M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- , .

APPLICATION FORM-1 (UPDATED) (AS PER EIA NOTIFICATION 2006 & REVISIONS THEREOF) (I) Basic Information Sl. No. Item Details Proposed Amendment in Existing Environmental Clearance obtained vide F. No.J-13012/73/2011- IA.II(T) on dated 05.12.2011 for addition of 1 x 350 1. Name of the project/s MW Coal Based Power plant in Phase-II to existing Power Plant.w.r.t increase of land from 1038.50 Acres to 1176.24 Acres. Details of additional land mentioned in Annexure – I& II 2. Sl. No. in the schedule 1 (d) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease Increase of land from 1038.50 Acres to 1176.24 Acres area/number of wells to be drilled Not Applicable: EC already granted for 1 x 350 MW 4. New/Expansion/Modernization unit. Now GKEL intend for Amendment of EC w.r.t. use of additional land (137.74 Acre) Total - 1400 MW Under Operation - 1050 (3x350) MW and Under 5. Existing capacity/area etc. Construction – 350 (1x350) MW 1038.50 acres will be amended to 1176.24 Acres.

Category of the project i.e. ‘A’ 6. A or ‘B’ Does it attract the general 7. No. condition? If yes, please specify. Does it attract the specific 8. No. condition? If yes, please specify. Latitude : 200 51’11.82” N 200 53’5.45” Location Longitude : 850 15’11.32” to 850 16’28.06” 9. Site Elevation : 70m AMSL Land schedule for additional land Attached as Plot/Survey/Khasra No. Annexure-III &Revised plant layout superimposed on Revenue Map attached as Annexure-IV

Visiontek Consultancy Services Private Limited

Page 1 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

Kamalanga, Mangalpur, Bhagabatpur and Village Senabatibarana Tehsil Odapada N District Dhenkanal State Odisha Nearest railway station/airport Budhapank rly station- 2 Kms 10. along with distance in kms. Airport – 120 Kms Nearest town, city, District Town/city – (25 Kms) 11. Headquarters along with District Headquarters –Dhenkanal (45 Kms) distance in Kms. Village Panchayats, Zilla Mangalpur gram panchayat, , via Parishad, Municipal Kadakhprasad, Orissa. 12. Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant Mr. Ramesh R. Pai Registered office- Skip House, 25 / 1, Museum Road, Bangalore – 560 025 14. Registered Address Corporate office- New Shakti Bhawan, Building No. 302 New Udaan Bhawan Complex, Opp. T3, IGI Airport, New Delhi 110037 DL IN Address for correspondence: Name Mr. Ramesh R Pai Designation Chief Operating Officer (Owner/Partner/CEO) GMR Kamalanga Energy limited, Address At/Po- Kamalanga, Via- Meramundali, 15. P.S.-Kantabania,Dist.- Dhenkanal, Odisha Pin Code 759121 E-mail [email protected] Telephone No. 06762 – 663605 06762 – 663637 Fax No.

Visiontek Consultancy Services Private Limited

Page 2 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

Details of Alternative Sites examined, if any. 16. Not Applicable Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil Whether separate application of 18. interlinked project has been Not Applicable submitted? 19. If yes, date of submission Not Applicable 20. If no, reason. Not Applicable Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. Forest Clearance for 32.092 Ha. obtained vide letter 21. (a) The forest (Conservation) Act, 1980? No. 5-ORC083/2008-FCE on dated 07.01.2011. (b) The wildlife (Protection) Act, 1972? Not Applicable (c) The C.R.Z. Notification, Not Applicable 1991? Whether there is any 22. Government Order/Policy No relevant/ relating to the site?

23. Forest land involved (hectares). 32.092 Ha.

Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? 24. (a) Name of the Court No (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. 25. Expected Project Cost Rs.1192.68 Crores.

