Map Sheets: 1:100,000 Mt Lindsay 9441; Casino Management Area Bonalbo 9440 Locality Map 1:25,000 9441-3S, Capeen 9440-4N Compartments 7128-7132 (Morpeth Park Plantation) Datum: GCS_GDA_1994 ³ Scale: 100,000 Bonalbo State Forest Projection: GDA_1994_MGA_Zone_56

455000 460000 465000 470000

0 Duck Creek R 0 0 oad 0 0 0

0 Richmond Range NP 0 d 3 3

y a 8 8 a o 6 6 R W

e e l

c z

n o

e o

r d

a

l g n C u RICHMOND RANGE B

Emergency Meeting Point Bonalbo Hospital, Hospital Road 0 0

0 463127 Easting 0 0 P 0

5 e 5 a 2 6821458 Northing 2 c 8 o 8

6 c 6 k

C

r e e k

R Helicopter Landing Area o a Bonalbo sporting field d d a o -28° 44' 17'' Latitude R

s 152° 37' 30'' Longitude n e t o 463402 Easting o H 6820972 Northing

d R s h rt o w d Ñ o BONAo LBO fW 0 0 0 0 0 0 0 0

2 d 2 8 R 8 6 th 6 e p or M

Sh anno n Cre ek Rd BONALBO

-

1 0 0 0 0 0 0 5 5 1 1 8 8

y 6 6 a

W

e c n e r a l

C

d a o R k e re C g n u b le g n u T

k d rac t T a s o d We Roa R e

v i f

e

k

a

T

455000 460000 465000 470000

MAP FEATURES ROADS SAFETY POINTS Harvest Area Sealed Ñ Plantations All Weather, Unsealed f Emergency Meeting Point Helicopter Landing Area State Forest Dry Weather, Unsealed National Park & Nature Reserve Four Wheel Drive 0 625 1,250 2,500 3,750 5,000 Meters Private Plantation Haulage Created By: Andrew Kemsley Drainage Feature Created: 17/03/2016 FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION BONALBO Sta te Forest HARVEST PLAN OPERATIONAL MAP NO. 1070 Pla n Na m e: Ca _ 7128_ 7129_ 7130_ 7131_ 7132_ Morpeth VERSION: 1 1:18,000 Com pa rtm en ts 7128,7129,7130,7131,7132 Ma n a gem en t Area : CASINO JN9017522 (Dun n s White Gum ) Con tour In terva l 10m Ma psheet:BONALBO(9440-4S); JN9017523 (Ca m den White Gum ) GDA 1994 MGA Z on e 56 T U NGLEBU NG(9440-3N) Da te Prin ted: 10/01/2019

460000 461000 462000 463000 464000 Lot: 1 Lot: 1 DP48496 DP110024 1 C1 Lot: 2 Lot: 1 Lot: 1 DP48496 DP1192835 DP857403 2 S1

d R Lot: 1 1 / 3 7128/3 Rd 8 DP110024 2 7 1 C17 1 7 2 8 0 / 0 0 2 0

0 0

0 5 R 0

2 d 2

8 C2 8 6 Lot: 2 6 6 4 DP857403 7 A d lk 8 a o o o R m h t S ie e u Lot: 11 rp n T r o k a DP1062899 M C3 e c n k

T 9 r 10 a c 7129/1 Rd k C4 7128 Lot: 11 Lot: 11 11 S DP1062899 p DP1062899 u H Lot: 12 r 13 C5 A i R lk d DP1062899 7129/2 Rd o d o o e 0 a m n 0 0 12 d T 0 0 ie r 0 9 R a 9

1 T 1 u r c 8 a k 8 6 s c 6 C6 ty k 7130/1 Rd s R o a d

Lot: 12 14 7129 DP1062899 18

P

e

a c T o re c a su k re T 17 T 15 ra c r C7 k a

i l 16 Spu r T r a ck Lot: 21 0 0

0 Lot: 21 L Lot: 22 0 0 DP751042 in 0 8 k 8

1 DP751042 1 DP1027181 8 T 8 6 r 6 a c d k d a d o a R R o n R 7130 2 a / y 0 R m 3 r 0 a 7 F l Lot: 32 20 i a DP751042 r 19 T Lot: 32 r DP751042 e P w

o e T a

c

o

c k C8 Lot: 22 T 21 r DP751042 a i Lot: 22 l

0 DP751042 0 0 0 0 0

7 Nor 7 1 th B 1 8 oun 8 6 da ry 6 T ra i l C9 Vi C18 ct or C C10 s re T e Lot: 17 ra k ck T DP751042 ra c k d C12 Roa Lot: 17 Lot: 75 zer Ma z DP751042 DP751062 7131 C11 7132/3 Rd Lot: 31 22 DP751042 Ra n ge T r a ck 23

