051-98

dated

Repair works of the

roof of Munsiff 14 - Magistrate Court 465 work completed Ponnani in 941233 938880 Judicial 3/2013 Ponnani

25.04.2013 29.04.2013 28.08.2013 12.11.2013 Malappuram District 26.06.2013 Malappuram 0.25% below 0.25% Sri.K. Moosa Rs.9,90,000/- EE (B) MLPM EE (B) 4059-01-051-98 (First Part) completed Work dated 24.09.2012 of 24.09.2012 dated (BM) SDR(P)17/2012-13 SDR(P)17/2012-13

EE AS-D9 (A)23178/012 dated dated (A)23178/012 AS-D9 o be retendered .2013 of SE .2013 of SE 8 Urgentgp Special 14 Eranakulam 1 13 -- TT - 99 , 99

m Repair to Munsiff Magistrate Court 466 Re tendered Ponnani in Judicial Ponnani

Malappuram District 23.09.2016 Malappuram Rs.5,00,000/- 4059-01-051- (Second Part) 03.09.20 dated SDR(P)43/2013 Judicial Buildings Circle, Circle, Buildings Judicial As-A 656/013 dated 02.0 dated 656/013 As-A Terminated on Rist & Cost . & Cost Terminated on Rist HEAD OF ACCOUNT NOT MENTIONED

Minor repairs/maintenance- Providing book shelf 467 Work completed

Tirur in the chamber of the Judicial 18207/- 31550/- 31550/- 2 Months Binumon.C Rs.32,000/-

Judicial first class Eranakulam Malappuram Estmate Rate Estmate

Magistrate-1, Tirur completed Work 20.05.2013 of High Court Court 20.05.2013 of High R(P)7/2014-15 dtd 05.07.2014 dtd R(P)7/2014-15 er No.D2(B)26370/2013(A) dtd dtd er No.D2(B)26370/2013(A) EE(P)29/14-15 dtd 03.09.2014 dtd EE(P)29/14-15 d D A PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 148 PWD BUILDINGS DIVISION MALAPPURAM MEDICAL DEPARTMENT 2210-05-105-32-17

Plan 2015-2016 of Govt: Medical college manjeri. Leak 468 work in progress. Rectification work Manjeri Medical Faizal T 7111000/- 7058408/- 6867831/- 12 Months

above MOT, SICU 26-02-2016 Malappuram 100.00 lakhs 100.00 lakhs

and MITU complex E/R Below 2.70% 2210-05-105-32-17 dtd-22-01-2016 of EE PWD(B)Dvn MLPM for MLPM of EE PWD(B)Dvn dtd-22-01-2016 EE(BM)18/2016-17 dt 13.06.2016 dt EE(BM)18/2016-17 2797/15/ H & FWD dated TVM 01/09/2015 dated H & FWD 2797/15/ g.No2787/2015-2016 order No.MLPM/2015- g.No2787/2015-2016 g e o PRICE Re GO ( Rt) No 16/2015/847 16/2015/847

HEAD OF ACCOUNT NOT MENTIONED

Repairs to waste segregation sheeeler 469 and painting works to Medical

water treatment plants 5,80,000/-

Teeated water pumping to confort 470 station and repairs to 420000 Medical sewage Construction of Iind 471 floor for existing of Medical building in GMCM 73 lakhs

Providing additional 472 edical 3.30 akhs

facility of OP Counter l M PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 149 PWD BUILDINGS DIVISION MALAPPURAM

Special repairs to 473 5.10 laundey building. lakhs Medical Urgent repairs of 474 Dining room at B 1.45 lakhs

Medical Block GMCM- HDC fund- construion of nursing of station in A B &C 475 Block and

Medical construcion of new 4.90 lakhs P.I.C.U in peaeditric wing Special repair work to Govt. MCH 476 Manjeri-

Medical Improvement facility 4.73 lakhs to JhPhJanatha Pharmacy Repair work of system room, plice 477 aid post, ENT op and

Medical pharmacist cabin in 2.75 lakhs GMCH GMCM- Development setting up of additional 478 office facility to Bio 4 lakhs Medical Medical Engineering wing

GMCM-2015 Special repir woks to labour 479 room complex Major 11.50 la Medical OP, MITU

GMCM-2015 Maintenance of 480 bathrool complex edical 90 lakhs . M attached to the PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 150 PWD BUILDINGS DIVISION MALAPPURAM Plan 2013-14 Govt. college Malappuram 481 CIVP deposit work 8 lakhs Medical construction of Toilet block for girls GMCM Development SR works Repair to 482 lecture Hall and

