Southeast Region Projects

2021 – 2024 Statewide Transportation Improvement Program 2021-2024 FINAL STIP Project Listing 101 Southeast Region KENOSHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 3732-09-71 03/08/2022 206 LET RECSTE 1.271 CTH K CTH K $7,000,000 - $7,999,999 UPRR TO 94TH CT CONST/RECONSTRUCT NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2023 3751-03-70 01/10/2023 206 LET RCND20 1.532 CTH W CTH W $2,000,000 - $2,999,999 ILL STATE LINE TO CTH C EAST CONST/RECONDITION STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 3745-00-70 11/09/2021 205 LET BRRPL 0.003 CTH WG CTH WG $500,000 - $749,999 OVER DUTCH GAP CANAL P300900 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 3762-03-70 04/12/2022 206 LET MISC 0.021 CTH Y CTH Y $1,000,000 - $1,999,999 INTERSECTION WITH CTH A CONST/ROUND ABOUT SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 1030-08-78 04/13/2021 303 LET BRRHB 7.933 IH 041 IH 41 NORTH SOUTH FREEWAY $2,000,000 - $2,999,999 DES PLAINES RIVER TO CTH KR CONST/BR REHAB SEG 1 PROJ B6H BACKBONE NATIONAL HIGHWAY PERF FAST 2023 3831-07-72 02/14/2023 206 LET MISC 0.005 LOC STR WASHINGTON ROAD $1,000,000 - $1,999,999 INTERSECTION WITH 39TH AVE CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2024 3831-07-71 11/12/2024 206 LET MISC 0.006 LOC STR WASHINGTON ROAD $2,000,000 - $2,999,999 INTERSECTION WITH 30TH AVE CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 102 Southeast Region KENOSHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 1032-10-75 02/08/2022 303 LET RSRF20 0.000 OFF SYS NORTH SOUTH FREEWAY, CTH ML-STH 50 $5,000,000 - $5,999,999 EAST FRONTAGE ROAD CONST / RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 3330-07-70 09/12/2023 303 LET PSRS20 2.570 STH 031 GREEN BAY RD - CITY OF KENOSHA $4,000,000 - $4,999,999 STH 50 TO CTH S CONST/PATCH, REPAIR, DIAMOND GRIND STATE 3R NATIONAL HIGHWAY PERF FAST 2023 3340-09-70 09/12/2023 303 LET RCND10 0.020 STH 031 GREEN BAY ROAD, CITY OF KENOSHA $100,000 - $249,999 78TH STREET INTERSECTION CONST/TURNING LANE STATE 3R NON-FEDERAL 2021 3240-11-70 09/14/2021 303 LET RCND10 0.030 STH 032 SHERIDAN RD, VIL PLEASANT PRAIRIE $1,000,000 - $1,999,999 STH 165 INTERSECTION CONST/RECONDITIONING STATE 3R NATIONAL HIGHWAY PERF FAST 2021 3240-16-20 07/25/2021 303 R/E RSRF30 3.257 STH 032 SHERIDAN RD - VIL PLEASANT PRAIRIE $0 - $99,999 ILLINOIS STATE LINE TO 91ST ST RE/RESURFACE STATE 3R NON-FEDERAL 2024 3240-16-70 03/12/2024 303 LET RSRF30 3.257 STH 032 SHERIDAN RD - VIL PLEASANT PRAIRIE $3,000,000 - $3,999,999 ILLINOIS STATE LINE TO 91ST ST CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 1310-10-40 06/25/2021 302 UTL RECSTE 4.750 STH 050 75TH ST, C KENOSHA/V PLEASNT PRAIRE $2,000,000 - $2,999,999 IH 94 TO 43RD AVE UTIL/LEVEL OF EFFORT FY2021 MAJORS NON-FEDERAL 2021-2024 FINAL STIP Project Listing 103 Southeast Region KENOSHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1310-10-41 06/25/2021 302 UTL RECSTE 4.750 STH 050 75TH ST, C KENOSHA/V PLEASNT PRAIRE $250,000 - $499,999 IH 94 TO 43RD AVE UTIL/LEVEL OF EFFORT FY 21 MAJORS NON-FEDERAL 2021 1310-10-90 02/25/2021 302 MIS MISC 4.740 STH 050 75TH ST, TRAFFIC MITIGATION $0 - $99,999 IH 94 TO 43RD AVE CONST/TRAFFIC MITIGATION MAJORS NON-FEDERAL 2021 1310-10-91 02/25/2021 302 MIS MISC 4.740 STH 050 75TH ST, SIGNAL RETIMING $0 - $99,999 IH 94 TO 43RD AVE CONST/SIGNAL RETIMING MAJORS NON-FEDERAL 2021 1310-14-20 04/25/2021 303 R/E MISC 0.130 STH 050 GENEVA RD, TOWN OF WHEATLAND $0 - $99,999 S CTH W TO 1750 FEET EAST RE/MITIGATE FOX RIVER FLOODING STATE 3R NON-FEDERAL 2022 1310-04-70 08/09/2022 303 LET RECST 1.190 STH 050 75TH ST, VILLAGE OF PADDOCK LAKE $11,000,000 - $11,999,999 256TH AVE TO 236TH AVE CONST /RECONSTRUCT STATE 3R NATIONAL HIGHWAY PERF FAST 2024 1310-14-70 09/10/2024 303 LET RECST 0.130 STH 050 GENEVA RD, TOWN OF WHEATLAND $3,000,000 - $3,999,999 S CTH W TO 1750 FEET EAST CONST/MITIGATE FOX RIVER FLOODING STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2420-00-20 11/25/2021 303 R/E RSRF30 12.080 STH 075 S BEAUMONT AVE - TOWN OF DOVER $0 - $99,999 STH 50 - STH 20 RE/RESURFACE STATE 3R NON-FEDERAL 2021-2024 FINAL STIP Project Listing 104 Southeast Region KENOSHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2024 2420-00-70 09/10/2024 303 LET RSRF30 12.080 STH 075 S BEAUMONT AVE - TOWN OF DOVER $10,000,000 - $10,999,999 STH 50 - STH 20 CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 3380-06-20 11/25/2021 303 R/E RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH-BURLINGTON $0 - $99,999 IL STATE LINE TO STH 50 RE/RESURFACE STATE 3R NON-FEDERAL 2024 3380-06-70 09/10/2024 303 LET RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH - BURLINGTON $5,000,000 - $5,999,999 IL STATE LINE TO STH 50 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2022 3834-06-70 02/08/2022 303 LET RSRF10 12.020 STH 142 BURLINGTON ROAD $4,000,000 - $4,999,999 RACINE CO LINE - IH94 W FRONTAGE RD CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2022 3220-09-70 09/13/2022 303 LET BRRPL 0.000 STH 158 52ND STREET, CITY OF KENOSHA $8,000,000 - $8,999,999 RAILROAD BRIDGES B-30-0002, 0003 CONST/BRIDGE REPLACEMENT STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 105 Southeast Region

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2050-04-20 02/25/2021 206 R/E RECST 0.480 CTH BB WEST RAWSON AVENUE $100,000 - $249,999 S 27TH STREET TO S 20TH STREET RE/RECONSTRUCT W/ NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 2050-08-01 07/25/2021 206 M/E RECST 1.003 CTH BB W RAWSON AVENUE $750,000 - $999,999 S 13TH STREET TO S HOWELL AVENUE PE-RIGHT OF WAY-FULL PS&E-RECST STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2050-04-70 03/08/2022 206 LET RECST 0.480 CTH BB WEST RAWSON AVENUE $3,000,000 - $3,999,999 S 27TH STREET TO S 20TH STREET CONST/RECONSTRUCT W/ NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2023 2050-08-21 05/25/2023 206 R/E RECST 1.003 CTH BB W RAWSON AVENUE $250,000 - $499,999 S 13TH STREET TO S HOWELL AVENUE RE/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2545-13-70 04/12/2022 205 LET BRRHB 0.000 CTH E W HAMPTON AVENUE $750,000 - $999,999 BRIDGE OVER MILWAUKEE RIVER CONST/BRIDGE DECK OVERLAY P-40-0750 LOCAL BRIDGES NON-FEDERAL 2022 2130-15-70 02/08/2022 205 LET BRRPL 0.000 CTH PP CTH PP (GOOD HOPE ROAD) $1,000,000 - $1,999,999 BRIDGE OVER MILWAUKEE RIVER CONST/BRIDGE REPLACEMENT B-40-0370 LOCAL BRIDGES NON-FEDERAL 2023 2984-07-76 04/11/2023 206 LET MISC 0.039 CTH PP 5 INTERSECTIONS ON GOOD HOPE ROAD $500,000 - $749,999 99TH ST TO 60TH ST CONST/INTERSECTION MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 106 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2160-17-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (NB) $1,000,000 - $1,999,999 BRIDGE OVER STH 36 B-40-0573 CONST/DECK OVERLAY LOCAL BRIDGES NON-FEDERAL 2022 2160-18-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (SB) $1,000,000 - $1,999,999 BRIDGE OVER STH 36 B-40-574 CONST/BRIDGE REHAB LOCAL BRIDGES NON-FEDERAL 2022 2505-03-21 07/25/2022 206 R/E RECST 1.008 CTH V SOUTH 13TH STREET $250,000 - $499,999 W PUETZ ROAD TO W DREXEL AVENUE RE/RECONSTRUCT W/ NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2023 2505-03-71 12/12/2023 206 LET RECST 1.009 CTH V SOUTH 13TH STREET $4,000,000 - $4,999,999 W PUETZ ROAD TO W DREXEL AVENUE CONST/RECONSTRUCT NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 1030-43-20 03/25/2021 303 R/E MISC 0.000 IH 041 IH 41 MITCHELL I/C $0 - $99,999 WB I43/I94 35TH-RAWSON-HOWARD RE/RESURE BACKBONE NON-FEDERAL 2021 1030-43-21 03/25/2021 303 R/E RSRF20 6.554 IH 041 IH 41 MITCHELL I/C $0 - $99,999 EB I43/I94 35TH-RAWSON-HOWARD RE/RESURFACE BACKBONE NON-FEDERAL 2021 1100-01-90 02/25/2021 303 MIS MISC 0.000 IH 041 IH 41 ZOO FREEWAY $250,000 - $499,999 BURLEIGH ST TO GOOD HOPE ROAD TRAFFIC MITIGATION 1100-01-77 BACKBONE NON-FEDERAL 2021-2024 FINAL STIP Project Listing 107 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1100-46-21 06/25/2021 303 R/E MISC 0.002 IH 041 IH 41 AIRPORT FREEWAY $0 - $99,999 STH 36 (LOOMIS RD) BRIDGE RE/BRIDGE REPLACEMENT, PRESERV BACKBONE NON-FEDERAL 2021 1100-46-22 06/25/2021 303 R/E MISC 0.638 IH 041 IH 41 AIRPORT FREEWAY $0 - $99,999 STH 36 (LOOMIS RD) BRIDGE RE/BRIDGE REPLACEMENT, PRESERV BACKBONE NON-FEDERAL 2022 1030-07-77 04/12/2022 303 LET BRRHB 2.253 IH 041 IH 41 NORTH SOUTH FREEWAY $500,000 - $749,999 MILWAUKEE CO LINE TO STH 100 CONST/BRIDGE REHAB BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1030-07-78 04/12/2022 303 LET BRRHB 8.046 IH 041 IH 41 NORTH SOUTH FREEWAY $250,000 - $499,999 STH 100 (RYAN RD) BRIDGES CONST/BRIDGE REHAB BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1100-17-76 04/12/2022 303 LET PSRS30 1.116 IH 041 MILWAUKEE - FOND DU LAC $5,000,000 - $5,999,999 GOOD HOPE RD TO WAUKESHA CO LN CONST/DIAMOND GRIND BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1100-20-72 01/11/2022 303 LET MISC 0.000 IH 041 ZOO FREEWAY $3,000,000 - $3,999,999 COLD SPRING RD TO HOWARD AVE CONST/NOISE WALLS BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1100-46-70 09/13/2022 303 LET BRRPL 0.118 IH 041 IH 41 AIRPORT FREEWAY $5,000,000 - $5,999,999 60TH STREET BRIDGE CONST/BRIDGE REPLACEMENT BACKBONE NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 108 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 1100-46-90 09/25/2022 303 MIS MISC 0.118 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999 60TH STREET BRIDGE TRAFFIC MITIGATION 1100-46-70 BACKBONE NON-FEDERAL 2023 1100-20-70 09/12/2023 303 LET RCND20 1.012 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999 BURLEIGH ST TO CAPITOL DR CONST/RESURFACE/PHASE I BACKBONE NATIONAL HIGHWAY PERF FAST 2023 1100-20-92 09/25/2023 303 MIS MISC 1.756 IH 041 IH 41 ZOO FREEWAY $250,000 - $499,999 BURLEIGH ST TO CAPITOL DR TRAFFIC MITIGATION 1100-20-70 BACKBONE NON-FEDERAL 2023 1100-45-70 02/14/2023 303 LET RSRF30 3.060 IH 041 IH 41 AIRPORT FREEWAY $35,000,000 - $39,999,999 84TH ST TO 35TH ST (MAINLINE) CONST/RSRF/BRIDGE REHAB/NOISE BARR BACKBONE NATIONAL HIGHWAY PERF FAST 2023 1100-45-71 02/14/2023 303 LET MISC 3.060 IH 041 IH 41 AIRPORT FREEWAY $9,000,000 - $9,999,999 84TH ST TO 35TH ST CONST/NOISE WALLS BACKBONE NATIONAL HIGHWAY PERF FAST 2023 1100-45-90 03/25/2023 303 MIS MISC 3.080 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999 