0 27 0

0 Lot: 18 0

0 C13 0 6 DP751042 6 1 1

8 C14 Lot: 78 8 6 Lot: 18 6 DP751042 DP751062 26 C15 Lot: 20 28 C19 DP751042 24 C20 S2 Lot: 20 Southwest tra ck DP751042 C16 7132/1 Rd 7132 25 Sout Lot: 182 h West T ra ck DP875828 Lot: 81 7132/2 Rd Lot: 81 Lot: 82 DP751062 DP751062 DP751062 460000 461000 462000 463000 464000

ú Approved crossin g J Wet Wea ther Dum p Lida r_ 10m _ con tour_ sha red Roads LiDAR Slope>30 (<0.25 ha ) Species Sea led telstra _ ca ble Lida r_ 100m _ con tour_ sha red Powerlin e_ ea sem en t ú Closed crossin g D Dry Wea ther, U n sea led Spotted Gum - Not a va ila ble for ha rvest Neighbour MGA Grid 100m Rn 17 Ra in forest ú Proposed crossin g LPI_Class New Con struction stream_buffer Ca m den White Gum - Clea rfa ll ha rvest ! ! Com pa rtm en ts (Lin e) In dica tive dra in a ge fea ture Non Ha ula ge Roa ds Dra in a ge lin e buffer (10m ) Dun n s White Gum - Clea rfa ll ha rvest H Dry Wea ther Dum p D D Electricity T ra n sm ission Lin e - FCNSW LIDAR corrected dra in a ge fea ture LIC IHL4 Exclusion Z on e River buffer (20m ) Gra ssla n d a n d n a tive vegeta tion

PREPARED BY ...... DAT E...... CHECK ED BY ...... DAT E...... K ilom etres © Crown Copyright 2013. T he in form a tion a n d da ta con ta in ed in this m a p is to the best of Forestry Corpora tion ’s belief, true a n d correct a t the tim e of 0 0.5 1 1.5 publica tion . However, cha n ges in circum sta n ces a fter the publica tion m a y im pa ct upon the a ccura cy of the m a teria l. No wa rra n ty or gua ra n tee is provided by the Sta te of New South Wa les, Forestry Corpora tion a n d its em ployees a n d a gen ts a n d n o lia bility is a ccepted for a n y loss or da m a ge, costs or expen se resultin g from the use or relia n ce upon the in form a tion a n d da ta con ta in ed in this m a p

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

FORESTRY CORPORATION OF NSW

ROADWORKS PLAN

Bonalbo State Forest; Compartments 7128, 7129, 7031, 7132

ASSOCIATED HARVEST PLAN NO. JN9017522 (Dunns White Gum) & JN9017523 (Camden White Gum)

Certification

Prepared by:

Senior Planner Date: 03.09.2018 Andrew Kemsley SIGNATURE ON FILE

Reviewed by:

Senior Planner Date: 19.9.2018 Steve Pickering SIGNATURE ON FILE

Approved by:

Planning Supervisor Date: 19.12.2018 Matthew Kinny SIGNATURE ON FILE

Road Works and Operational Expenditure Approved by:

Roading Manager Date: 17.12.2018 Craig Busby SIGNATURE ON FILE

Duration of Approval: The above approval is valid until 12 months from date of signature.

Contents 1. Cover Page 2. Operational Map 3. Costings 4. Roadworks Plan Text/Prescriptions/Road and crossings work sheets 5. Locality Map 6. Safety Plan HAMEEP 7. Harvesting Plan 8. Harvesting Notification List (Operations Team Leader and Roading Supervisor Only)

1 ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

This

page is intentionally

Blank

2 ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

1. Objectives 2. Roadworks are required to service plantation harvesting operations within the above compartments. These compartments are scheduled for harvest in 2018/2019. 3. The operational map shows the location of the proposed works. 4. Attachments: Financial Analysis Spreadsheet gives full details of costs, benefits, material & plant requirements.

