VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN

VirginiaVirginia KeyKey MasterMaster PlanPlan PreviewPreview PresentationPresentation MayMay 20,20, 20092009

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 *** The online presentation reflects the Master Plan design for . PREVIEWPREVIEW PRESENTATIONPRESENTATION PRESENTATION OUTLINE

1. Project Orientation, Goals, and Objectives 2. The Process 3. Consensus Building 4. Evolution of the Master Plan • Site Inventory and Analysis • Preliminary Land Use Plan • Preliminary Master Plan Options • Final Master Plan 5. Next Steps

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION VIRGINIA KEY SITE CONTEXT

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION GOALS AND OBJECTIVES

The goals for the Master Planning process are to:

• develop a viable waterfront with public open space areas; • develop policies for the use of the waterfront; • develop and manage the land; • provide for the protection and enhancement of the natural resources (i.e. public beaches, parks and conservation areas) with the necessary infrastructure and traffic flow to serve future development • integrate and preserve the historic Virginia Key Beach Park

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION THE PROCESS

1. PROJECT SCOPING

2. DATA COLLECTION AND RESEARCH

3. SITE INVENTORY AND ANALYSIS

4. STAKEHOLDER INTERVIEW PROCESS

5. PUBLIC MEETING #1: SITE INVENTORY AND ANALYSIS, March 29, 2007

6. PUBLIC MEETING #2: COMMUNITY WORKSHOP AND CONSENSUS BUILDING, June 20, 2007

7. PRELIMINARY CONCEPTUAL LAND USE PLANNING AND DESIGN

8. PUBLIC MEETING #3: PRELIMINARY MASTER PLANNING, August 26, 2008

9. FINAL MASTER PLANNING

10. PREVIEW PRESENTATION OF THE VIRGINIA KEY MASTER PLAN

11. PRESENTATIONS TO ADVISORY BOARDS AND CITY COMMISSION

12. FINAL DOCUMENTATION

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SITE INVENTORY AND ANALYSIS: PUBLIC MEETING #1

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SITE INVENTORY AND ANALYSIS: PUBLIC MEETING #1

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SITE INVENTORY AND ANALYSIS: PUBLIC MEETING #1 COMPOSITE ANALYSIS

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SITE INVENTORY AND ANALYSIS: PUBLIC MEETING #1 CONCEPTUAL LAND USE PLAN

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SITE INVENTORY AND ANALYSIS: PUBLIC MEETING #1 PUBLIC COMMENTS

FEEDBACK RECEIVED ON WEBSITE :

Category # of Comments

ƒAthletic Fields and Landfill 27 ƒDeed Restrictions and Leases 4 ƒLagoon- Rowing Club and Marina 13 ƒMarine Stadium 13 ƒNorth Point 2 ƒProcess 19 ƒ Public Purpose Land and Green Space Preservation 25 ƒPublic School 160 ƒWebsite 5 ƒOther Elements Total: 268

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION COMMUNITY WORKSHOP: PUBLIC MEETING #2

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION COMMUNITY WORKSHOP: PUBLIC MEETING #2

THE ‘DOTS’ EXERCISE : # of Dots Category # of Dots Category 400 Educational Center 164 North Point oRowing (193) oBiking (Mountain biking and road biking) oSchool (134) oNature trails Eco-camping 326 Bill Sadowski Aquatic Preserve o 315 Environmental Educational Trails and the National 155 Public Recreational Park Parks Service Center oRegional Athletic Park Soccer oNational Parks Service trails o oLow-impact nature/educational trails) 134 Marine Stadium 270 Multi-purpose Marine Village and Marina 126 Coastal Hardwood Hammock oRestaurant (i.e. Rusty Pelican) oEducational Trails oViews to oButterfly Gardens oPublic Waterfront Promenade oMarina 106 Improved Circulation Patterns oDedicated Biking Lanes/Pathways 243 Public Beach oWindsurfing 101 Improved Hobie Beach oProtected Sand dunes 198 Virginia Key Beach Park Trust oBoardwalks oEducational/Interpretive Trails with Seating 90 Public Icon Park 191 Shrimpers’ Lagoon oSculpture Gardens oLow-impact Water Sports oArt in Public Spaces oJimbos 34 Improved Fishing Pier 174 DERM Restoration Areas oElevated Boardwalks 27 Structured Seaquarium Parking and Public oWildlife viewing areas Waterfront Promenade oPublic Waterfront Promenade oGreen Roofs/ Rooftop Gardens

