California Regional Water Quality Control Board
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Planning and Natural Resources Committee R-19
PLANNING AND NATURAL RESOURCES COMMITTEE R-19-140 October 22, 2019 AGENDA ITEM 2 AGENDA ITEM Addendum to the Mindego Hill Ranch Grazing Management Plan to Expand Conservation Grazing into the South Pasture GENERAL MANAGER’S RECOMMENDATION Forward a recommendation to the Board of Directors to adopt an addendum to the Mindego Hill Ranch Grazing Management Plan as an amendment to the Russian Ridge Use and Management Plan that adds the south pasture as part of the conservation grazing area on the property. SUMMARY The General Manager recommends adoption of an addendum to the Mindego Hill Ranch (Mindego) Grazing Management Plan (Grazing Plan) (Attachment 1) to expand the conservation grazing area within Russian Ridge Open Space Preserve (Russian Ridge). The addendum identifies the existing resources and current uses in the proposed south pasture expansion area, and provides recommendations for future improvements, management, and monitoring at the site. The recommendations include: installation of additional water infrastructure, updates to fencing, management of brush encroachment into grasslands, and monitoring of resource management activities. Midpeninsula Regional Open Space District (District) staff and the current grazing tenant have been working with the Natural Resources Conservation Service (NRCS) to secure cost-sharing support for the anticipated improvements. Implementation of the recommended infrastructure improvements is estimated to cost $119,341, of which approximately $85,000 is projected to be the District’s share with the remainder funded by the NRCS. Recommended improvements would span four years with work anticipated to begin in July 2020. If approved, the District’s share would be allocated across the next four fiscal years and requested as part of the annual Budget and Action Plan development process. -
San Francisco Bay Area Integrated Regional Water Management Plan
San Francisco Bay Area Integrated Regional Water Management Plan October 2019 Table of Contents List of Tables ............................................................................................................................... ii List of Figures.............................................................................................................................. ii Chapter 1: Governance ............................................................................... 1-1 1.1 Background ....................................................................................... 1-1 1.2 Governance Team and Structure ...................................................... 1-1 1.2.1 Coordinating Committee ......................................................... 1-2 1.2.2 Stakeholders .......................................................................... 1-3 1.2.2.1 Identification of Stakeholder Types ....................... 1-4 1.2.3 Letter of Mutual Understandings Signatories .......................... 1-6 1.2.3.1 Alameda County Water District ............................. 1-6 1.2.3.2 Association of Bay Area Governments ................. 1-6 1.2.3.3 Bay Area Clean Water Agencies .......................... 1-6 1.2.3.4 Bay Area Water Supply and Conservation Agency ................................................................. 1-8 1.2.3.5 Contra Costa County Flood Control and Water Conservation District .................................. 1-8 1.2.3.6 Contra Costa Water District .................................. 1-9 1.2.3.7 -
Pinolecreeksedimentfinal
Pinole Creek Watershed Sediment Source Assessment January 2005 Prepared by the San Francisco Estuary Institute for USDA Natural Resources Conservation Service and Contra Costa Resource Conservation District San Francisco Estuary Institute The Regional Watershed Program was founded in 1998 to assist local and regional environmental management and the public to understand, characterize and manage environmental resources in the watersheds of the Bay Area. Our intent is to help develop a regional picture of watershed condition and downstream effects through a solid foundation of literature review and peer- review, and the application of a range of science methodologies, empirical data collection and interpretation in watersheds around the Bay Area. Over this time period, the Regional Watershed Program has worked with Bay Area local government bodies, universities, government research organizations, Resource Conservation Districts (RCDs) and local community and environmental groups in the Counties of Marin, Sonoma, Napa, Solano, Contra Costa, Alameda, Santa Clara, San Mateo, and San Francisco. We have also fulfilled technical advisory roles for groups doing similar work outside the Bay Area. This report should be referenced as: Pearce, S., McKee, L., and Shonkoff, S., 2005. Pinole Creek Watershed Sediment Source Assessment. A technical report of the Regional Watershed Program, San Francisco Estuary Institute (SFEI), Oakland, California. SFEI Contribution no. 316, 102 pp. ii San Francisco Estuary Institute ACKNOWLEDGEMENTS The authors gratefully -
