31 North Beacon Street Mixed-Use Development Union Square, Allston

Article 80E - Small Project Review Application January 26, 2016

VIEW FROM EVERETT STREET

Submitted by: Thirty-One North Beacon Street, LLC

TABLE OF CONTENTS

Letter of Intent

Project Team

Development Opportunity 1.0 Neighborhood Context 1.1 Planning Context 1.2 Development Site

Project Description 2.0 Project Overview Building Program 2.1 Urban Design 2.2 Community Benefits 2.3 Zoning Analysis Zoning chart 2.5 Accessibility

Transportation and Parking 3.0 Site Access Vehicular Pedestrian and Bicycle 3.1 Public Transportation 3.2 Parking

Community Outreach

Architectural Drawings

LIST OF FIGURES 1 Aerial Map 2 Union Square Photo 3 533 Cambridge Street Photo 4 15 North Beacon Street Photo 5 BRA Guest Street Area Planning Study Connections Diagram 6 Existing Site Photo 7 Aerial View 1 8 Context Height Diagram 9 Context Ground Floor Diagram 10 Zoning Chart – Table D of Article 51, Dimensional Requirements

EXHIBITS A. ISD rejection letter B. Urban Design Diagrams Context Height Diagram Context Height Diagram with Proposed 37 North Beacon Context Use Diagram

31 North Beacon Street, Allston Page 2 of 14 Context Use Diagram with Proposed 37 North Beacon Transportation Diagram C. Architectural Drawings Existing Conditions Site Survey Renderings Floor Plans and Building Sections Building Elevations D. Accessibility Documents Diagram of Accessible Routes Accessibility Checklist

31 North Beacon Street, Allston Page 3 of 14

January 26, 2016

Mr. Raul Duverge Project Manager Redevelopment Authority 1 City Hall Plaza Boston, MA 02201

Re: Request for Article 80E: Small Project Review 31 North Beacon Street Allston,

Dear Mr. Duverge:

On behalf of the Owner and Developer, Thirty-One North Beacon Street, LLC, we are submitting this application for the redevelopment of a site with an address of 31 North Beacon Street to the Boston Redevelopment Authority for Small Project Review as defined in Section 80-E-5, Procedures for Small Project Review.

Included with this letter is the Small Project Review submission which includes the team members, project description, zoning analysis, transportation analysis, accessibility checklist and the proposed plans, elevations and renderings.

The new approximately 32,110 gsf building will provide approximately 2,170 sf of retail space on the ground level and 4 levels of residential rental housing in a mix of studio, 1- and 2-bedroom apartments. Three of the 20 units will be affordable per the City’s inclusionary zoning requirements.

The Project will improve the character of the neighborhood by activating the streetscape and by contributing to a more diverse housing stock that will attract and retain residents.

Sincerely,

Spalding Tougias Architects, Inc.

Cheryl Tougias, AIA, LEED AP President

PROJECT TEAM

Developer: Gerry Bickoff Thirty-One North Beacon Street, LLC 31 North Beacon Street Allston, MA 02134 Tel: (617) 617-870-7241 Email: [email protected]

Legal Counsel: Johanna Schneider Rackemann, Sawyer & Brewster 160 Boston, MA 02110-1700 Tel: (617) 951-1162 Email: [email protected]

Consultant: Susan Elsbree Tel: (617) 212-6817 Email: [email protected]

Permitting Consultant: Jay Walsh Tel: (617) 293-8331 Email: [email protected]

Architect: Cheryl Tougias, AIA, LEED AP Spalding Tougias Architects, Inc. 241 A Street, Suite 200 Boston, MA 02210 Tel: (617) 542-4522 Email: [email protected]

Surveyor: DeCelle Burke & Associates, Inc. Jim DeCelle 1266 Furnace Brook Parkway, Suite 401 Quincy, MA 02169 Tel: (617) 405-5100 Email: [email protected]