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION COMMUNITY WORKSHOP: PUBLIC MEETING #2

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION COMMUNITY WORKSHOP: PUBLIC MEETING #2

SUMMARY OF COMMENTS :

1. Preserve and enhance natural environment

2. Low-impact mixed use

3. Multi-use and multi-purpose recreation trails through out island

4. Ensure safety (concern about wake in lagoon)

5. Sustainable and environmentally friendly practices

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION PRELIMINARY MASTER PLAN PRESENTATION PUBLIC CONSENSUS BUILDING PUBLIC MEETING #3

SUMMARY OF COMMENTS :

1. Ensure Sustainability of the Virginia Key Master Plan (Access and Traffic, Environmental Concerns with Boat Ramp location, night lighting, budget for development of plans, etc)

2. Promote Cultural Resources on the Key (i.e. Marine Stadium, Historic Virginia Key Beach Park, and others)

3. Concerns about programming of various uses in the Marine Stadium Basin and the mix of passive boating activities with motorized boat activities (i.e. Marina Wet Slips, Dry Stack etc). Propose a “No Wake” zone.

4. Conserve and celebrate Natural Resources (Bill Sadowski Critical Wildlife Area, etc)

5. Public Access for all (windsurfers, boaters, beach goers, nature lovers, rowers/kayakers, current users of Key, bikers, etc)

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION OWNERSHIP MAP

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION LAND USE SUMMARY

(minor improvements proposed to Fishing Pier and Rickenbacker Cswy)

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION VIRGINIA KEY FINAL MASTER PLAN

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION VEHICULAR CIRCULATION DIAGRAM

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION PEDESTRIAN AND BIKING TRAILS CIRCULATION DIAGRAM

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION DETAIL AREA PLANS

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION FISHING PIER

1

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION FISHING PIER LEGEND 1. Renovated and Improved Fishing Pier 2. Under-Bridge Connection (proposed) 3. Waterfront Overlook 4. Icon Gateway Elements 5. Refurbished Parking Lot with Drop-off 6. Family Picnic Area 7. Renovated Beach Public Restrooms 8. Multi-use Pedestrian and Biking Trail 2 8 RICKENBACKER 4 1 5 3 6 7

HOBIE BEACH DETAIL PLAN AREA #1

BISCAYNE BAY

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION FISHING PIER DETAIL PLAN

BISCAYNE BAY

4 1 LEGEND

1. Gateway Icon Element/Sculpture 2. 30” Raised Landscape Planter with Seating 3. 42” Raised Planters with Railing 4. Boardwalk with Guardrail (under bridge connection)

2

3

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION FISHING PIER PERSPECTIVE SKETCH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

2

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

MARINE STADIUM LAGOON

DETAIL PLAN AREA #1

RICKENBACKER CAUSEWAY

HOBIE BEACH

BISCAYNE BAY

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES LEGEND 1. Renovated City Marina 2. Mooring Field 3. Public Waterfront Promenade with Landscape Improvements, Vendor Kiosks, Seating, Shade MARINE STADIUM LAGOON Arbors, etc) 4. Two-way Access Road with Street Parking/Loading Areas and Drop-off at Rusty Pelican Restaurant 5. Harbor Master and Marina Operations Facility 6. Virginia Key Welcome Center 1