84TH ST TO 35TH ST (MAINLINE) TRAFFIC MITIGATION 1100-45-70 BACKBONE NON-FEDERAL 2024 1100-20-71 09/10/2024 303 LET RSRF30 1.910 IH 041 IH 41 ZOO FREEWAY $20,000,000 - $24,999,999 CAPITOL DR TO SILVER SPRING DR CONST/RESURFACE/PHASE II BACKBONE NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 109 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2024 1100-20-91 09/25/2024 303 MIS MISC 5.060 IH 041 IH 41 ZOO FREEWAY $750,000 - $999,999 CAPITOL DR TO SILVER SPRING DR TRAFFIC MITIGATION 1100-20-71 BACKBONE NON-FEDERAL 1100-45-01 303 I/E MISC 3.060 IH 043 IH 894 AIRPORT FREEWAY $750,000 - $999,999 84TH ST TO 35TH ST PE-FULL PS&E-NEW NOISE WALLS BACKBONE NATIONAL HIGHWAY PERF FAST 2021 1228-22-40 06/25/2021 303 UTL MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $0 - $99,999 CAPITOL DR-2100 FT N OF HAMPTON AVE UTIL/WIS ELECTRIC POWER BACKBONE NON-FEDERAL 2021 1228-22-41 06/25/2021 303 UTL MISC 1.080 IH 043 NORTH SOUTH FREEWAY $0 - $99,999 CAPITOL DR-2100 FT N OF HAMPTON AVE UTIL/CITY OF GLENDALE SEWER BACKBONE NON-FEDERAL 2021 1228-22-42 06/25/2021 303 UTL MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $0 - $99,999 CAPITOL DR-2100 FT N OF HAMPTON AVE UTIL/AMERICAN TRANSMISSION CO BACKBONE NON-FEDERAL 2021 1228-22-43 06/25/2021 303 UTL MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $0 - $99,999 CAPITOL DR-2100 FT N OF HAMPTON AVE UTIL/WISCONSIN BELL/DBA AT&T BACKBONE NON-FEDERAL 2021 1228-22-44 06/25/2021 303 UTL MISC 1.080 IH 043 NORTH SOUTH FREEWAY $0 - $99,999 CAPITOL DR-2100 FT N OF HAMPTON AVE UTIL/CITY OF GLENDALE WATER BACKBONE NON-FEDERAL 2021-2024 FINAL STIP Project Listing 110 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1228-22-71 03/09/2021 303 LET BRRPL 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $70,000,000 - $79,999,999 CAPITOL DR-2100 FT N OF HAMPTON AVE CONST / BRIDGE REPLACEMENT BACKBONE NATIONAL HIGHWAY PERF FAST 2021 1228-22-91 03/25/2021 303 MIS MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999 CAPITOL DRIVE TO HAMPTON AVENUE CONST/TRAFFIC MITIGATION 1228-22-71 BACKBONE NON-FEDERAL 2022 1228-09-73 02/08/2022 303 LET RSRF30 4.174 IH 043 IH 43 NORTH SOUTH FREEWAY $25,000,000 - $29,999,999 MITCHELL I/C TO MARQUETTE I/C CONST/RESURFACE/BRIDGE MAINTENANCE BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1228-22-03 03/25/2022 303 C/E BRRHB 0.780 IH 043 IH 43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999 KEEFE AVENUE TO CAPITOL AVENUE PE-FULL PS&E-BRIDGE REHAB BACKBONE NATIONAL HIGHWAY PERF FAST 2022 1229-04-72 10/11/2022 302 LET RECSTE 0.000 IH 043 I-43 NORTH SOUTH FREEWAY $14,000,000 - $14,999,999 UNION PACIFIC RR BRIDGE B-40-921 CONST/PHASE 3 RECST W/ EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2022 1229-04-73 10/11/2022 302 LET RECSTE 3.286 IH 043 I-43 NORTH SOUTH FREEWAY $100 MILLION OR GREATER BENDER ROAD TO BROWN DEER ROAD CONST/RECONSTRUCTION W/ EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 111 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2023 1090-32-20 03/25/2023 303 R/E BRRPL 0.000 IH 043 IH 43 AIRPORT FREEWAY $100,000 - $249,999 HALE I/C TO 92ND STREET BRIDGE RE/BRIDGE REPLACEMENT BACKBONE NON-FEDERAL 2023 1228-22-70 12/12/2023 303 LET RSRF30 2.350 IH 043 IH 43 NORTH SOUTH FREEWAY $45,000,000 - $49,999,999 BROWN STREET TO CAPITOL DRIVE CONST / RESURFACE BACKBONE NATIONAL HIGHWAY PERF FAST 2023 1228-22-90 12/25/2023 303 MIS MISC 5.270 IH 043 IH 43 NORTH SOUTH FREEWAY $250,000 - $499,999 BROWN STREET TO CAPITOL DRIVE MIS/TRAFFIC MITIGATION 1228-22-70 BACKBONE NON-FEDERAL 1100-17-01 303 I/E RSRF30 4.890 IH 094 IH 94 EAST WEST FREEWAY $1,000,000 - $1,999,999 ZOO I/C TO MARQUETTE I/C PE-FULL PS&E-RSRF30 BACKBONE NATIONAL HIGHWAY PERF FAST 2021 1060-27-07 03/25/2021 301EW C/E MISC 0.979 IH 094 IH 94 EAST WEST $2,000,000 - $2,999,999 WEST LEG DESIGN-PRELIMINARY DESIGN TO 60% SE FREEWAY - EAST WEST NATIONAL HIGHWAY PERF FAST 1300-03-06 303 I/E BRRHB 0.000 IH 794 IH 794 LAKE FREEWAY $1,000,000 - $1,999,999 WATER STREET TO CHICAGO STREET PE-FULL PS&E-BRIDGE REHABILITATION BACKBONE NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 112 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1229-04-71 12/14/2021 302 LET RECSTE 0.599 LOC N PORT WASHINGTON RD $12,000,000 - $12,999,999 STR BENDER RD TO W DAPHNE RD CONST/PHASE 2 RECST W/ EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2021 2030-15-70 05/11/2021 205 LET BRRHB 0.000 LOC N LOVERS LANE ROAD $1,000,000 - $1,999,999 STR BRIDGE OVER UP RR B-40-0435 CONST/DECK OVERLAY LOCAL BRIDGES NON-FEDERAL 2021 2090-16-00 05/25/2021 206 M/E MISC 0.050 LOC W SILVER SPRING DRIVE $100,000 - $249,999 STR 6 LOCAL INTERSECTIONS PE/HSIP TRAFFIC SIGNAL/FLASHERS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2110-00-73 04/13/2021 206 LET MISC 0.032 LOC W LINCOLN AVENUE $1,000,000 - $1,999,999 STR INTERSECT W/84TH,76TH & 71ST STR CONST/HSIP INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2135-04-01 03/25/2021 206 C/E RECST 0.860 LOC W NORTH AVENUE $1,000,000 - $1,999,999 STR MAYFAIR ROAD TO N 95TH STREET PE-FULL PS&E-RECST STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 2155-05-00 01/25/2021 206 M/E MISC 0.103 LOC N SHERMAN BLVD $250,000 - $499,999 STR 7 LOCAL STREET INTERSECTIONS PE-FULL PSE W/LFA-SIGNAL UPDATE 2021-2024 FINAL STIP Project Listing 113 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2155-05-01 01/25/2021 206 M/E MISC 0.075 LOC N SHERMAN BLVD $250,000 - $499,999 STR 6 LOCAL STREET INTERSECTIONS PE-FULL PSE W/LFA-SIGNAL UPDATE SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2160-19-00 07/25/2021 211 M/E MISC 0.000 LOC S 76TH ST, 92ND ST & W OKLAHOMA AVE $100,000 - $249,999 STR OKLAHOMA-COLD SPRING & 92ND-76TH PE-PROCURE TRAFF ADAPT SYSTEM CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 2365-07-70 11/09/2021 205 LET BRRHB 0.000 LOC W GRANGE AVENUE $2,000,000 - $2,999,999 STR BRIDGE OVER CP RR B-40-0500 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2021 2400-07-01 07/25/2021 290 M/E MISC 1.470 LOC OKLAHOMA AVENUE MULTIMODAL $100,000 - $249,999 STR S 27TH ST TO S 6TH ST PE-LOCAL LET/PED IMPROVEMENTS TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2445-09-71 11/09/2021 205 LET BRRPL 0.000 LOC E NORTH AVENUE $1,000,000 - $1,999,999 STR OVER OAK LEAF BIKE TRAIL B-40-0502 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2021-2024 FINAL STIP Project Listing 114 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2575-03-70 12/14/2021 205 LET BRRHB 0.000 LOC STR MILL ROAD $750,000 - $999,999 BRIDGE OVER OAK CREEK B-40-0936 CONST/DECK REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2021 2674-02-70 12/14/2021 206 LET RECST 0.539 LOC STR WEST WALNUT STREET $6,000,000 - $6,999,999 N 20TH STREET TO N 12TH STREET CONST/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 2978-02-70 04/13/2021 206 LET MISC 1.407 LOC STR SILVER SPRING DR $1,000,000 - $1,999,999 N LONG ISLAND DR TO N LYDELL AVENUE CONST/SAFETY/PVMT MARKING SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2984-09-94 03/25/2021 206 LFA MISC 0.000 LOC STR INSTALL TRAFFIC SIGNAL FACE 12-INCH $500,000 - $749,999 80 LOCAL INTER PER PROJ APPLICATION CONST/INSTALL SIGNAL FACES SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2984-09-97 03/25/2021 206 LFA MISC 0.000 LOC STR INSTALL TRAFFIC SIGNAL FACE 12-INCH $500,000 - $749,999 72 LOCAL INTER PER PROJ APPLICATION CONST/INSTALL SIGNAL FACES SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2984-12-04 08/25/2021 205 M/E BRRHB 0.000 LOC STR NORTH HOLTON STREET - PHASE 2 $250,000 - $499,999 BR OVER MILW RVR, COMMERCE, WATER PE-FULL PS&E-BRIDGE REHAB LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E 2021 2984-15-01 01/25/2021 206 M/E MISC 0.013 LOC STR W VILLARD AVE $100,000 - $249,999 INTERSECTIONS OF N 60TH & N 51ST ST PE-FULL PS&E W/LFA-INTER IMP HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 115 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2984-51-70 05/11/2021 205 LET BRRHB 0.000 LOC STR S DANA COURT $1,000,000 - $1,999,999 BRIDGE OVER LAND P-40-0589 CONST/BRIDGE DECK REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2021 2995-27-00 03/25/2021 301EW C/E RECSTE 0.048 LOC STR IH 94 EAST WEST $250,000 - $499,999 WASHINGTON STREET DESIGN-FULL PSE-RECSTE/NEW SE FREEWAY - EAST WEST SURFACE TRANS BLOCK-FLEX E 2022 2135-04-71 12/13/2022 206 LET RECST 0.860 LOC STR W NORTH AVENUE $8,000,000 - $8,999,999 MAYFAIR ROAD TO N 95TH STREET CONST/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2160-05-71 03/08/2022 206 LET MISC 0.008 LOC STR S 76TH STREET $500,000 - $749,999 INTERSECTION WITH W BECHER STREET CONST/HSIP/TRAFFICSIGNALS/RESURFACE SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2190-10-70 12/13/2022 205 LET BRRPL 0.000 LOC STR W WISCONSIN AVENUE $2,000,000 - $2,999,999 BRIDGE OVER HONEY CREEK P-40-776 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 2265-00-78 09/13/2022 206 LET MISC 0.085 LOC STR N 27TH STREET $250,000 - $499,999 INTERSECT W/LOCUST, CENTER & NORTH CONST/HSIP/INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2265-00-98 09/25/2022 206 LFA MISC 0.085 LOC STR N 27TH STREET $100,000 - $249,999 INTERSECT W/LOCUST, CENTER & NORTH CONST/HSIP/INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 116 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2345-07-71 03/08/2022 206 LET RSRF30 1.000 LOC STR W DREXEL AVENUE $2,000,000 - $2,999,999 CTH V TO STH 38 CONST/RESURFACE STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2395-05-71 12/13/2022 206 LET RECST 1.270 LOC STR EAST/WEST HOWARD AVENUE $7,000,000 - $7,999,999 S 6TH STREET TO S CLEMENT AVENUE CONST/RECONSTRUCT W/ NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2410-13-70 12/13/2022 206 LET RECST 0.185 LOC STR W NATIONAL AVENUE $2,000,000 - $2,999,999 S 62ND STREET TO S 65TH STREET CONST/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2545-09-71 01/11/2022 206 LET RCND20 2.020 LOC STR WEST HAMPTON AVENUE $8,000,000 - $8,999,999 N 60TH STREET TO N TEUTONIA AVENUE CONST/RECONDITION STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2656-00-72 03/08/2022 205 LET BRRPL 0.000 LOC STR S 70TH STREET $2,000,000 - $2,999,999 BRIDGE OVER CP RR/HAST P-40-856 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 2667-03-71 01/11/2022 206 LET RECST 1.502 LOC STR N HUMBOLDT BLVD $11,000,000 - $11,999,999 