31 North Beacon Street, Allston Page 4 of 14 DEVELOPMENT OPPORTUNITY

Neighborhood Context

The Project site is located 250 feet from Union Square at the corner of North Beacon and Everett Streets in the Allston/Brighton neighborhood of Boston. A traditionally young and thriving neighborhood, the area is home to many young professionals, immigrants and college students and diverse, vibrant businesses. Union Square, the western gateway to the Allston Village Main Streets retail district, is the convergence of several busy streets and a transit hub for buses that provide access to Brighton, Cambridge and Watertown. The area streetscape may be described as having a “gritty charm”, with a wide and eclectic mix of retail, dining, and entertainment establishments in addition to an aging light industrial component. It lacks consistency, with a variety of building heights and setbacks, sidewalk widths, types of lighting and location of street trees.

GUEST STREET AREA PLANNING STUDY 2012

Union Sq / Allston Village

Figure 1 – Aerial Map

Allston/Brighton is currently undergoing significant evolution. A third of a mile to the north of the Project site, in the BRA Guest Street Area Planning Study area, the Brighton Landing mixed-use development is transforming 15 acres of former industrial property into a mixed-use development of office space, retail and restaurants, residential and sports related uses, as well as a new MBTA commuter rail station. Recent construction and the pipeline of BRA-approved residential projects in the area are indicative of the evolution. Approximately 650 new construction rental apartments units have been delivered since 2012, and pre-construction projects with approvals currently account for approximately 700 additional units to be delivered.

31 North Beacon Street, Allston Page 5 of 14

Figure 2 – Union Square Photo

Residential development is proposed in the immediate vicinity, including at 37 North Beacon Street, where in 2013 the Boston Redevelopment Authority approved a 5-story, 41-unit project with a FAR of 3.56 and 35 parking spaces. The condominium building at 15 North Beacon Street, constructed in 1989, contains ground floor retail in a 4 ½ story wing fronting the street and rises to 9 stories beyond. A short distance away at 533 Cambridge Street, a 4- and 5-story condominium building with 44 units was completed in 2008.

Figure 3 – 533 Cambridge Street Photo Figure 4 – 15 North Beacon Street Photo

31 North Beacon Street, Allston Page 6 of 14 Planning Context

The Project site is located at the southern boundary of the Guest Street Area Planning Study area, the 2013 BRA study that was formulated to shape development of this underutilized area into a vibrant mixed-use district. Everett Street is characterized as an important connector through the district from North Beacon Street to the new MBTA commuter station, North Allston and eventually the . It is also identified as a “Neighborhood Street” with a landscaped setback zone of 10 feet from sidewalk to face of building. North Beacon Street is identified as an extension of “Main Streets” from the Allston Village Main Streets district. It characterizes the North Beacon Street boundary as primarily residential with a potential FAR of up to 1.50 and height up to 4 stories, though existing buildings are a mix of heights and densities along this street, in Union Square and in nearby areas beyond the boundaries of the study.

Figure 5 – BRA Guest Street Area Planning Study Connections Diagram

The City has identified, as outlined in Boston 2030 Housing Plan, a need for 20,000 new units of workforce housing in areas affordable to middle class residents where there is good access to public transit. The report encourages infill and density along existing and proposed transit lines, increased bike-ability and walkability of neighborhoods, and reform of parking standards to accommodate non-automobile centric development. The Boston Transportation Department parking guidelines for Allston/Brighton recommend 0.75 spaces per unit when within a 10 minute walk of a MBTA station.

31 North Beacon Street, Allston Page 7 of 14 Development Site

The Project site is 9,895 sf in area. An existing 12-unit rooming house, a freestanding garage, and an asphalt parking lot will be demolished as part of the project. The owner and project proponent is Mr. Gerry Bickoff, whose family-owned commercial cleaning business is located across the street from the development site. Founded in 1977, Commercial Cleaning Service is a full-service janitorial company specializing in condominium association and apartment building cleaning.