Medical seminar Hall "B" 7.30 lakhs Block PLANNING DEPARTMENT PW Deposit 9-11-2013 for Collector, Collector, Manjeri ed 15032-2013 e 10-20151 gs Tvm gs g . t 11 -

StrengthiningStrengthining o off n District planning laterite work Committee (DPC) and plastering 483 Construction of work in Planning 764 lakhs 55828517 75368498 24 months 35% above 35% 26-06-2014 Malappuram DPC 07-10-2015 06-10-2017 PW Deposit Deposit PW Malappuram Malappuram progress

Malappuram Spl. Malappuram Secretariat - building. Rs. 764 lkhs CE buildin CE 764 lkhs Rs. Sri.AM Mohammed Ali, Mohammed Ali, Sri.AM SE(K) 38/2015-16 dt 17- dt 38/2015-16 SE(K) for Rs. 764 lakhs of Sistrict of Sistrict 764 lakhs for Rs. Reg.No. 39/CE/BL/2013-14 dt dt 39/CE/BL/2013-14 Reg.No. order No.888/2006/RoI/DPO/dat REVENUE DEPARTMENT 2029-00-800-77P PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 151 PWD BUILDINGS DIVISION MALAPPURAM

Work nearing completion. Completion of balance work done only after shifting the dumped vehicle from this compound. The work has stop as Preserving the per the request existing Taluk Office, of 484 Tirurangadi in Sri.P.K.Abdurub, Rs.60 L Rs.60

Revenue Malappuram District 1934419/- 5143713/- 6.20 below 30.09.2013 29.05.2014

Tirurangadi Minister of Malappuram as Heritage Building 2029-00-800-77P

O.P.Moideen Haji Education, The gate and sitting area under E(BM)10/2013-14 dated 20.09.2013 dated E(BM)10/2013-14 6/2012/TD dated Thiruvananthapuram 28.06.2012 Thiruvananthapuram dated 6/2012/TD construction loss 8 E E of the beauty of the Heritage builder. Waiting instruction of GO(Rt)No.368 Archeology Department SC ST DEPARTMENT 2225-02-277-52-Improving Facilities in ITD Hostels PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 152 PWD BUILDINGS DIVISION MALAPPURAM n ITD n ITD i es es i t ili Construction of Shed ng Fac

for Drier Room and i Estimate 485 maintenance to Pre- submitted for SC ST Hostels

Matric Hostel 10/12/14 T.S. on 3/5/2015 Nilambur 8.25 Lakhs -Improv Malappuram

Manimooly 2 77-5 2 - 02 5- 222 No. D2-16679/14 of ST Dvpt Director datede datede Director Dvpt of ST D2-16679/14 No.

SOCIAL JUSTICEDEPARTMENT 42354235-60-800-98-60-800-98

dt

17 Repairs and - maintanance of 486 work completed Rescue Home Ponnani 1425373 1381186 6 months 6 months K.Moossa 18.06.2015 03.09.2016 11.07.2016 29.07.2016

Thavanoor below 3.1% Malappuram Social Justice 1430,000 lakhs 4235-60-800-98 EE(BM)41/2016 Reg No.1454/2016-17 dt dt No.1454/2016-17 Reg GO(Rt)No.383/2015/SJD dated dated GO(Rt)No.383/2015/SJD

dt

Repair and 17

maintanance of old - Pratheeksha Bhavan 487 Building for work completed

Ponnani accomodating 6 months 8 %above 1158122/- 1250772/- 04.08.2016 10.06.2016 Malappuram Social Justice Childrens Home 4235-60-800-98 11,60,000 lakshs dated 30.07.2015 dated Thavanoor KV Mohammed ali EE(BM)30/2016 3291/2015-16 dt 15.02.2016 dt 3291/2015-16 O(Rt)No.471/2015/SJD O(Rt)No.471/2015/SJD G PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 153 PWD BUILDINGS DIVISION MALAPPURAM Repair and maintanance of Special childrens work not 488 Home and necessary Ponnani 18.06.2015 observation Home at dated /SJD Malappuram Social Justice 4235-60-800-98 Thavanoor 86,00,000 Lakhs GO(Rt)No.383/2015

Construction of a new block for District 489 Early Interventianal AS not obtained Centre at Taluk Head Tirurangadi Malappuram Social Justice quarters Tirurangadi. 4235-60-800-98

