September 2020 Notes
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Fall 2011 510 520 3876
BPWA Walks Walks take place rain or shine and last 2-3 hours unless otherwise noted. They are free and Berkeley’s open to all. Walks are divided into four types: Theme Friendly Power Self Guided Questions about the walks? Contact Keith Skinner: [email protected] Vol. 14 No. 3 BerkeleyPaths Path Wanderers Association Fall 2011 510 520 3876. October 9, Sunday - 2nd An- BPWA Annual Meeting Oct. 20 nual Long Walk - 9 a.m. Leaders: Keith Skinner, Colleen Neff, To Feature Greenbelt Alliance — Sandy Friedland Sandy Friedland Can the Bay Area continue to gain way people live.” A graduate of Stanford Meeting Place: El Cerrito BART station, University, Matt worked for an envi- main entrance near Central population without sacrificing precious Transit: BART - Richmond line farmland, losing open space and harm- ronmental group in Sacramento before All day walk that includes portions of Al- ing the environment? The members of he joined Greenbelt. His responsibilities bany Hill, Pt. Isabel, Bay Trail, Albany Bulb, Greenbelt Alliance are doing everything include meeting with city council members East Shore Park, Aquatic Park, Sisterna they can to answer those questions with District, and Santa Fe Right-of-Way, ending a resounding “Yes.” Berkeley Path at North Berkeley BART. See further details Wanderers Asso- in the article on page 2. Be sure to bring a ciation is proud to water bottle and bag lunch. No dogs, please. feature Greenbelt October 22, Saturday - Bay Alliance at our Trail Exploration on New Landfill Annual Meeting Thursday, October Loop - 9:30 a.m. 20, at the Hillside Club (2286 Cedar Leaders: Sandra & Bruce Beyaert. -
Priority Conservation Area Grant Program
COASTAL CONSERVANCY Staff Recommendation October 17, 2019 PRIORITY CONSERVATION AREA GRANT PROGRAM ROUND 2 Project Manager: Brenda Buxton RECOMMENDED ACTION: Recommend to the Metropolitan Transportation Commission that sixteen resource protection and public access projects be included in the Priority Conservation Area Grant Program. LOCATION: Counties of Alameda, Contra Costa, Santa Clara, San Mateo, and San Francisco PROGRAM CATEGORY: San Francisco Bay Area Conservancy EXHIBITS Exhibit 1: Project Location Map Exhibit 2: Priority Conservation Area Grant Program Call for Proposals RESOLUTION AND FINDINGS: Staff recommends that the State Coastal Conservancy adopt the following resolution pursuant to Section 31160-31165 of the Public Resources Code: “The State Coastal Conservancy hereby recommends to the Metropolitan Transportation Commission that the following projects (in geographic order) and recommended grant amounts totaling $7,397,000 be included in the Priority Conservation Area Grant Program: 1. One million dollars ($1,000,000) to the City of Richmond to construct a 1.25-mile, Class 1 segment of the San Francisco Bay Trail connecting Point Molate Beach Park to the Winehaven Historic District in Contra Costa County. 2. One million dollars ($1,000,000) to East Bay Regional Park District to construct a 1.25- mile, Class 1 segment of the San Francisco Bay Trail connecting the Richmond-San Rafael Bridge to Point Molate Beach Park in Contra Costa County. 3. Nine hundred fifty thousand dollars ($950,000) to the John Muir Land Trust for construction of trails, bridges, overlooks and other public access amenities as part of the Pacheco Marsh (Lower Walnut Creek) Restoration Project in Contra Costa County. -
San Francisco Bay Area Integrated Regional Water Management Plan