RUSTY 3 3 PELICAN RESTAURANT 4 5 1 6 2

WY ER CS NBACK RICKE

HOBIE BEACH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES LEGEND 7. Fueling Dock 8. Parking Garage (600 Spaces, 5-Story) 9. Emergency Access only (gated) MARINE STADIUM LAGOON 10. Dry stack Boat Storage Facility 11. Boat/Equipment Drop-off 12. Access Path 13. Multi-use Pedestrian and Biking Trail

RUSTY PELICAN 11 RESTAURANT 7

DETAIL PLAN AREA 10 8 9 12 13 13

WY ER CS NBACK RICKE

HOBIE BEACH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

MARINE STADIUM LAGOON DETAIL PLAN AREA #2

RICKENBACKER CAUSEWAY

HOBIE BEACH

BISCAYNE BAY

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES LEGEND 1. Dry Stack Boat Storage Facility 2. Dry Stack Facility and Park Operations Center and Lagoon Patrol Building 3. Marine Stadium Gardens MARINE STADIUM LAGOON 4. Parking Garage (200 Spaces, 3-Story) 5. Small-scale Retail (1-2 Story, 40,000 SF) 6. Signature Waterfront Restaurant (12,000 SF) 7. Public Waterfront Park

7 2 MARINE STADIUM MAST 3 6 ACADEMY 5 5 1 4 5 5

RICKENBACKER CSWY

HOBIE BEACH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES LEGEND 8. Waterfront Boardwalk 9. Aquatic Center (60,000 SF) 10. Aquatic Center Public Pool (Olympic-size) MARINE STADIUM LAGOON 11. Classroom Facility with Equipment Storage (i.e. canoes, dragon boats, etc) 12. 4-5 Story Parking Garages with Green Roof and Solar Panels (1,050 Parking Spaces) 13. Service Road/Emergency Access 8 8 11

MARINE STADIUM MAST ACADEMY 10 9

13 DETAIL PLAN AREA 12 12

13

RICKENBACKER CSWY

HOBIE BEACH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BASIN AREA PROPERTIES PERSPECTIVE SKETCH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION DEVELOPING CRITERIA FOR SUSTAINABILITY Unique opportunity for innovation and design ideas promoting environmental, economical and sociopolitical sustainability such as:

Source: www.mainstreetportage.org/Visuals.htm Pervious pavements and rain gardens/bio- swales reduce storm water run-off and Source (both photos): www.lrce.usace.army.mil.jpg provide infiltration methods.

Al Gore’s Home, Tennessee. Photo: Treehugger.com Vertical garden by Patrick Blanc in Madrid, Spain. Photo: aptiveruse Using garage roofs canopies for building integrated photovoltaic arrays Garage Green Screens as a ‘Vertical creates alternative energy sources for the running of building systems. Garden’ reducing walls heat island impact and provide aesthetic appeal to blank walls.

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION DEVELOPING CRITERIA FOR SUSTAINABILITY Unique opportunity for innovation and design ideas promoting environmental, economical and sociopolitical sustainability such as:

Solaire Building, New York. Photo: Earth Observatory

Conservatorium of Music, Sydney. Photo: Water Sensitive Urban Design, Sydney A green roof atop a building in Beijing. Source: Treehugger

Use of green roofs to provide building insulation and rain water collection systems as well as community benefits through the establishment of community gardens.

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINA AND DRYSTACK MARKET SUMMARY

1. Existing facilities nearly 100% occupied 2. Unmet dockage demand in Miami-Dade County 3. Few opportunities to increase dockage supply in County 4. Economic downturn: • Temporary decline in boat registrations • Long-term demand supported by demographics • Opportunity to improve public waterfront access & boating infrastructure 5. Activity & opportunities expected to increase with Virginia Key redevelopment

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINE FACILITIES REDEVELOPMENT OBJECTIVES

1. Improve & increase waterfront access for the public 2. Improve access to the waterways for boaters 3. Improve & increase access from waterways to waterfront amenities 4. Maintain or increase capacity of existing facilities • Upgrade to modern design standards • Provide modern amenities • Optimize use of water space 5. Upgrade operational efficiency 6. Upgrade revenue potential 7. Enhance convenience & safety for boaters