Codornices Creek Watershed Restoration Action Plan
Codornices Creek Watershed Restoration Action Plan Prepared for the Urban Creeks Council By Kier Associates Fisheries and Watershed Professionals 207 Second Street, Ste. B Sausalito, CA 94965 November, 2003 The Codornices Creek watershed assessment and salmonid restoration planning project, the results of which are reported here, was funded by the Watershed Program of the California Bay-Delta Authority, through Contract No. 4600001722 between the California Department of Water Resources and the Urban Creeks Council. The Urban Creeks Council is a non-profit organization working to preserve, protect, and restore urban streams and their riparian habitat. The Urban Creeks Council may be reached at 1250 Addison Street, Ste. 107, Berkeley, CA 94702 (510- 540-6669). Table of Contents Executive Summary..................................................................................................................... ii Acknowledgements...................................................................................................................... ii Introduction Fish and stream habitat records................................................................................................. 1 Other Codornices Creek studies................................................................................................ 1 Methods: How Each Element of the Project Was Undertaken Fish population assessment methods ........................................................................................ 2 Salmonid habitat assessment methods..................................................................................... -
Central Coast
Table of Contents 1. INTRODUCTION ............................................................................................................ 1 1.1 Background ....................................................................................................................... 1 1.2 Consultation History......................................................................................................... 1 1.3 Proposed Action ............................................................................................................... 2 1.4 Action Area ..................................................................................................................... 32 2. ENDANGERED SPECIES ACT: BIOLOGICAL OPINION AND INCIDENTAL TAKE STATEMENT ......................................................................................................... 34 2.1 Analytical Approach ....................................................................................................... 34 2.2 Life History and Range-wide Status of the Species and Critical Habitat ...................... 35 2.3 Environmental Baseline .................................................................................................. 48 2.4 Effects of the Action ........................................................................................................ 62 2.5 Cumulative Effects .......................................................................................................... 76 2.6 Integration and Synthesis .............................................................................................. -
San Mateo County BBE Final Report-2016.11.2
Assessment and Management Prioritization Regime for the Bar-built Estuaries of San Mateo County Summary Report San Pedro Creek Prepared for: United States Fish and Wildlife Service San Francisco Area Coastal Program by: Central Coast Wetlands Group Moss Landing Marine Labs 8272 Moss Landing Rd. Moss Landing, CA 95039 November 2016 Summary Report: Bar-Built Estuaries of San Mateo County TABLE OF CONTENTS Table of Contents ........................................................................................................................................... 1 Figures and Tables .......................................................................................................................................... 2 Background and Need .................................................................................................................................... 3 What are BBEs and Why are they Important ............................................................................................................ 3 BBE are the most dominant estuarine resource on the San Mateo County coastline .............................................. 4 Purpose ........................................................................................................................................................... 5 Methods .......................................................................................................................................................... 7 Site Selection ............................................................................................................................................................ -
