List - I : Abstract of Commissioned works for the year 2018-19

Rs. in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Sl. No. Zone Budget Budget Budget Budget 18- Budget Nos. Nos. Nos. Nos. Nos. 18-19 18-19 18-19 19 18-19

1 Bengaluru 8 2353.00 11 638.75 4 87.00 0 0.00 23 3078.75

2 Tumakuru 5 580.00 11 264.50 6 5461.00 1 10.00 23 6315.50

3 Hassana 8 1431.20 8 49.13 7 141.04 3 548.07 26 2169.44

4 Mysuru 10 1129.00 7 176.00 3 138.00 1 150.00 21 1593.00

5 Bagalkote 7 399.00 7 173.00 5 1723.00 1 546.00 20 2841.00

6 Kalaburagi 7 1589.51 5 71.73 2 4446.00 1 280.87 15 6388.11

Total 45 7481.71 49 1373.11 27 11996.04 7 1534.94 128 22385.80

List - I List I - Commissioned Works 2018-19

Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

BENGALURU Bengaluru TRANSMISSION ZONE Khodays glass factory: a) Establishing 2x150MVA, 220/66/11kV Station along with 220kV DC line on NBTs to LILO the existing 220kV Peenya- Subramanyapura SC line near Avalahalli limits b) Khodays glass factory_66kV UG Cables: Budget FY-18-19 i) 630 sq.mm UG Cable from 5569.00 & Bengalur QV - 10 L 1 AA1078 Elite Promade S/s to RBI Bengaluru S 26.10.11 12043.13 0.00 12043.13 906.00 12226.69 100.00 u Urban PV - 20 L S/s for a route length of 0.982kms ii) 1000 sq.mm UG Cable to 66/11kV South city S/s for a route length of 6.62kms iii) 1000 sq.mm UG Cable to 66/11kV BTM 4th phase sub-station for a route length of 8.22kms iv) 66kV TBs at Southcity & BTM 4th Phase. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

FY 2018-19: Station: 199.45L Supply retention Bills 141L Civil Bills Bengaluru International 24.55L Erection Bills Exhibition center (BIEC): 182L Switch Gear Establishing 2x31.5 MVA, Bengalur 4217.80 & Bills 2 AA1157 Bengaluru S 936.44 3560.00 4496.44 2950.00 2712.98 1500.00 66/11 kV sub-station at u urban 28.12.15 Sub-Total=547L Bengaluru International Line: Exhibition center 451.44L Supply Retention Bills 23.43L Erection Retentio Bills 525.2 Civil Bills Sub-Total= 1000L

Sarjapura : a) Est 2x100 MVA, 220/66/11 kV S/S with 220kV LILO of Somanahalli- Malur line b) Const. of 66KV LILO line from Sarjapura station to 66 kV S/C Hoody-Chandapura line near Muttenallur Village limits for a distance of 8.5 6855.93 & Bengalur a)4339.33 FY 18-19 3 AB1008 Kms and Const. of 66KV Bengaluru S 06.10.08 1200.67 5882.86 28.48 5000.58 22.00 u Rural b) 342.86 Erection Bill-5L S/C line from 220/66/11KV Sarjapura station to the CTT for running 66KV 630 sqmm UG Cable to 66/11KV S/s at Attibele for a distance of 11.1 Kms and Terminal Bay at Attibele. a) 5.885 Kms b) 8.5 & 11.1 Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Dashavara Establishing 1x8MVA, FY 18-19: Ramanag 551.86 & 4 AC1057 66/11kV Sub-Station with Bengaluru S 551.86 40.00 591.86 470.00 699.76 65.00 Land Compn:65L ara 24.11.15 associated line for a distance of 3.5Kms

FY 18-19: Godur (Tattekere) : Rtn:120L Establishing 1x8 MVA, Ramanag 656.39 & QV:40L 5 AC1058 66/11kV Sub-Station with Bengaluru S 659.43 0.00 659.43 750.00 574.97 305.00 ar 24.11.15 Land compensation- associated line for a 145L distance of 7.25Kms

Bijjahalli (Arendappanahalli) : FY 18-19: Ramanag 525.19 & 6 AC1059 Establishing 1X8 MVA, Bengaluru S 536.17 30.00 566.17 497.00 596.64 79.00 Land Compn: 56L ara 27.11.15 66/11 kV s/s for a distance QV-23L of 3.213 kms. Mattikere: Establishing 1x8MVA, 682.45 & FY 18-19: Ramanag 7 AC1061 66/11kV Sub-Station with Bengaluru S 10.12.15 682.45 30.00 712.45 430.00 813.92 102.00 Land compn-62L ara associated line for a distance QV + PV 40L of 5.114Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Guruvinapura (Kanchanahalli): Est 12.5 MVA, 66/11kV S/s with FY18-19: Construction of 66kV LILO Rtn-110L line on DC towers from Ramanag 505.42 & 8 AC1064 Bengaluru S 517.88 60.00 577.88 450.00 401.62 180.00 QV:50L proposed 66kV B. V. Halli ara 08.01.15 PV-5L SC line on DC towers to Land compn-15L proposed 66/11kV Station at Guruvinapura for a distance of 0.834Kms

8 Total of Sub-stations Bengaluru 15927.36 4920.67 25530.22 6481.48 23027.16 2353.00

Naganathapura: FY 18-19 Bengalur Providing Additional 385 & Rtn: 45 L 1 AA1158 Bengaluru u A 99.99 223.00 322.99 330.00 267.26 35.00 1x20MVA 66/11kV 28.01.17 Tr : 17 L Urban Transformer SWG : 8 L

Malgudi: Bengalur Providing Additional 361 & FY 18-19 2 AA1159 Bengaluru u A 65.21 223.00 288.21 300.00 252.61 10.00 1x20MVA 66/11kV 04.01.17 RTn +PV+QV = 50 L Urban Transformer

Velankani: Bengalur providing Additional 355 & FY 18-19 3 AA1160 Bengaluru u A 55.57 223.00 278.57 400.00 255.22 13.00 1x20MVA 66/11kV 04.01.17 RTn +PV+QV = 50 L Urban Transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Kudur: 144.75 & Replacing 1x12.5MVA, Ramanag 4 AC1034 Bengaluru A 05.09.11 1.69 135.00 136.69 120.00 136.86 120.00 SWG- 120L 66/11kV by 1x20MVA, ara 66/11kV Transformer

Chintamani 220kV R/S: QV Bills=15 L Providing additional 808.76 & 5 AE1039 Bengaluru C.B.Pura A 372.08 597.00 969.08 121.00 743.79 35.00 BHEL Pending 100MVA, 220/66kV 17.01.14 Bils=20L Transformer

FY 18-19 Malur Industrial Area: 1st & 2nd PTr & CTR Replacing of 2X8 MVA, 435.98 & supply 10% balance 6 AD1040 66/11kV by 2X20 MVA Bengaluru KOLAR A 4.83 298.00 303.00 355.00 247.83 45.00 10.06.15 bills, Penalty bills, Transformer at 66/11KV Labour erection for S/S Malur Industrial Area 2nd P.Tr, Civl bills

FY 18-19 Ganjigunte : PTr & CTR supply Replacing 1x8MVA, 66/11kV 136.52 & 7 AE1041 Bengaluru C.B.Pura A 2.50 93.50 96.00 125.00 77.56 20.00 10% balance bills, by 1x12.5MVA, 66/11kV 02.09.14 Penalty bills, Labour Transformer erection, Civl bills Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Nallimaradhahalli : FY 18-19 Replacing 1x12.5MVA, C. B. 177.07 & 10% balance bills for 8 AE1048 Bengaluru A 2.45 0.00 2.45 160.00 130.66 35.00 66/11kV by 1x20MVA, Pura 30.03.16 PTr & CTR supply, 66/11kV Transformer Penalty & civil bills

FY 18-19 Replacement of second 8 10% P.Tr bill: 12.8L, MVA, by 20 MVA, Power Bengalur 203.88 & 10% CTR bill: 9 AA1169 Bengaluru A 2.11 148.89 151.00 175.00 126.30 35.00 Transformer at 66/11kV u Urban 21.06.17 Rs.1.76L & PV Bill: BIALS/s 6.83L & Penalty: Rs.9.62L

Ramanagara: Replacing 1x12.5MVA, Ramanag 198.15 & FY 18-19 10 AC1072 Bengaluru A 5.00 2.39 20.00 66/11kV by 1x20MVA, ara 05.07.17 Rtn :10 L 66/11kV Power Transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

400kV R/S Hoody: Providing additional 4572.24 & Bengalur Physicaly and 11 AA1052 500MVA, 400/220kV Bengaluru A 08.02.10 4176.09 0.00 4176.09 307.40 3941.73 270.75 u Urban Transformer with associated financialy closed. equipments.

11 Total of Augmentation Bengaluru 4782.52 1941.39 6724.08 2398.40 6182.21 638.75

66kV Nimhans Station to 66kV Jayadeva Station: 1960.00 & FY 18-19 Bengalur 1 AA1105 Running of 66kV 1000Sqmm Bengaluru L 05.05.12 1621.60 0.00 1621.60 593.62 1415.52 20.00 FQV-19L u Urban EHV UG Cable for a distance of 3.51 Kms. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

a)Peenya-DG Plant 3 & 4 : Re-conductoring of 66kV Peenya-DG Plant 3 & 4 DC 1873.03 & line from Peenya to 8 pole a) 01.08.11 structure near CB Hally Bengalur 484.31 & Physically & 2 AA1108 limits from Coyote to HTLS. Bengaluru L 1156.00 0.00 1156.00 357.00 595.74 7.00 u Urban b) b) Re-arrangement of Financially closed 24.11.11 existing 220 kV Nelamangala- Hoody to Peenya by LILO arrangements for a route length of 3.817 kms.

Hoody to ITI: Providing 630sqmm cable Bengalur 615.52 & 3 AA1133 from Hoody-ITI (remaining Bengaluru L 718.28 0.00 718.28 610.00 596.18 30.00 FY 18-19 u Urban 20.06.15 portion) for a length of Retention- 100L 1.335KM

Konadasapura to 4 Pole Structure: Running 66/11 kV 1000 Sqmm UG Cable from Bengalur 788.79 & Supply Rtn: 27L 4 AB1055 Bengaluru L 886.49 0.00 886.49 150.00 703.17 30.00 66/11kV Sub-station u Rural 15.05.14 FQV: 10L Konadasapura to 4 Pole Structure near Kadugodi for a distance of 1.337 Kms

4 Total of Lines Bengaluru 4382.37 0.00 4382.37 1710.62 3310.61 87.00

23 Total for Bengaluru Zone Bengaluru 25092.25 6862.06 36636.67 10590.50 32519.98 3078.75 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Hagalawadi : Establishing 1x8MVA, 66/11kV Sub- Tumakur 564.6 & Shifted from List II 1 BA1036 Station with 66kV tap line Tumakuru S 597.57 19.00 616.57 435.00 717.38 85.00 u 20.03.11 to List - I from - Hosakere line for a distance of 12.33 Kms.

Puravara : Establishing 1x8MVA, Tumakur 557.96 & Shifted from List II 2 BA1049 Tumakuru S 492.98 223.69 716.67 310.00 708.65 30.00 66/11kV Sub-Station along u 04.04.15 to List - I with line

Kadajji (Nagarakatte) : Establishing 2x8MVA, 1. Work Slip for Rs. Davanage 529.00 & 3 BB1047 66/11kV Sub-Station with Tumakuru S 553.70 50.82 604.52 161.00 586.33 125.00 52.46 Lakhs re 22.11.12 associated line for a distance approved of 4.538 Kms. 1. Work Slip No: 01 approved for Rs. 12.43 Lakhs for civil items. Shyagale(Lokikere): 2. PV bill for Rs. Establishing 1x8MVA, 2.73 Lakhs. Davanage 455.42 & 4 BB1048 66/11kV Sub-Station with Tumakuru S 530.52 50.82 581.34 100.00 377.92 150.00 3. Total Quantity re 13.01.12 associated line for a distance exceeded the of 6.04 Kms. approved DWA quantity due to site condition in civil items, QV to be prepared. Neeragunda Gate: Establishing 1x8MVA, 66/11kV Sub-Station in Neeraguda gate in Hosadurga Taluk, Chitradur 646.70 & 5 BC1070 Chitradurga Dist.by Tumakuru S 663.00 24.60 687.60 775.27 416.08 190.00 ga 07.12.15 constructing 66kv SC tap line on DC towers from existing 66kv Hosadurga- Bagur line for a distance of 10.205 kms 5 Total of Sub-stations Tumakuru 2837.77 368.93 3206.70 1781.27 2806.36 580.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Chowdanakuppe: Providing Tumakur 168.49 & QV: 7, Retnsn: 13 1 BA1063 additional 1x8MVA, Tumakuru A 75.00 98.00 173.00 10.00 58.23 20.00 u 12.10.11 in Lakhs 66/11kV Transformer

Antharasanahally 220kV R/S: 698.63 & Tumakur Retention Rs.50/- 2 BA1083 Providing additional Tumakuru A 12.03.13 268.98 594.40 863.38 200.00 738.24 70.00 u QV Rs.12/- in lakhs 100MVA, 220/66kV Transformer

Dasudi: Providing additional Tumakur 184.81 & Shifted from List II 3 BA1090 Tumakuru A 87.00 24.00 111.00 55.00 62.78 30.00 1x8MVA, 66/11 kV Power u 30.10.13 to List - I Transformer

ID Halli: Replacing 1x6.3MVA, Tumakur 136.52 & Shifted from List II 4 BA1104 Tumakuru A 1.57 93.47 95.04 93.00 85.06 7.00 66/11kV by 1x12.5MVA, u 08.04.14 to List - I 66/11kV Transformer.

Y.N. Hosakote: Replacing 2nd 1x6.3MVA, Tumakur 136.52 & Shifted from List II 5 BA1108 Tumakuru A 1.54 93.47 95.01 93.00 88.71 5.00 66/11kV by 1x 12.5MVA, u 25.07.14 to List - I 66/11kV Transformer.

BG Kere: Providing additional Chitradur 201.58 & Shifted from List II 6 BC1034 Tumakuru A 92.53 78.55 171.08 74.39 76.60 17.50 1x6.3MVA, 66/11kV ga 05.03.11 to List - I transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Nittur : Replacing 1x10MVA, Tumakur Payment of labour 7 BA1111 Tumakuru A 262.04 & 8.40 174.78 183.18 262.04 138.87 25.00 110/11kV by 1x20MVA, u charge are pending. 05.09.14 110/11kV Transformer. Nandigudi: Replacing 1x6.3MVA, Davanage 140.08 & Shifted from List III 8 BB1079 Tumakuru A 107.91 87.85 6.00 66/11kV by 1x 12.5MVA, re 01.03.17 to List - I 66/11kV Transformer. Rangenahalli: Providing additional Chitradur 170.97 & Shifted from List- 9 BC1040 Tumakuru A 92.58 92.58 100.00 78.38 48.00 1x8MVA, 66/11kV ga 12.10.11 111 to List-I Transformer Holalkere; Replacing 1x12.5MVA, Chitradur 177.07 & 10 BC1065 Tumakuru A 160.86 131.94 15.00 66/11kV by 1x 20MVA, ga 08.04.14 66/11kV Transformer. Kora: Replacing 1x8MVA 66/11kV Tumakur 200.62 & Retention & labour 11 BA1128 Tumakuru A 156.10 149.00 305.10 204.00 127.92 21.00 by 1x20MVA, 66/11kV u 12.06.17 bills pending Transformer 11 Total of Augmentation Tumakuru 783.70 1305.67 2089.37 1360.20 1674.58 264.50

Exs cost over DWA Hiriyur - Gowribidnur: IS Ddue to W.S Construction of 220kV DC 7488.40 & Appd. Rs. 4.734 Tumakur 1 BA1020 line from 400kV Hiriyur Tumakuru L 27.01.09 6493.00 0.00 6493.00 500.00 7117.48 50.00 Crs, Tree cut u Station to Gowribidnur comensation Station for 121Kms. Rs.3.55 Crs, FQV Rs. 0.15 Crs.

220kV SRS, Davangere to 66kV MUSS Davangere: Construction of 66kV DC Davanage 258.00 & FQV Payment 2 BB1056 Line on DC Narrow Based Tumakuru L 248.50 0.00 248.50 40.00 273.73 58.00 re 30.03.12 pending Towers in the existing corridor for a distance of 3.263 Kms. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Vasanthanarasapura to Anthrasanahally: Construction of 220kV DC line from PGCIL station at Tumakur 2241.56 & Shifted from List II 3 BA1094 Vasanthanarasapura to Tumakuru L 2799.00 1466.39 4265.39 480.00 3769.60 150.00 u 28.06.14 to List - I existing 220kV station at Anthrasanahally along with terminal bays for a distance of 18.8 kms.

Honnali station- Devarabelikere LILO Point 1 No. deterioated 66 KV DC line: tower replaced by Stringing of 2nd 66kV circuit Davanage 318.88 & new one. Total 4 BB1077 Tumakuru L 383.94 383.94 200.00 396.69 45.00 on existing DC towers from re 04.05.16 quantity exceeded 220kV Honnali Station to as per DWA due to Devarabelikere LILO Point site condition. for adistance of 31.84Kms.

work was short closed and revised Thallak-Hanagal: DWA issued. Construction of 66kV D/C Incurred before Chitradur 543.28 & 5 BC1038 Thallak - Hanagal line in the Tumakuru L 411.70 45.00 456.70 388.10 646.36 52.00 revised DWA ga 18.07.11 existing corridor for a 82.17Lakhs ( 82.17 distance of 33.52 Kms. +205.69) total exipture up to 31.03.2017

Tumakuru to Rampura limits: Construction of 400kV DC Chitradur 43277.77 & Shifted from List II 6 BC1052 with Quad Moose ACSR from Tumakuru L 54347.73 8980.00 63327.73 13742.00 58058.13 5106.00 ga 08.04.14 to List - I V.N.pura to Rampura Limits (Kelaginakanive) for distance of 188.74Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

6 Total of Lines Tumakuru 64683.87 10491.39 75175.26 15350.10 70261.99 5461.00 765/400/220KV Vasanthanarasapura: Providing 02Nos. Of 400KV Terminal Bay for Tumakur Finel payment due 1 BA1114 Terminating the 400KV Tumakuru T 1237.50 1345.00 1345.00 15.00 1441.49 10.00 u to PGCIL quade moose ACSR condcutor at 765/400/220KV Vasanthanarasapura 1 Total of TB's and Others Tumakuru 1345.00 0.00 1345.00 15.00 1441.49 10.00

23 Total of Tumakuru Zone Tumakuru 69650.34 12165.99 81816.33 18506.57 76184.42 6315.50

HASSANA TRANSMISSION Hassana 0.00 ZONE

LD: Ugane: S:16.50 Establishing 1x8MVA, E:1.35 66/11kV Sub- Station with C:10.85 Construction of 66kV LILO 449.74 & Total:28.70 1 CA1041 Hassana Hassana S 574.04 60.60 634.64 115.29 558.89 28.70 line from MBT-1 line to 10.04.07 proposed 66/11kV S/s at Ugane for a distance of 2.26 Kms.

Jade: Supply, erection & Establishing 1x10MVA, 792.16 & FQV difference- 2 CD1034 110/11kV Sub-Station with Hassana Shimoga S 780.27 50.62 830.89 149.11 631.77 92.00 22.08.13 rs.90.00L associated line for a Civil bills Rs.1.75L distance of 11.850 Kms. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Shivapura: Civil- 35.00L Establishing 1x10MVA, Chikkam 520.34 & Electrical- 15L (Fire 3 CE1008 110/11kV Sub-Station with Hassana S 318.64 140.90 459.54 5.00 305.67 50.00 agaluru 05.03.09 fighting & T&P LILO from SBT 2 line for a materials ) distance of 0.03 Kms.

Duggalapura: Establishing 2x 8MVA, 66/11kV Sub-Station at Duglapura in Tarikere Tq , Incentive Bill & Final Chikkamagalur Dist with Chikkam 651.04 & 4 CE1036 Hassana S 647.40 44.90 692.30 97.00 652.34 20.00 bills of FQV- Constrn of 66kv DC line for agaluru 29.10.14 Rs.20.00Lakhs a length of 0.295Kms to LILO one of the circuits of 66kV Bhadra-Chikkmagalur DC line. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

FQV:106.430.00 Rtn: S:265.66 E:6.81 C:43.11 Subtotal:315.58 Arasikere: Bills to be Establishing 2x100MVA, submitted: 3526.17 & supply:50.00 220/110kV and 1x10MVA, 5 CA1037 Hassana Hassana S 06.09.11 3251.50 193.00 3444.50 149.00 2684.94 834.50 Elec:113.2 110/11kV Station with C:142.58 associated lines for a Sub total-305.78 distance of 9.883 Kms. LD: S:81.50 E:4.14 C:21.07 Subtotal:106.71 Final :834.50

Belagumba: Establishing 2x10MVA, 110/11kV Sub-Station with construction of 110kV SC FQV:87.00 tap line on DC towers from Incentive:13.40 675.40 & 6 CA1065 existing 110kV Kadur-110kV Hassana Hassana S 669.75 161.93 831.68 777.52 789.90 116.00 Tree cut 04.03.2016 K.B. cross (SBT-2) SC line to compensation:11.70 the proposed 110/11kV MEI Rtn:3.9 Belagumba Sub-station in Total:116 Arasikere, Hassana District for a distance of 0.155Km. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Manjunathapura(Kothanag hatta) near Shravanbelagola: Establishing 2x8MVA, 66/11kV sub-station at Manjunathapura(Kothanagh atta)near Shravanabelagola FQV:49.45 Channarayaptana Taluk, 728.88 & incentive:12.80 7 CA1067 Hassan District along with Hassana Hassana S 637.95 143.66 781.61 881.61 671.28 155.00 01.03.17 MEI :92.75 construction of 66kV DC line total:155.00 to make LILO line from existing Yachenahally- Shravanbelagola- Santhebachahally 66kV SC line to the proposed sub- station for a distance of 0.546 Kms

Rippenpete: Establishing 1x10MVA, Expected bills for the 110/11kV Sub-Station at year 2018-19 Ripponpet and Construction Retention Rs.44.25 of 110kV SC tap line on DC 916.38 & Lakhs 8 CD1055 towers from 110kV Hassana Shimoga S 18.02.15 975.42 51.95 1027.37 375.00 835.94 135.00 Supply & Erection Shivmogga-Sagar SC line to Rs.45.00 Lakhs proposed 1x10MVA Civil bills Rs.45.00 110/11kV Substation at Lakhs Ripponpet for a distance of Total Rs.134.25 10.16Kms Lakhs

8 Total of Sub-stations Hassana 7854.97 847.56 8702.53 2549.53 7130.73 1431.20 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Alkola: Replacing 1x10MVA, 110/11kV by 1x20MVA, 250.90 & 1 CD1049 Hassana Shimoga A 53.89 158.01 211.90 206.00 234.78 7.00 Supply & Erection 110/11kV Power 16.05.15 Rs.7.00 Lakhs. Transformer at110/11kV Alkola S/s.

Shiralkoppa: Retention Rs.2.60 Replacing 1x10 MVA 110/11 257.54 & Lakhs 2 CD1053 kV Power Transformer by Hassana Shimoga A 65.23 195.52 260.75 165.60 248.43 8.00 08.04.14 Supply & Erection 1x20MVA, 110/11 kV Power Rs.3.40 Lakhs Transformer. Civil bills Rs.2.00 Lakhs Total Rs.8.00 Lakhs

Shikaripura: Supply & Erection Replacing 1x10MVA, 256.69 & 3 CD1054 Hassana Shimoga A 72.54 232.49 305.03 70.00 227.53 10.00 Rs. 60.00 Lakhs 110/11kV by 1x20MVA, 20.06.14 110/11kV Transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Ajjampura: Supply & Erection Replacing 1x10MVA , Rs.2.50 Lakhs Chikkam 282.04 & 4 CE1019 110/11kV Transformer by Hassana A 141.31 241.73 383.04 86.00 353.69 10.00 Civil Rs.2.50 Lakhs agaluru 25.05.11 1x20MVA,110/11kV Transformer

Nidaghatta: Providing additional Chikkam 252.83 & Expected final bills 5 CE1034 Hassana A 84.00 45.64 129.64 68.00 131.02 5.00 1x10MVA, 110/11kV agaluru 20.06.14 appx. Rs.5.00 Lakhs. Transformer

Hiremagalur S/s: Providing additional Chikkam 185.11 & Expected final bills 6 CE1037 Hassana A 78.23 30.00 108.23 32.00 104.53 3.00 1x8MVA, 66/11kV agaluru 11.07.14 appx. Rs.3.00 Lakhs. Transformer at 66/11kV

Kalasapura: Providing additional Chikkam 185.73 & 7 CE1038 Hassana A 76.39 30.00 106.39 31.00 97.39 3.00 Expected final bills 1x8MVA, 66/11kV agaluru 18.07.14 appx. Rs.3.00 Lakhs. Transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Kittadahalli: Providing additional 213.60 & 8 CD1056 1x10MVA, 110/11kV Power Hassana Shimoga A 76.97 35.09 112.06 54.00 107.87 3.13 23.07.14 Transformer at 110/11kV Kittadahalli S/s.

8 Total of Augmentations Hassana 648.56 968.48 1617.04 712.60 1505.24 49.13

Varahi - Khemar & Khemar - Kavoor: Commissioned on Construction of 220kV DC Dakshina 10082.99 & 12.01.2016 1 CB1008 Hassana L 8317.16 2221.76 10538.92 85.00 9745.56 50.00 line in the existing corridor Kannada 05.03.09 of 110kV SC SK line for a FQV-50L distance of 113.3 Kms

Hagare Sub-Station: Work is combined Providing LILO arrangement package of four to Hagare S/S by stringing of works out of wich 2nd ckt on existing DC one work is under 32.77 & 2 CA1034 towers from 66kV Hassana- Hassana Hassana L 28.46 2.66 31.12 22.41 25.56 3.00 progress. 22.03.13 Chikkamagalur line to Hagare S/S with TB at Workslip3: 2.00 Hagare S/s for a distance of LD:1.00 0.7Kms Total:3.0 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Balupete: Work is combined Providing LILO package of four arrangements to 66/11kV works out of wich Balupete Sub-Station by one work is under stringing the 2nd ckt line on 33.31 & progress. 3 CA1035 the existing DC towers from Hassana Hassana L 38.38 2.66 41.04 15.96 34.94 2.50 11.02.13 66kV Hassana-S.K.Pura 2nd Ckt line to 66/11kV Balupet Workslip3: 1.00 S/S with TB at 66/11kV LD:1.50 Balupet S/s for a distance of Total:2.50 0.6Kms

Doddahally: Work is combined Stringing of 66kV 2nd circuit package of four on existing 66kV DC towers works out of wich from tap point of 2nd circuit one work is under of 66kV Kadavinakote- 29.05 & 4 CA1043 Hassana Hassana L 37.50 2.80 40.30 15.48 34.67 3.00 progress. Hootagally line to the 07.11.12 existing 66/11kV Workslip:2.00 Doddahally S/S with TB at LD:1.00 Doddahally Sub-Station for a Total:3.00 distance of 0.315Kms

Hangarahally: Work under Construction of 66kV D/C progres.Workslip-3 line for providing LILO submitted. arrangement to 66/11kV 52.93 & 5 CA1047 Hassana Hassana L 39.48 29.34 68.82 70.33 46.69 42.54 Hangarahalli S/S with TB at 03.04.13 Workslip3:26.46 66/11kV Hangarahalli LD:4.06 S/S.for a distance of 0.35 Rtn:12.02 kms Total:42.54 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

LILO Arrangement at Hadavanahally: 1.Construction of 66kV D/C line on DC towers for a distance of 0.11Km from existing 66kVHolenarasipura-C R Patna SC line to provide LILO arrangements at 66/11 KV Hadavanahally Sub- FQV :9.14 Station in H.N. Pura Taluk, 269.35 & 6 CA1050 Hassana Hassana L 150.72 41.31 192.03 103.86 170.51 20.00 LD:5.18 Hassana District.. 15.06.15 Rtn:5.68 2.Construction of 66kV TB Total:20.00 and Providing Metering & Protection to 66kV H.N.Pura- C.R.Patna and Hariharpura line at 66/11kV Hadavanahalli S/s. 3. Providing Additional 1x8MVA, 66/11kV power Trasformer at 66/11kV Hadavanahalli S/s.

Gurupura Sub-Station: Construction of 110kV LILO line from the proposed For 18-19 (under Construction) Dakshina 72.32 & 7 CB1028 Hassana L 113.21 8.25 121.46 63.00 85.41 20.00 Rtn. And Final Bill: 220/110kV Varahi-Kavoor Kannada 06.07.13 20 L DC line (b/n Loc no.30 & 31) to 110kV S/s at Gurupura for a distance of 1.50Kms.

7 Total of Lines Hassana 8724.91 2308.78 11033.69 376.04 10143.34 141.04 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Providing Capacitor Bank and allied equipment’s in 762.72 & 1 CA1056 Hassana Hassana T 517.05 301.67 818.72 310.47 429.02 478.96 KPTCL Sub-stations of 09.09.14 Hassana Zone.

Hiriyadka: a) Renovation and Modernisation of 110/33/11kV S/S at Hiriyadka in Udupi Tq & Dist. 410.24 & 2 CC1027 Hassana Udupi T 715.04 57.76 772.80 170.00 725.64 12.00 B) Construction of towers for 20.02.10 LD amount of Rs. 12 re-arranging of the work of Lakhs R&M of 110/33/11kv S/S at Hiriyadka in Udupi Tq & Dist.

Talaguppa: Providing 63MVAR Bus 896.5 & 3 CD1033 Hassana Shimoga T 658.88 658.88 72.00 339.37 57.11 Reactor at 400/220kV 29.06.09 Station. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

3 Total of TB's & Others Hassana 1890.97 359.43 2250.40 552.47 1494.03 548.07

26 Total of Hassana Zone Hassana 19119.41 4484.25 23603.66 4190.64 20273.34 2169.44

MYSURU TRANSMISSION Mysuru 0.00 ZONE

Hebbal Industrial Area: Establishing 1x20MVA, Final variation to be 1 DA1086 Mysuru Mysuru S 514.42 & 614.24 61.96 676.20 30.00 612.42 35.00 66/11kV Sub-Station with approved 03.11.14 associated line 0.1Kms

Devanoor Stage-II: Establishing 2x12.5MVA, 918.42 & Final bill to be 2 DA1087 Mysuru Mysuru S 933.13 111.96 1045.09 145.00 1066.85 6.00 66/11kV Sub-Station with 16.03.14 submitted associated line 2.215Kms

Krishnapura: Establishing 1x8 MVA Final variation 382.88 & 3 DB1065 66/11kV Sub-Station with Mysuru Mandya S 438.28 56.69 494.97 102.00 406.13 80.00 approved for 10.10.13 associated line 462.36Lakhs for a distance of 0.18 Kms.

Belagola Establishing 2 x 12.5 MVA Final Quantity 66/11 KV SS with 2 TB at 4 DB1084 Mysuru Mandya S 510.52 & 511.30 130.00 641.30 101.00 572.55 58.00 Variation to be Belagola new place for a 27.09.14 approved distance 0.18Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Kalamandir Campus: a) Establishing 2x12.5 MVA, 66/11kV Gas Insulated (GI) Sub-Station near Dhobighat in Mysuru with associated line Physically closed, b) Running of 66 kv single 5 DA1043 Mysuru Mysuru S 3521.03 & 3880.29 390.00 4270.29 4225.00 3568.24 500.00 Final variation is to core, 630 sq mm XLPE 15.05.14 be prepared copper UG cable LILO line for a route length of 3.08 kms from the existing 66 kv bogadi-mysuru south line to the proposed Kalamandir GIS Station.

Maradihundi Village Establishing 1x8MVA, 618.05 & Final Variation to be 6 DA1113 66/11kV Sub-Station with Mysuru Mysuru S 566.32 117.19 683.51 625.00 571.25 60.00 11.01.17 prepared associated line for a distance of 6.302Kms Hadya (Karya) Village Establishing 1x8MVA, 667.24 & Final Variation to be 7 DA1114 66/11kV Sub-Station with Mysuru Mysuru S 615.16 117.19 732.35 680.00 580.40 70.00 11.01.17 prepared associated line for a distance of 7.30Kms

Ranganathapura(Tumbla) Village Establishing 544.15 & Final Variation to be 8 DA1116 1x8MVA, 66/11kV Sub- Mysuru Mysuru S 472.36 100.00 572.36 525.00 478.68 40.00 11.01.17 prepared Station with associated line for a distance of 0.597Kms

Tayuru Village Establishing 1x8MVA, 66/11kV Sub- 645.23 & Final Variation to be 9 DA1122 Mysuru Mysuru S 576.68 117.19 693.87 650.00 586.15 70.00 Station with associated line 11.01.17 prepared for a distance of 5.259Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

(Thirumalapura) Vaderahalli Establishing 1 x 8MVA, 635.59 & Final variation is to 10 DB1100 Mysuru Mandya S 591.38 39.69 631.07 625.00 447.81 210.00 66/11 KV Sub-Station with 13.04.17 be prepared associated line for a distance of 3.869Kms

10 Total of Sub-stations Mysuru 9199.14 1241.87 10441.01 7708.00 8890.48 1129.00

Kadakola: Replacing 2x8MVA, 66/11kV 237.08 & Final Variation to be 1 DA1046 Mysuru Mysuru A 19.27 210.20 229.47 10.00 220.75 11.00 Tr. by 2x12.5MVA, 66/11kV 03.08.11 prepared Transformer

Final Variation approved,without Bannur-I: considrering GST. Replacing 1x12.5MVA, 159.90 & 2 DA1069 Mysuru Mysuru A 15.00 136.00 151.00 8.00 139.36 8.00 Revised FQV with 66/11kV by 1x20MVA, 22.03.13 GST to be approved 66/11kV Transformer from CEE office

Kirugavalu: Replacing 1x6.3MVA, 193.40 & Final Variation is to 3 DB1072 Mysuru Mandya A 38.95 30.86 69.81 25.00 58.02 12.00 66/11kV by 1x12.5MVA, 05.12.13 be approved 66/11kV Transformer Vajamangala: Providing additional 1X20 331.59 & Final variation is to 4 DA1104 Mysuru Mysuru A 144.79 189.00 333.79 180.00 294.13 35.00 MVA , 66/11 KV transformer 29.06.15 be prepared . Seelenere: Revised price Providing additional 1 X 226.74 & 5 DB1082 Mysuru Mandya A 89.00 147.00 236.00 138.00 172.85 65.00 schedule is to be 12.5 MVA ,66/11 kV 12.02.14 issued as per GST. Transformer Haradanahalli : Providing additional 1 X 8 MVA, 66/11 KV Transformer 270.38 & Final Variation to be 6 DA1105 and Replacing 1 X 6.3 MVA Mysuru Mysuru A 85.00 224.16 309.16 80.00 56.93 30.00 18.08.15 prepared by 1 X 8 at 66/11 KV in Periyapatna taluk, Mysuru District. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Hardanahally (Devalapura): Replacing the existing 1 X 8 10% payment for 155.78 & 7 DB1088 MVA by 1 X 12.5 MVA at Mysuru Mandya A 100.00 100.00 100.00 84.45 15.00 Transformer to be 08.04.15 66/11 KV in Nagamangala made taluk, Mandya District.

7 Total of Aumentation Mysuru 392.01 1037.22 1429.23 541.00 1026.49 176.00

Chunchanakatte - Kushalnagar: Time extension is 588.66 & 1 DA1029 Construction of 66kV DC Mysuru Mysuru L 519.07 51.00 570.07 53.00 572.35 55.00 approved on 20.11.09 line in the existing Corridor 07.02.18 for a distance of 38.17 Kms

Vajamangala-Varun limits: Construction of 220/66KV MCMV line from location 4(3) to 20 along the proposed Final Variation 66kV Vajamangala- 556.67 & Statement has been 2 DA1072 Mysuru Mysuru L 705.03 55.00 760.03 27.00 728.21 60.00 Kadakola DC line corridor in 04.05.13 Approved Varun limits and providing 2 Nos. of 66kV TBs at Kadkola R/S for a distance of 4.52 kms

SFC-Madhuvanahalli to Kollegala Limits: Reconstruction of existing I BEAM 66kV line by 66kV Final variation is D/C towers with Chamaraj 564.2 & approved, revised 3 DD1040 Mysuru L 510.00 125.00 635.00 50.00 564.62 23.00 replacement of existing anagara 23.06.15 price schedule is to deteriorated Coyote be approved. Conductor /earth wire by new one for a distance of 22.0KM

3 Total of Lines Mysuru 1734.10 231.00 1965.10 130.00 1865.18 138.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Providing 12.1kV 2.9MVAR Capacitor Bank and allied Revise price list to be equipment’sto 14 Nos of 324.59 & issued as per GST 1 DA1097 Mysuru Mysuru T 205.95 134.86 340.81 170.00 231.93 150.00 existing KPTCL Sub- 09.09.14 and Final Variation stations in the jurisdiction of to be prepared Mysuru Transmission Zone.

1 Total of TB's & Others Mysuru 205.95 134.86 340.81 170.00 231.93 150.00

21 Total of Mysuru Zone Mysuru 11531.20 2644.95 14176.15 8549.00 12014.08 1593.00

BAGALKOTE Bagalkote 0.00 TRANSMISSION ZONE

Lachyan: Up-gradation of 2x5MVA, 33/11kV MUSS to 2x10MVA, 110/11kV & 980.68 & 1 EG1009 Bagalkote Bijapur S 739.99 257.32 997.31 112.00 858.95 50.00 QV: 112.00 1x20MVA, 110/33kV Sub- 11.05.06 Station with 110kV SC line from 220kV Indi Station for a distance of 13.041 Kms. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Budget under Utilization for the Year 17-18 Non submission of CC Bills , savings in DWA, approval of Time Extension Budget for the Year 2018-19 CC- Rs 6 Lacs Khadaklat: LD- Rs 46.17 Lacs Upgradation of Total- Rs 52.17 Lacs 920.69 & 2 EE1118 2x5MVA,33/11 kV S/S to Bagalkote Belgaum S 923.41 79.01 1002.42 832.68 921.36 52.00 Say Rs - 52.00 Lacs 05.02.16 2x10 MVA, 110/11 kV S/S with associated line. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Halaki: QV: 50.00 Establishing 1x10MVA, CC: 15.00 767.97 & 3 EF1061 110/11kV Sub-Station with Bagalkote Bagalkote S 882.02 39.75 921.77 420.96 914.46 75.00 PV: 5.00 06.01.15 associated line for a distance LD: 2.00 of 13.154Kms Total: 75.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Tolamatti:(Anagawadi) Ret: 10.99 Establishing 1x10MVA, 721.67 & LD: 0.30 4 EF1062 Bagalkote Bagalkote S 746.17 39.75 785.92 461.00 767.29 50.00 110/11kV Sub-Station with 23.03.15 Others: 38.71 associated line. Total: 50.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Navalagi: Establishing 2x10MVA, 791.98 & 5 EF1066 110/11kV Sub-Station with Bagalkote Bagalkote S 856.05 73.37 929.42 268.80 885.18 43.00 LD: 42.80 06.01.15 associated line for a distance of 1.906Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Devaragennur: Up- gradation of 33/11kV to Ret: 3.90 761.22 & 6 EG1030 2x10MVA, 110/11kV Sub- Bagalkote Bijapur S 820.00 82.53 902.53 732.53 896.60 24.00 CC+Others: 19.58 10.06.15 Station with associated line Total: 23.48 for a distance of 1.464Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Hiremasali: Ret: 67.26 Establishing 1x10MVA, 625.40 & LD: 8.80 7 EG1050 110/11kV Sub-Station with Bagalkote Bijapur S 660.00 39.75 699.75 421.75 597.85 105.00 13.08.15 CC+Others: 28.49 associated line for a distance Total: 104.55 of 6.955Kms

7 Total of Sub-stations Bagalkote 5627.64 611.48 6239.12 3249.72 5841.69 399.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

>As per revised Budget included in Lakamanahalli: column 17. Replacing 1x10MVA by 239.65 & Final QV and LD 1 EB1027 Bagalkote Dharwad A 48.09 198.12 246.21 25.00 199.99 5.00 1x20MVA, 110/11kV 19.06.15 amt+ 10% retention Transformer amount Rs.37Lsubject to EI approval

1. The Agency is not responding to complete the balance work. 2. Notice issued to agency on 13.11.17 but returned back. 3. Action to initiate as per DWA clause to complete the Vajramatti 220 kV: 197.18 & financial progress in 2 EF1023 Installing 1x10MVA, Bagalkote Bagalkote A 97.98 177.81 275.79 35.00 139.92 34.00 17.12.09 this year. 110/11kV Transformer 4. Ltr addressed to the firm as per the direction of SEE, W&M Circle, BGK on 09.02.18 to complete the physical & financial work in this financial year & to close this project in this Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Transportation- 3.5L Gadag Road: LD-5L, 10% Providing additional 215.78 & 3 EB1026 Bagalkote Dharwad A 71.92 6.24 78.16 58.48 59.88 16.00 retention subject to 1x10MVA, 110/11kV 2.06.14 EI: 7.5L Transformer Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Reason for Under Utilization of Budget QV to be approved Cum Exp w.r.t toPoject Cost Is less due to savings in the work Bill Details For theYear Ugar: 18-19 Replacement of 1x10MVA, 258.50 & 4 EE1095 Bagalkote Belagum A 64.98 203.95 268.93 244.94 232.57 10.00 Civil Rs 1.00 Lacs, 5 % 110/11kV by 1x20MVA, 20.11.14 SWG - Rs 1.86 Lacs,QV - 110/11kV transformer Rs 4.00 Lacs, Ret - Rs 1.00 Lacs, LD- Rs 1.32 Lacs Total - Rs 9.18 Lacs Say Rs 10.00 Lacs Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

110 KV S/s Badami: Trf. Ret: 16.00 Replacement of 1X10 MVA, 253.68 & QV: 6.20 5 EF1067 Bagalkote Bagalkote A 62.28 248.69 310.97 313.00 231.07 38.00 110/11 KV by 1X20 MVA, 18.05.15 CTR: 15.00 110/11 KV transformer Total: 37.20 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Ret: 25.00 Neerbudihal: QV: 8.00 Providing additional 216.36 & 6 EF1051 Bagalkote Bagalkote A 84.67 39.82 124.49 150.00 81.77 43.00 LD: 0.50 1x10MVA, 110/11kV 23.07.14 Others: 8.70 Transformer Total: 42.20

New 10 MVA Power Transformer 110KV S/S Teradal: supplied for this Providing additional 244.70 & project 7 EF1056 Bagalkote Bagalkote A 109.51 48.79 158.30 313.28 235.10 27.00 1X10MVA, 110/11kV Power 03.12.14 Transformer Ret: 1.20 LD: 1.28 Others: 24.52 Total: 27.00 7 Total of Augmentation Bagalkote 539.43 923.42 1462.85 1139.70 1180.30 173.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Budget Under Belgaum-Ghataprabha: Utilization for the Re-costruction of 110kV SC Year 17-18 line on DC towers in the Agency is not existing 110kV Ghataprabha responding to attend line corridor from Belgaum 824.89 & 1 EE1026 Bagalkote Belgaum L 812.74 40.00 852.74 10.00 681.19 1.00 the balance works (6-pole structure near 08.08.06 and also the agency Kanabargi) to 110kV has not submitted Ghataprabha Sub-Station the bills. Hence for a distance of 49.045 T.O O. M No- 3704- Kms. 08 dtd 30.01.2018

LD:762Lakhs. Gadag-Bagalkote : CC:122Lakhs.Reason Construction of 220kV DC 4869.82 & for cost over run is 2 EF1021 Bagalkote Dharwad L 7624.00 81.66 7705.66 940.00 7183.48 884.00 line for a distance of 95.295 21.09.11 due to inclusive of Kms. QV, PV, LD & CC amounts.

Mahalingapur-Mudhol : Conversion of 110KV SC tap line to LILO line at 110kV Uttur Sub-station by Subjected to 240.75 & 3 EF1059 construction of 110kV TB & Bagalkote Bagalkote L 263.70 15.26 278.96 60.00 194.20 40.00 approval of QV & 28.02.15 110kV SC line on DC towers Time extension from 110kV Mahalingapur- Mudhol station for a distance of 5.945Kms. Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Atharga LILO: LD: 10.00 Conversion of 110kV tap line 94.76 & 4 EG1026 Bagalkote Bijapur L 102.82 5.14 107.96 28.11 106.42 14.00 QV: 02.00 to LILO line for a distance of 24.01.12 Total: 12.00 10.705 kms.

Kudagi Ultra Mega Power Plant Evacuation Lines: Ret: 5.32 Construction of 220kV MC LD: 365.01 Line from proposed Kudagi 2143.75 & 5 EG1037 Bagalkote Bijapur L 3161.88 255.85 3417.73 1244.12 3105.29 784.00 QV+CC+PV+Others: 400kV STPP to LILO existing 23.05.13 413.58 220kV B.Bagewadi-Bijapur Total: 783.91 DC line for a distance of 18.168 kms.

5 Total of Lines Bagalkote 11965.14 397.91 12363.05 2282.23 11270.58 1723.00 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

>As per revised Budget included in column 17. LD-170L, SRS Hubli : 1789.35 & QV-250L, 1 EB1015 R & M Works at 220kV SRS Bagalkote Dharwad T 1714.71 0.00 1714.71 356.00 1648.51 546.00 03.03.11 Ret-126L. Hubli Station Reason for cost over run is due to inclusive of approved work slip, QV & LD 1 Total of TB's & Others Bagalkote 1714.71 0.00 1714.71 356.00 1648.51 546.00

20 Total of Bagalkote Zone Bagalkote 19846.92 1932.81 21779.73 7027.65 19941.08 2841.00

KALABURAGI Kalaburagi 0.00 TRANSMISSION ZONE

Mallat (Manvi): Establishing 2x100MVA, 220/110/11kV and 1x10MVA, 110/11kV 3948.94 & 1 FA1032 Station with associated Kalaburagi Raichur S 4093.00 39.86 4132.86 800.00 2955.01 1100.00 17.07.12 220kV and 110kV lines. 220KV line: 2.80Kms. 110KV lines:39.727 Kms

Muddapura: Establishing 1x10MVA, Erection: 02 Lakhs 509.75 & 2 FA1040 110/11kV Sub-Station with Kalaburagi Raichur S 589.67 0.00 589.67 740.00 703.43 25.00 Civil : 10 Lakhs 06.05.14 associated line for a distance Retention : 50 Lakhs of 2.09Kms Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Yaragera: Up-gradation of existing 33/11kV MUSS to QV Excess : 10 Lakhs 1339.47 & 3 FA1042 2x10MVA, 110/11kV and Kalaburagi Raichur S 1334.68 81.32 1416.00 1337.00 1437.32 50.00 PV Excess: 10 Lakhs 18.07.07 1X20 MVA,110/33 kV Sub- Retention : 30 Lakhs Station with associated line or a distance of 9.81Kms

Hunasagi: Up-gradation of existing 33/11kV MUSS to 1x20MVA, 110/33kV 1x20MVA, 110/33kV and Commissioned on 1x10MVA, 110/11kV Sub- Kalabura 1226.40 & 4 FC1016 Kalaburagi S 1030.07 0.00 1030.07 260.00 627.28 69.00 16.10.2017 at Station at Hunasagi with gi 02.07.09 7:30PM QV to be 110kV SC line on DC towers approved from 110kV Kembhavi Sub- Station for a distance of 23.34 Kms. Ghatarga (Afzalpur Tq): Establishing 2x10MVA, Kalabura 763.44 & 5 FC1056 110/11kV Sub-Station with Kalaburagi S 844.76 35.00 879.76 940.00 674.51 144.25 gi 01.06.15 associated line for a distance of 0.64Kms MEI Breaker supplied. Civil works Dubalgundi: like Jelly spreading, Establishing 110/33/11kV storm water drain. Substation with 1x20MVA 680.13 & 6 FE1020 Kalaburagi Bidar S 633.00 35.00 668.00 850.00 702.31 177.52 MEI breaker received 110/33kV and 1x10MVA 27.10.14 at the site erection 110/11kV Sub-Station with under process. QV associated line 0.35Kms preparation under Process.

Crop cut Googal: comopensations bills Establishing 1x10MVA, 781.01 & are pending. Will be 7 FA1039 110/11kV Sub-Station with Kalaburagi Raichur S 934.03 36.20 970.23 383.00 961.19 23.74 15.05.14 taken under associated line for a contingency budget distance of 15.78Kms in FY2018-19 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

7 Total of Sub-stations Kalaburagi 9459.21 227.38 9686.59 5310.00 8061.05 1589.51

MEI breaker received Mahagaon: at the site erection Providing additional Kalabura 189.22 & 1 FC1038 Kalaburagi A 72.66 103.50 176.16 68.00 137.01 30.00 under process. QV 1x10MVA, 110/33-11kV gi 01.08.11 preparation under Transformer process Will be Maski: commissioned in the Providing additional 1 x 10 241.97 & 2 FA1047 Kalaburagi Raichur A 116.60 126.28 242.88 310.00 221.14 40.00 FY 2017-18. MVA, 110/11 kV Power 10.06.15 Financially closed in Transformer at Maski S/s 2018-19 APMC Yard : Replacing 1x10MVA, 179.03 & Physically closed and 3 FA1034 110/33kV by 1x20MVA, Kalaburagi Raichur A 233.79 3.50 297.00 300.50 27.00 341.65 1.41 financially Closed 110/33kV & 1x10MVA, 03.08.13 110/11kV by 1x20MVA, Moregere: Providing additional 179.79 & Physically closed and 4 FB1078 Kalaburagi Bellary A 99.15 103.11 202.26 67.00 118.93 0.11 1x8MVA, 66/11kV 20.08.13 financially Closed Transformer Kalaburagi University: Providing additional Kalabura 296.27 & Physically and 5 FC1034 1x10MVA, 110/11kV Kalaburagi A 293.83 174.91 468.74 237.00 338.44 0.21 gi 19.04.11 financially Closed Transformer and construction of 2 TB's for 5 Total of Augmentation Kalaburagi 585.74 804.80 1390.54 709.00 1157.17 71.73 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

Bellary 400kV pooling station to Ramapura limits: Construction of 400kV MC Line with Quad Moose Final 10% : Conductor from Proposed 3300Lakhs Bellary 400kV pooling 25819.26 & QV Excess ( Supply- 1 FB1080 Kalaburagi Bellary L 34190.82 0.00 34190.82 4612.00 32100.13 4400.00 station (BPS to Ramapura 26.02.15 374, Erection- 126 limits (Kelagina kanavi) to and Civil - 600) : connect to 400kV 1100 lakhs Madhurgiri & Chikkanayakan Halli DC Lines for a distance of 43.018Kms

Kurugod to Thekkalakote: Budget required for Construction of 110kV Link FY 2017-18 line from 110kV Sub-Station 587.85 & 2 FB1053 Kalaburagi Bellary L 722.91 0.00 722.91 131.00 479.61 46.00 QV : 28 Lakhs Kurugod to 110kV Sub- 21.09.12 PV: 18 Lakhs Station at Thekkalakote for a TOTAL: 46Lakhs distance of 28.98 Kms.