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION PROPOSED VIRGINIA KEY FACILITIES

Mooring Marina Wetslips Drystack Boat Field Storage

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SUMMARY OF PROPOSED VIRGINIA KEY FACILITIES

1. 206 Wetslips • Increase of 6 slips • Significant increase in leasable space (LF = linear feet) 2. 40 Moorings • Increase of 28 moorings 3. 6,325 LF of Flexible Side-Tie & Day-Use Dockage • Major expansion of transient & day-use dockage 4. 750 Drystack Racks • Vessels 25 to 45 ft. • +100 racks compared to combined existing facilities • Efficient use of water space 5. Fuel Dock • Modernized Gas/Diesel • Pumpout

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION COMPARISON OF EXISTING AND PROPOSED VIRGINIA KEY FACILITIES

Overall Facility Comparison # of # of # of Day-Use & Side-Tie Total Dedicated Facility Wetslips Racks Moorings Dockage (LF) Slips/Racks Marine Stadium Marina 0 300 0 0 300 Rickenbacker Marina 200 350 12 0 562 Combined (MSM + RM) Total 200 650 12 0 862 Proposed Virginia Key 206 750 40 6,325 996 1. Increase in supply of high-demand size Wetslips Comparison range of wetslips Slip Length # of Dedicated Slips (ft.) Existing* Proposed 2. Smaller boats have more capacity in 20 - 35 77 0 drystack 36 - 45 120 30 46 - 60 3 156 3. Increased affordable mooring for sailboats 60+ 0 20 Total 200 206 (expanded mooring field) * Estimate 4. Huge expansion in access from water for smaller boats

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION IMPLEMENTATION

1. Additional Surveys, Studies, & Analyses for Permitting • Environmental Resource Surveys • Bathymetric Surveys • Flushing Analyses • Conceptual Design 2. Permitting • FDEP or SFWMD (Environmental Resources Permit) • ACOE (Federal Dredge/Fill Permit) 3. Design Refinement, Final Design, & Construction

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINE STADIUM LAGOON PROGRAMMING

Rowing Regatta Layout

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINE STADIUM LAGOON PROGRAMMING

Dragon Boat Competition Layout

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINE STADIUM LAGOON PROGRAMMING

Special Event Rowing Regatta Layout

NOTE: Southern course & practice lanes (as shown) only to be used for special events during non-peak boating times and only with coordination/approval from the City of Miami due to direct conflicts with the marine facilities operations.

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION MARINE STADIUM LAGOON PROGRAMMING

Special Event Dragon Boat Competition Layout

Note: Circular course & practice lanes (as shown) only to be used for special events during non-peak boating times and only with coordination/approval from the City of Miami due to direct conflicts with the marine facilities operations.

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

3

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

LEGEND 1. Proposed Vehicular Connection to Arthur J. Lamb Road (additional survey of existing wetlands will be required to determine exact location of roadway)

2. Renovated Access Drive (pervious pavement) BILL SADOWSKI CRITICAL and Public Waterfront Trails (pedestrian/biking WILDLIFE AREA connection to Waterfront Promenade in Basin Area Properties) 3. Wildlife Watch Tower, Boardwalks, and Environmental Education Signage 4. Miami Skyline Viewing Point (Pedestrian and Bicycle Access only)

3 4 2

DETAIL PLAN AREA #1

MARINE STADIUM LAGOON

1

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

LEGEND

• Skyline Viewing Point BILL SADOWSKI CRITICAL 2 WILDLIFE AREA • Outdoor Seating Area • Shade Pavilion • 10’ (min) Multi-use Trail with 3 pervious pavement systems 1 (pedestrians and bicycles only)