Figure 6 – Existing Site Photo

Growing-up in Allston/Brighton on Kilsyth and Colborne Roads, and being educated at the Baldwin, Edison and English High Schools have had a tremendous impact on Gerry’s life and success. His deep roots in the neighborhood and community make him proud to propose this new mixed-use development.

PROJECT DESCRIPTION

Project Overview

The Project is oriented to the growing demographic of smaller, environmentally conscious households with low car ownership, who want to live in a vibrant, dynamic and transit accessible neighborhood of the City. The new 32,110 gsf building will provide approximately 2,170 of retail space on the ground floor and 4 levels of residential rental housing above in a mix of Studio, 1- and 2-bedroom apartments. Three of the 20 units will be affordable per the City’s inclusionary zoning requirements.

31 North Beacon Street, Allston Page 8 of 14

Building Program: 4 studio apartments, approximately 600 sf in size 8 one-bedroom apartments, approximately 815-830 sf in size 8 two-bedroom apartments, ranging in size from 840 sf to 1,070 sf Ground level retail and residential amenity space Basement level vehicle parking and indoor bicycle storage

Figure 7 – Aerial View 1

Urban Design

The proposed Project is a five-story building with a total of 20 residential rental units and 1 tenant- leased commercial unit. Located at the intersection of North Beacon and Everett Streets and 250 feet from Union Square, the building’s massing negotiates between the varied scales and character of Everett, North Beacon, and Cambridge Streets and Brighton Avenue. The building is being designed to showcase appealing contemporary architecture and to feature environmentally friendly materials and energy efficient systems.

The exterior materials have been chosen to complement the brick apartment and commercial buildings and clapboard residential buildings in the surrounding neighborhoods. Brick is employed at the ground floor, plank siding on upper floors, and warm wood details at the residential entrance on Everett Street. The ground floor retail space will have storefront glass to provide transparency on the North Beacon Street façade.

The team met with BRA design review staff and modified the site and building design in response to comments received.

31 North Beacon Street, Allston Page 9 of 14

Figure 8 – Context Height Diagram

Community Benefits

The Project will help to ensure that residents have an opportunity to grow and stay in Allston/Brighton, provide empty-nesters a place to down-size which will free-up housing stock for families, all while bringing an appropriately scaled, signature mixed-use building to an important gateway parcel on Everett Street. The ground-floor retail will help extend the Allston Village down North Beacon Street, and the development team has met with Allston Village Main Streets staff to begin a conversation about creating a local retail opportunity on the site.

The Project will provide quality transit-oriented housing at moderate prices with access to neighborhood amenities that residents' desire. . Furthering the goals of the Boston 2030 Housing Plan, the Project offers an opportunity for young professionals to establish roots in the Allston neighborhood - contributing to neighborhood stability - with a mix of generously sized studio, 1- bedroom and 2-bedroom units.

The Project proponent intends to provide residents incentives to use alternative modes of transportation, such as MBTA Transit Passes free for the first month, 50 percent off a one-year Hubway membership, a one-year Zipcar membership and credits, and Uber Credits.

31 North Beacon Street, Allston Page 10 of 14

A B D C

Figure 9 – Context Ground Floor Diagram

A B

C D

31 North Beacon Street, Allston Page 11 of 14 Zoning Analysis

The Property is located within a 3F-4000 sub-district of the Allston/Brighton Neighborhood District and is governed by Article 51 of the Code. Multifamily residential and retail uses are prohibited in the district, and therefore a use variance from the ZBA will be required.

Table J of Article 51 sets forth the parking requirements: for residential developments over 10 units 2 spaces per unit are required for market rate units and 0.7 spaces per unit for affordable units, and for retail uses 2 spaces per 1,000 gsf of floor area are required. Therefore, the residential units require 36 spaces and the retail space requires 4 spaces, for a total of 40 required parking spaces. For projects 15,001-49,999 sf in floor area, an off-street loading bay is required. Variances will be required for parking and loading.