2 Total of Lines Kalaburagi 34913.73 0.00 34913.73 4743.00 32579.74 4446.00 Probable Expenditure Details: Lingapur 220kV switching Supply 50% - station : 1488.04 & 1 FB1063 Kalaburagi Bellary T 1768.92 12.83 1781.75 338.00 1431.63 280.87 003.92 R & M Works at 220kV 16.02.13 Supply 30% - Lingapur Station 037.26 Supply 10% - 1 Total of TB's & Others Kalaburagi 1768.92 12.83 1781.75 338.00 1431.63 280.87 Rs.in lakhs

Cost of Cost of Original / Deptly. Revised Cum Exp up Sl. Cost of Budget Work Code Name of the Work ZONE District S/A/L/T Revised Supplied Total Work Cost Budget 2017- to 31/03/18 Remarks No. DWA 2018-19 DPR & Materials & 18 as per APR Date others

15 Total of Kalaburagi Zone Kalaburagi 46727.60 1045.01 47772.61 11100.00 43229.59 6388.11

128 Total of List-I for All Zones 191967.72 29135.07 225785.15 59964.36 204162.49 22385.80 List - II : Abstract of Ongoing works for the year 2018-19

Rs. in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Sl. No. Zone Budget Budget Budget Budget 18- Budget Nos. Nos. Nos. Nos. Nos. 18-19 18-19 18-19 19 18-19

1 Bengaluru 30 87451.00 6 677.00 8 4715.00 9 6975.00 53 99818.00

2 Tumakuru 10 23272.00 5 1094.00 12 8166.00 2 947.00 29 33479.00

3 Hassana 16 5020.00 5 661.63 10 1709.22 2 980.00 33 8370.85

4 Mysuru 17 12880.00 23 3252.00 3 260.00 1 400.00 44 16792.00

5 Bagalkote 13 9433.00 18 3381.00 7 4287.00 2 1982.00 40 19083.00

6 Kalaburagi 12 6399.14 8 926.00 3 10894.59 2 260.00 25 18479.73

Total 98 144455.14 65 9991.63 43 30031.81 18 11544.00 224 196022.58

List - II List II - On-going works 2018-19 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others BENGALURU TRANSMISSION Bengalu ZONE ru

Naganathapura: a)Establishing 2x100MVA, 220/66kV Station with 220kV LILO of Hoody - Somanahally line, 66kV lines to Keonics City, HSR lay out, E city Sector II Ph FY 18-19 II, AECS L/O. 12175.34 & New cable work-82L Bengalu Bengaluru (a) 9608.56 (a)1191.44 1 AA1021 b) Naganathapura 2nd S 23.09.08 11136.35 2.00 9742.34 82.00 ru Urban (b) 230.54 (b) 105.81 Circuit_line: 2nd ckt of 66kV TCCM for cable to be line on existing 66 kV DC towers submitted. from keonics city to Naganathpura(5.4 kms) with LILO to Electronic city Ph II Sec II with TBs at Keonics city, HSR & Electronic city Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Vikas Tech Park: a) Establishing 2x150MVA, 220/66kV Station with line. b) Vikas Technical Park_Evacuation line 1: Running FY 18-19 66kV 630 sqmm UG cable from Stn : FQV-20L Vikas Technical Park 220kV S/s 7587.86 & a) 3123.78 Rtn-480L to 66 kV Shobha Developers S/s Bengalu Bengaluru 2 AA1038 S 31.10.09 b) 1064.93 0.00 5983.67 1018.74 6819.72 1000.00 Total-500L 3.5 Kms ru Urban c) 1794.96 c) Vikas Technical Park_Evacuation line 2: Line: FQv & Rtn - 66kV 1000 sq. mm SC UG cable 400L line from the proposed 220 kV cable supply500L Vikas Tech Park S/s to Devarabeesanahalli for a route length of 3.5 ckt. Kms

Yelahanka (DG Plant): a) Establishing 2x150MVA, a)Physically closed. 220/66kV Station b) 220-220 kV MC line from FQV sent to Nelamangala-D.B.Pura to corporate office for Singanayakanahalli 10.33Kms approval vide letter c) Running of DC 220KV, 2000 Sq dated 04.11.2017 mm UG cable for a route length of 5.875 Kms from 400/220kV FQV: 2L Singanayakanahalli station to c) Supply: 200L 220/66/11kV DG Plant Yelahanka Supply Retention- station & Construction of two 9902.75 & a) 3346.95 Bengalu Bengaluru 4800L, Civil:800 3 AA1042 numbers of 220 kV Terminal Bay S 25.06.10 (d) & (e) 0.00 5677.88 16672.02 23024.06 8500.00 ru Urban at 220/66KV/11kV DG Plant sub- 2330.93 Erection - 2500L station. TB-100L d) 220-66 kV MC line from e & f) FQV placed in yelahanka to 8 pole structure Chikkabettahalli 5.84k Kms PC -Jan 2018. e) 66 kV DC line from DG Plant to Proceedings awaited. DG Plant-Peenya 1 & 2. FQV - 100L 1.07 Kms. (b) and (d) works to be deleted from the project Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY 18-19 Samanduru : Station Retention- 764.24 & Establishing 2x8MVA, 66/11kV Bengalu Bengaluru 50L 4 AA1129 S 24.02.14 735.60 0.00 735.60 1.00 522.97 500.00 Sub-Station with associated line ru Urban for a distance of 5.581 Kms. Cable - 1450L

Hoskote: a) Establishing 2x100MVA, 220/66kV Station with 220/66kV MC line from BIAL with 220kV TB at BIAL b) Hoskote 220KV LILO line from Hoody-Kolar line c) 66KV SC line from Hoskote to Mandur, Pillaguppa- line to Nandagudi, 66 kV TB at (a) & (b) : 5249.00 & b) Provision for Nandagudi & BIAL Bengalu Bengaluru 5057.5 (a) & (b): 5 AB1007 S 05.07.06 7475.45 1.00 6686.78 250.00 Hoody-Kolar LILO- d) Hoskote to Tower no5 of ru Rural 1525.3 existing Pillagumpa-Sulibele (c) 892.65 250L 66kV line and Tower no5 of existing Pillagumpa-Sulibele 66kV line to Hoskote s/s 1) 21.03 Kms 2) 13.12 Kms 3) 10.25 Kms 4) 10.28 Kms. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Dobbaspet (Nelamangala): a) Establishing 2x100MVA, 220/66kV Station with 220kV BUDGET FOR 2018- LILO of Kadur - Nelamangala 19 5259.00 & a) 2555.42 b) 66kV lines to Nelamangala & Bengalu Bengaluru 35 L- Supply 6 AB1009 S 05.05.12 b) 993.54 1487.00 5416.94 33.00 4618.51 40.00 Kolala Sub-Station upto loc 65 ru Rural c) 380.98 Retention Bill c) Construction of 66kV SC line 3 L- Erection Bill on DC towers from Dabaspet to 22 L- Civil Bill Kolala from location 66 to 99 for a distance of 5.856 kms

(a) Provision for Mandur: station & TB - 80L Establishing 1x12.5MVA, 724.54 & Bengalu Bengaluru 7 AB1018 66/11kV Sub-Station with 66kV S 12.05.08 486.10 129.00 615.10 10.00 439.72 10.00 OH line is to be ru Rural D/C line from for a replaced by cable distance of 9.00 Km. work as approved in 75th TCCM Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Budget Required for FY- 2018-19: Sondekoppa: 97L Supply Establishing 2x8MVA, 66/11kV 848.02 & Bengalu Bengaluru Retention Bills 8 AB1019 Sub-Station with 66kV tap from S 28.04.08 647.27 177.00 824.27 1.00 598.59 124.00 ru Rural Dobbaspet - Nelamangala SBT 1L Erection Bills line for a distance of 12.50 Kms. 6L Civil Bills 20L- Treec Cut Bills(Approx)

FY 18-19: Kothipura (Ramanagara): Land Compensation Establishing 2x100MVA, =3304L 220/66kV Station with 10501.25 & Bengalu Supply, erection & 9 AC1015 220/66kV MC lines from Bidadi Ramanagara S 05.01.09 7637.98 1323.00 8960.98 3500.00 10548.26 6754.00 ru & SC line from Tubinakere. Civil bills = 3000L 220 KV DC line -68.82 Kms, Tree Cut = 450L MCMV 18.117 Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others a) Magadi: Establishing 2x100MVA, 220/66/11kV Station with associated line. b) Evacuation of 66kV lines from Magadi station: Budget Required for 1. Construction of 66KV MC and 2018-19: D/C towers to link 66KV Magadi a) Line & T.G.Halli 66KV Erection & Civil- Gudemaranahalli sub-station 400L 2. Construction of 66KV S/C line Bengalu 7659.56 & Compensation-300L 10 AC1029 on D/C towers from Magadi Ramanagara S 8660.00 0.00 8660.00 1700.00 8353.60 1150.00 ru 02.08.14 b)Line: station to Hulikatte 3. Construction of 66KV Supply running bill- Terminal Bay at the 66KV 85L Hulikatte Erection-50L Civil-115L Compensation-200

FY 18-19: Rtn: 120L Vandaraguppe: Establishing Forest: 20L 1x8MVA, 66/11kV Sub-Station Bengalu 531.57 & 11 AC1055 Ramanagar S 573.42 30.00 603.42 185.00 495.57 210.00 Tree Cut: 3L with associated line for a ru 29.08.15 distance of 0.926Kms Civil & Erection : 7L QV& PV-30L Other bills-30L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY 18-19: Land B. V. Halli : compensation:100L Establishing 1x12.5MVA, Bengalu 797.16 & Line Civil: 60L 12 AC1056 66/11kV Sub-Station with Ramanagar S 953.29 43.00 996.29 700.00 562.58 760.00 ru 05.12.15 associated line for a distance of Trf-100L 18.40Kms Land compn:250L Tree Cut:45L Rtn:180L & QV:25L

FY 18-19: TB erection and Civil - 20L Srigiripura : Line civil-30L Establishing 1x8MVA, 66/11kV Bengalu 761.87 & 13 AC1060 Ramanagara S 780.78 30.00 810.78 300.00 565.85 421.00 Line erection-36L Sub-Station with associated line ru 08.09.15 for a distance of 8.6Kms Land compn-60L Tree cut-85L Rtn-150L QV-40L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY18-19: Trf-100L Land Compn-125L Hegganur: Establishing 1X8 Stn & Line erection - MVA, 66/11 kV s/s with 45L Bengalu 991.51 & 14 AC1065 construction of SC line DC Ramanagara S 1064.61 35.00 1099.61 825.00 738.53 500.00 ru 21.03.16 Tree cut-125L towers from Doddalahalli S/s for Line Civil & erecn- a distance of 12.238 kms. 50L Forest-100L , Rtn- 200L QV-30L

T.Gollahalli (Thimmasandra) Establishing 2x100MVA, 220/66/11kV and 1x12.5MVA Supply Bills=4000L Bengalu 9106.29 & 15 AD1006 66/11kV Station with associated Kolar S 9533.08 46.16 9579.24 2000.00 1917.77 5000.00 ru 19.09.15 Erection=2000L lines for a distance of 220kV Civil bill-1500 L 27.269 Kms & 66kV (5.828+10.93+12.28)Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

10% Retention Bill of Supply=1600 Mittemari: Lakhs Establishing 2x100MVA, 10% Commission 220/66/11kV Station with Bengalu 7564.79 & 16 AE1026 C.B.Pura S 8858.74 38.64 8897.38 5500.00 6674.64 5000.00 Bill of associated lines for a distance of ru 10.07.15 220kV 91 kms & 66kV 80.36 Supply,Erection,Civil kms =1400 Lakhs Land Compensation: 2000Lakhs

FY 18-19 Koramangala: station supply Establishing 220/66/11kV GIS :4600L substation at Kormangala with Erection- 1200L Bengalu Bengaluru 37339.12 & 17 AA1131 220 kV 1000 sqmm LILO UG S 18047.93 0.00 18047.93 3928.72 3881.96 11000.00 220KV cable supply ru Urban 24.11.15 cable from existing HSR- =2850L NIMHANS UG cable with 66KV cable supply associated 66kV lines. =850L Rtn- 1500L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY 18-19 ITI : Station Supply- Establishing 2x150 MVA, 4000L 220/66/11kV GIS substation at Civil- 1000L ITI with 220kV DC 1200 sq mm Bengalu Bengaluru 14429.10 & 18 AA1132 S 19711.21 0.00 19711.21 5400.00 5177.66 6000.00 Copper single core XLPE UG ru Urban 15.04.15 220kv Cable : cable from existing Hoody-Hebbal Supply Rtn-2000L for a route length of 2.607Kms along with associated 66kV line. 66kv CABLE, supply =1000L

Brindavan alloys: Budget Required for Establishing 220/66/11kV GIS FY 2018-19: Bengalu Bengaluru 7710.86 & 19 AA1154 Sub-station along with S 10570.24 0.00 10570.24 350.00 0.00 2000.00 Supply-500l ru Urban 05.09.15 construction of 220kV DC line Erection & Civil- for a distance of 0.52 kms 100L

Kumbalgodu: Establishing 2x150MVA, 220/66/11 kV sub-satation at FY 18-19 Bengalu Bengaluru 37339.12 & 20 AA1156 Kumbalagodu with 220kv S 50.00 0.00 10000.00 Supply and erection - ru Urban 24.11.15 1200sqmm UG Cable between 20000L 400/220kv Bidadi and Vrishabhavathi Valley Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Hulimangala : Establishing 2x12.5MVA, Bengalu Bengaluru 4531.08 & FY 18-19 21 AA1161 S 5.00 0.00 1000.00 66/11kV Sub-Station with ru Urban 23.12.16 Supply -1000L associated line at anekal taluk.

Huskuru : Establishing 2x12.5MVA, 66/11kV Sub- Bengalu Bengaluru 5140.00 & FY 18-19 22 AA1162 S 759.22 0.00 759.22 5.00 0.00 200.00 Station with associated line at ru Urban 22.12.16 Supply -1000L anekal taluk. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Kumbaranahalli : Establishing Bengalu Bengaluru 2662.00 & FY 18-19 23 AA1163 2X12.5MVA, 66/11kV Power S 694.61 0.00 694.61 1.00 0.00 500.00 ru Urban 06.02.17 Transformer at Kumbaranahalli Supply -1000L

Devanahalli Hardware Park: Establishing 2 X 500 MVA, Budget FY-18-19 400/220kV Sub-Station (400KV GIS & 220KV AIS) at KIADB Supply- 18000 L Hardware Park, Devanahalli, Bengalu Bangalore 36815 & 24 AB1057 S 500.00 5.29 10000.00 Erection- 5000 L Bengaluru Rural District and ru Rural 04.02.17 also for creation of required Civil- 7000 L 220kV Terminal Bays at the Total- 30000 L receiving 220/66kV sub-stations for evacuation of power. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Channapatna: Establishing 1x100 MVA, 220/66/11KV Sub-station (220kV- Partial Hybrid/ Partial Bengalu 8176.43 & FY 18-19: 25 AC1068 Ramanagara S 10.00 0.00 5000.00 AIS, 66kV AIS) in the premises of ru 09.03.17 Running bills-2000L existing 66/11kV Sub station Channapatna , Ramanagara District.

FY 18-19 a) Station Erecction bill - Jigani : 50L. Establishing 2x150MVA, 6491.35 & 220/66kV Station with LILO of Bengalu Bengaluru 26 AB1014 S 20.07.09 9301.38 1300.21 10601.59 3500.00 7070.97 550.00 b) Tower protection 220kV Somanahalli - Malur MC ru Rural work - 200 L line & 66kV link lines for a PV & QV- 150 L distance of 7.356 Kms.. Final Retn- 150 L Total- 500L

FY 18-19: Civil & other bills: 30: Hosapalya Circle: Tree Cut: 40 : Establishing 1x8MVA, 66/11kV Bengalu 558.93 & 27 AC1031 Ramanagara S 551.29 41.00 592.29 281.00 488.74 250.00 Land Compensation- Sub-Station with associated line ru 29.08.15 55L for a distance of 3.99Kms Rtn-100L QV:25L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Mylasandra (Near Electronic City): Establishing 3 X 500 MVA, 400/220kV GIS Sub-Station at Budget FY-18-19 Mylasandra (Near Electronic City) in Bengaluru South Taluk, Supply- 18000 L Bengaluru Urban District along Bengalu Bengaluru 36730 & Erection- 5000 L 28 AA1166 S 50.00 1.13 10000.00 with associated transmission ru Urban 30.02.17 Civil- 7000 L lines and providing additional Total- 30000 L terminal bays (3 Nos) at 220/66/11Kv S/s at Yerandanahalli (Short closed work code AA1043)

Uragahalli: Bengalu 1412.15& FY 18-19: 29 AC1069 Establishing 2x8MVA, 66/11kV Ramanagara S 1.00 0.00 400.00 ru 01.03.17 Sub-Station with associated line. Running Bill-400L

Kunur: Establishing 1x12.5MVA, Bengalu 822.65 & FY 18-19: 30 AC1070 Ramanagara S 1.00 0.00 250.00 66/11kV S/s at Kunur ru 11.07.17 Running Bill-250L

Bengalu 30 Total of Sub-stations 99566.75 4680.01 138450.05 46531.48 98935.24 87451.00 ru Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Tavarekere: Bengalu Bengaluru 432.61 & Tr supply + Erection 1 AA1097 Replacing 2x8MVA, 66/11kV by A 55.85 377.00 432.85 160.00 178.83 2.00 ru Urban 16.02.13 2x20MVA, 66/11kV Transformer : 157 L

Nelamangala 400kV: Budget Required for Providing additional 3rd 4489.57 & FY 2018-19: 500MVA, 400/220kV three Bengalu Bengaluru 2 AB1028 A 20.03.10 4177.12 0.00 4177.12 1.00 3953.86 100.00 100L for phase Power ICT with associated ru Rural equipments for a distance of 3.06 commissionng of kms 220KV Bays

Thyamagondlu: Replacing 2x8MVA, 66/11kV by Bengalu Bengaluru 455.96 & Tr supply + Erection 3 AB1041 A 38.98 376.14 415.12 135.00 126.07 162.00 2x20MVA, 66/11kV ru Rural 27.08.11 : 162 L Transformers Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Lakshmipur: Budget sufficient if Replacing first 1x8MVA, Bengalu 122.15 & 4 AD1012 Kolar A 5.00 0.00 120.00 released good P.Tr is 66/11kV by 1x12.5MVA, ru 21.05.11 66/11kV Transformer allotted.

Augmentation of 1x12.5 MVA, FY 18-19 66/11kV Power Transformer 1 Bengalu Bengaluru 5 AA1168 A 150.00 0.00 130.00 Switchgear Cost: by 1x20MVA at 220/66/11kV ru Urban R/s Somanahalli, Bengaluru. 150 L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

66/11kV S/S Kodigehalli: FY 18-19 Bengalu Bengaluru 397.72& 6 AA1176 Replacing 2x8MVA, 66/11kV A 2.16 163.00 165.16 5.00 2.16 163.00 Tr supply + erection ru Urban 28.03.17 Power Transformer by : 163 L 2x20MVA,

Bengalu 6 Total of Augmentations 4274.11 916.14 5190.25 456.00 4260.92 677.00 ru Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Probabble Exp up to Hebbal-ITI: March-18 Replacing Coyote ACSR by HTLS 1780.46 & Bengalu Bengaluru Erection Bill-207L 1 AA1046 Conductor from the existing L 21.06.11 1679.14 0.00 1679.14 410.00 934.50 500.00 ru Urban 66kV line for a distance of 14.334 Kms. FY 18-19 Erection & Rtn-800L

BIAL toVidyanagar: Running Cable: Retention: 66kV SC 1000Sq mm XPLE 1000L copper UG Cable for a route Bengalu Bengaluru 5082.46 & 2 AA1134 L 5947.00 0.00 5947.00 388.00 4364.20 1255.00 Erection: 30L length 9.5 Kms from ru Urban 25.02.15 220/66/11kV Sub-station to Civil: 220L 66/11kV Vidyanagar S/s TB: Retention: 5L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

EPIP & Yerandanahalli: FY 18-19 Strenghtening of existing 66 kV Bengalu Bengaluru 2202.46 & Supply Rtn- 700L 3 AA1146 line between EPIP & L 2177.30 0.00 2177.30 454.00 1014.92 1000.00 ru Urban 13.08.15 Yerandanahalli sub-station by Erection-100L replacing Coyote by Drake ACSR cIVIL-200

Somanahally to Kolar via 3085.00 & FY 18-19 Malur: Bengalu Bengaluru 4 AB1017 L 19.12.06 2739.09 0.00 2739.09 52.19 3381.37 1000.00 Erection & Rtn- Construction of 220kV DC line ru Rural (balance works). 1000L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Tubagere Sub-station: 61.41 & Bengalu Bengaluru Retention:20L, 5 AB1046 Stringing of 2nd circuit for L 24.01.12 74.13 0.00 74.13 1.00 49.17 25.00 ru Rural Providing LILO arrangement Erection:5L

Probable Exp Upto Mar-18: T.K Halli to Iggalur: Running Bill-4L Construction of 66kV DC line for Supply & Civil Bills- a distance of 9.924Kms from 123L 220/66/11kV T.K.Halli Station Bengalu 304.32 & Total- 127L 6 AC1063 Ramanagara L 326.26 0.00 326.26 200.00 106.49 165.00 to 66kV Iggalur Tap point in the ru 16.04.15 existing corridor of 66kV T.K FY 18-19: Halli-Akkurmole SC line and QV-15L Providing 66kV TB's at T.K Halli Retention Bill-50L Running Bill-70L & Tree Cut-30L

Malur- Malur I/A: Construction Supply Bills=200 of 66kV SC line for a distance of Lakhs 10.77Kms partly on MC towers Bengalu 569.61 & Erection Bills=100 7 AD1041 Kolar L 619.75 619.75 300.00 149.80 470.00 and partly on DC towers from ru 23.09.15 Lakhs 220/66kV Malur S/s to 66/11kV Civil Bills=170 Malur Industrial area S/s Lakhs Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Malur to Lakkur: Supply Bills=100 Construction of 66kV SC line on Lakhs DC towers and partly on DC Bengalu 297.43 & 8 AD1042 Kolar L 410.00 0.00 410.00 300.00 143.74 300.00 Erection Bills=60 towers from 220/66kV Malur ru 20.02.13 Sub-station to 66/11kV Lakkur Lakhs Sub-station Civil Bills=40Lakhs

Bengalu 8 Total of Lines 13972.67 0.00 13972.67 2105.19 10144.19 4715.00 ru

Peenya : 3539.98 & Budget FY-18-19 Bengalu Bengaluru 1 AA1050 R & M works at Peenya T 17.02.11 4093.35 0.00 4093.35 50.00 2450.17 1000.00 Supply-100 L ru Urban 220/66kV Station. Civil & Erection Retention-400 L Total-500L

SRS Hoody : 1807.71 & Budget FY-18-19 Bengalu Bengaluru 2 AA1054 R & M Works at SRS Hoody T 27.08.11 2452.88 0.00 2452.88 70.57 1443.46 500.00 Supply-100 L ru Urban 220/66kV Station Civil & Erection Retention-400 L Total-500L

400kV R/S Hoody: 895.98 & Bengalu Bengaluru FY 18-19 3 AA1057 Providing 63MVAR Bus Reactor T 01.07.09 726.20 0.00 726.20 10.00 267.82 200.00 ru Urban at 400/220kV Station. supply -350L Erection: 50L Singanayakanahalli: 761.93 & Bengalu Bengaluru 4 AA1071 Construction of 4Nos of 220kV T 01.01.14 761.93 0.00 761.93 5.00 742.31 5.00 FY 18-19 : 5L ru Urban Bays for KPTCL lines. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY 18-19 Somanahalli: 2286.04 & Supply-300L Bengalu Bengaluru 5 AA1073 R&M works at Somanahalli T 04.09.10 2016.71 0.00 2016.71 191.00 1312.02 500.00 Suppy Rtn-100L ru Urban 220/66kV Station Erection and civil - 100L

FY 18-19 : Supply+Erection: Providing Capacitor Bank and Bengalu Bengaluru 2779.67 & 1050 L 6 AA1150 allied equipment’s in KPTCL Sub- T 2308.36 0.00 2308.36 2000.00 944.35 2800.00 ru Urban 13.01.15 stations of Bengaluru Zone. (SWG-1332L - Will be supplied by KPTCL)

Renovation and upgradation of protection systems of 220 kV FY 18-19 : Bengalu Bengaluru 1353.30 & 7 AA1153 substations (26 Nos.) & 400 kV T 1573.21 0.00 1573.21 1000.00 632.30 1200.00 Supply+Erection: ru Urban 20.06.14 (2 Nos) in Bengaluru 1050 L Transmission Zone Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

FY18-19: Balance Supply Bills- Nelamangala: 859.04 & 149L Bengalu Bengaluru 8 AB1030 Providing 63MVAR Bus Reactor T 20.07.09 641.73 0.00 641.73 10.00 232.94 170.00 Balance Erection ru Rural at 400/220kV Station. Bills- 7L Balance Civil Bills- 14L

Budget FY-18-19 KIADB DB Pura: Supply-100 L 2488.00 & R & M works at 220/66kV Bengalu Bengaluru Civil & Erection-300 9 AB1048 T 08.11.12 3072.66 0.00 3072.66 220.00 2120.36 600.00 KIADB DB Pura Station for a ru Rural L distance of 0.56 Retention- 200 L Total- 600L

Bengalu 9 Total of TB's & Others 17647.03 0.00 17647.03 3556.57 10145.73 6975.00 ru Bengalu 53 Total for Bengaluru Zone 135460.56 5596.15 175260.00 52649.24 123486.08 99818.00 ru TUMAKURU Tumaku 0.00 TRANSMISSION ZONE ru Pavagada: Establishing 2x100MVA, Tumaku 7160.37 & 1 BA1034 220/66kV Station with Tumakuru S 7661.00 1812.37 9473.37 3390.00 5700.17 3000.00 ru 17.10.11 associated lines for a distance of 120.00 Kms. Jagalur (Hiremallanahole): a) Establishing 2x500MVA,400/220 KV partly a) 18597.43(st GIS S/S i.e., 400kV GIS and 14186.67 & Tumaku 18597.43&9 ation- 2 BB1049 220kV AIS with associated Davanagere S 19.11.15 408.63 21000.00 19976.19 9706.00 ru 434.43 185.97+) 400kV lines. b) 8142.88 &9843.06 b) 220kV DC Line to Thallak, & 28.04.16 Chitradurga & Kudligi along with 220kv TB's Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Malladihalli : Establishing 2x8MVA, 66/11kV Sub-Station Tumaku 622.97 & 3 BC1053 Chitradurga S 670.64 32.11 702.75 80.00 582.39 150.00 with associated line for a ru 19.10.12 distance of 11.467 Kms.

Madadakere : Establishing 2x8MVA, 66/11kV Tumaku 777.14 & 4 BC1054 Chitradurga S 851.34 49.34 900.68 1051.14 683.70 216.00 Sub-Station with associated lines ru 03.07.15 for a distance of 13.33Kms Theriyur: Establishing 1 x 8 MVA 66/11 Tumaku 488.65 & Shifted from List III to List- 5 BA1119 KV S/S with associated line in Tumakuru S 498.41 0.00 498.41 390.00 234.83 300.00 ru 28.01.17 II Madhugiri Taluk, . Thippur: Tumaku 442.5 & Shifted from List III to List- 6 BA1120 Establishing 1 x 8 MVA 66/11 Tumakuru S 509.60 0.00 509.60 400.00 141.49 350.00 ru 01.07.16 II KV S/S with associated line Benkikere (Channagiri): Establishing 2x100MVA, Tumaku 7 BB1042 220/66kV Station with Davanagere S 8341.82 & 9763.96 9763.96 5000.00 4278.59 5000.00 shifted from List-III to List-II ru associated 220kV line for a 20.11.14 distance of 47.43Kms

Nallur : 566.96 & Tumaku 8 BB1078 Establishing 1x8MVA, 66/11kV Davangere S 09.02.17 5.00 0.00 250.00 Work under progress ru Sub-Station with associated line

Hosadurga: Establishing 2x100MVA, 220/66 Tumaku 9 BC1068 Chitradurga S 7468.00 10.00 0.00 4000.00 KV S/s with associated 220kV & ru 66kV lines Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Visveswarapura: Establishing Tumaku 528.33 & 10 BC1055 1x8MVA, 66/11kV Sub-Station Chitradurga S 10.00 10.00 1.00 0.00 300.00 shifted from List-IV to List-II ru 26.04.17 with associated line Tumaku 10 Total of Sub-stations 19954.95 2312.45 21858.77 31327.14 31597.36 23272.00 ru Davanagere: 1203.66 & Replacing 2x60MVA, 220/66kV Tumaku 1 BB1031 Davanagere A 27.10.10 248.41 1050.00 1298.41 20.00 65.50 100.00 by 2x100MVA, 220/66kV ru transformers

K.B. Cross: 621.73 & Providing Spare 1 x 100 MVA Tumaku 2 BA1091 Tumakuru A 12.02.14 621.73 621.73 201.00 87.40 782.00 220/110/11 KV Power ru transformer

Halukurke: Providing Additional 1x10 MVA, Tumaku 229.41 & 3 BA1118 Tumakuru A 275.50 275.50 133.20 63.25 75.00 110/11 kV Power Transformer at ru 02.09.14 110/11kV Station.

Yadavani: Providing additional 1x12.5 Tumaku 224.28 & 4 BA1122 Tumakuru A 88.26 88.26 83.00 8.78 115.00 Work under progress MVA, 66/11kV Power ru 13.01.16 Transformer Transformer

Dyavaranahalli: Tumaku 170.97 & Shifted from List-111 to List- 5 BC1041 Providing additional 1x8MVA, Chitradurga A 89.52 89.52 100.00 107.34 22.00 ru 12.10.11 I 66/11kV Transformer

Tumaku 5 Total of Augmentations 1323.42 1050.00 2373.42 537.20 332.27 1094.00 ru Antharsanahally - Chelur tap point - Sira: Construction of (a) 66kV MC line from Antharsana hally to Chelur tap point Tumaku 3931.71 & 1 BA1015 b) 66kV MC line from Chelur tap Tumakuru L 3504.08 0.00 3504.08 1.00 3426.46 1.00 ru 05.02.08 point to Sira (partly on DC) c) Providing 66kV TBs at 66kV Sira & Antharsana hally for above lines for a distance of 52.00 Kms. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Kibbanhalli - CN Hally - : Construction of 110kV DC line in Tumaku 966.15 & 2 BA1024 the new corridor from 220kV Tumakuru L 733.50 242.00 975.50 40.00 654.40 200.00 ru 01.12.09 K.B.Cross to Thimmanahally tapping point for a distance of 26.00 Kms.

Nagalamadike : Construction of new 66kV SC tap line on DC towers from Pavagada Tumaku 211.20 & 3 BA1043 tapping point to Nagalamadike Tumakuru L 197.11 0.00 197.11 1.00 41.30 1.00 Project is short closed ru 03.03.11 S/ S (Replacement of Rabbit conductor on RCC poles) for a distance of 13.46Kms.

Shylapura - Y. N. Hosakote: Construction of new 66kV SC line on DC towers (Replacement Tumaku 235.24 & 4 BA1044 Tumakuru L 265.00 0.00 265.00 1.00 71.62 1.00 Project is short closed of Rabbit conductor on RCC ru 11.05.11 poles by Coyote conductor on 17.24 Kms.

Vasanthanarasapura to Madhugiri: Construction of 220kV DC line with Moose ACSR from PGCIL Tumaku 5678.46 & 5 BA1096 Station at Vasanthanarasapura Tumakuru L 6056.94 1889.00 7945.94 740.80 6488.82 1300.00 ru 15.09.14 to existing 220kV station at Madhugiri along with terminal bays for a distance of 44.481KMS. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others 400 KV BTPS from Rampura Limts to Chikkanayakanahalli: a) Construction of 400 KV Quad Moose DC Line from 400 KV Rampura Limits to Jagaluru a) Limits for 65Kms Tumaku 49189.74 & 6 BA1112 b) Construction of 400 KV Quad Tumakuru L 17820.75 1264.57 19085.32 7675.29 12816.38 5000.00 ru 21.11.15 Moose DC Line from 400 KV Jagaluru Limits to Chikkanakanahalli for 123.69Kms

HAL Project: a) Construction of 220/220KV MC line for Shifting of Existing 220KV B1,B2 & B3,B4 Lines at proposed HALpremises b) Construction of 110KV D/C line with NBT for the shifting of existing 110KV Tumaku 7 BA1121 Tumakuru L 5764.00 3645.52 3279.80 6925.32 1996.00 4370.78 1500.00 S/C -Doddaguni line at ru Prposed HAL premises near Bidarehalli Kaval village limits in Gubbi taluk in Tumakuru District.

1. Work Slip for Rs. 47.57 Lakhs Davanagere - Chitradurga No. 1 2. Excess due to providing Multicircuit towers for : Loc.No: 01 to 12 in Re-construction of 66kV S/C line Tumaku 771.90 & Davangere City & 2 no's 8 BB1018 Davanagere L 570.24 0.00 570.24 45.00 495.13 75.00 on D/C towers in the existing ru 27.07.09 110KV D+9 towers for corridor for a distance of 55.70 Railway track crossing. 3. Excavation quantities for Kms. civil works like normal soil and DFR soil excees over the DWA quatities. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

1. Work Slip No: 03 amounting for Rs. 39.50 Lakhs approved vide ltr.no: Davanagere - Chitradurga No. 9942-43, DTd: 28.02.2015 by CEE/TZ/TMK. 2: 2. Excess due to providing Re-construction of 66kV S/C line Tumaku 649.58 & narrow based towers at 2 9 BB1019 Davanagere L 453.79 1.30 455.09 35.00 436.13 18.00 on D/C towers in the existing ru 14.07.09 locatio due space constraint corridor for a distance of 53.84 & 2 no's 110KV D+9 towers for Railway track crossing. Kms. 3. Excavation quantities for civil works like normal soil and DFR soil excees over the DWA quatities.

1. Work Slip for Rs. 69.49 Lakhs 2. Type of towers at few location for maintaining necessary clearnaces in Davanagere to Harapanahalli: Davangere city limits. Construction of new 66kV SC Tumaku 737.11 & 3. 2 No's 220KV Narraw 10 BB1039 Davanagere L 955.31 0.00 955.31 130.00 793.53 50.00 line on DC towers for a distance ru 28.03.11 based tower provided for of 45.40 kms. Railwat track crossing and 1 No for heightening the existing 220KV line. 4. 1. No of 220/66KV Multi circuit tower provided at 220KV line crossing.

Tallak: Construction of Balance 220kV DC line from LILO Point of Tumaku 7359.37 & 11 BC1017 220kV Hiriyur-Chitradurga to Chitradurga L 5082.28 1312.24 6394.52 50.00 5718.56 10.00 ru 21.04.08 400/220kV PGCIL Hiriyur station for a distance of 20.90 kms Pandarahalli - Holalkere: Construction of 66kV DC line in Tumaku 512.08 & 12 BC1025 the existing corridor of 66kV S/C Chitradurga L 646.00 0.00 646.00 10.00 444.91 10.00 ru 10.08.06 line with TBs for a distance of 25.34 Kms. Tumaku 12 Total of Lines 39930.52 7988.91 47919.43 10725.09 35758.02 8166.00 ru Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Providing 12.1kV 2.9MVAR Capacitor Banks and Other allied equipments to 57 Nos of Tumaku 1430.00 & 1 BA1109 Tumakuru T 1000.00 600.00 1600.00 300.00 605.22 541.00 existing KPTCL Sub-station in ru 23.09.14 the jurisdiction of Tumakuru Transmission Zone

Renovation and Up gradation of Protection systems of 220kV Tumaku 1283.10 & 2 BA1115 substations(11 Nos) & 400kV Tumakuru T 1505.46 0.00 1505.46 700.00 700.55 406.00 ru 20.06.14 Sub-stations(1 No) in Tumakuru Transmission Zone

Tumaku 2 Total of TB's & Others 2505.46 600.00 3105.46 1000.00 1305.77 947.00 ru Tumaku 29 Total of Tumakuru Zone 63714.35 11951.36 75257.08 43589.43 68993.42 33479.00 ru HASSANA TRANSMISSION Hassana ZONE Arkalgud line280.53

Kadavina Kote: Stn R.N.Pura line Establishing 2x100MVA, 5026.21 & Total :58.19 220/66kV Station with 220kV 23.9.08 1 CA1027 line from Shimoga - Mysuru line Hassana Hassana S 220kV Line 6137.07 168.76 6305.83 1.00 6201.81 100.00 Total:338.72 with associated 66kV lines. 796.98 220kV 16.355 Kms 66kV Line Balance portion of work 66kV 36.39 Kms. 1428.32 estimates are revised as per GST and due to shortage of materials Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Rtn: S:42.82 E:0.26 C:7.35 Subtotal:50.43 LD: S:14.71 Shettihalli: E:5.05 Establishing 1x8MVA, 66/11kV 465.60 & 2 CA1036 Hassana Hassana S 280.72 135.79 416.51 10.00 278.60 50.00 C:11.30 Sub-Station with associated line 17.12.09 Subtotal:31.06 for a distance of 2.34 Kms. Balance Work: S:56.07 E:1.35 C:57.79 Subtotal:135.15 Final :200

Rtn: S:106.12 E:2.48 C:30.01 Subtotal:138.61 LD: Hettur: S:18.32 Establishing 1x8MVA, 66/11kV E:1.42 Sub-Station at Hettur in c:12.35 Subtotal:32.09 S.K.Pura tq & Hassana Dist with 642.98 & 3 CA1055 Hassana Hassana S 738.78 156.77 895.55 335.82 614.83 400.00 Tree cut 01.10.14 constrn of 66kV SC tap line on compensation:75.58 DC towers from 66kV Horticulture:17.00 Arakalgudu-Yeslur line for a dist Coffee board:15.00 of 12.67kms cropcomp: 9.00 subtotal:91.0 Balance work bills: S:42.00 E:35.27 C:35.45 SubTotal:112.72 Total:400.00 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Contract agreement terminated with the agency, revised estimate Jeppu: amounting Rs. 10.94 Establishing 1x20MVA, crores submitted for the 110/33kV & 2x10MVA, Dakshina 1518.53 & balance portion of the 4 CB1012 Hassana S 901.68 436.15 1337.83 5.00 1007.15 10.00 110/11kV Sub-Station with LILO Kannada 20.12.06 work to CEE, TZ, of Kulashekara - Konaje line for Hassan. Tender to be invited. Additional a distance of 10.00 Kms. budget will be sought after awarding the balance portion of the work

Construction of 110kV TB will be taken up after dismantling of Karaya: 33kV TB which is Establishing 2x10MVA, Dakshina 1761.26 & assigned to M/s Kadevi 5 CB1013 110/11kV Sub-Station with SC Hassana S 1097.16 476.89 1574.05 10.00 1401.82 25.00 Kannada 20.12.06 Engineering. line from VIT College for a Civil Rtn: 6.5 L distance of 15.00 Kms. TB Rtn. : 10 L Errectn : 1.5 L TB Civil: 6L

Contract agreement Mulky: terminated with the Up-grading 2x5MVA, 33/11kV agency, revised estimate MUSS to 1x10MVA, 110/11kV Dakshina 937.43 & 6 CB1015 Hassana S 598.00 143.76 741.76 1.00 408.14 50.00 received for the balance Sub-Station with SC line from Kannada 11.12.06 portion amounting Rs. Nandikur for a distance of 11.00 5.81 crores , Tender Kms. invited. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Line: Tree cut compn: 700 Lakhs Errection: 13.55 L Civil: 14.89 L Total: 728.44 L Madavu: Establishing 2x20MVA, 110/33- Station: Tender 11kV & 1x10MVA, 110/11kV Dakshina 2414.24 & 7 CB1017 Hassana S 778.91 219.52 998.43 618.46 1229.01 1000.00 invited. proposal is 23.09.09 Sub-Station with 110kV line Kannada placed before CPC (Rs. from Puttur 220kV Station for a 1438 L) distance of 27.00 Kms.

Mangalore SEZ: Establishing 2x100MVA, Retention: 120 L , 220/110kV and 2x20MVA, Erection: 25 L Dakshina 4375.96 & 8 CB1024 110/11kV Station at MSEZ near Hassana S 3726.98 128.64 3855.62 200.00 3720.98 100.00 Civil : 50 L Kannada 21.10.10 Bajpe in Mangalore taluk along Line supply: 250L with associated lines for a Workslip & FQV-80L distance of 6.854Kms Total: 525 L

Karkala: For 18-19: Up-gradation of 2x5MVA, Supply -177 L 33/11kV Sub-station to Erection --27.5 L Civil -- 220.6 L 2x10MVA, 110/11kV Sub- Total: --425 L station at Karkala and 9 CC1016 Hassana Udupi S 1127.95 & 921.80 115.50 1037.30 800.00 630.46 425.00 Construction of 110kV LILO line 18.02.15 1X10MVA Tr.r to be from existing 110kV Khemar- supplied dept.ly Hiriyadka SC line to the Budget will be sought proposed 110/11kV Karkala Sub- after allotment station for a distance of 1.10Kms diversion of Tr.r Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Konandur: Establishing 1x10MVA, Tender invited for line 875.98 & 10 CD1022 110/11kV Sub-Station with Hassana Shimoga S 631.22 396.26 1027.48 1.00 864.55 350.00 portion of work. (Est. 29.08.08 associated 110kV V3 line for a cost- Rs.531Lakhs) distance of 11.83 Kms.

Chikkamagalur: Part A Establishing 2 x 100MVA, 220/66KV Substation & 1 x 12.5 MVA 66/11 KV Sub Station at Chikkamagalur and Construction of 220KV DC line for a length of 28.55 Kms from 220KV Shimoga-Mysuru DC line to the proposed 220/66KV S/S at Chikkamagalur on PTK Basis Part B Construction of 66KV Evacuation Chikkamagal 5935.32 & 11 CE1009 lines from the proposed 220KV Hassana S 3974.94 1311.80 5286.74 5.00 4437.65 10.00 Balance portion of uru 29.11.06 Station at Chikkamagalur 7.8Kms line work 1) Chikkamagalur to Hassana DC estimate cost- line: 0.6 Kms Rs.132.47 Lakhs 2) Chikkamagalur MC line : 0.74Kms 3) 66KV DC line from proposed 66KV MC line to Balehonnur (Mattavara Limits): 7.8 Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Rudrapatna: Establishing 1 X 8 MVA ,66/11 KV S/S at Rudrapatna in Arkalgud Tq, Hassana Dist with construction of 66kV SC line on 467.64 & 12 CA1063 Hassana Hassana S 1.00 0.00 300.00 Work under progress. DC towers for a route length of 31.10.07 4.8Kms to tap the existing 66kV Ramanathapura-Kushalanagar SC line to the proposed 66/11kV Rudrapatna S/S.

Santhekadur: Establishing 1x8MVA, 66/11kV Sub-Station at Santhekadur in Shivamogga Tq & Dist with construction of 66kV SC line on 395.99 & 13 CD1039 Hassana Shimoga S 422.08 0.00 422.08 20.00 0.00 300.00 LOI issued DC towers from the existing 22.06.16 66kV Bhadra-MRS Shivamogga line to the proposed S/S at Santhekadur for a dist of 0.095Kms.

Kortigere: Establishing 1x10MVA, 110/11kV Sub-Station at Koratigere in Shikaripura Tq , Shivamogga Dist with 692.42 & 14 CD1060 construction of 110kV SC line on Hassana Shimoga S 683.76 0.00 683.76 75.00 0.00 300.00 22.06.16 Work under progress. DC Towers from 110kV Balligavi (Shiralkoppa)- Bharangi line near Bilki Village limits to the proposed S/S at Koratigere for a dist of 7.139Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Mcgann Hospital; Establishing 1x10MVA,110/11KV S/S at McGann Hospital premises in Shivamogga Dist with running of 110kV , 240Sqmm XLPE Copper 1655.35 & 15 CD1062 U.G.Cable single circuit with one Hassana Shivamogga S 20.00 0.00 1000.00 09.03.17 Work under progress. spare cable (4Runs) for a dist of 2.123Kms from 110/11kV Alkola S/S to the proposed 110/11kV S/S MC Gann Hospital with construction of 1No of TN at Alkola S/S .

Yemmedoddi: Establishing 2x10MVA, 110/11kV Sub-Station at Yemmedoddi in Kadur Tq, Chikkamagalur Dist with Chikka- 1016.17 & 16 CE1016 construction of 110kV SC tap Hassana S 1104.30 0.00 1104.30 70.00 0.00 600.00 Work under progress. magalur 02.05.16 line on DC towers from existing 110kV Kadur-Nagenahalli SC line to the proposed 110/11kV Yemmedoddi S/S for a dist of 8.731Kms

16 Total of Sub-stations Hassana 21997.40 3689.84 25687.24 2173.28 20795.00 5020.00

Belur: Replacement of 1 X 6.3 MVA , 66/11 KV power Transformer by 257.63 & 1 CA1062 Hassana Hassana A 10.00 0.00 257.63 To be re-tendered 1 X 12.5MVA, 66/11kV Power 05.05.15 Transformer @ 66/11kV Belur S/s. Supply Rtn: 16.22L Netlamadnur 220kV R/S: E : 0.8 L Additional existing 1x10MVA, Civil:-7.28 L 110/11kVPower Transformer by Dakshina 274 & Retention amount to 2 CB1045 1x20MVA, 110/11kV Power Hassana A 103.98 60.58 164.56 155.00 131.22 30.00 Kannada 18.11.15 M/s MEI- Rs, 2.5 L Transformer at existing 220/110/33/11kV Netlamudnur S/S Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Supply & Erection Rs.52.00 Lakhs Integration cost(Appx.) Balligavi: 284.42 & Rs.20.00Lakhs 3 CD1057 Providing additional 1x10MVA, Hassana Shimoga A 126.89 50.94 177.83 100.00 133.94 80.00 18.07.14 Civil bills Rs.8.00 Lakhs 110/11kV Transformer Total Rs.80.00 Lakhs.

Retention Rs. Kadur: 8.29Lakhs Providing X10MVA, 110/11kV Chikkamagal 236.14 & 4 CE1039 Hassana A 88.95 25.63 114.58 50.00 111.14 150.00 Civil bills Rs.3.00 Lakhs Spare Power Transformer at uru 12.06.15 Transformer cost of 220kV Kadur Station. Rs.135.00 Lakhs. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others For 18-19 Vittla: switchgear: 76 L Replacing 1x10MVA,110/11kV & Contr. Bill: 68 L 1x10MVA, 110/12.1kV Power Dakshina 489.27 & 5 CB1049 Hassana A 136.80 345.19 481.99 200.00 34.48 144.00 Total : 144 L Transformer by 2x20MVA, Kannada 17.07.15 Additional budget will 110/11kV Power Transformer at be sought after Vittla S/s. allotment of Tr.rs

5 Total of Augmentations Hassana 456.62 482.34 938.96 515.00 410.78 661.63

Hassana: Rtn: a) Re-orientation of 220kV & S:111.48 66kV lines from Hassana 220kV E:1.99 Station. C:11.07 b) Shifting of 220kV B-4 LILO Subtotal:124.54 line passing through Airport 2092.57 & LD; 1 CA1031 Hassana Hassana L 1569.93 280.25 1850.18 20.00 1176.34 100.00 Land near Bhoovanahalli Cross. 11.7.07 S:25.72 c) Providing 2Nos of 66kV TB's E:10.17 for C R Patna 66kV DC line at C:3.61 220kV/66KV R/S Hassana for a Sub total;39.5 distance of 66kV 7.8/220kV Balance Work cost:.56.8 17.68Kms Total:220.84 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Shanthigrama: Construction of 220kV 2266.14 & 2 CA1032 Hassana Hassana L 1050.11 72.00 1122.11 1.00 767.23 10.00 Estiamte cost:296.17: evacuation lines for a distance of 16.08.08 7.14 & 7.76 Kms

Bills on hand : S:3.03 E:0.67 Shravanabelagola: Bill to receive: Providing metering and 21.47 & S:0.55 3 CA1054 protection to 66kV Yachenahalli- Hassana Hassana L 30.07.14 22.70 22.70 20.00 13.44 9.22 E:0.05 Shravanabelagola at 66/11kV C:0.05 sub station at Shravanabelagola Rtn:3.03 LD:1.84 Total:9.22

Kavoor - Kulashekar : Contract agreement Construction of 110kV DC line terminated with the Dakshina 1099.36 & 4 CB1007 from Kavoor to Kulashekara in Hassana L 906.92 10.50 917.42 10.00 475.48 10.00 agency, revised estimate Kannada 14.10.08 the existing 33kV line corridor to be submitted for the for a distance of 8.50 Kms balance portion, Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Puttur: Construction of 110-110kV MC For 18-19 and 110kV DC lines from loc TB Errection Rtn: 4.87 no.28 (Kabaka Railway Crossing L Dakshina 562.43 & 5 CB1018 limits) to the 110/33/11kV Hassana L 431.30 8.17 439.47 75.00 199.46 80.00 Line: 2.46 L Kannada 17.12.09 Puttur S/S for a dist of 4.5Kms Line Rtn: 66.76 L & Construction of 2nos of 110kV Civil : 6 L TBs at 110/33/11kV Puttur S/S Total : 80.09 L for a distance of 4.5 Kms

Exp for the year 18-19 1. Retention - 83 L 2. Erection - 7 L Total: 90 L

Kavoor-Baikampady: Strengthening of 110kV-Kavoor- Dakshina 517.94 & 6 CB1020 Baikampady line converting SC Hassana L 345.65 12.43 358.08 50.00 171.80 10.00 Kannada 28.01.10 line by DC line with TB at Kavoor for a distance of 3.885 Kms

Chikamagalur-Balehonur: Construction of 66kV DC line with coyote ACSR in the existing Chikkamagal 517.94 & Proposal is placed 7 CE1013 Hassana L 945.96 0.00 945.96 1.00 273.88 750.00 corridor of 66kV SC line from uru 06.07.04 before CPC chikkamagalur to Balehonnur (43.74 Kms) Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Brahmavara-Nittur: For 18-19 Stringing 2nd circuit in the S 70.6 L existing 110kV Brahmavara- 173.11 & 8 CC1029 Hassana Udupi L 157.32 12.32 169.64 70.00 15.80 90.00 E: 13.7 L Nittur line and creating 110kV 05.05.15 C: 8.5 L TB at Brahmavara & Nittur Sub- Total : 92.8 L Stations. MRS to Lingadahalli: Construction of new 66kV SC line on DC towers for a distance of 46.039Kms in the existing 823.01 & 9 CD1058 corridor of 66kV DVG-2 SC line Hassana Shimoga L 10.00 0.00 500.00 Work under progress. 11.09.15 From MRS Shivamogga to Lingadahalli (Channagiri Taluk) in Shivamogga & Davanagere Districts.