4

http://en.wikipedia.org/wiki/File:Miami_Collage_20090326.png

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

LEGEND

http://en.wikipedia.org/wiki/File:Miami_Collage_20090326.png

http://www.noaanews.noaa.gov/stories2008/20 http://www.dep.state.fl.us/coastal/sites/biscayne/ 080408_biscaynebay.html http://www.docomomofl.org/mms.donton.jpg

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION DETAIL PLAN AREA #2

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

LEGEND

1. Access Drive (resurface BILL SADOWSKI CRITICAL existing with pervious WILDLIFE AREA pavement) 2. Small Vehicular Drop-off and Temporary Parking 8 3. Shade Pavilion with Restroom Facilities and 6 Informational Signage/Kiosk 4. Demonstration Wetland 5 Garden 4 4 5. Wildlife Watch Tower 7 6. Elevated Boardwalks 6 7. Existing Boat Dock Area 8. Multi-purpose Trail 6 (Pedestrian and Bike 3 Access only) to Viewing Point 1

2

6 8

1

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ROADWAY IMPROVEMENTS

4

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ROADWAY IMPROVEMENTS

Ric ken b ack er Ca us ew ay

Improve Beach Access Road Between Mast Academy and Stadium Driveways

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION TRAFFIC IMPROVEMENTS ¾Pedestrian Path along North Side of Rickenbacker Causeway

¾Pedestrian Connection at East End of Study Area

¾Pedestrian Connection at West End of Study Area

¾Pedestrian Path along Arthur Lamb Jr. Road

¾Pedestrian Connection between Beach Area and Rickenbacker Causeway

¾Bicycle Lanes along Arthur Lamb Jr. Road

¾Bus Stop at Arthur Lamb Jr. Road and Rickenbacker Causeway

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION TRAFFIC SUMMARY ¾Rickenbacker Causeway is functioning adequately within Virginia Key

¾Additional traffic generated by proposed land uses within Master Plan will be mitigated with proposed improvements, including: ‐ Additional Turn Lanes ‐ Increased Storage Capacity of Existing Turn Lanes ‐ Improved Intersection Angle ‐ New Traffic Signal ‐ Improved Beach Access ‐ Transit Improvements ‐ Improved Pedestrian Facilities ‐ Improved Bicycle Facilities

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION TRAFFIC SUMMARY Infrequent Congestion (bumper‐to‐bumper traffic) within Virginia Key is caused by bottlenecks that occur outside of the study area, such as: ‐ At Entrances to During Peak Event Days ‐ At Toll Plaza including Avenue Intersection and I‐95 Entrance Ramp ‐ Transition from 6 to 4 Lanes (from Virginia Key to Crandon Park)

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION TRAFFIC SUMMARY ¾Traffic Problems that Occur Outside Virginia Key could be Improved by: ‐ Installing Sunpass at Toll Plaza ‐ Implementing a Parking Management Plan for Crandon Park During Peak Event Days (i.e. Variable Message Parking Signs) ‐ Improvements at the Intersection and I‐95 Entrance Ramp

¾Parking Improvements for Hobie Beach Include: ‐ Provide Parking Garages on N. Side of Rickenbacker Causeway (Included in Master Plan) ‐ Provide a Pedestrian Bridge Between New Parking Garages and Hobie Beach (Included in Master Plan)

¾The Hobie Beach Parking Improvements will Improve Traffic Flow and Enhance Safety within Virginia Key by: ‐ Eliminating Vehicles from Stopping on Rickenbacker Causeway or Continuously Accessing the Causeway to find parking spaces within Hobie Beach

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ROADWAY IMPROVEMENTS

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ROADWAY IMPROVEMENTS

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ROADWAY IMPROVEMENTS

A

B

A B

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ACTIVE RECREATION AND WELLNESS REGIONAL PARK

5

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ACTIVE RECREATION AND WELLNESS REGIONAL PARK LEGEND (* Please note that the plan depicts a MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT long-term potential site carrying capacity.) 1. Baseball Fields 2. Softball Fields 3. Batting Cages 4. Soccer Fields 5. Tennis Courts 6. Competition Stadium, Track and Field, and Football 4 4 4 7. Active Recreation and 2 2 Wellness Campus and Dormitories 3 8. Central Green 2 2 9. Entry at Arthur J. Lamb Road (and connection to 4 4 4 multi-use trail) 7 7 8 1 1 BILL SADOWSKI CRITICAL WILDLIFE 5 COASTAL HARDWOOD AREA HAMMOCK 6 5