Visiontek Consultancy Services Private Limited

Page 3 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions,which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/N Details thereof (with approximate quantities /rates, confirmation o wherever possible) with source of information data 1.1 Permanent or temporary No. Land Use of the Project Site: change in land use, land The land to be utilized for the project is of 1176.24 cover or topography acres (476.018 Ha.) is Industrial Land. including increase in intensity of land use (with respect to local land use Land use prior to acquisition by IDCO:- plan). Revenue Land: 139.63 Acre (56.507 Ha.) Forest land: 78.03 Acre (31.578 Ha.) Single Crop Agricultural Land: 83 Acre (33.589 Ha.) Waste Land: 875.58 Acre (354.342 Ha.) 1.2 Clearance of existing land, No Only minor vegetation clearance will be required for vegetation and buildings? additional land of 137.74 Acres only. 1.3 Creation of new land uses? Yes Greenbelt and afforestation improving the aesthetics value of land, whichis being developed in existing areas. Same will be developed in additional land also. 1.4 Pre-construction Yes Geotechnical investigation of soil is already done for investigations e.g. bore existing plant. holes, soil testing? 1.5 Construction works? Yes Construction work already started for erection of the plant & machinery during installation process, roads, storage sheds etc. 1.6 Demolition works? No No demolition work is envisaged. 1.7 Temporary sites used for Yes Temporary site for construction workers are already construction works or provided within the project site alongwith basic needs housing of construction such as water supply, housing, domestic fuel, workers? sanitation facilities etc. 1.8 Above ground buildings, Yes During construction site activities need cutting, filling structures orearthworks and grading to an extent of 2 to 3 meters and the including linear structures, graded. cut and fill or excavations 1.9 Underground works No Not Applicable including mining or tunneling?

Visiontek Consultancy Services Private Limited

Page 4 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable 1.13 Production and Yes Power generation through coal combustion and steam manufacturing processes? generation – Conventional Pulverized Coal Subcritical technology. 1.14 Facilities for storage of Yes Common Storage facilities for Phase-I (3x350) & goods or materials? Phase-II (1x350) such as Coal stack yard, startup fuel, water treatment chemicals etc. are already developed. 1.15 Facilities for treatment or Common facilities like silo for collection of dry Fly disposal of solid waste or ash & Ash pond is already constructed. liquid effluents? Yes Ash generated from 1 x 350 units will be collected in silos and most of it will be utilized / marketed in dry form. The balance will be disposed to the ash pond in slurry form.

Common facility like ETP/STP has already been constructed. 1.16 Facilities for long term Yes Township is already developed. housing of operational workers? 1.17 New road, rail or sea Yes Approach road will be provided. traffic during construction or operation? 1.18 New road, rail, air No. Not applicable. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No. Not applicable. existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No. Dedicated common transmission line is already transmission lines or constructed for Phase-I & Phase-II. pipelines?

Visiontek Consultancy Services Private Limited

Page 5 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

1.21 Impoundment,damming, No Not applicable. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? Yes A Nalla is passing through the project site which is not disturbed 1.23 Abstraction or transfers of Yes The project water requirement will be met from water form ground or Brahmani river (surface water). surface waters? 1.24 Changes in water bodies or No Not applicable. the land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes Through existing facility. materials for construction, operation or decommissioning? 1.26 Long-term dismantling or No Not applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area Yes Workers are being employed from the local area on in either temporarily or priority. permanently? 1.29 Introduction of alien No Not applicable. species? 1.30 Loss of native species or No Not applicable. genetic diversity? 1.31 Any other actions? No Not applicable.