Figure 10: Zoning Chart - Table D of Article 51, Dimensional Requirements

Required Proposed Variance Minimum Lot Area 2,000 per = 40,000 9,895 Yes Minimum Lot Width 25-45 78.14 No Minimum Lot 25-45 78.14 No Frontage Maximum Floor Area 0.80 2.54 Yes Ratio Maximum Building 3 stories / 35 feet 5 stories / 54.5 feet Yes Height Usable Open Space 650 per = 13,000 3,630 Yes per Dwelling Unit Minimum Front Yard 20 10 Yes Setback Minimum Side Yard 10 varied Yes Setback Minimum Rear Yard 30 23 Yes Setback

Accessibility

All of the Project’s entrances will be located at adjacent ground level and will be universally accessible. One accessible van parking space and one accessible car parking space will be provided in the garage adjacent to the elevator. The inclusion of elevator access makes the Project well- suited to a variety of demographic groups as well as those with physical disabilities. All common areas will be accessible and all 20 units will be handicap adaptable per 521 CMR.

Accessibility Checklist (see Exhibit D) Diagram of Accessible Routes (see Exhibit D)

31 North Beacon Street, Allston Page 12 of 14 TRANSPORTATION AND PARKING

Site Access – Vehicular

The existing curb cut on North Beacon Street will be eliminated and vehicular access will be provided via a new curb cut on Everett Street, providing access to garage level parking.

Site Access – Pedestrian and Bicycle

The Project site has a Walk Score of 94, as most daily errands do not require a car, a Transit Score of 82 which means transit is convenient for most trips, and a Bike Score of 81. Car sharing is available from Zipcar, RelayRides and Hertz On Demand and bike sharing is available from a Hubway station in front of the Jackson Mann School.

The Project will enhance the pedestrian experience by creating an active edge on North Beacon Street that links to the retail activity of Union Square. The residential entrance is located on Everett Street within a 10 foot wide landscaped zone between the sidewalk and building. The Project provides covered and secure bicycle parking in the basement level garage for residents and exterior bicycle parking adjacent to the sidewalk at the retail entrance for visitors.

Public Transportation

The Project is ideally situated to take advantage of nearby transportation opportunities. The new Boston Landing MBTA commuter rail station is located one third of a mile and a 10 minute walk from the Project site. Union Square is a key bus hub serving the following lines: 51, 57, 64, 66, 501, and 503. Significant lines provide access from Watertown Square to Cambridge (57), Oak Square to Central Square Cambridge (64), and Harvard Square Cambridge to Dudley Station via Allston and Brookline Village (66).

Parking

The development team anticipates that vehicle ownership will be low based upon the site’s transit- oriented location, walkable access to services and amenities, access to public transportation and major job centers, to Hubway bike share stations, to Zipcars and Uber services, and the following demographic and vehicle ownership data:

• 54% of Allston households own zero (0) cars1 • Approximately half of Boston renter’s own zero (0) cars and renters are 3.5 times less likely to own a car than a homeowner2 • Boston household composition is small - Approximately 70% of all Boston households are 1 and 2 people with the majority of those being 1 person households, and over half of 1 person households do not own a car2

1 Source: American Community Survey 2007-2011; BRA Research Division Analysis Finalized January 24, 2014, "Boston in Context: Neighborhoods"

2 Source: American Community Survey, City of Boston 5 year average 2009-2013

31 North Beacon Street, Allston Page 13 of 14 • Half of Bostonians do not drive to work2

In response to comments received from local elected officials and at community meetings, the team has modified the design to provide 22 parking spaces in a single level garage utilizing a car lift system. Two of the spaces are dedicated to the retail unit and 20 to the residential units.