E NORTH AVE TO E KEEFE AVE CONST/RECONST WITH NO ADDL LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2022 2984-12-05 08/25/2022 205 M/E BRRHB 0.000 LOC STR NORTH HOLTON STREET PHASE 3 $250,000 - $499,999 BR OVR MILW RIVER,COMMERCE, WATER PE-FULL PS&E-BRIDGE REHAB LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 117 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2984-13-74 04/12/2022 206 LET MISC 0.002 LOC W CENTER ST $250,000 - $499,999 STR INTS W/ W LISBON AVE & N 60TH ST CONST/HSIP/INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2984-13-94 04/25/2022 206 LFA MISC 0.002 LOC W CENTER STREET $100,000 - $249,999 STR INTS W/ W LISBON AVE & N 60TH ST LFA/HSIP/INTER IMPROVE W/2984-13-74 SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2984-17-71 03/25/2022 290 LLC MISC 1.544 LOC E/W WASHINGTON ST & W SCOTT ST $500,000 - $749,999 STR KK RIVER TRAIL-20TH & 20TH-LAYTON CONST/PED/BIKE FACILITIES TAP > 200,000 TRANS ALTERN >200K FAST EX 2022 2984-50-70 02/08/2022 205 LET BRRPL 0.000 LOC W CALUMET ROAD $1,000,000 - $1,999,999 STR BRIDGE OVER LITTLE RIVER CONST/BRIDGE REPLACEMENT P-40-0537 LOCAL BRIDGES NON-FEDERAL 2022 2995-04-74 03/08/2022 206 LET MISC 0.005 LOC S 92ND STREET $1,000,000 - $1,999,999 STR INTERSECTION WITH LINCOLN AVE CONST/HSIP/TRAFFIC SIGNALS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2995-05-77 03/08/2022 206 LET MISC 0.017 LOC S 60TH STREET $500,000 - $749,999 STR 2021-2024 FINAL STIP Project Listing 118 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding INTERSECTION WITH W GREENFIELD AVE CONST/TRAFFIC SIGNAL FLASHERS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2090-16-70 04/11/2023 206 LET MISC 0.050 LOC STR W SILVER SPRING DRIVE $1,000,000 - $1,999,999 6 LOCAL INTERSECTIONS CONST/HSIP TRAFFIC SIGNAL/FLASHERS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2155-05-70 02/14/2023 206 LET MISC 0.103 LOC STR N SHERMAN BLVD $750,000 - $999,999 7 LOCAL STREET INTERSECTIONS CONST/SIGNAL UPDATES & PED RAMPS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2155-05-71 02/14/2023 206 LET MISC 0.075 LOC STR N SHERMAN BLVD $1,000,000 - $1,999,999 6 LOCAL STREET INTERSECTIONS CONST/SIGNAL UPDATES & PED RAMPS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2155-05-90 03/25/2023 206 LFA MISC 0.103 LOC STR N SHERMAN BLVD $250,000 - $499,999 7 LOCAL STREET INTERSECTIONS INCIDENTAL TO 2155-05-70 SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2155-05-91 03/25/2023 206 LFA MISC 0.075 LOC STR N SHERMAN BLVD $250,000 - $499,999 6 LOCAL STREET INTERSECTIONS INCIDENTAL TO 2155-05-71 SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2525-03-71 01/10/2023 206 LET RECST 0.637 LOC STR W BELOIT ROAD $9,000,000 - $9,999,999 2021-2024 FINAL STIP Project Listing 119 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding S 60TH STREET TO LINCOLN AVENUE CONST/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2023 2984-12-73 01/10/2023 205 LET BRRHB 0.000 LOC STR HOLTON STREET PHASE 1 $4,000,000 - $4,999,999 BR OVER MILW RVR, COMMERCE, WATER PE/BRIDGE REHABILITATION/P-40-0875 LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS- 2023 2984-15-71 02/14/2023 206 LET MISC 0.013 LOC STR W VILLARD AVE $1,000,000 - $1,999,999 INTERSECTIONS OF N 60TH & N 51ST ST CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2984-15-91 04/25/2023 206 LFA MISC 0.013 LOC STR W VILLARD AVE $0 - $99,999 INTERSECTIONS OF N 60TH & N 51ST ST LFA/HSIP/INCIDENTAL TO 2984-15-71 SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2024 2160-19-70 12/25/2024 211 MIS MISC 0.000 LOC STR S 76TH ST, 92ND ST & W OKLAHOMA AVE $500,000 - $749,999 OKLAHOMA-COLD SPRING & 92ND-76TH CNST/ADAPTIVE TRAFFIC SIGNAL SYSTEM CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2024 2230-07-73 01/09/2024 206 LET RCND20 0.710 LOC STR W GREENFIELD AVENUE $3,000,000 - $3,999,999 S 56TH STREET TO MILLER PARK WAY CONST/RECONDITION STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2024 2365-05-71 01/09/2024 206 LET RCND20 0.497 LOC STR W GRANGE AVENUE $2,000,000 - $2,999,999 2021-2024 FINAL STIP Project Listing 120 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding S 76TH STREET TO S 84TH STREET CONST/RECONDITION STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2024 2400-07-71 03/25/2024 290 LLC MISC 1.470 LOC STR OKLAHOMA AVENUE MULTIMODAL $500,000 - $749,999 S 27TH ST TO S 6TH ST CONST/PEDESTRIAN IMPROVEMENTS TAP > 200,000 TRANS ALTERN >200K FAST EX 2024 2455-07-70 01/09/2024 206 LET RCND20 0.739 LOC STR E/W LOCUST STREET $3,000,000 - $3,999,999 N 7TH STREET TO N HOLTON STREET CONST/RECONDITION STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2024 2984-12-74 01/09/2024 205 LET BRRHB 0.000 LOC STR NORTH HOLTON STREET - PHASE 2 $3,000,000 - $3,999,999 BR OVER MILW RVR, COMMERCE, WATER CONST/BRIDGE REHABILITATION/P400875 LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E 1693-06-10 211 I/E MISC 0.000 NON CNG REFUSE PACKERS $0 - $99,999 HWY 33 REFUSE TRUCK CNG CONVERSION PE-PROCURE CNG CONVERSION CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 1060-33-56 01/25/2021 301ZO R/R MISC 0.000 NON ZOO IC, UPRR CROSSING NO 177 262X $0 - $99,999 HWY UPRR OVER USH 45 RR/CROSSING IMPROVEMENT SE FREEWAY-ZOO INTERCHANGE NON-FEDERAL 2021-2024 FINAL STIP Project Listing 121 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1693-06-09 07/25/2021 211 MIS MISC 0.000 NON BIG LAKE MARINE TOWBOAT $750,000 - $999,999 HWY 2 TOWBOATS PE-PROCURE TOWBOAT RETROFIT CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2021 1693-06-80 03/25/2021 211 MIS MISC 0.000 NON CNG REFUSE PACKERS $250,000 - $499,999 HWY PH 1 33 REFUSE TRUCK CNG CONVERSION MIS/REFUSE TRUCK CNG CONVERSION CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2021 1693-34-30 01/25/2021 211 TST MISC 0.000 NON CLEAN DIESEL ENGINE BUS PURCHASE $3,000,000 - $3,999,999 HWY PURCHASE OF 7 BUSES PHASE 4 OF 5 MILWAUKEE TRANSIT, CMAQ CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2021 1693-34-35 02/25/2021 211 TST MISC 0.000 NON MILW CO TRANSIT REPLACEMENT BUSES $4,000,000 - $4,999,999 HWY PHASE 2 - BUS PURCHASE FY20-24 TST/TRANSIT CONGESTION MITIGATION AND AIR QUALITY PROJ TO REDUCE PM 2.5 EMI (CMAQ) 2021 1693-34-37 05/25/2021 211 TST MISC 0.000 NON MCTS MARKETING PUBLIC OUTREACH $1,000,000 - $1,999,999 HWY MCTS PHASE 1 TST/TRANSIT-MARKETING CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2021 2190-06-74 02/25/2021 211 LLC MISC 0.000 NON BIKE SHARE PHASE 2 $250,000 - $499,999 HWY 2021-2024 FINAL STIP Project Listing 122 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 26 STATIONS, VAR LOCATIONS C OF MKE CONST/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGATION (CMAQ) MAP- 2021 2190-06-84 02/25/2021 211 MIS MISC 0.000 NON BIKE SHARE PHASE 2 $1,000,000 - $1,999,999 HWY 26 STATIONS, VAR LOCATIONS C OF MKE MIS/PROCUREMENT CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGATION (CMAQ) MAP- 2021 2555-07-00 07/25/2021 211 M/E MISC 0.000 NON SAFE ROUTES TO TRANSIT PHASE 1 $100,000 - $249,999 HWY W BURLEIGH, S CESAR CHAVEZ PE/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ TO REDUCE PM 2.5 EMI (CMAQ) 2021 2967-01-73 03/25/2021 290 LLC BRRHB 0.005 NON HISTORIC LAKE PARK RAVINE BRIDGE $2,000,000 - $2,999,999 HWY OVER RAVINE ROAD CONST/BRIDGE REHAB TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2967-01-74 03/25/2021 290 LLC MISC 0.000 NON GREENFIELD PARK OAK LEAF TRAIL $0 - $99,999 HWY 124TH ST TO WEST ALLIS TRAIL CON CONST/RECONSTRUCTION TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2967-01-75 10/25/2021 290 LLC MISC 0.000 NON LITTLE MENOMONEE RIVER PARKWAY $100,000 - $249,999 HWY OAK LEAF TRAIL RELOCATION 2021-2024 FINAL STIP Project Listing 123 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding CONST/TRAIL RELOCATION TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2967-09-02 05/25/2021 290 M/E MISC 0.000 NON OLT UNION PACIFIC SEGMENT $0 - $99,999 HWY CRESTWOOD STREAM CULVERT PE-LOCAL LET/CULVERT REPLACEMENT TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2967-10-01 05/25/2021 290 M/E MISC 0.000 NON LINCOLN/NW SIDE TRAIL CONN PLAN $0 - $99,999 HWY I94 EW-N CO LINE & I43 NS-W CO LINE PE/BIKE & PED PLAN TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2967-18-00 01/25/2021 206 TST MISC 0.000 NON TRANSIT SYSTEM BUS REPLACEMENT $4,000,000 - $4,999,999 HWY EIGHT MILWAUKEE COUNTY BUSES TST/PURCHASE 8 BUSES STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 2984-13-83 03/25/2021 290 LLC MISC 0.000 NON SRTS IMPLEMENTATION PHASE I $500,000 - $749,999 HWY CITY OF MILWAUKEE CONST/SAFE ROUTE TO SCHOOL PROGRAM TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2984-18-73 03/25/2021 290 LLC MISC 0.000 NON PEDESTRIAN & TRANSIT INTS IMPRVMNTS $500,000 - $749,999 HWY 8 LOCAL INTERSECTIONS CONST/PED & TRANSIT IMPROVEMENTS 2021-2024 FINAL STIP Project Listing 124 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2984-22-02 07/25/2021 211 M/E MISC 0.000 NON ATC CONTROLLER & COMM UPGRADE GR 6 $100,000 - $249,999 HWY 53 INTERSECTIONS PE-FULL PS&E-LFA-ATC/COMM UPGRADE CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 2984-22-03 03/25/2021 211 M/E MISC 0.000 NON ATC CONTROLLER & COMM UPGRADE GR 7 $250,000 - $499,999 HWY 70 INTERSECTIONS PE-FULL PS&E-LFA-ATC/COMM UPGRADE CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 2984-22-04 07/25/2021 211 M/E MISC 0.000 NON KINNICKINNIC RVR TRAIL CONNECTIONS $100,000 - $249,999 HWY VARIOUS LOCATIONS IN THE CITY PE-FULL PS&E-BIKE/PED TRAIL CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 2984-22-05 05/25/2021 290 M/E MISC 0.000 NON 20TH ST POWER LINE & BEERLINE TRAIL $100,000 - $249,999 HWY OLIVE ST-VILLARD AVE & 20TH-24TH ST PE-LOCAL LET/PED TRAIL TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2987-09-00 05/25/2021 290 C/E MISC 0.000 NON SAFE ROUTES TO SCHOOL-PHASE 1 $100,000 - $249,999 HWY 5 SCHOOL LOCATIONS PE-LOCAL LET/SIDEWALK/SIGNS TAP > 200,000 TRANS ALTERN >200K FAST EX 2021-2024 FINAL STIP Project Listing 125 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2994-00-72 03/25/2021 290 LLC MISC 0.000 NON WAUWATOSA BIKE SHARE III $100,000 - $249,999 HWY VARIOUS LOCATIONS CONST/BIKE/PED TAP > 200,000 TRANS ALTERN >200K FAST EX 2021 2994-00-82 03/25/2021 290 MIS MISC 0.000 NON WAUWATOSA BIKE SHARE III $250,000 - $499,999 HWY BIKE/STATION PROCUREMENT