110/11KV MUSS Thirthahalli LILO: 1) Construction of 110kV, 0.523KM LILO Line tapping from 110kV SK line to the existing 155.43 & 10 CD1059 110/11kV Thirthahalli Sub- Hassana Shimoga L 10.00 0.00 150.00 Work under progress. 19.12.15 station in Thirthahalli Taluk, Shivamogga District. 2) Construction of 110kV line Terminal bay at 110/11kV Thirthahalli S/s.

10 Total of Lines Hassana 5429.89 395.67 5825.56 267.00 3093.43 1709.22

Renovation and upgradation of protection system of 220kV 1257.03 & 1 CA1059 Sub-stations (10Nos) & 400kV Hassana Hassana T 1449.82 1449.82 1100.00 539.59 900.00 20.06.14 Sub- Station (1No) in Hassana Transmission Zone Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Kundapura: Construction of 2 Supply Rtn: 27.76 L Nos. TBs for feeding 110kV 238.32 & E Rtn. : 7.67 L 2 CC1012 Navunda Sub-Station (R & M Hassana Udupi T 212.94 16.91 229.85 150.00 164.07 80.00 25.01.11 Civil : 44.28 L works of Kundapura Sub- Total:79.71 L Station)

2 Total of TB's & Others Hassana 1662.76 16.91 1679.67 1250.00 703.66 980.00

33 Total of Hassana Zone Hassana 29546.67 4584.76 34131.43 4205.28 25002.87 8370.85

MYSURU TRANSMISSION ZONE Mysuru 0.00

Kanagalu 410.20 & 1 DA1106 Establishing 1x8MVA, 66/11kV Mysuru Mysuru S 476.57 31.27 507.84 400.00 367.94 140.00 Work under progress 17.03.16 Sub-Station with associated line Kittur : Establishing 1 x 8 MVA,66/11 398.43 & 2 DA1107 Mysuru Mysuru S 422.61 39.88 462.49 300.00 217.54 240.00 Work under progress KV sub-station with associated 28.12.15 lines Bannikuppe Establishing 1x8MVA, 66/11kV 628.76 & 3 DA1115 Mysuru Mysuru S 563.00 100.00 663.00 10.00 0.00 300.00 LOI Isuued Sub-Station with associated line 11.05.17 for a distance of 3.575Kms Chandravadi (Nallitalapura):Establishing 523.98 & 4 DA1117 1x8MVA, 66/11kV Sub-Station Mysuru Mysuru S 504.00 100.00 604.00 10.00 0.00 300.00 LOI Isuued 06.03.17 with associated line for a distance of 1.290Kms Maliyur: Establishing 1x8MVA, 66/11kV 651.24 & 5 DA1119 Mysuru Mysuru S 605.71 64.50 670.21 250.00 173.03 400.00 Sub-Station with associated line 06.03.17 for a distance of 2.809Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Chandalli (Madapura) Village: Establishing 1x8MVA, 66/11kV 716.11 & 6 DA1120 Mysuru Mysuru S 627.00 160.00 787.90 100.00 0.00 400.00 Sub-Station with associated line 10.04.17 for a distance of 5.668Kms

Madavadi (Parinamipura) : Establishing 1x8MVA, 66/11kV 570.79 & 11KV PCVCB to be 7 DA1121 Mysuru Mysuru S 527.00 45.00 572.00 300.00 284.66 300.00 Sub-Station with associated line 06.03.17 supplied by KPTCL for a distance of 1.153Kms

Hemmargala: Establishing 1x8MVA, 66/11kV 645.90 & 11KV PCVCB to be 8 DA1123 Mysuru Mysuru S 588.70 65.00 653.70 350.00 231.15 400.00 Substation with associated line 20.03.17 supplied by KPTCL for a distance of 3.905Kms

Tumbekere: Establishing 1x8MVA, 66/11kV 504.98 & LOI issued on 9 DB1047 Mysuru Mandya S 638.96 140.00 778.96 10.00 0.00 400.00 Sub-Station with associated line 24.01.12 12.03.2018 for a distance of 6.596 Kms.

220kV Shivanasamudra: Establishing 2x100MVA, 9252.27 & LOI issued on 10 DB1089 Mysuru Mandya S 9653.72 520.00 10173.72 10.00 0.00 5000.00 220/66kV Station with 03.06.17 15.03.2018 assosiated lines

Vadakepura Limits: Establishing 1x8MVA, 66/11kV 520.20 & LOI issued on 11 DB1098 Mysuru Mandya S 1.00 0.00 300.00 Sub-Station with associated line 11.05.17 20.03.2018 for a distance of 0.356Kms

Devalapura Handpost (Kasalagere) 849.21 & LOI issued on 12 DB1101 Establishing 1 x 8MVA, 66/11 Mysuru Mandya S 1.00 0.00 400.00 11.05.17 14.03.2018 KV Sub-Station with associated line for a distance of 7.65Kms

66kv Badanakuppe Industrial area : Establishing 2 X 31.5 MVA, 66/11kV Station with Chamarajana 3408.19 & 13 DD1041 Mysuru S 3069.48 302.00 3371.48 500.00 0.00 2500.00 Work under progress MCMV with 220kv at top x arm gar 11.01.17 provision & 66kv at bottom assosiated d/c lines Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Bargi: Chamarajana 783.36 & 14 DD1043 Establishing 1x8MVA, 66/11kV Mysuru S 654.68 125.00 779.68 300.00 192.16 500.00 Work under progress gar 10.08.16 Sub-Station with associated line.

Kothanoor: Chamarajana 833.18 & 15 DD1044 Establishing 1x8MVA, 66/11kV Mysuru S 853.49 119.00 972.49 200.00 0.00 500.00 Work under progress gar 10.01.17 Sub-Station with associated line.

Jannur: Establishing 1x8MVA, 66/11kV Chamarajana 700.9 & 16 DD1046 Mysuru S 1.00 0.00 400.00 Sub-Station with associated line gar 23.10.17 for a distance of 8.63Kms

Agara mamballi : Establishing 1 x 8 MVA,66/11 KV sub-station Chamarajana 690.70 & 17 DD1049 Mysuru S 10.00 0.00 400.00 Work under progress with associated line for a gar 12.06.17 distance of 3.047Kms

17 Total of Sub-stations Mysuru 19184.92 1811.65 20997.47 2753.00 1466.48 12880.00

Awaiting for 2 Nos. of Suttur : 11kV Breakers and Replacing 2x8MVA, 66/11kV by 279.99 & 1 DA1076 Mysuru Mysuru A 13.72 231.00 244.72 105.00 89.69 130.00 1x12.5 MVA Power 2x12.5MVA, 66/11kV 23.12.13 Transformer which is to Transformers be supplied by KPTCL .

Ravandur : Provding Additional 1X8 233.05 & Awating for 11KV 2 DA1102 Mysuru Mysuru A 84.18 146.48 230.66 205.00 127.89 76.00 MVA,and replacing 1x8MVA by 22.06.15 Switchgeras 12.5MVA 66/11kV Transformer. Bylukuppe: Providing Additional 1X8 232.28 & Awating for 11KV 3 DA1103 MVA,and replacing 1x8MVA by Mysuru Mysuru A 85.79 146.48 232.27 205.00 127.83 77.00 29.06.15 Switchgeras 1x12.5MVA 66/11kV Transformer.

Tubinakere 220kV R/S: 131.00 & Awaiting for 4 DB1039 Providing Spare 1x12.5MVA, Mysuru Mandya A 50.00 80.00 130.00 30.00 38.23 115.00 25.10.10 Transformer 66/11kV Transformer Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Huygonahalli 220kV: Providing additional 1x12.5 MVA, 296.98 & Awaiting for 5 DB1070 Mysuru Mandya A 135.56 182.44 318.00 25.00 91.77 241.00 66/11kV at 220/66/11kV 19.02.14 Transformer Transformer BG Pura: Power Transformer and Replacing 1x8MVA, 66/11kV by 146.24 & 6 DB1077 Mysuru Mandya A 22.40 116.37 138.77 50.00 0.00 140.00 switchgears to be 1x12.5MVA, 66/11kV 08.11.13 supplied by KPTCL Transformer Koppa: Awaiting for 2nd Replacing 2x8MVA, 66/11kV by 298.36 & 7 DB1083 Mysuru Mandya A 62.00 248.00 310.00 129.00 94.23 220.00 Transformer and 11KV 2x12.5MVA, 66/11kV 21.11.13 Switchgears Transformers Terakanambi: Replacing 2X8MVA, 66/11kV by Chamarajana 226.51 & 8 DD1031 Mysuru A 12.22 239.78 252.00 227.00 184.05 25.00 Awating for11kV SWG 2x12.5MVA, 66/11kV gara 27.12.12 Transformers P.G.Palya : Chamarajana 186.91 & 9 DD1037 Providing Additional 1X8 MVA, Mysuru A 75.45 45.00 120.45 100.00 28.50 67.00 Awating for11kV SWG gara 03.11.14 66/11kV Transformer Megalapura : Replacing 1x8MVA, 66/11kV by 156.76 & 10 DA1089 Mysuru Mysuru A 19.67 140.00 159.67 1.00 0.00 125.00 1x12.5MVA, 66/11kV 12.05.14 Transformer Santhesargur: Replacing 2x6.3MVA, 66/11kV 270.57 & 11 DA1093 Mysuru Mysuru A 20.96 300.00 320.96 1.00 0.00 160.00 by 2x12.5MVA, 66/11kV 12.11.14 Transformers H.D.Kote: 348.82 & Awaiting for 2nd Replacing 2x12.5MVA, 66/11kV 12 DA1095 Mysuru Mysuru A 19.11.14 33.22 318.22 351.44 210.00 140.02 211.00 Transformer and 11KV by 2x20MVA, 66/11kV Switchgears Transformers

Hunsur: 390.20 & Awaiting for 11kV Replacing 2x12.5MVA, 66/11kV 13 DA1096 Mysuru Mysuru A 20.11.14 38.60 330.72 369.32 310.00 301.92 60.00 Switchgear to be by 2x20MVA, 66/11kV supplied by KPTCL. Transformers

R.K Nagar : Replacement of 2 nd 12.5 MVA Awaiting for 11kV 198.75 & 14 DA1098 NGEF Power Transformer by 20 Mysuru Mysuru A 35.33 161.18 196.51 155.00 142.09 40.00 Switchgear to be 16.03.15 MVA, 66/11kV Power supplied by KPTCL. Transformer Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Hampapura : Providing Additional 1x12.5MVA 66/11kV Transformer and 227.39 & Awaiting for 11KV 15 DA1108 Mysuru Mysuru A 90.96 243.34 334.30 150.00 89.52 150.00 Replacement of 1 X 8 MVA by 1 25.08.15 Switchgears X 12.5 MVA, 66/11kV with additional SWG

Hanagodu : Replacement of 1 X 8 MVA by 1 152.75 & Awaiting for 16 DA1109 Mysuru Mysuru A 20.35 121.57 141.92 20.00 3.24 130.00 X 12.5 MVA 66/11kV 05.10.15 Transformer Transformer.

Kolkaranadoddi: Providing Additional 1X8 288.31 & 17 DB1080 Mysuru Mandya A 62.00 270.00 332.00 150.00 81.84 251.00 Work under progress MVA,and replacement 8MVA by 05.05.15 12.5MVA 66/11kV Transformer.

Jakkanhalli: Power Transformer and Replacing 1x6.3MVA, by 176.36 & 18 DB1085 Mysuru Mandya A 46.19 132.89 179.08 50.00 0.00 180.00 switchgears to be 1x12.5MVA, 66/11kV 24.07.14 supplied by KPTCL Transformer

Basaralu : Power Transformer and Replacement of 1 X 6.3 MVA by 203.87 & 19 DB1092 Mysuru Mandya A 59.16 132.47 191.63 50.00 0.00 192.00 switchgears to be 1 X 12.5 MVA 66/11kV 16.10.15 supplied by KPTCL Transformer.

Yethambadi : Power Transformer and Providing additional 1 X 12.5 235.30 & 20 DB1096 Mysuru Mandya A 94.36 160.46 254.82 50.00 0.00 255.00 switchgears to be MVA, 66/11 KV Power 19.12.15 supplied by KPTCL Transformer. Kushalanagara : 136.76 & Awating for 66/33KV 21 DC1010 1 X 8 by 1 X 12.5 MVA, Mysuru Kodagu A 13.66 113.07 126.73 10.00 0.00 127.00 15.08.15 12.5MVA Trs. 66/33/11 KV Begur MUSS: Replacing 1x6.3MVA, 66/11kV Chamarajana 168.61 & 22 DD1038 Mysuru A 60.69 117.83 178.52 100.00 0.00 180.00 Work under progress by 1x12.5MVA, 66/11kV gara 18.02.15 Transformer Hardanahally (Devalapura): Revised price schedule 186.58 & 23 DB1086 Provding Additional 1 X 8 MVA, Mysuru Mandya A 90.00 35.00 125.00 100.00 56.16 100.00 is to be issued as per 28.06.14 66/11kV Transformer GST. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

23 Total of Augmentations Mysuru 1226.47 4012.30 5238.77 2433.00 1596.98 3252.00

Kadakola - Vajamangala: Construction of 220kV D/C line 1217.40 & Work to be tendered for 1 DA1028 from Kadakola to Vajamangala Mysuru Mysuru L 964.67 88.00 1052.67 25.00 443.55 10.00 24.08.09 balance work with TB's for a distance of 19.64Kms Virajpet - Madekeri: Short closure of this Construction of 66kV SC Link work is approved in line on DC towers between 66kV 687.13 & 2 DC1005 Mysuru Kodagu L 655.71 186.66 842.37 320.00 262.48 50.00 CPC, tendering is under Virajpet & Madekeri Sub- 25.05.10 process for balance Stations for a distance of work. 36.16kms. Sri Rangapatna LILO: LILO Arrangement for the Garudanaukkada - Metagalli 136.5 & 3 DB1055 66kV line for a distance of Mysuru Mandya L 179.19 20.00 199.19 50.00 0.00 200.00 Work under progress 31.10.12 1.322Kms along with TBs at Sri Rangapatna Sub-Station for a distance of 1.322 kms

3 Total of Lines Mysuru 1799.57 294.66 2094.23 395.00 706.03 260.00

Renovation and upgradation of protection system of 220kV 965.39 & WORK UNDER 1 DA1101 Mysuru Mysuru T 828.72 828.72 830.00 507.00 400.00 Sub-stations (8 Nos) ) in Mysuru 10.05.13 PROGRESS Transmission Zone

1 Total of TB's & Others Mysuru 828.72 0.00 828.72 830.00 507.00 400.00

44 Total of Mysuru Zone Mysuru 23039.68 6118.61 29159.19 6411.00 4276.49 16792.00

BAGALKOTE TRANSMISSION Bagalkot 0.00 ZONE e

Doni 400kV (Gadag): Ere-300L Establishing 2x500MVA, Civil-200L, Bagalkot 13249.28 & 1 EC1010 400/220kV Station with Gadag S 17638.35 100.00 17738.35 12900.00 12459.49 2253.00 e 25.03.14 10% associated 440kV & 220kV link retention:1753.00 lines for a distance of 26.798Kms L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Budget For the Year 18-19 Ret- Rs 140.00 Lacs QV- Rs 30.00 Lacs LD- Rs 20.00 Lacs CC- Rs 27.50 Lacs Supply - Rs 69.00 Lacs Erection- Rs 59.56 Lacs Civil- Rs 158.57 Lacs Total- Rs 505.00 Lacs

Morab: Establishing 2x10MVA Bagalkot 949.92 & 2 EE1114 110/11kV Sub-Station with Belagum S 956.21 81.43 1037.64 951.94 646.72 310.00 e 05.05.15 associated line for a distance of 7.526Kms

>As per revised Budget included Garag (Shedabal): in column 17. Establishing 2x10MVA, Bagalkot 920.16 & Dept Supply - 3 EB1030 110/11kV Sub-Station with Dharwad S 952.95 127.67 1080.62 450.00 337.06 600.00 e 05.09.15 associated line for a distance of 121L 4.598Kms Supply-400L Erection-79L Civil-200L. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

>As per revised Belavanaki: Budget included Establishing 1x10MVA, Bagalkot 1071.11 & in column 17. 4 EC1018 110/11kV Sub-Station with Gadag S 1204.66 40.00 1244.66 800.00 339.52 700.00 e 13.08.15 associated line for a distance of Supply-600L 22.27Kms Erection-153L Civil-100L

Budget Under Utilization for the Year 17-18 LOI issued in the Month of Jan-18 , DWA in March- Islampur: Establishing 2x10MVA, 2018 Bagalkot 811.67 & 5 EE1048 110/11kV Sub-Station with Belagum S 935.19 63.62 998.81 100.00 22.27 600.00 e 01.06.15 associated line for a distance of Budget for the Year 7.875Kms 18-19 Supply +Erection +Civil- Rs 920.00 Lacs SWG- Rs 42.00 Lacs QV- RS 25.00 Lacs Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

For theYear 17-18 Supply Cost - Rs 92 Lacs Additional Budget of Rs 92.00 Lacs requested vide T.O Ltr Kakamari: No-3804 dtd Establishing 2x10MVA, Bagalkot 861.42 & 6 EE1065 Belagum S 880.03 42.00 922.03 93.94 25.38 600.00 110/11kV Sub-Station with e 16.08.16 02.02.2018 associated line & TB. For the Year 18-19 Supply+ Erection+ Civil- Rs 788 .00 Lacs SWG- Rs 42.00 Lacs QV- Rs 10.00 Lacs CC- Rs 10.00 Lacs Total - Rs 850.00 Lacs

For theYear 18-19 Supply+Erection+Ci Aratagal(Kitadal): vil- Rs 1046.67 Establishing 2x10MVA, Bagalkot 908.81 & Lacs+SWG- Rs 7 EE1066 110/11kV Sub-Station with Belagum S 922.44 80.00 1002.44 1.00 0.00 600.00 e 17.06.15 associated line & TB for a 84.00 Lacs Total= distance of 8.574Kms Rs 1130.67 Say - Rs 1131 Lacs Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Govt Land Land handed to KPTCL by Tahsildhar Ramdurga on 12.07.2016 For the Year 17-18 Token Budget- Rs Koganolli Up-gradiation 33/11kV S/s to 1.00 Lacs Bagalkot 1182.71 & 8 EE1117 2x10MVA, 110/11kV Sub- Belgaum S 1376.54 84.00 1460.54 100.00 52.30 800.00 e 23.09.15 For the Year 18-19 Station with associated line for a Supply+erection distance of 17.192Kms +Civil- Rs 942.00 Lacs CC- Rs 15.00 Lacs SWG-Rs 42.00 Lacs Total- Rs 999.00 Lacs Say Rs -999.00 Lacs

Govt Land Land handed to KPTCL by Tahsildhar Ramdurga on 12.07.2016 For the Year 17-18 G.Hosakoti: Token Budget- Rs Establishing 2x10MVA, Bagalkot 948.89 & 9 EE1121 Belgaum S 1.00 0.00 600.00 110/11kV Sub-Station with e 28.03.17 1.00 Lacs associated line. For the Year 18-19 Token Budget- Rs 600.00 Lacs Since the project is tendered and is under evaulation Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Sup: 189.00 Hebballi: Ere: 62.39 Establishing 1x10MVA, Bagalkot 769.06 & Civil: 75.00 10 EF1063 110/11kV Sub-Station with Bagalkote S 914.21 40.00 954.21 628.00 584.34 370.00 e 02.01.15 associated line for a distance of CC+Others: 14.18Kms. 43.39 Total: 369.78

Inchageri: Establishing 1x10MVA, 958.08 & Bagalkot 11 EG1029 110/11kV Sub-Station with Bijapur S 05.11.15 0.00 300.00 0.00 600.00 e associated line & TB for a distance of 19.759 Kms Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Sup: 700.00 Talikote: Up-gradiation of existing Civil: 352.00 33/11kV S/s to 2x10MVA, Bagalkot 1140.34 & Ere: 102.81 12 EG1049 Bijapur S 1323.29 80.00 1403.29 300.00 214.28 800.00 110/11kV Sub-Station with e 18.08.15 CC+Others: associated line for a distance of 33.60 17.557Kms Total: 1188.41

Sup: 462.00

Rodagi (Khedagi cross) : Civil: 195.83 Establishing 1x10MVA, Ere: 45.33 Bagalkot 758.09. & 13 EG1051 110/11kV Sub-Station with Bijapur S 863.25 40.00 903.25 300.00 148.73 600.00 e 05.10.15 Ret: 36.20 associated line for a distance of CC+Others: 10.969 14.93 Total: 754.29

Bagalkot 13 Total of Sub-stations 27967.12 778.72 28745.84 16925.88 14830.09 9433.00 e

Ambevadi: >As per revised Budget included in column 17. SEE tech Replacing 2x55MVA, 220/110kV Bagalkot 1682.70 & KPTCL has inspected the work 1 ED1007 North Canara A 722.32 744.04 1466.36 1.00 847.64 1.00 by 2x100MVA, 220/110kV e 17.02.11 site for proposed 220kV GIS . Additional budget will be sought Transformer with R&M works. after awarding of balance works. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Reason for Under Utilization of Budget for the Year 17-18 Due to non supply of Dept1X10 MVA 110 /11 KV Trf departmentally For the Year 18-19 Soundatti: Supply- Rs 6.21 Lacs-Erection - Rs Providing spare 1x10MVA, Bagalkot 188.48 & 4.50 Lacs 2 EE1111 Belagum A 64.42 20.99 85.41 63.00 53.43 32.00 110/11KV Transformer at e 26.08.14 Civil- Rs 2.50 Lacs, , MEI LD- Rs 2.09 Lacs 110KV S/S Soundatti Ret-Rs 13.62 Lacs, QV - Rs 3.00 Lacs Total- Rs 31.92 Lacs, Say Rs 32.00 Lacs

Ret: 15.01 Moratagi: QV: 20.00 Bagalkot 237.24 & 3 EG1046 Providing additional 1x10MVA, Bijapur A 88.37 148.87 237.24 150.00 48.79 252.00 e 25.03.14 Suo: 150.00 110/11kV Transformer Others: 66.00 Total: 251.01 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Haveri: Trans cost - 184L Bagalkot 207.93 & 4 EA1019 Providing spare 1x20MVA, Haveri A 61.26 217.74 279.00 79.00 38.81 196.00 e 01.08.14 Erection- 6L 110/33-11kV Transformer 10% retention:6L

>Total cost of project 406.10L including cost of trf & QV. > Budget required for 2018-19 = 259.83 L Karwar(Shejwad): Bagalkot Uttar 320.05 & > 20MVA trf to 5 ED1021 Providing additional 1x20MVA, A 225.35 200.00 425.35 391.00 146.30 260.00 e Kannada 21.08.14 110/33-11kV Transformer supplied deartmentally Break Up Trn cost-180L. Sup 68.48L Civil 8.65L Ere 2.7L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others > Total cost of project = 396.47L > Prob Expendicture by the end of March- 18 = 194.03L > Budget requried Haliyal: for 2018-19 = Replacement of 1X10 MVA, 202.44L Bagalkot Uttar 330.2 & 6 ED1022 110/11kV by 1X20MVA, A 99.42 240.00 339.42 330.00 201.47 195.00 > 11kV ( e Kannada 13.08.15 110/11kV Power Transformer at 2IC+2BC+8F+2CB 110kV S/s Haliyal + 1A +1ADPC) MCVCB swg to be supplied departmentally > If swgs are supplied 36L+cost of swg i.e 102 may be spend by end

>Total cost of project = 335.11L > Budget requried for 2018-19 = 148.32L Sirsi: Break Up Replacement of 1x10MVA by Uttar 284.66 & 7 ED1023 Bagalkote A 99.99 220.77 320.76 343.78 194.54 149.00 1) Sup = 69.54L 1x20MVA 110/11KV Kannada 10.07.15 Transformer 2) Ere 1.56L 3) Civil = 5.03L 4) QV-5L 5)SWG -50.77L 6)WS-2.75L 7)Trf Ret-13.67L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Budget Under Utilization Due to non suppy of 10 MVA Trf + SWG Budget for the Year 18-19 220KV Kudachi: Supply- Rs 34.39 Bagalkot 243.87 & 8 EE1091 Providing additional 1x10MVA, Belagum A 106.83 35.00 141.83 291.79 104.09 148.00 e 27.08.13 Lacs 110/11kV Transformer Civil- Rs 16.72Lacs Erection - Rs 5.29 Lacs Ret- Rs 26 Lacs SWG - Rs Rs 55.31 Lacs LD- Rs 10.00 Lacs Total - Rs 147.71

Budget Under Utilization Work Awarded , Work to be taken up For theYear 18-19 M.K.Hubli: DWA Cost- Rs Replacement of 1x10MVA, Bagalkot 256.48 & 59.38 Lacs 9 EE1109 110/11kV by 1x20MVA, Belagum A 1.00 0.00 273.00 e 21.08.14 110/11kV transformer at 110 SWG Cost- Rs KV S/S M.K.Hubli 54.00 Lacs New 1X20 MVA trf- Rs 160 Lacs Total- Rs 273.38 Lacs Say Rs 273.00 Lacs Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Budget Under Utilization Work Awarded , Work to be taken up For the Year 18-19 Award Cost- Rs 67.04 Lacs Nehru Nagar: SWG - Rs 54.00 Replacing 2x10MVA, 110/11kV Bagalkot 420.54 & 10 EE1112 Belagum A 200.00 0.00 441.00 by 2x20MVA, 110/11kV e 04.06.14 Lacs Transformers New 2X20 MVA Trf - Rs 320 Lacs Total- Rs 441.04 Lacs Says Rs 441.00 Lacs

Budget Under Utilization Work Awarded , Work to be taken up Kittur: Swapping of 1x20MVA, For theYear 18-19 110/33KV & 1x10MVA, Bagalkot 95.50 & Award Cost- Rs 11 EE1120 Belgaum A 1.00 0.00 114.00 110/11KV Power Transformers e 27.09.14 60.05 Lacs at 110KV Sub-Station Kittur with additional 11KV switch gear SWG Cost- Rs 54.00 Lacs Total- Rs 114.05 Lacs Say Rs 114.00 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

110KV S/S Banahatti: Work will be Replacement of 1x10MVA, Bagalkot 257.56 & 12 EF1052 Bagalkot A 150.00 0.00 258.00 110/11kV by 1x20MVA, e 17.11.15 under progress, if 110/11kV Transformer awarded

New 20 MVA Power Transformer supplied for this Rampur: project Replacement of 1x10MVA, Bagalkot 171.55 & 13 EF1064 Bagalkote A 16.37 200.00 216.37 188.00 142.39 44.00 110/33kV by 1x20MVA, e 21.08.14 LD: 17.00 110/33kV Transformer Ret: 3.13 Civil: 4.47 Ere: 8.00 Others: 10.66 Total: 43.26 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

QV: 5.00 Hirebevanur: Bagalkot 222.40 & Ret: 8.89 14 EG1039 Providing additional 1x10MVA, Bijapur A 88.23 41.07 129.30 125.00 58.31 54.00 e 17.09.14 110/11kV Transformer. Sup: 40.00 Total: 53.89

Sup: 13.00 Lachyan: Civil: 6.00 Replacing 1x10MVA, 110/11kV Bagalkot 245.85 & 15 EG1040 Bijapur A 63.89 241.07 304.96 245.00 206.82 22.00 by 1x20MVA, 110/11kV e 27.10.14 Ere+Others: Transformer. 2.02 Total: 21.02 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Sup: 60.00 Civil: 30.00 110 KV S/S Malaghan: Replacement of 1X10 MVA, Ere: 10.00 110/11 KV by 1X20 MVA, Bagalkot 252.44 & Total: 100.00 16 EG1044 Bijapur A 58.41 247.12 305.53 252.00 165.06 100.00 110/11 KV transformer instead e 13.08.15 Reason for cost of Providing additional 1x10MVA, over run is due to 110/11kV Transformer inclusive of QV amount.

B Bagewadi: Sup: 347.51 1x100MVA Transformer Civil: 173.78 Bagalkot 579.19 & 17 EG1048 220/110KV for arranging the Bijapur A 61.12 0.00 580.00 e 19.01.15 Ere+Others: power supply to the Chimmalagi 57.90 LIS. Total: 579.19 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

110/11kV Devanagaon: Providing additional 1x10MVA, Bagalkot 271.09 & 18 EG1054 110/11kV Transformer at Vijayapura A 1.00 0.00 262.00 e 25.05.17 110/11kV Devanagaon Sub- station

Bagalkot 18 Total of Augmentations 1694.86 2556.67 4251.53 2873.69 2207.65 3381.00 e

a) B.Bagewadi - Bagalkote Work will be (46KM) completed, based b) Mahalingapur - Mudhol- on CPC decision. Vajramati - Katarki (110kV SC Bagalkot 1341.96 & 1 EF1013 Bagalkote L 1957.59 0.00 1957.59 1.00 1112.80 1.00 line 67Km): e 19.05.08 Additional budget Re-conductoring of existing wolf will be sought ACSR by LYNX ACSR conductor after awarding of for a distance of 113.00 Kms. balance works. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Guledgud - Ilkal: Construction of 110kV S.C. link Additional budget line on D/C towers from 110kV Bagalkot 758.25 & will be sought 2 EF1029 Bagalkote L 619.68 619.68 1.00 159.28 1.00 Sub-Station Guledgudda to e 04.12.10 after awarding of 110kV Sub-Station Ilkal for a balance works. distance of 34.575 Kms.

Ret: 199.36 Mahalingpur to Jamkhandi: LD: 5.79 construction of 110 kV DC line Sup: 100.00. from 220 kV Mahalingapur S/S Ere: 65.00 to 110 kV Jamakhandi S/S in Bagalkot 917.86 & 3 EF1050 Bagalkote L 1089.71 1089.71 785.88 629.72 523.00 the existing 110 kV SC line e 19.04.14 CC+Others: corridor along with 110 kV 51.63 Terminal bays at both ends for a Forest proposal: distance of 23.897 kms. 101.00 Total: 522.78 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Slow progress by the firm as adequete batches is not deployed Kudagi to Vajaramatti: & restricted ROW Construction of 220kV DC Line issues. from proposed Kudagi 400kV Bagalkot 5002.81 & 4 EG1047 Bijapur L 5782.67 106.00 5888.67 461.84 2857.82 2500.00 STPP to 220kV Sub-station e 08.01.15 Ret: 1525.97 Vajramatti for a distance of LD: 7.37 79.42Kms Sup: 943.35 Civil: 393.06 Ere: 235.84 Total: 3105.59

>As per revised Budget included Hirekerur - Rattihalli Line: Stringing of 110kV 2nd Circuit in column 17. on existing D/C towers between Bagalkot 200.52 & Sup-66L 5 EA1021 Haveri L 203.82 203.82 210.00 107.75 110.00 Rattihalli and Hirekerur Sub- e 05.11.14 Ere 3.5L Stations for a distance of 12.34 Civil 14.5L Kms CC 10L QV 16L Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

>As per revised Bidnal LILO: Construction of 220kV DC line Budget included for having LILO arrangement of Bagalkot 1331.89 & in column 17. 6 EB1028 Dharwad L 1713.67 1713.67 1175.00 784.77 950.00 220kV Narendra-Haveri first e 20.11.15 Supply:570L circuit to 220kV Station Bidnal Civil:285L for a distance of 15.505Kms Erection:95L.

>As per revised Budget included in column 17. Siddapur LILO: Total cost of Bagalkot Uttar 243.25 & 7 ED1024 Providing LILO arrangement to L 215.29 57.99 273.28 264.88 88.11 202.00 project = 273.54L e Kannada 28.09.15 110kV Sub-Station Siddapur. > BUdget required 2018-19 = 201.41L > 11kV ( Bagalkot 7 Total of Lines 11582.43 163.99 11746.42 2899.60 5740.25 4287.00 e

Providing 12.1kV 2.9MVAR Capacitor Bank and other allied Bagalkot 1612.78 & 1 EF1058 Bagalkote T 1116.65 667.18 1783.83 1027.00 823.42 484.00 equipment’s in KPTCL Sub- e 27.08.14 stations of Bagalkote Zone. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Renovation and up-gradation of protection systems of 220KV Bagalkot 1481.29 & 2 EF1065 Bagalkote T 1818.29 1818.29 1740.00 579.60 1498.00 Sub Stations(22 Nos) in e 20.06.14 Bagalkot Transmission Zone

Bagalkot 2 Total of TB's & Others 2934.94 667.18 3602.12 2767.00 1403.02 1982.00 e Bagalkot 40 Total of Bagalkote Zone 44179.35 4166.56 48345.91 25466.17 24181.01 19083.00 e KALABURAGI TRANSMISSION Kalabur 0.00 ZONE agi

Raichur town: Establishing of 110kV Ring Instructed the EEE MWD RCR to Mains & associated 110kV Sub- Kalabur 1883.00 & take action as per DWA 1 FA1013 Stations viz Malayabad and Raichur S 2297.11 282.00 2579.11 5.00 2543.66 200.00 agi 30.06.06 conditions as the TK agency has Vadavatti with 1x10MVA, not teken up the work till date. 110/11kV Trs for a distance of 37.00 Kms. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Supply: 90Lakhs Yapaladinni: Erection: 10 Lakhs Up-gradation of existing 33kV Civil : 40 Lakhs Kalabur 982.38 & 2 FA1044 MUSS to 2x10MVA, 110/11kV Raichur S 1049.50 63.30 1112.80 722.00 742.51 500.00 Retention : 160 Lakhs agi 05.05.15 Sub-Station with associated line QV Excess: 20 lakhs or a distance of 11.147Kms Crop cut : 10 Lakhs PV Excess: 20 Lakhs

Kudligi: Establishing 2x100MVA, 220/66/11kV & 1x12.5MVA, Now the agency has 66/11kV Station at Kudligi Kalabur 4967.70 & come forward to take up 3 FB1035 Bellary S 4565.69 38.00 4603.69 5.00 2475.67 1000.00 (Badeladaku) along with agi 21.09.11 the work and he started associated lines & TB's for a station work distance of (220kV 32.63Kms & 66kV M/C 5.36Kms) Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Budget required for FY 2018-19 Final 10% retention: 55 Lakhs First 10% retention: 42Lakhs Bachigondanahalli: Supply: 43 Lakhs Establishing 1x8MVA, 66/11kV Kalabur 474.36 & 4 FB1039 Bellary S 549.00 36.00 585 379.00 215.30 205.00 Erection: 15 Lakhs Sub-Station with associated line agi 23.09.14 Civil: 20 Lakhs or a distance of 6.85Kms QV : 20 Lakhs PV: 10 Lakhs TOTAL: 205Lakhs

Budget required for FY 2017-18 Harivi : Final 10% retention: 56 Lakhs Establishing of 66/11kV Sub- Kalabur 467.78 & First 10% retention: 30 Lakhs 5 FB1081 station with installed capacity of Bellary S 561.06 24.33 585.39 161.00 367.15 110.00 agi 05.11.14 PV Excess: 10 Lakhs 1x8MVA 66/11kV Transformer QV : 14 Lakhs or a distance of 6.638Kms TOTAL: 110Lakhs Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Line :Work is yet to be taken up. Total Loc - 72 Nos Stub Concreting -25No's Tower Erection - 12No's Chowdapura: Stringing: 3.30Kms Up-gradation of 33/11kV MUSS completed. to 1x10MVA, 110/11kV and Kalabur 1284.94 & Short closed by Ltr No : 6 FC1048 Kalaburagi S 912.79 36.20 948.99 50.00 513.51 385.48 1x20MVA, 110/33kV Sub- agi 27.05.11 CEE/TZ/GLB/SEE(o)/A Station with associated line for a EE-3/2016-17/6771-79 distance of 20.30 Kms. Dtd : 19.09.2016. For balance work, tendered at Zonal Office and Agenda Submitted to Corporate Office to Place before the PC Meeting.

Probable Expenditure Details Yeradona: (2017-18): Establishing of 1x10MVA, Kalabur 528.71 & 7 FD1015 110/11kV Sub-Station with Koppal S 413.29 36.20 449.49 384.00 176.66 537.37 Supply - 210.87 agi 06.04.11 associated line for a distance of Erection - 008.34 4.964 Kms. Civil - 145.34 Total - 364.55 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Probable Expenditure Details: S/S Supply (55%) - 317.13 S/S Supply (25%) - 200.24 S/S Erection - Thavaragera: Establishing 014.43 1x10MVA, 110/11kV and S/S Civil - 1x20MVA, 110/33kV Sub- Kalabur 1433.55 & 077.80 8 FD1018 Koppal S 1974.90 43.50 2018.40 1407.00 1345.79 766.09 Station with associated 110kV agi 16.05.13 Line Supply (55%) - line for a distance of 26.495 026.23 Kms. Line Supply (25%) - 050.00 LIne Erection - 010.00 Line Civil - 020.00 Total - - 715.83

Probable Expenditure Details: Bennur: S/S Supply - 167.38 Establishing 1x10MVA, Line Supply - 066.43 9 FD1026 110/11kV Sub-station with Kalaburagi Koppal S 802.56 & 895.90 32.00 927.90 757.00 643.56 195.20 Line Civil - 008.56 assciated line for a distance 28.09.15 S/S Civil - 121.14 8.647Kms S/S Erection - 018.17 Line Erection - 026.46 Total - 408.14

Renewal of currency Adavi Amareshwara: upto 05.05.2018 vide Establishing 1x10MVA, Kalabur 10 FA1049 Raichur S 493.50 1.00 0.00 500.00 CEE/TZ/GLB/SEE(O)/ 110/11kV Sub-Station with agi AEE-4/2017-18/1181- associated line 84 08.05.2017 Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Budget Required for 2018-19 S/S Supply 80% - Koppal : 2724.49 Establishing 2x100MVA, Line Supply 55% - 220/110kV and 1x10MVA, 0162.90 110/11kV Station at Koppal Kalabur 3759.87 & S/S Erection - 11 FD1016 Koppal S 2997.91 0.00 2997.91 700.00 778.20 1000.00 (Halavarthi) along with agi 25.06.11 0171.53 associated lines & TB's. S/S Civil - 11.06 (11KM-110KV&0.06KM- 0602.57 220KV) Line Civil - 0061.27 Total:- 3722.76

Ramsamudra: LOI issued to Establishing 220/110kV Sub Kalabur 5831.49 & 12 FF1003 Yadgiri S 1.00 0.00 1000.00 M/s Bajaj Electricals, Station with associated 220kV agi 03.11.17 Ltd. and 110kV lines

Kalabur 12 Total of Sub-stations 16217.15 591.53 16808.68 4572.00 9802.01 6399.14 agi

Alkod: Providing additional 1 x 10 MVA, Kalabur 241.17 & 1 FA1045 Raichur A 0.00 1.00 0.00 150.00 110/11 kV Power Transformer at agi 10.06.15 Alkod S/s Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Maliyabad : Providing additional 1 x 10 MVA, Kalabur 241.97 & 2 FA1046 Raichur A 1.00 0.00 150.00 110/11 kV Power Transformer at agi 10.06.15 Maliyabad S/s

Gurugunta: 243.44 & Providing additional 1 x 10 MVA, Kalabur 3 FA1048 Raichur A 08.01.16 1.00 0.00 150.00 110/11 kV Power Transformer at agi Gurugunta S/s

BislaHalli : Creating 33kV reference by Kalabur 292.46 & 4 FB1050 Bellary A 189.58 189.58 25.00 21.34 164.00 Will be commissioned in the FY 2018-19. Providing 1x20MVA, 110/33kV agi 03.08.13 Transformer.

Siruguppa : Transformer and 110KV Replacing 1x10MVA, 110/11kV Kalabur 197.51 & 5 FB1085 Bellary A 10.78 151.98 162.76 200.00 132.60 50.00 CB to be supplied by by 1x20MVA, 110/11kV agi 12.09.14 KPTCL Transformer Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others

Kampli: Repl of 1X10MVA by 1X20MVA, 210.62 & 6 FB1090 Kalaburagi Ballari A 17.90 17.90 166.00 131.68 50.00 110/11KV Trf at 110/11KV S/S 20.03.17 Kampli

Chincholi: Kalabur 157.75 & 7 FC1037 Providing additional 1x10MVA, Kalaburagi A 68.49 98.16 166.65 30.00 0.00 167.00 agi 01.08.11 110/33kV Transformer

Tender floated from Tr Circle, Munirabad on 04.02.2017 as per the Munirabad : approval of Installing of 1x10MVA, Kalabur CEE/TZ/KLB vide Ltr 8 FD1027 110/11kV Power transformer at Koppal A 149.90 & 27.01 128.07 155.08 15.00 0.00 45.00 agi No.9717-18 220/110/66/33/11kV 23.02.16 Dtd:26/11/2016. Munirabad Power House Station Transformer and 110KV CB to be supplied by KPTCL Kalabur 8 Total of Augmentations 313.76 378.21 691.97 439.00 285.62 926.00 agi Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Work slip-1 with 8.44% savings [ 43.49 Crores] YTPS to 400kV Bellary pooling submitted to station (BPS): CE/TZ/KLB vide Ltr No: Construction of 400kV DC Line Kalabur 39439.25 & MW121/17-18/8324-26 1 FA1036 with Quad Moose Conductor Raichur L 51500.42 0.00 51500.42 14989.00 37365.35 10156.00 agi 26.02.15 DT:01.02.2018 from YTPS to Proposed 400kV Probabale Exp: 2017- Bellary pooling station (BPS) for a 18 distance of 142.49Kms Supply : 517 Lakhs Erection: 300 lakhs

Munirabad - Ujjini: Dismantling of existing 66kV Munirabad-Sokke-Davangere line Work short closed. To emanating from Munirabad Kalabur 991.18 & be tendered for Balance 2 FB1025 Generating Station & Erecting a Bellary L 773.98 0.00 773.98 10.00 439.86 10.00 agi 24.10.09 portion of work after new 66kV line with Coyote taking Joint inventory conductor upto 66kV Ujjani Sub- Station in Kudligi Taluk for a distance of 204.31 Kms

Chincholi-Mannekalli-Sedam: This project has been i) Construction of 110kV DC link closed vide ltr line between 110kV Chincholi No:CEE/GLB/AEE- and 110kV Manna-E-Khelly Sub- 3/6623-32 Stations 49.87Kms. Kalabur 1128.89 & 3 FC1023 Kalaburagi L 924.99 0.00 924.99 50.00 146.40 728.59 Dtd:16.09.2016 . For ii) Stringing Second circuit on agi 07.01.11 balance work, Approved existing DC towers from 220kV in 64th CPC held on Sedam Station to 110kV 03.03.2018. LOI under Chincholi Sub-Station for a process. distance of 32kMs. Rs.in lakhs

Cost of Cost of Cum Exp up Original / Deptly. Revised Sl. Work Total Work to Budget Remarks furnished Name of the Work ZONE District S/A/L/T Revised Cost of DWA Supplied Budget 2017- No. Code Cost 31/03/18as 2018-19 by Zone DPR & Materials 18 per APR Date & others Kalabur 3 Total of Lines 53199.39 0.00 53199.39 15049.00 37951.61 10894.59 agi

Work completed and Yet to commissioned in Providing 12.1KV, 2.9MVAR 110kV Manna-Ek- Capacitor Bank and other allied Kalabur 577.83 & 1 FC1055 Kalaburagi T 387.00 232.45 619.45 605.00 194.40 100.00 KhelliS/s,110kV equipment’s in KPTCL Sub- agi 02.09.14 Sastapur S/s, 110kV stations of Kalaburagi Zone. Jewargi S/s,110kV mandewal S/s.

Sedam : 1) 4 No's of CVT foundation. Renovation and Upgraduation 2) 14 No's of CVT of Protection systems of 220kV Kalabur 1384.05 & 2 FC1057 Kalaburagi T 1436.37 0.00 1436.77 1250.00 612.27 160.00 Erection. Substations (12 Nos) in agi 20.06.14 3) 1 No of C&R panel Kalaburagi Transmission Zone erection. Shahabad : 4 No's of CVT Kalabur 2 Total of TB's & Others 1823.37 232.45 2056.22 1855.00 806.67 260.00 agi

Kalabur 25 Total of Kalaburagi Zone 71553.67 1202.19 72756.26 21915.00 48845.91 18479.73 agi

224 Total of List-II for All Zones 367494.28 33619.63 434909.87 154236.12 294785.78 196022.58 List - III : Abstract of Works Proposed to be taken up during 2018-19

Rs. in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Sl. No. Zone Budget Budget Budget Budget 18- Budget Nos. Nos. Nos. Nos. Nos. 18-19 18-19 18-19 19 18-19

1 Bengaluru 16 529.00 52 6205.00 19 400.00 0 0.00 87 7134.00

2 Tumakuru 4 151.00 44 3362.00 5 5180.00 0 0.00 53 8693.00

3 Hassana 6 505.00 24 3614.00 7 32.22 5 54.00 42 4205.22

4 Mysuru 12 676.00 25 1349.00 13 163.00 0 0.00 50 2188.00

5 Bagalkote 5 5.00 19 1261.00 9 188.00 2 39.00 35 1493.00

6 Kalaburagi 5 117.00 28 1556.82 6 510.00 3 102.00 42 2285.82

Total 48 1983.00 192 17347.82 59 6473.22 10 195.00 309 25999.04

List - III List III Works which are proposed to be taken up during the present fiscal year 2018-19 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

BENGALURU TRANSMISSION Bengaluru ZONE

S.Medehalli: Establishing 2x12.5 MVA, Bengaluru 1978 & 1 AA1165 66/11kV sub-station at Bengaluru S 1.00 0.00 1.00 Urban 09.03.17 S.Medehalli, in Anekal Taluk, Bengaluru Urban District.

Muthanallur: Establishing 2x31.5MVA, Bengaluru 1080.00 & 2 AA1167 Bengaluru S 1.00 0.00 1.00 66/11kV Sub-Station with Urban 19.04.17 associated line at anekal taluk.

Nandi (Muddenahalli): Establishing 1x8MVA, 66/11kV 394.20 & 3 AE1027 Bengaluru C.B.Pura S 320.96 104.75 425.71 1.00 99.07 10.00 Sub-Station with associated line 20.06.11 for a distance of 3.466 Km. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Channarayapattana: Bengaluru 992 & 4 AB1034 Establishing 2x8MVA, 66/11kV Bengaluru S 1.00 0.00 10.00 Rural 10.05.17 Sub-Station with associated line.

Sasalu(Sriramanahalli: Bengalulru 1118 & 5 AB1058 Establishing 1x8MVA, 66/11kV Bengaluru S 1.00 0.00 10.00 Rural 10.05.17 Sub-Station with associated line Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bagganadoddi: FY 18-19: Bengaluru 2913.00 & 6 AA1179 Establishing 1x8MVA, 66/11kV Bengaluru S 1.00 0.00 200.00 Running Bill- Urban 21.11.17 Sub-Station with associated line 1000 L

HBR: Bengaluru 25149.10 & 7 AA1180 Establishing 2x150 MVA, Bengaluru S 5.00 0.00 5.00 Urban 28.11.17 220/66/11kV GIS sub station Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Madappanahalli: Establishing 2x20MVA, 66/11kV Sub-Station Bengaluru 1119.73 & 8 AA1183 Bengaluru S 2.00 0.00 2.00 with associated line for a Urban 25.05.17 distance of 3.604Kms

Sathanur(): FY 18-19: 780.02 & 9 AC1073 Establishing 2x8MVA, 66/11kV Bengaluru Ramanagara S 2.00 0.00 100.00 21.12.17 Running Bill- Sub-Station with associated line 300L

Shivanahalli: Establishing. 1x8 FY 18-19: 601.87 & 10 AC1074 MVA, 66/11kV S/s and Bengaluru Ramanagara S 2.00 0.00 100.00 18.12.17 Running Bill- associated line 250L Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bommepalli cross: 661.64 & 11 AE1049 Establishing 1x8MVA, 66/11kV Bengaluru C.B.Pura S 1.00 0.00 5.00 05.02.18 Sub-Station with associated line

Hagadur: Establishing 2x31.5MVA, Bengaluru 12 66/11kV Sub-Station with Bengaluru S 0.00 10.00 Urban 66kV,1000Sqmm Cable from 220kV EPIP Station.

Nelamangala: Upgradation of existing 66/11kV Bengaluru 13 Bengaluru S 0.00 50.00 Nelamanagala S/s to 2x100 Urban MVA, 220/66/11kV sub station

EXORA Business park: Establishing 2x150MVA, Bengaluru 14 AA1075 Bengaluru S 0.00 10.00 220/66/11kV Station with Urban associated line.