2. Specifications and Legal Conditions This operation must comply with: · Standard Operating Procedures issued by FCNSW. · State Forests of NSW Forest Practices Code - Part 4 Forest Roads and Fire Trails (February 1999). · Technical Guidance Notes for Roadworks. · Plantations and Reafforestation Act (1999). · Plantations and Reafforestation (Code) Regulation (2001), subject to the conditions described in Attachment 1 of the Authorisation for the timber plantation.

3. Special Conditions

Feature Conditions Overhead Powerlines Yes- There are overhead powerlines within compartment 7128 as marked indicatively on HPOM. Refer to HP and SSP for detail.

Underground Telstra cable Telstra cables exists within the plantation in compartment 7128 as shown indicatively on the HPOM. FCNSW and its contractors must: - Prior to work commencing, areas in the vicinity of Telstra cable must be identified. Use existing markers in the field for identification and Indicative areas are shown on the HPOM. Where there is a risk of damage to a cable a cable locator should be engaged to precisely locate the cable - When areas identified conduct a risk assessment. Develop suitable controls such as increasing cover of earth over cables at set locations and restricting crossing machinery over the cables to set locations (as opposed to running along the cable). Works on council road reserve Conditions apply to intersection of Morpeth Rd / Clarence Way. FCNSW and its contractors must adhere to conditions as attached to roading plan. Safety Issues (includes hazards, public Yes – Refer to SSP for detail use of roads)

4. General Conditions · Tree removal should be undertaken mechanically where possible. Refer to Safety Procedures 4.25 “Manual Tree Felling” and 4.26 “Management of Hazardous Trees & Overhead Hazards”. · Remove vegetation within 3m of the road prism only where required to maintain safe sight distance and passage of trucks. · Note: Clearing is generally permitted within 3m of the road prism for all roads. Ground disturbance and tree debris may impact outside this 3m either side of the road prism as is required to effect clearing within 3m of the road prism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply.

3 Road Maintenance/upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Cable locator must be used prior to commencing work Conditions apply for works in addition to those specified below as per attached document: 'Application to conduct minor works within the road reserve' from Council. Road Name Morpeth Rd & Clarence Way intersection Road Works Materials Gravel/road base 96 t Install 10mx10m bell shaped concrete intersection with 3mx10m bitumen strip abutting Clarence Way. Build up Concrete 100 m2 eastern side of intersection using excess spoil from Bitumen 30 m2 intersection, using road base where required. Ensure fill batter on eastern side of intersection adjoining the fenceline is compacted.

North

Bridge Clarence Way

3mx10m bitumen strip

slope Fenceline Remove/relocate give way sign 10mx10m concrete pad

remove height off road Build up road and ensure fill batter is compacted at Gravel Road from here stable angle

move existing/install new cattle grid as required

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Cable locator must be used prior to commencing work

Road name Morpeth Rd/Clarence Way Category Permanent intersection Location Off Clarence Way Max Grade 3 Degrees Length 10 metres Max Side slope 3 Degrees WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO Widening YES Location Entire length Formation Width 10 m P ave m e nt U pg r a de Realignment YES As required Gravel YES As base material Batter Repair/Upgrade YES Fill batter on SE side near fenceline must be stablised R o a d si e/Ba tt e rs

D r ai n a ge Mitres YES

Comments:

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name Morpeth Rd Category Permanent Location Off Clarence Way Max Grade 10 Degrees

Over 10 degrees N/A metres Length 7140 metres Max Side slope 19 Degrees Cut Batter 2-3 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location South of dump 21 Formation Width 4.5 m Curve Widening As required Grade Lowering NO NA

U pg r a de Realignment YES Crossings C9, C11 & C16 Reopening NO NA P ave m e nt Clear veg/debris YES South of dump 21 Repair surface NO NA Crown/Crossfall YES Install rollovers if crown/crossfall is insufficent

M ai nt e n a ce Gravel YES Required south of cattle grid Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts YES 2 x log culverts requiring removal at E461 277 N6817 315 and installing 24t 75-mm rock Mitres YES ROD/Spoon NO Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: Only patch grading and dozer work required north of dump 21.

