TO HAZRAT NIJAMUDDIN
TO LAJPAT NAGAR
Ext. CARRIAGEWAY
TO ASHRAM
EXT. FLYOVER
NEHRU NAGAR
SWAMI PRANAVANAD MARG
UNDERGROUND DMRC TRACK Proposed Pedestrian Crossings with Pelican(Push Button) Signals
Ext. BUS STOP E 6 M WIDE ROAD
GOVT. BOYS RAILWAY BOUNDARY WALL SR. SECONDARY SCHOOL E
6 M WIDE ROAD
JUNIOR PLAYGROUND 6 M WIDE ROAD D
PLAY FIELD SWAMI PRANAVANAND MARG D
Ext. BUS STOP
Ext. FOOT OVER BRIDGE
PLAY FIELD
STP STP WTP WTP
CNG PUMP ESS
DG DG EXISTING FLYOVER
Ext. BUS STOP ESS 30X25
WTP C 30X25 C
STP
30X50
PROPOSED ENTRY / EXIT PG DAV COLLEGE Ext. BUS STOP
Ext. SUBWAY
Proposed Pedestrian Crossings with Pelican(Push Button) Signals
PROPOSED ENTRY / EXIT
PRIVATE BUILDINGS PRIVATE G+3 GATE2 BUILDINGS PRIVATE G+4 BUILDINGS G+3
SWAMI PRANAVANAND MARG A PARK EXISTING TEMPLE L- MARKET
PRIVATE R.O.W. BUILDINGS GATE1 G+3
PRIVATE BUILDINGS G+3 64.00M POST OFFICE PARK RADHA KRISHNA PRIVATE MANDIR BUILDINGS G+2 Proposed Population - 24970 CAR PARKING DELHI METRO PHASE-III PINK LINE RING ROAD TOILET HEALTH CENTRE PARK SATSANGG+2 BHAVAN BLOCK 8 FOREST AREA A. Residential - Details of Proposed Dweling Units
HANUMAN MANDIR No.of DU's Peak Hour
Ext. PEDESTRIAN PLAZA LAUNDARY SHOPS VACANT AREA No.of DU's BADERPUR S.No. Typology Ext. BUS STOP Proposed Old Trips
DHOBI GHAT NEHRU PLACE NEHRU MANDIR SWAMI PRANAVANAND MARG
Ext. BUS STOP SRINIWASHPURI 648
TO MOOLCHAND CAPTAIN GAUR MARG 1. Type-I 0 GPRA
B 2. Type-II 1554 756 824 JAMA MASJID Type-III 1500 25 795 Ext. BUS STOP 3.
B SRINIVASPURI BUS DEPOT 4. Type-IV 1350 716 STP KALKI MANDIR CAPTAIN GAUR MARG WTP DR. JHA MARG 5. Type-V 400 212 ARYA SAMAJ MANDIR Ext. BUS STOP
ESS Ext. BUS STOP PROPOSED F.O.B. PROPOSED DG 6. Type-VI 190 101 BLOCK C OKHLA RAILWAY STATION Ext. BUS STOP OKHLA STATION LINE 7. Type-VII
Ext. BUS STOP Total 4994 1429 2647
PROPOSED BUS STOP MARG DHIRSAIN RAJA Opening to be closed for vehicles (PEDESTRIANS ONLY) B. Commercial
MALBA DUMPING GROUND CAPTAIN GAUR MARG Area/No. of Peak Hour Ext. BUS STOP S.No. Particulars Students Trips PROPOSED FOB 1. Shopping Centre 19444 Sq.m 1311 Ext. BUS STOP PS and Post office 3732 Sq.m 75
TO EAST OF KAILASH OF EAST TO 2. 3. Proposed School 3600 Students 1378 Proposed Pedestrian Crossings with Total Trips 5411 Pelican(Push Button) Signals OKHLA MANDI Total Vehicular Trips (PCU) 1126 Proposed Parking by NBCC - 12920 ECS KAILASH HILLS KALKA DEVI MARG Ext. BUS STOP
TO TUGLAKABAD
Ext. BUS STOP
MAX HEALTHCARE INSTITUTE DR. JHA MARG
Ext. BUS STOP
Proposed Pedestrian Crossings with TO ZAMRUDPUR Pelican(Push Button) Signals SAMBHU DAYAL BAGH
-';2.#0
Client Drawn By Checked By Approved By PWD Office Drg No : CRTS / PWD / S-A / STP / 004-B Consultant 4+0)41#& ³ Executive Engineer Prepared On: 14/10/2018 %4#2*65%1057.6#065 + 286.6& 27$.+%914-5&'2#46/'06 M. ARAFAT P. ALAM F-121, PWD ´ ´ /CVJWTC4QCF(CTKFCDCF REVISIONS )1861(&'.*+ 2JÄÄ S.NO. DATE AS PER REMARKS R1 31/03/2019 Compliance of observations of CRAPHTS IUT/UMTC SCENARIO II :- OPTIMISATION OF EXISTING FACILITIES AND EXTENSION OF BARAPULA ELEVATED CORRIDOR TO THE AIRPORT R2 Compliance of observations of 17/04/2019 IUT/UMTC