PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

PROPOSAL FOR TERMS OF REFERENCE

For Proposed Waste to Energy Plant (25 MW) at Tehkhand, Okhla, South East , Delhi

M/s. TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

Project Proponent Sh. Ajay Kumar Agrawal M/s. TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED Room No. 16, -110 002

EIA Consultant

AMALTAS ENVIRO INDUSTRIAL CONSULTANTS LLP 1104-Vikrant Tower, Rajendra Place, NEW DELHI-110 008 NABET Certificate No.: NABET/EIA/1518/IA 0017

December, 2017

0 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW) AT OKHLA APPLICANT: TEHKHAND WASTE TO ENERGY PROJECT LIMITED

FORM I

2 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW) AT OKHLA APPLICANT: TEHKHAND WASTE TO ENERGY PROJECT LIMITED

APPENDIX I FORM I (I) Basic Information S.No. Item Details 1. Name of the project Proposed Waste to Energy Plant (25 MW) at Tehkhand, Okhla South , Delhi M/s. TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED 2. S. No. in the schedule 1 (d) Thermal Power Plants (Capacity 25 MW using Municipal Solid Non-Hazardous Waste as fuel) 3. Proposed capacity /area /length 25 MW /tonnage to be handled/command area/lease area/number of wells to be drilled 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. - 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘A’ (Capacity & General Conditions Applied) 7. Does it attract the general condition? Yes, following are falling within 10 Km radius of the If yes, please specify. project site:  ‘Delhi-Haryana Interstate Boundary’  ‘Asola Wildlife Sanctuary’ & Okhla Bird Sanctuary  Okhla Industrial Area is Notified Critically Polluted Area  ESZ around Asola Wildlife Sanctuary, Okhla Bird Sanctuary and Aravalli Range 8. Does it attract the specific condition? No If yes, please specify. 9. Location Latitude: Longitude : 28o 30’ 35.37”N 77o 16’ 50.82”E 28o 30’ 32.40”N 77o 16’ 56.59”E 28o 30’ 22.98”N 77o 16’ 51.15”E 28o 30’ 25.49”N 77o 16’ 44.93”E

2 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

Plot/Survey/Khasra No. - Village Tehkhand Tehsil - District Southeast Delhi State Delhi 10. Nearest railway station/airport along Railway Station – Tughlaqabad (approx. 800m) in North with distance in kms. east International Airport – IGI (approx. 17.5 Km) in Northwest 11. Nearest Town, city, District Nearest Town - Okhla, Phase I (approx. 700 m) in North Headquarters along with distance in Directions kms. Nearest District Headquarters – Saket (approx. 7.5 Km) in West northwest Direction 12. Village Panchayats, Zilla Parishad, Municipal Corporation Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of applicant M/s. TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED 14. Registered Address 9th Floor, Dr. SPM Civic Centre, JLN Marg, New Delhi, , Delhi, India, 110002 15. Address for correspondence:

Name Mr. Ajay Kumar Agrawal Designation (Owner/Partner/CEO) Authorized Signatory Address Room No. 16, Ambedkar Stadium, New Delhi Pin Code 110 002 E-mail [email protected] Telephone No. +91 97177 88590 Fax No. - 16. Details of Alternative Sites examined, Not Applicable if any. Location of these sites should The site was allocated by Delhi Development Authority be shown on a toposheet. (DDA) - Ref. Annexure I. 17. Interlinked Projects Yes, there is interlinked proposed project ‘Proposed

3 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

Sanitary Landfill at Okhla’ in the premises of the proposed Waste to Energy Plant at Okhla, Tehkhand, Okhla, Delhi 18. Whether separate application of Yes, Separate application for “TOR” is submitted interlinked project has been simultaneously. Proposal No. : IA/DL/MIS/71829/2017 submitted? 19. If yes, date of submission 25.12.2017 20. If no, reason -