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Cable locator must be used prior to commencing work Road name 7128/1 Rd Category Permanent Location Off Morpeth Rd to dump 3 Max Grade 3 Degrees Over 10 degrees N/A metres Length 250 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5m Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: Remove gate and fenceline at intersection of 7128/1 Rd & 7128/Rd

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Cable locator must be used prior to commencing work Road name 7128/2 Rd Category Permanent Location Off 7128/2 Rd to dump 4 Max Grade 2 Degrees Over 10 degrees N/Ametres Length 490 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment YES see comments below Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: Exact location needs to be slightly varied based on location of Telstra cable

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name Alkoonie track Category Permanent Location Off Morpeth Rd to dump 6 Max Grade 3 Degrees Over 10 degrees N/A metres Length 140 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres YES ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: Fenceline at start off road needs to be cut

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7128/3 Rd Category Permanent Location Off Morpeth Rd to dump 8 Max Grade 4 Degrees Over 10 degrees N/A metres Length 250 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: NO

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7129/1 Rd Category Permanent Location Off Morpeth Rd to dump 10 Max Grade 3 Degrees Over 10 degrees N/A metres Length 290 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7129/2 Rd Category Permanent Location Off Morpeth Rd to dump 13 Max Grade 2 Degrees Over 10 degrees N/Ametres Length 200 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name Peacock Trail Category Permanent Location Off Morpeth Rd to dump 18 Max Grade 5 Degrees Over 10 degrees N/A metres Length 660 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO

U pg r a de Realignment NO Reopening NO P ave m e nt Clear veg/debris NO Repair surface NO Crown/Crossfall NO

M ai nt e n a ce Gravel NO Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7130/1 Rd Category Permanent Location Off Morpeth Rd to dump 17 Max Grade 3 Degrees Over 10 degrees N/A metres Length 130 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7130/2 Rd Category Permanent Location Off Morpeth Rd to dump 19 Max Grade 7 Degrees Over 10 degrees N/A metres Length 400 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location south of dump 21 Formation Width 4.5M Curve Widening sections Grade Lowering NO NA

U pg r a de Realignment YES NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name Southwest track Category Permanent Location Morpeth Road to dump 27 Max Grade 6 Degrees Over 10 degrees N/A metres Length 1010 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location Entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7132/2 Rd Category Permanent Location Southwest track to dump 25 Max Grade 4 Degrees Over 10 degrees N/A metres Length 230 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Maintainence/Upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7132/3 Rd Category Permanent Location Southwest track to dump 28 Max Grade 6 Degrees Over 10 degrees N/A metres Length 220 metres Max Side slope 0 Degrees Cut Batter 0 metres WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONS Works >30 slopes NO Mass Movement NO

S i t e I nfo Dispersible NO* * possibility of localised dispersible soils. See harvest plan for details. Widening YES Location entire length Formation Width 4.5M Curve Widening as required Grade Lowering NO NA

U pg r a de Realignment NO NA Reopening NO NA P ave m e nt Clear veg/debris NO NA Repair surface NO NA Crown/Crossfall NO NA

M ai nt e n a ce Gravel NO NA Remove trees >20cm NO Max clearing outside road prism N Remove trees <20cm YES Remove vegetation only in accordance to general condition 4 Batter Repair/Upgrade NO NA R o a d si e/Ba tt e rs Culverts NO Location/s: 0

Mitres NO ROD/Spoon YES Grid Drains NO Sets required: 0

D r ai n a ge Silt Trapping NO

Comments: 0

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Inital Road Construction ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Road name 7132/1 Rd Category Permanent

Location Off Southwest track near dump 34 to Morpeth Rd

Length 150 metres

Site Information Mass Movement NO Dispersible NO* *possibile localised dispersible soils. See harvest plan for details. Side Slope (°) 0 >30° slopes NO Proximity Drainage 0 Specifications Prism Width (m) 6 Formation Width (m) 4.5