San Francisco Bay Area Integrated Regional Water Management Plan October 2019 Table of Contents List of Tables ............................................................................................................................... ii List of Figures.............................................................................................................................. ii Chapter 1: Governance ............................................................................... 1-1 1.1 Background ....................................................................................... 1-1 1.2 Governance Team and Structure ...................................................... 1-1 1.2.1 Coordinating Committee ......................................................... 1-2 1.2.2 Stakeholders .......................................................................... 1-3 1.2.2.1 Identification of Stakeholder Types ....................... 1-4 1.2.3 Letter of Mutual Understandings Signatories .......................... 1-6 1.2.3.1 Alameda County Water District ............................. 1-6 1.2.3.2 Association of Bay Area Governments ................. 1-6 1.2.3.3 Bay Area Clean Water Agencies .......................... 1-6 1.2.3.4 Bay Area Water Supply and Conservation Agency ................................................................. 1-8 1.2.3.5 Contra Costa County Flood Control and Water Conservation District .................................. 1-8 1.2.3.6 Contra Costa Water District .................................. 1-9 1.2.3.7 -
Weekly Projects Bidding 8/13/2021
Weekly Projects Bidding 8/13/2021 Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies. Plan# Name Bid Date & Time OPR# Location Estimate Project Type Monday, August 16, 2021 OUTREACH MEETING (VIRTUAL) EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES Addenda: 0 COMPLEX (REQUEST FOR SUB BIDS) SC 8/16/21 10:00 AM 21-02526 San Jose School ONLINE Plan Issuer: XL Construction 408-240-6000 408-240-6001 THIS IS A VIRTUAL OUTREACH MEETING. REGISTRATION IS REQUIRED. SEE FLYER FOR DETAILS. The 74,000 sf Student Services Complex at Evergreen Valley College is part of the San Jose Evergreen Community College District's Measure X Bond Program. This is a new ground-up two -story complex including collaboration spaces, offices, storage, restrooms and supporting facilities. All subcontractors must be prequalified with XL Construction to bid the project. Please email [email protected] for a prequalification application link, and [email protected] if you are an Under Utilized Business Enterprise (SBE, WBE, MBE, VBE...). REFINISHING GYM AND STAGE FLOORS AT CALIFORNIA SCHOOL FOR THE BLIND Addenda: 0 8/16/21 12:00 PM 21-02463 Fremont State-Federal Plan Issuer: California Department of Education - Personnel Service Division 916-319-0800 000-000-0000 Contract #: BF210152 The Contractor shall provide all labor, equipment and materials necessary for preparing and refinishing the stage and gym floors, twice a year, at the California School for the Blind (CSB), located at 500 Walnut Avenue, Fremont. -
Contra Costa County
Historical Distribution and Current Status of Steelhead/Rainbow Trout (Oncorhynchus mykiss) in Streams of the San Francisco Estuary, California Robert A. Leidy, Environmental Protection Agency, San Francisco, CA Gordon S. Becker, Center for Ecosystem Management and Restoration, Oakland, CA Brett N. Harvey, John Muir Institute of the Environment, University of California, Davis, CA This report should be cited as: Leidy, R.A., G.S. Becker, B.N. Harvey. 2005. Historical distribution and current status of steelhead/rainbow trout (Oncorhynchus mykiss) in streams of the San Francisco Estuary, California. Center for Ecosystem Management and Restoration, Oakland, CA. Center for Ecosystem Management and Restoration CONTRA COSTA COUNTY Marsh Creek Watershed Marsh Creek flows approximately 30 miles from the eastern slopes of Mt. Diablo to Suisun Bay in the northern San Francisco Estuary. Its watershed consists of about 100 square miles. The headwaters of Marsh Creek consist of numerous small, intermittent and perennial tributaries within the Black Hills. The creek drains to the northwest before abruptly turning east near Marsh Creek Springs. From Marsh Creek Springs, Marsh Creek flows in an easterly direction entering Marsh Creek Reservoir, constructed in the 1960s. The creek is largely channelized in the lower watershed, and includes a drop structure near the city of Brentwood that appears to be a complete passage barrier. Marsh Creek enters the Big Break area of the Sacramento-San Joaquin River Delta northeast of the city of Oakley. Marsh Creek No salmonids were observed by DFG during an April 1942 visual survey of Marsh Creek at two locations: 0.25 miles upstream from the mouth in a tidal reach, and in close proximity to a bridge four miles east of Byron (Curtis 1942). -