21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a)The forest (Conservation) act, No, Not Applicable 1980? (b) The wildlife (Protection) act, No, Not Applicable 1972? (C) The C.R.Z Notification, 1991? No, Not Applicable 22. Whether there is any Government South Delhi Municipal Corporation (SDMC) has Order/Policy relevant/relating to the position of 50.34 Acres of land allotted by Delhi site? Development Authority at the adjoining area of existing Sanitary Land Fill site at Okhla. The land breakup is as follows: i) 15 acres is for Waste to Energy Plant of capacity - 25 MW ii) 32 acres is for setup of Waste processing/management and iii) balance 3.34 acres is for JJ Clusters (Refer - Report of Central Empowered Committee vide Application No. 1414 dt 13.12.2017 23. Forest land involved (hectares) NIL 24. Whether there is any litigation Yes, pending against the project and /or land in which the project is propose Report of Central Empowered Committee (Constituted to be set up? by Hon’ble Supreme Court of India) vide F.No. 1- (a) Name of the Court 19/CEC/SC/2008-Pt.XXXXVII dated: 13th December

4 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

(b) Case No. 2017. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes There will be permanent changes in the land land use, land cover or topography use. Presently, the proposed project site is including increase in intensity of Morphological Ridge Area/Extended Ridge land use (with respect to local land Area which will be used for Solid Waste use plan) Management Facility and Waste to Energy Plant. The land will be leveled and made suitable for waste to energy plant of capacity 25 MW. 1.2 Clearance of existing land, Yes The site is occupied with shrubs, scarce vegetation and buildings? plantation & trees. Trees will be preserved and site will made suitable for the proposed Project. It is proposed that green belt naturally present in the site vicinity will be preserved. Greenbelt is also proposed to be developed. 1.3 Creation of new land uses? Yes Present Landuse of the allotted land (50.34 Acres) is “Residential” and “Commercial” for setting up the waste processing/disposal facility, landuse of this land is required to be changed to 18.10.2017. The proposed Waste to Energy Plant of 25 MW and dump of Municipal Solid Waste. DDA has to be

5 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

approved by DDA Authority. 1.4 Pre-construction investigations e.g. Yes Prior construction, topographic survey, geo- bore houses, soil testing? technical investigations and ground engineering will be done. 1.5 Construction works? Yes Construction work for Waste to Energy plant will be made and amenities will also be made available. 1.6 Demolition works? No There is presently no civic structure in the Site. 1.7 Temporary sites used for No Local people/people will be hired for construction works or housing of construction; hence no temporary sites for construction workers? housing will be required. 1.8 Above ground buildings, structures Yes Project involves construction of Waste to or earth works including linear Energy. Excavation will also be involved in the structures, cut and fill or process for building foundation. excavations 1.9 Underground works including No Not Applicable mining or tunneling? Underground mining or tunneling will not be involved. 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Dredging is not required.

1.12 Offshore structures? No --

1.13 Production and manufacturing Yes 25 MW Electricity will be produced processes? 1.14 Facilities for storage of goods or Yes During construction phase: construction materials? material will be stored in designated area. During Operation phase: No storage of goods/ material is required as this is waste to energy plant. 1.15 Facilities for treatment or disposal Yes The project itself has a facility for disposal of of solid waste or liquid effluents? solid waste and liquid effluent treatment plant

6 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

1.16 Facilities for long term housing of No Local people and workers will be hired for the operational workers? construction & operation of proposed plant.

There is no provision for long term housing

for operational workers now. However, house will be constructed if demand arises. 1.17 New road, rail or sea traffic during Yes Road will be constructed inside the project construction or operation area for movement of vehicles/construction materials, machineries. 1.18 New road, rail, air waterborne or No The proposed site is well connected to road, other transport infrastructure rail, air network. New infrastructure is not including new or altered routes and required for the proposed project. stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable. transport routes or infrastructure There would be no closure or diversion of leading to changes in traffic existing routes. movements? 1.20 New or diverted transmission lines No Not Applicable. or pipelines? There is no diversion of pipeline or transmission line. 1.21 Impoundment, damming, No Not Applicable. culverting, realignment or other There is no damming, culverting, realignment changes to the hydrology of or other changes in hydrology of watercourses or aquifers? watercourses or aquifers.

1.22 Stream crossings? No No stream crossings are involved. 1.23 Abstraction or transfers of water No Water will be provided by Delhi Jal from ground or surface waters? Board/Treated water from existing Water Treatment Plant at the project site. There is no abstraction/ transfer of water. Total water demand is 490 m3/day. Demand for Air Cooled Water Condenser – 380 m3/day. Miscellaneous water demand (including drinking water, washing and cleaning) is 110

7 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

m3/day.