CONST/BIKE/PED TAP > 200,000 TRANS ALTERN >200K FAST EX 2022 1693-34-36 11/25/2022 211 TST MISC 0.000 NON MILW CO TRANSIT REPLACEMENT BUSES $5,000,000 - $5,999,999 HWY PHASE 3 - BUS PURCHASE FY20-24 TST/TRANSIT CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2022 1693-34-38 07/25/2022 211 TST MISC 0.000 NON MCTS MARKETING PUBLIC OUTREACH $500,000 - $749,999 HWY MCTS PHASE 2 TST/TRANSIT-MARKETING CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2022 1693-34-42 12/25/2022 211 TST MISC 0.000 NON CLEAN DIESEL ENGINE BUS PURCHASE $100,000 - $249,999 HWY PURCHASE OF 7 BUSES PHASE 5 OF 5 MILWAUKEE TRANSIT, CMAQ CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2022 2967-09-72 03/25/2022 290 LLC MISC 0.000 NON OLT UNION PACIFIC SEGMENT $500,000 - $749,999 HWY 2021-2024 FINAL STIP Project Listing 126 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding CRESTWOOD STREAM CULVERT CONST/BIKE/PED CULVERT REPLACEMENT TAP > 200,000 TRANS ALTERN >200K FAST EX 2022 2967-11-01 07/25/2022 211 M/E MISC 0.000 NON OAK LEAF TR CONNECTIVITY-BENDER PRK $100,000 - $249,999 HWY BENDER PARK PE-FULL PS&E-BIKE/PED TRAIL CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2022 2967-11-02 07/25/2022 211 M/E MISC 0.000 NON OAK LEAF TRAIL EXTENSION $250,000 - $499,999 HWY KOHL PARK CONNECTION PE/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ TO REDUCE PM 2.5 EMI (CMAQ) 2022 2980-06-71 03/25/2022 211 LLC MISC 0.000 NON POWERLINE TRAIL PHASE 1 $1,000,000 - $1,999,999 HWY W COLD SPRING RD TO 60TH STREET CONST/PED BIKE TRAIL CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 1693-06-07 07/25/2023 211 TST MISC 0.000 NON EAST WEST BUS RAPID TRANSIT $2,000,000 - $2,999,999 HWY MILWAUKEE COUNTY TST/OPERATING COSTS 3RD YR CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 1693-06-81 01/25/2023 211 MIS MISC 0.000 NON CNG REFUSE PACKERS $1,000,000 - $1,999,999 HWY PH 2 33 REFUSE TRUCK CNG CONVERSION 2021-2024 FINAL STIP Project Listing 127 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding MIS/REFUSE TRUCK CNG CONVERSION CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 1693-34-39 09/25/2023 211 TST MISC 0.000 NON MILW CO TRANSIT REPLACEMENT BUSES $3,000,000 - $3,999,999 HWY PHASE 4 - BUS PURCHASE FY20-24 TST/TRANSIT CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 2555-07-70 03/25/2023 211 LLC MISC 0.000 NON SAFE ROUTES TO TRANSIT PHASE 1 $1,000,000 - $1,999,999 HWY W BURLEIGH, S CESAR CHAVEZ CONST/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 2984-22-74 03/25/2023 211 LLC MISC 0.000 NON KINNICKINNIC RVR TRAIL CONNECTIONS $1,000,000 - $1,999,999 HWY VARIOUS LOCATIONS IN THE CITY CONST/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 2984-22-75 03/25/2023 290 LLC MISC 0.000 NON 20TH ST POWER LINE & BEERLINE TRAIL $750,000 - $999,999 HWY OLIVE ST-VILLARD AVE & 20TH-24TH ST CONST/BIKE PEDESTRIAN TRAIL TAP > 200,000 TRANS ALTERN >200K FAST EX 2023 2984-22-92 03/25/2023 211 LFA MISC 0.000 NON ATC CONTROLLER & COMM UPGRADE GR 6 $1,000,000 - $1,999,999 HWY 53 INTERSECTIONS CONST/VAR CORRIDORS S SIDE 2021-2024 FINAL STIP Project Listing 128 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 2984-22-93 03/25/2023 211 LFA MISC 0.000 NON ATC CONTROLLER & COMM UPGRADE GR 7 $1,000,000 - $1,999,999 HWY 70 INTERSECTIONS LFA/VAR CORRIDORS MILW CBD CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2024 2967-02-71 07/25/2024 206 TST MISC 0.000 NON TRANSIT SYSTEM BUS REPLACEMENT $12,000,000 - $12,999,999 HWY 15 MILWAUKEE COUNTY BUSES CONST/TRANSIT STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2024 2967-11-71 03/25/2024 211 LLC MISC 0.000 NON OAK LEAF TR CONNECTIVITY-BENDER PRK $1,000,000 - $1,999,999 HWY BENDER PARK CONST/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2024 2967-11-72 03/25/2024 211 LLC MISC 0.000 NON OAK LEAF TRAIL EXTENSION $2,000,000 - $2,999,999 HWY KOHL PARK CONNECTION CONST/PED BIKE FACILITIES CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2024 2987-09-70 02/25/2024 290 LLC MISC 0.000 NON SAFE ROUTES TO SCHOOL-PHASE 1 $500,000 - $749,999 HWY 5 SCHOOL LOCATIONS CONST/SIDEWALK SIGNS BIKE/PED TAP > 200,000 TRANS ALTERN >200K FAST EX 2021-2024 FINAL STIP Project Listing 129 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 1228-22-74 02/08/2022 303 LET BRRPL 0.000 OFF SYS IH43 NORTH SOUTH FREEWAY $4,000,000 - $4,999,999 HAMPTON AVE-SB RAMP OVER MILW RVR CONST/BRIDGE REPLACEMENT BACKBONE NATIONAL HIGHWAY PERF FAST 2022 2565-09-70 02/08/2022 303 LET MISC 0.000 OFF SYS STH 57 $100,000 - $249,999 RAMPS WITH SILVER SPRING DRIVE CONST/SAFETY SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 1060-53-70 12/12/2023 303 LET MISC 0.000 OFF SYS VARIOUS NOISE WALL LOCATIONS $500,000 - $749,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/NOISE BARRIER REHAB BACKBONE NATIONAL HIGHWAY PERF FAST 2021 2120-18-20 11/25/2021 303 R/E MISC 5.270 STH 024 W FOREST HOME AVE $250,000 - $499,999 USH 45 TO 45TH STREET RE/RESURFACE STATE 3R NON-FEDERAL 2023 2195-04-70 09/12/2023 303 LET RECST 0.440 STH 032 WELLS STREET, CITY OF MILWAUKEE $4,000,000 - $4,999,999 N BROADWAY TO N PROSPECT AVE CONST/RECONSTRUCT NO ADDL LANES STATE 3R SURFACE TRANS BLOCK-FLEX E 2024 2225-00-73 09/10/2024 303 LET RSRF30 2.630 STH 032 STH 32 - VILLAGE OF FOX POINT $2,000,000 - $2,999,999 SCHOOL ROAD TO DEAN ROAD CONST/RESURFACE STATE 3R PROJ RDUCE PM 2.5 EMI FAST 2024 2225-15-70 02/13/2024 303 LET RECST 0.852 STH 032 LAKE DR, CITY OF MILWAUKEE $5,000,000 - $5,999,999 NEWBERRY BLVD TO EDGEWOOD AVE CONST/RECONSTRUCT STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 130 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2240-00-28 07/25/2022 303 R/E RSRF30 5.338 STH 036 W LOOMIS ROAD $0 - $99,999 STH 100 TO 51ST STREET RE/RESURFACE STATE 3R NON-FEDERAL 2021 2060-18-20 05/25/2021 303 R/E MISC 0.000 STH 038 CHASE AVE, CITY OF MILWAUKEE $250,000 - $499,999 BRIDGE OVER UP RR B40-571 RE/BRIDGE REPLACEMENT STATE 3R NON-FEDERAL 2021 2060-20-00 12/25/2021 303 C/E RSRF20 6.368 STH 038 HOWELL AVE $500,000 - $749,999 OAKWOOD RD TO GRANGE AVE PE/FULL PS & E-RSRF20 STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2060-18-70 12/12/2023 303 LET BRRPL 0.000 STH 038 CHASE AVE, CITY OF MILWAUKEE $5,000,000 - $5,999,999 BRIDGE OVER UP RR B40-571 CONST/BRIDGE REPLACEMENT STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 2565-07-70 08/10/2021 303 LET RECST 0.000 STH 057 GREEN BAY RD, VILLAGE BROWN DEER $2,000,000 - $2,999,999 TEUTONIA AVE INTERSECTION CONST/RECONSTRUCT, NO ADDL LANES STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2275-05-70 01/10/2023 303 LET RSRF30 1.058 STH 057 N 20TH ST, CITY OF MILWAUKEE $3,000,000 - $3,999,999 NORTH AVE TO HOPKINS ST CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 2565-02-71 03/14/2023 303 LET MISC 0.037 STH 057 STH 57 $1,000,000 - $1,999,999 INTERSECTION WITH CTH PP CONST/TURNING LANES HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 131 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2023 2410-10-20 07/25/2023 303 R/E MISC 2.620 STH 059 W NATIONAL AVE, CITY OF MILWAUKEE $0 - $99,999 39TH ST TO 1ST ST RE/RECONSTRUCT STATE 3R NON-FEDERAL 2021 2030-13-71 03/25/2021 303 CCO MISC 0.019 STH 100 108TH ST $250,000 - $499,999 INTERSECTION WITH LAPHAM CCO FOR 2030-13-70 STATE 3R NON-FEDERAL 2021 2150-00-72 08/10/2021 303 LET BRRHB 0.047 STH 100 BROWN DEER ROAD $2,000,000 - $2,999,999 STH 100, B-40-504, B-40-505 CONST/BRIDGE REHAB STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2270-04-51 04/25/2021 303 R/R RCND20 0.000 STH 100 STH 57-VIL BROWN DEER & CITY MEQUON $250,000 - $499,999 TEUTONIA AVENUE TO MEQUON ROAD RR/CROSSING SIGALS/NO 386 836L STATE 3R SURFACE TRANS BLOCK-FLEX E 2022 2030-10-21 04/25/2022 303 R/E MISC 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $0 - $99,999 W BURLEIGH ST TO W SILVER SPRING DR RE/BRIDGE REPLACEMENT STATE 3R NON-FEDERAL 2023 2040-03-75 09/12/2023 303 LET RSRF10 2.390 STH 100 RYAN ROAD $2,000,000 - $2,999,999 SHEPARD AVE TO STH 32 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2040-20-70 09/12/2023 303 LET BRRHB 0.000 STH 100 RYAN RD, CITY OF OAK CREEK $1,000,000 - $1,999,999 BRIDGE OVER CNW RR B-40-530 CONST/BRIDGE REHABILITATION STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 132 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2024 2030-10-71 09/10/2024 303 LET BRRPL 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $15,000,000 - $16,999,999 W BURLEIGH ST TO W SILVER SPRING DR CONST/BRIDGE REPLACEMENT STATE 3R NATIONAL HIGHWAY PERF FAST 2024 2015-10-71 09/10/2024 303 LET PVRPLA 0.213 STH 119 STH 119 AIRPORT SPUR RAMPS $2,000,000 - $2,999,999 STH 119 AT HOWELL AVE CONST/PAVEMENT REPLACEMENT STATE 3R NATIONAL HIGHWAY PERF FAST 2021 1360-12-20 06/25/2021 303 R/E BRRPL 0.006 STH 145 FOND DU LAC, CITY OF MILWAUKEE $0 - $99,999 107TH ST BRIDGE RE/B-40-252 STATE 3R NON-FEDERAL 2023 1360-11-70 02/13/2023 303 LET BRRHB 0.000 STH 145 FOND DU LAC AVE (STH 145) $3,000,000 - $3,999,999 GRANTOSA,FLAGG/FLORIST BRIDGES CONST/BRIDGE REHAB STATE 3R NATIONAL HIGHWAY PERF FAST 2023 1360-12-70 11/14/2023 303 LET BRRPL 0.016 STH 145 FOND DU LAC, CITY OF MILWAUKEE $4,000,000 - $4,999,999 107TH ST BRIDGE CONST/B-40-252 STATE 3R NATIONAL HIGHWAY PERF FAST 2023 1360-13-70 11/14/2023 303 LET BRRHB 0.015 STH 145 FOND DU LAC, CITY OF MILWAUKEE $4,000,000 - $4,999,999 SILVER SPRING,76TH, PED BRIDGES CONST/BRIDGE REHAB STATE 3R NATIONAL HIGHWAY PERF FAST 2023 1360-15-70 02/13/2023 303 LET RSRF30 3.920 STH 145 FOND DU LAC AVE (STH 145) $13,000,000 - $13,999,999 GOOD HOPE RD INTERCHANGE TO 68TH ST CONST/RESURFACING STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 133 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2023 1360-16-70 02/13/2023 303 LET MISC 0.730 STH 145 FOND DU LAC AVE (STH 145) $500,000 - $749,999 GOOD HOPE RD TO W COUNTY LINE CONST/SHOULDER RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2160-06-01 303 I/E RSRF30 2.211 STH 181 GLENVIEW AVE - WAUWATOSA AVE $250,000 - $499,999 WISCONSIN AVE TO CENTER ST PE/FULL PS & E-RSRF30 STATE 3R NATIONAL HIGHWAY PERF FAST 2022 2545-03-72 04/12/2022 303 LET MISC 0.019 STH 181 76TH ST (STH 181) $500,000 - $749,999 INTERSECTION WITH HAMPTON AVENUE CONST/INTERSECTION AND SIGNALS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2545-03-92 04/25/2022 303 LFA MISC 0.019 STH 181 76TH