Tadigol Cross : 15 AD1021 Establishing 2x8MVA, 66/11kV Bengaluru C. B. PURA S 0.00 5.00 Sub-Station with associated line. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Sahakarinagar: New Bengaluru 16 Establishing 2x150 MVA, Bengaluru S 0.00 10.00 15-16 Urban 220/66/11kV GIS sub station

16 Total of Sub-stations Bengaluru 320.96 104.75 425.71 18.00 99.07 529.00

Telecom Layout: FY 18-19 Replacing 1x20MVA, 66/11kV Bengaluru 235.00 & Tr supply + 1 AA1114 Bengaluru A 1.00 0.00 200.00 by 1x31.5MVA, 66/11kV Urban 02.01.13 Erection: Transformer 275L Naganathapura: Augumentation of 2x100 MVA, 220/66/11kV Power FY 18-19 Transformer by 2x150MVA, Bengaluru 1616.20 & Tr supply+ 2 AA1164 220/66/11kV Power Bengaluru A 0.00 5.00 0.00 1200.00 Urban 28.01.17 Transformers at 220/66/11kV Eerection: Naganathapura Receiving 1600 Station, Bangalore South Taluk, Bangalore Urban District.

FY 18-19 Budigere: Tr supply + Bengaluru 3 AB1050 Replacing 1x8MVA, 66/11kV by Bengaluru A 224.5 & 50.00 1.23 220.00 erection + Rural 1x20MVA, 66/11kV Transformer 26.08.14 Switchgear Cost: 220 L

Channapatna: FY 18-19 Augmentation of 1X12.5 MVA 181.74 & Tr supply + 4 AC1049 Bengaluru Ramanagara A 5.00 0.00 170.00 66/11 kV Tr. By 1 X 20 MVA at 05.06.15 erection : 66/11 kV Channapatna 170 L Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Magadi: FY 18-19 Replacing 1x12.5MVA by 175.95 & 5 AC1067 Bengaluru Ramanagara A 1.00 0.00 5.00 Erection : 1x20MVA, 66/11kV Pwer 17.02.16 Transformer at 66/11kV Magadi 170 L

Dalasanur: FY 18-19 Replacing 1x8MVA, 66/11kV by 121.55 & Tr supply + 6 AD1025 Bengaluru Kolar A 125.00 0.00 5.00 1x12.5MVA, 66/11kV 26.10.11 erection : Transformer 125 L

Tamaka: FY 18-19 Replacing 1x12.5MVA, 66/11kV 144.75 & Tr supply + 7 AD1026 Bengaluru Kolar A 160.00 122.30 175.00 by 1x20MVA, 66/11kV 30.08.11 erection : Transformer 175 L

S.M.Mangala: 121.55 & Replacing 1x8MVA, 66/11kV by FY 18-19 8 AD1028 Bengaluru Kolar A 27.08.11 3.00 0.00 3.00 1x12.5MVA, 66/11kV Erection :3 L Transformer

Masti: FY 18-19 Replacing 2nd 2x12.5MVA, 286.15 & Tr supply + 9 AD1029 Bengaluru Kolar A 35.00 35.00 7.50 134.17 3.00 66/11kV by 2x20MVA, 66/11kV 20.02.13 erection : Transformer 130 L Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Kyalanur: Replacing 1x8MVA, 66/11kV by 117.01 & FY 18-19 10 AD1034 Bengaluru Kolar A 3.00 0.00 3.00 1x12.5MVA, 66/11kV 08.01.13 Erection :3 L Transformer Anderdsonpet : FY 18-19 Replacing 2x8MVA, 66/11kV by 269.61 & Tr supply + 11 AD1039 Bengaluru Kolar A 200.00 0.00 3.00 2x12.5MVA, 66/11kV 05.11.14 erection : Transformer 130 L M.G.Halli: Replacing 1x8MVA, 66/11kV by 110.49 & FY 18-19 12 AE1017 Bengaluru C.B.Pura A 5.00 0.01 3.00 1x12.5MVA, 66/11kV 09.11.10 Erection :3 L Transformer Y.Hunasenahalli: Replacing 1x6.3MVA, 66/11kV by 121.55 & FY 18-19 13 AE1030 Bengaluru C.B.Pura A 3.00 0.00 120.00 1x12.5MVA, 66/11kV 27.08.11 Erection :3 L Transformer Cheemangala: Replacing 1x6.3MVA, 66/11kV 127.35 & FY 18-19 14 AE1031 Bengaluru C.B.Pura A 3.00 0.43 120.00 by 1x12.5MVA, 66/11kV 27.08.11 Erection :3 L Transformer Yenigadale : Replacing 1x6.3MVA, 66/11kV 136.52 & FY 18-19 15 AE1042 Bengaluru C.B.Pura A 3.00 0.00 120.00 by 1x12.5MVA, 66/11kV 02.09.14 Erection :3 L Transformer

Somanahalli: Replacing 2x100MVA, 220/66/11kV Power Bengalulru 1635.73 & 16 AA1170 Transformer by 2x150MVA at Bengaluru A 1.00 0.00 1200.00 urban 17.05.17 220/66/11kV R/s Somanahalli, Bengaluru. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Hoody: Providing 3rd additional Bengaluru 555 & FY 18-19 : 10 17 AA1151 1x31.5 MVA, 66/11 kV Bengaluru A 1.00 0.00 10.00 Urban 10.05.17 transformer. L

Rajarajeshwarinagar: Replacement of 2X20MVA by Budget 18-19 Bengalulru 700.03 & 18 AA1173 2X31.5MVA transformer at Bengaluru A 1.00 0.00 3.00 11 kV SWG: urban 09.06.17 66/11kV Rajarajeshwarinagar 160 L S/s Kumbalgodu: Budget Replacement of 1x12.5MVA by provision is Bengalulru 276.38 & 19 AA1174 1x31.5MVA 66/11kV Bengaluru A 1.00 0.00 3.00 made for urban 09.06.17 Transformer at 66/11kV labour Kumbalagodu Substation portion Prestige Shanthinikethan: Budget Replacing 1X20MVA by provision is Bengalulru 248.90 & 20 AA1175 1X31.5MVA 66/11kV Power Bengaluru A 1.00 0.00 200.00 made for urban 15.07.17 transformerat 66/11kV Prestige labour Shanthinikethan substation . portion

FY 18-19 Erection+ Army Welfare Housing Civil = 80L Organisation: Bengaluru 400.00 & 21 AA1177 Bengaluru A 1.00 0.00 80.00 (TR & SWG Providing Additional 1X31.5MVA, Urban 21.10.17 66/11kV Power Transformer will be supplied by KPTCL)

FY 18-19 Gudemaranahalli: 394.72 & Tr supply + 22 AC1071 Replacing 2x8MVA by 2x20MVA Bengaluru Ramanagara A 1.00 0.00 3.00 16.06.17 66/11kV Power Transformer erection :170 L Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Anekal.: FY 18-19 Replacing 1X20MVA by Bangalore 282.61& Tr supply + 23 AB1059 Bengaluru A 1.00 0.00 200.00 1X31.5MVA , 66/11KV Power rural 09.06.17 erection :190 transformer at 66/11KV S/S, L Attibele: FY 18-19 Replacement of 1x20 MVA, Bengaluru 319.13 & Tr supply + 24 AA1182 66/11 kV transformer by Bengaluru A 2.00 0.00 190.00 Urban 05.12.17 1x31.5MVA 66/11kV erection : Transformer 190 L Peenya: Augmentation of 2x20MVA, FY 18-19 66/11kV power transformer no.II Bengaluru 597.33 & Tr supply + 25 AA1184 Bengaluru A 2.00 0.00 200.00 & III by 2x31.5MVA, 66/11kV Urban 205.05.17 erection : power transformer at SRS 500 L Peenya 220/66/11kV Substation

Abbigere: Replacement of FY 18-19 Bengaluru 546.12 & 26 AA1185 2x12.5MVA, 66/11kV by Bengaluru A 2.00 0.00 5.00 Tr erection : Urban 29.05.17 2x20MVA, 66/11kV transformer 10 L

FY 18-19 IISC: Replacing of 2x20MVA, Bengaluru 676.65 & Tr supply + 27 AA1186 66/11kV power transformer by Bengaluru A 2.00 0.00 200.00 Urban 03.07.17 2x31.5MVA power transformer erection : 600 L

Raj Mahal Vilas (RMV): FY 18-19 Augmentation of 2x20MVA, Bengaluru 530.00 & Tr supply + 28 AA1187 Bengaluru A 2.00 0.00 200.00 66/11kV by 2x31.5MVA, Urban 13.11.17 erection : 10 66/11kV transformer L

Byadarahally: Replacement of FY 18-19 1x20MVA, 66/11kV Power Bengaluru 351.00 & Tr supply + 29 AA1188 Bengaluru A 2.00 0.00 200.00 Transformer by 1x31.5MV, Urban 26.10.17 erection : 66/11kV power transformer 300 L Brindavaa: Replacement of FY 18-19 2x20MVA, 66/11kV Power Bengaluru 635.30 & Tr supply + 30 AA1189 Transformer II & III by Bengaluru A 2.00 0.00 200.00 Urban 08.11.17 2x31.5MVA, 66/11kV power erection : transformer 530 L Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bidadi: Providing additional 1x20 MVA 359 & Budget 18- 31 AC1075 Power Transformer at Bengaluru Ramanagara A 1.00 0.00 50.00 17.06.17 220/66/11 kV Bidadi Sub- 19: Rs. 50L station Hukunda: Providing additional 1x8MVA, 225.17 & 32 AC1076 Bengaluru Ramanagara A 1.00 0.00 5.00 66/11kV Power Transformer at 25.05.17 66/11kV Hukunda Sub-station. Budget provision is V.G.Doddi: made for Providing additional 1x8MVA, 225.30 & labour 33 AC1077 Bengaluru Ramanagara A 1.00 0.00 5.00 66/11kV Power Transformer at 10.05.17 portion if 66/11kV V.G.Doddi Sub-station. released good P.Tr is allotted

Budget 66/11KV S/s Volvo: provision is Replacing of 1X6.3 MVA by Bengaluru made for new 34 Bengaluru A 0.00 120.00 1X12.5 MVA Transformer at Rural good P.tr 66/11KV S/S Volvo with labour portion

Budget provision is Srinivasapura: made for Replacing 1x12.5MVA, 66/11kV labour 35 Bengaluru Kolar A 0.00 3.00 by 1x20MVA, 66/11kV portion if Transformer released good P.Tr is allotted Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Budget : provision is Replacing 1x8MVA, 66/11kV by made for new 36 Bengaluru Kolar A 0.00 120.00 1x12.5MVA, 66/11kV good P.tr Transformer iwith labour portion

Budget provision is Thayalur: made for Replacing 1x6.3MVA, 66/11kV labour 37 Bengaluru Kolar A 0.00 3.00 by 1x12.5MVA, 66/11kV portion if Transformer released good P.Tr is allotted Budget provision is Malasandra: made for Replacing 1x8MVA, 66/11kV by labour 38 Bengaluru Kolar A 0.00 3.00 1x12.5MVA, 66/11kV portion if Transformer released good P.Tr is allotted

Irragampalli: Replacing 1x12.5MVA, 66/11kV 39 Bengaluru CBPura A 0.00 3.00 by 1x20MVA, 66/11kV transformer

Talagavara: Replacing second 1x12.5MVA, 40 Bengaluru CBPura A 0.00 3.00 66/11kV by 1x20MVA, 66/11kV transformer Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Cheemangala: Replacing second 1x6.3MVA, 41 Bengaluru CBPura A 0.00 3.00 66/11kV by 1x12.5MVA, 66/11kV transformer

Budget provision is Replacement of second 12.5 made for New MVA, by 20 MVA, Power labour 42 Bengaluru A 0.00 3.00 15-16 Transformer at 66/11kV portion if Ranganadoddi S/s released good P.Tr is allotted

Nelagadaranahalli: Replacing FY 18-19 New 2x20MVA, 66/11kV by Tr supply + 43 Bengaluru B'lore A 0.00 200 15-16 2x31.5MVA, 66/11kV erection : transformer 600 L

Providing additional 20 MVA TR New Bengaluru 44 at 220 kV KIADB Bengaluru A 0.00 5 17-18 Rural Doddaballapura Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Budget provision is Sulibele : made for New Replacing of 2 x 12.5MVA Bengalore labour 45 Bengaluru A 0.00 6.00 16-17 Transformers by 2x 20MVA Rural portion if transformers released good P.Tr is allotted Budget provision is Nanadagudi : made for New Replacing 2 x12.5MVA Bengalore labour 46 Bengaluru A 0.00 6.00 16-17 Transformers by 2x 20 MVA Rural portion if Transformers released good P.Tr is allotted Budget provision is CBPura(I/A): made new New Replacing 1x12.5MVA NGEF Bengaluru 47 Bengaluru A 0.00 10.00 Power 16-17 make Tr-1, 66/11kV by Rural 1x20MVA, 66/11kV Transformer Transformer with labour if allotted

New work 18- Replacing of 2x8 MVA by 2x12.5 Chikkaballap 48 Bengaluru A 0.00 3.00 19 MVA at ura

Naganathapura : Replacing New work 18- Bengaluru 49 2X20MVA by 2X31.5MVA Bengaluru A 0.00 200.00 19 Urban 66/11kV Power transformer

Adugodi: Replacing 3X20MVA by New work 18- Bengaluru 50 3X31.5MVA 66/11kV Power Bengaluru A 0.00 200.00 19 Urban transformer Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

220KV EKARAJAPURA: New Bengalore 51 Additional 220/66KV, 100 MVA Bengaluru A 0.00 5.00 16-17 Rural Transformer

Widia S/s: New 52 Providng addnl 1X20MVA, Bengaluru Bengaluru A 0.00 5.00 15-16 66/11kV Power Transformer.

52 Total of Augmentations Bengaluru 0.00 35.00 35.00 599.50 258.14 6205.00

HAL-Amarjyothi: Strengthening of existing 66kV line by replacing Bengaluru 481.6 & 1 AA1040 Bengaluru L 1.00 0.00 1.00 Coyote by HTLS Conductor for a Urban 21.06.11 distance of 3.21 kms

Somanahalli -Subramanyapura : i) Construction of 220kV -66kV MC - MV line from Somanahalli in the Existing corridor FY 18-19: ii) Rearrangement of existing Bengaluru 4118.9 & 2 AA1047 Bengaluru L 6666.28 0.00 6666.28 10.00 0.00 10.00 Running Bill- 220kv lines around 220kV Urban 02.06.11 Somanahalli Station. 10 L iii) 220kV DC line using AAAC Moose conductor in Somanahalli- Peenya SC line corridor upto Nagarabhavi tap point. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Amarjyothi-Audugodi: Replacement of Existing Coyote ACSR Conductor by HTLS Bengaluru 665.24 & 3 AA1139 Bengaluru L 1.00 0.00 1.00 Conductor for a route length of Urban 05.11.14 4.20Kms in the existing 66kV DC Audugodi-Amarjyothi line.

220-220kV MC line to 220/66/11kV Yerranadanahalli S/s: Construction of 220-220kV Narrow based Multi Circuit Lines for route length of 6.615kms Bengaluru 1550.63 & FY 18-19 4 AA1155 Bengaluru L 100.00 0.00 10.00 from the proposed 220kV Urban 01.06.15 Supply: 100L Sommanahally-Malur I & II Lines to the exisisting 220/66/11kV Yarandanahally S/s in exisisting 220kV Sommanahally-Singarpet SC line Corridor

Ranganadoddi Sub-Station: Providing 66kV LILO 41.00 & 5 AC1035 arrangement to 66/11kV Sub- Bengaluru Ramanagara L 1.00 0.00 5.00 24.01.12 Station for a distance of 0.10 kms. Ramnagara Sub-Stn. : Constructing additional 66kV 34.13 & 6 AC1036 circuit from Bidadi - Bevoor line Bengaluru Ramanagara L 1.00 0.00 10.00 11.01.13 to provide LILO arrangements for a distance of 0.65 kms. Siddlaghatta - Y.Hunasenahalli: Running of 2nd Circuit on existing DC Tower of Siddlaghatta 66kV line upto 115.04& 7 AE1034 Bengaluru C.B.Pura L 529.93 529.93 1.00 0.00 1.00 Tower No.51 and linking the 05.05.12 same to Y.Hunasenahalli line with TB at 220kV R/S Chintamani for a distance of 12.3 kms. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Jangamkote Sub-Station: Providing 66kV LILO 54.97 & 8 AE1036 arrangement to 66/11kV Sub- Bengaluru C.B.Pura L 1.00 0.00 1.00 14.05.12 Station for a distance of 7.00 kms. Somanahalli : Replacing 66 kV North and Bengalulru 657 & 9 AA1171 South Strung bus by rigid bus at Bengaluru L 1.00 0.00 300.00 urban 26.09.17 220/66/11 kV Somanahalli sub- station Nelagadarenhalli to WIDIA: Running of 66kV 1000sqmm SC UG cable from existing 66/11kV Bengaluru 2359.00 & 10 AA1181 Bengaluru L 1.00 0.00 1.00 Nelagadarenahalli S/s to existing Urban 25.05.17 Widia S/s for a route length of 3.540Kms

66KV D.B.Pura -Devanahalli line: Strengthening the 66KV Bengaluru 11 Bengaluru L 0.00 10 D.B.Pura -Devanahalli line by rural Drake conductor 20KMS

D cross to Thodebhavi: Strengthening of about 31 Kms Bengaluru 66kV line from D cross to 12 Bengaluru Rural & L 0.00 10 Thodebhavi limites (Existing CBPura fabricated small tower and rabit conductor) Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Kanakapura- Kothipura 220 kV S/s: Interlinking of existing 220/66 13 kV Kanakapura sub-station with Bengaluru Ramangara L 0.00 5.00 proposed 220 kV Kothipura S/s by construction of 220 kV DC line for a distance of 27 Kms.

Construction of 66kV MC/DC line in the existing corridor of New 66kV Somanahalli - 14 Bengaluru Bangalore L 0.00 5.00 17-18 Kanakapura - T.K.Halli DC line B1 & B2 having old H frame towers and cat conductor

66kV Mattikere- Jalamangala Line: Construction of 66kV Line 15 New 18-19 from 66/11kV Mattikere to Bangalore Ramanagara L 0.00 5.00 Jalamangala for a distance of 10.78Kms

66kV DC line to 66/11kV Maralavadi S/s: Conversion of existing 66kV SC 16 New 18-19 Bangalore Ramanagara L 0.00 5.00 line to DC line from taping point to 66/11kV Maralavadi Line for a distance of 9.6Kms

Conversion of existing 66kV SC New 17 line to DC line from Harobele Bengaluru Ramanagara L 0.00 5.00 16-17 station to Kodihalli station Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

66kV SC line from 220kV Kanakapura to Kunur station: Construction of 66kV SC line 18 New 18-19 partially cable and partially Bangalore Ramanagara L 0.00 0.00 5.00 overhead line from Kanakapura to proposed Kunur station for a distance of 7.481Km

Kanteerava GIS Station: Establishing link line between 220/66/11kV Sir.M.V.GIS station(East Division Compound) Bengaluru 1782.00 & 19 AA1190 Bengaluru L 1.00 0.00 10.00 and 66kV Kanteerava GIS station Urban 24.01.18 by laying kV SC 1000Sqmm UG cable for a route length of 2.488Kms

19 Total of Lines Bengaluru 7196.21 0.00 7196.21 119.00 0.00 400.00

87 Total for Bengaluru Zone Bengaluru 7517.17 139.75 7656.92 736.50 357.21 7134.00

TUMAKURU Tumakuru 0.00 TRANSMISSION ZONE

Chikkanayakanahalli 400kV: 1 BA1113 Establishing 400KV switching Tumakuru Tumakuru S 1.00 0.00 1.00 station at Chickanayakanahalli

Karadi: Establishing 1x10MVA, 590.73 & To be shifted from 2 BA1131 Tumakuru Tumakuru S 0.00 1.00 0.00 50.00 110/11kV Sub-Station with 23.01.18 List-IV to List-III associated line Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Sira(Kallukote) : Establishing 2x100MVA, 6800.90 3 BA1048 Tumakuru Tumakuru S 0.00 1.00 0.00 50.00 DPR Approved on 220/66/11kV Sub-station with &16.03.18 associated line

Changawara: 4 Establishing 1x8MVA, 66/11kV Tumakuru Tumakuru S 0.00 50.00 Sub-Station with associated line 4 Total of Sub-stations Tumakuru 0.00 0.00 0.00 3.00 0.00 151.00 Doddaguni: 186.18 & 1 BA1092 Providing Spare 1x10MVA, Tumakuru Tumakuru A 0.00 0.00 1.00 0.00 1.00 12.02.14 110/11kV Transformer K.B Cross: Providing Spare 1x20 MVA, 110/11 kV Power 307.04 & 2 BA1093 Tumakuru Tumakuru A 0.00 0.00 1.00 0.00 1.00 Transformer at 110/11kV 12.02.14 Station in K.B.Cross Kolala: Replacing 1x8 MVA,66/11kV by 136.52 & 3 BA1105 Tumakuru Tumakuru A 5.00 0.00 5.00 1x 12.5 MVA, 66/11kV 15.04.14 Transformer. Thovinakere: Replacement of 1x12.5MVA, 177.07 & 4 BA1107 Tumakuru Tumakuru A 0.00 1.00 0.00 1.00 66/11kV by 1x 20MVA, 66/11kV 08.04.14 Transformer.

Gubbi : Replacing 1x10MVA, 110/11kV 201.61 & 5 BA1110 Tumakuru Tumakuru A 1.00 0.00 200.00 by 1x20MVA, 110/11kV 27.08.14 Transformer.

Huliyar: Providing Additional 1x10MVA, 253.85 & 6 BA1116 Tumakuru Tumakuru A 10.00 0.00 100.00 110/11kV Power Transformer at 03.03.15 110/11kV Station. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Ankasandra: Providing Additional 1x8MVA, 191.44 & 7 BA1117 Tumakuru Tumakuru A 10.00 0.00 100.00 66/11kV Power Transformer at 03.11.14 66/11kV Station.

Kattige: 173.45 & 8 BB1051 Providing additional 1x8MVA, Tumakuru Davanagere A 0.00 1.00 22.86 30.00 12.10.11 66/11kV Transformer

Kundur: 174.69 & 9 BB1052 Providing additional 1x8MVA, Tumakuru Davanagere A 0.00 1.00 22.86 30.00 24.09.11 66/11kV Transformer Davanagere: Providing Spare 1x20MVA, 253.24 & 10 BB1061 Tumakuru Davanagere A 0.00 1.00 0.00 1.00 0 66/11kV Transformer at 09.12.13 220/66kV Davanagere SRS.

Bidarekere: 11 BB1072 Providing Additional 1x8MVA, Tumakuru Davanagere A 179.01 & 1.00 0.00 20.00 66/11kV Power Transformer. 27.08.14

Obbajjihalli: 179.01 & 12 BB1073 Providing Additional 1x8MVA, Tumakuru Davanagere A 1.00 0.00 50.00 02.09.14 66/11kV Power Transformer

Avaregare: Replacing 1x8MVA, 66/11kV by 136.52 & 13 BB1074 Tumakuru Davanagere A 1.00 0.00 100.00 1x 12.5MVA, 66/11kV 05.09.14 Tranformer. Mayakonda: Replacing 1x8MVA, 66/11kV by 137.84 & 14 BB1076 Tumakuru Davanagere A 1.00 0.00 100.00 1x 12.5MVA, 66/11kV 02.09.14 Transformer. Bharamasagara: Providing Spare 198.54 & 15 BC1060 1x12.5MVA, 66/11kV Tumakuru Chitradurga A 0.00 1.00 0.00 5.00 23.01.14 Transformer Kanchipura: 183.72 & 16 BC1071 Providing Additional 1x8 MVA, Tumakuru Chitradurga A 1.00 0.00 5.00 21.07.15 66/11kV Power Transformer. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Kadaba: Replacing 1x10 MVA,110/11kV 204.20 & Shifted from List- 17 BA1123 Tumakuru Tumakuru A 1.00 0.00 50.00 by 1x 20 MVA, 110/11kV 11.05.17 IV to List - III Transformer.

Kolala: Replacing 2nd 1x8 MVA, 139.07 & 18 BA1124 Tumakuru Tumakuru A 1.00 0.00 50.00 66/11kV by 1x 12.5 MVA, 17.05.17 66/11kV Transformer.

Sampige: Replacing 1x10MVA,110/11kV 204.20 & Shifted from List- 19 BA1125 Tumakuru Tumakuru A 1.00 0.00 100.00 by 1x 20MVA, 110/11kV 17.05.17 IV to List - III Transformer.

K.G Temple: Replacing 1x10MVA,110/11kV 204.53 & Shifted from List- 20 BA1126 Tumakuru Tumakuru A 1.00 0.00 100.00 by 1x 20MVA, 110/11kV 11.05.17 IV to List - III Transformer.

Kallur: Replacing 1x10 MVA,110/11kV 204.53 & Shifted from List- 21 BA1127 Tumakuru Tumakuru A 1.00 0.00 100.00 by 1x 20 MVA, 110/11kV 11.05.17 IV to List - III Transformer.

Ucchagidurga: Replacing 2x8MVA, 66/11kV by 22 BB1080 Tumakuru Tumakuru A 107.94 90.48 135.00 2x12.5MVA, 66/11kV Transformer Harapanahalli: Replacing 1x12.5 MVA, 201.47 & Shifted from List- 23 BB1081 Tumakuru Davangere A 1.00 0.00 100.00 66/11kV by 1x 20 MVA, 11.05.17 IV to List - III 66/11kV Transformer. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bennihalli: Replacing 1x6.3 MVA, 66/11kV 140.08 & Shifted from List- 24 BB1082 Tumakuru Davangere A 1.00 0.00 100.00 by 1x 12.5 MVA, 66/11kV 11.05.17 IV to List - III Tranformer. Halavagalu: Replacing 2x6.3M VA, 66/11kV 274.74 & Shifted from List- 25 BB1083 Tumakuru Davangere A 1.00 0.00 100.00 by 2x 12.5MVA, 66/11kV 25.05.17 V to List - III Transformer. Telagi: Replacing 2x6.3 MVA, 66/11kV 272.75 & Shifted from List- 26 BB1084 Tumakuru Davangere A 1.00 0.00 120.00 by 2x12.5MVA, 66/11kV 12.06.17 V to List - III Transformer. Sasuvehalli : Replacing of 1x6.3 MVA 1x8MVA 27 BB1085 Tumakuru Davanagere A 1.00 0.00 200.00 by 2x12.5MVA 66/11kv Power Transformer Bellavi: Replacing 1x12.5MVA Power 205.44 & 28 BA1129 Trnasformer-1 by 1x20MVA Tumakuru Tumakuru A 2.00 0.00 50.00 27.09.17 Power Transformer at 66/11kV Bellavi Substation Chilur: Replacing 1x8 MVA, 66/11kV by 138.17 & 29 BB1086 Tumakuru Davanagere A 2.00 0.00 138.00 1x 12.5MVA, 66/11kV 29.05.17 Transformer. Savalanga: Providing additional 223.52 & Shifted from List- 30 BB1087 Tumakuru Davangere A 1.00 0.00 100.00 1x8MVA,power Transformer at 20.05.17 IV to List III 66/11kV Savalanga S/S. Heggere: Providing additional 1x8MVA 273.12 & Shifted from List- 31 BA1130 Tumakuru Tumakuru A 1.00 0.00 100.00 Power Transformer at 66/11kV 21.11.17 V to List III Substation

Tavarekere: Replacing 1x8MVA, 66/11kV 142.26 & To be shifted from 32 BA1132 Power transformer-1 by Tumakuru Tumakuru A 1.00 0.00 50.00 27.09.17 List-IV to List-III 1x12.5MVA 66/11kV Power transformer Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Koratagere: Replacement of 1x 12.5MVA 206.30 & To be shifted from 33 BA1133 66/11kV Power Transformer by Tumakuru Tumakuru A 1.00 0.00 100.00 10.10.17 List-IV to List-III 1x 20 MVA, 66/11kV Transformer.

Pandarahalli : Replacing 2nd 12.5 MVA, 34 Tumakuru Chitradurga A 0.00 200.00 66/11kV by 20MVA, 66/11kV Transformer.

Thimmasandra: Replacing1x8MVA, 66/11kV by To be shifted from 35 Tumakuru Tumakuru A 0.00 50.00 1x 12.5MVA, 66/11kV List-IV to List-III Transformer.

Hebbur: Replacing 1x12.5 MVA, To be shifted from 36 Tumakuru Tumakuru A 0.00 120.00 66/11kV by 1x 20 MVA, List-IV to List-III 66/11kV Transformer.

Sira: Replacing 12.5MVA,66/11kV by 37 Tumakuru Tumakuru A 0.00 0.00 100.00 1x 20 MVA, 66/11kV Transformer. Mylanahalli : Replacing 1x8 MVA, 66/11kV by 38 Tumakuru Chitradurga A 0.00 0.00 50.00 1x 12.5 MVA, 66/11kV Transformer. Thallak : Replacing 1x6.3 MVA, 66/11kV 39 Tumakuru Chitradurga A 0.00 0.00 50.00 by 1x 12.5 MVA, 66/11kV Transformer. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Hanagal: Replacing 1x8 MVA, 66/11kV by 40 Tumakuru Chitradurga A 0.00 50.00 1x12.5 MVA, 66/11kV Transformer. Hirehalli: For replacement of 1 x 12.5 MVA New 41 Tr.-1 by 1 X20 MVA Tr. at 66/11 Tumakuru Tumakuru A 0.00 50.00 15-16 KV Sub-station with 1IC+4F+1BC Yadiyur: For replacement of 1 New work 18- 42 x 6.3 MVA by 1 X 20 MVA Tr. at Tumkur Tumkur 0.00 100.00 New Work 19 66/11 KV Sub-station

Kunigal: For replacement of 1 New work 18- x 12.5 MVA Tr-2 by 1 X 20 MVA 43 Tumkur Tumkur 0.00 100.00 New Work 19 Tr. 1Bank + 4Feeders at 66/11 KV Sub-station

Honnudike: Replacing 1x8 MVA- New work 18- 44 1 66/11kV by 1x 12.5 MVA, Tumkur Tumkur 0.00 50.00 New Work 19 66/11kV Transformer (2nd Tr.) 44 Total of Augmentations Tumakuru 0.00 0.00 0.00 163.94 136.20 3362.00 Chelur Sub-Station: Construction of DC line for a length of 16.22 kms using Drake 116.47 & 1 BA1079 conductor from Chelur tap point Tumakuru Tumakuru L 0.00 1.00 0.00 150.00 23.04.14 to Chelur Sub-Station and in the exisiting corridor with modification of 66kV Bays

Hiriyur-Chitradurga Cosntruction of 220kV SC line from 400kV Hiriyur(PGIL) S/s to 220kV Hiriyur S/s for a distance of 15.168Kms and Construction 5210.14 & 2 BC1069 of 220kV DC line from Tumakuru Chitradurga L 10.00 0.00 5000.00 24.11.16 220/66/11kV Chitradurga S/s to 220/66/11kV Hiriyur S/s for a distance of 36.506Kms with Construction of 2 Nos of TB's at Hiriyur & One No.at Chitradurga Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Jagalur-Sokke 66KV line: Recontruction of existing 66kV, age old coyote conductor SC line from 66kV Sub-Station Jagalur To be shifted from 3 Tumakuru Davanagere L 0.00 10.00 to 66kV Sub-Station Sokke as List-IV to List-III SC line on DC towers with coyote conductor for a distance of 24 Kms.

Sasvehalli Station to Sasvehalli Tap point:Providing LILO arrangement at 66kv To be shifted from 4 station Sasvehalli from tap point Tumakuru Davanagere L 0.00 10.00 List-IV to List-III of Lingadahalli-Channagiri line for a distance of 0.5 kms with TB.

Chilur Station to Chilur Tap point: Conversion of SC line on SC towers to DC line on DC towers To be shifted from 5 BB1067 Tumakuru Davanagere L 0.00 10.00 from Tap point to Chilur 66kV List-IV to List-III Sub-Station for a distance of 1 Km with TB at Chilur station for LILO arrangement. 5 Total of Lines Tumakuru 0.00 0.00 0.00 11.00 0.00 5180.00 53 Total of Tumakuru Zone Tumakuru 0.00 0.00 0.00 177.94 136.20 8693.00 HASSANA TRANSMISSION Hassana 0.00 ZONE

Kundur Mata: Establishing 1 X 8 MVA ,66/11 KV S/S at Kunduru Mata in CR Patna Taluk Hassana Dist with 491.91 & Land under 1 CA1064 construction of 66kv Tap line on Hassana Hassana S 1.00 0.00 1.00 04.04.07 litigation DC towers from Bagur- Ramapura line to proposed 66/11kV S/S at Kundurmata for a dist of 6.2Kms Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Nagarthi: Establishing 1x6.3 MVA, 66/11KV S/S at Nagarthi in H.N.Pura Tq, Hassan Dist with Revised TCCM construction of 66kV SC line of 534.14 & 2 CA1066 Hassana Hassana S 1.00 0.00 1.00 proposal DC towers for a route length of 07.11.07 submitted 10.03Kms to tap the existing 66kV C.R.Patna-H.N.Pura- Singapura SC line to the proposed 66/11kV Nagarthi S/S.

Belapu : Establishing 1x10MVA, 110/11kV Sub-Station at Belapu in Udupi Tq & Dist with Revised Dakshina 3 CB1047 construction of 110kV SC line on Hassana S 964.93 & 0.00 1.00 0.32 1.00 estimate to be Kannada DC towers from the proposed 16.03.07 submitted 110kV Nandikur S/S for a dist of 10Kms with 110kV TB at Nandikur

Sulia: Proposal Establishing 2x10MVA, Dakshina 1492.02 & submitted to 4 CC1018 110/11kV, 1x20MVA, 110/33- Hassana S 1.00 0.00 1.00 Kannada 01.09.10 forest dept. for 11kV Sub-Station with approval, associated line. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Heggunje : Establishing 2x100 MVA, 220/110 kV , 1x10 MVA 110/11kV Sub Station at Heggunje in Udupi Tq & Dist with Construction of 220/110kV MCMV LILO line from 220kV Varahi-Kemar SC line and 110kV Haladi-Hiriyadka SC line to proposed 220/110/11kV Station at Heggunje and a) Construction of 110kV DC line from the proposed Heggunje Station to the existing 110/11kV Brahmavara S/S for 8651.63 & 5 CC1020 Hassana Udupi S 1.00 0.00 500.00 Tendered a dist of 17.5Kms 04.04.17 b) Construction of 110kV DC line on Conventional, 110kV MC and 220/110kV MC towers from the proposed Heggunje Station to the existing Kundapura S/S for a dist of 25Kms. c) Construction of 2Nos of TB's for 110kV Heggunje-Brahmavara DC line at 110/11kV S/S Brahmavara d) Construction of 2Nos of 110kV TN's for 110kV Heggunje-Kundapura DC line at Kundapura S/S

Belman(Nandalike): Establishing 1x10MVA, 878.75 & 6 CC1031 110/11KV s/s at Hassana Udupi S 1.00 0.00 1.00 05.02.18 Belman(Nandalike) (in Karkala Taluk, Udupi district.

6 Total of Sub-stations Hassana 0.00 0.00 0.00 6.00 0.32 505.00

CR Patna: Replacement of 1 X 12.5MVA, 174.86 & To be re- 1 CA1057 66/11 KV power Transformer by Hassana Hassana A 0.00 155.00 155.00 175.00 135.93 155.00 16.03.15 tendered. 1 X 20 MVA, 66/11kV Power Transformer at CR Patna S/S

Salagame: Replacement of 2 X 8 MVA, 66/11 KV power Transformer by 275.27 & 2 CA1068 Hassana Hassana A 1.00 0.00 150.00 Tendered 2 X 12.5 MVA, 66/11kV Power 23.03.17 Transformer at Salagame S/S in Hassana Taluk Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Shanthigrama: Replacement of 2 X 8 MVA, 66/11 KV power Transformer by 275.27 & 3 CA1069 Hassana Hassana A 1.00 0.00 150.00 Tendered 2 X 12.5 MVA , 66/11kV Power 20.03.17 Transformer at Shanthigrama S/S in Hassana Taluk

Balligavi (Shiralkoppa): Providing 1X20MVA, 110/11kV 376.64 & 4 CD1061 Hassana Shivamogga A 10.00 0.00 50.00 To be tendered Spare Transformer at 220kV 07.02.17 Balligavi (Shiralkoppa) Station.

Juttanahally: Providing Additional 1x8MVA, 222.54 & 5 CA1070 Hassana Hassana A 1.00 0.00 150.00 Tendered 66/11kV Power Trnasformer at 28.03.17 66/11kV S/s Juttanahlly

Thogarsi: Providing additional 1 289.70 & 6 CD1063 x 10MVA, 110/11KV Power Hassana Shivamogga A 1.00 0.00 150.00 11.10.17 To be Tendered Transformer

Tyvarachatnalli: Enhancement of existing 6.3MVA 66/11KV Power transformer to 12.5 MVA 176.10 & 7 CD1064 Hassana Shivamogga A 1.00 0.00 50.00 with 5 addl. MCVCB switchgear 07.10.17 To be Tendered at 66/11KV MUSS Tyavarechatnahalli

Kumsi: Enhancement of existing 1 x 10MVA 110/11KV Power 8 CD1065 Hassana Shivamogga A 312.09 1.00 0.00 50.00 Tendered transformer by 1 x 20 MVA, 110/11KV power transpower

Budget Salethur: Dakshina 285.78 & requested 9 CB1050 Providing additional 1X10 MVA Hassana A 1.00 0.00 290.00 Kannada 16.06.17 based on DPR 110/11kV Transformer. cost 285.78 L

Netlamudnur: Providing Budget additional 1x20 MVA, 110/33 kV Dakshina 335.86 & requested 10 CB1051 transformer at 220 kV Hassana A 1.00 0.00 250.00 Kannada 31.10.17 based on DPR Netlamadnur station, in Bantwal cost 335.86 L Taluk, DK District Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bantwala:Providing additional Budget 1x20 MVA, 110/33 kV Dakshina 338.10 & requested 11 CB1052 transformer at 110 kV Bantwal Hassana A 1.00 0.00 340.00 Kannada 23.10.17 based on DPR station, in Bantwal Taluk, DK cost 338.1 L District. Madhuvana:Providing additional Budget 1x20 MVA, 110/11KV Power 256.44 & requested 12 CC1030 Transformer at 110/11KV Hassana Udupi A 1.00 0.00 260.00 05.07.17 based on DPR Madhuvana Sub-station in Udupi cost 256.44 L Taluk and District. Chikkabommenahally: Augmentation of 1 X 8 MVA, 66/11 KV power Transformer by 244.09 & 13 CA1072 Hassana Hassana A 1.00 0.00 244.00 Tendered 1 X 12.5 MVA @ 12.06.17 Chikkabommenahally S/S in Arkalgud Taluk Bychanahally:Providing additional 1x8MVA power transformer @ 66/11kV sub- 232.09 & 14 CA1073 Hassana Hassan A 1.00 0.00 150.00 Tendered station Bychanahally, in 17.05.17 Arkalagud Taluk, Hassan District. K.Byrapura:Providing additional 1x8MVA, 66/11kV power 209.30 & 15 CA1074 Hassana Hassan A 1.00 0.00 150.00 Tendered transformer at K.Byrapura sub- 12.06.17 station.

Kallusadarahally :Providing additional 1x10 MVA, 110/11 kV 271.33 & 16 CA1075 power transformer at 110/11 kV Hassana Hassan A 1.00 0.00 150.00 Tendered 12.06.178 Kallusadarahally Sub station in Arasikere Taluk, Hassan District.

Mudigere: Replacement of 2x6.3MVA, 66/11kV Power Transformers by Chikkamagal 574.31 & 17 CE1040 2x12.5MVA, 66/11kV Power Hassana A 1.00 0.00 50.00 To be tendered uru 01.03.18 Transformer at Mudigere S/s in Mudigere Taluk, Chikkamagaluru District Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Mudigere: Creating 33kV reference by Chikka- 18 Hassana A 0.00 5.00 to be tendered installing 1x8MVA, 66/33kV magalur Transformer additional Gurupura: budget will be Replacement of 1x10MVA, Dakshina 19 Hassana A 0.00 250.00 sought after 110/11kV by 1x20MVA, Kannada awarding the 110/11kV Transformer work additional Bantwala: budget will be Replacement of existing 20 Hassana DK A 0.00 210.00 sought after 1x10MVA,110/33KV Tr. by awarding the 1x20MVA,110/33KV work Arehalli :Providing additional 1x8 MVA, 66/11 kV power New 21 transformer at 66/11 kV Hassana Hassan A 0.00 150.00 Tendered 17-18 Arehalli Sub station in Belur Taluk, Hassan District.

Hiriyadka: Replacement of existing 1x10MVA, 110/33KV To be tendered. New Power Transformer by 20MVA, 22 Hassana Udupi A 0.00 50.00 17-18 110/33KV Power Transformer at 110/33/11kV Hiriadka Sub- station in Udupi Taluk & Dist.

MSEZ: Providing 1 x20 MVA, 110/33/11kV Transformer as To be tendered. New Dakshina 23 spare at 220kV Station MSEZ, Hassana A 0.00 10.00 17-18 Kannada Bajpe in Mangalore Taluk, DK Dist

Chikkamagalur: Replacing 2X12.5MVA, 66/11kV New work 18- Chikkamagal 24 Transformer by 2X20MVA, Hassana A 0.00 150.00 19 ur 66/11kV transformer at 66kV Chikkamagaluru Substation.

24 Total of Augmentations Hassana 0.00 155.00 155.00 200.00 135.93 3614.00 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Gendehally - Arehally: Construction of 66kV DC line from 66kV Arehalli Sub-station to LILO the existing 66kV SC line 444.11 & 1 CA1033 Hassana Hassana L 0.00 1.00 0.00 1.00 To be tendered between Belur-Gendehally Sub- 24.11.09 station along with two Nos of 66kV TB's at 66kV Arehalli Sub- station

Mosalehosahally: Providing LILO arrangements to 66/11kV Mosalehosahally Sub-station in 13.22 & 2 CA1044 Hassana Taluk & District by Hassana Hassana L 10.00 0.00 13.22 Tendered 02.05.16 constructing 66kV DC line for a distance of 130 meters from new SMT-1 line.

Shimoga-Bengaluru 1 & 2 lines: Re-stringing of existing Drake Conductor, replacing of Ground 289.52 & 3 CD1025 Conductor, Disc Insulators, Hassana Shimoga L 5.00 91.72 1.00 To be tendered 19.10.11 Hardwares of 220kV Shimoga- Bengaluru 1 & 2 DC line from MRS Shimoga to Basavanahalli gate (Loc.No.1 to 269)

Shimoga Station to 220kV Kadur Station: Construction of 110kV DC line in Chikkamagal 2134.06 & 4 CE1028 the existing 110kV Shimoga - Hassana L 1.00 0.00 10.00 To be tendered uru 08.06.17 Bengaluru SB line corridor from 220kV Shimoga Station to 220kV Kadur Station.

Reconstruction of 66kV SC line in existing corridor of 66kV SC MBT(FTS Mysuru-Bhadra) line on DC towers from Hassan to 2108.42 & 5 CA1071 H.N.Pura and reconstruction of Hassana Hassan L 1.00 0.00 1.00 02.04.08 66kV sC line in the existing 110kV SC SMT(Shimoga-Mysuru) line corridor on DC towers from HN Pura to Hootagalli Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Baikampady: Creating One No. To be New Dakshina 6 110kV TB for providing new Hassana L 0.00 1.00 16-17 Kannada tendered. 20MVAR, 110jkV Capacitor Bank

S K Pura to Arehall: Conversion of existing 66kV S/C 7 CA1048 Hassana Hassana L 0.00 5.00 To be tendered line on D/C towers in to D/C line.

7 Total of Lines Hassana 0.00 0.00 0.00 18.00 91.72 32.22

Kulashekar: 1) Re-arranging of existing 110kV lines at 110/33/11kV Kulashekara S/S inview of R&M Revised works of S/S. Dakshina 716.04 & 1 CB1022 Hassana T 0.00 1.00 0.11 1.00 estimate to be 2) R&M of 110/33/11kV Kannada 18.02.11 submitted Kulashekara S/S and providing additional 1X20MVA, 110/33kV Tr at 110/33/11kV Kulashekara S/S Kavoor: Dakshina 1948.23 & Tender to be 2 CB1023 R & M Works at Kavoor 220kV Hassana T 1.00 0.00 1.00 Kannada 30.04.11 invited Station. Additional budget will be Formation of 220KV rigid bus at 236.89 & 3 CC1028 Hassana Udupi T 1.00 0.00 1.00 sought after 220KV RS, Kemar 04.12.09 awarding the work Chikkamagalur: Providing of 2Nos. of 66kV SF6 CB to Incoming lines from 220kV R/S Mugluvalli (Chikkamagalur) Chikka- 211.33 & 4 CE1031 Hassana T 1.00 0.00 50.00 To be tendered & 2Nos of 66kV SF6 CB to magalur 15.06.17 Incoming lines from Bhadra including 2Nos. bay at Chikkamagalur Sub-Station To be tendered New Formation of 110KV rigid bus at 5 Hassana Udupi T 0.00 1.00 15-16 220KV RS, Kemar Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

5 Total of TB's & Others Hassana 0.00 0.00 0.00 4.00 0.11 54.00

42 Total of Hassana Zone Hassana 0.00 155.00 155.00 228.00 228.08 4205.22

MYSURU TRANSMISSION ZONE Mysuru 0.00

Kampalapura: Establishing 562.89 Approved in 1 DA1044 1x8MVA, 66/11kV Sub-Station Mysuru Mysuru S 0.00 1.00 0.00 1.00 13.06.7 70th TCCM with associated line

Kaggere (Hampapura) DPR Approved 528.36 & 2 DA1112 Establishing 1x8MVA, 66/11kV Mysuru Mysuru S 1.00 0.00 1.00 , 15.05.17 Sub-Station with associated line To be Tendered.

Chamalapura (B.Seehalli): Establishing 1x8MVA, 66/11kV 618.08 & DPR Approved, 3 DA1118 Mysuru Mysuru S 10.00 0.00 10.00 Sub-Station with associated line 06.03.17 Tendered for a distance of 3.835Kms

Koppalur (Srinagar): Establishing 1x12.5MVA, 4 DA1124 Mysuru Mysuru S 1.00 0.00 100.00 NIT Issued 66/11kV Sub-Station with associated line Panchayat Vyasarajapura Land Establishing 1x8 MVA 66/11kV 593.88 & hanedover to 5 DA1126 Mysuru Mysuru S 1.00 0.00 10.00 Sub-Station with associated line 03.01.18 KPTCL from for a distance of 3.498Kms PDO, TNPura, Mysuru 220kV Nagamangala: Establishing 2X100MVA, 6 DB1097 Mysuru Mandya S 1.00 0.00 1.00 Land acquired 220/66kV Station with assosiated lines Kadukothanahalli Establishing 1x 8MVA, 66/11 KV 526.11 & 7 DB1099 Mysuru Mandya S 1.00 0.00 200.00 Sub-Station with associated line 06.10.17 for a distance of 0.08Kms Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Hariyaldamma Temple Establishing 1 x 8MVA, 66/11 815.94 & 8 DB1102 Mysuru Mandya S 1.00 0.00 300.00 KV Sub-Station with associated 05.07.17 line for a distance of 8.591Kms

220kV Begur: Establishing 2X100MVA, Chamarajana Awaiting for 9 DD1045 Mysuru S 1.00 0.00 1.00 220/66kV Station with gar DPR assosiated lines

Arkalavadi: Establishing 1x8MVA, 66/11kV Chamarajana 10 DD1047 Mysuru S 1.00 0.00 1.00 - Sub-Station with associated line gar for a distance of 10.368Kms

Lokkanahalli : Chamarajana 11 DD1048 Establishing 1 x 8 MVA,66/11 Mysuru S 1.00 0.00 1.00 - gar KV sub-station.

Gargeshwari: Private Land Establishing 1x8MVA, 66/11kV 780.89 & 12 DA1136 Mysuru Mysuru S 1.00 0.00 50.00 aquired by Sub-station with associated line 23.02.18 KPTCL. for a distance of 0.543Kms

12 Total of Sub-stations Mysuru 0.00 0.00 0.00 21.00 0.00 676.00

Bannur : Replacing 2nd 1x12.5MVA, 248.25 & 1 DA1088 66/11kV by 1x20MVA, 66/11kV Mysuru Mysuru A 0.00 1.00 0.00 1.00 To be tendered 13.05.14 Transformer with additional SWG. T.N.Pura : 426.97 & 2 DA1090 Repl 2X12.5MVA by 2X20 MVA Mysuru Mysuru A 1.00 0.00 175.00 To be tendered 20.06.14 66/11kV Transformer Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Bhogadhi: 225.70 & 3 DA1091 Providing Spare 1x20 MVA Mysuru Mysuru A 1.00 0.00 1.00 To be tendered 12.09.14 66/11kV Transformer Jayapura: Replacing 2nd 8MVA, 66/11kV 134.19 & 4 DA1092 Mysuru Mysuru A 1.00 0.00 1.00 To be tendered by 12.5MVA, 66/11kV 27.09.14 Transformer KHB Colony: Replacing 1x6.3MVA, 66/11kV 138.86 & To be re- 5 DA1094 Mysuru Mysuru A 1.00 0.00 150.00 by 1x12.5MVA, 66/11kV 03.11.14 tendered Transformer Hebbal : Replacement of 2 X 12.5 MVA, 371.90 & 6 DA1099 Mysuru Mysuru A 84.18 146.48 230.66 1.00 0.00 50.00 To be tendered 66/11 KV Power Transformer by 27.02.15 2 X 20 MVA . Hullahalli : Awaiting for Replacement of 2 X 8 MVA by 2 285.16 & 7 DA1110 Mysuru Mysuru A 110.00 98.65 125.00 2nd X 12.5 MVA, 66/11kV 05.05.15 Transformer Transformer. Dattagalli: Replacing 1x5 MVA, 66/11kV by 168.51 & To be Re 8 DA1127 Mysuru Mysuru A 1.00 0.00 10.00 1x12.5MVA, 66/11kV 23.05.17 Tendered Transformer Hadli : 248.71 & 9 DB1068 Providing additional 1x12.5MVA, Mysuru Mandya A 0.00 0.00 1.00 0.00 1.00 - 23.12.13 66/11kV Transformer

Addihalli: Replacing 1X6.3MVA & 1X8MVA, 66/11kV Trs. by 2x12.5MVA, 66/11kV Trs. at Addihalli along with stringing of 2nd ckt 66kV line b/w 220kV K.R.Pet- 1216.71 / 10 DB1078 Santhebachally and linking by Mysuru Mandya A 1.00 0.00 300.00 13.06.16 66kV SC line to Addihally Sub- station with construction of 2Nos of 66kV TBs at Santhebachahalli, One TB at Addihalli Sub-station and One TB at 220kV K.R.Pet station

Guddenahalli : Replacement of 1 158.85 & 11 DB1093 X 6.3 MVA by 1 X 12.5 MVA Mysuru Mandya A 1.00 0.00 1.00 - 14.09.15 66/11kV Transformer. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Akkihebbal : 178.62 & 12 DB1094 Replacement of 2 nd 8 by 12.5 Mysuru Mandya A 1.00 0.00 1.00 - 19.09.15 MVA, 66/11kV Transformer. Gamanahalli : Replacement of 1 166.97 & 13 DB1095 X 8 MVA by 12.5 MVA, 66/11kV Mysuru Mandya A 1.00 0.00 1.00 10.09.15 Transformer. Mandagere : Providing additional 1 X 12.5 257.18 & 14 DB1104 Mysuru Mandya A 1.00 0.00 1.00 DPR Approved MVA, 66/11 KV Power 03.10.17 Transformer. Ponnampet: Replacing 1 X 8MVA, 66/11kV 168.14 / 15 DC1013 Mysuru Kodagu A 1.00 0.00 180.00 NIT Issued by 1x12.5MVA, 66/11kV 20.03.17 transformers Ponnampet : 144.89 & 16 DC1014 Mysuru Kodagu A 1.00 0.00 150.00 NIT Issued 1 X8 by 1 X 12.5 66/33/11 KV 20.03.17

Chandakavadi : Replacing 2X8 Chamarajana 290.17 & LOI to be 17 DD1039 MVA,66/11 KV transformers by Mysuru A 10.00 0.00 175.00 gara 16.03.15 issued 2X12.5 MVA transformers . Hanur : Replacement of 1 X 8 MVA by 1 Chamarajana 158.64 & 18 DD1042 Mysuru A 1.00 0.00 1.00 To be tenderd X 12.5 MVA, 66/11kV gar 16.11.15 Transformer.