4 Infrastructure Systems Infrastructure Analysis Contents 4.01 INTRODUCTION 04-1
4 Infrastructure Systems Infrastructure Analysis Contents 4.01 INTRODUCTION 04-1 4.02 STORM DRAINAGE SYSTEM 04-2 4.02.01 GENERAL 04-2 4.02.02 SUPPLY AND CAPACITY 04-2 4.02.03 RUNOFF PATTERNS 04-2 4.02.04 RATIO OF PERVIOUS TO IMPERVIOUS AREA 04-3 4.02.05 DESIGN CONSIDERATIONS 04-3 4.02.06 RECOMMENDED IMPROVEMENTS 04-4 4.03 WATER SYSTEM 04-6 4.03.01 EXISTING CONDITIONS 04-6 4.03.02 RECOMMENDED IMPROVEMENTS 04-6 4.04 SANITARY SEWER SYSTEM 04-8 4.04.01 EXISTING CONDITIONS 04-8 4.04.02 RECOMMENDED IMPROVEMENTS 04-8 4.05 DRY UTILITIES 04-11 4.05.01 PG&E GAS LINE LOCATION 04-11 4.05.02 PG&E ELECTRIC LINE LOCATION 04-11 4.05.03 CABLE, INTERNET, AND TELECOM ACCESS 04-11 4.06 REFERENCES 04-12 04.ii - San Pablo Avenue Specific Plan - August, 2014 - Corrected Infrastructure Analysis Table of Figures Infrastructure Figure 01. Impermeable surfaces are widespread in the study area 04-5 Infrastructure Figure 04. Low impact development features may serve as community amenities. 04-5 Infrastructure Figure 02. Award wining low impact streetscape improvements along San Pablo Ave 04-5 Infrastructure Figure 03. Green roof is a good stormwater best management practise. 04-5 Infrastructure Figure 05. Permeable paving, used for the parking spaces at right, is an example of LID 04-5 San Pablo Avenue Specific Plan - August, 2014 - Corrected - 04.iii Infrastructure Analysis List of Tables Infrastructure Table 01. Buildout Planning Horizon: Additional Water Demands and Associated Distribution System Improvements 04-7 Infrastructure Table 02. -
Baxter Creek Gateway Park Restoration a Post-Project Appraisal
Baxter Creek Gateway Park Restoration A Post-project appraisal University of California, Berkeley LD ARCH 227 - Restoration of Rivers and Streams By: Yiwen Chen Yuanshuo Pi Dec 16, 2019 1 Abstract This paper is seeking to evaluate the results of the Baxter Creek Gateway Restoration Project located in an urbanized section of Baxter Creek, northern El Cerrito, California, and figure out how the channel transforms and how it impacts the site and its surroundings. We appraisal the project by the condition of the creek bed and bank, vegetation, water management and public accessibility. Making a comparison of 2006 and 2019 status of the creek to figure out how the stream performed and transformed in the last 13 years. Moreover, depending on the analysis of the water catchment area, planting evolvement, space quality to study the impact of the project for the surrounding area. In the end, we devote to discuss the possibilities of improvement of the site by studying other similar precedents, trying to explore the future design directions of river restoration projects. 2 1. Introduction 1.1 Site location & History Baxter Creek Gateway Restoration project is located in El Cerrito (Figure 1.1.1). The site is located on 1.6 acres of land and is 700 feet long, consisting of a branch of one of the three tributaries of Baxter Creek (Figures 1.1.2 and 1.1.3). [1] The City of El Cerrito hired Hanford Applied Restoration Conservation contractors in 2005 to restore the creek and construct a new civic gathering area facing San Pablo Ave. -
City Manager's Update
MEMORANDUM TO: Mayor and City Council FROM: Karen Pinkos, City Manager DATE: September 3, 2020 SUBJECT: City Manager’s Update On Tuesday, September 1, the City Council held a study session that discussed the City’s ongoing efforts to address our budget challenges and the impacts of the COVID-19 public health crisis. The meeting included reports from our Departments featuring Melanie Mintz, Community Development Director; Christopher Jones, Recreation Director; Yvetteh Ortiz, Public Works Director/City Engineer; Michael Pigoni, Fire Chief; and Paul Keith, Police Chief. If you are a regular reader of this update, you already know much of the work our Departments have been doing; however during this meeting our Directors were able to discuss