1.24 Changes in water bodies or the land No There is no change in water bodies or land surface affecting drainage or run- surface affecting drainage or runoff. The off? proposed project will not affect natural drainage pattern in the area. 1.25 Transport of personnel or materials Yes During Construction phase: Transportation of for construction, operation or machines/construction material will be decommissioning? involved. During Operation Phase: Municipal Solid Waste will be utilized into Waste to Energy Plant of capacity – 25 MW. 1.26 Long-term dismantling or Yes As generated from the power Plant will be decommissioning or restoration dumped in the landfill. Restoration of Landfill works? site is part of the interlinked-project. 1.27 Ongoing activity during No It is presently a scrub land (Source: SoI decommissioning which could have Toposheet Map) without any civic structure. an impact on the environment? Hence decommissioning is not involved. 1.28 Influx of people to an area in either No Only local people will be deployed to carry temporarily or permanently? out construction and operation of the project. So no influx of people is expected either temporarily or permanently 1.29 Introduction of alien species? No No such introduction of alien species is foreseen. 1.30 Loss of native species or genetic No As such no loss of native species or genetic diversity? diversity is expected 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 8 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

2.1 Land especially undeveloped or Yes 15 acres is for Waste to Energy Plant of agricultural land (ha) capacity - 25 MW. It is used for Waste to Energy plant of 25 MW. 2.2 Water (expected source & Yes Water will be supplied from Delhi Jal Board competing users) unit: KLD (DJB) & Treated water from existing ETP will be used for construction phase of the project. Fresh water is not required. Detailed Water Balance will be discussed in EIA Report. 2.3 Minerals (MT) Yes Construction Material will be required for construction of Waste to Energy plant. 2.4 Construction material – stone, Yes Soil, Gravel, HDPE Pipes will be used in aggregates, sand / soil (expected construction of project. source – MT) 2.5 Forests and timber (source – MT) No Not required for this project. 2.6 Energy including electricity and Yes Energy will be supplied by BSES Power Ltd. fuels (source, competing users) During construction and operation phase of Unit: fuel (MT), energy (MW) the project energy generated from the Waste to Energy plant itself will be used. 2.7 Any other natural resources (use No No other natural resources will be used. appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data. 3.1 Use of substances or materials, No This project operation will not involve use of which are hazardous (as per MSIHC any materials, hazardous as per MSIHC rules, rules) to human health or the 2016. environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or Yes The project involves handling of Municipal

9 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

affect disease vectors (e.g. insect or Solid Waste. If not managed properly may water borne diseases) cause health hazards to the people in the surrounding areas. 3.3 Affect the welfare of people e.g. by Yes The project is being proposed to maintain changing living conditions? sanitation in the Area. Proper management of municipal solid waste will result to improve the health & hygiene of people in South Delhi Area. 3.4 Vulnerable groups of people who Yes There are vulnerable groups of people in could be affected by the project e.g. vicinity. Buffer and green belt at the site hospital patients, children, the boundary will be created as per “Guidelines of elderly etc. the provision of buffer zone around waste processing and disposal facilities by CPCB, April 2017”1 3.5 Any other causes Yes The project involves transportation and handling of municipal solid waste. The people involved will be exposed to the waste and vectors. Thus proper health and safety measures will be taken throughout the operation of the project. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes Overburden during construction phase of the project will be used for landfill. Land is in position of South Delhi Municipal Corporation. Land will be leveled and will be used for Waste to Energy plant. 4.2 Municipal waste (domestic and or Yes The proposed project is utilizing 2000 TPD of commercial wastes) Municipal Solid Waste and producing energy

1http://www.cpcb.nic.in/Final_Guidelines_on_Buffer_Zone_29052017.pdf 10 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

