ECTL Working Paper Philine Gaffron, Sylke Streich, Raouf Djekrif, Christophe Racine, Jochen Schneider Public Private Partnerships around Urban Rail Transit EU Project PPP-TRANSIT PART II CASE STUDY REPORTS Contract No: GMA-2000-20025 Date: May/June 2002 ECTL European Centre for Transportation and Logistics TUHH 30 Technische Universität Hamburg-Harburg ECTL Working Paper 30 Herausgeber: Technische Universität Hamburg-Harburg European Centre for Transportation and Logistics Institut für Verkehrsplanung und Logistik Kontakt: Nadia Nabaoui-Engelhard TUHH / ECTL Verkehrsplanung und Logistik D-21071 Hamburg Tel.: 040/ 42878-3519 Fax: 040/ 42878-2728 e-mail:
[email protected] ISSN: 1616-0916 Band 30 CD, Part II Case Study Reports, 2006 PPP TRANSIT CASE STUDIES European Centre for Transportation and Logistics, TU Harburg TABLE OF CONTENTS 1. CASE STUDIES AUSTRIA 1 Rail Station Linz, Upper Austria 2 ViennaSubway turn-around Ottakring, Vienna 10 2. CASE STUDIES FRANCE 18 Rail station development Massy, Ile de France 19 Rail station development Cergy, Ile de France 35 3. CASE STUDIES GERMANY 41 Commuter Rail stop Bernau-Friedenstal, Brandenburg 42 Station Entrance Building Hennigsdorf, Brandenburg 48 Commuter Rail Stop Weiherfeld, Lower Saxony 57 4. CASE STUDIES GREAT BRITAIN 63 Croydon Tramlink, Croydon, Greater London 64 Docklands Light Railway, London 74 Doncaster Interchange, Doncaster, South Yorkshire 87 Salford Quays and Metrolink, Manchester 98 5. CASE STUDY NETHERLANDS 108 Rail Station and associated urban development, ‘s Hertogenbosch