Construction Projects Cost Overrun: What Does the Literature Tell Us?

Total Page:16

File Type:pdf, Size:1020Kb

Construction Projects Cost Overrun: What Does the Literature Tell Us? International Journal of Innovation, Management and Technology, Vol. 8, No. 2, April 2017 Construction Projects Cost Overrun: What Does the Literature Tell Us? Abdulelah Aljohani, Dominic Ahiaga-Dagbui, and David Moore Humber bridge in the UK (175% overrun) and the Paris Nord Abstract—Construction industries have a poor reputation in TGV in France (25% overrun) [3]. In Korea, a study done by terms of finishing projects on budget. Nine out of ten projects Seung Heon, Sungmin [4] showed that the average final cost normally experience cost overrun. Different causes for cost of seven megaprojects (defined as a project that cost more overrun have been identified. This paper critically reviews the literature concerning cost overrun in construction projects in than $1 billion) at completion increased by 122.4% compared different countries to identify the main potential causes. 173 to the original budgeted cost. The average cost overrun for 29 causes of cost overrun have been found in seventeen contexts medium sized projects (defined as a project that cost between with the main potential causes being: frequent design change, $50 million and $1 billion) studied within the same time span, contractors’ financing, payment delay for completed work, lack is 32.5%. Another study conducted by Merrow, McDonnell [5] of contractor experience, poor cost estimation, poor tendering includes 52 Megaprojects from different regions around the documentation, and poor material management. world and their budgets between $0.5 and $30 billion (in 1984 Index Terms—Construction projects, cost overrun, literature value US dollars). The results show that only 4 projects met review. their cost goals, while the rest accrued average cost overruns of 88%. From the USA, Pickrell’s [6], [7] studies of cost estimation in eight US rail projects identified an average cost I. INTRODUCTION overrun of 61%. Moreover, a Dutch study containing 78 Besides being unique, expensive and usually carried out projects (Road: 37 projects, Rail: 26 projects, Tunnel: 8 within a limited time frame, construction projects have been projects, Bridge: 7 projects) found an average cost overrun of described as complicated and uncertain in nature, as no two 16.5% [8]. Finally, a study published by Flyvbjerg, Bruzelius construction projects are ever exactly the same. Even if two [3] concerning the quality of the estimating of cost and construction projects are similar, the opportunity for exactly demand in 258 transport projects located in twenty countries repeating the process of execution is very low, as most of the (constructed between 1927 and 1998) found that nine out of projects’ elements are site-specific. Although the level of ten projects (86% of the projects) experienced cost overrun, investment represented by construction projects has increased with the overall average overrun being 28%. over the years, construction projects have a consistently poor In light of the above, cost overrun should be regarded as a record in finishing within budget. Morris [1] considers cost vital issue in the management of construction projects overrun as a “regular feature” for public projects. Himansu [2] globally; this phenomenon is not limited to a specific country defines cost overrun as “…the degree to which the final cost as the above studies show. The variation on the percentages of of the project exceeds the ‘base’ estimate”. cost overrun could be related to different factors such as the Construction projects experiencing cost overrun have the project size [9]-[11], project type [11] and project location as potential to become defaulted projects, with a resultant it was one of the main findings obtained from the following significant impact on all the projects’ parties. For example: studies [8], [12]-[14]. Equally, the studies support the claim clients will be unable to use the facility, as the projects have that the worldwide findings are not always applicable for not finished yet, and consultation and designing fees might individual countries. increase. For contractors the impact could include loss of reputation and being “trapped” in only one project for long time. II. METHODOLOGY One of the most famous projects to experience cost overrun A large number of factors leading to project cost overruns was the Channel Tunnel project. Construction costs increased have already been identified by previous studies. This study from £2600 million to £4650 million (80% higher than the takes such previous studies one step forward by identifying forecasted costs) [3]. Other examples of projects with cost the main potential factors leading to cost overrun within overrun are found in different countries around the world such different contexts. The identification of these factors should as: the Great Belt link in Denmark (54% overrun), the