1 1 5

EXISTING MANGROVE AREA 9

HISTORIC VIRGINIA KEY BEACH PARK

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ACTIVE RECREATION AND WELLNESS REGIONAL PARK LEGEND (* Please note that the plan depicts a MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT long-term potential site carrying capacity.) 10. Internal Pathway System (for Pedestrians, Bicycles and limited golf carts) 12 11. Surface Parking (with pervious pavement and rain gardens /natural stormwater runoff filtration systems) 12 12. Parking Garages (1-2 Story with Green Roofs where 12 12 13 feasible) Total Parking: 2,660 spaces 10 10 13. Open Recreation Space 12 12 10

BILL SADOWSKI CRITICAL WILDLIFE AREA 12 10

COASTAL HARDWOOD HAMMOCK 6

11 11

EXISTING MANGROVE AREA

DETAIL PLAN AREA

HISTORIC VIRGINIA KEY BEACH PARK

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ACTIVE RECREATION AND WELLNESS CAMPUS AND DORMITORIES 2 LEGEND 3 1. Central Pavilion (i.e. restrooms, snack bar, 4 etc) 1 2. Softball Fields 3. Soccer Fields 2 12 4. Pedestrian Walkway and Biking Trails System 10 5. Baseball Fields 6. Entry Area 3 11 7. Parking (with bio-swales and pervious 20 14 pavement) 8. Stadium Grand Stand 4 15 19 9. Track and Field and Football Competition Field 10. Children’s Outdoor Recreation and Playground Area 4 13 11. Interactive Water Feature 12. Passive Outdoor Gardens and Gathering Spaces 18 16 13. Public Plaza and Central Green Campus Building Program: 17 14. Group Exercise Rooms, Day Care and 5 Infirmary/Clinic 15. Dormitories (Overnight Lodging), Dining Facilities, and Community Meeting Center 12 12 6 16. Wellness and Fitness Institute 17. Administration and Reception 12 4 18. Gymnasium (i.e. YMCA) with Training and Locker Rooms 8 19. Indoor Courts (i.e. Racquetball, Squash, etc) 5 7 7 9 20. Offices and Training Facilities

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION ACTIVE RECREATION AND WELLNESS CAMPUS AND DORMITORIES PERSPECTIVE SKETCH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION LANDFILL CLOSURE AND REDEVELOPMENT

• Beneficial reuse is fully achievable:

– Special engineering and institutional controls will be required to protect the public

– Brownfield funding grants should be investigated

• Coordination is the key to success:

– The Landfill Closure Plan, Master Plan, and reuse designs must be coordinated to avoid the potential for significant additional redesign costs

– Regulating agencies must be made fully aware of and agree to the closure and master plans to avoid possible permitting delays and redesigns

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SHRIMPERS LAGOON: PUBLIC BEACH AND COASTAL HARDWOOD HAMMOCK RESTORATION

6

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SHRIMPERS LAGOON: PUBLIC BEACH AND COASTAL HARDWOOD HAMMOCK RESTORATION LEGEND 1 1. Landscape Buffer with 20’ Berm and Native Planting 2. Small Boat Launch with Canoe/Kayak and other Small Boat (non-motorized boats) Rentals and Food Concessions 3. Parking (with bio-swales and pervious pavement) 6 4. Multi-purpose Pedestrian and Biking Trail 4 5. Reclaimed Area (replanted with native plants) MIAMI-DADE WATER 5 AND SEWAGE 6 6. Elevated Boardwalks with Environmental Educational Signage TREATMENT PLANT 10 2 7. Public Beach Entry Signage SHRIMPERS 3 LAGOON 8. Beach Pavilion and Public Facilities Building 14 6 9. Playground/Tot-lot, Beach Volleyball Courts, and Public Picnic Area 10. Enhanced Public Beach Area and Trails 3 9 11. Coastal Hardwood Hammock Restoration Area 7 12. Enhanced Interpretive Trail System with Environmental 8 10 Education Opportunities 12 13. Public Restrooms and Shelter Building 4 14. Enhanced Arthur J. Lamb Road