Visiontek Consultancy Services Private Limited

Page 6 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sl.No. Information/checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 2.1 Land especially Yes Land Use of the Project Site: undeveloped or agricultural The land to be utilized for the project (3 x 350 MW + land (ha) 1 x 350 MW) is of 1176.24 acres (476.018 Ha.) is Industrial Land. Land use prior to acquisition by IDCO/GKEL:- Revenue Land: 139.63 Acre (56.507 Ha.) Forest land: 78.03 Acre (31.578 Ha.) Single Crop Agricultural Land: 83 Acre (33.589 Ha.) Waste Land: 875.58 Acre (354.342 Ha.) 2.2 Water (expected source & Yes 32000 KLD water is required for the project (1 x 350 competing users) unit: MW), It will be drawn from Brahmani river through KLD an existing intake point at approx. 1.5 km distance. 2.3 Minerals (MT) Yes Coal as fuel during normal operation phase. The estimated total annual coal requirement for 1 x 350 MW would be 1.934 million tons which will be transported from mines on the existing railway track up to Budhapank Railway Station and further through dedicated MGR system. 2.4 Construction material – Yes Civil construction materials like stone, cement, stone, aggregates, sand / concrete, sand, iron rods etc. are being procured soil (expected source –MT) from local area. 2.5 Forests and timber (source No Not Applicable – MT) 2.6 Energy including Yes Electricity requirement for the activities shall be met electricity & fuels (source, from in house existing generation unit. Coal will be competing users) Unit: fuel met from CIL as well as imported coal. Other fuel (MT), energy (MW) like HFO/LDO will be procures from open market. The estimated quantum of energy require during operation period (1x350MW) are as follow:-  Electricity:25.165MW  Coal : 5310 TPD  HFO/LDO: 15KLD 2.7 Any other natural No Not Applicable. resources (use appropriate standard units)

Visiontek Consultancy Services Private Limited

Page 7 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl.N Information/Checklist Yes/N Details thereof (with approximate o. confirmation o quantities/rates, wherever possible) with source of information data 3.1 Use of substances or Yes Will be taken care with necessary precautionary materials, which are measures. hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No Not Applicable. disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people Yes GKEL is doing welfare under different CSR e.g. by changing living programme like health, education and lively conditions? hood. 3.4 Vulnerable groups of people No Not Applicable. who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No Not envisaged

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.N Information/Checklist Yes/ Details thereof (with approximate o. confirmation No quantities/rates, wherever possible) with source of information data 4.1 Soil, overburden or mine No Not envisaged wastes 4.2 Municipal waste (domestic Yes 0.06 TPD Sludge from STP shall be used for and or commercialwastes) plantation as manure. 4.3 Hazardous wastes (as per Yes During Construction Phase Hazardous Recyclable WasteManagement Rules)  Used batteries  Waste metal from welding and cutting During Operation Phase Recyclable

Visiontek Consultancy Services Private Limited

Page 8 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

 Used Batteries  Containers of hazardous materials (viz. oil drums, chemical drums)  8-10 kg/day Sludge from ETP Shall be disposed off as per hazardous waste management and handling rules. 4.4 Other industrial process Yes Fly Ash: 1865.11 TPD, Bottom Ash 466.28 TPD wastes will be generated during operation of 1 x 350 MW. Common Ash Silos and Ash pond provided. Further fly ash will be utilised as per the Fly Ash Notifications. 4.5 Surplus product No No surplus product is envisaged. 4.6 Sewage sludge or other Yes 0.06 TPD Sludge from STP shall be used for sludge from effluent plantation as manure. treatment 4.7 Construction or demolition Yes Negligiblequantity of top soil will be excavated wastes for construction, which shall be utilized for greenbelt development. Waste steel – shall be sold to recyclers. Waste cement plaster & waste cement concrete – shall be used for making base layer for roads within premises. 4.8 Redundant machinery or No - equipment 4.9 Contaminated soils or other No Proper precautionary measures during materials construction would ensure no such contamination. 4.10 Agricultural wastes No Not Applicable.

4.11 Other solid wastes No Not Applicable.

Visiontek Consultancy Services Private Limited

Page 9 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion Yes Particulate / gaseous emissions will be limited of fossil fuels from to the regulatory norms through appropriate stationary or mobile sources control equipment. Similar measures would be adopted to contain emissions through mobile sources. 5.2 Emissions from production Yes Particulate / gaseous emissions will be limited processes to the regulatory norms through appropriate control equipment. 5.3 Emissions from materials Yes Dust extraction / suppression systems would be handling including storage in place to contain dust emissions from Coal or transport. Stock Yard. 5.4 Emissions from construction Yes From all combined sources in plant, the ambient activities including plant and air quality (24 hrs.) will be as follows: equipment 3  PM10< 100 µg/m 3  PM2.5< 60 µg/m 3  SO2< 80 µg/m  NOx < 80 µg/m3 5.5 Dust or odours from No Fugitive dust emission from material (coal) handling of materials handling and vehicular movement in coal stack including construction yard will be controlled through appropriate materials, sewage and waste. measures. No odour is envisaged as the sewage will be treated in STP. 5.6 Emissions from incineration No No Incinerationofwaste isinvolved of waste 5.7 Emissions from burning of No Not Applicable waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