COMMUNITY OUTREACH

The Project Team met with the Allston Civic Association Executive Board on October 13, 2015 and the full Allston Civic Association on October 21, 2015. Feedback was also obtained at meetings with abutters, City Councilor Mark Ciommo and Alana Olsen of Allston Village Main Streets. The building design was modified in response to comments received, including a less prominent corner volume, setbacks within the building massing and material/color selections.

ARCHITECTURAL DRAWINGS

See Exhibit C.

31 North Beacon Street, Allston Page 14 of 14

EXHIBIT A

31 North Beacon Street, Allston

EXHIBIT B

31 North Beacon Street, Allston

533 Cambridge Street 15 N Beacon Street (1988) (2008) 4.5-9 stories, retail, 5 stories, 44 condominiums condominiums

OVER 50’

50’ +/- 40’ +/-

30’ +/-

Union Square

31 NORTH BEACON STREET, ALLSTON CONTEXT HEIGHT DIAGRAM 533 Cambridge Street 37 N Beacon Street 15 N Beacon Street (1988) (2008) BRA approved (2013) 4.5-9 stories, retail, 5 stories, 44 condominiums 5 stories, 41 units condominiums

OVER 50’

50’ +/- 40’ +/-

30’ +/-

Union Square

31 NORTH BEACON STREET, ALLSTON CONTEXT HEIGHT DIAGRAM WITH PROPOSED 37 NORTH BEACON 31 N Beacon Street COMMERCIAL 5 stories, 20 units, retail proposed RETAIL 1ST FLOOR

Union Square

31 NORTH BEACON STREET, ALLSTON CONTEXT USE DIAGRAM 37 N Beacon Street 31 N Beacon Street COMMERCIAL BRA approved (2013) 5 stories, 20 units, retail 5 stories, 41 units proposed RETAIL 1ST FLOOR

Union Square

31 NORTH BEACON STREET, ALLSTON CONTEXT USE DIAGRAM WITH PROPOSED 37 NORTH BEACON 1/3 mile, 10-minute walk to new MBTA commuter rail station at Boston Landing T

3F-4000 64

66

Union Square / Allston Village

57

31 NORTH BEACON STREET, ALLSTON TRANSPORTATION DIAGRAM

EXHIBIT C

31 North Beacon Street, Allston

31 NORTH BEACON STREET, ALLSTON EXISTING CONDITIONS SITE SURVEY

31 NORTH BEACON STREET, ALLSTON NORTH BEACON STREET VIEW 1 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 1 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 1 WITH PROPOSED 37 NORTH BEACON 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 2 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 2 WITH PROPOSED 37 NORTH BEACON 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 3 31 NORTH BEACON STREET, ALLSTON AERIAL VIEW 3 WITH PROPOSED 37 NORTH BEACON 31 NORTH BEACON STREET, ALLSTON NORTH BEACON STREET VIEW 2 31 NORTH BEACON STREET, ALLSTON EVERETT STREET VIEW 31 NORTH BEACON STREET, ALLSTON EVERETT STREET ENTRANCE VIEW FIRST FLOOR PLAN BASEMENT FLOOR PLAN

31 NORTH BEACON STREET, ALLSTON FLOOR PLANS BUILDING SECTION 1 BUILDING SECTION 2

FIFTH FLOOR PLAN SECOND & THIRD FLOOR PLAN

31 NORTH BEACON STREET, ALLSTON FLOOR PLANS & BUILDING SECTIONS NORTH BEACON STREET ELEVATION

31 NORTH BEACON STREET, ALLSTON BUILDING ELEVATIONS EVERETT STREET ELEVATION

31 NORTH BEACON STREET, ALLSTON BUILDING ELEVATIONS EAST ELEVATION

NORTH ELEVATION

31 NORTH BEACON STREET, ALLSTON BUILDING ELEVATIONS

EXHIBIT D

31 North Beacon Street, Allston

Article 80 | ACCESSIBILTY CHECKLIST

Accessibility Checklist (to be added to the BRA Development Review Guidelines)

In 2009, a nine-member Advisory Board was appointed to the Commission for Persons with Disabilities in an effort to reduce architectural, procedural, attitudinal, and communication barriers affecting persons with disabilities in the City of Boston. These efforts were instituted to work toward creating universal access in the built environment.