with the City Council the impacts of the current environment due to financial challenges and the COVID-19 pandemic as well as their focus for this coming year. It was extremely informative and I encourage anyone who wasn’t able to watch the meeting live to watch it at your leisure. I want to thank our Directors for the great work they and their teams do for El Cerrito residents, businesses, and visitors every day, especially in these unprecedented times. Next week, the updated proposed Fiscal Year 2020-21 Budget Document will be available for review and will be discussed by the City Council at their next Council Meeting on September 15, 2020. Once available, it will be posted on our Annual Budget Process webpage. As you will see in the Recreation Department section of this update, this month we are presenting our 30 in 30 Challenge! For just about 20 minutes a day, most can achieve at least one mile’s worth of walking, running, or other low impact exercise. -
Wildcat Creek Restoration Action Plan Version 1.3 April 26, 2010 Prepared by the URBAN CREEKS COUNCIL for the WILDCAT-SAN PABLO WATERSHED COUNCIL
wildcat creek restoration action plan version 1.3 April 26, 2010 prepared by THE URBAN CREEKS COUNCIL for the WILDCAT-SAN PABLO WATERSHED COUNCIL Adopted by the City of San Pablo on August 3, 2010 wildcat creek restoration action plan table of contents 1. INTRODUCTION 5 1.1 plan obJectives 5 1.2 scope 6 Urban Urban 1.5 Methods 8 1.5 Metadata c 10 reeks 2. WATERSHED OVERVIEW 12 c 2.1 introdUction o 12 U 2.2 watershed land Use ncil 13 2.3 iMpacts of Urbanized watersheds 17 april 2.4 hydrology 19 2.5 sediMent transport 22 2010 2.6 water qUality 24 2.7 habitat 26 2.8 flood ManageMent on lower wildcat creek 29 2.9 coMMUnity 32 3. PROJECT AREA ANALYSIS 37 3.1 overview 37 3.2 flooding 37 3.4 in-streaM conditions 51 3.5 sUMMer fish habitat 53 3.6 bioassessMent 57 4. RECOMMENDED ACTIONS 58 4.1 obJectives, findings and strategies 58 4.2 recoMMended actions according to strategy 61 4.3 streaM restoration recoMMendations by reach 69 4.4 recoMMended actions for phase one reaches 73 t 4.5 phase one flood daMage redUction reach 73 able of 4.6 recoMMended actions for watershed coUncil 74 c ontents version 1.3 april 26, 2010 2 wildcat creek restoration action plan Urban creeks coUncil april 2010 table of contents 3 figUre 1-1: wildcat watershed overview to Point Pinole Regional Shoreline wildcat watershed existing trail wildcat creek highway railroad city of san pablo planned trail other creek arterial road bart Parkway SAN PABLO Richmond BAY Avenue San Pablo Point UP RR San Pablo WEST COUNTY BNSF RR CITY OF LANDFILL NORTH SAN PABLO RICHMOND San Pablo -
(Oncorhynchus Mykiss) in Streams of the San Francisco Estuary, California
Historical Distribution and Current Status of Steelhead/Rainbow Trout (Oncorhynchus mykiss) in Streams of the San Francisco Estuary, California Robert A. Leidy, Environmental Protection Agency, San Francisco, CA Gordon S. Becker, Center for Ecosystem Management and Restoration, Oakland, CA Brett N. Harvey, John Muir Institute of the Environment, University of California, Davis, CA This report should be cited as: Leidy, R.A., G.S. Becker, B.N. Harvey. 2005. Historical distribution and current status of steelhead/rainbow trout (Oncorhynchus mykiss) in streams of the San Francisco Estuary, California. Center for Ecosystem Management and Restoration, Oakland, CA. Center for Ecosystem Management and Restoration TABLE OF CONTENTS Forward p. 3 Introduction p. 5 Methods p. 7 Determining Historical Distribution and Current Status; Information Presented in the Report; Table Headings and Terms Defined; Mapping Methods Contra Costa County p. 13 Marsh Creek Watershed; Mt. Diablo Creek Watershed; Walnut Creek Watershed; Rodeo Creek Watershed; Refugio Creek Watershed; Pinole Creek Watershed; Garrity Creek Watershed; San Pablo Creek Watershed; Wildcat Creek Watershed; Cerrito Creek Watershed Contra Costa County Maps: Historical Status, Current Status p. 39 Alameda County p. 45 Codornices Creek Watershed; Strawberry Creek Watershed; Temescal Creek Watershed; Glen Echo Creek Watershed; Sausal Creek Watershed; Peralta Creek Watershed; Lion Creek Watershed; Arroyo Viejo Watershed; San Leandro Creek Watershed; San Lorenzo Creek Watershed; Alameda Creek Watershed; Laguna Creek (Arroyo de la Laguna) Watershed Alameda County Maps: Historical Status, Current Status p. 91 Santa Clara County p. 97 Coyote Creek Watershed; Guadalupe River Watershed; San Tomas Aquino Creek/Saratoga Creek Watershed; Calabazas Creek Watershed; Stevens Creek Watershed; Permanente Creek Watershed; Adobe Creek Watershed; Matadero Creek/Barron Creek Watershed Santa Clara County Maps: Historical Status, Current Status p. -