ST (STH 181) $0 - $99,999 INTERSECTION WITH HAMPTON AVENUE LFA/ INCIDENTAL TO 2545-03-72 SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2023 2025-20-70 09/12/2023 303 LET BRRHB 0.000 STH 190 CAPITOL DR, CITY OF WAUWATOSA $2,000,000 - $2,999,999 124TH ST TO STH 100 CONST/RIDGE DECK OVERLAY STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2265-10-21 04/25/2021 303 R/E MISC 0.477 STH 241 27TH STREET $0 - $99,999 8 MILE RD TO ELM RD RE/RECONSTRUCT NO ADDL LANES STATE 3R NON-FEDERAL 2021-2024 FINAL STIP Project Listing 134 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2265-18-20 07/25/2022 303 R/E MISC 2.003 STH 241 27TH STREET $0 - $99,999 LAYTON AVE TO COLLEGE AVE RE/RESURFACE STATE 3R NON-FEDERAL 2024 2265-10-71 01/09/2024 303 LET BRRHB 0.477 STH 241 27TH STREET $3,000,000 - $3,999,999 8 MILE RD TO ELM RD CONST/BRIDGE DECK REPLACEMENT STATE 3R NATIONAL HIGHWAY PERF FAST 2023 1060-35-82 01/10/2023 301ZO LET MISC 0.000 USH 045 USH 45, ZOO IC, N LEG LANDSCAPING $500,000 - $749,999 MAYFAIR ROAD TO BURLEIGH STREET CONST/LANDSCAPING SE FREEWAY-ZOO INTERCHANGE NON-FEDERAL 2024 2040-14-70 09/10/2024 303 LET RECST 1.000 USH 045 LOVERS LANE (CITY OF FRANKLIN) $13,000,000 - $13,999,999 RAWSON AVE TO COLLEGE AVE CONST/RECONSTRUCT STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2984-06-79 04/13/2021 206 LET MISC 4.469 VAR ROAD DIET, CITY OF MILWAUKEE $1,000,000 - $1,999,999 HWY 6 LOCAL STREETS, PER PROJECT APPL CONST/REDUCE THROUGH LANES SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2967-00-77 04/12/2022 206 LET MISC 0.117 VAR 6 LOCAL INTERSECTIONS $750,000 - $999,999 HWY GOOD HOPE, PORT WASH & SHERMAN CONST/HSIP/INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 135 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2984-13-95 08/25/2022 206 LFA MISC 0.000 VAR VARIOUS LOCATIONS $500,000 - $749,999 HWY 73 CITY INTERSECTIONS LFA/HSIP/INTERSECT IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2984-13-96 08/25/2022 206 LFA MISC 0.000 VAR VARIOUS LOCATIONS $500,000 - $749,999 HWY 72 CITY INTERSECTIONS HSIP/INTERSECTION IMPROVEMENTS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2984-28-91 04/25/2022 211 LFA MISC 0.000 VAR FIBER OPTIC INTERCONNECT $1,000,000 - $1,999,999 HWY LISBON, WALNUT AND 27TH CORRIDORS LFA/FIBER OPTIC CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2022 2984-28-92 04/25/2022 211 LFA MISC 0.000 VAR ATC CONTROLLER & COMM UPGRADE GR 3 $1,000,000 - $1,999,999 HWY 79 INTERSECTIONS LFA/VAR CORRIDORS NEAR N-W CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2022 2984-28-94 04/25/2022 211 LFA MISC 0.000 VAR FIBER OPTIC INTERCONNECT $750,000 - $999,999 HWY CESAR CHAVEZ DR & NATIONAL AVE CORR LFA/FIBER OPTIC CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2023 1360-17-70 02/13/2023 303 LET BRPVTV 0.031 VAR VARIOUS BRIDGE LOCATIONS $1,000,000 - $1,999,999 HWY 2021-2024 FINAL STIP Project Listing 136 Southeast Region MILWAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding STH 145/STH 175/STH 181 CONST/BRIDGE PREVENTIVE STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2090-14-70 12/25/2023 211 MIS MISC 0.000 VAR SILVER SPRING DRIVE $250,000 - $499,999 HWY 124TH ST TO 91ST ST MIS/ADAPTIVE TRAFFIC SIGNAL SYS CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2023 2967-17-70 03/14/2023 303 LET BRRHB 0.000 VAR VARIOUS BRIDGE LOCATIONS $4,000,000 - $4,999,999 HWY STH 181, STH 175 CONST/BRIDGE REHAB STATE 3R SURFACE TRANSP BLOCK GRTS- 2021-2024 FINAL STIP Project Listing 137 Southeast Region OZAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2330-08-00 05/25/2021 206 C/E MISC 3.889 CTH NN CTH NN $0 - $99,999 WASHINGTON COUNT LINE TO STH 60 PE/HSIP SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST 2022 2330-08-70 05/10/2022 206 LET MISC 3.889 CTH NN CTH NN $250,000 - $499,999 WASHINGTON COUNT LINE TO STH 60 CONST/HSIP SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST 2022 2695-07-71 03/08/2022 206 LET MISC 0.010 CTH NN CTH NN $750,000 - $999,999 INTERSECTION WITH CTH Y CONST/RECON INTERSECTION & SIGNALS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 1229-04-03 302 I/E RECSTE 7.871 IH 043 I-43 NORTH SOUTH FREEWAY $3,000,000 - $3,999,999 DONGES BAY TO STH 60 PE-FULL PS&E-RE-UTIL-RR-RECSTE MAJORS NATIONAL HIGHWAY PERF FAST 2021 1229-04-41 06/25/2021 302 UTL MISC 14.112 IH 043 I-43 NORTH SOUTH FREEWAY $750,000 - $999,999 SILVER SPRING TO STH 60 UTL/LEVEL OF EFFORT FY2021 MAJORS NON-FEDERAL 2021 1229-04-42 09/25/2021 302 UTL MISC 14.112 IH 043 I-43 NORTH SOUTH FREEWAY $6,000,000 - $6,999,999 SILVER SPRING TO STH 60 UTL/LEVEL OF EFFORT FY2022 MAJORS NON-FEDERAL 2021 1229-04-70 07/13/2021 302 LET RECSTE 14.112 IH 043 I-43 NORTH SOUTH FREEWAY $10,000,000 - $10,999,999 2021-2024 FINAL STIP Project Listing 138 Southeast Region OZAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding SILVER SPRING DR TO STH 60 CONST/WORK ZONE PREP MAJORS NATIONAL HIGHWAY PERF FAST 2021 1229-04-74 12/14/2021 302 LET RECSTE 1.220 IH 043 I-43 NORTH SOUTH FREEWAY $60,000,000 - $69,999,999 W COUNTY LINE RD INTERCHANGE CONST/RECONSTRUCT W/EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2021 1229-04-76 11/09/2021 302 LET RECSTE 5.912 IH 043 I-43 NORTH SOUTH FREEWAY $100 MILLION OR GREATER HIGHLAND ROAD TO STH 60 CONST/RECONSTRUCTION W/EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2021 1229-04-80 07/25/2021 302 C/E MISC 14.110 IH 043 I-43 NORTH SOUTH $3,000,000 - $3,999,999 SILVER SPRING DRIVE TO STH 60 PROJECT CONTROLS MAJORS NATIONAL HIGHWAY PERF FAST 2022 1229-04-43 09/25/2022 302 UTL MISC 14.112 IH 043 I-43 NORTH SOUTH FREEWAY $6,000,000 - $6,999,999 SILVER SPRING TO STH 60 UTL/LEVEL OF EFFORT FY2023 MAJORS NON-FEDERAL 2022 1229-04-75 10/11/2022 302 LET RECSTE 2.534 IH 043 I-43 NORTH SOUTH FREEWAY $50,000,000 - $59,999,999 MEQUON RD INTERCHANGE CONST/RECONSTRUCTION W/ EXPANSION MAJORS NATIONAL HIGHWAY PERF FAST 2022 1229-04-92 03/25/2022 302 MIS MISC 14.112 IH 043 I-43 NORTH SOUTH FREEWAY $0 - $99,999 SILVER SPRING DR TO STH 60 2021-2024 FINAL STIP Project Listing 139 Southeast Region OZAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding TRAF MITIGATION FOR1229-04-70/74/76 MAJORS NON-FEDERAL 2022 2695-11-70 03/08/2022 205 LET BRRPL 0.000 LOC STR COVERED BRIDGE ROAD $750,000 - $999,999 BRIDGE OVER CEDAR CREEK B-45-0013 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2021 1693-06-08 07/25/2021 211 TST MISC 0.000 NON MINI-BUS HYBRID CONVERSTION $0 - $99,999 HWY 6 CONVERSION KITS TST/HYBRID CONVERSION CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI FAST (CMAQ) 2021 1410-01-21 03/25/2021 303 R/E MISC 0.390 STH 033 STH 33 $0 - $99,999 INTERSECTION WITH CTH I RE/INTERSECTION MOD ROUND-ABOUT STATE 3R NON-FEDERAL 2022 1410-01-71 05/10/2022 303 LET RECST 0.390 STH 033 STH 33 $1,000,000 - $1,999,999 INTERSECTION WITH CTH I CONST/INTERSECTION MOD ROUND-ABOUT SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 1040-00-70 09/14/2021 303 LET PSRS20 1.089 STH 057 SAUKVILLE - WALDO $1,000,000 - $1,999,999 IH-43 TO CTH W CONST/PSRS20 - DIAMOND GRIND STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2270-04-70 08/10/2021 303 LET RCND20 3.610 STH 057 STH 57-VIL BROWN DEER & CITY MEQUON $17,000,000 - $19,999,999 TEUTONIA AVENUE TO MEQUON ROAD CONST/RECONDITION 2021-2024 FINAL STIP Project Listing 140 Southeast Region OZAUKEE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding STATE 3R SURFACE TRANS BLOCK-FLEX E 2022 1380-02-70 09/13/2022 303 LET RCND10 3.740 STH 167 MEQUON ROAD, CITY OF MEQUON $2,000,000 - $2,999,999 WASHINGTON CO LINE TO BUNTROCK AVE CONST / RESURFACING STATE 3R NATIONAL HIGHWAY PERF FAST 2729-07-00 303 I/E RSRF20 2.209 STH 181 WAUWATOSA ROAD $500,000 - $749,999 COUNTY LINE ROAD TO MEQUON ROAD PE/SURFACE - PCC STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2729-05-20 04/25/2021 303 R/E MISC 1.040 STH 181 WAUWATOSA RD, CITY OF CEDARBURG $0 - $99,999 CTH C TO STH 60 RE/RESURFACE STATE 3R NON-FEDERAL 2023 2729-05-70 09/12/2023 303 LET RSRF30 3.027 STH 181 WAUWATOSA RD, CITY OF CEDARBURG $3,000,000 - $3,999,999 CTH C TO STH 60 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 141 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2390-09-03 206 I/E RECST 0.609 CTH C CTH C $0 - $99,999 N OHIO STREET TO FAIRWAY DRIVE PE/DESIGN OVERSIGHT STP URBAN 50,000 - 200,000 NON-FEDERAL 2024 2390-09-73 12/10/2024 206 LET RECST 0.609 CTH C CTH C $4,000,000 - $4,999,999 NORTH OHIO STREET TO FAIRWAY DRIVE CONST/RECONSTRUCT NO ADDED CAPACITY STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2021 3755-03-70 11/09/2021 206 LET MISC 5.757 CTH D CTH D $100,000 - $249,999 WALWORTH COUNTY LINE TO STH 20 CONST/HSIP/SIGNING, PVMT MARKING SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST 2023 3755-02-70 01/10/2023 206 LET RECST 1.860 CTH D CTH D $2,000,000 - $2,999,999 HERITAGE RD TO 753 FT W OF STATE ST CONST/RECONSTRUCT NO ADDED CAPACITY STP RURAL STBG <5K POP - FAST EXT 2021 2814-03-00 09/25/2021 206 C/E MISC 0.027 CTH J CTH A $100,000 - $249,999 INTERSECTION WITH CTH J PE/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2024 2814-03-70 02/13/2024 206 LET MISC 0.027 CTH J CTH A $1,000,000 - $1,999,999 INTERSECTION WITH CTH J CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2816-03-00 09/25/2021 206 C/E MISC 0.024 CTH U CTH U $100,000 - $249,999 INTERSECTION WITH 7 MILE ROAD 2021-2024 FINAL STIP Project Listing 142 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding PE/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2024 2816-03-70 02/13/2024 206 LET MISC 0.024 CTH U CTH U $1,000,000 - $1,999,999 INTERSECTION WITH 7 MILE ROAD CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 1030-08-75 04/13/2021 303 LET BRRHB 12.051 IH 041 IH 41 NORTH SOUTH FREEWAY $2,000,000 - $2,999,999 CTH KR TO MILWAUKEE CO LINE CONST/BRDGE REHAB/SEG 1 PROJECT B6I BACKBONE NATIONAL HIGHWAY PERF FAST 2021 2703-00-72 05/11/2021 205 LET BRRPL 0.000 LOC STR W 6TH STREET $4,000,000 - $4,999,999 BRIDGE OVER ROOT RIVER (P-51-0709) CONST/BRIDGE REPLACEMENT P-51-0709 LOCAL BRIDGES STBG 5-200K POP FAST EXT 2021 2703-09-21 12/25/2021 206 R/E RECST 0.536 LOC STR N MAIN STREET $100,000 - $249,999 GOOLD ST TO MELVIN AVE RE/RECONSTRUCT NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2021 2703-11-20 01/25/2021 206 R/E MISC 0.686 LOC STR GOOLD STREET $0 - $99,999 