In line with these priorities, the Accessibility Checklist aims to support the inclusion of people with disabilities. In order to complete the Checklist, you must provide specific detail, including descriptions, diagrams and data, of the universal access elements that will ensure all individuals have an equal experience that includes full participation in the built environment throughout the proposed buildings and open space.

In conformance with this directive, all development projects subject to Boston Zoning Article 80 Small and Large Project Review, including all Institutional Master Plan modifications and updates, are to complete the following checklist and provide any necessary responses regarding the following: • improvements for pedestrian and vehicular circulation and access; • encourage new buildings and public spaces to be designed to enhance and preserve Boston's system of parks, squares, walkways, and active shopping streets; • ensure that persons with disabilities have full access to buildings open to the public; • afford such persons the educational, employment, and recreational opportunities available to all citizens; and • preserve and increase the supply of living space accessible to persons with disabilities.

We would like to thank you in advance for your time and effort in advancing best practices and progressive approaches to expand accessibility throughout Boston's built environment.

Accessibility Analysis Information Sources: 1. Americans with Disabilities Act – 2010 ADA Standards for Accessible Design a. http://www.ada.gov/2010ADAstandards_index.htm 2. Massachusetts Architectural Access Board 521 CMR a. http://www.mass.gov/eopss/consumer-prot-and-bus-lic/license-type/aab/aab-rules- and-regulations-pdf.html 3. Boston Complete Street Guidelines a. http://bostoncompletestreets.org/ 4. City of Boston Mayors Commission for Persons with Disabilities Advisory Board a. http://www.cityofboston.gov/Disability 5. City of Boston – Public Works Sidewalk Reconstruction Policy a. http://www.cityofboston.gov/images_documents/sidewalk%20policy%200114_tcm3- 41668.pdf 6. Massachusetts Office On Disability Accessible Parking Requirements a. www.mass.gov/anf/docs/mod/hp-parking-regulations-mod.doc 7. MBTA Fixed Route Accessible Transit Stations a. http://www.mbta.com/about_the_mbta/accessibility/

Article 80 | ACCESSIBILTY CHECKLIST

Project Information

Project Name: 31 North Beacon Street

Project Address Primary: 31 North Beacon Street, Allston, MA

Project Address Additional:

Project Contact (name / Title / Cheryl Tougias/Principal/Spalding Tougias Architects, Inc. Company / email / phone): [email protected]/617-542-4522

Team Description

Owner / Developer: Thirty-One North Beacon Street, LLC

Architect: Spalding Tougias Architects, Inc.

Engineer (building systems): TBD

Sustainability / LEED: TBD

Permitting: TBD

Construction Management: TBD

Project Permitting and Phase

At what phase is the project – at time of this questionnaire?

PNF / Expanded Draft / Final Project Impact Report BRA Board PNF Submitted Submitted Approved

Article 80 BRA Small Project Under Construction Construction just Review completed: Small Project Review

Article 80 | ACCESSIBILTY CHECKLIST

Building Classification and Description

What are the principal Building Uses - select all appropriate uses?

Residential – One Residential - Institutional Education to Three Unit Multi-unit, Four +

Commercial Office 1st Floor Retail Assembly

Laboratory / Manufacturing / Mercantile Storage, Utility Medical Industrial and Other

First Floor Uses (List) Retail and Residential Amenity

What is the Construction Type – select most appropriate type?

Wood Frame Masonry Steel Frame Concrete

Describe the building?

Site Area: 9,895 SF Building Area: 31,500 SF

Building Height: 54.5 Ft. Number of Stories: 5 Flrs.