HEAD OF ACCOUNT NOT MENTIONED Social Justice Complex, Thavanur uram lakhs ani ustice ated Chidrens Home 2014 TS accord,, site is .281/2014 . pp JJ . 33 nn 490 dd (Boys) Chidrens hindarnce free Pon 28.04. Home (Girls), CWC /SJD Malap Social & JJB. 38082. GO(Rt)No TECHNICAL EDUCATION DEPARTMENT 2230-03-101-87 - 02 - 13 t d

Construction of 5

1 Work Amenity Center for - 491 completed. Final

Woman at ITI 2015 100% Ernad /2014

Rs. 15 L Rs. Bill submitted. 6 months 7 17.03.2014 18-02-2015 20-08-2015

Nilambur Rs.1376574 Rs. 1361432 Rs. Malappuram )4 C.D. Varghese C.D. BELOW 1.1% 2230-03-101-87 Technical Education BM ( GO(Rt) No.383/2014 dated dated No.383/2014 GO(Rt) EE 8443-103-PW-Deposit PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 154 PWD BUILDINGS DIVISION MALAPPURAM - 09 - 13

d

Providing Lift Room ate d for the lift mechanic 11 492 operater trade in - Completed 2010

Ernadu Government ITI 635461/- 10% above 10% 10.60 lakhs 10.60 lakhs 28-04-2010 20-09-2010 Malappuram Areacode )03/2010 Technical Education 8443-103-PW-Deposit dated TVM 01/09/2015 TVM dated BM ( K.Bavutty PWD Kadalundy PWD K.Bavutty EE GO ( Rt) No 2797/15/ H & FWD & FWD H 2797/15/ No ( Rt) GO 8782-00-102-97-PW-OR(iii)

Additional works to 7-PW- 9 )

lift block of - iii 493 Government ITI ( work completed 102 - lappuram 75 lakhs cal Educationc OR O ErnaduE 0 . i aa Areacode in 00 4. - M Malappuram District 82 7 Techni 8

Industries Department 1

Infrastructure development- maintanace of 494 work completed District industirs 10 Lakh 999072/- 797060/- 6 months 29.07.2016 Centre at Civil Saju joseph Station malappuram below 20.22% 239/14/ID dt 22.02.2014 dt 239/14/ID 8443-00-108-PW Deposit 8443-00-108-PW 1507/2016-17 dt 03.7.2016 dt 1507/2016-17 EE(BM)34/2016-16 dated29.08.20 EE(BM)34/2016-16 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 155 PWD BUILDINGS DIVISION MALAPPURAM 1

Construction of building for ofice and plastering work 495 conference hall

20.L completed

attached to District 20 Lakh 8 months 1996715/- 1692815/- TB Centre Manjeri 29.07.2016 15.22 % Below 15.22 % V,Abdul majeed V,Abdul GO(Rt) 4263/2011 dt dt 4263/2011 GO(Rt) 1450/2016-17 dt 11.07.2016 dt 1450/2016-17 12.12.2011 H& FWD TVM for TVM FWD 12.12.2011 H& 29.08.20 dt EE(BM)35/2016-17

Imporovement work to new toilet plastering elow 35 99 ussain S /15-16 dt 06.04.2016 20162 00/-0 nthsn d dt 11.07.2016 block in MSP 17 dt 04.10.20161 bb 55 44 . hh - 0 o

496 H workwork inin English Medium

747 682 progress 7600 6 mo

School Toilet at 29.07. 8.7 % malappuram Anwar 1453/2016-17 EE(BM)52/2016- 1002/constructio/EMH PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 156 PWD BUILDINGS DIVISION MALAPPURAM 5

Improvement and modification of Janamythri homedt 17.10.201 GF slab 497 Quarters No. M114 concreted 13.5L 1215103 6 months 13.49965 2016-17 dt 06.10.2016 at MSP Camp 29.07.2016 8443-00-108 9.99% below malappuram Anwar hussain 1452/2016 -17 dt 11.07.2016 EE(BM)53/ GO(Rt) no.2616/2015/ /2015/H .11.2015 khk 22 22 Internal Road at a TS Estimate 498 RRRF Pandikkad under scruitiny 95.00 La GO(Rt)No.289 ome dt TVM 1

Construction of Day Care centre at 499 work completed PTM Govt College

Perinthalmanna. 11.00 Lakh

Construction of Students Aminity 500 Centre at PTM work completed Govt College Perinthalmanna. 14.99 lakh PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 157 PWD BUILDINGS DIVISION MALAPPURAM revised Construction of estimate Pavilion at PTM sanctioned as 501 Govt College per new