improve the performance of construction projects and increase the probability of successful project completion. A critical literature review methodology is used to achieve this Manuscript received June 24, 2016; revised August 30, 2016. This work goal. was supported by Albaha University, Albaha, Saudi Arabia and Robert Gordon University, UK. A. Previous Studies The authors are with the Scott Sutherland School of Architecture and Built Environment, Robert Gordon University, Garthdee Road, Aberdeen, Table I comprises the 17 national studies selected from the AB10 7QB, Scotland, UK (e-mail: [email protected], literature review. [email protected], [email protected]). doi: 10.18178/ijimt.2017.8.2.717 137 International Journal of Innovation, Management and Technology, Vol. 8, No. 2, April 2017 TABLE I: SUMMARY OF THE PREVIOUS STUDIES Study Country Methodology Number of Study Country Projects’ type Projects Phase factors [15] Malaysia Building projects cost more Not mentioned identified than $ 1.1 M. owners, 17.5% worked for [16] Nigeria Telecom projects Not mentioned contractors, 14.8% designers, 8% [17] WW Transport projects Planning and consulting companies, 2.1% as construction private owners). [18] Turkey Residential construction Not mentioned [21] Saudi Identified factors from the existing 41 projects Arabia literature. [19] Pakistan Construction projects Not mentioned Analysis 160 questionnaire survey [20] Israel Building and infrastructure Not mentioned (160 Project Manager (23% Owners, projects 52% Contractors, 25% [21] Saudi Infrastructure projects Not mentioned Consultants)). Arabia [22] Kuwait Identified factors from the existing 7 [22] Kuwait Private residential projects Implementation literature. Phase Analysis 450 personal interview [23] Australia Highway construction projects Not mentioned survey of owners. (450 house [24] Gaza Strip Building, roads, water and Implementation owners). sewage, electro-mechanical Phase [23] Australia Analysis 231 highway projects (140 37 and public works. open tender, 91 negotiate, and 7 [25] UK Construction projects Not mentioned panel experts) [26] Indonesia High-rise projects Implementation [24] Gaza Identified factors from literature 42 Phase Strip review, personal interviews with a [27] Uganda Construction projects Implementation number of contractors and the Phase experiences of the researchers. Analysis 66 questionnaire survey (66 [28] South FIFA World Cup stadia Not mentioned Contractors). Africa [25] UK Analysis 141 open-ended 341 [29] Nigeria Highway projects Not mentioned questionnaire, asking professional [30] Ghana Groundwater projects Implementation cost estimators to list up to five phase reasons for cost overrun. [31] Zambia Road construction projects Not mentioned [26] Indonesia Identified factors from literature 7 review. Most of the studies have not identified in which project Analysis 31 questionnaire survey (31 phase the cost overrun occurred; only six out of seventeen Project Manager) The questionnaire survey was studies identify the causes of cost overrun during the supported by follow-up interviews. implementation phase. [27] Uganda Identified factors using face-to-face 22 discussion B. Previous Studies Methodologies Analysis 742 questionnaire survey As the summary table shows, almost all the studies (13 out (30% client, 57% consultant, 13% contractors). of 17) used a questionnaire as the sole data collecting method. [28] South Identified factors from the existing 18 The respondents for the questionnaire typically comprised all Africa literature. the projects stakeholders (Owners, Contractors and Analysis 22 questionnaire survey (5 Consultants) (see Table II). clients, 3 contractors, 14 consultant). [29] Nigeria Analysis completed highway 23 projects. TABLE II: SUMMARY OF THE PREVIOUS STUDIES Identified factors from the existing Study Country Methodology Number of literature. factors Analysis 37 questionnaire survey (9 identified clients, 15 contractors, [15] Malaysia Preliminary study (interview). 35 13consultants). Analysis 97 questionnaire survey (16 [30] Ghana Identified factors from the existing 26 Clients, 25 Consultants, 56 literature. Contractors). Analysis 72 questionnaire survey (28 [16] Nigeria Identified factors from the existing 42 owners, 25 contractors, literature. 19consultants). Analysis 53 questionnaire survey (23% Clients, 41% Consultants, 36% Contractors). [17] WW Analysis 258 projects. 3 III. RESULTS [18] Turkey Identified factors from the existing 40 The total number of factors identified across the 16 studies literature. Analysis 79 questionnaire survey (30 reaches 366 factors. After removing factors that are PM Consultants, 26 Contractors, 23 essentially a duplication
Recommended publications
  • An Assessment of the Causes of Schedule and Cost Overruns in South African Megaprojects: a Case of the Critical Gov.Za> Energy Sector Projects of Medupi and Kusile