DOUGLAS AVENUE TO MAIN STREET RE/RECONSTRUCT W/ NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG 2021 2703-11-70 12/14/2021 206 LET RECST 0.686 LOC STR GOOLD STREET $1,000,000 - $1,999,999 DOUGLAS AVENUE TO MAIN STREET CONST/RECONSTRUCT W/ NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2021-2024 FINAL STIP Project Listing 143 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2702-03-70 03/08/2022 205 LET BRRPL 0.000 LOC STR 58TH ROAD $250,000 - $499,999 BRIDGE OVER W BR ROOT RIVER CANAL CONST/BRIDGE REPLACEMENT/P-51-0058 LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E 2022 3834-00-72 11/08/2022 205 LET BRRPL 0.000 LOC STR JEFFERSON STREET $2,000,000 - $2,999,999 BRIDGE OVER FOX RIVER B-51-0001 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E 2024 2703-09-71 11/12/2024 206 LET RECST 0.536 LOC STR N MAIN STREET $2,000,000 - $2,999,999 GOOLD ST TO MELVIN AVE CONST/RECONSTRUCT NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2021 1693-34-76 02/25/2021 211 LLC MISC 0.000 NON LAKE MICHIGAN PATHWAY PHASE 4 $500,000 - $749,999 HWY 24TH ST TO NORTH SHORE BIKE TRAIL CONST/BIKE/PED TRAIL CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2023 1320-23-75 03/14/2023 303 LET MISC 0.000 OFF SYS STH 11, PARK AND RIDE RESTORATION $250,000 - $499,999 STH 11 PARK AND RIDE CONST/RESTORATION STATE 3R NON-FEDERAL 2021 1320-16-71 12/14/2021 211 LET TOSIG 5.990 STH 011 STH 11 $750,000 - $999,999 IH 94 TO OHIO STREET CONST/SIGNAL TIMING/SE0037 CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2021-2024 FINAL STIP Project Listing 144 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2260-08-70 09/14/2021 303 LET RECST 0.380 STH DURAND AVE, CITY OF RACINE $3,000,000 - $3,999,999 011 KEARNEY AVE TO EAST OF MEMORIAL DR CONST/RECONSTRUCT STATE 3R NATIONAL HIGHWAY PERF FAST 2022 1320-07-23 04/25/2022 303 R/E MISC 0.004 STH STH 11 $0 - $99,999 011 CTH J RE/ROUND ABOUT STATE 3R NON-FEDERAL 2024 1320-07-73 02/13/2024 303 LET MISC 0.004 STH STH 11 $1,000,000 - $1,999,999 011 CTH J HSIP/ROUND ABOUT SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2440-11-01 303 I/E RECST 1.640 STH WASHINGTON AVE, CITY OF RACINE $1,000,000 - $1,999,999 020 WEST BLVD TO MARQUETTE ST PE-FULL PS&E-RECST STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2250-14-71 12/14/2021 211 LET TOSIG 5.510 STH STH 20 $500,000 - $749,999 020 IH 94 TO STH 31 CONST/SIGNAL TIMING/SE0036 CONGESTION MITIGATION AND AIR QUALITY CONGESTION MITIGAT FAST (CMAQ) EX 2021 2250-15-20 05/25/2021 303 R/E MISC 1.240 STH WASHINGTON AVE - VIL OF MT PLEASANT $100,000 - $249,999 020 OAKES RD TO STH 31 2021-2024 FINAL STIP Project Listing 145 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding RE/RESURFACE STATE 3R NON-FEDERAL 2022 2340-03-73 02/08/2022 303 LET BRRHB 1.432 STH 020 WASHINGTON AVENUE $3,000,000 - $3,999,999 90TH STREET TO OAKES ROAD CONST/BRIDGE REHAB STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2340-00-79 09/12/2023 303 LET RSRF10 3.559 STH 020 EAST TROY - RACINE $1,000,000 - $1,999,999 HONEY CREEK ROAD TO BUENA PARK ROAD CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 2340-10-70 09/12/2023 303 LET RCND10 8.460 STH 020 WASHINGTON AVE, TOWN DOVER $9,000,000 - $9,999,999 STH 36 TO SB USH 45 CONST/RECONDITION STATE 3R NATIONAL HIGHWAY PERF FAST 2024 2250-15-70 09/10/2024 303 LET RSRF30 1.240 STH 020 WASHINGTON AVE - VIL OF MT PLEASANT $5,000,000 - $5,999,999 OAKES RD TO STH 31 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2022 2390-12-20 03/25/2022 303 R/E MISC 1.510 STH 031 GREEN BAY RD, C RACINE/V MT PLEASNT $1,000,000 - $1,999,999 STH 11 TO STH 20 RE/RECONSTRUCTION STATE 3R NON-FEDERAL 2023 2350-15-70 09/12/2023 303 LET RSRF30 4.620 STH 032 DOUGLAS AVE, VILLAGE CALEDONIA $3,000,000 - $3,999,999 4 MILE RD TO E COUNTY LINE RD CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2023 3180-00-76 01/10/2023 303 LET RSRF10 7.938 STH 036 STH 36/STH 11 BURLINGTON BYPASS $13,000,000 - $13,999,999 STH 83 TO STH 20 2021-2024 FINAL STIP Project Listing 146 Southeast Region RACINE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding CONST/RESURFACING STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2290-03-23 01/25/2021 303 R/E BRRPL 0.022 STH 038 NORTHWESTERN AVENUE $100,000 - $249,999 BRIDGE OVER ROOT RIVER B-51-0012 RE/BRIDGE REPLACEMENT STATE 3R NON-FEDERAL 2021 2290-24-20 12/25/2021 303 R/E BRSHRM 8.589 STH 038 CALEDONIA - OAK CREEK $0 - $99,999 DUNKELOW RD TO E OAKWOOD RD RE/RESURFACE STATE 3R NON-FEDERAL 2022 2290-03-73 12/13/2022 303 LET BRRPL 0.022 STH 038 NORTHWESTERN AVENUE $6,000,000 - $6,999,999 BRIDGE OVER ROOT RIVER B-51-0012 CONST/BRIDGE REPLACEMENT STATE 3R SURFACE TRANS BLOCK-FLEX E 2024 2290-24-70 09/10/2024 303 LET PSRS40 8.589 STH 038 CALEDONIA - OAK CREEK $4,000,000 - $4,999,999 DUNKELOW RD TO E OAKWOOD RD CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2022 1300-09-70 09/13/2022 303 LET RCND20 7.190 STH 083 NORTHWEST HIGHWAY (STH 83) $10,000,000 - $10,999,999 STH 20 TO IH 43 CONST/RECONDITIONING STATE 3R SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 147 Southeast Region SOUTHEAST REGION WIDE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 1000-33-40 303 I/E MISC 0.000 NON HWY UTILITY COORD-DEVELOP 6-YR PROGRAM $100,000 - $249,999 REGION-WIDE CE STATE 3R NON-FEDERAL 2021 1000-09-11 02/25/2021 303 C/E MISC 0.000 NON HWY MANUAL TRAFFIC COUNTS $2,000,000 - $2,999,999 SE REGION WIDE PE/FY 2021- FY 2026 STATE 3R NON-FEDERAL 2023 3742-00-17 07/25/2023 303 C/E MISC 0.000 NON HWY PDS PROGRAM CONTROL MANAGEMENT $750,000 - $999,999 TRACKING, FY 24-28 PE STATE 3R NON-FEDERAL 1000-01-32 303 I/E MISC 0.000 VAR HWY WEST ALLIS INVENTORY CONTROL $0 - $99,999 SE REGION PE STATE 3R NON-FEDERAL 1000-29-52 303 I/E MISC 0.000 VAR HWY VARIOUS HIGHWAYS $250,000 - $499,999 UTILITY COORDINATION -- STATE 3R NON-FEDERAL 2021 1000-03-04 10/25/2021 303 C/E MISC 0.000 VAR HWY SE REGION WIDE $2,000,000 - $2,999,999 EARLY SURVEY TO MEET ADV DATES PE/ANNUAL SURVEY PROJ IN SCOPING STATE 3R NON-FEDERAL 2021 1000-05-35 09/25/2021 303 C/E MISC 0.000 VAR HWY VARIOUS HIGHWAYS $750,000 - $999,999 REPLACE SECTION CORNERS - SEWRPC JV CONSULT CONTRACT W/VAR COUNTIES STATE 3R NON-FEDERAL 2021-2024 FINAL STIP Project Listing 148 Southeast Region SOUTHEAST REGION WIDE

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1000-70-14 02/25/2021 303 C/E MISC 0.000 VAR HWY THERMOGRAPHIC BRIDGE DECK SURVEYS $2,000,000 - $2,999,999 VARIOUS LOCATIONS FY 21-25 STATE 3R NON-FEDERAL 2022 1000-77-22 05/10/2022 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2022 $1,000,000 - $1,999,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/ PAVEMENT MARKING STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E 2022 1000-80-22 05/10/2022 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2022 $250,000 - $499,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/CLEAN & RELAMP LTG SYSTEMS STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL 2023 1000-77-23 05/09/2023 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2023 $1,000,000 - $1,999,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/PAVEMENT MARKING STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E 2023 1000-80-23 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2023 $250,000 - $499,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/CLEAN & RELAMP LTG SYSTEMS STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL 2023 1000-80-24 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2024 $250,000 - $499,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/CLEAN & RELAMP LTG SYSTEMS STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL 2024 1000-77-24 05/14/2024 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2024 $1,000,000 - $1,999,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/ PAVEMENT MARKING STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 149 Southeast Region STATEWIDE

Estimate Contract Net Project Description Anticipated Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Funding 2021 1000-20-64 12/14/2021 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2022 $500,000 - $749,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/SIGN BRIDGE REPAIR & REPLACE STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL 2022 1000-20-65 12/13/2022 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2023 $500,000 - $749,999 LOCATIONS ON STN PER ANNUAL PLAN CONST/SIGN BRIDGE REPAIR & REPLACE STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL 2021-2024 FINAL STIP Project Listing 150 Southeast Region WALWORTH

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 3839-00-70 03/08/2022 205 LET BRRPL 0.000 LOC STR LAUDERDALE DRIVE $1,000,000 - $1,999,999 BRIDGE OVER GREEN LAKE P-64-0921 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 3841-03-70 11/08/2022 205 LET BRRHB 0.000 LOC STR RICHMOND ROAD $500,000 - $749,999 BRIDGE OVER SWAN CREEK B-64-0157 CONST/BRIDGE REHABILITATION LOCAL BRIDGES STBG <5K POP FAST 2022 3841-05-00 07/25/2022 206 C/E RCND20 0.498 LOC STR WRIGHT STREET $250,000 - $499,999 RACINE ST (STH 11) TO HOBBS DRIVE PE-FULL PS&E-RCND20 STP URBAN 5,000 - 20,000 STBG 5-200K POP FAST EXT 2024 3841-05-70 11/12/2024 206 LET RCND20 0.498 LOC STR WRIGHT STREET $1,000,000 - $1,999,999 RACINE ST (STH 11) TO HOBBS DRIVE CONST/RECONDITION STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG 2021 3845-05-01 05/25/2021 290 C/E MISC 0.000 NON HWY SOUTH STREET TRAIL $100,000 - $249,999 LAKE SHORE-STH 120, ALONG H .5 MI S PE-LOCAL LET/PED TRAIL TAP 5,000 - 50,000 TRANS ALTERN 5-200K FAST E 2024 3845-05-71 03/25/2024 290 LLC MISC 0.000 NON HWY SOUTH STREET TRAIL $750,000 - $999,999 LAKE SHORE-STH 120, ALONG H .5 MI S CONST/TRAIL TAP 5,000 - 50,000 TRANS ALTERN 5-200K FAST E 2022 1320-22-70 05/10/2022 303 LET MISC 0.002 STH 011 ELKHORN - BURLINGTON $750,000 - $999,999 INDIAN RUN CR 0.7 MI E CLAUSSEN RD CONST/CULVERT REPLACE/REPAIR STATE 3R SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 151 Southeast Region WALWORTH