of 25 MW. 2000 TPD will be used as raw materials for the Waste to Energy plant. Ash (25%) will be dumped in landfill site. 4.3 Hazardous wastes (as per No No hazardous waste management is Hazardous Waste Management envisaged. Rules) 4.4 Other industrial process wastes No No industrial process waste is envisaged. 4.5 Surplus product No No production is involved. 4.6 Sewage sludge or other sludge from Yes Sludge from ETP will be neutralised & will be effluent treatment managed in the landfill, Okhla. 4.7 Construction or demolition wastes No Required quantity of construction material will be transported to the site. No construction or demolition wastes will be produced. 4.8 Redundant machinery or equipment No Redundant equipment will be managed properly and not left unattended. This will be responsibility of SDMC. 4.9 Contaminated soils or other Yes Yes contaminated soils are likely to be materials generated due to oil spillage from machinery. 4.10 Agricultural wastes No No agricultural wastes will be produced. 4.11 Other solid wastes Yes Shrubs clearance will be done prior to construction of the project. The waste produced will be managed by proponent as per SWM Rules, 2016. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes Energy will be generated from the organic fuels from stationary or mobile fraction of waste by Bio-chemical and sources Thermo-chemical conversion process in enzymatic decomposition of organic matter. The calorific value of Solid Waste is around

11 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

1500 kcal/kg. Methane gas is the byproduct in combustion of Municipal Solid Waste.

5.2 Emissions from production Yes Methane (CH4) and CO2 are the primary processes constituents of combustion process of Solid Waste. The Solid Waste quantity 2000 TPD is used for Waste to Energy power generation of 25 MW. 5.3 Emissions from materials handling Yes Municipal Solid Waste is raw material for including storage or transport Waste to Energy plant. Particulate Matter emissions is generated in the form of fugitive dust (i.e., garbage trucks). Dust emission from the MSW during transportation, piling and loading/unloading will be minimized by 60% by use of water sprinklers. 5.4 Emissions from construction Yes Fugitive dust emission is likely to be activities including plant and generated during construction phase by equipment handling and transportation of construction material. Machines used for construction will also add to the generation of emissions due to combustion of fuel. There will be emissions due to combustion of fuel from vehicles used for transportation of municipal solid waste, and diesel run machines during construction phase. 5.5 Dust or odors from handling of Yes During Construction phase: Dust is generated materials including construction by handling and transportation of materials, sewage and waste construction material and combustion of fuel used in machinery. During Operation Phase: Particulate Matter is generated from the fugitive dust from Raw Material Handing areas. 5.6 Emissions from incineration of Yes Methane gas is by product in combustion

12 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

waste process. Energy will be generated from decomposition of organic matter from Solid Waste. The calorific value of Solid Waste is around 1500 kcal/kg. Waste incineration is not part of the solid waste management in the proposed project. 5.7 Emissions from burning of waste in No Not Applicable open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Noise will be generated during construction engines, ventilation plant, crushers activity from operation of construction equipment. Only machinery of Standard make will be used. Noise generated during operation phase will be mitigated by proper insulation of noise polluting source. 6.2 From industrial or similar processes Yes Noise & Vibration generated during operation phase will be mitigated by proper insulation of noise polluting source. 6.3 From construction or demolition Yes Noise will be generated during construction phase by construction machineries. There is no demolition. 6.4 From blasting or piling No Not Applicable Blasting and piling is not involved. 6.5 From construction or operational Yes Noise will be generated by transportation of traffic construction materials through vehicular movement in construction phase. During operation, noise will be generated in 13 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

transportation, piling, loading and unloading of solid waste and also by vehicle movement. The Pollution Under Control certified vehicles will be used and vehicles drivers will be trained for Traffic rules, vehicles speed and handling of solid waste materials. 6.6 From lighting or cooling systems Yes 25 MW of energy will be generated from 2000 TPD of Solid Waste.

6.7 From any other sources No --

7. Risks of contamination of land or water from release of pollutants into ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No Not Applicable. spillage of hazardous materials This is Waste to Energy project. No hazardous material will be dumped at the site, no risk of contamination of land or water is envisaged. 7.2 From discharge of sewage or other No Water from discharge of sewage/effluents will effluents to water or the land be treated and 100% recycled within the plant (expected mode and place of premises. discharge) 7.3 By deposition of pollutants emitted Yes Pollutants deposition may take place due to to air into the land or into water following reason:2

Pollutant Environment Component Fugitive dust emission Air, Noise, might take place due to Water, Soil handling and transportation of construction material during construction phase.