First Floor Elevation: 54.33 Elev. Are there below grade spaces: Yes / No

Assessment of Existing Infrastructure for Accessibility:

This section explores the proximity to accessible transit lines and proximate institutions such as, but not limited to hospitals, elderly and disabled housing, and general neighborhood information. The proponent should identify how the area surrounding the development is accessible for people with mobility impairments and should analyze the existing condition of the accessible routes through sidewalk and pedestrian ramp reports.

Provide a description of the The surrounding area is comprised of a mix of rooming houses, condominium development neighborhood and buildings, commercial and retail business along North Beacon Street and a mix of identifying characteristics. residential types along Everett Street.

List the surrounding ADA compliant The project site is a short ten minute walk to the proposed new MBTA commuter MBTA transit lines and the proximity rail station at Boston Landing on Everett Street, and a short walk to bus lines 57, to the development site: Commuter 64 and 66. rail, subway, bus, etc. Article 80 | ACCESSIBILTY CHECKLIST

List the surrounding institutions: St. Elizabeth’s Hospital, Jackson Mann School and Community Center and the hospitals, public housing and Horace Mann School for the Deaf. elderly and disabled housing developments, educational facilities, etc.

Is the proposed development on a No. Refer to above. priority accessible route to a key public use facility? List the surrounding: government buildings, libraries, community centers and recreational facilities and other related facilities.

Surrounding Site Conditions – Existing:

This section identifies the current condition of the sidewalks and pedestrian ramps around the development site.

Are there sidewalks and pedestrian Yes. The existing site has sidewalks along North Beacon and Everett Streets. The ramps existing at the development proposed project will provide a paved connection from Everett Street directly to the site? residential lobby and from North Beacon Street to the retail space.

If yes above, list the existing The existing sidewalks material is concrete with granite curbing in good condition sidewalk and pedestrian ramp with curb cuts and recessed tactile surfaces. materials and physical condition at the development site.

Are the sidewalks and pedestrian The compliance of existing surrounding sidewalks will be confirmed by the project ramps existing-to-remain? If yes, surveyor. have the sidewalks and pedestrian ramps been verified as compliant? If yes, please provide surveyors report.

Is the development site within a No, it is not. historic district? If yes, please identify.

Surrounding Site Conditions – Proposed

This section identifies the proposed condition of the walkways and pedestrian ramps in and around the development site. The width of the sidewalk contributes to the degree of comfort and enjoyment of walking along a street. Narrow sidewalks do not support lively pedestrian activity, and may create dangerous conditions that force people to walk in the street. Typically, a five foot wide Pedestrian Zone supports two people walking Article 80 | ACCESSIBILTY CHECKLIST

side by side or two wheelchairs passing each other. An eight foot wide Pedestrian Zone allows two pairs of people to comfortable pass each other, and a ten foot or wider Pedestrian Zone can support high volumes of pedestrians.

Are the proposed sidewalks The existing sidewalk on Everett Street is approximately 6 feet wide and the North consistent with the Boston Beacon Street one is approximately 10 feet wide with existing trees and tree Complete Street Guidelines? See: grates. The building is set back 10 feet from the sidewalk on both streets with www.bostoncompletestreets.org plantings and a minimum 12 feet wide connection from sidewalk to building entrances.

If yes above, choose which Street Neighborhood connector sidewalk guideline was applied. Type was applied: Downtown Commercial, Downtown Mixed-use, Neighborhood Main, Connector, Residential, Industrial, Shared Street, Parkway, Boulevard.

What is the total width of the The sidewalks are existing to remain, please see above. proposed sidewalk? List the widths of the proposed zones: Frontage, Pedestrian and Furnishing Zone.

List the proposed materials for The existing sidewalks are concrete with granite curbs. each Zone. Will the proposed materials be on private property or will the proposed materials be on the City of Boston pedestrian right- of-way?

If the pedestrian right-of-way is on NA private property, will the proponent seek a pedestrian easement with the City of Boston Public Improvement Commission?