Project name is altered as this work is for replacing the Begur : Chamarajana existing 2nd 19 DD1050 Providing 1X12.5MVA, 66/11 KV Mysuru A 1.00 0.00 1.00 gar 8MVA Tr., by Power Transformer. 12.5MVA Tr., and this is not providing 1X12.5MVA Tr.

Mandya KIADB: Replacing 1x12.5MVA, 66/11kV 20 Mysuru Mandya A 0.00 1.00 To be tendered by 1x20MVA, 66/11kV Transformers with SWGs Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Chinakurali : New Replacement of 1 X 8 MVA, 21 Mysuru Mandya A 0.00 1.00 DPR Approved 15-16 66/11 KV Power Transformer by 1 X 12.5 MVA, 66/11 KV. Kadaballi : New Providing additional 1 X 12.5 22 Mysuru Mandya A 0.00 1.00 To be tenderd 15-16 MVA, 66/11 KV Power Transformer. Adichunchangiri: Additional New 23 1X12.5MVA 66/11kV Power Mysuru Mandya A 0.00 1.00 To be tenderd 17-18 Transformer New Kunthur: Providing additional Chamarajana 24 Mysuru A 0.00 10.00 17-18 1x8MVA, 66/11kV Power Tr. gara

New Bandalli: Providing additional Chamarajana 25 Mysuru A 0.00 0.00 10.00 17-18 1x8MVA, 66/11kV Power Tr. gara

25 Total of Augmentations Mysuru 84.18 146.48 230.66 137.00 98.65 1349.00

Hootagalli - Bherya Limits: Replacing of H - Frames by Re- 1025.04 To be re- 1 DA1051 construction of 66kV SC line Mysuru Mysuru L 1.00 0.00 1.00 22.04.16 tendered between Hootagalli - Bherya Limits to a distance of 54 km

Hootagalli R/S, Vijayanagar and FTS Sub-Station: Stringing of 66kV 2nd circuit 128.00 & To be Re- 2 DA1056 between Hootagalli R/S, Mysuru Mysuru L 1.00 0.00 1.00 06.08.11 tendered Vijayanagar and FTS Sub-Station on existing D/C towers with Terminal Bays at both ends

Bettadapura Sub-station: Reconstruction of 66 kV SC line on SC towers by LILO line from existing 66 kV Chunchanahatti- 94.25 & To be Re- 3 DA1059 Kushalnagar line to 66/11 kV Mysuru Mysuru L 1.00 0.00 1.00 18.08.12 tendered Bettadapura S/S for a distance of 2.457 km in Periyapatna Taluk,Mysuru District for a distance of 2.46 kms Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Jayapura : To maintain the Providing additional 1 No. of 66 Minimum kV TB and LILO of Kadakola - Ground Sargur 66kV line by constructing 58.00 & 4 DA1060 Mysuru Mysuru L 1.00 0.00 1.00 Clearence, the additional Circuit on existing 06.09.11 work has to be towers for a distance of 6.0 kms taken on TOP along with Terminal Bay at Priority Jaipura for a distance of 6 kms

Hootgalli-Kanayanbetta upto Bavali limit: Re-Construction of 220kV 415.2 & 5 DA1080 Hootgalli-Kanayanbetta line upto Mysuru Mysuru L 1.00 0.00 10.00 To be tendered 26.03.15 Bavali limit for a distance of 81kms as per Southern Grid instruction.

K R Nagar to Chunchanakatte: Re-Construction of existing 66kV 155.96 & 6 DA1081 Mysuru Mysuru L 1.00 0.00 1.00 To be retenderd line between K R Nagar Sub- 23.11.15 Station to Chunchanakatte Sub- Station for a distance of 5.8kms

Kadakola-Devanur (Nanjangud) Estimate HTLS Line: submitted for Strenthening of 66kv s/c line on Detailed survey 7 DA1135 s/c towers from Kadakola 220kv Mysuru Mysuru L 1.00 0.00 1.00 on 05.07.2017. R/S TO 66KV Devanur s/s ( Detailed Survey Nanganagud ) by HTLS Tender to be Conductor ( 22 km) called.

Shimsha - Mandya: To be re- Construction of 66kV SC link 431.53 & 8 DB1024 Mysuru Mandya L 346.87 0.00 346.87 1.00 42.29 10.00 Tendered for line in the existing corridor for a 13.10.09 balance works distance of 44.57KMs. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Hampapura : LILO of Kadakola -Santhesaguru 66kV line by constructing additional Circuit on existing towers for a distance of 6.5km 60.57 & 9 DB1053 Mysuru Mandya L 1.00 0.00 1.00 To be tendered along with Terminal Bay at 06.09.11 Hampapura (HD Kote) for a distance of 6.5 kms

Kiragavalu LILO: Converstion of 66kV S/C Line 132.38 & 10 DB1087 on SC Tower to 66kV LILO line Mysuru Mandya L 0.00 1.00 0.00 75.00 Tendered 01.10.14 on DC Towers from the existing 66kV SFC-Vajamangala DC line.

Anegola LILO: Construction of 2nd circuit on existing 66kV DC towers for a 74.09 & 11 DB1090 Mysuru Mandya L 1.00 0.00 1.00 To be Tendered distance of 2.965 Kms for 12.06.15 Making LILO arrangement to Anegola Sub-Station

Santhemaranahalli Sub-station: Providing 66kV LILO arrangment Chamarajana 154.78 & 12 DD1029 Mysuru L 1.00 0.00 50.00 To be Tendered to existing 66/11kV gara 20.01.15 Santhemaranahally S/s along with 1 No TB

Ramapura LILO: Construction of 66kV 2nd circuit line for a distance 1.5Kms. on Chamarajana 56.27 & 13 DD1036 existing D/C towers for making Mysuru L 1.00 0.00 10.00 To be Tendered gara 20.11.14 LILO arrangement to Ramapura Sub-Station along with Terminal Bay.

13 Total of Lines Mysuru 346.87 0.00 346.87 13.00 42.29 163.00

50 Total of Mysuru Zone Mysuru 431.05 146.48 577.53 171.00 140.94 2188.00 BAGALKOTE TRANSMISSION Bagalkote 0.00 ZONE Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others Alternate Land Sankratti : Establishing 2x10MVA, Identified, 110/11kV Sub-Station with LILO 844.07 & Land 1 EE1058 Bagalkote Belagum S 700.34 73.00 773.34 1.00 57.00 1.00 line from 110kV Kudachi - 17.02.11 Purchased Teradal line for a distance of 8.3 Kms. Committee Meeting was conducted on

Private Land identified, Documents to be collected. Mughalkod: For theYear Establishing 2x100MVA, 17-18 2 EE1059 220/110kV & 1x10MVA, Bagalkote Belagum S 7249.00 1.00 0.00 1.00 110/11kV Station with asociated Token Budget- 220kV & 110kV lines Rs 1.00 Lacs For theYear 18-19 Token Budget- Rs 1.00 Lacs Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others The land handed to KPTCL by the Thasildhar , Athani on 17.02.2016. Shiraguppi: For the Up-gradation of 33kV MUSS to 1075.44 & Year 17-18 3 EE1064 1x10MVA, 110/11kV Sub- Bagalkote Belgaum S 1.00 0.00 1.00 24.09.16 Station with associated line for a Token distance of 16.7 kms & TB. Budget- Rs 1.00 Lacs For the Year 18-19 Token Budget- Rs 1.00 Lacs

Singatalur : token Up-gradiation of existing 4 Bagalkote Gadag S 0.00 1.00 33/11kV MUSS to 110/11kV Budget Sub-Station with associated line. requested

Banavasi: Establishing 1x10MVA, Uttara 928.90 & 5 ED1008 Bagalkote S 1.00 0.00 1.00Token Budget requested. 110/11kV Sub-Station with Kannada 21.09.2017 associated line & TB.

5 Total of Sub-stations Bagalkote 700.34 73.00 773.34 4.00 57.00 5.00 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Project work will be awarded shorlty , Hangal: excpet Providing additional 1X10MVA, 199.5 & 10MVA Trf 1 EA1023 Bagalkote Haveri A 1.00 0.00 50.00 110/11kV Power Transformer at 10.07.15 budget 110kV S/s Hangal requested. Supply:70L, Erection:10 L, Civil:20L.

Inanticipati on of awarding of work 100% Navanagar: DPR Replacement of exisiting 227.96 & amount 2 EB1023 Bagalkote Dharwad A 203.55 203.55 1.00 203.35 50.00 1x10MVA by 1x20 MVA , 110/11 11.02.14 requested. KV Transformer 20MVA Trf booked and same was diverted to kalaburgi. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Inanticipati on of awarding of work 100% DPR Dambal: 172.34 & amount 3 EC1014 Providing additional 1x10MVA, Bagalkote Gadag A 17.29 17.29 80.00 17.29 50.00 28.01.13 110/11kV Transformer requested. 20MVA Trf booked and same was diverted to kalaburgi.

Project work will be awarded shorlty , Naregal: excpet 181.41 & 4 EC1015 Providing spare 1x10MVA, Bagalkote Gadag A 23.87 23.87 80.00 23.70 60.00 07.12.13 10MVA Trf 110/33-11kV Transformer budget requested. Supply:42L, Erection:6L, Civil:12L. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Project work will be awarded shorlty and 100% DPR cost Gadag: requested. Providing additional 4th 786.94 & Supply:627 5 EC1019 Bagalkote Gadag A 1.00 0.00 500.00 1x100MVA, 220/110kV 29.12.16 L Transformer Erection:79 L, civil:80L Additional budget will be sought after award of work. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

For theYear 17-18 Token Budget of Rs

110KV S/S Nagaramunnoli 1.00 Lacs Replacement of 1x10MVA, 247.71 & For theYear 6 EE1100 Bagalkote Belagum A 1.00 0.00 50.00 110/11kV by 1x20MVA, 02.12.14 18-19 110/11kV Transformer Token Budget of Rs 200.00 Lacs Say Rs 200.00 Lacs Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Work will Muddebihal: 179.3 & be under 7 EG1035 Providing additional 1x10MVA, Bagalkote Bijapur A 10.00 5.75 10.00 14.10.10 110/33kV Transformer progress, if awarded

110KV S/S Shirabur: Work will Replacement of 1x10MVA, 252.58 & be 8 EG1042 Bagalkote Bijapur A 1.00 0.00 250.00 110/11kV by 1x20MVA, 14.08.15 completed, 110/11kV Transformer if awarded Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Work will 220KV Station, Indi: 255.13 & be 9 EG1043 Providing Additional 1x10MVA, Bagalkote Bijapur A 53.24 53.24 1.00 0.00 150.00 19.06.15 110/11kV transformer completed, if awarded

Zalaki: Work will Replacement of 10MVA, 256.11 & be 10 EG1052 Bagalkote Bijapur A 1.00 0.00 10.00 110/11kV by 20MVA, 110/11kV 05.11.15 completed, Transformer if awarded

Work will Chadachan: 287.07 & be 11 EG1053 Providing additional 1x10MVA, Bagalkote Bijapura A 1.00 0.00 10.00 16.02.17 110/11kV Transformer completed, if awarded Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Project work will be awarded shorlty , Konnur: excpet Providing additional 1X10MVA, 10MVA Trf 12 Bagalkote Gadag A 0.00 10.00 110/11kV Power Transformer at budget 110kV Konnur S/s. requested. Supply:70L, Erection:10 L, Civil:20L.

Bagalkot: 1x100MVA Transformer 13 New Bagalkote Bagalkot A 0.00 1.00 220/110KV for arranging the power supply tBTDA substations Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

For theYear 18-19 Shiragaon : Token Budget Replacing 1x10MVA, 110/11kV 14 New Bagalkote Belgaum A 0.00 10.00 by 1x20MVA, 110/11kV of Rs 200.00 Transformer Lac Say Rs 200.00 Lac

For theYear Hirebagewadi: 18-19 Augmentation of 10 MVA Token Budget New 15 ,110/11 KV by 20 MVA, 110/11 Bagalkote Belagavi A 0.00 10.00 17-18 of Rs 200.00 KV Power Transformer at 110 KV Lac S/S Hirebagewadi Say Rs 200.00 Lac

For theYear 110 kV S/S Satti : Providing 18-19 additional 1x10 MVA, 110/11 kV Token Budget New 16 transformer at 110 kV Satti sub- Bagalkote Belagavi A 0.00 10.00 17-18 of Rs 150.00 station, in Athani Taluk, Belagavi Lac District Say Rs 150.00 Lac Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

For theYear 110 kV S/S Itnal : Replacement 18-19 of 1x10 MVA, 110/11 kV Token Budget New transformer by 1x20 MVA, 17 Bagalkote Belagavi A 0.00 10.00 of Rs200.00 17-18 110/11 kV transformer at 110 kV Itnal sub-station, in Raibag Lac Taluk, Belagavi District Say Rs 200.00 Lac

110 kV S/S Bisnal : Creating 33 kV reference by installing 1x20 New 18 MVA, 110/33 kV transformer at Bagalkote Bagalkot A 0.00 0.00 10.00 17-18 110 kV Bisnal sub-station, in Bilagi Taluk, Bagalkot District

For theYear 17- 18 Token Budget of 110 kV S/S Sulthanpur : Replacement of 1x10 MVA, Rs 1.00 110/11 kV transformer by 1x20 283.46 & Lacs 19 EE1122 Bagalkote Belagavi A 1.00 0.00 10.00 MVA, 110/11 kV transformer at 28.06.17 Say Rs 1.00 110 kV Sulthanpur sub-station, Lacs in Raibag Taluk, Belagavi District For theYear 18- 19 Tender Cost- Rs 40.00 Lacs 19 Total of Augmentations Bagalkote 0.00 297.95 297.95 179.00 250.09 1261.00 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

110KV Kawalwad-Hubli Line: Replacing of Exisisting Dog/Wolf conductor by Lynx Conductor of Token 110kV NK1 & NK2 Line from 869.92 & Budget for 1 EB1029 110kV Kavalavad S/s 220kV Bagalkote Dharwad L 0.00 1.00 0.00 1.00 15.04.15 SRS Hubali S/s for a distance of tendereing 32kms along with strenghthening requested. of line by replacing weakened Towers for a distance of 32Kms

Gadag-Naregal-Ron: Conversion of 110kV SC line to DC line from 220kV Gadag S/s to 110kV Token Naregal S/s and Stringing of Budget for 2 EC1017 Bagalkote Gadag L 1194.72 & 1.00 0.00 1.00 110kV 2nd Circuit from 110kV 19.03.15 tendereing Naregal S/s to 110kV Ron S/s requested. for a distance of 28.57 & 16.795Kms

Jog-Sirsi: Replacement of Existing Towers Token Dog/Coyote Conductor by new Uttar Budget for 3 ED1019 towers and Lynx Conductor of Bagalkote L 1534.87 & 1.00 0.00 1.00 Kannada 110kV NK1 & NK-2 DC line form 02.02.15 tendereing MGHE PH Jog to 110kV Sirsi S/s requested. for A distance of 49.71 Kms

Sirsi and Kavalawada line Replacement of 110kV Token Dog/coyote ACSR conductor by 1560.53 & Budget for 4 ED1020 Lynx conductor of NK-1 and NK- Bagalkote North Canara L 1.00 0.00 1.00 15.05.14 2 lines between Sirsi and tendereing Kavalawada for a distance of requested. 67.376Kms Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Ambewadi - Kawalwad Line: Replacement of detoriarated and Token rusted 19 Nos. of MS towers with Uttar 850.28 & Budget for 5 ED1025 Dog and coyote conductor by Bagalkote L 1.00 0.00 1.00 Kannada 24.12.16 lynx conductor of 110kV NK-1 & tendereing 2 D/C Line between Ambewdai requested. and Kawalwad.

For theYear Nehru nagar-6 Pole Struture: 18-19 conversion of 110 kV Nehrunagar-6 pole structure SC Tender Cost line constructed on 110 kV SC Rs 82.66 6 EE1113 Bagalkote Belagum L 82.19 & 1.00 0.00 83.00 towers(MS towers)to 110 kV SC 15.05.14 Lacs line on DC towers for a distance of 2.3 kms Say Rs 83.00 Lacs

Mudhol Tap line: Conversion of existing 110kV 100% DPR 88.16 & 7 EF1049 Mudhol tap line to D/C line Bagalkote Bagalkote L 1.00 0.00 89.00 17.05.14 cost along with 1 TB for a distance of considered 1.176kms. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Shifting and Re-routing of 110 kV line from Loc 125-145 of 100% DPR 583.23 & 8 EG1055 Bagalkot-B.Bagewadi DC line in Bagalkote Vijayapur L 1.00 0.00 10.00 10.11.17 cost TLM section B.Bagewadi considered jurisdiction in Vijayapura District

220kV SRS Hubli -220kV Haveri Station: Conversion of existing S/C line 9 on /SC Towers to DC line from Bagalkote Dharwad L 0.00 1.00 Token Budget 220/110kV SRS Hubli R/S to 220/110kV Haveri Station for a length of 78Kms

9 Total of Lines Bagalkote 0.00 0.00 0.00 8.00 0.00 188.00

Mundaragi Sub-station: 100% DPR 37.73 & 1 EC1013 Providing 1No of 110kV TB for Bagalkote Gadag T 0.00 6.03 6.03 1.00 11.56 38.00 26.10.11 cost Uppinabetagera Line. considered

Chikkodi 220kV R/S: For theYear Construction of 2 Nos of 220kV 362.32 & 18-19 2 EE1093 TBs at 220kV Chikkodi S/s for Bagalkote Belagum T 0.00 1.00 0.00 1.00 01.01.14 Terminating 220kV Ghataprabh- Token Chikkodi DC line. Budget of Rs 1.00 Lacs

2 Total of TB's & Others Bagalkote 0.00 6.03 6.03 2.00 11.56 39.00

35 Total of Bagalkote Zone Bagalkote 700.34 376.98 1077.32 193.00 318.65 1493.00

KALABURAGI TRANSMISSION Kalaburagi 0.00 ZONE Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Approved in 66th TCCM, Dated: Mangalore: 20.07.2015.; In Up-gradation of 33/11kV MUSS 1076.00 & case project is 1 FD1029 to 2X10 MVA,110/11kV Sub- Kalaburagi Koppal S 0.00 1.00 0.00 100.00 27.04.17 awarded , Station with associated lines for budget of a distance of 7.426 Kms. Rs.100Lakhs is required for FY2018-19

Ghanagapura: Establishing 2x100MVA, 6911.68 & 2 FC1050 220/110/11kV Station with Kalaburagi Kalaburagi S 1.00 0.00 1.00 To be tendered 25.05.17 associated 220kV and 110kV lines. Approved in 38th TCCM , Dated: 17.10.2006. Later, again approved in 75th TCCM DT: 04.11.2017 Subject:92 Kukanur(Itagi) : Establishing Block level 1x10MVA, 110/11kV Sub- 3 FD1019 Kalaburagi Koppal S 0.00 10.00 drawings Station with associated 110kV submitted to line. CEE/P&C/Ben galuru Dated: 27.01.2017 from O/o the SEE/Tr(W&M)C /MRB.

Approval obtained for purchase of the Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Approved in 56th TCCM , 30.11.2014. Kalaburagi switching station - 50Acres of 400kV: Land alloted 4 FC1052 Kalaburagi Kalaburagi S 0.00 1.00 Establishment of 400/220 kV vide Ltr No: Sub Station at Kalaburagi PCKL/A4/201/ 2007-08/2266- 67 Dtd: 30.07.2014.

Bayappur: Establishing 5 New 16-17 1x10MVA, 110/11kV Sub- Kalaburagi Raichur S 0.00 5.00 Station with associated line

5 Total of Sub-stations Kalaburagi 0.00 0.00 0.00 2.00 0.00 117.00

Kogali: 20.08.13 & 1 FB1075 Providing additional 1x8MVA, Kalaburagi Bellary A 1.00 0.00 1.00 178.18 66/11kV Transformer

Sovenahalli: 178.52 & 2 FB1076 Providing additional 1x8MVA, Kalaburagi Bellary A 1.00 0.00 1.00 20.08.13 66/11kV Transformer

Banavikallu: 180.84 & 3 FB1077 Providing additional 1x8MVA, Kalaburagi Bellary A 1.00 0.00 1.00 20.08.13 66/11kV Transformer

HB Halli: Replacement of 1X 136.45 & 4 FB1084 Kalaburagi Bellary A 1.00 0.00 1.00 8MVA,66/11KV Transformer by 02.09.14 1X12.5MVA,66/11KV Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Somasamudra: 209.74 & 5 FB1086 Providing additional 1x10MVA, Kalaburagi Bellary A 1.00 0.00 1.00 15.05.14 110/11kV Transformer

Kamalapur (Hospet Tq.): Providing additional 268.92 & 6 FB1089 1 X10MVA, 110/11kV Power Kalaburagi Bellary A 1.00 0.00 10.00 01.06.15 Transformer at kamalapur in Hospet Tq. Kalaburagi University: Replacement of 1X10MVA by 172.79 & 7 FC1058 1X20MVA power Transformer at Kalaburagi Kalaburagi A 1.00 0.00 1.00 01.02.16 110/11KV S/s Kalaburagi University Yedrami: Replacement of 1 x 10 MVA 196.66 & 8 FC1059 110/33 KV Transformer by 1 x Kalaburagi kalaburagi A 1.00 0.00 196.66 20.03.17 20 MVA 110/33 KV Transformer at 110 kv Yedrami Sub-Station

Bevoor : DPR approved. Providing additional 1 x 10 MVA, 243.72 & DPR Cost Rs 9 FD1024 Kalaburagi Koppal A 1.00 0.00 50.00 110/11 kV Power Transformer at 01.06.15 243.72 lakhs, Bevoor S/s Dtd 04.06.2015.

Ganadal : DPR approved. Providing additional 1 x 10 MVA, 241.45 & 10 FD1025 Kalaburagi Koppal A 1.00 0.00 50.00 DPR Cost Rs 110/11 kV Power Transformer at 01.06.15 241.45 lakhs, Ganadal S/s Dtd 04.06.2015

Konkal: 164.46 & 11 FF1002 Providing additional 1x10MVA, Kalaburagi Yadgiri A 1.00 0.00 164.46 04.06.14 110/11kVTransformer Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Creating 33 KV reference by providing additional 1 x 20 MVA 110/33kV Transformer along 379.12 & Tendered on 26- 12 FC1061 Kalaburagi Kalaburagi A 0.00 1.00 0.00 379.12 with construction of 33kV 03.07.17 03-2018. Terminal Bay at 110/11 kv Kalaburagi (South) Sub-Station

Providing additional 1 x 20 MVA 110/33 kv Transformer along with construction of 33kV 356.58 & Tendered on 26- 13 FC1062 Kalaburagi Kalaburagi A 1.00 0.00 356.58 Terminal Bay at existing 10.05.17 03-2018. 110/33/11kV at Kalaburagi (West) Sub-Station

Creating 33 KV reference by Shifted from L4 providing additional 1 x 20 MVA to L3 with 110/33 kv Power Transformer nominal 14 FF1004 along with construction of 33kv Kalaburagi Yadgir A 1.00 0.00 1.00 budget(CEE Terminal Bay at Existing P&C Ltr 110/11kV Gurmitkal Sub- No.:26028-032 Station in Yadgir Tq. yadgir Dist. Dtd:06.03.2018

Koppal: Providing spare 20 MVA, 15 110/33/11 kV Power Kalaburagi Koppal A 0.00 50 Transformer at 110 kV S/S Koppal Tekkalakote: New 69th TCCM 16 Providing 1x20 MVA, 110/33 kV Kalaburagi Ballari A 0.00 1 15-16 Dtd:17.08.2016 Power transformer

Approved in 66/11KV S/S Ujjini: Const. of 70th TCCM new comtrol room building along Dt:20.12.2016 . New with shifting of equipments from Estimate 17 Kalaburagi Ballari A 0.00 5 17-18 existing control to the proposed submitted to control with providing protection CE(P&C) vide for the existing equipments 3760-61 DT: 30.06.2017 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Sankalapura: Repl of 1X10MVA Approved in New 18 by 1X20MVA, 110/11KV Trf at Kalaburagi Ballari A 0.00 10 73rd TCCM 17-18 110/11KV S/S Sankalapura Dtd:20.03.2017

Venkatapura: Repl of 1X8MVA Approved in New 19 by 1X12.5MVA, 66/11KV Trf at Kalaburagi Ballari A 0.00 10 73rd TCCM 17-18 66/11KV S/S Venkatapura Dtd:20.03.2017

Sindhanoor: Replacement of 1x10MVA by New 69th TCCM 20 1x20MVA 110/11KV Power Kalaburagi Raichur A 0.00 5 17-18 Dtd:17.08.2016 Transformer at 110KV S/S Sindhanoor

73rd TCCM 20.03.2017; DPR Approved vide Enhanncement of 10MVA, B19/1374/87- 110/33/11kV power 88 Dt: Transformer NGEF Make) by New 05.02.2018 21 20MVA, 110/33Kv POWER Kalaburagi Koppal A 0.00 100 17-18 Alwandi LIS Transformer at 110/33/11kV scheme also MUSS Betegeri in Koppal Tq, requested District. power supply on 33KV Voltage class , 2.75MVA

Venkatgiri : Enhancement of 10 MVA, 110/11kV Power Approved on New 22 Transformer by 20 MVA Kalaburagi Koppal A 0.00 50 73rd TCCM 17-18 110/11kV Power Transformer at 20.03.2017 110/11kV S/s Venkatgiri. Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Enhanncement of 10MVA, 110/11kV power Transformer New NGEF Make) by 20MVA, 23 Kalaburagi Koppal A 0.00 50.00 17-18 110/11Kv POWER Transformer at 110/33kV MUSS Koppal in Koppal Tq, District.

110KV Sriramnagar: Replacement of of 1X10 MVA, New work 18- 24 110/11kV by 1x20MVA Kalaburagi Koppal A 0.00 50.00 19 110/11KV Power Transformer at 110/11kV Sriram Nagar S/s.

Enhancement of 1x10MVA, 110/11kV Power Transformer New work 18- 25 No. 1 by 1x20 MVA 110/11kV Kalaburgi Shorapur A 0.00 5.00 19 Power Transformer at 110/11kV Shorapur.

Enhancement of 1x10MVA,110/33kV power New work 18- 26 transformer No.III by 1X20MVA Kalaburgi Shahapur A 0.00 5.00 19 110/33kV Power Transformer at 110/11kV Shahapur S/S Valkamdinni: Replacement of 1x10MVA by New 202.25&11.4 73rd TCCM 27 1x20MVA 110/33KV Power Kalaburagi Raichur A 1.00 17-18 .2018 20.03.2017 Transformer at 110KV S/S Walkamadinni. Raichur: Providing spare 10 MVA, 110/11 227.84&16.0 28 Kalaburagi Raichur A 1.00 kV Power Transformer at 220 kV 4.18 R/S Raichur

28 Total of Augmentations Kalaburagi 0.00 0.00 0.00 14.00 0.00 1556.82 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Alipur to Bellary(South): Stringing of 110kV 2nd Circuit on exisitng DC towers from 51.95 & 1 FB1057 Kalaburagi Bellary L 0.00 1.00 0.00 1.00 Alipur Station to Bellary (South) 13.08.12 Sub-Station for a distance of 8.00 Km. Shahapur - Haattigudar: Re-construction of 110kV DC line from 220kV 494.34 & 2 FC1042 Hattigudar(Shahapur) RS to Kalaburagi Yadgiri L 0.00 10.00 0.00 496.00 05.05.15 110kV Shahapur S/s for a distance of 10.63kms using Lynx conductors Jewargi Sub-station: Construction of 110kV LILO line from existing Shahabad- 128.83 & 3 FC1051 Shahapur line to 110/33-11kV Kalaburagi Kalaburagi L 1.00 0.00 1.00 16.06.17 Jewargi sub-station in the existing corridor for a distance of 0.86Kms Betagera to proposed 220kV Station at Koppal: Approved in Construction of 110kV SC line on 62nd TCCM, DC towers from proposed 1029.46 & Dated: 4 FD1030 Kalaburagi Koppal L 1.00 0.00 10.00 220/110/11kV 07.06.17 29.11.2014. Halavarthy(Koppal) S/s to the Estimate existing 110/33/11kV Betagera submitted. S/s for a distance of 23.836Kms

YTPS to Kalaburagi-400kV: Approved in Construction of 400kV DC Line 56th TCCM, 5 FC1054 with Quad Moose Conductor Kalaburagi Kalaburagi L 0.00 1.00 Dated: from YTPS to Kalaburagi 400kV 29.11.2014. sub station

66KV link line from proposed New DPR approved , 6 220KV Hire Mallana Hole to Kalaburagi Ballari L 0.00 0.00 1.00 17-18 to be tendered 66KV Hosahalli

6 Total of Lines Kalaburagi 0.00 0.00 0.00 13.00 0.00 510.00 Rs.in lakhs

Cost of Cost of Cum Exp up Deptly. Revised Remarks Sl. Original / Cost of Total Work to Budget Work Code Name of the Work ZONE District S/A/L/T Supplied Budget 2017- furnished by No. Revised DWA Cost 31/03/18as 2018-19 Materials & 18 Zone DPR & Date per APR others

Gangavathi: LILOing of 110kV Munirabad- 162.74 & 1 FB1062 Sindhnur line - II and Kalaburagi Bellary T 0.00 1.00 0.00 1.00 21.05.12 construction of 2 Nos. TBs at 110kV Gangavathi Sub-Station

Munirabad Power House Station: Shifting of exisiting Control Room 2 FD1021 at 220kV Munirabad Power Kalaburagi Koppal T 315.78 & 0.00 1.00 1.00 1.00 House to existing work shop 06.07.13 building at 220kV Munirabad Power House yard

Guddadahalli: Providing Bus Bar protection to New work 220kV KPTCL Bays at 160.37 & Included in 3 FD1031 Kalaburagi Koppal T 2.00 0.00 100.00 400/220kV, Guddadahalli, 26.09.17 APW-17-18 List- PGCIL Sub-station in Koppal III Taluk and District

3 Total of TB's & Others Kalaburagi 0.00 0.00 0.00 4.00 1.00 102.00

42 Total of Kalaburagi Zone Kalaburagi 0.00 0.00 0.00 33.00 1.00 2285.82

309 Total of List-III for All Zones 8648.56 818.21 9466.77 1539.44 1182.08 25999.04 List-IV : Projects which have been cleared either by Technical Advisory Committee/Technical co-ordination committee but administrative sanctions are still to be obtained.

Sl. Work Code Name of the Work ZONE District No.

BENGALURU TRANSMISSION ZONE Bengaluru

Srinivasapura: 1 Establishing 2x100MVA, 220/66kV Bengaluru Kolar Station with associated lines

Manihambal: Establishing 1X8 MVA, 66/11 kV s/s with with construction of New 2 66kV SC line on DC towers from Bengaluru Ramanagara 15-16 existing 66kV Maralawadi S/s for a distance of 7kms.

Byramangala: New 3 Establishing 2x 12.5 MVA, 66/11kV Bengaluru Ramanagara 15-16 Sub-Station with associated line.

Mayasandra : New Establishing 2x31.5MVA, 66/11kV Sub- 4 Bengaluru Bengaluru 15-16 Station with associated line at anekal taluk.

Anathanagara: New Establishing 2x31.5MVA, 66/11kV Sub- 5 Bengaluru Bengaluru 15-16 Station with associated line at anekal taluk.

New Kodamballi: Establishing 2x8 MVA, 6 Bengaluru Ramanagara 16-17 66/11kV S/s along with 66kV line

400 kV Peenya: Establishing 3x500 MVA, 400/220 kV Station along with New 7 400 kV LILO line in the existing 110 kV Bengaluru Bengaluru Urban 17-18 line corridor (from Gutti-Somanahalli line) Sl. Work Code Name of the Work ZONE District No.

400 kV T.K.Halli: Establishing 2x500 MVA, 400/220 kV sub-station at T.K. Halli with construction of 400 kV DC New Quad Moose line from UPCL to proposed 8 Bengaluru Mandya 17-18 400/220 kV T.K.Halli sub-station & 400 kV DC Quad Moose line to link T.K.Halli to existing 400/220 kV Somanahalli sub- station.

Gownpalli : 9 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Thorlakki: 10 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

400kV S/s Dommasandra: Establishing 2X500 MVA, 400/220kV 11 New 18-19 GIS Sub-station at Dommasandra with Bengaluru Bengaluru Rural associated 400kV source line and 220kV evacuation lines.

Audugodi GIS: Conversion of existing 12 New 18-19 66/11 kV Audugodi substation(AIS) to Bengaluru Bangalore Urban GIS substation

12 Total of Sub-stations Bengaluru

Attur Yelahanka: 1 AA1112 Providing additional 1x31.5 MVA, Bengaluru Bengaluru Urban 66/11kV Transformer

220kV R/S Gowribidanur: 2 Additional 1x20 MVA, 66/11kV Bengaluru CB Pura Transformer with 66kV Bay

KGF : 3 Replacing 1x8MVA, 66/11kV by Bengaluru Kolar 1x12.5MVA, 66/11kV Transformer

Tamaka : 4 Replacing 1x12.5MVA, 66/11kV by Bengaluru Kolar 1x20MVA, 66/11kV Transformer Sl. Work Code Name of the Work ZONE District No.

Bangarpet: 5 Replacing second 1x12.5MVA, 66/11kV Bengaluru Kolar by 1x20MVA, 66/11kV Transformer

Pottery Road: New Replacing1x20MVA,66/11kV 6 Bengaluru 15-16 by1x31.5MVA,66/11kV Transformer along with one incommer pannel

LR bande: Replacing1x20MVA,66/11kV New 7 by1x31.5MVA,66/11kV Transformer Bengaluru 15-16 along with one incommer panel

Augmentation of 2*100MVA by New 8 2*150MVA Power Transformer 2 & 3 at Bengaluru Bengaluru Urban 17-18 220kV R/S Hoody

New Providing additional 1x20MVA Power 9 Bengaluru Blore 15-16 Transformer in 66/11kV Elita station

Viduraswatha: Replacing 1x8MVA, New 66/11kV by 1x20MVA, Power 10 Bengaluru CB Pura 16-17 Transformer-II 66/11kV transformer at 66/11kV Muss Viduraswatha

New Providing additional 31.5MVA 11 Bengaluru Bengaluru Urban 17-18 transformer at BTM 4th phase

Kanakapura : Providing 1X20MVA, 66/11kV Power transformer as a SPARE 12 New 18-19 Bangalore Ramanagara at Kanakapura 66/11kV S/s with associated bay equipments

Kanakapura: Providing 1X100MVA, 13 New 18-19 220/66kV Power transformer as SPARE Bangalore Ramanagara with associated terminal bay. Sl. Work Code Name of the Work ZONE District No.

a) Providing 3rd 500 MVA, 400/220kV Power Transformer and 220kV Terminal bays at KIADB Hardware Park, Devanahalli, Bengaluru Rural District.

b)Running four circuits of 220KV Single core 1000 Sq mm XLPE Copper UG cable for a route length of 5.255Kms 14 New 18-19 from proposed 400/220kV Devanahalli Bengaluru Bengaluru Rural Hardware Park S/s to Cable Terminating Tower (in the corridor of 66kV Vidhyanagar O.H line at Bagalur road crossing point) for double LILO of 220kV Nelamangala Hoody DC transmission line.

c) Construction of 220kV MC Doddaballapura : Providing additional 15 New 18-19 1X100MVA, 220/66kV Power Banagaluru Bengaluru Rural transformer at Doddaballapura S/s.

Bommasandra I/A: Providing 1X20MVA, 66/11kV Power transformer 16 New 18-19 as a SPARE at Bommasandra I/A Banagaluru Bengaluru Rural 66/11kV S/s with associated bay equipments Providing 1X12.5MVA, 66/11kV Power transformer as a SPARE at Ganjigunte 17 New 18-19 Banagaluru Chikkaballapura 66/11kV S/s with associated bay equipments

D Cross: Providing 1X12.5MVA, 66/11kV Power transformer as spare 18 New 18-19 Banagaluru Bengaluru Rural power transformer with associated bay at D-cross s/s

NRS : Replacement of 66kV old rigid 19 New 18-19 bus by new Alluminium bus at 22/66kV Banagaluru Bangalore Urban S/s NRS Rajajinagar in Bangalore North

Erection of 1X20MVA spare power transformer by extending existing 66KV 20 New 18-19 bay at 66/11 KV sub station, Bengaluru Ramnagar Gudemaranahalli in TL&SS Division, Nelamangala

Erection of 1X20MVA spare power transformer by extending existing 66KV 21 New 18-19 bay at 66/11 KV sub station, Bengaluru Bengaluru Urban Kodigehalli in TL&SS Division, Nelamangala

21 Total of Augmentations Bengaluru Sl. Work Code Name of the Work ZONE District No.

DG Plant to DB Pura: Strenghtening of existing 66 kV line 1 AA1148 Bengaluru Bengaluru Urban between DG Plant to DB Pura sub- stations by replacing Coyote by HTLS

Somanahalli Station to T.K.Halli Station: Ramanagara 2 AC1039 Bengaluru Construction of 220kV DC line on DC towers in the existing SC corridor

Tavarekere Sub-Station: 3 AA1106 Providing LILO arrangement from Bengaluru Bengaluru Urban Byadarahalli- T.G.Halli 66kV SC line

220kV DB Pura Stn. to 220kV KIADB DB Pura Stn.: 4 AB1032 Bengaluru Bengaluru Rural Conversion of 66kV SC Line to 66kV DC Line in Existing Corridor

Dabbaspet to Doddabelavangala: Construction of 66kV SC line from 5 AB1043 Bengaluru Bengaluru Rural 220/66/11kV Dabbaspet Station to 66/11kV Doddabelavangala Sub-Station

Kolar PGCIL to Hosakote: 6 AD1032 Bengaluru Kolar Construction of 220kV DC line

Vijayanagar: LILO arrangemant & bus bars due to 7 Bengaluru Bengaluru Urban direct tapping from towers 11kV bus bars upgradation

Sarjapura station to 66 kV Lakkur : Construction of 66 kV DC line from 220 8 Bengaluru Bengaluru Urban kV Sarjapura station to 66 kV Lakkur sub-station Sl. Work Code Name of the Work ZONE District No.

Sathanur limits to Harobele via Doddalahalli : 1) Running 2nd circuit from Sathanur limits to Doddalahalli S/s in the existing SC line on DC towers. New 2) Constuction of 66kV line from 9 Bengaluru Ramanagara 16-17 Doddalahalli S/s to Sathanur-Harobele line near Krishnaiahna Doddi village limits. 3) Conversion of SC to DC lne from Krishnaiahna Doddi village limits to Harobele

66KV D.B.Pura - Vijaypura line : Strengthening the 66KV D.B.Pura - 10 Bengaluru Bengaluru rural Vijaypura line of coyote conductor by drake 30.1kms

220/66/11kV NRS Doddaballapura to 11 AB1044 CBPura 1 &2 DC lines: Replacement of Bengaluru Bengaluru Rural coyote ACSR by Drake ACSR conductor

Conversion of existing 66 kV NRS 1 & New 12 2 bunched conductor lines to 220/66 Bengaluru 15-16 kV MCMV line between NRS & Peenya

Replacement of coyote conductor by New 13 double circuit drake from 66/11 KV Bengaluru 16-17 Gokula MUSS to 220 KV Hebbal Line

Peenya to DG-Plant Sub-station: Strenghtening of existing 66 kV DG1 & DG2 lines from existing 220kV Peenya New to DG-Plant sub-station partial ly by 14 Bengaluru Bengaluru Urban 17-18 DRAKE (22.726 kms from SRS - Silvepura village T. No 1 to P-42) & partially by HTLS(10.152 Kms) from Silvepura T.No. P-42 to DG plant. Sl. Work Code Name of the Work ZONE District No.

Magadi-Byadarahalli: Conversion of existing 66kV SC line to DC line by Drake conductor from New Bengaluru Urban 15 Magadi station to Byadarahalli station Bengaluru 17-18 Ramanagara (replacing existing H-Frame)one circuit terminated at Byadarahalli & other at Kodigehalli station

Somanahalli -Kanakapura- T.K.Halli : New Construction of 66kV DC line with drake 16 Bengaluru Ramangara 17-18 conductor in the existing SC corridor of B1 or B2 line

Construction of 220kV double circuit line between Chintamani and Mittemari with a new corridor from the proposed 220kV R/s Mittemarito Dibburahalli New limits and up gradation of existing 17 Bengaluru CB Pura 17-18 corridor having 66kV single circuit to MCMV tower for extending 220kV and 66kV circuits up to 220kV R/s Chintamani from Dibburahalli limits via Gangigunte.

Releasing the overload on 66kV Gowribidanur- Peresandra S/C line by making LILO arrangement from 66/11kV S/s Somenahalli to New 18 Somenahalli tap point for a line length Bengaluru CB Pura 17-18 of 7.87km and by shifting the load of 66/11kV S/sPeresandra& 66/11kV S/s Somenahallion to the proposed 220kV R/s Mittemari.

Conversion of the existing 220kV GBDR- DBPura SC to 220kV DC line to an New 19 extent of 40kms for taking supply Bengaluru CB Pura 17-18 directly from 400/220kV R/s PGCIL located at Devanahalli Hardware Park. Sl. Work Code Name of the Work ZONE District No.

Conversion of existing 220kV GBDR- New Madhugiri SC line to 220kV DC line 20 Bengaluru CB Pura 17-18 between 220kV R/s Gowribidanur and 220kV R/s Madhugiri.

Providing 66KV, 1000sqmm cable from New existing Jigani1/2 line to 66/11kV 21 Bengaluru Blore 15-16 Anjanapura S/s for a distance of 3.5 Kms.

Running of 66kV, 1000Sq.mm. UG cable New 22 from Kadugodi to Shanthinikethan Bengaluru Bengaluru Urban 17-18 about 3Kms

Sarjapura-Attibele : Running 2nd circuit from Sarjapura station to Attibele S/s in the existing SC on DC line 23 AA1172 Bengaluru Bengalulru urban corridor up to CTT, UG Cable from CTT to Attibele for a route length of 4.722Km & 66kv TB's at Sarjapura & Attibele

Providing alternate 66kV source to 66/11kV Vidyanagar Sub-station from 24 New 18-19 Bengaluru Bengaluru Rural 220/66/11kV Devanahalli Hardware Park Sub-station.

Gudemaranahalli- line: Construction of 66kV SC on DC towers 25 New 18-19 with Coyote ACSR between 66/11kV Banagaluru Ramnagar Gudemaranahalli(Solur) s/s & Kudur s/s for a distance of 10kms.

Jigani-RBI - Strengthening 66kV Jigani- 2A & 2B circuit lines from Coyote to 26 New 18-19 Bengaluru Bengaluru Rural Drake in the existing corridor from RBI tapping point(Kotthur dinne) to Jigani.

Conversion of existing 66kV DG-1 and DG-2 line from Peenya to Silvepura 27 New 18-19 limit HTL - (10.5Km) and then from Bangalore Bangalore Urban Silvepura to Puttenahalli DC Drake conductor. Revised Proposal for replacing of existing 66kV SC tower of 66kV Maralwadi line by constructing DC 28 New 18-19 Bengaluru Ramnagar Tower, Drake DC line from tapping point of existing 66kV kanakapura- Chatra(tapping)-Maralwadi(tapping)- Sl. Work Code Name of the Work ZONE District No.

Conversion of existing 220kV SC line to 29 New 18-19 DC line from SRS Peenya to connect to Bengaluru Bengaluru Urban proposed 400/220 kV Mylasandra.

29 Total of Lines Bengaluru Somanathapura: 1 Terminal Bay at Somanathapura sub- Bengaluru C.B. Pura station

Erection and commissioning of 66KV incoming line bay by providing breaker 2 New 18-19 Bengaluru Ramnagar and CT’s at 66/11KV substation, Kudur in TL&SS Division, Nelamangala.

2 Total of TB's & Others Bengaluru

64 Total for Bengaluru Zone Bengaluru

TUMAKURU Tumakuru TRANSMISSION ZONE

Doddaennegere: 1 Establishing 1x10MVA, 110/11kV Sub- Tumakuru Tumakuru Station with associated line

G.Hosahalli: 2 Establishing 1x10MVA, 110/11kV Sub- Tumakuru Tumakuru Station with associated line

Belagumba: 3 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line

Dibbur: 4 Establishing 2x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line

Doddagrahara: 5 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line

Kilaralahalli: 6 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line

Vajjanakurke: 7 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line Sl. Work Code Name of the Work ZONE District No.

Belaguli: Establishing 1 x 10 MVA 110/11 KV 8 Tumakuru Tumakuru S/S with associated line in C.N. halli Taluk, Tumakuru District.

M.Dasarahalli (Kotta): Establishing 1 x 9 8 MVA 66/11 KV S/S with associated Tumakuru Tumakuru line in Sira Taluk, Tumakuru District

Kudapura : Establishing 2x8MVA, 66/11kV Sub- 10 Tumakuru Chitradurga Station with associated line in Challakere Tq & Chitradurga Dist.

Arasikere: 11 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Davanagere Station with associated line

Nandigavi: Establishing 1x8 MVA, 66/11kV Sub- 12 Tumakuru Davanagere Station with associated line in Harihar Taluk Davangere Dist.

12 Total of Sub-stations Tumakuru

Goppenhalli: 1 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Davanagere 12.5MVA, 66/11kV Transformer.

Challakere: 2 Providing Additional 1x12.5 MVA, Tumakuru Chitradurga 66/11kV Power Transformer.

Hosadurga: 3 Replacing 1x12.5 MVA, 66/11kV by 1x Tumakuru Chitradurga 20 MVA, 66/11kV Transformer.

Honnavalli: 4 Replacing 1x10 MVA,110/11kV by 1x 20 Tumakuru Tumakuru MVA, 110/11kV Transformer.

Hosakere_Madhugiri: 5 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Tumakuru 12.5MVA,66/11kV Transformer. Sl. Work Code Name of the Work ZONE District No.

Bevinahalli: 6 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Tumakuru 12.5MVA, 66/11kV Transformer.

Chikkanayakanahalli: 7 Replacing 1x10 MVA, 110/11kV by 1x Tumakuru Tumakuru 20 MVA, 110/11kV Transformer

7 Total of Augmentations Tumakuru

Hiriyur - Chitradurga 66kV Line: Construction of 66kV DC line on DC 1 BC1049 towers from Hiriyur 220kV Station to Tumakuru Chitradurga Chitradurga 220kV Station in the existing corridor.

Mellakatte Sub-Station to Mellakatte Tap point: Conversion of SC line on SC towers to DC line on DC towers from Tap point to 2 Tumakuru Davanagere Mellakatte 66kV Sub-Station for a distance of 0.3 Km with TB at Mellakatte station for LILO arrangement. Malebennur Sub-Station to Malebennur Tap point: Conversion of SC line on SC towers to DC line on DC towers from Tap point to 3 Tumakuru Davanagere Malebennur 66kV Sub-Station for a distance of 0.5 Km with TB at Malebennur station for LILO arrangement.

Stringing of 2nd circuit using coyote ACSR conductor on existing DC towers of 66kv line from loc 98 of Honnalli - Lingadahalli line to 66kv Lingadahalli station for a distance of 2.21 kms along New with construction of 04 Nos 66KV TB's 4 Tumakuru Davangere 15-16 at existing 66/11kv station Lingadahalli for terminating proposed DC line from Lingadahalli-channagiri tap point and 2nd circuit from loc 98 of Honnalli - Lingadahalli DC line from 220KV SRS in Channagiri taluk,Davangere district

4 Total of Lines Tumakuru Sl. Work Code Name of the Work ZONE District No.

23 Total of Tumakuru Zone Tumakuru

HASSANA TRANSMISSION ZONE Hassana

Antharghatta: 1 Establishing 1x10MVA, 110/11kV Sub- Hassana Chikka-magalur Station with associated line

Hosanagar: Up gradation of 33/11KV, 2x5MVA Substation to 110/11KV, 2x10 MVA, Sub- station and Construction of 45Kms New 2 of 110KV Single circuit line on DC Hassana Shivamogga 15-16 Towers in Hosanagar, Hosanagar Taluk, Shimoga District

Bejjuvalli: 3 CD1037 Establishing 1x10MVA, 110/11kV Sub- Hassana Shimoga Station with line.