Perinthalmanna. 14.99 lakh structural design

Construction of Central Prison, Civil work 502 Thavanur completed Home Thavanur 22.08-2014 Malappuram 21-08-2016 Malappuram 159143491/- 160138249.8 188322581.7 SE(K)27/2014 Rs.17.66Lakhs Suresh Gopinath Suresh 2235-02-800-82-XIII Tvpm dated 19.07.2012 Tvpm dated 21/02/2014 Rs.163436395 21/02/2014 GO(Rt) 274/2014/PWD Dt Dt 274/2014/PWD GO(Rt) G.O. (MS)No.199/2012/Home (MS)No.199/2012/Home G.O.

844 t d

3- 7 1

consrucion of - 00- building for regional 108 plastering 503 medical store in - completed 23/2016 Health

Manjeri

Govt. Homoeo 4387921 4139126 8 months ) 23.06.2016 28.01.2016 50.00 Lakh PW Saju joseph Malappuram Hospital Manjeri below 5.67% Dep BM ( dt TVM 15.05.2014 TVM dt

osit EE 2322/2015-16 dt 04.01.2016 dt 2322/2015-16 GO(Rt) No.1535/2014/H&FWD No.1535/2014/H&FWD GO(Rt) HEAD OF ACCOUNT NOT MENTIONED

Improvements to Sub Estimate under 504

Tirur Jail,Tirur preparation Home Malappuram PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 158 PWD BUILDINGS DIVISION MALAPPURAM

AS OBTAINED FOR RS. 1475 LAKHS AS PER LETTER NO. P4- Construction of 11399/2011/PrHQ 505 Central Prison, OF DIRECTOR

Home Thavanur Phase II GENERAL OD Thavanur 785 Lakhs

Malappuram PRISONS & CORRECTIONAL SERVICES DATED 21/12/16

AS OBTAINED FOR RS. 1475 LAKHS AS PER Construction of LETTER NO. P4- r Central Prison, 11399/2011/PrHQ

vanu OF DIRECTOR 506 ppuramp omeo Thavanur-one of Lakhs aa a 4 HH Entrance Block & GENERAL OD Th 284 Mala Main Block PRISONS & CORRECTIONAL SERVICES DATED 21/12/16

13TH FINANCIAL COMMISSION AWARD WORKS - PROGRESS REPORT UNDER PWD BUILDINGS DIVISION, MALAPPURAM- HEALTH DEPARTMENT 2210-01-110-35(05)(P) 13th Finance

Waste management and sewage treatement Work to be 507 plant, THQH, arranged. Health Perinthalmanna Malappuram Perinthalmanna dtd. 06.12.2013 Rs60Lakhs 2210-01-110-35(05)(P) 13th Finance 2210-01-110-35(05)(P) AS No.GO (Rt) 4066/2013/H&FWD 4066/2013/H&FWD (Rt) No.GO AS HOME DEPARTMENT PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 159 PWD BUILDINGS DIVISION MALAPPURAM

13th Finance Commission Award 508 2012-13 increasing work completed Home 289108 Manjeri Manjeri toilet facilities in Sub Basheer 289108/- 289387/- 21.05.2011 14-08-2013 13-11-2013 12-05-2014 0.10% beloe Malappuram Jail, Manjeri Rs.2,89,660/- Work completed Work 8443-300/80-PW SDM 33/2013-14 dt 22.06.2013 33/2013-14 SDM GO(MS)No.110/2011 Home dated dated Home GO(MS)No.110/2011 AEE(M)32/013-014 dated 18.07.2013 dated AEE(M)32/013-014

13th Finance Commission Award 509 2012-13 increasing work completed

Home toilet facilities in Sub 258691/- 258691/- 242581/- Vinoj VT Vinoj 01.06.2013 14-08-2013 13-11-2013 12-05-2014 Malappuram Estmate Rate Jail, Perinthalmanna. Rs.2,89,660/- Perinthalmanna. Work completed Work 8443-300/80-PW O(MS)No.110/2011 O(MS)No.110/2011 SDR(P)27/2012-13 dt SDR(P)27/2012-13 ome dated 21.05.2011 dated ome E(PB)02/013-014 dated dated E(PB)02/013-014 E GG E HH AE

