Modifications to One Freedom Plaza

Total Page:16

File Type:pdf, Size:1020Kb

Modifications to One Freedom Plaza Permit Resubmittal Project: One Freedom Plaza (1301 Pennsylvania) Title: Permit Resubmittal Architect’s Supplemental Instruction No.: Date of Issuance: 04/16/2018 Owner: QUADRANGLE, LC Architect’s Project No.: 4770 To Contractor: HENSEL PHELPS Distribution to: X Owner □ Architect X Consultant X Contractor □ Field □ Other Contract for: The work shall be carried out in accordance with the following supplemental instructions and/or revised Contract Documents – issued in accordance with the Contract Documents to clarify, or interpret, pursuant to Subparagraph 2.2.8 and/or order minor modifications in the Work pursuant to Subparagraph 12.3.1 of the General Conditions of the Contract for Construction without change in Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate below your acceptance of these instructions, within seven (7) days receipt thereof. After acceptance of the Supplementary Instructions, all such documents shall become part of the Contract Documents. Description: The attached are updated drawings to be resubmitted for Life and Safety Permit Approval. Changes include interior and exterior modifications altering paths of egress. Existing electric room enlarged as required by Pepco. The Parking Office has been moved to ensure head clearance. The updated drawings reflect Owner request for additional bathroom at Level 14, additional storage at Level 14, men’s bathroom expanded at Level 12-13, expanded Fitness Center at Level 2, Retail A split in two, reconfigured Retail entrance on Penn Ave, northeast corner entrance vestibule moved and corner reconfigured. Interior ramp replaced by stair. FCC room moved and interior access added. Sheet List: See below. Issued by: Lynda Dossey A0001 – updated sheet index A0005 – areas, paths of egress, and occupant loads updated A0007 – areas, paths of egress, and occupant loads updated A0008 – areas, paths of egress, and occupant loads updated A0200 – (2) operable leaves added to exits, entrance vestibule moved, door to FCC removed, door added A1011 – existing electric room enlarged, second door added A1012 – existing electric room enlarged A1101 – parking office moved; retail space split by new wall, retail slab height changed, stair and rail removed, second door added to Retail A1; FCC room moved, FCC exterior access door removed, custom FCC interior access door added A1102 – entrance vestibule moved, corner reconfigured, (2) operable leaves added, stair removed; fitness wall moved, egress door moved A1103 – roof extended at corner reconfiguration, guardrail extended to follow modified roofline A1112 – men’s bathroom changed: ada + ambulatory shifted, one typical stall added, two lavs added A1113 – men’s bathroom changed: ada + ambulatory shifted, one typical stall added, two lavs added A1114 – WC-2 and bathroom vestibule added, mechanical room fire wall moved, built in storage added, door to Stair A moved A1202 – parking office moved A1203 – Lvl 11-13 men’s bathroom changed; ada + ambulatory shifted, one typical stall added, two lavs added Lvl 14; WC-2 and bathroom vestibule added, mechanical room fire wall moved, built in storage added, door to Stair A moved A2011 – existing electric room enlarged A2101 – parking office moved; retail space split by new wall; FCC room moved A2103 – entrance vestibule moved; fitness wall moved, FE lights and fitness ceiling panels extended into new fitness area