2 Further details will be incorporated after EIA Study in EIA Report 14 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

Spillage of municipal waste Soil during transportation. Odour Air Adequate measures to suppress dust, manage transportation of municipal waste and waste water treatment is proposed in the project. 7.4 From any other sources No Not envisaged

7.5 Is there a risk of long term build up No Leachate from the municipal solid waste will of pollutants in the environment be mitigated by proper base sealing system, from these sources? leachate collection and treatment is proposed. The ash content is 25 % of the total Municipal Solid Waste will be reused as per Fly Ash Notification, 2009 & its amendments. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc. Yes There is possibility of explosions, spillage and from storage, handling, use or fires. Municipal Solid Waste is used as fuel for production of hazardous substances Waste to Energy plant of Capacity 25 MW and Ash generation is 25 %. 8.2 From any other causes Yes Risk of accidents are expected: 1. During transportation. 2. Exposure to health risk, during handling of municipal solid waste. 3. Waste to Energy (25 MW) plant area Accidents can be avoided by taking due care and precautions. PPE will be provided to staff involved during construction and operation phase at high noise level areas. 8.3 Could the project be affected by Yes Delhi comes in the seismic zone IV in the natural disasters causing Map of India. environmental damage (e.g. floods,

15 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

earthquakes, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S.No. Information/Checklist confirmation Yes/ Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting Yes This is proposed Waste to Energy project of facilities ancillary development or 25 MW which is interlinked with Land fill development stimulated by the site. project which could have impact on The project is in addition to existing nearby the environment e.g.: landfill site and Waste to Energy site at •Supporting infrastructure (roads, Okhla. Land fill site is to be closed owing to power supply, waste or waste water its exhausted capacity. treatment, etc.) • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, which Yes Ash generated from the proposed power could have an impact on the plant will be used for landfill but the existing environment. landfill has exhausted its capacity which will be reclaimed as per landfill closure plan. 9.3 Set a precedent for later Yes Proposed project is precedent for Swachh developments Bharat Vision. 9.4 Have cumulative effects due to Yes There will be cumulative effect as Waste to proximity to other existing or planned Energy plant of 16 MW capacity is already in projects with similar effects operation. Proposed waste to Energy plant of 25 MW is an addition will have cumulative impact on environment. However, existing landfill will be closed and soil will be

16 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

reclaimed for green belt development which will improve environment.

(III) Environmental Sensitivity S.No. Areas Name/ Aerial distance (within 15 Identity km.) Proposed project location boundary 1 Areas protected under international Asola Wildlife Sanctuary Approx. 3.5 Km SW conventions, national or local Direction legislation for their ecological, Asola WLS ESZ Approx. 3.0 Km SW landscape, cultural or other related Okhla Bird Sanctuary Approx 6 Km in NE value Direction Okhla Bird Sanctuary ESZ Approx. 5.1 Km in NE Direction River Approx 5 Km in NE Direction ASI Sites are listed in Table

below *# 2 Areas which are important or Aravalli Biodiversity Park Approx. 12.5 Km in West sensitive for ecological reasons - Asola Wildlife Sanctuary Approx. 3.5 Km SW Wetlands, watercourses or other Direction water bodies, coastal zone, Okhla Bird Sanctuary Approx. 6 Km in NE biospheres, mountains, forests. Direction National Zoological Park Approx. 10.5 Km in N Unani Medicine Garden Approx. 3.5 Km in West 3 Areas used by protected, important Aravalli Biodiversity Park Approx. 12.5 Km in West or sensitive species of flora or Asola Wildlife Sanctuary Approx. 3.5 Km SW fauna for breeding, nesting, Direction foraging, resting, over wintering, Okhla Bird Sanctuary Approx. 6 Km in NE migration. Direction National Zoological Park Approx. 10.5 Km in N Unani Medicine Garden Approx. 3.5 Km in West

17 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

River Yamuna Approx. 5 Km in NE

4 Inland, coastal, marine or River Yamuna Approx. 5 Km in NE underground waters Agra Canal Approx. 2.5 Km in East 5 State, National boundaries Delhi-Haryana Interstate Approx. 200m in South Border Direction 6 Routes or facilities used by the -Badarpur Road Adjacent to site in SW public for access to recreation or Ma Anandmayee Marg Adjacent to site in NW

other tourist, pilgrim areas Railway line Approx. 1 Km in East Direction 7 Defense installations Air-force Residential Approx. 1.5Km in West quarters Direction Airforce Station Approx. 2.0 Km in West Direction Department of Defense Approx. 12.5 Km in NW Defense colony Approx. 8.5 Km in NW