    Review articles • Oorsigartikels Fhumulani Tshidavhu Ms Fhumulani Tshidavhu, Old Mutual Building, 78 Hans Van Rensburg Street, Polokwane, 0699, Limpopo, Published by the UFS RSA National Department of Public http://journals.ufs.ac.za/index.php/as Works, Polokwane, South Africa. Phone: 071 679 8604, © Creative Commons With Attribution (CC-BY) e-mail: <Fhumulani.Tshidavhu@dpw. How to cite: Tshidavhu, F. & Khatleli, N. 2020. An assessment of the causes of schedule and cost overruns in South African megaprojects: A case of the critical gov.za> energy sector projects of Medupi and Kusile. Acta Structilia, 26(2), pp. 119-143. Nthatisi Khatleli AN ASSESSMENT OF THE CAUSES Dr Nthatisi Khatleli, senior lecturer, School of Construction Economics OF SCHEDULE AND COST and Management, University of OVERRUNS IN SOUTH AFRICAN the Witwatersrand, Johannesburg, South Africa. MEGAPROJECTS: A CASE Phone: 011 7177651, e-mail: <[email protected]> OF THE CRITICAL ENERGY DOI: http://dx.doi. SECTOR PROJECTS OF org/10.18820/24150487/as27i1.5 MEDUPI AND KUSILE ISSN: 1023-0564 e-ISSN: 2415-0487 Peer reviewed and revised March 2020 Acta Structilia 2020 27(1): 119-143 Published June 2020 *The authors declared no conflict of interest for the article or title ABSTRACT Cost and schedule overruns are the most common challenges in mega construction projects around the globe, and South Africa is no different. Although comparatively small in number, megaprojects have an inordinate number of projects failing, due to budget overflow and schedule slippage. This article assessed the causes of cost and schedule overruns as well as the challenges with the implementation of critical construction megaprojects, using Kusile and Medupi energy-sector megaprojects in South Africa.
    [Show full text]
  • 78 Risk Assessment of Time and Cost Overrun Factors Throughout
    Risk Assessment of Time and Cost Overrun Factors throughout Construction Project Lifecycle Prof. Mostafa Hasan Kotb1, Prof. Amin Saleh Aly2 and Eng. Khaled Muhammad Ali Muhammad3 1Professor, Structural Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt 2Professor, Structural Engineering Department, Faculty of Engineering, Ain Shams University, Cairo, Egypt 3PhD Student,, Structural Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt [email protected] Abstract: The construction industry has a reputation for delivering projects over budget. This research identifies actual project examples illustrating the problem of cost overruns. Results of a questionnaire survey present perceptions of the main reasons why building construction projects sometimes exceed the initial budget estimate. The paper reviews how the construction industry is responding to the challenge of accurate budgeting. In the domain of facility capital cost budgets and risk management, two key conclusions are made. Firstly, that complete design information leads to more accurate budget estimates. Secondly, that client driven design change is the greatest risk. Clients are the key drivers of change and they must therefore take a look at themselves before blaming the industry for being inefficient. [Mostafa Hasan Kotb, Amin Saleh Aly, and Khaled Muhammad Ali Muhammad. Risk Assessment of Time and Cost Overrun Factors throughout Construction Project Lifecycle. Life Sci J 2019;16(9):78-91]. ISSN: 1097- 8135 (Print)
    [Show full text]
  • Simulation Modeling of Cost Overrun in Construction Project in Ethiopia Geletaw Taye
    International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-8 Issue-4, November 2019 Simulation Modeling of Cost Overrun in Construction Project in Ethiopia Geletaw Taye Abstract: Cost is an essential part of any construction worldwide and it is more severe in developing countries. project. It was observed that cost overrun is one of the most Like many other developing countries, the construction frequently occurring issues in construction projects of Ethiopia and it is more severe in different parts of the country. The aim of industry in Ethiopia also affected by the cost overrun. Most this research has identified the factors that influence cost of the construction projects in Ethiopia are exposed to cost overruns of construction projects, quantified the percentage of overrun this leading to loss of projects profit, budget identified factors, established probability distribution of identified shortfall of project owners, falling the project to deliver on factors and develop simulation modeling of cost overrun. The study was conducted based on the desk study and questionnaire time, the company or firms exposed to bad debt or survey. Questionnaire surveys were analyzed by using Relative bankruptcy, and it also considered another a big problem, Important Index (RII) ranking and significance of data checked which hinders project's progress since it decreases the by using a t-test at a 95% confidence level. Based on the desk study of 19 projects, a simulation model of cost overrun was contractor profit leading to huge losses leaving the project in developed by using the Monte Carlo simulation method. a big trouble.