Visiontek Consultancy Services Private Limited

Page 10 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. confirmation rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes The noise levels at the receptor will be e.g. engines, ventilation plant, restricted to the desired regulatory norms. crushers This will further be taken care through appropriate design of Greenbelt. Appropriate Noise protections will be used. Proper insulation is provided to heating equipment. 6.2 From industrial or similar Yes Please refer item 6.1 processes 6.3 From construction or No This will be temporary and workers will be demolition provided with Personal Protective equipment. 6.4 From blasting or piling No There is no blasting or piling activity related to the erection & commissioning of Plant. 6.5 From construction or Yes Safety measures are being ensured through operational traffic contractual clauses with the respective contractors with due supervision of safety Incharge of plant 6.6 From lighting or cooling Yes Noise generated from CT shall be within the systems Industrial Norms 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sl.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use No Safe storage facilities are provided for or spillage of hazardous elimination of any contamination. materials 7.2 From discharge of sewage or No Plant is designed for ‘Zero Discharge’ other effluents to water or the land (expected mode and place of discharge)

Visiontek Consultancy Services Private Limited

Page 11 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

7.3 By deposition of pollutants Yes Pollutant will be limited to the stipulated emitted to air into the land or standards as per National Ambient Air Quality Standards dated 16th Nov 2009 into water 7.4 From any other sources No Not applicable. 7.5 Is there a risk of long term No Not Applicable. build-up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Sl.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, No Risk assessment and appropriate safety fires etc. from storage, measures will be taken as per different safety handling, use or production Standards, in congruence with Inspector of of hazardous substances Factory & Boilers Guidelines. 8.2 From any other causes No Not Applicable

8.3 Could the project be affected No Natural disasters of this kind are not envisaged by natural disasters causing in the identified location. environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc.)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Sl. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of The minimal ancillary development around the supporting facilities, ancillary project would be directed properly to ensure No development or least impact. developmentstimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste

Visiontek Consultancy Services Private Limited

Page 12 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment

9.3 Set a precedent for later No Shall be developed. developments

9.4 Have cumulative effects due No Super Thermal Power Project of NTPC to proximity to other existing is 30 kms away from the project. or planned projects with similar effects.

(III) Environmental Sensitivity The 15km radius topographical location map is enclosed asAnnexure-V. Sl. Areas Name/Identity Aerial distance (within 15km.) No. Proposed project location boundary 1 Areas protected under Not applicable Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Reserve Forest sensitive for ecological reasons  Barbanka South R.F  6.5 Km E – Wetlands, watercourses or  Khapal R.F  7.5 Km ESE other water bodies, coastal Protected Forest zone, biospheres, mountains,  Ghanthigarhia P.F  5.4 Km SSW forests Water Bodies  Brahmani River  1.5 Km SE  Lingra Nadi  7.8 Km S  Nandira Jhor  1.3 Km N  Kisinda Jhor  4 Km S  Ria Jhor  8 Km ESE  Baulimani Jhor  4.0 Km SE  Ghodadian Jhor  2.4 Km NE  Mundamal Jhor  9.0 Km NE

Visiontek Consultancy Services Private Limited

Page 13 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

Sl. Areas Name/Identity Aerial distance (within 15km.) No. Proposed project location boundary 3 Areas used by protected, None Not applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or None Not applicable underground waters 5 State, National boundaries None Notapplicable 6 Routes or facilities used by the *NH-55 2.5 Km public for access to recreation or *NH-149 4.2 Km other tourist, pilgrim areas 7 Defense installations None Notapplicable 8 Densely populated or built-up Yes Talcher-8 Km NW area 9 Areas occupied by sensitive man-  High School, College,  8.0 Km SSE made land uses (hospitals, Hospital at Motang schools, places of workshop,  High School, College,  4.0 SSE community facilities) Hospital at Kurunti  PrimarySchool,M.E.  5.3 Km N School, College, Dispensary at Saranga  High School, College,  8.0 Km NW Hospital at Talcher  High School at  3.0 Km SSE Kushapanga  Parjang High School  7.3 Km NNE  Primery School,High  6.2 Km SE School, Hospital at Kharag Prasad 10 Areas containing important, high None Not applicable quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to None Notapplicable pollution or environmental damage (those where existing legal environmental standards are exceeded)