R-17-76 Meeting 17-15 June 28, 2017 AGENDA ITEM 15 AGENDA ITEM
R-17-76 Meeting 17-15 June 28, 2017 AGENDA ITEM 15 AGENDA ITEM Amendment to the La Honda Creek Open Space Preserve Master Plan to include One Proposed New Trail Loop and New Trail Names for the Preserve GENERAL MANAGER’S RECOMMENDATIONS 1. Approve an amendment to the La Honda Creek Open Space Preserve Master Plan to add a one-mile trail loop; 2. Approve the following trail names: “Harrington Creek Trail” for the main ranch road in lower La Honda Creek Open Space Preserve; “Folger Ranch Loop Trail” for a new loop trail off the main ranch road; “Coho Vista Trail” for the existing trail to the vista point in upper La Honda Creek; and “Cielo Trail” for an existing trail leading to the Redwood Cabin area. SUMMARY Phase I implementation of the La Honda Creek Open Space Preserve (OSP) Master Plan includes opening the Sears Ranch Road Parking Area, establishing the main Driscoll Ranch road in lower La Honda Creek as a hiking and equestrian trail, and providing permit-only equestrian parking at the former Event Center. The General Manager recommends adding an additional one-mile segment of an existing ranch road to the Phase I Trails Plan, to provide a seasonal loop opportunity, as an amendment to the Master Plan. In preparation for the opening of the Preserve, the General Manager also recommends new trail names for lower and upper La Honda Creek. The proposed trail names for lower La Honda Creek are: “Harrington Creek Trail” for the main ranch road and “Folger Ranch Trail” for the new loop. -
April 11, 2014 City Council Weekly Digest
City Council Weekly Digest TO: MENLO PARK CITY COUNCIL Friday FROM: Alex D. McIntyre, City Manager April 11, 2014 ITEMS INCLUDED: ATTACHMENTS: Summer Activity Guide Information to be Released Washington Post article April 21st mentioning Menlo Park’s “Nutty the Squirrel” Menlo Park Police Department Appoints New K-9 Handler SF Bay Restoration Authority Brochure and Supporters List $565,000 Approved for Menlo Park Projects under Measure A Bicycle and Pedestrian Program Letter to C/CAG re: Circulation Element 4/17 Workshop on FAA Proposed Changes to NorCal Compliance with Complete Airspace and Draft Environmental Assessment Report Streets Act of 2008 4/23 Meeting Regarding Changes to the National Flood SF Creek JPA Flood insurance Insurance Program (NFIP) meeting flyer 4/23 Public Hearing for West Bay Sanitary District’s Menlo Park Construction Proposed Sewer Service Fee Increase News Update 04/11/2014 Update on Menlo Park’s OBAG/Complete Streets City Council Only: Eligibility Invitation to 4/24 Pacific Union Office Opening Potential Solar on Five City Buildings and Electric Invitation to 4/24 Redwood Vehicle Charging Stations Coming Soon! City Health Center Event Invitation to 4/30 Youth Potential Regional Ballot Measure to Fund Bay Community Service Annual Restoration Luncheon Invitation to 5/7 HEART C/CAG Public Opinion Mail Survey for Potential Storm Opening Doors Event Water Funding Initiative Council Digest – April 11, 2014 Summer Activity Guide Information to be Released April 21st The much anticipated Summer Activity Guide will be mailed to residents and available to the public starting on Monday, April 21st. Registration will open for Menlo Park residents on Monday, April 28th and for non- residents on Monday, May 5th. -
POS538-Landscapes C5 8/16/10 4:57 PM Page 1
POS538-Landscapes c5 8/16/10 4:57 PM Page 1 PENINSULA OPEN SPACE TRUST Landscapes FALL 2010 POS538-Landscapes c5 8/16/10 4:57 PM Page 2 Going with the Flow: Watershed Protection on POST Lands “To put your hands in a river is to feel the chords that bind the earth together.” — BARRY LOPEZ 2 ■ landscapes POS538-Landscapes c5 8/16/10 4:57 PM Page 3 Water defines us. It’s the reason we call our region the WBay Area. It shapes the Peninsula and sculpts the land. It cleans the air. It comes down from the sky as rain and fog, and comes up from the earth via springs and aquifers. It makes up more than 70 percent of most living things. Beach Bubbles © 2003 Dan Quinn Land carries the water, but water makes the land come alive, coursing through the earth and giving it health and vitality. Watershed protection has long been a priority at POST, and by helping us save open space, you preserve the natural systems found there, including critical water resources that nourish and sustain us. Connecting Land and Water There are 16 major watersheds in the 63,000 acres POST has saved since its founding in 1977. These watersheds supplement our Contents sources of drinking water, support native wildlife habitat, provide 14–5 Watershed Map places of recreation and help us grow food close to home. 16 Spotlight: Saving land surrounding vulnerable waterways is the first step San Gregorio Watershed to ensuring the quality of our water. When it flows over land, water picks up things along the way, including nutrients, sediment and 17 A Water Droplet’s Point of View pollutants. -