    [Show full text]
  • Using Agile in Construction Projects: It’S More Than a Methodology
    Using agile in construction projects: It’s more than a methodology Milind Padalkar Indian Institute of Management, Kozhikode, Kerala, India Saji Gopinath Bennett University, NOIDA, UP, India [email protected] Abhilash Kumar UL Technology Solutions Ltd., Trivandrum, Kerala, India Abstract Agile methods have been successful in information technology projects. Can they lead to superior performance in construction projects under high uncertainty? From case study of a high performance construction company, we find that agile methods succeed when supplemented by high levels of trust, vertical communication, empowerment, and ethical values. Keywords: Agile methods, Construction industry, Organizational trust, Values INTRODUCTION Despite several decades of practice experience and research attention, project performance remains far from satisfactory. According to a recent Standish Group survey report, 61 per cent of information technology projects either failed or were challenged to meet success criteria; and 74 per cent faced schedule overruns (Standish, 2013). Zwikael and Globerson (2006) survey project managers from several industries and report that despite much discussion in practitioner literature about critical success factors, the failure rate of projects remains high, with average schedule overrun of 32 per cent and average cost overrun of 25 per cent. Another study finds that 40 to 200 per cent schedule overrun is normal in information technology projects (Lyneis et al. 2001). Multiple studies link failures in information systems projects to an inability to foresee and manage uncertainty in project contexts such as user involvement, stakeholder communication; or process risks such as weak estimates, requirements analysis (Yeo, 2002, p. 245; Nelson, 2008, p. 70-71; Chua, 2009, p.
    [Show full text]
  • IMIA Working Group Paper 96(16) Cost Overrun in Construction Projects 49 Annual IMIA Conference, September 2016, Qatar
    IMIA WG Pape 96(16), Cost Overrun . I M I A Working Group Paper 96(16) Cost Overrun in Construction Projects 49th Annual IMIA Conference, September 2016, Qatar Working Group Members Caroline Hairsine, CNA Hardy – Chairperson Roman Emelyanov, Sogaz Vitaly Valyuk, Sogaz Cedric Wong, Swiss Re Marina Zyuganova, Renaissance Insurance Group IMIA EC Sponsor: Olivier Hautefeuille, SCOR 1 IMIA WG Pape 96(16), Cost Overrun . Table of Contents Executive Summary ........................................................................................................................ 3 Cost overrun in the Construction Industry .................................................................................... 4 What is Cost Overrun ................................................................................................................. 4 The challenges for construction industry .................................................................................. 4 What are the causes of Cost overrun? ..................................................................................... 8 Does the type of contract have an impact on cost overrun? ................................................. 12 Liquidated Damages and it’s interface with cost overrun ...................................................... 13 Feasibility Studies & Risk Management as a means to mitigate cost overrun .................... 13 Project Finance Issues ............................................................................................................. 14 Cost and
    [Show full text]
  • Does and Should Control Live in Agile Development
    ee DEGREE PROJECT, IN PROJECT MANAGEMENT AND OPERATIONAL DEVELOPMENT, SECOND LEVEL STOCKHOLM, SWEDEN 2014 Does and should control live in Agile Development. A case study of a gaming company Pamela Morris Williams KTH ROYAL INSTITUTE OF TECHNOLOGY INDUSTRIAL ENGINEERING AND MANAGEMENT ABSTRACT In an ever changing and competitive global market, cost estimation and cost control are becoming paramount when companies develop new products and services. Being that the driving force for continuous evolvement in Agile methodologies is reduction in time hence cost, it is quite peculiar that there is so little research made in cost control in Agile. This even though the problem in regards to cost control and handling in system development is a known problem area. Furthermore, most cost estimation in regards to software in an Agile software development environment has several challenges due to the continuous varying levels of customer requirements and different individual personnel capabilities. The question proposed by this research is: How is cost control affected and managed in Agile driven development projects? In other words how can a company handle cost control in a sufficient and effective manner when using an Agile methodology. The research in this thesis is based on both relevant literature studies as a case study analysis. Several conclusions can be drawn from the research one being that it is crucial that a company using the Agile Scrum methodology finds a cost estimation technique that gives cost estimation on the on-going projects. A method that will work together with the teams and also give the management the ability to budget and plan for both the short and long term future.