A2112 – bathroom ceiling condition extended to area added for one typ stall and two lavs A2113 – bathroom ceiling condition extended to area added for one typ stall and two lavs A2114 – WC-2 and bathroom vestibule added, mechanical room fire wall moved, built in storage added, door to Stair A moved, exit signs moved JAHN/35 EAST WACKER DRIVE/CHICAGO, ILLINOIS 60601/312-427-7300 A3001 – entrance vestibule moved, corner reconfigured, (2) operable leaves added, guardrail extended, door removed A3102 – entrance vestibule moved, corner reconfigured, (2) operable leaves added, guardrail extended A3201 – FCC room moved, retail split by new wall, retail slab height changed A3203 – entrance vestibule moved, corner reconfigured, (2) operable leaves added; retail split by new wall, retail slab height changed A3206 – entrance vestibule moved, corner reconfigured, stair removed, guardrail extended; interior stair replaced ramp A3209 – FCC room moved, retail space split, retail slab height changed A3303 – entrance vestibule moved, corner reconfigured, (2) operable leaves added, guardrail extended A4121 – corner reconfigured where entrance vestibule moved from, guardrail extended A4123 – entrance vestibule moved, (2) operable leaves added, second door added to Penn Ave Retail Entry A5201 – door from Unassigned Space to Stair A moved A5202 – door from Unassigned Space to Stair A moved A5208 – stair replaced ramp A6100 – FCC room moved, custom FCC interior access door added A6101 – FCC room moved A6111 – custom FCC interior access door added A6160 – custom FCC interior access door added A6220 – fitness wall moved, FE lights and fitness ceiling panels extended into new fitness area A6221 – fitness wall moved, FE lights and fitness ceiling panels extended into new area, glass panels added A6309 – original bathroom repositioned, second bathroom and vestibule added A6322 – men’s bathroom changed: ada + ambulatory shifted, one typical stall added, two lavs added A7110 – updated door schedule JAHN/35 EAST WACKER DRIVE/CHICAGO, ILLINOIS 60601/312-427-7300 DCRA USE ONLY PROFESSIONAL OF RECORD STAMP 6 03.16.2017 PERMIT REVISION K 09.15.2017 ASI-005 5 10.01.2016 REVISION TO PERMIT F 09.01.2016 GMP REVISION 09.01.2016 ISSUE FOR CONSTRUCTION C F C D 01.22.2016 100% CD C 12.04.2015 GMP 1301 09.23.2015 DCRA PERMIT SUBM B F ISSION B 07.31.2015 90% CD PHASE 1 K 6 K A 06.17.2015 80% CD ADDENDUM 05.29.2015 80% CD ENTRANCE VESTIBULE MOVED DOUBLE DOORS REPLACE SINGLE DOORS A 05.01.2015 ISSUE FOR PERMIT 5 GUARDRAIL EXTENDED 09.17.2012 03.31.2015 100% PRELIMINARY DESIGN DEVELOPMENT PERMIT REVIEW 05.18.2012 50% DESIGN DEVELOPMENT 09.07.2011 FACADE BUDGET PACKAGE EAST ELEVATION Index Date Description 2 1/16"= 1'- 0" Copyright C JAHN, LLC. 2015. All rights reserved Architect JAHN ARCHITECTS 35 EAST WACKER DRIVE 312.427.7300 PHONE CHICAGO, ILLINOIS 60601 312.332.0274 FAX Special Structures WERNER SOBEK NEW YORK 138 SPRING STREET 212.588.0233 PHONE C NEW YORK, NY 10012 917.210.3882 FAX Structural Engineers FERNANDEZ ASSOCIATES 101 PARK WASHINGTON COURT 703.533.7700 PHONE FALLS CHURCH, VIRGINIA 22046 703.534.0319 FAX Mechanical-Plumbing Engineers SOUTHLAND INDUSTRIES 22340 Dresden Street, Suite 177 703.834.5570 PHONE DULLES, VIRGINIA 20166 703.834.5572 FAX F 5 Electrical Engineers ASHE CONSULTANTS 950 Herndon Parkway, Suite 320 703.230.2500 PHONE HERNDON, VIRGINIA 20170 Civil Engineers VIKA Capitol 4910 Massachusetts Ave NW, Suite 214 202.244.4140 PHONE WASHINGTON, DC 20016 202.244.4196 FAX