TO HAZRAT NIJAMUDDIN

TO

Ext. CARRIAGEWAY

TO ASHRAM

EXT. FLYOVER

NEHRU NAGAR

SWAMI PRANAVANAD MARG

UNDERGROUND DMRC TRACK Proposed Pedestrian Crossings with Pelican(Push Button) Signals

Ext. BUS STOP E 6 M WIDE ROAD

GOVT. BOYS RAILWAY BOUNDARY WALL SR. SECONDARY SCHOOL E

6 M WIDE ROAD

JUNIOR PLAYGROUND 6 M WIDE ROAD D

PLAY FIELD SWAMI PRANAVANAND MARG D

Ext. BUS STOP

Ext. FOOT OVER BRIDGE

PLAY FIELD

STP STP WTP WTP

CNG PUMP ESS

DG DG EXISTING FLYOVER

Ext. BUS STOP ESS 30X25

WTP C 30X25 C

STP

30X50

PROPOSED ENTRY / EXIT PG DAV COLLEGE Ext. BUS STOP

Ext. SUBWAY

Proposed Pedestrian Crossings with Pelican(Push Button) Signals

PROPOSED ENTRY / EXIT

PRIVATE BUILDINGS PRIVATE G+3 GATE2 BUILDINGS PRIVATE G+4 BUILDINGS G+3

SWAMI PRANAVANAND MARG A PARK EXISTING TEMPLE L- MARKET

PRIVATE R.O.W. BUILDINGS GATE1 G+3

PRIVATE BUILDINGS G+3 64.00M POST OFFICE PARK RADHA KRISHNA PRIVATE MANDIR BUILDINGS G+2 Proposed Population - 24970 CAR PARKING METRO PHASE-III PINK LINE RING ROAD TOILET HEALTH CENTRE PARK SATSANGG+2 BHAVAN BLOCK 8 FOREST AREA A. Residential - Details of Proposed Dweling Units

HANUMAN MANDIR No.of DU's Peak Hour

Ext. PEDESTRIAN PLAZA LAUNDARY SHOPS VACANT AREA No.of DU's BADERPUR S.No. Typology Ext. BUS STOP Proposed Old Trips

DHOBI GHAT NEHRU PLACE NEHRU MANDIR SWAMI PRANAVANAND MARG

Ext. BUS STOP SRINIWASHPURI 648

TO MOOLCHAND CAPTAIN GAUR MARG 1. Type-I 0 GPRA

B 2. Type-II 1554 756 824 JAMA MASJID Type-III 1500 25 795 Ext. BUS STOP 3.

B SRINIVASPURI BUS DEPOT 4. Type-IV 1350 716 STP KALKI MANDIR CAPTAIN GAUR MARG WTP DR. JHA MARG 5. Type-V 400 212 ARYA SAMAJ MANDIR Ext. BUS STOP

ESS Ext. BUS STOP PROPOSED F.O.B. PROPOSED DG 6. Type-VI 190 101 BLOCK C RAILWAY STATION Ext. BUS STOP OKHLA STATION LINE 7. Type-VII

Ext. BUS STOP Total 4994 1429 2647

PROPOSED BUS STOP MARG DHIRSAIN RAJA Opening to be closed for vehicles (PEDESTRIANS ONLY) B. Commercial

MALBA DUMPING GROUND CAPTAIN GAUR MARG Area/No. of Peak Hour Ext. BUS STOP S.No. Particulars Students Trips PROPOSED FOB 1. Shopping Centre 19444 Sq.m 1311 Ext. BUS STOP PS and Post office 3732 Sq.m 75

TO EAST OF KAILASH OF EAST TO 2. 3. Proposed School 3600 Students 1378 Proposed Pedestrian Crossings with Total Trips 5411 Pelican(Push Button) Signals OKHLA MANDI Total Vehicular Trips (PCU) 1126 Proposed Parking by NBCC - 12920 ECS KAILASH HILLS KALKA DEVI MARG Ext. BUS STOP

TO TUGLAKABAD

Ext. BUS STOP

MAX HEALTHCARE INSTITUTE DR. JHA MARG

Ext. BUS STOP

Proposed Pedestrian Crossings with TO ZAMRUDPUR Pelican(Push Button) Signals SAMBHU DAYAL BAGH

-';2.#0

Client Drawn By Checked By Approved By PWD Office Drg No : CRTS / PWD / S-A / STP / 004-B Consultant 4+0)41#& ³ Executive Engineer Prepared On: 14/10/2018 %4#2*65%1057.6#065 + 286.6& 27$.+%914-5&'2#46/'06 M. ARAFAT P. ALAM F-121, PWD ´ ´ /CVJWTC4QCF(CTKFCDCF REVISIONS )1861(&'.*+ 2JÄÄ S.NO. DATE AS PER REMARKS R1 31/03/2019 Compliance of observations of CRAPHTS IUT/UMTC SCENARIO II :- OPTIMISATION OF EXISTING FACILITIES AND EXTENSION OF BARAPULA ELEVATED CORRIDOR TO THE AIRPORT R2 Compliance of observations of 17/04/2019 IUT/UMTC