Alankar: Establishing 1x20MVA, 110/33kV & 1x10MVA, 110/11kV Sub-Station at Alankar, in Puttur Taluk, D.K District 4 Hassana Dakshina kannada by constructing approx. 12kM 110kV SC line on DC Towers from Proposed 110kV Madavu Sub-station(Under Construction).

Kepu: Establishing 1x10MVA, 110/11kV Sub- Station at Kepu in Bantwal Taluk, D.K. 5 Hassana Dakshina kannada District by constructing Approx. 15 Km LILO line from existing 110/11kV Vittla Sub-station.

Ulavi: 6 Establishing 1x10MVA, 110/11kV Sub- Hassana Shimoga Station with associated lines

Kunkanadu: 7 Establishing 1x8MVA, 66/11kV Sub- Hassana Chikka-magalur Station with associated line

Nuggehalli: 8 Establishing 2x8MVA, 66/11kV Sub- Hassana Hassana Station with associated line Sl. Work Code Name of the Work ZONE District No.

Udayavara: Establishing 2x10MVA, 110/11kV, 9 CC1017 Hassana Udupi 1x20MVA, 110/33-11kV Sub-Station with associated line.

Thyagarthi: New 10 Establishing 1x10 MVA, 110/11KV SS, Hassana Shivamogga 15-16 10Kms 110KV line

Shrungeri: Up gradation of 33/11KV, 1x5MVA Substation to 110/11KV, 1x10 MVA, New 11 Sub- station and Construction of 25Kms Hassana Chikka-magalur 16-17 of 110KV Single circuit line on DC Towers in Shrungeri, Shrungeri Taluk, Chikkamagalur District

Nehru Maidan: Upgradation of existing 33/11kV station to 1 x20MVA, New 12 110/11kV & 1 x20MVA, 110/33kV GIS Hassana Mangalore 17-18 Sub-station at Nehru Maidan, Mangalore

New Mavali: Establishing 1 x 10MVA, 13 Hassana Shivamogga 17-18 110/11KV sub-station & associated line

New Kuppagudde: Establishing 1 x 10MVA, 14 Hassana Shivamogga 17-18 110/11KV sub-station & associated line

Ayanur Establishing 2x10MVA, New 15 110/11KV s/s and associated 110KV Hassana Shimoga 17-18 line

Siddakatte: Establishing 2x10MVA, 110/11kV Sub- Station at Siddakatte in Bantwala Tq, 16 CB1025 Hassana Dakshina Kannada D.K.Dist with Construction of 110kV LILO line with Lynx ACSR conductor for Hosmar:a dist of 2.52Kms from one circuit of the Establishing 1x10MVA, 110/11kV Sub- Station at Hosmar in Karkala tq, Udupi 17 CC1019 Hassana Udupi Dist with construction of 110kV LILO line from 220/110kV Multi circuit Kemar-Guruvayankere line to the Sl. Work Code Name of the Work ZONE District No.

Kaniyaru: Establishing 1X100MVA and 1X8MVA ,220/66/11kV substatopn 18 New 18-19 near Kaniyaru village in Arakalagudu Hassana Hassan TQ,Hassan dist with associated 220kV and 66kV lines

Establishing 2X10 MVA, 110/11KV 19 New 18-19 Substation at Kadalakere near Hassana Dakshina Kannada Moodibidri in Mangalore Taluk DK dist.

Establishing 1X10 MVA, 110/11KV 20 New 18-19 Substation at Byndoor, with associated Hassana Udupi line

21 New 18-19 Establishing 110kV Substation Panja Hassana Dakshina Kannada

21 Total of Sub-stations Hassana

Holalur: Enhancement of 2nd 8 MVA 66/11KV 1 Power transformer to 12.5 MVA with 5 Hassana Shimoga addl. MCVCB switchgears at Holalur MUSS

Konaje: 2 Providing additional 1X20 MVA Hassana DK 110/33kV Transformer.

Karaya: New Creating 33KV reference by providing 3 Hassana D.K. 15-16 20MVA, 110/33KV Tr. at 220KV RS at Karaya s/s

Kandli: New Augmentation of 1 X 8 MVA, 66/11 KV 4 Hassana Hassana 16-17 power Transformer by 1 X 12.5 MVA @ Kandli S/S in Hassana Taluk

Javgal: New Augmentation of 1 X 10 MVA, 110/11 5 Hassana Hassana 16-17 KV power Transformer by 1 X 20 MVA @ Javgal S/S in Arasikere Taluk Sl. Work Code Name of the Work ZONE District No.

Nittur: Replacement of existing 10MVA, New 6 110/11KV Power Transformer by Hassana Udupi 16-17 20MVA, 110/11KV Power Transformer

Kundapura: Providing additional New 7 1X20MVA, 110/11KV Power Hassana Udupi 16-17 Transformer

Kulashekara: Providing additional New 8 1X20MVA, 110/33KV Power Hassana Dakshina Kannada 16-17 Transformer

Ramnathapura: Augmentation of 1x6.3MVA power New transformer to 1x12.5 MVA power 9 Hassana Hassan 17-18 transformer at 66/11kV Sub-station Ramanathapura in Arakalagud Taluk, Hassan District.

Hassan 220:Providing additional 1x100 New MVA, 220/66kV power transformer at 10 Hassana Hassan 17-18 220/66 kV Hassan Receiving station in Hassan District.

Manipal: Providing additional 1X20 New MVA, 110/11KV Power Transformer at 11 Hassana Udupi 17-18 110/33/11KV Manipal Sub-station in Udupi Taluk and District.

Guruvayanakere: Providing additional 1 x20 MVA, 110/33kVTR & 33kV New 12 outgoing line bay at at 110kV Station Hassana Dakshina Kannada 17-18 Guruvayanakere in Belthangady Taluk, DK dist

New Singtagere: Providing additional 1 x 13 Hassana Chikkamagalur 17-18 10MVA, 110/11KV Power Transformer Sl. Work Code Name of the Work ZONE District No.

Tangli: Enhancement of existing 1 x New 10MVA 110/11KV Power transformer 2 14 Hassana Chikkamagalur 17-18 by 1 x 20 MVA, 110/11KV power transpower

Bagur: Augmentation of 1 X 8 MVA, 66/11 KV 15 Hassana Hassana power Transformer by 1 X 12.5 MVA @ Bagur S/S in C. R. Patna Taluk

Chikkakondagola: Augmentation of 1x8MVA by 1x20MVA Power 16 New 18-19 Transformer at 66/11kV S/s Hassana Hassan Chikkakondagola in Hassan Taluk, Hassan District.

Hassan: Augmentation of 1x8MVA by 1x20MVA Power Transformer at 17 New 18-19 Hassana Hassan 66/11kV S/s Hassan in Hassan Taluk, Hassan District.

Belur:Augmentation of 1x6.3MVA, 66/11kV Power Transformer by 18 New 18-19 Hassana Hassan 1x12.5MVA@Belur S/s in Belur Taluk, Hassan District

Mattanavile: Augmentation of 1x8MVA, 66/11kV Power Transformer by 19 New 18-19 Hassana Hassan 1x12.5MVA@Mattanavile S/s in Channarayapattana Taluk, Hassan District

Rameshwaranagara: Augmentation of 2x8MVA, 66/11kV 20 New 18-19 Power Transformer by Hassana Hassan 2x12.5MVA@Rameshwaranagara S/s in Hassan Taluk, Hassan District

Basavaghatta Augmentation of 2x8MVA, 66/11kV 21 New 18-19 Power Transformer by Hassana Hassan 2x12.5MVA@Basavaghatta S/s in Hassan Taluk, Hassan District

Halebeedu: Augmentation of1x12.5MVA, 66/11kV 22 New 18-19 Power Transformer by 1x20 Hassana Hassan MVA@Halebeedu S/s in Belur Taluk, Hassan District Sl. Work Code Name of the Work ZONE District No.

Mosalehosahally: Additional 1 X 8MVA, 66/11 KV power 23 New 18-19 Hassana Hassan Transformer @Mosalehosahally S/S in Hassan Taluk, Hassan District

Rampura: Augmentation of 1x6.3MVA, 66/11kV Power Transformer by 24 New 18-19 Hassana Hassan 1x12.5MVA@Rampura S/s in Channarayapatna Taluk, Hassan District

Singapura: Augmentation of 1x8MVA, 66/11kV 25 New 18-19 Power Transformer by Hassana Hassan 1x12.5MVA@Singapura S/s in Holenarasipura Taluk, Hassan District

Spare 1x12.5MVA Power Transformer at Juttanahally Sub-station in 26 New 18-19 Hassana Hassan Channarayapattana Taluk, Hassan District

Spare 1x20MVA Power Transformer at 27 New 18-19 Hassan Sub-station in Hassan Taluk, Hassana Hassan Hassan District.

Augmentation of 2X100MVA by 2X150MVA, 220/110kV Power 28 New 18-19 Hassana Udupi Transformer at Kemar 220kV station, Karkala

Sagara: Enhancement of 1 x 10MVA Power 29 New 18-19 Transformer by 20MVA, 110/33KV Hassana Shimoga Power transformer at Sagara Sub- Station.

Providing additional 1 x 8MVA 30 New 18-19 transformer at 220/66/11KV Hassana Chikkamagalur Mugulavalli sub-station.

Providing spare 12.5MVA Transformer at 31 New 18-19 Hassana Chikkamagalur 220KV station Mugulavalli. Sl. Work Code Name of the Work ZONE District No.

Panchanahalli : Enhancement of existing 2nd 1x6.3 32 New 18-19 MVA, 66/11 kV Power Transformer by Hassana Chikkamagalur 12.5MVA at 66 kV Panchanahalli sub- station, in Chikkamagalur District

Providing 1 x 100MVA, 220/66KV Power Transformer with 66KV bus coupler and 33 New 18-19 Hassana Shimoga 4 Nos. of 66kV bays at 220KV MRS Shivamogga

Yagati: Enhancement of 1 x 10MVA, 110/11kV 34 New 18-19 power transformer No.1 by 1 x 20MVA, Hassana Chikkamagalur 110/11kV sub-station Yagati, Kadur Taluk, Chikkamagaluru Dist.

Kammaradi: 35 New 18-19 Providing additional 1X100MVA Power Hassana Shivamogga Transformer at 110/11kV sub-station.

Muthinakoppa: Enhancement of 1X10MVA Power 36 New 18-19 Transformer -2 by 20MVA capacity Hassana Chikkamagalur power transformer at 110/33/11kV substation

Thirthahalli: Enhancement of 1X10MVA Power 37 New 18-19 Transformer -2 by 20MVA capacity Hassana power transformer at 110/33/11kV substation

37 Total of Augmentations Hassana

Kavoor-Kulshekar : Running of 110kV DC 400sq.mm. XLPE 1 CB1046 UG cable line from Kavoor S/S to link to Hassana Dakshina Kannada OH line at proposed Tower No 5 of proposed Kavoor-Kulshekar DC line.

Vitla Sub-Station : 2 CB1030 Providing 110kV LILO arrangement from Hassana Dakshina Kannada Salethur-Netlamadur line. Sl. Work Code Name of the Work ZONE District No.

Linganamakki to Iduvani: Replacement of existing MS Towers of 2 3 Hassana Shimoga DC 110KV lines from Linganamakki to Iduvani

110kV BDVT 3 Line Machenahalli: Conversion of exitsing S/C 110KV BDVT 4 3 line to DC upto Machenahalli & Hassana Shimoga construction of new S/C 110KV line in existing corridor.

Balligavi limit to 110KV Bharangi MUSS : Conversion of existing 110KV Single Circuit line on DC tower to DC line from 5 Hassana Shimoga Balligavi limit to 110KV Bharangi MUSS for a distance of 16 Kms and providing 1No of 110KV line bay with protection equipment at 110KV Bharangi MUSS

66/11KV MUSS Holalur LILO: Providing LILO arrangements to 6 Hassana Shimoga 66/11KV MUSS Holalur with M&P Equipments (0.3 KM)

110/11KV MUSS Bhadravathi LILO: Providing LILO arrangements & M& P 7 Hassana Shimoga equipments at 110/11KV MUSS Bhadravathi

110/11KV MUSS Machenahalli LILO: Providing LILO arrangements & M & P 8 Hassana Shimoga equipments at 110/11KV MUSS Machenahalli

Belur Sub-Station to Gendehalli tap point : Construction of 66kV DC line Between 9 Hassana Hassana 66kV Belur Sub-Station to Gendehalli tap point in the existing corridor of 66kV SC line between Belur & Mudigere. Sl. Work Code Name of the Work ZONE District No.

Karaya-Guruvayanakere: Construction New 10 of 110KV DC line from 110KV s/s Hassana D.K. 15-16 Karaya to 110KV Guruvayankere s/s.

Construction of new 66kV SC line on DC towers in the existing cprridor of 66kV Mild Steel H-frame Shimoga-Mysore (SMT) from 220kV Receiving station New Hassan to 66/11kV Belur MUSS for a 11 Hassana Hassan 17-18 distance of about 35Kms with a terminal Bay at Hassan and with LILO arrangements at Hagare S/s (0.64kms) and Halebeedu S/s (0.755Kms) in Hassan District.

Re-conducting of conductor by drake conductor of 110kV Kemar- Hiriyadka New and Hiriyadka-Madhuvana-Kundapura 12 Hassana Udupi 17-18 line for a distance of 42kM with providing intermediate Towers and Tower Protection Work

Providing LILO arrangement 110KV SS2 New 13 line 110/11KV MUSS at Kumsi sub- Hassana Shimoga 17-18 station.

Convertion of existing 220kV Sharavathi -Ranebennur S/C line to 14 CD1026 D/C line from Kilara limits at Loc-19 to Hassana Shimoga 220kV Shiralakoppa Station for distance of 58Kms

Conversion of 66kV Circuite line on Mild steel single circuit towers into 66kV Double Circuit line from 220kV 15 New 18-19 Hassana Hassan Kadavinakote to 220kV Yachenahally duly providing 66kV TB's at both substations in Hassan District. Providing 66kV LILO to 66kV Channarayapatna-Malali line at 66/11kV Atthichowdenahally S/s 16 New 18-19 Hassana Hassan with 1 no of 66kV Terminal bay in Channarayapatna Taluk in Hassan District. Sl. Work Code Name of the Work ZONE District No.

Construction of new 66kV Sc line on DC towers in the existing corridor of 66kV Mild Steel H-frame Shimoga-Mysore 17 New 18-19 (SMT-1) from 66kV S/s Hassana Hassan Holenarasipura to tap point of Saligrama (Manjanahally limits) line for a distance of abou 21kms in Hassan Conversion of 66kV Single Circuite line on Mild steel single circuit towers into 66kV Double Circuit line from 18 New 18-19 Hassana Hassan 66kV Channarayapatna S/s to 66kV Hirisave S/s duly providing 66kV TB's at both substations in Hassan District.

Construction of 66kV Single Circuit line for a distance of 13kms between 19 New 18-19 66/11kV S/s Rampura to Didiga duly Hassana Hassan providing 66kV TB's at both substations in Hassan District. Bifurcation of 66kV Hiremagalur- Chikkamagalur line by constructing a new DC line from Mugulavalli 20 New 18-19 220/66kV R/S to Hiremagaluru S/S Hassana for a dist of 1.5Km by utilizing the existing spare line TB (Bhadra bay at Mugulavalli 220/66kV R/S) and existing 20 Total of Lines Hassana

Hiresave: 1 CA1046 Providing LILO arrangement to Hiresave Hassana Hassana S/S

Belur : 2 CE1030 Providing TB at Belur for Hassana - Hassana Hassana Chikkamagalur 66kV line

2 Total of TB's & Others Hassana

80 Total of Hassana Zone Hassana

MYSURU TRANSMISSION ZONE Mysuru

Hunsur: 1 Establishing 220kV Station with 220kV Mysuru Mysuru line and 66kV evacuation lines .

Kyathanahalli 2 Establishing 1 x 8 MVA, 66/11 KV Sub- Mysuru Mandya Station with associated line

Thalabetta: 3 DD1032 Establishing 1x8MVA 66/11kV Sub- Mysuru Chamaraja-nagar Station with associated line Sl. Work Code Name of the Work ZONE District No.

Kudige: 4 Establishing 1x8MVA, 66/11kV Sub- Mysuru Kodagu Station with associated line.

Dwaraka Nagar: 5 DB1044 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mandya Station with associated line

Talagawadi / Dugganahalli limits : 6 Establishing 1x12.5MVA, 66/11kV Sub- Mysuru Mandya Station with associated line.

Bachanahalli/Panditahalli 7 Establishing 1 x 8MVA, 66/11 KV Sub- Mysuru Mandya Station with associated line

New Padukote/Chikkereyur : Establishing 8 Mysuru Mysuru 15-16 1 x 8 MVA,66/11 KV sub-station.

New Shindenahally : Establishing 1 x 8 9 Mysuru Mysuru 15-16 MVA,66/11 KV sub-station. Maddur : 10 DB1091 Establishing 220/66 kV Gas Insulated Mysuru Mandya Substation .

Adakanahalli: Establishing 2X100MVA, New 11 220/66kV R/s & 2X12.5MVA66/11kV Mysuru Mysuru 17-18 S/s with assosiated lines

SreeMangala: Upgradation of 33kV to New 12 66kV line & station by Establishing 2x Mysuru Kodagu 17-18 8 MVA,66/11 KV sub-station.

Ajjipura: Establishing 1x8MVA, New 13 66/11kV Sub-Station with associated Mysuru Chamarajanagara 17-18 line.

New Varuna village limits : Establishing 2 14 Mysuru Mysuru 15-16 x 8 MVA,66/11 KV sub-station.

New Sunakathonnur : Establishing 1 x 8 15 Mysuru Mandya 15-16 MVA,66/11 KV sub-station.

Siddapura: Upgradation of 33kV to New 16 66kV line & station by Establishing 1x Mysuru Kodagu 17-18 8 MVA,66/11 KV sub-station. Sl. Work Code Name of the Work ZONE District No.

Honganuru: Establishing 1x8MVA, New 17 66/11kV Sub-Station with associated Mysuru Chamarajanagara 17-18 line.

EchalaGudda Kavalu (Ganadahalli): New 18 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mandya 17-18 Station with associated line.

Yerahally Hand post : Upgadation of 19 DA1125 Mysuru Mysuru 33/11KV SS to 66/11KV SS.

Hanagallu Shettalli(Hanagallu bani) : 20 DC1011 Establishing 1 x 8 MVA,66/11 KV sub- Mysuru Kodagu station.

Murnadu : Upgradation of 33kV to 21 DC1012 66kV line & station Establishing 1 x 8 Mysuru Kodagu MVA,66/11 KV sub-station.

Somavarpet: 22 DD1027 Establishing 1x8MVA, 66/11kV Sub- Mysuru Chamaraja-nagar Station with associated line

Goluru: Establishing 1x8MVA, 66/11kV Sub- 23 New work 18-19 Mysuru Mysuru station at GOLURU in Nanjangud Taluk, Mysuru district.

Valagere: Establishing 1x8MVA, 66/11kV Sub- 24 New work 18-19 Mysuru Mysuru station at VALAGERE in Nanjangud Taluk, Mysuru district.

Hadinaru: Establishing 1x8MVA, 66/11kV Sub- 25 New work 18-19 Mysuru Mysuru station at HADINARU village in Nanjangud Taluk, Mysuru district.

25 Total of Sub-stations Mysuru

Kadakola R/S : 1 DA1084 Spare 1X100 MVA 66/11kV Power Mysuru Mysuru Transformer

Doddainduvadi : New Replacing 1X8 MVA,66/11 KV 2 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers. Sl. Work Code Name of the Work ZONE District No.

Madhuvanahalli : New Replacing 1X6.3 MVA,66/11 KV 3 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers .

Sathegala : New Replacing 1X6.3 MVA,66/11 KV 4 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers .

Yelandur : New Replacing 2 nd 8 MVA,66/11 KV 5 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers .

New Chunchanakatte: Providing additional 6 Mysuru Mysuru 17-18 1x8MVA, 66/11kV Power Tr.

New Berya: Providing additional 1x8MVA, 7 Mysuru Mysuru 17-18 66/11kV Power Tr.

New Hura: Providing additional 1x8MVA, 8 Mysuru Mysuru 17-18 66/11kV Power Tr.

New Antharasanthe: Providing additional 9 Mysuru Mysuru 17-18 1x8MVA, 66/11kV Power Tr.

New B.Matkere: Providing additional 10 Mysuru Mysuru 17-18 1x8MVA, 66/11kV Power Tr.

New Ramapura : Replacement of 2X8MVA, 11 Mysuru Chamarajanagara 17-18 66/11kV Power Tr. By 2X12.5MVA Tr.

New Martalli : Providing additional 1x8MVA, 12 Mysuru Chamarajanagara 17-18 66/11kV Power Tr.

DMG Halli : 13 DA1128 Replacement of 1 X 8 MVA, 66/11 KV Mysuru Mysuru Power Transformer by 1 X 12.5 MVA

Hosur Gate : 14 DA1129 Providing additional 1 X 12.5 MVA, Mysuru Mysuru 66/11 KV Power Transformer. Sl. Work Code Name of the Work ZONE District No.

Nanjangud : Replacement of 1 X 8MVA, 66/33 KV 15 DA1130 Mysuru Mysuru Power Transformer by 1 X 12.5 MVA, 66/33/11 KV.

Doora: 16 DA1132 Providing additional 1x8MVA, 66/11kV Mysuru Mysuru Power Tr.

Gavadagere: 17 DA1133 Providing additional 1x8MVA, 66/11kV Mysuru Mysuru Power Tr.

Megalapura : 18 DA1134 Replacement of 2nd 8MVA, 66/11kV Mysuru Mysuru Power Tr. By 12.5MVA Tr.

K.Honnalagere: Replacement of 2 X 8 MVA, 66/11 KV 19 DB1103 Mysuru Mandya Power Transformer by 2 X 12.5 MVA, 66/11 KV.

19 Total of Augmentations Mysuru

Vajamangala - Bannur SFC: 1 DA1050 Re-construction of 66kV line for a Mysuru Mysuru distance of 48 kms

Kadaballi LILO: Running of 2nd Ckt on New Existing 66kV DC Tower from Tapping 2 Mysuru Mandya 17-18 Point to Kadaballi S/s for a distance of about 1.5 Kms with TB at Kadaballi S/s

Seelanere LILO: Running of 2nd Ckt on Existing 66kV DC Tower from Tapping New 3 Point to Seelanere S/s for a distance of Mysuru Mandya 17-18 about 1.75 Kms with TB at Seelanere S/s

Yattambadi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 4 Tapping Point to Yattambadi S/s for a Mysuru Mandya 17-18 distance of about 1.5 Kms with TB at Yattambadi S/s Sl. Work Code Name of the Work ZONE District No.

Kolakaranadoddi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 5 Tapping Point to Kolakaranadoddi S/s Mysuru Mandya 17-18 for a distance of about 0.75 Kms with TB at Kolakaranadoddi S/s

Shivalli (V.C.Farm) LILO: Running of 2nd Circuit on existing 66KV DC tower New from Tapping Point to Shivalli 6 Mysuru Mandya 17-18 (V.C.Farm) S/s for a distance of about 7.6Kms with TB at Shivalli (V.C.Farm) S/s.

66kV Radial line from Ramapura Station to Proposed Ajjipura S/s: Radial line from Ramapura S/s by 7 New 18-19 Mysuru Chamarajanagar consructing TB at Ramapura S/s to porposed Ajjipra S/s using Coyote conductor with SC line on DC Towers.

7 Total of Lines Mysuru

51 Total of Mysuru Zone Mysuru

BAGALKOTE TRANSMISSION ZONE Bagalkote

Sindagi: Establishing 220/110kV Receiving 1 Bagalkote Bijapur Station with associated 220kV and 110kV lines

Mughalkod: Establishing 2x315MVA, 400/220kV 2 Bagalkote Belgaum Station with asociated 400kV & 220kV lines

Hosur : New 3 Establishing 1x10MVA, 110/11kV Sub- Bagalkote Belagavi 15-16 Station with associated line.

Maganur: 4 Establishing 110/11kV Sub-Station Bagalkote Belgaum with associated line Sl. Work Code Name of the Work ZONE District No.

Salahally: Establishing 2x100MVA, 220/110kV & 5 EE1061 Bagalkote Belgaum 1x10MVA, 110/11kV Station with asociated 220kV & 110kV lines

Chikkalaki Cross: Establishing 2x100MVA, 220/110kV Receiving 6 Bagalkote Bagalkote Station with associated 220kV and 110kV lines

Bilagi: 7 Establishing 2x100 MVA, 220/110 kV Bagalkote Bagalkot S/S with associated line.

Bellad Bagewadi: 8 Establishing 2x10MVA, 110/11kV Sub- Bagalkote Belgaum Station with associated line.

Diggewadi: 9 Establishing 2x10MVA, 110/11kV Sub- Bagalkote Belgaum Station with associated line.

Gosbal: 10 Establishing 110/11kV Sub-Station Bagalkote Belgaum with associated line.

Halyal: Up-gradiation of existing 33/11kV 11 Bagalkote Belgaum MUSS to 110/11kV Sub-Station with associated line.

Ronihal: 12 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Nalatwad: 13 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Telagi: 14 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Alnavar: Up-gradiation of 33/11KV sub-station to 15 2X10MVA, 110/11KV & 1x20 MVA, Bagalkote Dharwad 110/33 kV Sub-station with 110 kV SC line from 110 kV Halyal S/S. Sl. Work Code Name of the Work ZONE District No.

Tabkadhonnalli: 16 Establishing 110/11kV Sub-Station Bagalkote Dharwad with associated line at Tabkadhonnalli

Bagewadi : Establishing 2x10MVA, 110/11kV Sub- Station with associated line from 17 Mundargi Sub-Station and from Bagalkote Gadag proposed 110kV Sub-Station Bagewadi to Bellatti Sub-Station for a length of 20km+20km

Hamsabhavi: Up-gradiation of existing 33/11kV 18 Bagalkote Haveri MUSS to 110/11kV Sub-Station with associated line.

Morab : 19 New Establishing 1x10MVA 110/11KV S/s Bagalkote Dharwad with associated line.

Hebballi : 20 New Establishing 1x10 MVA, 110/11KV S/s Bagalkote Dharwad with associated line.

Belur : 21 New Establishing 110/11KV S/s with Bagalkote Haveri associated line.

Kodachwad : 22 New Establishing 2x10MVA, 110/11kV Sub- Bagalkote Belagavi Station with associated line.

Hebbal : 23 New Establishing 2x10MVA, 110/11kV Sub- Bagalkote Bagalkot Station with associated line.

Sutagundar : 24 New Establishing 1x10MVA, 110/11kV Sub- Bagalkote Bagalkot Station with associated line.

Kainkatti : 25 New Establishing 1x10 MVA, 110/11kV Sub- Bagalkote Bagalkot Station with associated line.

Ukkali : 26 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line. Sl. Work Code Name of the Work ZONE District No.

Dhulkhed: Upgradation of 33 kV S/S to 2x10 27 New Bagalkote Vijayapur MVA,110/11kV Sub-Station with associated line

Itnal: Establishing 1X10 MVA ,110/11 KV Sub station at Itnal in Soundatti Taluka, New Belagavi Dist 28 Bagalkote Belagavi 17-18 S/S Capacity -1X10 MVA 110 KV SC Line on DC Tower from 110 KV Katkol to a distance of 11 KMs

Kaginele: New Upgradation of 33 kV S/S to 2x10 29 Bagalkote Haveri 17-18 MVA,110/11kV Sub-Station with associated line

AEQUS SEZ: New 30 Establishing 2x100 MVA, 220/110 kV Bagalkote Belagavi 17-18 S/S with associated line.

110kV S/s Godgeri (Nandgaon): New Establishing of 2X10 MVA ,110/11 KV 31 Bagalkote Belagavi 17-18 Sub Station at Nandgaon in Gokak Taluka, Belagavi Dist

Gubbewad: New 32 Establishing 2x10 MVA,110/11kV Sub- Bagalkote Vijayapura 17-18 Station with associated line

Hireharkuni: New 33 Establishing 1x10 MVA,110/11kV Sub- Bagalkote Dharwad 17-18 Station with associated line

Arjunagi: 34 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Bellubbi: 35 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Honwad: 36 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Sl. Work Code Name of the Work ZONE District No.

Jambagi: 37 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Kannur: 38 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Karur (Khandarayanahlli) : Establishing 1x10MVA, 110/11kV & 39 Bagalkote Haveri 1x20MVA 110/33-11kV Sub-Station with associated line

Hattaragi: 40 ED1009 Establishing 1x10MVA, 110/11kV Sub- Bagalkote North Canara Station with associated line & TB.

Kambagi : 41 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Establishing 1X10MVA, 110/11KV Sub New 42 Station at Kulenur along with Bagalkote Haveri 17-18 associated line.

Establishing 2X100MVA,220/110KV New 43 Sub Station at Byadagi along with Bagalkote Haveri 17-18 associated line.

New Establishing 220 KV Hybrid GIS 2X100 44 Bagalkote Belagavi 17-18 MVA at Desur

Kansur: Establishing 1x10MVA Uttar 45 New 18-19 110/11KV Sub station with associated Bagalkote Kannada line.

Ron: Establishing 2X100MVA, 46 New 18-19 220/110KV Sub station at Ron in Ron Bagalkote Gadag Taluk, Gadag District.

Akkilalur: Upgradation of 2X5MVA, 33/1kV to 2X10MVA, 110/11kV and 47 New 18-19 Bagalkote Haveri 1*20MVA, 110/33kV S/s at AkkiAlur in Hanagl Taluk, Haveri District.

Lokapur: Establishing 2x500 MVA, 48 New 18-19 400/220 KV S/S at Lokapur in Mudhol Bagalkote Tq., Bagalkot Dist. Sl. Work Code Name of the Work ZONE District No.

Yalwar (Tentative Loc): Establishing 2x500 MVA, 400/220 KV S/S at Yalwar 49 New 18-19 Bagalkote Vijayapur (Tentative Loc) in B.Bagewadi Tq., Vijayapur Dist.

49 Total of Sub-stations Bagalkote

110 KV S/S Alamel: Replacement of New 1 1X10 MVA, 110/11 KV by 1X20 MVA, Bagalkote Vijayapur 15-16 110/11 KV transformer

Belagavi: New Providing 3 rd 100 MVA ,220/11 KV 2 Bagalkote Belagavi 17-18 Transformer at 220 KV Belagavi Receiving Station , Belagavi Dist

Katkol: New Augmentation of 10 MVA ,110/11 KV by 3 Bagalkote Belagavi 17-18 20 MVA, 110/11 KV Power Transformer at 110 KV S/S Katkol

110 kV S/S Tumminakatti : Creating 33 kV reference by installing 1x20 MVA, New 4 110/33 kV transformer at 110 kV Bagalkote Haveri 17-18 Tumminakatti sub-station, in Ranebennur Taluk, Heveri District

110 kV S/S Aremallapura : Providing additional 1x10 MVA, 110/11 kV New 5 transformer at 110 kV Aremallapura Bagalkote Haveri 17-18 sub-station, in Ranebennur Taluk, Haveri District

Yalparahatti: 6 Providing additional 1x10MVA, Bagalkote Belgaum 110/11KV Power Transformer

Sirsi: Providing additional 7 New 18-19 1X50MVA,220/110kV Trf at 220kV Bagalkote Uttara Kannada Sirsi(Else) S/S. Sl. Work Code Name of the Work ZONE District No.

Hirehal:Replacement of 1X10MVA,110/33kV Trf by 1X20MVA,110/33kV Trf at Hirehal S/S 8 New 18-19 Bagalkote Gadag and RON:Replacement of 1X20MVA,110/33kV Trf by 1X10MVA,110/33kV Trf at Ron S/S.

Mundargi:Replacement of 1X10MVA,110/11kV Trf by 9 New 18-19 Bagalkote Gadag 1X20MVA,110/11kV Trf at Mundargi S/S.

Providing Addl 1X10MVA, 110/11KV Trfr at 110KV Hosa Honnatti Sub 10 New 18-19 Bagalkote Haveri station in Ranebennur Taluk, Haveri District.

Replacement of 1X10MVA, 110/33KV Trfr by 1X20MVA, 110/33KV Trfr at 11 New 18-19 Bagalkote Gadag 110KV Dambal Sub station in Mundaragi Taluk, Gadag District.

Providing spare 1X20MVA, 110/33- 11KV Trfr at 110KV Sambapur Road 12 New 18-19 Sub station in Gadag Taluk, Gadag Bagalkote Gadag District instead of providing at 110KV Mundaragi Sub station.

Replacement of 1X10MVA, 110/11KV Trfr by 1X20MVA, 110/11KV Trfr at 13 New 18-19 Bagalkote Haveri 110KV Tiluvalli Sub station in Hanagal Taluk, Haveri District.

220 KV Chikkodi Providing additional 3rd 1X100 MVA 14 New 18-19 ,220/110 KV Power Transformer at Bagalkote Belagavi 220/110/11 KV Chikkodi Sub Station in Belagavi District

110 KV S/S Yalapharatti Creating 33 KV reference by installing 15 New 18-19 1X20 MVA ,110/33 KV Transformer at Bagalkote Belagavi 110 KV Yalapharatti Sub station in Raibag Taluka, Belagavi Dist Sl. Work Code Name of the Work ZONE District No.

110 KV S/S Sadalaga Providing spare 1X10 MVA,110/33-11 16 New 18-19 KV Transformer at 110 KV Sadalaga Bagalkote Belagavi Sub -Station in Chikkodi Taluka, Belagavi Dist

220 KV Ghataprabha Providing additional 1X100 MVA 17 New 18-19 ,220/110 KV Power Transformer at Bagalkote Belagavi 220/110/11 KV Ghataprabha Sub Station in Belagvai District

110 KV Udyambagh Creating 33 KV Reference by providing 18 New 18-19 additional 1X20 MVA 110/33 KV Bagalkote Belagavi Transformer at 110 KV Udyambagh Sub Station in Belagavi Taluka, Belagavi Dist

Jambagi K.D.: Providing additional 1x10 MVA, 110/11 KV Transformer at 19 New 18-19 Bagalkote 110 KV Jambagi K.D. S/S in Mudhol Tq. Bagalkot Dist.

19 Total of Augmentations Bagalkote

Kudachi - Ugar line: Construction of new 110KV SC line on 1 DC towers from 220KV Kudachi S/S to Bagalkote Belgaum 110KV Ugar S/S in the existing corridor of 110KV Kudachi - Ugar line.

Bijapur to Tikota Loc.01 to 115: Stringing of 2nd circuit on existing DC 2 Bagalkote Bijapur GI towers from 110kV KIADB Bijapur to Tikota Sub-station from Loc.01 to 115.

Ghataprabha to Mahalingpur: Conversion of existing 110kV S/C line 3 Bagalkote Belgaum between 220kV Ghataprabha & 220kV Mahalingpur Stations to 110KV DC line. Sl. Work Code Name of the Work ZONE District No.

Karwar-Heggunje Line: Strenghtining of transmission corridor of costal belt by convertion of existing Uttar 4 110kV S/C line from Karwar to Bagalkote Kannada Muradeshwar and extending it to proposed Heggunje 220/110kV Station by 220-110 KV MCMV towers.

220kV MK Hubli to 110kV Mache LILO point: Conversion of existing 110kV S/C line 5 with Wolf conductor on S/C tower to Bagalkote Belgaum proposed D/C line with Lynx conductor on D/C tower from 220kV MK Hubli to 110kV Mache LILO point.

Bidnal-Annigeri-Gadag 110kV Line : Convesion of existing 110kV H-frame S/C type to S/C line on D/C type lattice 6 Bagalkote Dharwad tower from 220kV Bibnal Station to 110kV Annigeri Sub-Station & to 110V Gadag S/S. Length-50 Kms

Shirabur-Bisnal: 110KV link line from existing 110KV 7 Bagalkote Bagalkot/ Bijapur S/S Shirabur in Bijapur Dist to proposed 110KV S/S at Bisnal

B.Bagewadi - Shahabad-Moratagi line : Replacement of MS towers by GI towers along with conductor and ground wire 8 Bagalkote Bijapur from 220kV S/S B.Bagewadi to 220kV S/S Shahabad-up to Moratagi S/S (Loc.No194 to 415) Sl. Work Code Name of the Work ZONE District No.

Conversion of 110kV line from SRS Hubli to Anandnagar- Conversion of 110KV SC Line from SRS 9 New Bagalkote Dharwad Hubli to 110KV Anandnagar by replacing existing SC, DC Towers by narrow based DC Towers

Supa-Goa: Replacement of MS and Deteriorated Towers and Lines of 110 kV Supa-Goa Uttar 10 New DC line by new 110 kV DC line with Bagalkote Kannada Lynx conductor using 110 kV GI towers in the existing corridor in Uttara Kannada District

Replacement of rusted GI lattice towers along with conductor and ground wire of New 110 kV SRS Hubli-Bidnal-Bagalkot DC Dharwad, Gadag & 11 Bagalkote 16-17 line from loc no 01 to 15 & 18 to 250 in Bagalkot TLM sub-Division jurisdiction Dharwad and Gadag District

Replacement of MS Fabricated tower by GI lattice tower along with conductor New from 66 kV Multi circuit to 66 kV 12 Bagalkote Haveri 16-17 Harihar-Hospet sub-station & Poly Fiber station Harihar-Hospet in Haveri TLM section, Haveri District

Replacement of age old insulators and ground wire of 220kV Sharavathi to New Hubli D/C line by Polymer insulators 13 Bagalkote Dharwad 17-18 and new ground wire from location no.43 to 293 in the jurisdiction of Sirsi TLM section in U.K.District.

Conversion of 110 KV SC line to DC Line from 220 KV Athani Sub Station to 110 KV Athani Sub Station for a distance of New 14 3.7 Kms with replacement of existing Bagalkote Belagavi 17-18 110 KV SC Line constructed on SC MS towers from Loc 125 to Loc 133 in Athani Taluka , Belagavi Dist Sl. Work Code Name of the Work ZONE District No.

Construction of 110 KV SC Line Line on DC Towers with Lynx Conductor from 110 KV Ainapur to 110 KV Kagwwad Sub Station for a distance of 25 Kms New 15 in Belagavi Dist Bagalkote Belagavi 17-18 (Approved 110 KV Link Line between proposed 110 KV Shiraguppi and existing 110 Kagwad Sub Station for a distance of 9 Kms)

Construction of 110 KV SC Line on DC GI Tower with Lynx Conductor from 110 KV Sub Station Mamadapur to 110 KV New 16 Sub Station Yaragatti for a distance of Bagalkote Belagavi 17-18 20 Kms duly creating 110 KV Line Bays at 110 KV Mamadapur and 110 KV Yaragatti Sub Station in Belagavi Taluka

Conversion of 110 KV SC Line on SC Towers (Partially MS and Partially GI) by New DC Line with GI Towers from 220 KV 17 Bagalkote Belagavi- Bagalkot 17-18 Mahalingpur S/S to 220 KV Athani S/s from Loc No-1 to 117 in Bagalkot and Belagavi Dist

Conversion of 110 KV SC Line on SC towers to DC towers from 220 KV New 18 Mahalingpur S/S to 110 KV Bagalkote Belagavi- Bagalkot 17-18 Yalaparhatti S/S in Bagalkot / Belagavi Dist

Providing alternate source to 220 kV New Ranebennur sub-station by LILOing 220 19 Bagalkote Haveri 17-18 kV Haveri-Guttur line-1 at Loc 94-95 in Ranebennur Taluk, Haveri District Sl. Work Code Name of the Work ZONE District No.

Construction of 110 kV SC line on DC towers from 110 kV Nippani sub- station to proposed 110 kV Kugonalli New sub-station for a distance of about 15 20 Bagalkote Belgaum 17-18 kms and 110 kV Bhoj sub-station to 110 kV Boregaon sub-station for a distance of about 14 kms in Belagavi District

Stringing of 110 kV 2nd circuit on existing 110 kV DC towers between 220 New 21 kV Belagavi sub-station to 110 kV Bagalkote Belagavi 17-18 Mache substation for a distance of about 29.54 kms in Belagavi District

220kV Bidnal to 220kV Mahalingpur: Replacement of existing conductor & 22 towers from 220kV Bidnal to 220kV Bagalkote Dharwad Mahalingpur Stations by new conductor & towers.

New proposal for alternate power supply New to 110kV Akshay Colony S/s to 110kV 23 Bagalkote Dharwad 16-17 Tarihal S/s by installing 110kV U.G. Cables for about 5 kms.

Construction of IInd Circuit LILO of 220 New 24 KV Mahalingpur - Kudachi DC Line to Bagalkote Belagavi 17-18 220 KV Athani Sub Station

New 110 KV Babaleshwar-Tikota line for a 25 Bagalkote Vijayapur 17-18 distance of approx 16 Kms

Construction of 110KV SC link line for a distance of about 2.84 Kms from 26 New 18-19 Aremallapur tap line to 110KV Hosa Bagalkote Haveri Honnatti Sub station along with 110KV TB at 110KV Hosa honnatti Sub sation Construction of 110 KV Link Line between 110 KV Mantur and 110 KV 27 New 18-19 Kabbur ( Nagaramunnoli ) sub Bagalkot Belagavi Stations with Lynx Conductor for a distance of of about 27 Kms in belagvai 110 KV Chikkodi - Sankeshwara - Hukkeri SC Line 28 New 18-19 Replacement of 110 KV SC Line having Bagalkot Belagavi partially MS SC towers by new DC Line with GI towers along with conductor and Sl. Work Code Name of the Work ZONE District No.

110 KV Link Line 110 KV Shiragaon -110 KV Hukkeri 29 New 18-19 Construction of 110 KV Link Line Bagalkot Belagavi between 110 KV Shiragoan and 110 KV Hukkeri Sub Stations with Lynx 110 KV Nehru Nagar Replacement of Copper Bus 30 New 18-19 constructed with I Beam strcutures by Bagalkot Belagavi Rigid Bus along with Bus GOS etc of 110 KV Nehru Nagar Sub Station in Replacement of existing SC towers by DC Towers with Drake Conductor from Dharwad-Belagavi- 31 New 18-19 220 KV Bidnal to 220 KV Soundatti to Bagalkot Bagalkot 220 KV Mahalingpura in existing corridor from location No-13 to 431 from 110 KV Indi to Devarahipparagi: Replacement of Partially MS towers by 32 New 18-19 GI towers or providing intermediate Bagalkot Vijayapur owers to 110 KV Indi-Devarahipparagi line from Loc 01 to 131 in Vijayapur Replacement of porcelain MS towers by DC GI towers along with conductor & 33 New 18-19 ground wire from Loc No: 1 to 127 & Bagalkot Bagalkot replacement of SC MS towers by DC Monopole towers along with conductor Stringing of 110 KV 2nd Circuit using Lynx conductor from Loc No: 1 to 44 34 New 18-19 for a distance of about 12.38 Kms of Bagalkot Bagalkot 110 KV Mattihal tap line along with 110 KV TB at 110 KV Mattihal S/S in

34 Total of Lines Bagalkote

Providing metering & protection to New 1 existing 5MVA, 110/11kV Power Bagalkote U.K.District 16-17 Transformer at 110/11kV S/s Anmod

Providing metering to existing 220kV New 2 Ambewadi to ponda 1 & 2 lines at Bagalkote U.K.District 16-17 220kV Ambewadi R/s

2 Total of TB's & Others Bagalkote

104 Total of Bagalkote Zone Bagalkote

KALABURAGI TRANSMISSION ZONE Kalaburagi

Masarakal: 1 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur Station with associated line

Pamanakallur: 2 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur Station with associated line Sl. Work Code Name of the Work ZONE District No.

Hospet (West): Establishing 2x10MVA, 110/11kV and 3 Kalaburagi Bellary 1x 10MVA, 110/33-11kV Sub-Station with associated line

Chilakana Hatti: 4 Establishing 1x8MVA, 66/11kV Sub- Kalaburagi Bellary Station with associated line

Sandur: 5 Establishing 2x10MVA, 110/11kV Sub- Kalaburagi Bellary Station with associated line

G.Kodihalli: New 6 Establishing 1X8 MVA 66/11 KV S/S at Kalaburagi Ballari 15-16 G.Kodihalli

Hudem: New 7 Establishing 1X8 MVA 66/11 KV S/S at Kalaburagi Ballari 15-16 Hudem

Nimbalagere: New 8 Establishing 1X8 MVA 66/11 KV S/S at Kalaburagi Ballari 15-16 Nimbalagere

Deodurga: New 9 Establishing 1x100MVA, 220/110kV Kalaburagi Raichur 15-16 Sub-Station with associated line

Kurkunda : New 10 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur 15-16 Station with associated line

Tavaragera : Establishing 220kV Switching station by New 11 Terminating 220kV Lingapur-Kushtagi Kalaburagi Bellary 15-16 line and 220kV Lingasugur - Kushtagi line

Harvi (Manvi Tq.) : 12 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur Station with associated line

Byluvadagere: 13 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Bellary Station with associated line

Yakatpur (Mannalli): 14 Establishment of 2x10MVA 110/11 kV Kalaburagi Bidar S/S at Yakatpur (Mannalli) Sl. Work Code Name of the Work ZONE District No.

Rudrawadi (Aland Tq): Establishing 1x10MVA 110/11kV and 15 Kalaburagi Kalaburagi 1x10MVA 110/33-11kV Sub-Station with associated Line.

Gangavathi: 16 Establishing 220/110/11kV Receiving Kalaburagi Koppal Station

Bhagyanagar: 17 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Koppal Station with associated line

Chilakamukhi: 18 Up-gradation of 33/11kV MUSS to Kalaburagi Koppal 110/33/11kV Sub-Station.

Vajrabandi: Upgradation of 33/11kv s/s to 110kV 19 Kalaburagi Koppal S/S at Vajrabandi along with associated 110kV Line

Ashapur road Raichur: 20 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur Station with associated line

Jawarhar nagar: Up-gradation of existing 33kV MUSS to 21 Kalaburagi Raichur 2x10MVA, 110/11kV Sub-Station with associated line

Yadgir North: 22 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Yadgiri Station with associated line

Devapur Cross: 23 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Yadgiri Station with associated line

Madana: 24 Establishment of 1x10MVA 110/11 kV Kalaburagi Yadgir S/S at Madana

Kadlur: New 25 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur 15-16 Station with associated line

Gandhinagar : New 26 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Raichur 15-16 Station with associated line Sl. Work Code Name of the Work ZONE District No.

Aurad: 27 Establishing 1x10MVA, 110/11kV Sub- Kalaburagi Bidar Station with associated line

Udnoor cross(Kalaburagi): 28 Establishing 2x10MVA, 110/11kV Sub- Kalaburagi Kalaburagi Station with associated line

Kollur Cross: 29 Establishment of 1x10MVA 110/11 kV Kalaburagi Kalaburagi S/S at Kollur Cross

Hiresindhogi: 30 New 16-17 Upgradation of 33/11kV S/S to Kalaburagi Koppal 110/11kV S/S

Ballatgi : Establishing 1 x10 MVA, 110/11 Kv 31 FA1050 Kalaburagi Raichur S/S at Ballatgi along with associated 110kV Line in Manvi Taluka H.V Kunta Establishing 2x10 MVA 110/11 KV and 32 FD1028 1x10 MVA 110/33 KV substation by Kalaburagi Koppal upgrading the existing 2x5 MVA 33/11 KV S/S at H.V Kunta in Kustagi Taluk ,

Tavergera:Establishing 1x10MVA, 33 New 18-19 110/11kV Sub-Station with associated Kalaburagi Kalaburgi line

M-Kollur: Establishing of 1X10MVA, 34 New 18-19 110/11kV Sub-Station at M-Kollur Kalaburagi Yadgir Village in Shahapur Tq, Yadgir Dist.

Ratification Subject: Upgradation of 2x5MVA, 33/11kV Sub-station to 2x10 MVA, 110/11kV and 1X20MVA, 35 New 18-19 Kalaburagi Koppal 110/33kV Sub-station at Kuknoor village in Yelburga Taluk, Koppal District.

35 Total of Sub-stations Kalaburagi Sl. Work Code Name of the Work ZONE District No.

Allipur: Providing spare 100 MVA, 220/110 kV 1 Kalaburagi Bellary Power Transformer at 220 kV R/S Allipur

Raichur: Providing spare 10 MVA, 110/11 kV 2 Kalaburagi Raichur Power Transformer at 220 kV R/S Raichur

Providing additional 1x10MVA, New 3 110/33kV Power Transformer at Kalaburagi Kalaburgi 17-18 110/11kV Mandewal Sub Station.

Hampsagara: Repl of 1X6.3MVA by New 4 1X12.5MVA, 66/11KV Trf at 66/11KV Kalaburagi Ballari 17-18 S/S Hampasagara

Mukkunda: New Replacement of 1x10MVA by 1x20MVA 5 Kalaburagi Raichur 17-18 110/11KV Power Transformer at 110KV S/S Mukkunda

Turvihal: New Replacement of 1x10MVA by 1x20MVA 6 Kalaburagi Raichur 17-18 110/11KV Power Transformer at 110KV S/S Turvihal.

Manvi: Replacement of 1x10MVA by 1x20MVA New 110/11KV Power Transformer at 110KV 7 Kalaburagi Raichur 17-18 S/S Manvi and providing 3 Nos of 1x100Sqmm XLPE cable to 11kV bank II at 110/11kV manvi station

Raichur: Enhancement of 1x10MVA, 110/11KV Power Transformer by 20MVA New 8 ,110/11kV power transformer & Kalaburagi Raichur 17-18 providing 3 no's of 1x1000sq.mm XLPE CABLES TO 11Kv Bank III at 220KV S/S Raichur.

66KV S/S Hoovinahadagali: New 9 Augumentation 6.3MVA by 12.5 MVA Kalaburagi Ballari 17-18 Trf Sl. Work Code Name of the Work ZONE District No.

Providing additional 1 X 10MVA, 110kV 10 New 18-19 Power Transformer at 110/33/11kV Kalaburgi Afzalpur MUSS, Chowdapur.