Friends of Five Creeks Letters Re Restoration of Codornices Creek
The letters below deal with F5C’s early involvement in Codornices Creek. They shed some light on challenges that faced efforts to restore our area’s only trout stream, and the role citizens played. These are by no means the whole story. Most credit for the big projects on Codornices west of San Pablo goes to the partnership of creek-restoration pioneers Carole Schemmerling, who headed the now defunct Urban Creeks Council, and consulting hydrologist Dr. Ann Riley, whose now defunct private consulting firm Watershed Restoration Institute. The two shared offices; UCC was effectively the nonprofit arm of WRI, able to receive grants and similar government support. Credit also goes to longtime environmental visionary Richard Register, who with UCC played a large role in bringing Codornices out of its pipe between 8th and 9th Streets in 1994-5. This was one of Berkeley’s pioneer “daylighting” projects. Friends of Five Creeks 1000 San Pablo Ave. Albany, CA 94706 412 7257 October 4, 1998 Mr. Ron Gervason San Francisco Bay Regional Water Quality Control Board 1515 Clay St., 14th Floor Oakland, CA 94612 [email protected] Re: Triannual Review of Water Quality Control Plan of San Francisco Bay Basin Friends of Five Creeks is a grassroots organization that seeks to protect and restore creeks in Albany, California. While Albany’s natural creeks are mostly in culverts, one, Codornices, is substantially free flowing and has a small trout population. Efforts are ongoing to restore another, Cerrito Creek. We believe that the few creeks in our urbanized area that can or do support relatively natural aquatic life, especially cold-water or anadromous fish, should receive the highest possible degree of protection, including that of the Regional Water Quality Control Board. -
Weekly Projects Bidding 8/13/2021
Weekly Projects Bidding 8/13/2021 Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies. Plan# Name Bid Date & Time OPR# Location Estimate Project Type Monday, August 16, 2021 OUTREACH MEETING (VIRTUAL) EVERGREEN VALLEY COLLEGE (EVC) STUDENT SERVICES Addenda: 0 COMPLEX (REQUEST FOR SUB BIDS) SC 8/16/21 10:00 AM 21-02526 San Jose School ONLINE Plan Issuer: XL Construction 408-240-6000 408-240-6001 THIS IS A VIRTUAL OUTREACH MEETING. REGISTRATION IS REQUIRED. SEE FLYER FOR DETAILS. The 74,000 sf Student Services Complex at Evergreen Valley College is part of the San Jose Evergreen Community College District's Measure X Bond Program. This is a new ground-up two -story complex including collaboration spaces, offices, storage, restrooms and supporting facilities. All subcontractors must be prequalified with XL Construction to bid the project. Please email [email protected] for a prequalification application link, and [email protected] if you are an Under Utilized Business Enterprise (SBE, WBE, MBE, VBE...). REFINISHING GYM AND STAGE FLOORS AT CALIFORNIA SCHOOL FOR THE BLIND Addenda: 0 8/16/21 12:00 PM 21-02463 Fremont State-Federal Plan Issuer: California Department of Education - Personnel Service Division 916-319-0800 000-000-0000 Contract #: BF210152 The Contractor shall provide all labor, equipment and materials necessary for preparing and refinishing the stage and gym floors, twice a year, at the California School for the Blind (CSB), located at 500 Walnut Avenue, Fremont. -
2005 Pleasanton Plan 2025
2005 Pleasanton Plan 2025 7. CONSERVATION AND OPEN SPACE ELEMENT Table of Contents page page BACKGROUND AND PURPOSE.................................................. 7-1 Tables SUSTAINABILITY ........................................................................ 7-1 Table 7-1 Potential Wildlife Species of Concern in the RESOURCE CONSERVATION ..................................................... 7-2 Planning Area ........................................................... 7-3 Animal Life.......................................................................... 7-2 Table 7-2 Potential Rare, Threatened, or Endangered Plants Plant Life............................................................................. 7-4 in the Planning Area .................................................. 7-6 Soil Resources ..................................................................... 7-9 Table 7-3 Historic Neighborhoods and Structures ..................... 7-15 Sand and Gravel............................................................... 7-10 Cultural Resources............................................................. 7-11 Figures OPEN SPACE LANDS............................................................... 7-18 Figure 7-1 Generalized Land Cover, 2005 .................................. 7-5 Recreational Open Space................................................... 7-18 Figure 7-2 Aggregate Resources and Reclamation ...................... 7-12 Water Management, Habitat, and Recreation...................... 7-24 Figure 7-3 Historic Neighborhoods