13th Finance Commission Award 510 2012-13 increasing work completed Home 287440 287368 Ponnani toilet facilities in Sub 264078/- 14-08-2013 13-11-2013 12-05-2014 Malappuram Sri.K. Moosa Sri.K. Rs.2,89,660/- Jail, Ponnani 0.025% beloe Work completed Work dated 21.05.2011 dated 01.06.2013 dated 8443-300/80-PW SDR(P)25/2013-14 SDR(P)25/2013-14 GO(MS)No.110/2011 Home Home GO(MS)No.110/2011 AEE(P)30/013-014 dated 05/08/2013 dated AEE(P)30/013-014 JAIL DEPARTMENT 2235-02-800-82-XIII PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 160 PWD BUILDINGS DIVISION MALAPPURAM

Construction of District Jail at Thavannor, Malappuram (Amount 511 enchanced as per completed Jail

Ponnani G.O(MS) Malappuram 159143471/-

No.199/2012/Home dt Rs.176600000 17.6% above of ER of 17.6% above

19.07.12) 2235-02-800-82-XIII Tvpm dated 19.07.2012 dated Tvpm 21/02/2014 Rs.163436395 GO(Rt) 274/2014/PWD Dt Dt 274/2014/PWD GO(Rt) G.O. (MS)No.199/2012/Home (MS)No.199/2012/Home G.O. 8443-300/80-PW HEAD OF ACCOUNT NOT MENTIONED

Increasing toilet 512 facilities in SubJail, No Land Available. Jail Tirur Tirur Malappuram NABARD WORKS - PROGRESS REPORT UNDER PWD BUILDINGS DIVISION, MALAPPURAM - JANUARY - 2017 AYURVEDA (ISM) DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED NABARD Construction of Estimate for AS 513 Building for submitted 52 lakhs

Kondotty Ayurveda Hospital Ayurveda Malappuram Cherukkavu HIGHER SECONDARY EDUCATION DEPARTMENT HEAD OF ACCOUNT NOT MENTIONED

NABARD-RIDF XVII- Constrction of Academic Block for 514 Work completed Government H.Edn 230 lakhs 23.04.2013 03 08 2013 Polytechnic College, 19383422/- 25935019/- Vallikkunnu (2011-2012) Malappuram 33.80% above 33.80% K.Manikandan Thrirurangadi 20.03.2012 Dt. SE(K)17/2013-14 dated dated SE(K)17/2013-14 GO(Rt)No 579/2012/H.Edn 579/2012/H.Edn GO(Rt)No CR/I/2012-13 dated 29.09.2012 dated CR/I/2012-13 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 161 PWD BUILDINGS DIVISION MALAPPURAM

NABARD- 205 Investigation Additional infra 9- works started 515 stucture work like 01- Preliminary H Edn

kottakal Class room etc in 051 400 Lakh G.O. (Rt)

26.12.2015 design received Malappuram GHSS Perassannur -86 No.6021/2015/G.Edn dt TVM

NABARD- r Additional infra FF SLAB stucture work like CASTED GF 516 Class room etc in

H Edn MASONRY IN kottakal 225 Lakh )06/2016-17 dt dt )06/2016-17 G.O. (Rt) .aboobacke 18 months M 26.12.2016 17 05 2016 20.02.2016 29.03.2016 20540681/- 17858068/-

GHSS Mankada below 3.06% 21/2015/G.Edn dt dt 21/2015/G.Edn 2 M dt o.3425/2015-16 o Malappuram

KK PROGRESS KK 11 VV 0 N

Pallippuram T SE( No.60 Reg.N

NABARD - Construction of New Block Building for Estimate 517 Govt: Higher submitted to SE Ernad Secondary School at Education 460.00 Lakh Malappuram Pandikkad in Malappuram District. HEALTH DEPARTMENT 4202-01-203-99 PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 162 PWD BUILDINGS DIVISION MALAPPURAM - 04 - 23 . d t d

14

Elamkulam. PHC - 518 Completed

ELAMKULAM 2013 100% Health 5488660 19/05/2012 50.05Lakhs 02-05-2013 01-11-2013 23-02-2014 Malappuram )1/2013 Perinthalmanna 4202-01-203-99 35% ABOVE ER 35% ABOVE dated tvm 06.05.2011 tvm dated BM 30/CE/BL/2012-13 Dt Dt 30/CE/BL/2012-13 ( EE G.O. (Rt) No.1767/2011/h&fwd No.1767/2011/h&fwd (Rt) G.O. HEAD OF ACCOUNT NOT MENTIONED

r Cheriyamundam.