Enhancement of 1x10MVA, 110/11kV Power Transformer No-1 by 1x20 MVA, 11 New 18-19 Kalaburgi Bidar 110/11kV Power Transformer at 110/11kV S/S Chidri

11 Total of Augmentations Kalaburagi

Koppal-Guddadahalli: Construction of 220kV DC line from 1 FD1022 proposed Koppal (Halavarthy) S/S to Kalaburagi Koppal existing 400kV S/S PGCIL Guddadahalli 12Kms

Construction of 110KV LILO line to 110KV MUSS Somasamudra on the existing D/c tower from the tapping New 2 point 110KV -Ballari(North) Kalaburagi Ballari 17-18 Line for a distance of 4.1KM pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad.

Construction of New 66KV SC(Coyote) line on D/C towers on the same corridor for a distance of 42KM from 66KV MUSS New Kudligi to 66KV MUSS Hangal by 3 Kalaburagi Ballari 17-18 dismantling existing 66KV Towers pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad

Construction of New 66KV SC(Coyote) link line on D/C towers from 66KV S/s New Banavikallu to 66KV S/s C J Halli for 4 Kalaburagi Ballari 17-18 a distance of 4Kms pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad Sl. Work Code Name of the Work ZONE District No.

110kV Munirabad-Sindhanoor- New Raichur Line I& II Reconductering by 5 Kalaburagi Raichur 17-18 providing intermidiate towers if necessary

Re- construction of 110kV SC line on DC Towers having wolf/ patridge conductor from 220kV Shahabad R/S to New 6 110kV University S/S for a distance of Kalaburagi Kalaburgi 17-18 27Km by 110kV SC line on DC towers using Lynx conductor in the exisitng corridor

Construction fo 110kV SC link line on DC towers from existing Kapnoor 220kV R/S to the existing 110/33-11kV New 7 Kalaburagi (University) S/S via 110/33- Kalaburagi Kalaburgi 17-18 11kV Kalaburagi (West), 110/11kV Kalaburagi (South) for distance fo 51Kms. Circut length

Re- construction of 110kV Sedam - Chittapur H type tower, line for a New 8 distance of 25KM in the exisiting Kalaburagi Kalaburgi 17-18 corridor

Re- Construction of 110kV Shahabad- New 9 Chittapur H type tower, line for a Kalaburagi Kalaburgi 17-18 distance of 33kV.

Re-construction of 110kV Shahabad - New 10 Shahapur DC line in Shahabad TLM Kalaburagi Yadgir 17-18 Sub-Division for a distance of 57 Kms.

Construction of 110KV LILO line to 110/11KV MUSS Kamalapura S/s on the existing D/C towers from the New tapping point for a distance of 5.8KM 11 Kalaburagi Ballari 17-18 from 110KV Munirabad- Hagari line pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad Sl. Work Code Name of the Work ZONE District No.

Construction of 110KV LILO line to 110/11KV MUSS Bisilahalli S/s on the existing D/C towers from the tapping New 12 point for a distance of 3.35KM to Kalaburagi Ballari 17-18 Ballari(N) Halakundi line pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad.

Re-construction of 220KV SC line(Drake) on DC Towers for a distance of 92.42KM in the existing 220KV-BTPS- Gooty SC Line by dismantling existing New 13 S/c MS Angle Lattice Towers by new Kalaburagi Ballari 17-18 D/C GI Tower in the existing corridor pertaining to TLM Sub-Division Munirabad in TL&SS Division Munirabad

Creation of 66KV reference at upcoming 220KV switching station(work of construction os switching station taken New up by M/s SLR under self execution) 14 Kalaburagi Ballari 17-18 and conversion of following 66KV lines. 1.Conversion of 66KV MHD line SLR to 220KV R/S Ittagi and interconnecting between 66KV Banavikallu and CJ Halli.

Construction of 110kV SC link Line New from Existing 110/33/11kv S/S 15 Kalaburagi Bidar 17-18 Kamalnagar to Existing Lada 110/33- 11kVS/S for a distance of 40Kms

Enhancement of 10MVA, 110/33kV New Power Transformer by 20MVA, 16 Kalaburagi Kalaburgi 17-18 110/33kV power transformer at 110/33KV S/S Kalaburagi (North).

Strngthening of 220KV DC Line between 220/110KV Kustagi and proposed switching station at the LILO point of 17 New 18-19 Kalaburagi Koppal Kustagi-Lingapur- Lingasgur by replacing existing Darke by higher amapacity conductor Sl. Work Code Name of the Work ZONE District No.

Re- Construction of 110kV Shahabad- Chittapur H type tower, line for a 18 New 18-19 Kalaburagi Kalaburgi distance of 33.75Kms in the existing corridor.

Re-construction of existing 110kV Kalaburgi-I SC line on tower by constructing 110kV DC New line on DC towers from 220/110 kV Receiving 19 New 18-19 Kalaburagi Kalaburagi station Kapanoor to the 220kV Receiving station Humnabad LOLI at 110/33-11kV Mahagaon S/S & Re-Construction110/11kV Margutti of the S/S existing using theSC lines on SC towers by new DC line on DC & MC Towers from 220kV Kapnoor to 110kV Gulbrga North S/S (8Kms) and 20 New 18-19 Kalaburagi Kalaburagi DC line on DC tower with connectivity to MC tower for LILO from 110kV North S/s to 110kV University using the existing corridor over a distance of construction of 110kV SC link line on DC towersform existing Nirna 110/11kV Sub-Station to existing Mannaekheli 21 New 18-19 Kalaburagi Bidar 110/33-11kV Sub-station in Humnabad and Bidar Dist. for a distance of 20 kms.

Construction of 2nd circuit line from 220kV Shahapur to Khanapur on 22 New 18-19 Kalaburagi Yadgir existing DC tower for a distance of 19.25 Kms & TB at bothe ends.

22 Total of Lines Kalaburagi

68 Total of Kalaburagi Zone Kalaburagi

390 Total of List-IV for All Zones List-V : Projects lined up seeking clearance of Technical Co-ordination Committee.

Sl. No. Work Code Name of the Work ZONE District

BENGALURU TRANSMISSION Bengaluru ZONE

BSK 6th stage : Establishing 1 1x20MVA, 66/11kV Sub-Station Bengaluru Bengaluru Urban with associated line

Tigalarapalya ('D'group layout): 2 AA1077 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line.

Kulavanahalli: 3 AB1035 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Bengaluru rural Station with associated line.

Yentaganahaali: Establishing 4 AC1030 2x8MVA, 66/11kV Sub-Station with Bengaluru Bengaluru rural associated line.

Bhoruka Tech Park (near Hoody): 5 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Sorahunse : 6 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Konadasanapura 2 : 7 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Kambeepura : 8 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Kumbalagodu 2 : 9 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Doddatoguru near Eectronic City Phase I: 10 Bengaluru Bengaluru Urban Establishing 2x31.5MVA, 66/11kV Sub-Station with associated line Sl. No. Work Code Name of the Work ZONE District

Kurubarahalli : 11 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Mahanthalingapura : 12 Establishing 2x31.5MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Dhobhi Ghat: near Chamrajapet 13 (Deer park) Bengaluru Bengaluru Urban Establishing 2x31.5MVA, 66/11kV Sub-Station with associated line

Sigehalli: 14 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Bengaluru Urban Station with associated line

Andarahalli : 15 Establishing 1x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated linek

J. P. Nagara 3rd Phase: 16 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Doddagubbi: 17 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Gorvigere: 18 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Biderahalli: 19 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

IOC/Tarabanahalli: 20 Establishing 2x20MVA, 66/11kV Bengaluru Bengaluru Urban Sub-Station with associated line

Gollahalli Railway Gate: 21 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Bengaluru Urban Station with associated line, Sl. No. Work Code Name of the Work ZONE District

Talgunda: 22 AD1020 Establishing 2x8MVA, 66/11kV Sub- Bengaluru C. B. PURA Station with associated line.

Burdagunte: 23 AE1023 Establishing 2x8MVA, 66/11kV Sub- Bengaluru C. B. PURA Station with associated line.

Ramdevaragudi: Establishing 24 AE1024 2x8MVA, 66/11kV Sub-Station with Bengaluru C. B. PURA associated line.

Allipura: 25 AE1025 Establishing 2x8MVA, 66/11kV Sub- Bengaluru C. B. PURA Station with associated line.

Kenchariahalli : 26 Establishing 2x8MVA, 66/11kV Sub- Bengaluru CBPura Station with associated line

Gulur: 1x8MVA 66/11kV S/s with 27 Bengaluru C.B. Pura associated line

Thambihalli : 28 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Rayalpadu: 29 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Hudukula: 30 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Thopanahalli Cross: 31 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Benavara : 32 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Hunkunda: 33 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line Sl. No. Work Code Name of the Work ZONE District

Magondhi: 34 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Kudiyanur: 35 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Araleri: 36 Establishing 2x8MVA, 66/11kV Sub- Bengaluru Kolar Station with associated line

Hesaraghatta: 37 Establishing 2x20 MVA, 66/11 kV Bengaluru Bengaluru urban sub-station at Hesaraghatta

Hunasamaranahalli: 38 Establishing 2x20 MVA, 66/11 kV Bengaluru Bengaluru Rural sub-station at Hunasamaranahalli

Hegade Nagara.: 39 Establishing 2x20 MVA, 66/11 kV Bengaluru Bengaluru urban sub-station at Hegade Nagara.

Yelahanka Airforce opposite to VISF: 40 Establishing 2x20 MVA, 66/11 kV Bengaluru Bengaluru urban sub-station near Yelahanka Airforce opposite to VISF

Nagarbhavi: Establishing 2x150MVA, 41 AA1079 Bengaluru Bengaluru Urban 220/66/11kV Station with associated lines.

Srirampura New ( Pemmanahalli) : Establishing 42 Bengaluru Ramanagara 15-16 2x8MVA, 66/11kV Sub-Station with associated line.

New Dodderi : Establishing 2X8 MVA, 43 Bengaluru Bengaluru South 16-17 66/11kV S/s at Dodderi Sl. No. Work Code Name of the Work ZONE District

Garakahalli: New 44 Establishing 1x8 MVA, 66/11kV S/s Bengaluru Ramanagara 16-17 along with 66kV line

Mudugere: New 45 Establishing 1x8 MVA, 66/11kV S/s Bengaluru Ramanagara 16-17 along with 66kV line

Avalahalli 12 Pole structure : New Establishing 2x8 MVA, 66/11kV 46 Bengaluru Bengaluru Rural 16-17 Sub station near Avalahalli 12 Pole Structure

Providing GIS Station at Vidhana Soudha Compound by Loop in and 47 New 18-19 Bangalore Bangalore Urban Loop out arrangement between 'A' Station and 'C' Station.

Proposal for GIS station at 48 New 18-19 Indiranagar, KPTCL/BESCOM Bangalore Bangalore Urban Colony area

Conversion of existing 220/66 kV 49 New 18-19 NRS sub-station to GIS sub-station

49 Total of Sub-stations Bengaluru Subramanyapura : Replacing 1X20MVA power transformer-2 by New 1X31.5MVA Power transformer 1 Bengaluru Blore 16-17 including (2I/C+1BC+4 Fdr) at 66/11kV Subramanyapura Sub Station.

HBR : Replacing 2X20 MVA power transformer to 2X31.5 MVA at New 2 66/11 KV HBR Muss along with 2 Bengaluru 16-17 nos of incommer panel for each power transformer

Banswadi : Replacing 1X20 MVA New 3 power transformer to 1X31.5 MVA Bengaluru 16-17 at 66/11 KV Banswadi Muss Sl. No. Work Code Name of the Work ZONE District

Sahakar nagar : Replacing2X20 MVA power transformer to 2X31.5 New 4 MVA at 66/11 KV Sahakar nagar Bengaluru 16-17 Muss along with 2 nos of incommer panel for each power transformer

New Pillagumpa:Additional 20MVA, 5 Bengaluru Bengalore Rural 16-17 66/11 kV Transformer

Lakkur: Replacing of 1X 8 MVA New Power Transformer-2 by 1X12.5 MVA 6 Bengaluru 16-17 Power Transformer at 66/11 KV S/S Lakkur.

Malur: Providing additional 100MVA New 7 Power Transformer at 220kV R/s Bengaluru Kolar 16-17 Malur

Enahncement of 12.5 MVA NGEF New 8 make by 20MVA at 66/11kV Bengaluru Bengaluru RURAL 17-18 Doddabelavangala Substation.

Enahncement of 8 MVA Power New 9 Transformer by 20MVA at 66/11kV Bengaluru Bengaluru RURAL 17-18 Kanasawadi Substation.

Tekal: Augementation of existing New 1x8 MVA, 66/11 kV (PTR No:2) by 10 Bengaluru Kolar 17-18 1x12.5MVA, 66/11 kV transformers at 66/11 kV Tekal sub-station. .

Malur (Town): Augementation of existing 1x8 MVA, 66/11 kV (PTR New 11 No:2) by 1x12.5MVA, 66/11 kV Bengaluru Kolar 17-18 transformer at 66/11 kV Malur (Town) sub-station.

Bangarpet: Augementation of existing 1x12.5 MVA, 66/11 kV (PTR New No:2) by 1x20 MVA, 66/11 kV 12 Bengaluru Kolar 17-18 transformers at 66/11 kV Bangarpet sub-station. . Sl. No. Work Code Name of the Work ZONE District

Malur Industrial Area: Providing Buffer/Spare power transformer of 1x20 MVA, 66/11kV transformer & New 13 construction of associated terminal Bengaluru KOLAR 17-18 Bay wilth control and protection equipments at 66/11 kVMalur Industrial Area Substation

220/66 kV Malur Receiving Station: Providing Buffer/Spare power transformer of 1x100 MVA, New 220/66 kV power transformer & 14 Bengaluru KOLAR 17-18 construction of associated 220 kV and 66 kV terminal Bays wilth control and protection equipments at 220/66 kV Malur Receiving Station.

Shidlaghatta New 15 Replacing 1x12.5MVA, 66/11kV by Bengaluru CBPura 17-18 1x20MVA, 66/11kV transformer

Replacing 1x6.3MVA, 66/11kV by New 1x12.5MVA, Power Transformer-II 16 Bengaluru CB Pura 17-18 66/11kV transformer at 66/11kV Muss Thimmampalli

Replacing 1x12.5MVA, 66/11kV by New 1x20MVA, Power Transformer-I 17 Bengaluru CB Pura 17-18 66/11kV transformer at 66/11kV Muss Peresandra

Providing additional 1X12.5 MVA New 18 Power Transformer at 66/11kV Bengaluru CB Pura 17-18 MUSS Mandikal

Providing additional 1X12.5 MVA New 19 Power Transformer at 66/11kV Bengaluru CB Pura 17-18 MUSS Somenahalli

Providing additional 1X12.5 MVA New 20 Power Transformer at 66/11kV Bengaluru CB Pura 17-18 MUSS Chelur Sl. No. Work Code Name of the Work ZONE District

Providing additional 1X12.5 MVA New 21 Power Transformer at 66/11kV Bengaluru CB Pura 17-18 MUSS Pathpalya

Replacement of 8MVA by 12.5MVA New 22 Power Transformer at 66kV S/s Bengaluru Bengaluru Urban 17-18 Jadigenahalli

Hebbal: Replacing of 2x100MVA, 220/66kV by 2x150MVA, 220/66kV 23 New 18-19 Banagaluru Bangalore Urban (DESIGNED BASE) suiting existing space at Hebbal 220/66kV station.

Puttenahalli :Providing additional 24 New 18-19 150MVA 220/66kV Transformer at Banagaluru Bangalore Urban Puttenahalli Station.

Vijayanagar MUSS: Providing new 1X31.5 MVA Power transformer by 25 New 18-19 Banagaluru Bangalore Urban providing new bay at Vijayanagar MUSS. Replacement of Single phase 3x167MVA Auto transformer by 3- 26 New 18-19 phase 500MVA of ICT-1 Bank as it Banagaluru Bangalore Urban was commissioned during 1994 which has served for more than 24 Providing additional 1X 100 MVA, 27 New 18-19 220/66/11 kV Transformer at Bengaluru Mandya 220 kV R/S TK Halli

Providing additional 1X 12.5 MVA, 66/11 kV Tansformer at 66/11 28 New 18-19 Bengaluru Ramnagar kV MUSS Sankalgere along with 1+6 + Capacito bank

66/11kV S/S Hullenahalli: 29 New 18-19 Replacing 2x8MVA, 66/11kV Power Bengaluru Ramanagara Transformer by 2x12.5/20MVA,

66/11kV S/S : Replacing 30 New 18-19 Bengaluru Ramanagara 2x8MVA, 66/11kV Power Transformer by 2x12.5/20MVA, Augmentation of 1 X 12.5 MVA Power Transformer 1 by 1 X 20 MVA 31 New 18-19 Bengaluru Ramanagara Power Transformer at 66/11 kV Substation Hejjala

Augmentation of 12.5MVA Tr-2 by 32 New 18-19 20MVA Power Transformer at Bengaluru Bengaluru Rural 66/11kV Jadigenahalli Sl. No. Work Code Name of the Work ZONE District

Sulibele : Replacing of 1x 12.5MVA 33 New 18-19 Bengaluru Bengaluru Rural Transformer-1 by 1x20MVA transformer

Augmentation of existing 12.5MVA 34 New 18-19 transformer by 20MVA at 66/11kV Bengaluru C.B.Pura MUSS Chikkaballapura

Augmentation of existing 8 MVA 35 New 18-19 power transformer -2 by 20MVA Bengaluru Bengaluru rural power transformer at Gundamgere

Enhancement of 66/11kV power transformer 2 of capacity 1x6.3MVA 36 New 18-19 Bengaluru Kolar to 1x12.5MVA at 66/11kV sub- station, Byrakur Enhancement of 66/11kV power transformer 2 of capacity 1x6.3MVA 37 New 18-19 Bengaluru Kolar to 1x12.5MVA at 66/11kV sub- station, Mudiyanur. 37 Total of Augmentations Bengaluru

Replacement of 66 kV Coyote Conductor by Drake Conductor from New 220kV BIAL Begur station to Bengulru Urban & 1 Bengaluru 15-16 Budigere station and 220kV Rural Hosakote to Budigere station for a distance of 20 Kms

Replcaemenet of coyote conductor by New Drake from Kadugodi Sub station 2 Bengaluru 16-17 to 4 pole structure near Railways- 0.5kms

Replcaemenet of coyote conductor by 630sqmm UG Cable 4 pole New 3 structure near Railways to Bengaluru 16-17 Kannamangala 4 pole structure - 4kms

Providing 3 runs of 66 kV, 1000 New sqmm XLPE cable from 66/11kV 'C' 4 Bengaluru 16-17 station to 66/11 kV Pottery Road Muss

Providing 03 no of Hybrid New switchgear for 2X31.5+ 1 x20 MVA 5 Bengaluru 16-17 Power transformer-3 at 66/11 KV Banswadi Muss Sl. No. Work Code Name of the Work ZONE District

Conversion of overhaed line from New cable termination point upto 6 Bengaluru 16-17 Chandra Layout MUSS. 500Mtrs, 3 Span, 0.65 Kmts.

Conversion of overhaed line from New 7 Vijayanagar to Chandra Layout Bengaluru 16-17 MUSS.

Replacement of coyote conductor by New Drake conductor from 220KV 8 Bengaluru Bengalore Urban 16-17 Hoskote station to Vidyanagar LILO point for a distance of 21 KM.

Construction of New 66KV line New 9 Tapping from 66KVBegur-Hoskote Bengaluru Bengalore Rural 16-17 line to 66/11KV MUSS Sulibele.

Construction of New 66KV line New tapping from existing Malur- 10 Bengaluru Bengalore Rural 16-17 Hoskote 66KV line to 66/11KV MUSS Volvo.

New Providing LILO arrangement to 11 Bengaluru CB Pura 16-17 66/11kV Muss Thondebhavi

Conversion of existing single circuit 66kV SBT line to muticircuit line New 12 Bengaluru Bengaluru Rural 16-17 with Drake conductor from Dabespet 220kV station to 400kV station Compound Nelamangala

Reconducting of 66KV DG3 & DG4 transmission line of coyote New conductor by HTLS/drake conductor 13 Bengaluru Bengaluru Urban 17-18 from chikkabetahalli 8 Pole structure to 220KV Hoskote to a distance of approx 35 km

66 KV Outgoing cable Transmission Line from Proposed 220kV HBR to New 14 Pottery Road by laying 1000Sqmm Bengaluru Bengaluru Urban 17-18 XLPE UG cable for a distance of approx 4 Km Sl. No. Work Code Name of the Work ZONE District

Construction of 2nos of terminal Bay at Attur Yelahanka MUSS for DG3 & DG4 outgoing Line by New 15 providing 66 kV 1000 sqmm XLPE Bengaluru Bengaluru Urban 17-18 UG cable for approx dist of 100 mrts from the tower at station to proposed terminal bay(100X3X2=600 mtrs)

Conversion of 220kV Strung Bus by Rigid BUS along with providing Split New 16 Isolator and replacement of 220kv Bengaluru Bengaluru Urban 17-18 isolators at 220kV R/S Subramanyapura.

Providing Alternate 66kV source New 17 from 66kV HAL-1 / HAL-2 line to Bengaluru Bengaluru Urban 17-18 66kV Brigade Metropolis S/s.

220 KV R/S Chintamani Providing link line from New Nandiganahalli to Adgal to transfer 18 Bengaluru CBPura 17-18 load of Adgal sub-station from Lakshmipura line to Nandiganahalli line.

Replacement of 9Nos of English Electric make C&R panel (old type) by New type C&R panel with double New bus bar arrangement and duplex 19 Bengaluru CB Pura 17-18 type including replacement of 66kV single bus by double bus arrangement (including Civil works) at 220kV R/S GBDR

New Providing LILO arrangement to 20 Bengaluru CB Pura 17-18 66/11kV Muss Gundlukottur

Conversion of existing single circuit 66kV Peenya –Nelamangala line to New 21 Double circuit line from 66kV Bengaluru Bangalore Rural 17-18 Nelamangala Station to 66kV station MEI Sl. No. Work Code Name of the Work ZONE District

conversion of existing 66KV SC Line New to DC Line of Drake conductor from 22 Bengaluru Bangalore 17-18 220/66/11KV R/s, Yarandanahalli to 66/11KV S/S, Anekal.

Construction of 220 kV DC, 1000 Sqmm UG cable (6Kms) from 400 kV Devanahalli Hardware Park to Vidyanagara 66 kV line and New conversion of exsiting Vidyanagar 66 23 Bengaluru Bengaluru Rural 17-18 kV DC line to 220-66 kV MCMV (14 Kms) line upto 220 kV Nelamangala- Hoody line to connect proposed Devanahalli Hardware Park to 220 kV Ring main of Bengaluru.

Providing Additional Source to 24 New 18-19 Telecom layout by extending 66kV Bengaluru Bangalore Urban Cable upto REMCO GIS Station

Replacement of existing 66kV N'pura- Malgudi-Keonics city D/C Coyote 25 New 18-19 Bengaluru Bangalore Urban conductor line by HTLS conductor for strenghtening of line.

Replacement of existing 66kV Austin town-Koramanagala 9-pole structure 26 New 18-19 Bengaluru Bangalore Urban D/C Coyote conductor line by HTLS conductor for strenghtening of line.

66kV Hoody-Hoskote - replacement of SC line cyote conductor by HTLS - 27 New 18-19 Bengaluru Bangalore Urban 12.2 kM at TLM Sub-Division, Hoody. Sl. No. Work Code Name of the Work ZONE District

Proposal for alternate source to Amrjyothi and K&C Vally from 28 New 18-19 Bengaluru Bangalore Urban 220/66kV Koramnagala (9 pole structure) by running 66kV UG cable

Replacement of existing coyote 66kV line from 220/66/11kV Ekarajapura 29 New 18-19 (Hosakote) station to 66/11kV Bengaluru Bengaluru Rural Hosakote station by HTLS / Drake line

Replacement of existing coyote 66kV line from 220/66/11kV Ekarajapura 30 New 18-19 (Hosakote) station to 66/11kV Bengaluru Bengaluru Rural Sulibele station by HTLS / Drake line

Providing alternate source from 220/66/11kV R/s Ekarajapura 31 New 18-19 (Hosakote) station to 66/11kV Bengaluru Bengaluru Rural Nandagudi station for a distance 26kms.

Enhancement of incoming line from 66kV Chintamani to Talagawara 32 New 18-19 (SINGLE CIRCUIT TO DOUBLE Bengaluru Chickballapura CIRCUIT ) due to overloading of line as it is feeding three station.

Strengthening of existing 220 kV 33 New 18-19 Bengaluru Kolar Kolar HVDC Kolar PGCIL line Sl. No. Work Code Name of the Work ZONE District

Construction of 220 kV line from 34 New 18-19 proposed T.Gollahalli station to 220 Bengaluru Kolar kV R/s Malur

34 Total of Lines Bengaluru

Providing terminal bay at 66KV New Mudiyanur substation for making 1 Bengaluru KOLAR 15-16 LILO arrangement to 66KV H.Gollahalli tap line

New R & M Works at 220 KV 2 Bengaluru CBPura 15-16 Gowribidanur Station

Vijayanagar station: Providing 66kV Control and providning rigid bus to 3 New 18-19 Bengaluru Bangalore 2x31.5MVA Transformer at Vijayanagar Station

Providing 2no's of 72.5kV class 30MVAR Capacitor Bank along with 4 New 18-19 2no's of 66kV Bays at 220/66/11kV Bengaluru Bengaluru Rural S/s Ekarajapura, Hosakote in BIAL TL&SS Division. 4 Total of TB's & Others Bengaluru

124 Total for Bengaluru Zone Bengaluru TUMAKURU Tumakuru TRANSMISSION ZONE

Rajagondanahalli : 1 BB1044 Establishing 2x8MVA, 66/11kV Tumakuru Davanagere Sub-Station with associated lines

Tumbadi: 2 BA1054 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station along with line

Salakatte: Establishing 2x100MVA, 220/110/ 3 Tumakuru Tumakuru 11kV Station with associated 220kV lines Sl. No. Work Code Name of the Work ZONE District

Chandravalli (Chitradurga Town): 4 BC1059 Establishing 2x8MVA, 66/11kV Sub- Tumakuru Chitradurga Station with associated line

Konasagar: 5 Establishing 2x6.3MVA, 66/11kV Tumakuru Chitradurga Sub-Station with associated line

Mallapanahalli: 6 Establishing 2x6.3MVA, 66/11kV Tumakuru Chitradurga Sub-Station with associated line

J N.Kote: Establishing 2x8MVA, 66/11kV Sub- 7 Tumakuru Chitradurga Station with associated line in Chitradurga Taluk & Dist.

Vijapura: Establishing 2x6.3 MVA, 66/11kV 8 Tumakuru Chitradurga Sub-Station with associated line in Chitradurga Taluk & Dist.

N G Halli : Establishing 2x8MVA, 66/11kV Sub- 9 Tumakuru Chitradurga Station with associated line in Holalkere Taluk, CHitradurga Dist.

Godabanal : Establishing 2x8MVA, 66/11kV Sub- 10 Tumakuru Chitradurga Station with associated line in Chitradurga Taluk & Dist.

Igoor Gollarahatti: Establishing 2 x 8 MVA 66/11 KV S/S with 11 Tumakuru Davanagere associated line in Davanagere Taluk & District.

Konanatale: Establishing 1x8 MVA, 66/11kV 12 Tumakuru Davanagere Sub-Station with associated line in Honnali Taluk Davangere Dist. Sl. No. Work Code Name of the Work ZONE District

Basavanakote: Establishing 1x8 MVA, 66/11kV 13 Tumakuru Davanagere Sub-Station with associated line in Jagalur Taluk Davangere Dist.

Bidarekere (Chandrabavi): Establishing of 1x8 MVA, 66/11kV 14 Sub-station with associated 66kV Tumakuru Tumakuru line in Madhugiri Taluk, Tumakuru Dist.

Shettigondanahalli: 15 Establishing 1x8MVA, 66/11kV Sub- Tumakuru Tumakuru Station with associated line

Honnenahally: Establishing 1 x 8 MVA 66/11 KV 16 Tumakuru Tumakuru S/S with associated line in Tumakuru Taluk & District.

Thirumani: Establishing of 1X8MVA, 66/11kV 17 Sub-station with associated 66kV Tumakuru Tumakuru line in Pavagada Taluk, Tumakuru Dist.

Mookanahalli Patna: Establishing 1 x 10 MVA 110/11 KV S/S with 18 Tumakuru Tumakuru associated line in Gubbi Taluk, Tumakuru District.

Belavattha: Establishing 1 x 10 MVA 110/11 KV 19 Tumakuru Tumakuru S/S with associated line in Gubbi Taluk, Tumakuru District.

Haridasanahalli: Establishing 1 x 10 MVA 110/11 KV S/S with 20 Tumakuru Tumakuru associated line in Turuvekere Taluk, Tumakuru District.

Dinkanahalli: 21 400kV Switchnig Station in C.N Halli Tumakuru Tumakuru Taluk, Tumakuru Dist. Sl. No. Work Code Name of the Work ZONE District

Talagunda: Establishing 1 x 8 MVA 66/11 KV 22 Tumakuru Tumakuru S/S with associated line in Sira Taluk, Tumakuru District.

Baragur/Poojara Muddanahally Gate: Establishing 1 x 8 MVA 66/11 23 Tumakuru Tumakuru KV S/S with associated line in Sira Taluk, Tumakuru District.

Bidaregudi: Establishing of 1x10 MVA, 24 110/11kV Sub-station with Tumakuru Tumakuru associated110kV line in Tiptur Taluk, Tumakuru Dist.

B Kodihally: New 25 Establishing 1 x 10 MVA 110/11 KV Tumakuru Tumakuru 15-16 S/S with associated line

Banasandra: New 26 Establishing 1 x 10 MVA 110/11 KV Tumakuru Tumakuru 15-16 S/S with associated line

Mallaghatta: New 27 Establishing New S/S in Turuvekere Tumakuru Tumakuru 15-16 Tq.

Halappagudde: New 28 Establishing new S/S at Tumakuru Tumakuru 15-16 Halappanagudde : Establishing 1x8 MVA, 66/11KV Sub-station at Sirivara and construction of 29 New 18-19 66KV LILO line from existing 66KV Tumakuru Tumkur Anchepalya – 1 line in Tumakuru Taluk, Tumakuru district Proposal for new Etsablishing 2 X 30 New 18-19 12.5MVA power transformer, 66/11KV Tumakuru Davanagere S/S at Maganahalli, Davangere (T)(D).

Proposal for new Etsablishing 2 X 8 31 New 18-19 MVA power transformer, 66/11KV S/S Tumakuru Davanagere at Hirekogalur, in Davangere (T)(D). Sl. No. Work Code Name of the Work ZONE District

Proposal for new Etsablishing 2 X 8 32 New 18-19 MVA power transformer, 66/11KV S/S Tumakuru Davanagere at Anabur in Davangere (T)(D).

Proposal for new Etsablishing 2 X 8 MVA power transformer, 66/11KV S/S 33 New 18-19 Tumakuru Davanagere at Honnebagi in Channagiri (T) Davangere (D). Proposal for new Etsablishing 2 X 8 MVA power transformer, 66/11KV S/S 34 New 18-19 Tumakuru Davanagere at Betakadur in Channagiri (T) Davangere (T)(D). Proposal for new Etsablishing 2 X 8 MVA power transformer, 66/11KV S/S 35 New 18-19 Tumakuru Davanagere at Agarabanihatti in Channagiri (T) Davangere (D).

35 Total of Sub-stations Tumakuru

Chickajajur: Replacing 1x6.3MVA, 1 66/11kV by 1x 12.5MVA, 66/11kV Tumakuru Chitradurga Transformer.

Chitradurga: Replacing 1x12.5 MVA, 66/11kV by 2 Tumakuru Chitradurga 1x 20 MVA, 66/11kV Transformer at 66/11 KV station chitradurga.

Sasaluhalla: 3 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

Hireguntanur: 4 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

Nayakanahatti: 5 Replacing 1x12.5 MVA, 66/11kV by Tumakuru Chitradurga 1x 20 MVA, 66/11kV Transformer.

220kV Chitradurga SRS: Replacing 6 1x12.5MVA, 66/11kV by 1x20MVA, Tumakuru Chitradurga 66/11kV Transformer. Sl. No. Work Code Name of the Work ZONE District

Balenahalli: 7 Replacing 1x8 MVA, 66/11kV by Tumakuru Chitradurga 1x12.5MVA, 66/11kV Transformer.

Turuvanur: 8 Replacing 1x6.3MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5MVA, 66/11kV Transformer.

Hiremallanahole: 9 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Tranformer.

Holalkere: 10 Replacing 2nd 12.5MVA, 66/11kV Tumakuru Chitradurga by 1x 20MVA, 66/11kV Transformer.

Bagur: 11 Replacing 1x8MVA 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Transfformer.

Kalamaranahalli: 12 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

JG Halli: 13 Replacing 1x6.3VA, 66/11kV by 1x Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

Sanikere: 14 Replacing 1x6.3 MVA, 66/11kV by Tumakuru Chitradurga 1x 12.5 MVA, 66/11kV Transformer.

Hiriyur: 15 Replacing 1x8 MVA, 66/11kV by Tumakuru Chitradurga 1x12.5 MVA, 66/11kV Transformer.

Sasaluhalla: 16 Replacing 2nd 8 MVA, 66/11kV by Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer. Sl. No. Work Code Name of the Work ZONE District

Hireguntanur: 17 Replacing 2nd 8 MVA, 66/11kV by Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

Hosadurga: 18 Replacing 2nd 12.5 MVA, 66/11kV Tumakuru Chitradurga by 20 MVA, 66/11kV Transformer.

Halurameswara: 19 Replacing 2nd 6.3 MVA, 66/11kV by Tumakuru Chitradurga 1x 12.5MVA, 66/11kV Transformer.

Rampura : Replacing 2nd 1x6.3 MVA, 66/11kV 20 Tumakuru Chitradurga by 1x12.5 MVA, 66/11kV Transformer.

Balenahalli: 21 Replacing 2nd 8 MVA, 66/11kV by Tumakuru Chitradurga 12.5MVA, 66/11kV Transformer.

Madanayakanahalli: Replacing 1x8 22 MVA, 66/11kV by 1x 12.5 MVA, Tumakuru Chitradurga 66/11kV Transformer.

Hiremallanahole: 23 Replacing 2nd 8 MVA, 66/11kV by Tumakuru Chitradurga 12.5 MVA, 66/11kV Tranformer.

H.D Pura: 24 Replacing 1x12.5 MVA, 66/11kV by Tumakuru Chitradurga 1x20MVA, 66/11kV Transformer.

Ramagiri: Replacing 1x12.5MVA, 66/11kV by 25 Tumakuru Chitradurga 1x 1x20 MVA, 66/11kV Transfformer.

Mathod: 26 Replacing 2nd 6.3 MVA, 66/11kV Tumakuru Chitradurga by 12.5 MVA, 66/11kV Transformer. Sl. No. Work Code Name of the Work ZONE District

Bagur: 27 Replacing 2nd 8MVA 66/11kV by Tumakuru Chitradurga 12.5 MVA, 66/11kV Transfformer.

Sirigere: 28 Replacing 2nd 8MVA, 66/11kV by 1x Tumakuru Chitradurga 12.5MVA, 66/11kV Transformer.

Hariyabbe: 29 Replacing 1x6.3 MVA, 66/11kV by Tumakuru Chitradurga 1x 12.5 MVA, 66/11kV Transformer

JG Halli: 30 Replacing 2nd 6.3VA, 66/11kV by Tumakuru Chitradurga 12.5 MVA, 66/11kV Transformer.

PR Pura: 31 Replacing 1x12.5 MVA, 66/11kV by Tumakuru Chitradurga 1x 20MVA, 66/11kV Transformer.

Bharamasagara: 32 Replacing 2x12.5 MVA, 66/11kV by Tumakuru Chitradurga 2x 20 MVA, 66/11kV Transformer.

Angodu: 33 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Attigere: 34 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Punabghatta: 35 Replacing 1x8MVA, 66/11kV by 1x Tumakuru Davangere 20 MVA, 66/11kV Transfformer.

Kurubarahalli: 36 Replacing 1x8MVA, 66/11kV by Tumakuru Davangere 1x12.5MVA, 66/11kV Transformer. Sl. No. Work Code Name of the Work ZONE District

Sokke: 37 Providing Additional 1x8MVA, Tumakuru Davanagere 66/11kV Power Transformer.

Angodu: 38 Replacing 2 nd 8MVA, 66/11kV by Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Attigere: 39 Replacing 2nd 8MVA, 66/11kV by Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Chilur: 40 Replacing 2nd 8 MVA, 66/11kV by Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Jagalur: 41 Replacing 2x12.5 MVA, 66/11kV by Tumakuru Davangere 2x 20 MVA, 66/11kV Transformer.

Pallagatte: Replacing 1x8MVA & 1x6.3MVA 42 Tumakuru Davangere 66/11kV by 2x 12.5 MVA, 66/11kV Transfformer.

Kurubarahalli: 43 Replacing 2nd 8MVA, 66/11kV by Tumakuru Davangere 12.5MVA, 66/11kV Transformer.

Avaregere: 44 Replacing 2x12.5 MVA, 66/11kV by Tumakuru Davangere 2x 20 MVA, 66/11kV Tranformer.

Doddasarangi: 45 Providing Additional 1x12.5 MVA, Tumakuru Tumakuru 66/11kV Power Transformer.

Talakere: 46 Providing Additional 1x10 MVA, Tumakuru Tumakuru 110/11kV Power Transformer. Sl. No. Work Code Name of the Work ZONE District

Tandaga: 47 Providing Additional 1x10 MVA, Tumakuru Tumakuru 110/11kV Power Transformer.

Bidare: 48 Providing Additional 1x10 MVA, Tumakuru Tumakuru 110/11kV Power Transformer.

Kodigenahalli: 49 Providing Additional 1x12.5 MVA, Tumakuru Tumakuru 66/11kV Power Transformer

Ammasandra: 50 Replacing 1x10MVA,110/11kV by 1x Tumakuru Tumakuru 20MVA, 11011kV Transformer.

Badavanahalli: 51 Replacing 2nd 1x12.5MVA, 66/11kV Tumakuru Tumakuru by 1x 20MVA, 66/11kV Transformer.

Beladhara: 52 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Tumakuru 12.5MVA, 66/11kV Transformer.

Huliyar: 53 Replacing 1x10MVA, 110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

Madhugiri: 54 Replacing 1x12.5 MVA, 66/11kV by Tumakuru Tumakuru 1x 20 MVA, 66/11kV Tranformer.

Mallasandra: 55 Replacing 1x12.5 MVA, 66/11kV by Tumakuru Tumakuru 1x 20 MVA, 66/11kV Tranformer.

Pulamaghatta: 56 Replacing 1x8 MVA, 66/11kV by Tumakuru Tumakuru 1x12.5MVA, 66/11kV Transformer. Sl. No. Work Code Name of the Work ZONE District

Urdigere: Replacing 1x8 MVA, 66/11kV by 57 Tumakuru Tumakuru 1x1 2. 5 MVA, 66/11kV Transformer.

Bandihalli: 58 Replacing 1x10MVA,11011kV by 1x Tumakuru Tumakuru 20MVA, 110/11kV Transformer.

Chikkabanagere: 59 Replacing 1x12.5MVA, 66/11kV by Tumakuru Tumakuru 1x 20MVA, 66/11kV Transformer.

Gubbi: 60 Replacing 1x10 MVA, 110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer

Guligenahalli: 61 Replacing 1x6.3MVA, 66/11kV by Tumakuru Tumakuru 1x 12.5 MVA, 66/11kV Transformer.

Handanakere: 62 Replacing 1x10MVA,110/11kV by 1x Tumakuru Tumakuru 20MVA, 110/11kV Transformer.

Holavanahalli: 63 Replacing 1x8 MVA, 66/11kV by 1x Tumakuru Tumakuru 12.5MVA, 66/11kV Transformer.

Honnavalli: 64 Replacing 2nd 10 MVA,110/11kV by Tumakuru Tumakuru 20 MVA, 110/11kV Transformer.

Kadehalli: 65 Replacing 1x10 MVA, 110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

K.B.Cross: Replacing 1x10 MVA, 110/11kV by 66 Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer @ 220/110kV Sl. No. Work Code Name of the Work ZONE District

Lingadahalli: 67 Replacing 1x6.3 MVA,66/11kV by 1x Tumakuru Tumakuru 12.5 MVA, 66/11kV Transformer.

Mayasandra: Replacing 2nd 10 MVA,110/11kV 68 Tumakuru Tumakuru by 1x 20 MVA, 110/11kV Transformer.

Nonavinakere: 69 Replacing 1x10 MVA,110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

Shettikere: 70 Replacing 1x10 MVA,110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

Thimmasandra: 71 Replacing 2nd 8MVA, 66/11kV by Tumakuru Tumakuru 12.5MVA, 66/11kV Transformer.

Thimmanahalli: 72 Replacing 1x10MVA, 110/11kV by Tumakuru Tumakuru 1x 20MVA, 110/11kV Transformer.

Tiptur: 73 Replacing 1x10 MVA, 110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

Turuvekere: 74 Replacing 1x10 MVA, 110/11kV by Tumakuru Tumakuru 1x 20 MVA, 110/11kV Transformer.

P.N.Hally: New For replacement of 1 x 8 MVA Tr. -2 75 Tumakuru Tumakuru 15-16 by 1 x 12.5 MVA Tr. at 66/11 KV Sub-station with 1IC+4F+1BC

Tavarekere: New For replacement of 1 x 8 MVA Tr.-2 76 Tumakuru Tumakuru 15-16 by 1 X 12.5 MVA Tr. at 66/11 KV Sub-station with 1IC+4F+1BC Sl. No. Work Code Name of the Work ZONE District

Doddasarangi: New For replacement of 1 x 8 MVA Tr.-1 77 Tumakuru Tumakuru 15-16 by 1 X 12.5 MVA Tr. at 66/11 KV Sub-station

K.B.Cross: New Replacing 1x10 MVA, 110/11kV by 78 Tumakuru Tumakuru 15-16 1x 20 MVA, 110/11kV Transformer- 1 at 220/110kV

Chikkanayakanahalli: New 79 Replacing 1x10 MVA, 110/11kV by Tumakuru Tumakuru 15-16 1x 20 MVA, 110/11kV Transformer

220KV station Honnalli : Providing New Additional 3rd 100 MVA, 220/66 kV 80 Tumakuru Davangere 15-16 Power Transformer at 220/66/11 kV Honnalli Davanagere Dist.

Nagasamudra : New 81 Providing addl. 1x8 MVA, 66/11 KV Tumakuru Chitradurga 15-16 Power Transformer 66/11KV S/S

Kalamaranahalli: New 82 Providing addl. 1x8 MVA, 66/11 KV Tumakuru Chitradurga 15-16 Power Transformer 66/11KV S/S

Pandrahalli : Replacement of 2nd 1x12.5MVA, New 83 66/11KV Power Transformer by Tumakuru Chitradurga 15-16 1x20MVA at 66/11KV S/S in Chitradurga district.

Bharamasagara : Replacement of 2nd 1x12.5MVA, 66/11KV Power New 84 Transformer by 1x20MVA at Tumakuru Chitradurga 15-16 66/11KV S/S in Chitradurga district.

Ramagiri : Replacement of 1x12.5MVA, New 85 66/11KV Power Transformer by Tumakuru Chitradurga 15-16 1x20MVA at 66/11KV S/S in Chitradurga district. Sl. No. Work Code Name of the Work ZONE District

Turuvanur : Replacement of 1x6.3 New MVA, 66/11KV Power Transformer 86 Tumakuru Chitradurga 15-16 by 1x12.5 MVA at 66/11KV S/S in Chitradurga district.

Pandrahalli: Replacement of 1x12.5MVA, 87 BC1061 66/11KV Power Transformer by Tumakuru Chitradurga 1x20MVA at 66/11KV S/s in Chitradurga district.

Ungra: Augmentation of 1 x 10 MVA Tr-1 by 1 X 20 MVA Tr. at New 88 110/11 KV Sub-station Ungra in Tumakuru Tumakuru 17-18 Anchepalya Division, Tumkur Transmission Circle

Bukkapatana: Augmentation of 1 x 12.5 MVA Tr-1 by 1 X 20 MVA at New 89 66/11 KV Sub-station Tumakuru Tumakuru 17-18 in Tumkur TL&SS Division inTumkur Transmission Circle

Somalapura : Providing additional New 1x10MVA, 110/11kV Power 90 Tumakuru Tumkur 17-18 Transformer at 110/11KV S/S Somapalapura

Anchepalya: 91 New 18-19 Replacing 1x12.5MVA,66/11kV by 1x Tumakuru Tumkur 20MVA, 66/11kV Transformer. (Tr-2)

Santhemavathur: 92 New 18-19 Replacing 1x8MVA,66/11kV by 1x 20MVA, Tumakuru Tumkur 66/11kV Transformer (Tr-2)

220/66KV R/S Anchepalya: Providing additional 6.3MVA P.Tr. & Tr. Bay for 93 New 18-19 Tumakuru Tumkur arranging auxillary power supply to Receiving Station

Baddihalli: Replacing 2x12.5MVA,66/11kV by 2x 94 New 18-19 Tumakuru Tumkur 20MVA, 66/11kV Transformer. ( Tr-1 &Tr- 2) Sl. No. Work Code Name of the Work ZONE District

Bramsandra : Augmentation of 1X12.5 66/11KV Power Transformer-2 by 1X20MVA 66/11KV Power Transformer 95 New 18-19 Tumakuru Tumkur

Holavanahalli : Augmentation of 1X8 66/11KV Power Transformer-2 by 1X12.5MVA 66/11KV Power Transformer 96 New 18-19 Tumakuru Tumkur

Lingadahalli : Augmentation of 1X6.3 66/11KV Power Transformer-2 by 1X12.5MVA 66/11KV Power Transformer 97 New 18-19 Tumakuru Tumkur

Hoskere : Augmentation of 1X8 66/11KV Power Transformer-2 by 1X12.5MVA 66/11KV Power Transformer 98 New 18-19 Tumakuru Tumkur

98 Total of Augmentations Tumakuru

Bharamsagar S/s to Bharamsagar Tap point: Conversion of SC line on SC towers 1 Tumakuru Chitradurga to DC line LILO line from tap point to Bharamsagar 66kV Sub-Station for a distance of 1.5 Km with TB.

Hiriyur-J.G. Halli 66KV line: Recontruction of existing Owl conductor 66kV SC line on DC 2 towers from 220kV Hiriyur Station Tumakuru Chitradurga to 66kV Sub-Station J.G. Halli with Coyote ACSR conductor for a distance of 20kms.

Garaga S/s to Garaga Tap point:Conversion of SC line on SC towers to DC line on DC towers from 3 Tap point to Garaga 66kV Sub- Tumakuru Chitradurga Station for a distance of 1.6 Km with TB at Garaga station for LILO arrangement. Sl. No. Work Code Name of the Work ZONE District

220KV Chitradurga station -66kV Turuvanur line: Conversion of SC line on SC towers to DC line on DC towers from220 kV 4 Tumakuru Chitradurga Station Chitradurga to 66KV station Turuvanur for a distance of 28 Km in the existing corridor with TB's at both stations.

Kurubarahalli Station to Guttur Station : Construction of new SC Line on DC 5 Towers from 66kV Kurubarahalli Tumakuru Davanagere Sub-Station to 66kV Guttur Sub- Station with TBs at both Stations in new corridor for a distance of 8 Kms.

Davangere-Harihar Hospet 66kV SC: Re-Construction of existing Davangere-Harihar Hospet 66kV SC 6 Line on SC towers from Davangere Tumakuru Davanagere side MC tower location No 19 to Shamanur village limits for a distance of 15KM on DC Towers with coyote conductor.

Honnalli Sub-Station to Honnalli Tap point 66kV DC line: Conversion of SC line on SC towers to DC line DC Towers from Tap point 7 Tumakuru Davanagere to Honnalli 66kV Sub-Station for a distance of 1.0 Kms with TB at Honnalli station for LILO arrangement.

Nymathi Station to Nyamati Tap point: Providing LILO arrangement at 66kv 8 Tumakuru Davanagere station Nyamathi from tap point of Davangere-shimoga-2 line for a distance of 1.5 kms with TB. Sl. No. Work Code Name of the Work ZONE District

Harihara Station to Harihara Tap point: Providing LILO arrangement at 66kv 9 Tumakuru Davanagere station Harihara from tap point of Harihara-Hospete line for a distance of 0.75 kms with TB.

Anchepalya to Kunigal: Replacement of tubular structures 10 by towers and conductor of existing Tumakuru Tumakuru 66kV SC line from Anchepalya to Kunigal in the existing corridor.

Javagondanahally to Chikkabanagere: Replacement of all alluminium 11 Tumakuru Tumakuru conductor of existing 66kV SC line from Javagondanahally to Chikkabanagere Sub-Station.

Madhugiri to Badavanahally: Replacing existing 66kV line with rabbit conductor on RCC poles by towers with coyote conductor from 12 Tumakuru Tumakuru Madhugiri 66/11kV S/S to Badavanahally 66/11kV S/S for a distance of 25 Kms in existing line corridor.

Pavagada S/S to tapping point of MC line: Replacing existing 66kV line with rabbit conductor on RCC poles by 13 Tumakuru Tumakuru towers with coyote conductor from Pavagada 66/11kV S/S to tapping point of MC line for a distance of 15 Kms in existing line corridor.

Hariyabbe to Chikkabanagere: Replacement of all alluminium New 14 conductor of existing 66kV SC line Tumakuru Tumakuru 15-16 from Hariyabbe to Chikkabanagere Sub-Station. Sl. No. Work Code Name of the Work ZONE District

Interlinking of 220KV DC line from Hiriyur - Gowribidanur 220KV line to the proposed 765/400/220KV Vasanthanarasapura PGCIL. As the New 15 work of construction of 220KVDC Tumakuru Tumakuru 15-16 interlinking line from 765/400/220KV Vasanthanarasapura to 220KV Nittur has been cancelled.

Transfering of 66/11KV station New Attigere from Davangere-Chitradurga 16 Tumakuru Davangere 15-16 66KV line-2to Davangere- Chitradurga 66KV line-1

220kV Davanagere to Mayakonda- Anagodu tap point:-Stringing of 2nd circuit from 220kV Davangere to anagodu tapping point on existing 17 BB1066 Tumakuru Davanagere 66KV DC towers of 66 KV Davangere- Chitradurga SC line-2 -24 kms Coyote conductor with TB at 220 KV Davangere station.