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 3180-00-77 05/10/2022 303 LET RSRF30 2.387 STH 011 BURLINGTON BYPASS $6,000,000 - $6,999,999 E OF LYONS TO E OF SPRING VALLEY RD CONST/RESURFACING STATE 3R NATIONAL HIGHWAY PERF FAST 2024 4910-02-70 09/10/2024 303 LET MISC 0.007 STH 011 ELKHORN-BURLINGTON $250,000 - $499,999 BAKER CREEK 0.8 MI NE OF USH 12 CONST/CULVERT REPLACE C-64-0038 STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 2698-03-21 03/25/2021 303 R/E MISC 5.200 STH 020 EAST TROY - RACINE $1,000,000 - $1,999,999 IH 43 TO HONEY CREEK RD RE/ PHASE 2 / RECONSTRUCT STATE 3R NON-FEDERAL 2023 2698-03-70 09/12/2023 303 LET RCND20 6.124 STH 020 EAST TROY - RACINE $13,000,000 - $13,999,999 THOMAS DRIVE TO HONEY CREEK ROAD CONST/RECONDITIONING STATE 3R SURFACE TRANS BLOCK-FLEX E 3170-09-00 303 I/E RSRF30 2.530 STH 050 W MAIN ST (CITY OF LAKE GENEVA) $250,000 - $499,999 FOREST ST TO GRAND GENEVA WAY PE-FULL PS&E-RSRF30 STATE 3R NATIONAL HIGHWAY PERF FAST 2021 1310-12-21 01/25/2021 303 R/E MISC 0.024 STH 050 STH 50(DELAVAN-LK GENEVA) $0 - $99,999 0.3 MILES W OF CTH F RE/CULVERT REPLACEMENT STATE 3R NON-FEDERAL 2021 1310-12-71 05/11/2021 303 LET MISC 0.024 STH 050 STH 50 (DELAVAN - LK GENEVA) $100,000 - $249,999 0.3 MILES W OF CTH F CONST/CULVERT REPLACEMENT STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 152 Southeast Region WALWORTH

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 1310-17-70 02/08/2022 303 LET RSRF20 7.958 STH 050 GENEVA RD, TOWN WHEATLAND $12,000,000 - $12,999,999 GRAND GENEVA WAY TO CTH O CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 3706-01-60 09/14/2021 303 LET PSRS40 7.577 STH 067 SHARON - WALWORTH $2,000,000 - $2,999,999 SALT BOX ROAD TO USH 14 CONST / PREVENTIVE MAINTENANCE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 3325-06-71 02/13/2023 303 LET RSRF30 1.210 STH 067 ELKHORN ROAD $2,000,000 - $2,999,999 GENEVA ST TO GLENWOOD DR CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 3325-06-72 02/13/2023 303 LET RSRF30 1.210 STH 067 ELKHORN ROAD $1,000,000 - $1,999,999 GENEVA ST TO GLENWOOD DR CONST/UTILITY STATE 3R NON-FEDERAL 2023 3390-04-70 04/11/2023 303 LET RSRF30 7.294 STH 089 RICHMOND - WHITEWATER $4,000,000 - $4,999,999 CTH A TO WILLIS RAY ROAD CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 3694-00-71 09/12/2023 303 LET RSRF20 9.422 STH 120 HEBRON - EAST TROY $7,000,000 - $7,999,999 STH 36 TO O'LEARY LN CONST/RSRF 20 RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 1080-12-70 09/14/2021 303 LET BRRHB 9.260 USH 012 USH 12 - STRUCTURES $1,000,000 - $1,999,999 STH 50 TO STH 67 CONST/BRIDGE REHAB STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 153 Southeast Region WALWORTH

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1080-12-72 09/14/2021 303 LET RSRF30 10.500 USH 012 LAKE GENEVA - ELKHORN RD (USH 12) $11,000,000 - $11,999,999 EB STH 50 TO STH 67 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 1080-12-73 09/14/2021 303 LET RSRF30 10.500 USH 012 LAKE GENEVA - ELKHORN RD (USH 12) $12,000,000 - $12,999,999 WB STH 50 TO STH 67 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 3120-12-20 12/25/2021 303 R/E MISC 0.598 USH 012 USH 12 $100,000 - $249,999 INTERSECTION WITH CTH ES RE/INTERSECTION MODIFICATION SAFETY (REGULAR HSIP) NON-FEDERAL 2022 3130-03-21 10/25/2022 303 R/E RSRF30 7.640 USH 012 WHITEWATER TO ELKHORN $0 - $99,999 COX ROAD TO STH 20/67 RE/RESURFACE STATE 3R NON-FEDERAL 2023 3120-13-70 11/14/2023 303 LET MISC 0.000 USH 012 USH 12 $250,000 - $499,999 INTERSECTION WITH STH 67 CONST/HSIP INTERSECT MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2024 3120-10-70 09/10/2024 303 LET RSRF10 7.420 USH 012 ELKHORN - WHITEWATER $4,000,000 - $4,999,999 STH 20 TO USH 12/STH 67 SPLIT CONST / RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2024 3120-12-70 09/10/2024 303 LET MISC 0.698 USH 012 ELKHORN - WHITEWATER $1,000,000 - $1,999,999 INTERSECTION WITH CTH ES CONST/INTERSECTION MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 154 Southeast Region WALWORTH

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 3150-06-20 05/25/2022 303 R/E MISC 14.200 USH 014 USH 14 $2,000,000 - $2,999,999 CTH K TO ILLINOIS ST LINE RE/RECONDITIONING/MILL & OVERLAY STATE 3R NON-FEDERAL 2023 3150-07-70 09/12/2023 303 LET PVRPLA 2.780 USH 014 USH 14 $4,000,000 - $4,999,999 IH 43 TO CTH K CONST/PAVEMENT REPLACEMENT STATE 3R SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 155 Southeast Region WASHINGTON

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 4867-01-70 08/10/2021 205 LET BRRPL 0.000 CTH H CTH H $1,000,000 - $1,999,999 BRIDGE OVER MILWAUKEE RIVER B660655 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2023 2711-06-70 12/12/2023 206 LET RECST 1.846 CTH P CTH P $2,000,000 - $2,999,999 STH 145 TO SHERMAN ROAD CONST/RECONSTRUCT NO ADDL LANES STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2023 2709-07-70 04/11/2023 206 LET MISC 0.028 CTH Q CTH Q $1,000,000 - $1,999,999 INTERSECTION WITH HILLSIDE ROAD CONST/INTERSECTION MOD-ROUND-ABOUT SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 1100-17-79 09/14/2021 303 LET BRRHB 14.560 IH 041 MILWAUKEE - FOND DU LAC $250,000 - $499,999 STH 144 TO DODGE CO LINE CONST/BRIDGE REHAB SEG 7 PROJ B1A BACKBONE NATIONAL HIGHWAY PERF FAST 2024 1100-43-70 01/09/2024 303 LET BRRHB 11.509 IH 041 MILWAUKEE - FOND DU LAC $15,000,000 - $16,999,999 WASHINGTON CO LINE TO STH 60 CONST/BRIDGE REHAB BACKBONE NATIONAL HIGHWAY PERF FAST 2024 1100-43-90 01/25/2024 303 MIS MISC 19.770 IH 041 MILWAUKEE - FOND DU LAC $500,000 - $749,999 WASHINGTON CO LINE TO STH 60 TRAFFIC MITIGATION 1100-43-70 BACKBONE NON-FEDERAL 2021 2712-03-70 05/11/2021 206 LET MISC 0.003 LOC STR FREISTADT ROAD $750,000 - $999,999 INTERSECTION WITH MAPLE ROAD CONST/HSIP/TRAFFIC SIGNALS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 156 Southeast Region WASHINGTON

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2736-00-70 11/09/2021 205 LET BRRPL 0.000 LOC STR CEDAR CREEK ROAD $500,000 - $749,999 BRIDGE OVER BRANCH OF CEDAR CREEK CONST/BRIDGE REPLACEMENT P-66-0904 LOCAL BRIDGES NON-FEDERAL 2021 4824-04-70 11/09/2021 205 LET BRRPL 0.000 LOC STR TRADING POST TRAIL ROAD $750,000 - $999,999 BR OVR N BR MILW RIVER P-66-0907 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 2707-06-70 03/08/2022 206 LET RECST 0.522 LOC STR 18TH AVENUE $2,000,000 - $2,999,999 VOGT DRIVE TO PARADISE DRIVE CONST/RECONSTRUCT STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT 2022 4824-03-71 03/08/2022 205 LET BRRHB 0.000 LOC STR BADGER ROAD $500,000 - $749,999 BRIDGE OVER KEWASKUM CREEK P-66-913 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES STBG <5K POP - FAST EXT 2024 1410-00-73 09/10/2024 303 LET RSRF30 2.734 STH 033 WEST BEND TO NEWBURG, T OF TRENTON $2,000,000 - $2,999,999 1/2 MI WEST OF N POPLAR RD TO CTH Y CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2310-13-20 09/25/2021 303 R/E RSRF30 1.040 STH 060 MAIN ST, VILLAGE JACKSON $0 - $99,999 CTH P TO EAGLE DR RE/RESURFACE STATE 3R NON-FEDERAL 2023 2310-13-70 09/12/2023 303 LET RSRF20 1.650 STH 060 MAIN ST, VILLAGE JACKSON $3,000,000 - $3,999,999 CTH P TO EAGLE DR CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 157 Southeast Region WASHINGTON

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 1330-22-20 09/25/2021 303 R/E MISC 3.910 STH 083 STH 83 $0 - $99,999 STH 167 TO MONROE AVENUE RE / RESURFACING STATE 3R NON-FEDERAL 2024 1330-22-70 09/10/2024 303 LET RSRF30 3.910 STH 083 STH 83 - HARTFORD TO CHENEQUA $2,000,000 - $2,999,999 STH 167 TO MONROE AVENUE CONST / RESURFACING STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 2300-06-20 03/25/2021 303 R/E MISC 2.105 STH 167 STH 167 $100,000 - $249,999 CTH K TO CTH CC RE/RESURFACE SAFETY (REGULAR HSIP) NON-FEDERAL 2024 2300-06-70 04/09/2024 303 LET MISC 2.105 STH 167 STH 167 $1,000,000 - $1,999,999 CTH K TO CTH CC CONST/RESURFACE SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 3360-17-20 01/25/2021 303 R/E MISC 0.002 STH 175 STH 175 $0 - $99,999 OVER LITTLE CEDAR CREEK RE/CULVERT REPLACEMENT STATE 3R NON-FEDERAL 2022 1000-09-86 12/13/2022 303 LET BRRHB 0.000 USH 045 USH 45 $100,000 - $249,999 IH 41/USH 45 BOX CULVERT CONST/BRIDGE REHABILITATION STATE 3R SURFACE TRANS BLOCK-FLEX E 2023 4070-00-70 09/12/2023 303 LET RSRF30 1.212 USH 045 FOND DU LAC AVENUE $2,000,000 - $2,999,999 WB CTH H TO WB STH 28 CONST / RESURFACING STATE 3R NATIONAL HIGHWAY PERF FAST 2021-2024 FINAL STIP Project Listing 158 Southeast Region WASHINGTON

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2023 4070-00-71 09/12/2023 303 LET RSRF30 1.198 USH 045 FOND DU LAC AVENUE $1,000,000 - $1,999,999 WB CTH H TO WB STH 28 CONST / RESURFACING STATE 3R NON-FEDERAL 2022 3360-17-70 05/10/2022 303 LET MISC 0.002 VAR HWY STH 175 AND STH 167 $750,000 - $999,999 LOCATIONS ON STN PER PLAN CONST/CULVERT REPLACEMENT STATE 3R SURFACE TRANS BLOCK-FLEX E 2021-2024 FINAL STIP Project Listing 159 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 3779-03-70 04/12/2022 206 LET MISC 0.009 CTH B CTH B $250,000 - $499,999 INTERSECTION WITH MORGAN ROAD CONST/INTERSECTION MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 3781-03-70 04/13/2021 206 LET MISC 0.007 CTH C CTH C $500,000 - $749,999 INTERSECTION WITH HASSLINGER DRIVE PE/SAFETY HSIP, RECONSTRUCT INTERS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2773-05-71 05/11/2021 206 LET RSRF30 3.040 CTH D CTH D $2,000,000 - $2,999,999 CALHOUN ROAD TO E COUNTY LINE CONST/RESURFACE STP URBAN OVER 200,000 STP-MADISON/MILW/RNDLK/AP/ 2021 3782-04-70 11/09/2021 206 LET MISC 0.015 CTH D CTH D $500,000 - $749,999 INTERSECTION W/ MORAINE HILLS DRIVE CONST/INTERSECTION MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2754-05-00 05/25/2021 206 M/E MISC 0.029 CTH F CTH F $100,000 - $249,999 INTERSECTION WITH LINDSAY ROAD PE/HSIP INTERSECT MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2022 2717-03-70 12/13/2022 205 LET BRRHB 0.000 CTH F REDFORD BLVD $500,000 - $749,999 BRIDGE OVER GREEN ROAD, B-67-0095 CONST/BRIDGE REHABILITATION LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E 2023 2754-05-70 04/11/2023 206 LET MISC 0.029 CTH F CTH F $750,000 - $999,999 INTERSECTION WITH LINDSAY ROAD CONST/HSIP INTERSECT MODIFICATION SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 160 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2021 2722-04-01 12/25/2021 206 C/E PVRPLA 1.469 CTH O MOORLAND ROAD $750,000 - $999,999 CTH D TO STH 59 PE/FULL PS&E-RE-PVRPLA STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2722-07-21 02/25/2021 206 R/E PVRPLA 0.770 CTH O MOORLAND ROAD $500,000 - $749,999 I-94 TO