    [Show full text]
  • Cost Overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness
    Cost overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness By Chantal C. Cantarelli, Bent Flybjerg, Eric J. E. Molin, and Bert van Wee Full reference: Cantarelli, C. C., Flyvbjerg, B., Molin, E.J.E., and van Wee, B. 2010. “Cost Overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness,” European Journal of Transport and Infrastructure Research, 10 (1): 5-18. Link to published article: http://www.ejtir.tbm.tudelft.nl/issues/2010_01 2 Abstract Managing large-scale transportation infrastructure projects is difficult due to frequent misinformation about the costs which results in large cost overruns that often threaten the overall project viability. This paper investigates the explanations for cost overruns that are given in the literature. Overall, four categories of explanations can be distinguished: technical, economic, psychological, and political. Political explanations have been seen to be the most dominant explanations for cost overruns. Agency theory is considered the most interesting for political explanations and an eclectic theory is also considered possible. Non- political explanations are diverse in character, therefore a range of different theories (including rational choice theory and prospect theory), depending on the kind of explanation is considered more appropriate than one all-embracing theory. Keywords: cost overruns, explanations, large-scale projects, theoretical embeddedness, transportation infrastructure 3 Introduction Investments in infrastructure are a considerable burden on a country’s gross domestic product (GDP). For example, in 2005 the Dutch government invested about 8 billion euros (CBS, 2005 in KIM, 2007) in infrastructure, amounting to 1.55% of GDP. This is of even greater concern if the inefficient allocation of financial resources as the result of decisions based on misinformation are recognised (Flyvbjerg, 2005b, De Bruijn and Leijten, 2007).
    [Show full text]
  • What You Should Know About Megaprojects and Why: an Overview PAPERS Bent Flyvbjerg, Saïd Business School, Oxford University, Oxford, United Kingdom
    CIMFP Exhibit P-00134 Page 1 What You Should Know About Megaprojects and Why: An Overview PAPERS Bent Flyvbjerg, Saïd Business School, Oxford University, Oxford, United Kingdom ABSTRACT ■ Mega, Giga, Tera: How Big Are Megaprojects? Megaprojects are large-scale, complex ventures that typically cost US$1 bil- lion or more, take many years to develop and build, involve multiple pub- This paper takes stock of megaproject man- lic and private stakeholders, are transformational, and impact millions of agement, an emerging and hugely costly people.1 Hirschman (1995, vii, xi) calls such projects “privileged particles of field of study, by first answering the question the development process” and points out that often they are “trait making”; in of how large megaprojects are by measuring other words, they are designed to ambitiously change the structure of society, them in the units of mega, giga, and tera, and as opposed to smaller and more conventional projects that are “trait taking,” concluding with how we are presently enter- that is, they fit into pre-existing structures and do not attempt to modify these. ing a new “tera era” of trillion-dollar projects. Megaprojects, therefore, are not just magnified versions of smaller projects. Second, total global megaproject spend- Megaprojects are a completely different breed of project in terms of their level ing is assessed, at US$6 to US$9 trillion of aspiration, lead times, complexity, and stakeholder involvement. Conse- annually, or 8% of the total global gross quently, they are also a very different type of project to manage. A colleague domestic product (GDP), which denotes the of mine likes to say that if managers of conventional projects need the equiva- biggest investment boom in human history.
    [Show full text]
  • A Review of Optimism Bias, Planning Fallacy, Sunk Cost Bias and Groupthink in Project Delivery and Organisational Decision Making
    Behavioural Insights Team A review of optimism bias, planning fallacy, sunk cost bias and groupthink in project delivery and organisational decision making Accompanying An Exploration of Behavioural Biases in Project Delivery at the Department for Transport Client: Department for Transport Date: July 2017 1 © Behavioural Insights Ltd Contents Introduction ....................................................................................................................................... 3 How we make decisions and judgements ........................................................................................ 3 Optimism bias and the planning fallacy .............................................................................................. 5 How prevalent is the planning fallacy? ............................................................................................ 5 Causes of optimism bias and the planning fallacy ........................................................................... 6 Self-serving biases..................................................................................................................... 6 Illusion of control ....................................................................................................................... 7 Confirmation bias ...................................................................................................................... 8 Perception of risk ......................................................................................................................