Will sidewalk cafes or other If a café locates in the retail space, exterior furnishings will be located with the 10 furnishings be programmed for the foot setback zone. pedestrian right-of-way?

If yes above, what are the proposed dimensions of the sidewalk café or furnishings and what will the right- of-way clearance be?

Article 80 | ACCESSIBILTY CHECKLIST

Proposed Accessible Parking:

See Massachusetts Architectural Access Board Rules and Regulations 521 CMR Section 23.00 regarding accessible parking requirement counts and the Massachusetts Office of Disability Handicap Parking Regulations.

What is the total number of parking 22 parking spaces will be provided under the new construction. spaces provided at the development site parking lot or garage?

What is the total number of 2 accessible parking spaces are provided. accessible spaces provided at the development site?

Will any on street accessible No. parking spaces be required? If yes, has the proponent contacted the Commission for Persons with Disabilities and City of Boston Transportation Department regarding this need?

Where is accessible visitor parking The accessible parking spaces are adjacent to the accessible elevator. located?

Has a drop-off area been No. identified? If yes, will it be accessible?

Include a diagram of the accessible Refer to the attached accessible route diagram. routes to and from the accessible parking lot/garage and drop-off areas to the development entry locations. Please include route distances.

Article 80 | ACCESSIBILTY CHECKLIST

Circulation and Accessible Routes:

The primary objective in designing smooth and continuous paths of travel is to accommodate persons of all abilities that allow for universal access to entryways, common spaces and the visit-ability* of neighbors.

*Visit-ability – Neighbors ability to access and visit with neighbors without architectural barrier limitations

Provide a diagram of the accessible Refer to the attached accessible route diagram. route connections through the site.

Describe accessibility at each A flush condition is proposed at all entryways. entryway: Flush Condition, Stairs, Ramp Elevator.

Are the accessible entrance and the Yes. standard entrance integrated?

If no above, what is the reason?

Will there be a roof deck or outdoor There is an outdoor patio located on the first floor adjacent to the residential courtyard space? If yes, include amenity space. diagram of the accessible route.

Has an accessible routes way- Not yet. It is the intent that an accessibility wayfinding package will be developed finding and signage package been during the construction document phase of the project. developed? If yes, please describe.

Accessible Units: (If applicable)

In order to facilitate access to housing opportunities this section addresses the number of accessible units that are proposed for the development site that remove barriers to housing choice.

What is the total number of 20 apartment units. proposed units for the development?

How many units are for sale; how 20 apartments will be for rent. Three units will be affordable per the City’s many are for rent? What is the inclusionary zoning requirements. Market value vs. affordable TBD. market value vs. affordable breakdown?

How many accessible units are All of the units will be designed to meet the Fair Housing Act and the being proposed? Massachusetts Architectural Access Board Group 1 dwelling unit requirements. Article 80 | ACCESSIBILTY CHECKLIST

Please provide plan and diagram of the accessible units.

How many accessible units will also be affordable? If none, please describe reason.

Do standard units have None of the apartment units have architectural barriers that would prevent entry architectural barriers that would or use of a common space. prevent entry or use of common space for persons with mobility impairments? Example: stairs at entry or step to balcony. If yes, please provide reason.

Has the proponent reviewed or Not at this time. presented the proposed plan to the City of Boston Mayor’s Commission for Persons with Disabilities Advisory Board?

Did the Advisory Board vote to support this project? If no, what recommendations did the Advisory Board give to make this project more accessible?

Thank you for completing the Accessibility Checklist!

For questions or comments about this checklist or accessibility practices, please contact: [email protected] | Mayors Commission for Persons with Disabilities

BASEMENT FLOOR PLAN

FIRST FLOOR PLAN

TYPICAL RESIDENTIAL FLOOR PLAN

31 NORTH BEACON STREET, ALLSTON ACCESSIBLE ROUTE DIAGRAMS