Visiontek Consultancy Services Private Limited

Page 14

M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

Annexure-I Proposed Amendment Particulars Land Additional Land Total Land Requirement Requirement as Requirement Sl. as mentioned per Proposed (in Acre) No. in Pervious EC Amendment (in Acre) (in Acre) Steam Turbine Generator and 37.00 -- 37.00 1 Accessories, TG Building 2 Switch Yard 10.00 -- 10.00 Cooling Towers & CW Pump 24.00 -- 24.00 3 house River Water pump house and 06.00 -- 06.00 4 pipeline Water treatment plant & 18.00 -- 18.00 5 accessories 6 Ash Disposal Area 393.00 -- 393.00 7 Coal handling Plant 137.00 -- 137.00 8 Fuel Handling Plant 04.00 -- 04.00 9 Fire Fighting System 01.00 -- 01.00 10 Ash handling & Silos 05.00 -- 05.00 Miscellaneous Non plant 08.00 -- 08.00 11 Building 12 Reservoir & Pump House 51.00 -- 51.00 13 Greenbelt 320.00 -- 320.00 14 Others 24.50 -- 24.50 Direct Approach Road at outside -- 31.02 31.02 15 plant boundary (DAR) Merry Go Round Railway Line at -- 30.79 30.79 16 outside plant boundary (MGR) Realignment of PGCIL -- 17.67 17.67 17 Transmission Line at Inside Plant Boundary Left-Out Plots at inside Plant -- 31.19 31.19 18 Boundary Periphery Development at -- 7.33 7.33 19 Outside of plant boundary Permissive Possession of Govt. -- 19.74 19.74 20 Land at inside of Plant Boundary Sub Total 1038.50 137.74 1176.24 Note:-No additional land provision is given for green belt development in the above land use pattern, since GKEL is adding only liner infrastructure viz. Direct Approach Road & MGR systems. However plantation will be carried out along both sides of Direct Approach Road.

Visiontek Consultancy Services Private Limited

Page 16 M/s. GMR KAMALANGA ENERGY LIMITED Updated Form-1 for Proposed Amendment in Environmental Clearance obtained vide F. No.J- 13012/73/2011-IA.II(T) on dated 05.12.2011 for addition of 1 x 350 MW Coal Based Power plant in Phase-II to existing Power Plant located at- Village- Kamalanga, Dist.- Dhenkanal, Odisha.

Annexure-II

Justification of Additional Land Requirement

S. Additional Project Area in Remarks/Justification No. Requirement Acres Direct Approach Road 31.02 This road is connecting NH-55 to the project. As Hon’ble Odisha High court order is not to use the 1 present village road connecting from Kantabania to project during day time for vehicle movement. MGR Railway Line 30.79 Required for coal transportation from Budhapank 2 railway station to project.

Realignment of PGCIL 17.67 The Existing PGCIL transmission line is passing Transmission line across the project land. This is to be shifted to 3 periphery of the project within the boundary. The land below the tower line is acquired. Left out plot 31.19 While taking possession of the land-subsequent to acquisition of land, it came to notice that small parcel of land were not acquired as same was not 4 reflected in the Revenue MAP. These left plots were acquired to complete the acquisition of entire portion of land. 5 Periphery development 7.33 For periphery development Permissive Possession of 19.74 This is a part of government land - 139.63 Acres, govt. land which has given to the project as permissive possession subject to the condition that this is not 6 leasable as the land is classified as Adi, Jalasaya, Mahara, Pani within the plant boundary, however we have not used this land for any construction. Total 137.74

Visiontek Consultancy Services Private Limited

Page 17