Providing alternate source to Turuvekere 110/11 KV S/S by constructing DC line with Lynx conductor from 110 KV Mayasandra New line to Turuvekere 110/11 KV S/S 18 Tumakuru Tumkur 17-18 for a distance of 1.3 KM in the existing corridor in TLM Sub- division Tumkur , TL&SS Division KPTCL Tumkur

18 Total of Lines Tumakuru

151 Total of Tumakuru Zone Tumakuru

HASSANA TRANSMISSION ZONE Hassana

Balehalli: 1 CE1021 Establishing 1x8MVA, 66/11kV Sub- Hassana Chikka-magalur Station with associated line.

Adyar: 2 CB1031 Establishing 110/33/11kV Sub- Hassana Dakshina Kannada Station with associated line. Sl. No. Work Code Name of the Work ZONE District

Kotekar: 3 Establishing 1x10MVA, 110/11kV Hassana Dakshina kannada Sub-Station with associated line.

Kottara: 4 Establishing 1x10MVA, 110/11kV Hassana Dakshina kannada Sub-Station with associated line.

Kommanalu: 5 Establishing 1x8MVA, 66/11kV Sub- Hassana Shimoga Station with associated line

BIKKODU:Establishing 1 X 8 MVA New 6 ,66/11 KV S/S at Bikkodu,Arehally Hassana Hassana 16-17 Hobli,Belur Taluk Hassana Dist

Byrapura New 7 Establishing 1x8 MVA, 66/11KV S/S Hassana Hassan 17-18 with line

Chowlahiriyur: Establishing 1 x New 8 10MVA, 110/11KV sub-station & Hassana Chikkamagalur 17-18 associated line

Hanike:Establishing 1X8MVA and 66/11kV substation near Hanike 9 New 18-19 Hassana Hassan village in Belur TQ,Hassan dist with associated lines

Heragu:Establishing 1X8MVA and 66/11kV substation near Heragu 10 New 18-19 Hassana Hassan village in Shantigrama TQ,Hassan dist with associated lines

Establishing 110/11KV Substation 11 New 18-19 Hassana Dakshina Kannada at Ujre with associated line

Kagodu: Establishing 1 x 10MVA, 110/11kV sub-station & 9 Kms of 110kV single 12 New 18-19 Hassana Shivamogga circuit line on DC towers at Kagodu village, Sagara Taluk, Shivamogga District. Sl. No. Work Code Name of the Work ZONE District

Mallenahalli: Establsing 1 x 8MVA, 13 New 18-19 66/11KV sub-station with Hassana Chikkamagalur associated lines.

Anjanapura: Establishing 1 x 14 New 18-19 10MVA, 110/11KV sub-station with Hassana Shivamogga associated lines.

Gaanadaalu: Establsing 1 x 8MVA, 15 New 18-19 66/11KV sub-station with Hassana Chikkamagalur associated lines.

Belavadi: Establsing 1 x 8MVA, 16 New 18-19 66/11KV sub-station with Hassana Chikkamagalur associated lines.

Devakatikoppa: Establishing 1 x 17 New 18-19 10MVA, 110/11KV sub-station with Hassana Shivamogga associated lines.

17 Total of Sub-stations Hassana

Hirisave: Augmentation of 1 X 12.5 MVA , New 1 66/11 KV power Transformer by 1 X Hassana Hassana 15-16 20 MVA @ Hirisave S/S in C. R. Patna Taluk

Moodibidri: Replacement of existing 10MVA, 110/11KV Power 2 New 16-17 Hassana Dakshina Kannada Transformer by 20MVA, 110/11KV Power Transformer

Shanivarsante: Replacement of New 3 1X8MVA by 1X12.5 MVA at Hassana Hassan 17-18 Shanivarasanthe Substation. Sl. No. Work Code Name of the Work ZONE District

Nittur: Creating additional 33kV Terminal Bay at 110/33/11kV Nittur New 4 Sub-station for proposed 2X5MVA, Hassana Udupi 17-18 33/11kV Sub-station, Udupi, Udupi Taluk & Dist by MESCOM.

Kundapura: Creating additional 33kV Terminal Bay at 110/33/11kV New Kundapura Sub-station for proposed 5 Hassana Udupi 17-18 33/11kV Sub-station at Padukere, Udupi Taluk & Kundapura Dist by MESCOM.

Bandishettyhally: Adnl 1x8MVA, 66/11kV Power Transformer @ 6 New 18-19 Bandishettyhally S/s in Hassana Hassan Holenarasipura Taluk, Hassan District

Hallymysore: Augmentation of 1x5MVA, 66/11kV Power Transformer by 7 New 18-19 Hassana Hassan 1x8MVA@Hallymysore S/s in Holenarasipura Taluk, Hassan District

Creating 33kV reference by installing 1X20MVA, 110/33kV power 8 New 18-19 Hassana Udupi transformer at 110/11kV substation Karkala

Providing additional 1X100MVA, 9 New 18-19 220/110KV Power Tr.r at 220kV Hassana Dakshina Kannada Netlamudnur station Sl. No. Work Code Name of the Work ZONE District

Replacement of 1X10MVA, 110/11KV Power Tr.r by 1X20MVA, 10 New 18-19 Hassana Dakshina Kannada 110/11KV Power Tr.r at 110kV Baikampady station

Replacement of 1X10MVA, 110/11KV Power Tr.r by 1X20MVA, 11 New 18-19 110/11KV Power Tr.r at 110kV Hassana Dakshina Kannada Karaya sub station in Belthangady Taluk, DK Dist.

Providing Additional 20 MVA 110/33kV Transformer at 110kV 12 New 18-19 Hassana Dakshina Kannada Karaya sub station in Belthangady Taluk, DK Dist.

12 Total of Augmentations Hassana

220KV B3 & B4 lines between MRS & Basavanahalli gate: Replacement of ground wire, 1 hardware, Disc insulators and Hassana Shimoga restringing of conductor with addl. Towers of 220KV B3 & B4 lines between MRS & Basavanahalli gate.

Conversion of 66kV DVG-1 SC line to DC line on existing DC tower from New MRS, Shimoga to Mallapura tapping 2 Hassana Shivamogga 17-18 tower for a distance of 22km and providing 1No. Additional 66kV terminal bay at MRS.

Cconversion of SC line (lynx)to DC line (lynx)from Ajjampura to Shivani New 3 on existing DC tower at existing Hassana Chikkamagaluru 17-18 corridor at a distance of 15.55km in TLMSD, Kadur. Sl. No. Work Code Name of the Work ZONE District

Construction of new DC line from Byagedehalli 220kV Station to Ajjampura S/s in existing SC New corridor for a distance of 19.34km 4 Hassana Chikkamagaluru 17-18 and construction of new terminal bay one each at 220kV Station, Byagedehalli and at Ajjampura S/s in TLMSD, Kadur.

Construction of 66kV Link line 5 New 18-19 between Hariharapura and Hassana Hassan Atthichowdenahally S/s.

Conversion of 66kV Tap line of 6 New 18-19 Chikkabommenahally into LILO from Hassana Hassan Ramnathapura substation.

Conversion of 66kV Tap line of 7 New 18-19 Haradanahally into LILO from Hassana Hassan Somanahally substation.

Making Double LILO of 66kV lines 8 New 18-19 Hassana Hassan at Udayapura S/s.

Replacement of existing Lynx conductor by Drake conductor duly 9 New 18-19 replacing existing SC tower by DC Hassana Dakshina Kannada tower, of 110kV Inter state Konaje - Kerala line Conversion of existing 66kV DVG-1 SC line to DC line on existing DC 10 New 18-19 tower for the length of 18.20Km from Hassana 220kV MRS to Holalur & create 1 LILONo. of arrangement 66KV terminal of 220KVbay at 220kV Sharavathi-Shivamogga S4 line to 400KV Talaguppa station & 11 New 18-19 Hassana providing 2 Nos. 220kV Terminal Bays in 400kV Talaguppa station in Shivamogga District. Sl. No. Work Code Name of the Work ZONE District

11 Total of Lines Hassana

Creating 33kV Bay at 110/11kV 1 New 18-19 substation Guruvayanakere for Hassan Dakshina Kannada 33kV Venur Line

1 Total of TB's & Others Hassana

41 Total of Hassana Zone Hassana

MYSURU TRANSMISSION ZONE Mysuru

Hunasevadi: New 1 Establishing 1x8 MVA 66/11kV Sub- Mysuru Mysuru 17-18 Station with associated line .

Seeguru: New 2 Establishing 1x8 MVA 66/11kV Sub- Mysuru Mysuru 17-18 Station with associated line .

Gowdalli: Establishing 1x8MVA, New 3 66/11kV Sub-Station with Mysuru Chamarajanagara 17-18 associated line.

Vaddagere: Establishing 1x8MVA, New 4 66/11kV Sub-Station with Mysuru Chamarajanagara 17-18 associated line.

Horeyala: 5 Establishing 1x8MVA, 66/11kV Sub- Mysuru Chamarajanagar Station with associated line.

Balele: 6 Establishing 1x8MVA, 66/11kV Sub- Mysuru Kodagu Station with associated line.

Keragodu : 7 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mandya Station with associated line.

Kadaba (Narayanapura): 8 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mandya Station with associated line

Dudda (B.Hatna) : Establishing 9 1x8MVA, 66/11kV Sub-Station with Mysuru Mandya associated line Sl. No. Work Code Name of the Work ZONE District

Hongalli (water supply) 10 Establishing 66/11 KV 2 x 12.5 MVA Mysuru Mandya with 2 TB . Thendekere 11 Establishing 66/11 KV 1x 8 MVA Mysuru Mandya sub-station with associated line

Ilawala (Telcom ) : Establishing 1x8MVA, 12 Mysuru Mysuru 66/11kV Sub-Station with associated line

Dhangalli (Udbur): 13 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mysuru Station with associated line

Ramabainagar 14 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mysuru Station with associated line

BOGADI BEML LAYOUT 15 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mysuru Station with associated line

KENCHALGOODU 16 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mysuru Station with associated line

GOHALLI & K.HEMMANAHALLI 17 Establishing 1x8MVA, 66/11kV Sub- Mysuru Mysuru Station with associated line

Ankanahalli : New 18 Establishing 1 x 8 MVA,66/11 KV Mysuru Mandya 15-16 sub-station.

Santhekasalagere New (Mangala) : 19 Mysuru Mandya 15-16 Establishing 1 x 8 MVA,66/11 KV sub-station.

Maduvinakodi : New 20 Establishing 1 x 8 MVA,66/11 KV Mysuru Mandya 15-16 sub-station.

Madapura : New 21 Establishing 1 x 8 MVA,66/11 KV Mysuru Kodagu 15-16 sub-station. Sl. No. Work Code Name of the Work ZONE District

Kowdle: Establishing 1X8MVAMVA, New 22 66/11kV Sub-Station with Mysuru Mandya 17-18 assosiated line

Kopatti: Establishing 1x8MVA, New 23 66/11kV Sub-Station with Mysuru Kodagu 17-18 associated line. Kodlipet: Establishing 1x8MVA, New 24 66/11kV Sub-Station with Mysuru Kodagu 17-18 associated line.

Beeruvalli Limits: Establishing New 25 1x8MVA, 66/11kV Sub-Station with Mysuru Mandya 17-18 associated line.

Palya Limits: Establishing 1x8MVA, 66/11kV Sub- 26 New 18-19 station at PALYA village limits in Mysuru Chamarajanagara Kollegala Taluk, Chamagarjanagara district.

Managalli Limits: Establishing 1x8MVA, 66/11kV Sub- 27 New 18-19 station at MANAGALLI village limits Mysuru Chamarajanagara in Gundlupete Taluk, Chamagarjanagara district.

Vasantha Nagara (Bhugatagally Limits): Establishing 1x12.5MVA, 66/11kV 28 New 18-19 Mysuru Mysuru Sub-station at Vasantha Nagara (Bhugatagally Limits) limits in Mysuru Taluk, Mysuru district.

Beechanahally: Establishing 1x8MVA, 66/11kV Sub- 29 New 18-19 Mysuru Mysuru station at Beechanahally limits in H.D.Kote Taluk, Mysuru district.

29 Total of Sub-stations Mysuru

FTS : New Replacement of 2 X 20 MVA, 66/11 1 Mysuru Mysuru 15-16 KV Power Transformer by 2 X 31.5 MVA Sl. No. Work Code Name of the Work ZONE District

Vijayanagara : New Replacement of 2 X 12.5 MVA, 2 Mysuru Mysuru 15-16 66/11 KV Power Transformer by 2 X 20 MVA. Saligrama : New Replacement of 1 X 6.3 MVA, 66/11 3 Mysuru Mysuru 15-16 KV Power Transformer by 1 X 12.5 MVA.

Periyapatna : New Replacement of 2 X 12.5 MVA, 4 Mysuru Mysuru 15-16 66/11 KV Power Transformer by 2 X 20 MVA, 66/11 KV.

Chidravalli : New Replacement of 1 X 8 MVA, 66/11 5 Mysuru Mysuru 15-16 KV Power Transformer by 1 X 12.5 MVA.

Gejjaianavaddaragudi : New Replacement of 1 X 8 MVA, 66/11 6 Mysuru Mysuru 15-16 KV Power Transformer by 1 X 12.5 MVA.

Bookanakere : New Replacement of 2 X 12.5 MVA, 7 Mysuru Mandya 15-16 66/11 KV Power Transformer by 2 X 20 MVA, 66/11 KV.

Kikkeri : New Replacement of 2 X 12.5 MVA, 8 Mysuru Mandya 15-16 66/11 KV Power Transformer by 2 X 20 MVA, 66/11 KV.

Shivalli (V.C.Farm) : Replacement New of 1 X 8 MVA, 66/11 KV Power 9 Mysuru Mandya 15-16 Transformer by 1 X 12.5 MVA, 66/11 KV.

Mahadeshwarapura : Replacement New of 2 X 8 MVA, 66/11 KV Power 10 Mysuru Mandya 15-16 Transformer by 2 X 12.5 MVA, 66/11 KV.

Pandavapura : New Replacement of 2 X 12.5 MVA, 11 Mysuru Mandya 15-16 66/11 KV Power Transformer by 2 X 20 MVA, 66/11 KV. Sl. No. Work Code Name of the Work ZONE District

Attigulipura : New Replacing 1X8 MVA,66/11 KV 12 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers.

Hangala : New Replacing 1X8 MVA,66/11 KV 13 Mysuru Chamarajanagar 15-16 transformers by 1X12.5 MVA transformers.

Kollegala : New Replacing 1X12.5 MVA,66/11 KV 14 Mysuru Chamarajanagar 15-16 transformers by 1X20 MVA transformers .

Ganjigere S/s:- Providing Additional New 15 1X12.5 MVA 66/11kV Power Mysuru Mandya 17-18 Transformer at Ganjigere S/s

New Mirle: Providing additional 1x8MVA, 16 Mysuru Mysuru 17-18 66/11kV Power Tr.

New Suntikoppa: Providing additional 17 Mysuru Kodagu 17-18 1x8MVA, 66/11kV Power Tr.

New Alur-Siddapura: Providing additional 18 Mysuru Kodagu 17-18 1x8MVA, 66/11kV Power Tr.

Chikkamandya : Replacement of New 19 2X8MVA, 66/11kV Power Tr. By Mysuru Mandya 17-18 2X12.5MVA Tr.

Nagamangala : Replacement of New 20 1X12.5MVA, 66/11kV Power Tr. By Mysuru Mandya 17-18 1X20 MVA, 66/11kV Tr.

Doddabyadarahalli : Replacement of New 21 1X8MVA, 66/11kV Power Tr. By Mysuru Mandya 17-18 1X12.5MVA, 66/11kV Tr.

Arakere : Replacement of New 22 1X6.3MVA, 66/11kV Power Tr. By Mysuru Mandya 17-18 1X12.5MVA, 66/11kV Tr. Sl. No. Work Code Name of the Work ZONE District

Bilikere: 23 New 18-19 Replacement of 1x8 MVA Tr. By Mysuru Mysuru 1x12.5 MVA Tr. At Bilikere S/s

Mugur: 24 New 18-19 Providing additional 1x8 MVA Tr. At Mysuru Mysuru Mugur S/s

Talakadu: 25 New 18-19 Replacement of 2x8 MVA Tr. By Mysuru Mysuru 2x12.5 MVA Tr. At Talakadu S/s

Jayapurua: 26 New 18-19 Replacement of 2x8 MVA Tr. By Mysuru Mysuru 2x12.5 MVA Tr. At Jayapura S/s

Nanjanagudu: 27 New 18-19 Replacement 1st 1x12.5 MVA Tr. By Mysuru Mysuru 1x20 MVA Tr. At Nanajanagudu S/s

Attigulipurua: 28 New 18-19 Replacement of 2nd 8 MVA Tr. By Mysuru Chamarajanagara 12.5 MVA Tr. At Attigulipura S/s

Gundlupete: 29 New 18-19 Replacement of 2nd 12.5 MVA Tr. By Mysuru Chamarajanagara 20 MVA Tr. At Gundlupete S/s

Harve: 30 New 18-19 Replacement of 1of 12.5 MVA Tr. By Mysuru Chamarajanagara 20 MVA Tr. At Harve S/s

Honnalli: 31 New 18-19 Replacement of 1of 12.5 MVA Tr. By Mysuru Chamarajanagara 20 MVA Tr. At Honnalli S/s

Cowdally: 32 New 18-19 Replacement of 6.3 MVA Tr. By 12.5 Mysuru Chamarajanagara MVA Tr. At Cowdally S/s

Pannyadahundi: 33 New 18-19 Replacement of 1of 8 MVA Tr. By Mysuru Chamarajanagara 12.5 MVA Tr. At Pannyadahundi S/s Sl. No. Work Code Name of the Work ZONE District

Bommlapura: 34 New 18-19 Replacement of 6.3 MVA Tr. By 12.5 Mysuru Chamarajanagara MVA Tr. At Bommalapura S/s

Akkihebbalu: Replacement of 1X12.5MVA by 20MVA Transformer 35 New 18-19 Mysuru Mandya at Akkihebbalu S/s in KR Pete Taluk, Mandya Dist

KR Pete: Replacement of 2X12.5MVA by 2X20MVA 36 New 18-19 Mysuru Mandya Transformer at KR pete S/s in KR Pete Taluk, Mandya Dist

K.M Doddi: Replacement of 1X12.5MVA by 1X20MVA 37 New 18-19 Mysuru Mandya Transformer at KM Doddi S/s in Maddur Taluk, Mandya Dist

Halaguru: Replacement of 6.3 MVA Tr. By 12.5 38 New 18-19 Mysuru Mandya MVA Tr. At Halaguru S/s in Malavally Taluk Mandya Dist

Kirugavalu: Replacement of 1X12.5MVA by 1X20MVA 39 New 18-19 Mysuru Mandya Transformer at Kirugavalu S/s in Malavally Taluk, Mandya Dist

Basaralu: Replacement of 1X8MVA by 1X12.5MVA Transformer at 40 New 18-19 Mysuru Mandya Basaralu S/s in Mandya Taluk, Mandya Dist

Hampapura: Replacement of 1X12.5MVA by 1X20MVA 41 New 18-19 Mysuru Mandya Transformer at Hampapura S/s in Mandya Taluk, Mandya Dist

BG Nagara: Replacement of 1X12.5MVA by 1X20MVA 42 New 18-19 Mysuru Mandya Transformer at BG Nagaraa S/s in Nagamangala Taluk, Mandya Dist

Guddenhally: Replacement of 1X8MVA by 1X12.5MVA Transformer 43 New 18-19 Mysuru Mandya at Guddenahally S/s in Nagamangala Taluk, Mandya Dist

Belagola: Replacement of 1X6.3MVA by 1X12.5MVA Transformer at 44 New 18-19 Mysuru Mandya Belagola S/s in Srirangapatna Taluk, Mandya Dist Sl. No. Work Code Name of the Work ZONE District

G.Malligere: Providing additional 1X12.5MVA 66/11KV Power 45 New 18-19 Mysuru Mandya Transformer at G.Malligere in Mandya Taluk & Dist

Krishnapura: Providing additional 1X12.5MVA 66/11KV Power 46 New 18-19 Mysuru Mandya Transformer at Krishnapura in KR Pete Taluk Mandya Dist

Taripura: Providing additional 1X12.5MVA 66/11KV Power 47 New 18-19 Mysuru Mandya Transformer at Taripura in Srirangapatna Taluk Mandya Dist

KIADB Mandya: Replacement of 1X12.5MVA by 1X20MVA 48 New 18-19 Mysuru Mandya Transformer at KIADB Mandya S/s in Mandya Taluk&Dist

Shivally(VC Farm): Replacement of 2nd1X8MVA by 1X12.5MVA 49 New 18-19 Mysuru Mandya Transformer at Shivally(VC Farm) S/s in Mandya Taluk&Dist

Chinakurali: Replacement of 2nd 1X8MVA by 1X12.5MVA Transformer 50 New 18-19 Mysuru Mandya at Chinakurali S/s in Pandavapura taluk Mandya Taluk&Dist

Nagamangala:: Replacement of 2nd 1X12.5MVA by 1X20MVA 51 New 18-19 Transformer at Nagamangala S/s in Mysuru Mandya Nagamangala taluk Mandya Taluk&Dist

51 Total of Augmentations Mysuru

Kalahalli and Kalenahalli: Construction of additional circuit on 1 DB1060 existing MC towers betwen Kalahalli Mysuru Mandya and Kalenahalli emanating from 220 kV R/S Tubinkere Sl. No. Work Code Name of the Work ZONE District

66kV Hanur -Cowdalli Line: Strengthening existing 66 KV line 2 from Hanur -Cowdalli by replacing Mysuru Chamarajanagar Coyote conductor by Tensile Coyote conductor.

Huygonahally - Mahadeshwarapura: Running second circuit on existing 3 Mysuru Mandya 66 KV DC towers from Huygonahally - Mahadeshwarapura for a distance of 25 Kms with TBs at both ends.

Haradanahlli S/s LILO: Running second circuit on existing 66 KV DC towers from tapping point 4 Mysuru Mandya to Haradanahlli SS for making LILo arrangement for a distance of 10 KM with TB.

N1 line fromTubinakere to Nagamangala: Strengthening existing 66 KV N1 line 5 Mysuru Mandya from Tubinakere to Nagamangala by replacing Coyote conductor by Tensile Coyote conductor.

Saligrama- Haradanahalli: Construction of 66kV Link Line in 6 order to get alternate source with 2 Mysuru Mysuru Nos. of 66kV TBs, one each at Saligrama & Haradanahalli.

Doora LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 7 Tapping Point to Doora S/s for a Mysuru Mysuru 17-18 distance of 0.9 Kms with TB at Doora S/s

Hullalli LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 8 Tapping Point to Hullalli S/s for a Mysuru Mysuru 17-18 distance of 1.5Kms with TB at Hullalli S/s Sl. No. Work Code Name of the Work ZONE District

Terakanambi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 9 Tapping Point to Terakanambi S/s Mysuru Chamarajanagara 17-18 for a distance of 6.0 Kms with TB at Terakanambi S/s

Bylakuppa LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 10 Tapping Point to Bylakuppa S/s for Mysuru Mysuru 17-18 a distance of 1.5 Kms with TB at Bylakuppa S/s

Chamarajanagara-Panyadahundi- Devanur(Nanjanagud): Replacement New 11 & Strengthing of existing 66kV S/c Mysuru Chamarajanagara 17-18 Coyote Line of 21Kms on S/c tower by Drake ACSR on DC towers

Chidravalli LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 12 Tapping Point to Chidravalli S/s for Mysuru Mysuru 17-18 a distance of 3 Kms with TB at Chidravalli S/s

Hadli LILO: Running of 2nd Ckt on Existing 66kV DC Tower from New 13 Tapping Point to Hadli S/s for a Mysuru Mandya 17-18 distance of about 0.5 Kms with TB at Hadli S/s

Nagamangala LILO: Running of additional Ckt. from Tapping Point to New Nagamangala S/s for a distance of 14 Mysuru Mandya 17-18 about 0.75 Kms with TB at Nagamangala S/s by replacing existing DC towers by MC towers

Re construction Bannur- T.Narasipura SC line on SC towers 15 New 18-19 by DC line on DC towers using Mysuru Mysuru Coyote Conductor for a distance of 18 Kms. Tumbala LILO: Running of 2nd Circuit on existing 66KV DC tower 16 New 18-19 Mysuru Mysuru from Tapping Point of Megalapura- SFC-T.Narasipura line to Tumbala Sl. No. Work Code Name of the Work ZONE District

Hura LILO: Running of 2nd Circuit on existing 66KV DC tower from 17 New 18-19 Mysuru Mysuru Tapping Point of Kadakola - santesaragur line to HURA S/s for a MARADI HUNDI LILO: Running of 2nd Circuit on existing 66KV DC tower from Tapping Point of 18 New 18-19 Kadakola - Ayarahally-Vajamangala Mysuru Mysuru line to MARADI HUNDI S/s for a distance of about 6.3KMs with TB at MARADI HUNDI S/s. Ayarahalli LILO: Running of 2nd Circuit on existing 66KV DC tower from Tapping Point of Kadakola - 19 New 18-19 Mysuru Mysuru Vajamangala 66 kv line to DOORA S/s for a distance of about 6.4 Kms with TB at Ayarahalli S/s.

Karya LILO: Running of 2nd Circuit on existing 66KV DC tower from Tapping Point of Kadakola - Devanur 20 New 18-19 Mysuru Mysuru 66 kv line to DOORA S/s for a distance of about 7.3 Kms with TB at KARYA S/s.

Madhuvanahally-Doddinduvadi: Conversion of existing 66KV SC line 21 New 18-19 on SC tower to DC line on DC towers Mysuru Chamarajanagara with Coyote ACSR and Construction of 66KV TBs at both ends.

Doddinduvadi-Hanur: Strengthning of existing 66KV SC line on SC tower 22 New 18-19 Mysuru Chamarajanagara with Coyote ACSR using HTLS Conductor.

22 Total of Lines Mysuru

FTS Mysuru: 1 DA1085 Renovation and Modernisation of Mysuru Mysuru 66/11kV MUSS

220 kV SRS, Hootagalli: 2 DA1066 Renovation and Modernization at Mysuru Mysuru 220 kV SRS, Hootagalli Station Sl. No. Work Code Name of the Work ZONE District

66/11kV K. R. Nagar: 3 DA1067 Renovation and Modernization at Mysuru Mysuru 66/11kV K. R. Nagar Sub-Station

K.R.Nagara S/s: 4 Providing 2 Nos. of 66 KV TBs at Mysuru Mysuru K.R.Nagara S/s.

4 Total of TB's & Others Mysuru 106 Total of Mysuru Zone Mysuru BAGALKOTE TRANSMISSION Bagalkote ZONE

Hukkeri: Establishing 2x100MVA, 220/110kV 1 EE1060 Bagalkote Belgaum & 1x10MVA, 110/11kV Station with asociated 220kV & 110kV lines

RM-2: Up-gradation of existing 33/11kV 2 EE1082 Bagalkote Belgaum MUSS to 110/11kV Sub-Station with associated line

Kanabargi: Establishing 2x100MVA, 220/110kV 3 EE1067 Bagalkote Belgaum & 1x10MVA, 110/11kV Station with associated 220kV & 110kV lines

Alagur: Establishing 1x10MVA, 110/11kV 4 EF1034 Bagalkote Bagalkote Sub-Station with associated line & TB.

Hungund: Establishing 2x100MVA, 220/110kV 5 Bagalkote Bagalkote Receiving Station with associated 220kV and 110kV lines

Shirahatti: Up-gradiation of existing 2x5MVA, 6 Bagalkote Belgaum 33/11kV MUSS to 110/11kV Sub- Station with associated line. Sl. No. Work Code Name of the Work ZONE District

Raibag Road, Harugeri: 7 Establishing 110/11kV Sub-Station Bagalkote Belgaum with associated line.

Batakurki: 8 Establishing 2x10MVA, 110/11kV Bagalkote Belgaum Sub-Station with associated line.

Mazgoan: 9 Establishing 110/11kV Sub-Station Bagalkote Belgaum with associated line.

Hallur: Up-gradiation of existing 33/11kV 10 Bagalkote Belgaum MUSS to 110/11kV Sub-Station with associated line.

Sureban: Up-gradiation of existing 33/11kV 11 Bagalkote Belgaum MUSS to 110/11kV Sub-Station with associated line.

Beeranholi 12 Establishing 110/11kV Sub-Station Bagalkote Belgaum with associated line Kerur: 13 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Dindvar: 14 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Nevaragi: Up-gradiation of existing 33/11kV 15 Bagalkote Bijapur MUSS to 110/11kV Sub-Station with associated line.

Hullur: 16 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line.

Kannal: 17 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Kanakal: 18 Establishing 110/11kV Sub-Station Bagalkote Bijapur with associated line. Sl. No. Work Code Name of the Work ZONE District

Bhatkal: Up-gradation of 33kV MUSS to 19 ED1010 Bagalkote North Canara 2x10MVA, 110/11kV Sub-Station with associated line & TB.

Bhurunki : 20 New Establishing 2x10MVA, 110/11kV Bagalkote Belagavi Sub-Station with associated line.

Karajol : 21 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Kanamadi : 22 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Kakhandaki : 23 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Dasur : 24 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Halasangi : 25 New Establishing 110/11kV Sub-Station Bagalkote Vijayapur with associated line.

Horthi : 26 New Up-gradation of 33KV SS to 110kV Bagalkote Vijayapur Sub-Station with associated line.

Naad : 27 New Up-gradation of 33KV SS to 110kV Bagalkote Vijayapur Sub-Station with associated line.

Mulgund: Establishing 1X10MVA, New 28 110/11kV Switching station with Bagalkote Gadag 16-17 6Nos of 110kV TB's

Establishing 1X10MVA, 110/11KV New 29 Sub Station at Mudenur along with Bagalkote Haveri 17-18 associated line. Sl. No. Work Code Name of the Work ZONE District

Upgradation of 33KV 3X5MVA to New 30 3X10MVA 110/11KV station at Ind Bagalkote Dharwad 17-18 Estate Hubballi

Upgradation of 33KV 2X5MVA to New 31 2X10MVA 110/11KV station at Bagalkote Dharwad 17-18 Kusugal Road Hubballi

Upgradiation of existing 33 KV S/S New 32 at Sadashiv Nagar, Belagavi Tq and Bagalkote Belagavi 17-18 Dist

Divagi: 2X100MVA, 220/110KV 33 New 18-19 Divagi Sub Station in Kumta Taluk, Bagalkote Uttar Kannada Uttar kannda District

Mewundi: Establishing 2X100MVA, 34 New 18-19 220/110KV Sub station at Mewundi Bagalkote Gadag in Mundargi Taluk, Gadag District.

Shiggaon: Establishing 2X100MVA, 35 New 18-19 220/110KV Sub station at Shiggaon Bagalkote Haveri in Shiggaon Taluk, Haveri District.

Madangere:Establishing 1x10MVA 36 New 18-19 110/11KV, 1X20MVA, 110/33kV Bagalkote U.K.District Sub station with associated line.

110 Kv S/S Aralimatti Upgradiation of existing 2X5 MVA 37 New 18-19 Bagalkote Belagavi 33/11 KV S/S to 2X10 MVA 110/11 KV S/S at Aralimatti

110 KV Tigadi 38 New 18-19 Establishing 1X10 MVA ,110/11 KV Bagalkote Belagavi Sub Station

110 KV Turkar Sheegihalli 39 New 18-19 Establishing 1X10 MVA ,110/11 KV Bagalkote Belagavi Sub Station

Benakatti: Establishing 1x10MVA, 110/11kV Sub-Station with 40 New 18-19 Bagalkote Bagalkot associated line in Bagalkot Tq. & Dist. Sl. No. Work Code Name of the Work ZONE District

40 Total of Sub-stations Bagalkote

110KV S/S Rabakavi: 1 EF1054 Replacement of 1x10MVA, 110/11kV Bagalkote Bagalkot by 1x20MVA, 110/11kV Transformer

Babaleshwar: 2 Replacement of 10MVA, 110/11kV Bagalkote Bijapur by 20MVA, 110/11kV Transformer

110kV Ramankoppa : Creating New 3 33kV Referance by providing Bagalkote Dharawad 16-17 additional 20MVA

Belur: Replacement of 1X10MVA,110/11kV Trf-1 by 4 New 18-19 Bagalkote Dharwad 1X20MVA, 110/11kV at 110kV S/s Belur. Akhsay Colony: Creating 33kv bay by providing additional 1X10MVA, 5 New 18-19 110/33-11kV Power Transformer at Bagalkote Dharwad 110kV S/s Akshay Colony, in Hubballi Taluk, Dharwad District.

220kV Esale: Additional 1X10MVA, 6 New 18-19 110/11kV Trf at 220kV R/s Esale Bagalkote U.K.District Sirsi, Sirsi Taluk, U.K.Distrcit

110kV Siddapur: Replacement of 7 New 18-19 1X5MVA, 110/11kV by 1X10MVA, Bagalkote U.K.District 110/11kV at 110kV S/s Siddapura

7 Total of Augmentations Bagalkote

Strenthening of 110kV D/C line by replacing existing old D/C towers by New new D/C towers and replacing lynx Dharwad, Gadag & 1 Bagalkote 17-18 ACSR conductor from 220kV SRS Bagalkot Hubballi to 220kV Bagalkot R/s for about 130 kms. Sl. No. Work Code Name of the Work ZONE District

Strenthening of 110kV S/C line by replacing existing 110kV S/C towers by D/C towers and wolf conductor New 2 by ACSR Lynx conductor from Bagalkote Dharwad 16-17 220kV Narendra to 110kV Kittur S/s from Loc. No.:97 to 133 about 12 kms

Construciton of 110 KV SC line on DC towers with Lynx conductor from 110 KV Kaladagi to 110 KV New Kataraki S/S for a distance of about 3 Bagalkote Bagalkot 17-18 9 Kms & dismantling of 110 KV Bagalkot-Kataraki SC line which will be submerged in the back water of Alamatti Dam in Bagalkot Dist.

Alternate power supply to 110kV 4 New 18-19 Bagewadi from 110kV Guttal S/s Bagalkot Gadag with associated TBs.

Conversion of 110kV Single circuit 5 New 18-19 line to D/C line from 220kV Bagalkot U.K.District Rs/Karwar to 110kV Kumta in Conversion of 110kV Single circuit line to D/C line from 110kV Rs/Kumta to 110kV Murudeshwar & 6 New 18-19 Bagalkot U.K.District linking to proposed Bhatakal 110kV S/s to proposed S/s Baindur in U.K.Distcrict LILOing of 400Kv line of 400Kv Narendra to Guttur Line to 400Kv 7 New 18-19 Bagalkot Gadag Station Doni under Green Energy corridor project

7 Total of Lines Bagalkote

Kawalawad: Providing 6 Nos. of Terminal Bays for Uttar 1 New protection & metering to 110KV NK- Bagalkote Kannada 1, NK-2, SRS-1, SRS-2, Esale-1 & Esale-2 lines.

1 Total of TB's & Others Bagalkote

55 Total of Bagalkote Zone Bagalkote

KALABURAGI TRANSMISSION Kalaburagi ZONE Sl. No. Work Code Name of the Work ZONE District

Santekallur: 1 New 16-17 Establishing 1x10MVA, 110/11kV Kalaburagi Raichur Sub-Station with associated line

Somasamudra: Establishing 2x100MVA, 220/110 2 FB1036 Kalaburagi Bellary kV Station at Somasamudra with associated 220kV and 110kV lines.

Belagal: 3 Establishing 1x10MVA, 110/11kV Kalaburagi Bellary Sub-Station with associated line

Hyati Mundargi 4 Establishing 1x10 MVA, 110/11 kV Kalaburagi Koppal S/S along with associated line.

Jawalgera: 5 Establishing 1x10MVA, 110/11kV Kalaburagi Raichur Sub-Station with associated line

Korvihal: 6 Establishing 1x10MVA, 110/11kV Kalaburagi Raichur Sub-Station with associated line

Aerekera (Deodurga Tq.) : Up-gradation of existing 33kV MUSS 7 Kalaburagi Raichur to 1x10MVA, 110/11kV Sub-Station with associated line

Y.Budihal: New 8 Establishing 2X10 MVA 110/11 KV Kalaburagi Ballari 15-16 S/S at Y.Budihal Anthapura New 9 Establishing 2X10 MVA 110/11 KV Kalaburagi Ballari 15-16 S/S at Anthapura

Jalahalli : Up-gradation of existing 2x5MVA, New 10 33/11kV MUSS to 2x10MVA, Kalaburagi Raichur 15-16 110/11kV Sub-Station with associated line

Talakal: New Establishing 110/11kV S/S at 11 Kalaburagi Koppal 15-16 Talakal and construction of associated 110kV line Sl. No. Work Code Name of the Work ZONE District

Aurad (Kalaburagi Tq): 12 Establishing 2x10MVA, 110/11kV Kalaburagi Kalaburagi Sub-Station with associated line

Amdihal: 13 New 16-17 Establishing 1x10MVA, 110/11kV Kalaburagi Raichur Sub-Station with associated line

Shivavilas Nagar: Establishing 14 New 16-17 1x10MVA, 110/11kV Sub-Station Kalaburagi Raichur with associated line

KHB Colony Manvi: Establishing 15 New 16-17 1x10MVA, 110/11kV Sub-Station Kalaburagi Raichur with associated line

Jagatgal: Establishing 1x10MVA, 16 New 16-17 110/11kV Sub-Station with Kalaburagi Raichur associated line

Halapur: Establishing 1x10MVA, 17 New 16-17 110/11kV Sub-Station with Kalaburagi Raichur associated line

Neelavanji: Establishing 1x10MVA, 18 New 16-17 110/11kV Sub-Station with Kalaburagi Raichur associated line

New Bellagatta: Establishing 1X8 MVA, 19 Kalaburagi Ballari 17-18 66/11KV with associated line

New Kandagal : Establishing 1X8 MVA, 20 Kalaburagi Ballari 17-18 66/11KV with associated line

M M Wada(Manyara Masalawada): New 21 Establishing 1X8 MVA, 66/11KV Kalaburagi Ballari 17-18 with associated line

New Uttangi: Establishing 1X8 MVA, 22 Kalaburagi Ballari 17-18 66/11KV with associated line Sl. No. Work Code Name of the Work ZONE District

Hanavala: New Establishing 110kV Sub-Station at 23 Kalaburagi Koppal 17-18 Hanavala village in Gangavathi Taluk of Koppal District

Sridharagadda: Establishing 2X10 MVA 110/11, 1X20MVA 110/33KV 24 New 18-19 Kalaburagi Ballari S/S at Sridharagadda, Siraguppa Tq, Ballari Dist

Nadavi : Establishing 2 X10 MVA , 110/11KV & 1X20MVA 110/33KV 25 New 18-19 Kalaburagi Ballari Sub-ststion at Nadavi Village, Siraguppa Tq, Ballari Dist Valaballary Upgradation of existing 2X5MVA 26 New 18-19 33/11KV to 2X10MVA 110/11KV Kalaburagi Raichur Sub-ststion at Valaballari by tapping existing 110KV Sindhnoor- Raichur Ittagi Upgradation of existing 2X5MVA 27 New 18-19 33/11KV to 2X10MVA 110/11KV Kalaburagi Ballari Sub-ststion at Ittagi by tapping existing 110KV Sindhnoor-

Kawloor: Establishing 1X10 MVA 28 New 18-19 110/11,at Kawloor, at Yadgir Kalaburagi Yadgir District, Yadgir Taluka

Banadeshwar Temple :Establishment of 2x10MVA 110/11 29 New 18-19 kV S/S near Banadeshwar Temple, Kalaburagi Yadgir kalbelgundi village in Yadgir Taluka & District.

Azadpur:Establishment of 1x10MVA 30 New 18-19 110/11 kV S/S at Kalaburagi Taluk Kalaburagi Kalaburgi & District

Sirwal: Establishing of 2X10MVA, 31 New 18-19 110/11kV Sub-Station at Sirwal Kalaburagi Yadgir Village in Tq, Yadgir Dist.

Sagnoor: Establishing of 1X10MVA,1X20MVA, 110/33/11kV 32 New 18-19 Kalaburagi Kalaburgi Sagnoor Sub-station Afzalpur taluka in Kalaburagi Dist.

Bankalga: Establishing of 2X10MVA, 33 New 18-19 110/11kV MUSS at Bankalga village Kalaburagi Kalaburgi Afzalpur taluka in Kalaburagi Dist. Sl. No. Work Code Name of the Work ZONE District

Honegera: Establishing of 34 New 18-19 1X10MVA, 110/11kV Sub-Station at Kalaburagi Yadgir Honegera Village in Tq, Yadgir Dist.

34 Total of Sub-stations Kalaburagi

66/KV S/S Gudekote: New 1 Augumentation 6.3MVA by 12.5 Kalaburagi Ballari 17-18 MVA Trf

New 66/KV S/S Kottur: Augumentation 2 Kalaburagi Ballari 17-18 6.3MVA by 12.5 MVA Trf

Kanakagiri: Augumentation pf 110/11KV 10 3 New 18-19 MVA Power Transformer -1 to Kalaburagi Koppal 20MVA at 110/33/11KV Sub- station, Kanakagiri

Hunasagi: Providing additional 1 X 10MVA, 4 New 18-19 Kalaburagi Yadgir 110/11kV Power Transformer at 110/33/11kV MUSS, Hunasagi.

4 Total of Augmentations Kalaburagi

Munirabad Power house to Bellary (North): 1 FB1056 Construction of 110kV DC line in Kalaburagi Bellary the exisitng corridor from Munirabad Power house to Bellary (North) Sl. No. Work Code Name of the Work ZONE District

Construction of IInd Circuit line from 220KV Shahapur to Khanapur 2 Kalaburagi Yadgir on existing DC tower for a distance of 19.25Kms and TB at both end

Interlinking of 110KV Yadgir line to existing Saidapur line for a distance 3 Kalaburagi Yadgir of 7Kms by converting the existing 110KV SC towers by DC towers

New 110KV Munirabad- Allipura SC line 4 Kalaburagi Ballari 17-18 to DC line.

Conversion of exisitng 110KV Sindhanoor- 110KV Sirguppa SC New 5 tower to DC tower with terminal Kalaburagi Ballari 17-18 bays at 110KV Sindhanoor and 110KV Sirguppa

Replacment of existing 110KV Sindhanoor -Raichur DC Line -I & New 6 II Patridge conductor by Lynx Kalaburagi Raichur 17-18 Conductor including intermediate Towers.

Replacment of existing 110KV Raichur -Shahapur DC Line -I & II New 7 Patridge conductor by Lynx Kalaburagi Raichur 17-18 Conductor including intermediate Towers.

Construction of 110kV SC link Line New from 110/33/11kv S/S Mane- 8 Kalaburagi Bidar 17-18 Khelli to Existing Nirna110/11kV for a distance of 8Kms Sl. No. Work Code Name of the Work ZONE District

Re- construction of 110kV SC line on DC Towers having wolf/ patridge New conductor from 110kV University 9 Kalaburagi Kalaburgi 17-18 S/S to 220kV Kapnoor for a distance of 19Km by 110kV SC line on DC towers using Lynx conductor.

Re- construction of 110kV SC line on DC Towers having wolf/ patridge conductor from 220kV Kapnoor R/s New 10 to 220kV Humnabad R/S for a Kalaburagi Kalaburgi 17-18 distance of 52.83Km by 110kV SC line on DC towers using Lynx conductor.

Enhancement of 1X20MVA 110/11kV Power Transformer No-.1 by 1X20MVA 110/11kV Power New Transformer at 110/11kV Chidri S/S 11 Kalaburagi Bidar 17-18 in Bidar City for arranging power supply for 11kV express feeder to an extent of 2000KVA for Medical college Bidar.

Reconstruction of 110kV SC line on SC towers having lynx conductor from 220kV kustagi S/S to 110kV Yelbyrga S/S for a Distance of 12 New 18-19 28kms by 110kV DC line on DC Kalaburgi Ballari towers using LYNX conductor in the existing corridor along with two terminal bays one at 220kV Kustagi s/s & one at Yelburga S/s.

Ganadhal LILO: LILOing of existing 110KV Kustagi - Kanakagiri Line at 13 New 18-19 Kalaburagi Koppal 110/11KV Sub-station Ganadhal for distance of 1.62 Kms

13 Total of Lines Kalaburagi

51 Total of Kalaburagi Zone Kalaburagi

528 Total of List-V for All Zones List - IV : Abstract of Works which have been cleared by either TAC/TCCM. Or administrative sanction has been accorded for the DPR (in the absence of TAC/TCCM clearance) and are not intended to be taken up during the year 2018-19

Rs. in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Zone Nos. Nos. Nos. Nos. Nos.

Bengaluru 12 21 29 2 64

Tumakuru 12 7 4 0 23

Hassana 21 37 20 2 80

Mysuru 25 19 7 0 51

Bagalkote 49 19 34 2 104

Kalaburagi 35 11 22 0 68

Total 154 114 116 6 390

List - IV List - V : Abstract of Works seeking clearance of TAC/TCCM

Sub-Stations Augmentations Exclusive Lines TB's & Others Total Name of the Zone

Nos. Nos. Nos. Nos. Nos.

Bengaluru 49 37 34 4 124

Tumakuru 35 98 18 0 151

Hassana 17 12 11 1 41

Mysuru 29 51 22 4 106

Bagalkote 40 7 7 1 55

Kalaburagi 34 4 13 0 51

Total 204 209 105 10 528

List - V GENERAL CAPITAL BUDGET FOR 2018-19 Rs. in Lakhs

Bengaluru Tumakukru Hassana Mysuru Bagalkote Kalaburagi Total Zone Zone Zone Zone Zone Zone Category Particulars Budget Budget Budget Budget Budget 18- Budget 18- Budget 18-19 18-19 18-19 18-19 18-19 19 19

Providing new 11kV A 3351.31 1393.27 503.26 200.00 890.00 432.38 6770.22 Switch Gears

Providing new EHV B 1391.37 136.52 479.30 50.00 779.00 0.00 2836.19 breakers & C&R panels

C Spare Transformers 1059.00 0.00 436.00 350.00 450.00 1635.69 3930.69

D Survey & Investigation 50.00 129.85 237.24 100.00 450.00 451.29 1418.38

Land acquisition, E levelling and area 400.00 126.00 509.20 200.00 2585.00 874.50 4694.70 fencing Protection Equipments F 156.30 84.90 139.00 50.00 1881.00 349.51 2660.71 & Metering

Budgetary grant for procurement of G 20.00 178.54 126.00 50.00 64.00 10.00 448.54 materials for Minor Capital Works.

Total 6427.98 2049.08 2430.00 1000.00 7099.00 3753.37 22759.43 Zone Wise Abstract of all Works 2018-19

Rs. in Lakhs Sub-Stations Augmentations Exclusive Lines TB's & Others Total

Name of the Zone Budget Budget Budget Budget Nos. Nos. Nos. Nos. Budget 18-19 Nos. 18-19 18-19 18-19 18-19

Bengaluru 115 90333.00 127 7520.75 94 5202.00 15 6975.00 351 110030.75

Tumakuru 66 24003.00 165 4720.50 45 18807.00 3 957.00 279 48487.50

Hassana 68 6956.20 86 4324.76 55 1882.48 13 1582.07 222 14745.51

Mysuru 93 14685.00 125 4777.00 48 561.00 6 550.00 272 20573.00

Bagalkote 114 9837.00 70 4815.00 62 6198.00 8 2567.00 254 23417.00

Kalaburagi 93 8105.65 56 2554.55 46 15850.59 6 642.87 201 27153.66

Total 549 153919.85 629 28712.56 350 48501.07 51 13273.94 1579 244407.42 Abstract of Total Capital Budget for the year 2018-19 Rs. in Lakhs

Bengaluru Tumakuru Hassana Mysuru Bagalkote Kalaburagi Total

Sl. Particulars No. Budget Budget Budget Budget Budget Budget Budget Nos. Nos. Nos. Nos. Nos. Nos. Nos. 18-19 18-19 18-19 18-19 18-19 18-19 18-19

A MAIN CAPITAL WORKS List-I : Commissioned 1 Works 23 3078.75 23 6315.50 26 2169.44 21 1593.00 20 2841.00 15 6388.11 128 22385.80

2 List-II : Ongoing Works 53 99818.00 29 33479.00 33 8370.85 44 16792.00 40 19083.00 25 18479.73 224 196022.58

List-III : Works proposed 3 to be taken up 87 7134.00 53 8693.00 42 4205.22 50 2188.00 35 1493.00 42 2285.82 309 25999.04 this year

4 Sub-Total 163 110030.75 105 48487.50 101 14745.51 115 20573.00 95 23417.00 82 27153.66 661 244407.42

5 List-IV 64 0.00 23 0.00 80 51 104 68 390 0.00

6 List-V 124 0.00 151 0.00 41 106 55 51 528 0.00

Total of Works 351 110030.75 279 48487.50 222 14745.51 272 20573.00 254 23417.00 201 27153.66 1579 244407.42

GENERAL CAPITAL B 6427.98 2049.08 2430.00 1000.00 7099.00 3753.37 22759.43 WORKS

C Total 351 116458.73 279 50536.58 222 17175.51 272 21573.00 254 30516.00 201 30907.03 1579 267166.85

D a) Civil Budget (at the disposal of CEE (P&C) for meeting the budgetary requirement for Civil works). 4000.00

b) Construction of office complex at A.R Circle Bangaluru 5000.00

c)Construction of multipurpose auditorium , Amphi theatre executive hostel block and addtion hostel block at HRDC hudi Bangaluru. 3000.00

LDC / SCADA (at the disposal of CEE LDC for procurement of materials for Telecommunication Division and for meeting Expenditure for SCADA works E 5000.00 only).

F Transport for meeting expenditure for procurement of Vehicles. 50.00

T&P, Computers and RT and R&D (at the disposal of CEE (P&C) for meeting budgetary requirment for procurement of Tools & Plants, Computers, office G equipments and RT and R & D equipments 5000.00

H Contingency Budget : (to be held by CEE (P&C) for releasing budgetary requirement for taking up unforeseen and urgent works/Expenses. 5000.00

I GRAND TOTAL (Rs.in Lakhs) 294216.85