Roadside clearance Road Length >10° 0 width (m) 2 Max Length Batter: 100m Max Grade (°) 9 Max Height Batter: 1m Angle Cut Batter 3/4 (standard) Gravel YES Gravel Length 40 Drainage ROD/Spoon YES ROD/Spoon No: 0 Mitre NO Grid Drain NO Grid Drain No: 0 Soil Erosion and Stabilisation Controls Soil Stabilisation/erosion: Compact fill batters >1m and grass seed Soil Stabilisation Interval: Fortnightly or after storm event

Start Date: Finish Date: Soil Stabilsation Date (must be within 5 days):

Date Event Initial Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C1 Road name Morpeth Rd Drainage Feature 2nd Order Stream Permanency Intermittant Location North of Dump 2, E 463548 N 6820481

Existing Crossing Size Stability Status Crossing Required Size Future Concrete Pipe 1200mm stable No change

Crossing Works Materials Remove veg from pavement and install gravel. Install Gravel 24 t approach drainage Rock (small) 0 t Inlet Nil required Rock (large) 0 t Outlet Nil required

Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C2 Road name Morpeth Rd Drainage Feature 2nd order Stream Permanency Intermittant Location NW of dump 6. E463335 N6819913

Existing Crossing Size Stability Status Crossing Required Size Future Concrete pipe 375stable No change

Crossing Works Materials Build up pavement if required. Install gravel. Install sill log if Gravel 24 t required. Rock (small) 0 t Inlet Nil required Rock (large) 0 t Outlet Nil required Sill logs 2

Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C3 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 9. E462733 N6819471

Existing Crossing Size Stability Status Crossing Required Size Future Concrete pipe 375mm unstable Concrete/plastic pipe 600mm Permanent

Crossing Works Materials Remove 375mm pipe. Install concrete or plastic 600mm pipe Sandbags 60 (require 4.2m length) with headwalls and baseplate. Rock (small) 12 t Alternatively install causeway. Rock (large) 6 t Inlet Nil additional Outlet Install 200mm rock (or greater)

Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C4 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 11. E462574 N6819299 Existing Crossing Size Stability Status Crossing Required Size Future Concrete pipe 300unstable Concrete or plastic pipe 600Permanent

Crossing Works Materials Gravel 24 t Remove 375mm pipe. Install concrete or plastic 600mm pipe Rock (large) 6 t (require 4.2m length) with headwalls and baseplate. Sandbags 60 Alternatively install causeway. Inlet Nil additional Road Drainage Outlet Install 200mm rock (or greater) Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C5 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 11 E462363 N6819080 Existing Crossing Size Stability Status Crossing Required Size Future Concrete Pipe 300stable no change

Crossing Works Materials Gravel 24 t Clean inlet and outlet. Raise height of road to ensure pipe is Rock (small) 0 t not crushed. Install sill logs if required. Install gravel. Rock (large) 0 t Inlet Nil required Outlet Nil required Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C6 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location N of dump 14. E462155 N6818858 Existing Crossing Size Stability Status Crossing Required Size Future Concrete pipe 375mm unstable concrete or plastic pipe 600permanent

Crossing Works Materials Remove 375mm pipe. Install concrete or plastic 600mm pipe Gravel 24 t (require 4.2m length) with headwalls and baseplate. Rock (small) 0 t Alternatively install causeway. Rock (large) 6 t Inlet Nil additional Sandbags 60 Outlet Install 200mm rock (or greater) Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C7 Road name 0 Drainage Feature 2nd order DL Stream Permanency 0 Location NE of dump 16 E462300 N6818247 Existing Crossing Size Stability Status Crossing Required Size Future Log culvert ~200 unstable Concrete or plastic pipe 750mm permanent

Crossing Works Materials Remove log culvert. Install concrete or plastic 750mm pipe Gravel 24 t (require 5m length) with headwalls and baseplate. Use sill Rock (small) 0 t logs if required. Alternatively install causeway. Rock (large) 6 t Inlet Nil additional Sandbags 60 Outlet Install 250mm rock (or greater) Road Drainage Facing upstream left approach Falls away within 30m Facing upstream right approach Install griddrain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C8 Road name Morpeth Rd Drainage Feature Stream Permanency Intermittant 4th order DL Location N of dump 21 E461296 N6817228 Existing Crossing Size Stability Status Crossing Required Size Future