    [Show full text]
  • Reference Class Forecasting Method in Predicting Construction Project Duration
    Süleyman Demirel Üniversitesi Süleyman Demirel University Fen Bilimleri Enstitüsü Dergisi Journal of Natural and Applied Sciences Cilt 22, Sayı 3, 1132-1142, 2018 Volume 22, Issue 3, 1132-1142, 2018 DOI: 10.19113/sdufenbed.469288 Reference Class Forecasting Method in Predicting Construction Project Duration Savaş BAYRAM*1, Saad AL-JIBOURI2 1Erciyes University, Faculty of Engineering, Department of Civil Engineering, 38280, Kayseri, Turkey 2University of Twente, Faculty of Engineering Technology, Department of Construction Management&Engineering, P.O. Box 217, 7500 AE Enschede, The Netherlands (Alınış / Received: 23.01.2018, Kabul / Accepted: 04.10.2018, Online Yayınlanma/ Published Online: 10.10.2018) Keywords Abstract: Project delay is a global problem affecting construction and other industries in Construction, many countries. Its impact on planning and budgeting can be serious for all stakeholders Project involved and difficult to resolve. The purpose of this study is to analyze the reliability of management, duration estimates of public building projects based on actual duration of similar projects Estimating, carried out in the past.Turkey is used as a case study for this purpose and data from 643 Scheduling public building projects completed in Turkey were collected. The data include contract durations, actual durations as well as the total construction areas for all projects. Reference Class Forecasting (RCF) method is proposed and used to investigate whether it would be possible to produce reliable and realistic project duration forecasts based on such data. RCF can realistically predict the actual final duration of the projects of different reference classes for various levels of acceptable risks. Original estimates of the contract durations in Turkey are generally optimistic or underestimated.
    [Show full text]
  • Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures
    WPS3781 Public Disclosure Authorized Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures By Public Disclosure Authorized Bent Flyvbjerg Public Disclosure Authorized World Bank Policy Research Working Paper 3781, December 2005 The Policy Research Working Paper Series disseminates the findings of work in progress to encourage the exchange of ideas about development issues. An objective of the series is to get the findings out quickly, even if the presentations are less than fully polished. The papers carry the names of the authors and should be cited accordingly. The findings, interpretations, and conclusions expressed in this paper are entirely those of the authors. They do not necessarily represent the view of the World Bank, its Executive Directors, or the countries they represent. Policy Research Working Papers are available online at http://econ.worldbank.org. Public Disclosure Authorized Page 1 of 32 1. Introduction * For a number of years my research group and I have explored different aspects of the planning of large infrastructure projects (Flyvbjerg, Bruzelius, and Rothengatter, 2003; Flyvbjerg, Holm, and Buhl, 2002, 2004, 2005; Flyvbjerg and Cowi, 2004; Flyvbjerg, 2005a, 2005b).1 In this paper I would like to take stock of what we have learned from our research so far. First I will argue that a major problem in the planning of large infrastructure projects is the high level of misinformation about costs and benefits that decision makers face in deciding whether to build, and the high risks such misinformation generates. Second I will explore the causes of misinformation and risk, mainly in the guise of optimism bias and strategic misrepresentation.
    [Show full text]
  • Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects
    International Journal of Research and Scientific Innovation (IJRSI) | Volume V, Issue X, October 2018 | ISSN 2321–2705 Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects Kareem Mohammad Mahmoud Mostafa, Dr. Ayman Hamdy Nassar Civil Engineering Program, Faculty of Engineering and Material Sciences, The German University In Cairo, Cairo, Egypt Abstract: - Cost overrun is one of the most important problems networks which is a branch of Artificial Intelligence, a model was and risks that encounter Real Estate projects success, since it developed including the 43 factors which can predict the reduces the contractor’s profit and sometimes lead to enormous percentage overrun for real estate project. The model was later losses, and leaving the project in great troubles. Construction tested by one of the projects and the variance between the actual cost is one of the peak criteria of success for a real estate project overrun and the predicted overrun was calculated. throughout its lifecycle and is of high concern to those who are involved in the real estate industry. All real estate projects, I. INTRODUCTION regardless of their size, complexity are saddled by targets and uncertainties. Mostly in developing countries real estate projects he construction industry has a tremendous impact on the are characterized by overruns in cost. Cost overruns occur in T economy of most of countries which is due to the fact every real estate project while the magnitude varies significantly that it provides the mandatory elements for the development from project to project. This leads to severe need of addressing of an economy.
    [Show full text]