8 Densely populated or built-up area The project site is itself Yes surrounded by Densely populated area. 9 Areas occupied by sensitive Max Super Speciality Approx. 7.0 Km in WNW man-made land uses Hospital Saket (hospitals, schools, places of Fortis C-Doc Hospital Approx. 5.3 Km in NW worship, community facilities) Apollo Approx. 3.5 Km in NE Hospital Aggarwal Boys School Approx. 1.5 Km in ENE Institute of Integrated Approx 1.8 Km in SE Marketing Communication

and Management Delhi Business School Approx. 2 Km in SE NIILM Business School Approx. 1.5 Km in SE Manav Rachna Approx. 600 m in SE International School Madarsa Approx. 3.5 Km in South

18 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

Gurukul Indraprastha Approx. 3.5 Km in NE College There are many places of worship and community facilities within 15 km 10 Areas containing important, high River Yamuna Approx. 5 Km in NE quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution Nazafgarh drain basin The site is itself in Okhla or environmental damage. (those (including Anand Parvat, where existing legal environmental Naraina, Okhla and standards are exceeded) Wazirpur) Critically Polluted Area3 12 Areas susceptible to natural hazard Yes The site is located in zone which could cause the project to IV which has fairly high present environmental problems seismicity where the (earthquakes, subsidence, general occurrence of landslides, erosion, flooding or earthquakes is of 5-6 extreme or adverse climatic magnitude, a few of conditions) magnitude 6-7 and occasionally of 7-8 magnitude. There is also severe threat of soil liquefaction in the area. From the recurring phenomenon of floods in the mighty river Yamuna and flash floods caused by rains due to choked drains

3http://cpcbenvis.nic.in/industrial_pollution.html# 19 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

of Delhi, it can be said that the area is at high of flood.

*#Table of Sites under Archeological Survey of India within 15 Km Sr. No. Name of Place Direction Distance(in Km) 1. Adilabad Fort Southwest 1.0 2. Tuglaqabad Fort West Northwest 2.0 3. Surajkund Reservoir South 2.5 4. Zafar Khan Tomb West 2.0 5. North 12.65 6. Safdarjung Tomb North- West 11.13 7. Parliament House North- West 14.19 8. Rashtrapati Bhawan North 14.43 9. Jantar Mantar North 14.79 10. Shamshi Talab West 10.24 11. Ghazipur Land fill North 13.83 12. National police Memorial Garden North West 13.79 13. HauzKhas, MundaGumbad West 9.20 14. National Museum, New Delhi 13.22 Secretariat, North Block 14.15 15. North-West Secretariat, South Block 14.05 16. PuranaQila North 12.05 17. Baro Lao KaGumbad West 12.75 18. Humayun’s Tomb North 10.11 19. Agasen Ki Baoli North 14.43 20. Lake West 10.29 21. West 8.76 22. Sanjay Van West 10.28 23. QutubMinar West 9.66 24. Chaumachi Khans Tomb West 10.26 25. West 8.82 26. Lal Bangla North 11.26 27. Khair-Ul-Manzil North 11.96 28. Kos Minar North 11.06

20 | P a g e

PROPOSED WASTE TO ENERGY PROJECT (25 MW), AT OKHLA PROPONENT: TEHKHAND WASTE TO ELECTRICITY PROJECT LIMITED

29. Tomb of Ghiasuddin North 10.37 30. Tomb of Nizzamuddin Aulia North 10.22 31. Bagh- I- Alam ka Gumbad North 9.85 32. Arab Sarai North 9.95 33. Lakhar wal Gumbad North 10.81 34. Shamsid Tallab West 10.24 35. Sunder Wala & Burj North 10.54 36. Tomb of Mohammed shah North West 11.26 37. Tomb of Sikander Lodi North 11.60 38. Biwi or Poti ka Gumbad North West 9.27 39. Biran ka Gumbad West 9.45 40. Choti Gunti North West 9.43 41. Idgah of Kharehra West 8.87 42. Nili masjid North West 9.02 43. Sakri Gumti-284 North West 9.42 44. Khirkee Masjid North West 6.69 45. North West 6.39 46. Tomb Of Usuf-Quttal North West 6.87 47. West 10.15

Pre – feasibility Report Enclosed

21 | P a g e