519 L/2012-13 Work completed anu ealth above E/R 0 Lakhs -14 dtd.29.04.2013 011 for Rs.48.30 011 for Rs.48.30 .Abdu appurama 2 for Rs.48.3 lakhs 2 for Rs.48.3 767/2011/H&FWD 767/2011/H&FWD 05.20130 11.2013 10.2013 7 2 l lakhs 87577/- PHC CheriCheriyamundamyamundam 8 BB 100%1 TT l 33 33 . . . 22 HH %% KK 33 08. 07. 28. 48. Mal 19.50 39/CE/ dated 06.05. dated dtd.06.06.201 EE(BM)4/201 G.O. (Rt) No.1

Construction of a building for Selection 520 Oncology Centre at notice issued Health TIRUR 15.02.16 G.O. (Rt) 197613685 District Hospital Tirur 3370 Lakhs Malappuram AM muhammedali AM 27.11.2015 for Rs.3370 lakhs 27.11.2015 for Rs.3370 No.3829/2015/H&FWD dated dated No.3829/2015/H&FWD PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 163 PWD BUILDINGS DIVISION MALAPPURAM 5- 0 - d11 t d

14 Mankada. CHC - 521 Completed

MANKADA 2013 100% Health /2013 4614972 Mankada 50.05 lakh 5 06/06/2012 22-05-2013 21-11-2013 25-02-2014 Malappuram )0 22% ABOVE ER 22% ABOVE dated tvm 06.05.2011 tvm dated 38/CE/BL/2012-13 dt dt 38/CE/BL/2012-13 BM ( Muhammed Musthafa M. Muhammed Musthafa EE G.O. (Rt) No.1767/2011/h&fwd No.1767/2011/h&fwd (Rt) G.O.

Request submitted for Govt for taken up the work Irimbliyam. PHC 522 since this work ttakal ealth 7/2011/h&fwd dated dated 7/2011/h&fwd LDS/2012-2013 DT DT LDS/2012-2013 6.05.2011 appurama 0 05.2012

oo IRUMBLIYAM l 66 HH 0 BB k cancelledll d bby ththe 16. Mal Chief Engineer, tvm 0 Buildings due to non started work Reg No 26/CE/ No Reg G.O. (Rt) No.17

523 PHC MELATTUR Work Completed 100% Health Wandoor G.O. (Rt) 50.51 Lakhs Malappuram tvm 06.05.2011 tvm dated31/03/2012 35% ABOVE ER 35% ABOVE 176/CE/BL/2011-12 176/CE/BL/2011-12 No.1767/2011/h&fwd dated dated No.1767/2011/h&fwd PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 164 PWD BUILDINGS DIVISION MALAPPURAM

Constrction of OP block and labour Work transferred 524 room for CHC to LSGD Dept Health 91 Lakhs Wandoor Wandoor G.O. (Rt) Malappuram Dt.11.08.2014 tvm 27.01.2014 tvm DR-21/2014-15 DR-21/2014-15 No.303/2014/h&fwd dated dated No.303/2014/h&fwd

NABARD assistance under RIDF XXI 2015- 2016.Improvements to CHC Urangattiri - Work transferred 525 Construction of IP to LSGD Dept Ernad Health G.O. (Rt) Block, Tribal Block 415 Lakhs Malappuram and staff Qurters 829/2015/H&FWD dated dated 829/2015/H&FWD 8 11.2015 for Rs.415 lakhs 11.2015 for Rs.415 BuildingBuilding at 1 27.

Malappuram No.3

NABARD assistance under RIDF XXII Gl - Edn. VHSE - Estimate under 526 Construction of preparation Wandoor Education building for GVHSS G.O. (Rt) Malappuram 125.00 Lakhs

Wandoor 24.11.2016 TVM No.4041/2016/Gl Edn dt Edn dt No.4041/2016/Gl

NABARD assistance under RIDF XXII Gl - Edn. VHSE - Estimate under 527 Construction of preparation Education building for GVHSS G.O. (Rt) Vallikkunnu Malappuram 375.00 Lakhs

Chelari 24.11.2016 TVM No.4041/2016/Gl Edn dt Edn dt No.4041/2016/Gl PROGRESS REPORT OF NABARD WORKS FOR JULY 2016 165 PWD BUILDINGS DIVISION MALAPPURAM

NABARD assistance under RIDF XXII Gl - Edn. VHSE - Estimate under 528 Construction of preparation Education building for GVHSS G.O. (Rt) Malappuram Malappuram 110.00 Lakhs

Pullanoor 24.11.2016 TVM No.4041/2016/Gl Edn dt Edn dt No.4041/2016/Gl