Causeway 8m(W)x6m(L) stable no change

Crossing Works Materials Causeway requires reshaping to allow water flow. Ensure Gravel 0 t maximum height of causeway does not exceed 100mm higher Rock (small) 36 t then inlet height Rock (large) 0 t Inlet Nil Outlet Nil Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C9 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 21 E461321 N6816837 Existing Crossing Size Stability Status Crossing Required Size Future Log culvert ~200mm unstable causeway 5mWx4mL permanent

Crossing Works Materials Replace log culvert with causeway. Install rock to causeway Gravel 36 t and gravel to approaches. Alternatively install 375mm pipe. Rock (small) 24 t Requires minor realign. to north approach. Rock (large) 0 t Inlet install small rock Outlet install small rock Road Drainage Facing upstream left approach install RO Facing upstream right approach install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C10 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Permanent Location S of dump 21 E461362 N6816769 Existing Crossing Size Stability Status Crossing Required Size Future metal pipe 2000mm unstable no change - stablise pavement

Crossing Works Materials Install small rock to hole and edge of road adjacent to pipe Gravel 0 t inlet and outlet and pack with excavator. Install rock to Rock (small) 48 t pavement to raise height, installing sill logs if required. Rock (large) 0 t Realign north approach Inlet Nil Outlet Nil Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C11 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22 E461166 N6816551 Existing Crossing Size Stability Status Crossing Required Size Future Causeway 5mWx4mL unstable outlet causeway with stablised outlet. Require 6m wide

Crossing Works Materials Gravel 0 t Realign northern approach to crossing. Install small rock to Rock (small) 24 t pavement. Rock (large) 6 t Inlet Small rock Outlet Remove woody debris and install large rock Road Drainage Facing upstream left approach falls away Facing upstream right approach install rollover

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C12 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22, S of crossing C11 E461137, N6816520 Existing Crossing Size Stability Status Crossing Required Size Future causeway 6mWx1mL stable causeway 6mWx3mL permanent

Crossing Works Materials Excavate approaches to facilitate log haulage. Install small Gravel 0 t rock to pavement and outlet. Rock (small) 24 t Inlet Small rock Rock (large) 0 t Outlet Small rock

Road Drainage Facing upstream left approach fall away within 30m Facing upstream right approach install grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C13 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 23. E461082, N6815991 Existing Crossing Size Stability Status Crossing Required Size Future Log culvert ~200 unstable causeway 5mWx5mL Perm

Crossing Works Materials Gravel 0 t Replace log culvert with causeway. Install small rock. Rock (small) 36 t Inlet Small rock Rock (large) 0 t Outlet Small rock

Road Drainage Facing upstream left approach install RO Facing upstream right approach install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C14 Road name Morpeth Rd Drainage Feature Lidar derived drainage - DD at location Stream Permanency Intermittant Location S of dump 23, S of crossing C13 E461214, N6815898 Existing Crossing Size Stability Status Crossing Required Size Future Log culvert ~200 unstable causeway 5mWx10mLPerm.

Crossing Works Materials Gravel 0 t Replace log culvert with causeway. Install small rock. Rock (small) 36 t Inlet small rock Rock (large) 0 t Outlet small rock

Road Drainage Facing upstream left approach falls away Facing upstream right approach install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C15 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Intermittant* Location N of dump 24 *water presence due to pooling which will not E461297, N6815804 be present after reshaping Existing Crossing Size Stability Status Crossing Required Size Future Causeway 5mWx3mL stable causeway 6mWx6mL Permanent

Crossing Works Materials Remove vegetation to facilitate log haulage. Lower Gravel 0 t approaches with excavator. Install small rock. Rock (small) 36 t Inlet Install small rock Rock (large) 0 t Outlet Install small rock

Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C16 Road name South West Track Drainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 24 E461191, N6815623 Existing Crossing Size Stability Status Crossing Required Size Future Causeway 5mWx6mL stable No change Permanent

Crossing Works Materials Install small rock. Realign east approach to facilitate log Gravel 0 t haulage. Rock (small) 36 t Inlet install small rock Rock (large) 0 t Outlet install small rock

Road Drainage Facing upstream left approach Install RO Facing upstream right approach Install GD

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C17 Road name 7128/1 Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 2 E463573 N6820136 Existing Crossing Size Stability Status Crossing Required Size Future causeway 5mWx10mL stable causeway - no change permanent