11 14 13 12

ATLANTIC OCEAN 10 4 PUBLIC BEACH AND COASTAL SHRIMPERS LAGOON HARDWOOD HAMMOCK AREA

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION SHRIMPERS LAGOON: PUBLIC BEACH AND COASTAL HARDWOOD HAMMOCK RESTORATION

West Lake Park, Tradewinds Park, Broward County, Florida

Boynton Beach, Florida Boynton Beach, Florida

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION NORTH POINT RECREATION PARK

7

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION LEGEND NORTH POINT RECREATION PARK 1. Existing Mangroves and Wetland Restoration Area 5 2. Eco-campgrounds (46 sites) 3. Mountain Biking Trails (varying skill levels, approx. 3 miles total) 1 4. BMX Course 1 5. Viewing/Rest Public 7 Pavilions 5 6. Park-Ranger Station with Multi-use flex space 2 7. Public Facilities (Restrooms, Water 3 Fountains, First-Aid, Small 2 6 Food Concessions, etc) 1 5 8. North Point Recreational Center (Community Meeting Rooms, DETAIL PLAN AREA 12 Dormitories, etc) 3 9. Confidence/Ropes Course 7 3 10. Public Picnic Area 8 7 12 14 11. Park Management Facility 1 4 12. Parking (with bio-swales 3 and pervious pavement) 9 12 13. Access Road 10 14. Enhanced Public Beach 11 12 7 12 13 FAA TOWER 14

MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION NORTH POINT RECREATIONAL CENTER DETAIL AREA PLAN

LEGEND 1. Community Meeting Rooms, Dormitories (20- 1 5 30 beds), Public Restrooms and Skyline- 3 Viewing Deck 3 2. Arrival and Drop-off 1 2 3. Mountain Biking Trails 4 (varying skill levels) 4. Multi-use pedestrian and 4 biking trail 5. Public Facilities Pavilion 6 6. Confidence/Ropes Course 7. Public Picnic Area 8. Parking (with bio-swales and pervious pavement) 8 4 9. Access Road 7

8 9

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION NORTH POINT RECREATIONAL CENTER CONCEPTUAL SKETCH

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION UTILITIES AND INFRASTRUCTURE

UTILITIES INVESTIGATION • Miami-Dade Water and Sewer Dept. • Bellsouth • Florida Power and Light • Miami-Dade County Public Works Dept. • Adelphia Cable • TECO Gas

SCHEMATIC UTILITIES PLAN • Water and Sewer • Drainage • Communications • Power • Cable • Gas

PRELIMINARY COST ESTIMATES • North Point Recreation Park • Active Recreation Regional Park • Basin Area Properties • Bill Sadowski Critical Wildlife Area • Shrimper’s Lagoon • Fishing Pier

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION UTILITIES AND INFRASTRUCTURE

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION UPCOMING PUBLIC PRESENTATIONS

June 9, 2009: Waterfront Advisory Board

June 17, 2009: Planning Advisory Board

June 25, 2009: City Commission

Please provide us with your comments at: http://virginiakeymasterplan.com/feedback.php

NOTE: During the feedback period, comments and suggestions may also be faxed to the City of Miami Planning Department at (305) 416-2156, Attention: Perla Gonzalez

VIRGINIAVIRGINIA KEYKEY MASTERMASTER PLANPLAN May 20, 2009 PREVIEWPREVIEW PRESENTATIONPRESENTATION