Pt. Isabel-Stege Area
Tales of the Bay Shore -- Pt. Isabel-Stege area Geology: The “bones” of the shoreline from Albany to Richmond are a sliver of ancient, alien sea floor, caught on the edge of North America as it overrode the Pacific. Fleming Point (site of today’s racetrack), Albany Hill, Pt. Isabel, Brooks Island, scattered hillocks inland, the hills at Pt Richmond, and the hills across the San Pablo Strait (spanned by the Richmond Bridge) all are part of this Novato Terrane. Erosion and uplift eventually left their hard rock as hilltops in a valley. Still later – only about 5000 years ago -- rising seas from the melting glaciers of our last Ice Age flooded the valley, forming today’s San Francisco Bay. The “alien” hilltops became islands, peninsulas linked to shore by marsh, or isolated dome-like “turtlebacks.” Left: Portion of 1911 map of SF Bay showing many Native American sites near Pt. Isabel and Stege. Right: 1853 U.S. Coastal Survey map showing N. end of Albany Hill, Cerrito Creek, Pt. Isabel, and marshes/ to North. Native Americans: Native Americans would have watched the slow rise of today’s Bay. When Europeans reached North America, the East Bay was the home of Huchiun Ohlone peoples. Living in groups generally of fewer than 100 people, they moved seasonally amid rich and varied resources, gathering, hunting, fishing, and encouraging useful plants with pruning and burning. They made reed boats, baskets, nets, traps, mortars, and a wide variety of implements and decorations. Along the shellfish-rich shoreline they gradually built up substantial hills of debris – shell mounds -- that kept them above floods and served as multipurpose homesites, burial sites, refuse dumps, and more. -
Community Participation and Creek Restoration in the East Bay of San Francisco
Louise A. Mozingo Community Participation and Creek Restoration and Recreation, had been inspired by an article of Bay Area Community Participation and historian Grey Brechin on the possibilities of daylighting creeks Creek Restoration in the East in Sonoma County north of San Francisco (Schemmerling, 2003). Doug Wolfe, a landscape architect for the City of Bay of San Francisco Berkeley, proposed that a short culverted stretch of Strawberry Creek crossing a new neighborhood park in Berkeley then culverted, be opened or “daylit.” As a first step in proposing Louise A. Mozingo the unprecedented idea, Wolfe named the new open space Strawberry Creek Park. As he later reported, this “lead to the ABSTRACT question ‘Where is this creek?’ My answer was that it was ‘Twenty feet down and waiting’” (Wolfe, 1994, 2). Controversial The creeks of the upper East Bay of San Francisco in the extreme, Wolfe found political support from Carol have been the location of two decades of precedent Schemmerling, and David Brower, founder of Friends of the setting creek restoration activities. This discussion will Earth, and a city council member. With vocal citizen support review the essential role of both citizen activism and at public meetings the radical concept prevailed. The notion NGOs in the advent of a restoration approach to creek that a reopened creek could be an asset rather than a hazard management. Beginning with small pilot projects to proved to be a lasting inspiration (Schemmerling; Wolfe, 2-3). “daylight” a culverted creek and spray paint signs on street drain inlets, participation in the restoration of the Also in Berkeley, a small but telling community education act East Bay creeks has evolved into a complex layering took place on city streets.