Crossing Works Materials Gravel 0 t Install small rock Rock (small) 48 t Inlet install small rock Rock (large) 0 t Outlet install small rock

Road Drainage Facing upstream left approach install RO Facing upstream right approach install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C18 - STABLISATION WORKS Road name Morpeth Rd (old alignment) NOT FOR HAULAGE Stream Permanency Intermittant Drainage Feature 2nd order Location adjacent to crossings C11 & C12 E461125, N6816566 Existing Crossing Size Stability Status Crossing Required Size Future Gully stuffer 8mWx4mLx1mDunstable Stable crossing no change stable

Crossing Works Materials Remove unstable sections of debris and bench back Gravel 0 t banks if required to stablise. Seed and mulch disturbed Rock (small) 0 t areas. Install crossbanks either side to restrict access Rock (large) 0 t Inlet Nil Outlet Nil Road Drainage Facing upstream left approach Install crossbanks Facing upstream right approach Install crossbanks

Install Bench back crossbank Install banks if required crossbank Remove unstable sections of debris

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C19 Road name 7132/1 Rd Drainage Feature drainage depression Stream Permanency Permanent Location E461373 N6815751

Existing Crossing Size Stability Status Crossing Required Size Future Nil present NA NA Causeway 15mLx5mWPermanent

Crossing Works Materials Reduce grade eastern approach. Excavate ~100mm along Gravel 0 t section of causeway. Install geofab and small and large rock. Rock (small) 24 t Install approach drainage Rock (large) 60 t Inlet small rock Outlet small rock

Road Drainage Facing upstream left approach rollover/rubberflap Facing upstream right approach Grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name C20 Road name 7132/1 Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location E461414 N6815765

Existing Crossing Size Stability Status Crossing Required Size Future Nil present - construction NA NA 600mm pipe 600mmx6mW Permanent

Crossing Works Materials Gravel 0 t Excavate approaches as required & install 600mm pipe. Rock (small) 24 t Install 50- rock to approaches and install concrete bag Rock (large) 0 t headwall. Increase angle of crossing as required to ensure Sand 6 t road widening on eastern approach does is not in close 600mm pipe. Requires approx 6m width. proximity to drainage line. Concrete base plate Inlet Nil Road Drainage Outlet Install small rock Facing upstream left approach - RO if required Facing upstream right approach - Utilise RO/RF installed for C19

Close road here

Old road which follows creek line - do not disturb Old existing crossing

Install small rock at outlet Close road here

Remove veg as required

7132/1 Rd

Install 50-rock on Ensure road widening is approaches away from creek to the north

Concrete bag headwall

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name Snig crossing 'S1' Road name Unnamed Drainage Feature 1st order Stream Permanency Intermittant Location E of dump 3 E463697, N6820319 Existing Crossing Size Stability Status Crossing Required Size Future concrete pipe 600mm unstable causeway 5mWx3mLPermanent

Crossing Works Materials Remove pipe and reshape to allow snigging/4wd access Gravel 0 t (moderate approach angles permitted). Install small and large Rock (small) 24 t rock to surface. Ensure causeway does not exceed 100mm Rock (large) 12 t greater height then inlet height. Inlet Install small rock Outlet Install large rock Road Drainage Facing upstream left approach Install RO if required Facing upstream right approach Install RO if required

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital Crossing Works ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾ Crossing Name S2 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location E461714 N6815652

Existing Crossing Size Stability Status Crossing Required Size Future Causeway 6mWx6mL stable no change permanent

Crossing Works Materials Install large rock (300mm+) on outlet. Widen vegetation Gravel 0 t around crossing. Rock (small) 0 t Inlet Nil Rock (large) 6 t Outlet Install rock

Road Drainage Facing upstream left approach install RO on completion of snigging Facing upstream right approach install RO on completion of snigging

Remove veg

Install large rock Widen outside of corner

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date: Date Event Inital ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

6. Operational Control Roading Supervisor to sign here I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions as the principle controller of the operation. I will brief any other operators not present at this briefing prior to them starting any work on site and ensure that risk assessment for the Safety Management Plan is completed for this area prior to operations commencing

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

5 ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

7. Handover Briefing I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan.

Position - Company Name Signature Date

6