W BLUEMOUND ROAD RE/RESURFACE STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2722-07-22 02/25/2021 206 R/E PVRPLA 1.358 CTH O MOORLAND ROAD $750,000 - $999,999 W BELOIT ROAD TO W NATIONAL AVENUE RE/REPLACEMENT STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2722-08-01 03/25/2021 206 C/E PVRPLA 1.326 CTH O MOORLAND ROAD $500,000 - $749,999 CTH ES TO CTH D PE/FULL PS&E-RE-PVRPLA STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2722-08-02 07/25/2021 206 C/E RECSTE 1.065 CTH O MOORLAND ROAD $1,000,000 - $1,999,999 CTH HH TO GRANGE AVENUE PE/FULL PS&E RE-PVRPLA STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2722-08-21 12/25/2021 206 R/E PVRPLA 1.326 CTH O MOORLAND ROAD $750,000 - $999,999 CTH ES TO CTH D RE/PAVEMENT REPLACEMENT STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2022 2722-07-71 02/08/2022 206 LET PVRPLA 0.770 CTH O MOORLAND ROAD $6,000,000 - $6,999,999 I-94 TO W BLUEMOUND ROAD CONST/RESURFACE STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021-2024 FINAL STIP Project Listing 161 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2022 2722-08-22 12/25/2022 206 R/E RECSTE 1.065 CTH O MOORLAND ROAD $500,000 - $749,999 CTH HH TO GRANGE AVENUE RE/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2023 2722-04-21 01/25/2023 206 R/E PVRPLA 1.469 CTH O MOORLAND ROAD $1,000,000 - $1,999,999 CTH D TO STH 59 RE/PAVEMENT REPLACEMENT STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2023 2722-07-72 01/10/2023 206 LET PVRPLA 1.358 CTH O MOORLAND ROAD $11,000,000 - $11,999,999 W BELOIT ROAD TO W NATIONAL AVE CONST/REPLACEMENT STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2024 2722-08-71 12/10/2024 206 LET PVRPLA 1.326 CTH O MOORLAND ROAD $6,000,000 - $6,999,999 CTH ES TO CTH D CONST/PAVEMENT REPLACEMENT STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2024 2722-08-72 12/10/2024 206 LET RECSTE 1.065 CTH O MOORLAND ROAD $7,000,000 - $7,999,999 CTH HH TO GRANGE AVENUE CONST/RECONSTRUCT NO ADD'L LANES STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2024 2717-04-70 01/09/2024 206 LET RSRF30 0.970 CTH T GRANDVIEW BLVD $2,000,000 - $2,999,999 NORTHVIEW ROAD TO IH-94 CONST/RESURFACE STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2753-08-00 09/25/2021 206 M/E MISC 0.009 CTH VV CTH VV $100,000 - $249,999 INTERSECTION WITH CTH YY PE/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021-2024 FINAL STIP Project Listing 162 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding 2023 2753-08-70 04/11/2023 206 LET MISC 0.009 CTH VV CTH VV $750,000 - $999,999 INTERSECTION WITH CTH YY CONST/HSIP SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2021 2794-05-70 11/09/2021 205 LET BRRHB 0.000 CTH XX CTH XX $100,000 - $249,999 BRIDGE OVER PEBBLE BROOK B-67-0195 CONST/BRIDGE DECK OVERLAY LOCAL BRIDGES NON-FEDERAL 2021 1090-35-90 02/25/2021 303 MIS MISC 6.620 IH 043 IH 43 ROCK FREEWAY $0 - $99,999 STH 164 TO BELOIT ROAD TRAFFIC MITIGATION 1090-35-70 BACKBONE NON-FEDERAL 2022 1090-08-71 01/11/2022 303 LET RSRF20 3.610 IH 043 IH 43 ROCK FREEWAY $17,000,000 - $19,999,999 MOORLAND RD TO HALE I/C CONST/RESURFACE BACKBONE NATIONAL HIGHWAY PERF FAST 1060-13-06 303 I/E RSRF30 9.343 IH 094 IH 94 EAST WEST FREEWAY $4,000,000 - $4,999,999 STH 16 TO WAUKESHA E CO LN PE/FULL PS&E RSRF30 BACKBONE NATIONAL HIGHWAY PERF FAST 2021 1060-10-70 09/14/2021 303 LET BRRPL 0.000 IH 094 IH 94 EAST WEST FREEWAY $3,000,000 - $3,999,999 ELMHURST ROAD OVERPASS (B-67-0059) CONST/BRIDGE REPLACEMENT BACKBONE NATIONAL HIGHWAY PERF FAST 2021 1060-10-90 09/25/2021 303 MIS MISC 0.000 IH 094 IH 94 EAST WEST FREEWAY $100,000 - $249,999 ELMHURST ROAD OVERPASS (B-67-0059) 2021-2024 FINAL STIP Project Listing 163 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding TRAFFIC MITIGATION - 1060-10-70 BACKBONE NON-FEDERAL 2024 1060-47-70 09/10/2024 303 LET RSRF30 5.960 IH 094 IH 94 EAST WEST FREEWAY $25,000,000 - $29,999,999 STH 83 TO CTH T CONST/RESURFACE BACKBONE NATIONAL HIGHWAY PERF FAST 2024 1060-47-90 09/25/2024 303 MIS MISC 15.330 IH 094 IH 94 EAST WEST FREEWAY $750,000 - $999,999 STH 83 TO CTH T TRAFFIC MITIGATION 1060-47-70 BACKBONE NON-FEDERAL 2021 2718-04-21 01/25/2021 206 R/E RECST 0.320 LOC STR W ST PAUL AVENUE $100,000 - $249,999 MOUNTAIN AVE TO MADISON ST RE/RECONSTRUCT NO ADDED CAPACITY STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST 2021 2718-04-71 12/14/2021 206 LET RECST 0.320 LOC STR W ST PAUL AVENUE $4,000,000 - $4,999,999 MOUNTAIN AVE TO MADISON ST CONST/RECONSTRUCT NO ADDED CAPACITY STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2021 2718-19-70 11/09/2021 205 LET BRRHB 0.000 LOC STR MADISON STREET $100,000 - $249,999 BRIDGE OVER FOX RIVER B-67-0099 CONST/DECK OVERLAY LOCAL BRIDGES NON-FEDERAL 2021 2720-07-01 07/25/2021 206 C/E RECST 1.413 LOC STR MENOMONEE AVENUE $500,000 - $749,999 TOWN HALL ROAD TO STH 175 PE/FULL PS&E-RECST 2021-2024 FINAL STIP Project Listing 164 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding STP URBAN OVER 200,000 STBG FAST OFF-SYS BRIDGE E 2022 2370-04-70 02/08/2022 205 LET BRRPL 0.000 LOC STR DUPLAINVILLE ROAD $250,000 - $499,999 BRIDGE OVER SPRING CREEK B-67-0009 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES NON-FEDERAL 2022 2720-05-01 07/25/2022 205 C/E BRRPL 0.000 LOC STR OVERVIEW DRIVE $100,000 - $249,999 BRIDGE OVER BUTLER DITCH, P-67-0774 PE/FULL PS&E-BRRPL LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E 2022 2720-09-70 02/08/2022 205 LET BRRPL 0.000 LOC STR LILLY ROAD $500,000 - $749,999 BRIDGE OVER MENOMONEE RIVER CONST/BRIDGE REPLACEMENT B-67-0261 LOCAL BRIDGES NON-FEDERAL 2023 3853-03-70 11/14/2023 205 LET BRRPL 0.000 LOC STR DELAFIELD ROAD $250,000 - $499,999 BRIDGE OVER BATTLE CREEK B-67-0670 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E 2024 2720-05-71 11/12/2024 205 LET BRRPL 0.000 LOC STR OVERVIEW DRIVE $750,000 - $999,999 BRIDGE OVER BUTLER DITCH, P-67-0774 CONST/BRIDGE REPLACEMENT LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E 2021 1693-34-40 09/25/2021 211 TST MISC 0.000 NON WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999 HWY FY 2022 TST/TRANSIT-MARKETING 2021-2024 FINAL STIP Project Listing 165 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2022 2718-14-71 01/25/2022 290 LLC MISC 0.000 NON PEWAUKEE TO BROOKFIELD FACILITY $1,000,000 - $1,999,999 HWY RIVER RD TO S OF WATERTOWN ROAD CONST/PED/BIKE TAP > 200,000 TRANS ALTERN >200K FAST EX 2023 1693-34-41 09/25/2023 211 TST MISC 0.000 NON WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999 HWY FY 2024 TST/TRANSIT-MARKETING CONGESTION MITIGATION AND AIR QUALITY PROJ RDUCE PM 2.5 EMI (CMAQ) FAST 2021 3310-07-00 11/25/2021 303 C/E PSRS20 3.587 STH 016 OCONOMOWOC - NASHOTAH $250,000 - $499,999 STH 67 TO 0.7 MILES EAST OF CTH P PE/FULL PS&E-PSRS20 STATE 3R NATIONAL HIGHWAY PERF FAST 2022 1370-17-70 08/09/2022 303 LET MISC 7.373 STH 016 STH 16 $2,000,000 - $2,999,999 5800' WEST OF STH 83 TO STH 190 CONST/HSIP/GUARD RAILS SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST 2450-07-00 303 I/E PSRS10 3.622 STH 059 STH 59 EAST WAUKESHA BYPASS $100,000 - $249,999 CTH X TO SUNSET DRIVE PE/PSRS10 RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2773-10-20 03/25/2021 303 R/E MISC 0.000 STH 059 EAST WAUKESHA BYPASS $100,000 - $249,999 SUNSET DRIVE TO ARCADIAN AVENUE 2021-2024 FINAL STIP Project Listing 166 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding RE / RESURFACE STATE 3R NON-FEDERAL 2021 2773-10-22 03/25/2021 303 R/E MISC 0.005 STH 059 EAST WAUKESHA BYPASS $0 - $99,999 STH 59 AND CTH XX INTERSECTION RE/INTERSECTION IMPROVEMENTS STATE 3R NON-FEDERAL 2023 2773-10-70 09/12/2023 303 LET RCND10 1.990 STH 059 EAST WAUKESHA BYPASS $6,000,000 - $6,999,999 SUNSET DRIVE TO ARCADIAN AVENUE CONST/PATCH/REPAIR/GRIND/INTERSCT STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2773-10-72 09/12/2023 303 LET MISC 0.005 STH 059 EAST WAUKESHA BYPASS $250,000 - $499,999 STH 59 AND CTH XX INTERSECTION CONST/INTERSECTION IMPROVEMENTS STATE 3R NON-FEDERAL 2022 3120-01-61 02/08/2022 303 LET PSRS40 9.610 STH 067 DOUSMAN - EAGLE $4,000,000 - $4,999,999 1000' N STH 59 TO 200' S USH 18 CONST/RESURFACE STATE 3R SURFACE TRANS BLOCK-FLEX E 2021 1330-00-23 10/25/2021 303 R/E MISC 3.229 STH 083 DELAFIELD - HARTLAND $500,000 - $749,999 GOLF RD TO VETTELSON RD RE/PAVEMENT REPLACEMENT STATE 3R NON-FEDERAL 2023 1330-29-70 09/12/2023 303 LET RSRF10 2.742 STH 083 STH 83 (MILL ST) $2,000,000 - $2,999,999 OCONOMOWOC RVR TO N WAUKESHA CO LN CONST/RESURFACE (B-67-0952) 2021-2024 FINAL STIP Project Listing 167 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding STATE 3R SURFACE TRANS BLOCK-FLEX E 2022 2025-03-23 01/25/2022 303 R/E RSRF30 4.054 STH 190 CAPITOL DR, CITY OF BROOKFIELD $100,000 - $249,999 BROOKFIELD RD TO 124TH ST RE/RESURFACE STATE 3R NON-FEDERAL 2024 2025-07-73 09/10/2024 303 LET RSRF30 1.746 STH 190 CAPITOL DRIVE $9,000,000 - $9,999,999 STH 16 TO .3 MI E OF 5 FIELDS RD CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2021 2200-20-20 10/25/2021 303 R/E RSRF30 5.264 USH 018 BLUEMOUND ROAD $100,000 - $249,999 IH 94 TO EAST COUNTY LINE RE/RESURFACE STATE 3R NON-FEDERAL 2021 2210-12-20 07/25/2021 303 R/E RCND10 5.120 USH 018 SUMMIT AVE, TOWN DELAFIELD $0 - $99,999 STH 83 TO STH 318 RE/RECONDITION STATE 3R NON-FEDERAL 2021 3080-04-20 06/25/2021 303 R/E RSRF30 3.965 USH 018 SUNSET DRIVE $0 - $99,999 STH 67 TO MORAINE VIEW DR RE/RESURFACE STATE 3R NON-FEDERAL 2023 2210-12-70 09/12/2023 303 LET RSRF30 5.120 USH 018 SUMMIT AVE, TOWN DELAFIELD $5,000,000 - $5,999,999 STH 83 TO STH 318 CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2023 3080-04-70 03/14/2023 303 LET RSRF30 3.965 USH 018 SUNSET DRIVE $3,000,000 - $3,999,999 2021-2024 FINAL STIP Project Listing 168 Southeast Region WAUKESHA

Contract Net Project Description Estimate Year Project Schd Dt Pgm Type CONCEPT Miles Route WISDOT Program Anticipated Funding STH 67 TO MORAINE VIEW DR CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2024 2200-20-70 09/10/2024 303 LET RSRF30 5.264 USH 018 BLUEMOUND ROAD $13,000,000 - $13,999,999 IH 94 TO EAST COUNTY LINE CONST/RESURFACE STATE 3R NATIONAL HIGHWAY PERF FAST 2023 2715-03-73 03/14/2023 303 LET BRRPL 0.000 VAR VARIOUS BRIDGE LOCATIONS $3,000,000 - $3,999,999 HWY STH 59 & USH 18 CONST/BRIDGE REPLACEMENT STATE 3R SURFACE TRANS BLOCK-FLEX E