Consulting Architect HARTMAN-COX ARCHITECTS 1074 THOMAS JEFFERSON STREET NW 202.393.1999 PHONE WASHINGTON, DC 20007 202.393.0548 FAX Development Manager QDC DEVELOPMENT SERVICES OF WASHINGTON, LLC 1001 G STREET, SUITE 700 W 202.393.1999 PHONE WASHINGTON, DC 20001 202.393.0548 FAX Owner 1301 ASSOCIATES, LP 1001 G STREET, SUITE 700 W 202.393.1999 PHONE WASHINGTON, DC 20001 202.393.0548 FAX Project 1301 Pennsylvania Avenue, NW NATIONAL THEATRE 1301 Pennsylvania Ave., NW Washington, DC 20004 Drawn Checked DC PC JAHN ProjectNr. Date NATIONAL THEATRE 13 01 B 5 4770 09.07.2011 KIRKLAND & ELLIS Scale Index 1/16" = 1'-0" Title MEASURING POINT - MID-POINT OF BLOCK SOUTH ELEVATION C CONTEXT ELEV. T/C EL. +14.00 PHASE 2 PHASE 3 1 1/16"= 1'- 0" SOUTH AND EAST A A 0 4' 12' 24' REFER TO A3 010 GENERAL FACADE NOTES Sheet No. Plan North FOR ALL GENERAL FACADE NOTES AND FACADE SCHEDULE A3001 14 March 2018 S S S S S S S S S S S S S S S S S S S S S S S S S 3 A3306 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G7 G7 G7 G7 G7 G7 G7 G7 G7 G7 S S S S S S S S S S S S S S S G9 S S S S S S S S S S S S G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G9 G5 G9 G7 G7 G7 G7 G7 G7 G7 G7 G7 G7 EK A DCRA USE ONLY G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 C C C C C C C C C C C C C C G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 3 C C C C C C A4102 C C C C C C C C PROFESSIONAL OF RECORD STAMP G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 6 03.16.2018 PERMIT REVISION B B B B B B B B B B B B B B K 09.15.2017 ASI-005 J 06.16.2017 ADDENDUM 3 5 10.01.2016 REVISION TO PERMIT G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 F 09.01.2016 GMP REVISION 09.01.2016 ISSUE FOR CONSTRUCTION B B B B B B B B B B B B B B D 01.22.2016 100% CD C 12.04.2015 GMP 09.23.2015 DCRA PERMIT SUBM ISSION B 07.31.2015 90% CD G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 A 06.17.2015 80% CD ADDENDUM 05.29.2015 80% CD 2 05.01.2015 ISSUE FOR PERMIT B B B B B B A4102 B B B B B B B B 04.01.2013 03.31.2015 REVISION PRELIMINARY TO DD PERMIT REVIEW 09.17.2012 100% DESIGN DEVELOPMENT 05.18.2012 50% DESIGN DEVELOPMENT G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 G1 09.07.2011 FACADE BUDGET PACKAGE B B B B B B B B B B B B B B Index Date Description Copyright C JAHN, LLC.
Recommended publications
  • Discover Woman American History
    soei D g American Democracy et. 07 How Women Shaped American Life and Culture Prepared by Susan Sullivan Lagon,Ph.D., Historian, The Jefferson, Washington, DC The Jefferson, Washington, DC • 1200 16th St. NW • Washington DC, 20036 1 The Jefferson, Washington, DC • 1200 16th St. NW • Washington DC, 20036 How Women Shaped American Life and Culture Prepared by Susan Sullivan Lagon, Ph.D., Historian, The Jefferson, Washington, DC John Adams, whose bust is opposite Thomas Jefferson’s in the lobby, was a faithful correspondent with his wife Abigail while she remained in Massachusetts. In a famous letter from Abigail to her husband on March 31, 1776, she wrote: “I long to hear that you have declared an independency. And, by the way, in the new code of laws which I suppose it will be necessary for you to make, I desire you would remember the ladies and be more generous and favorable to them than your ancestors. Do not put such unlimited power into the hands of the husbands. Remember, all men would be tyrants if they could. If particular care and attention is not paid to the ladies, we are determined to foment a rebellion, and will not hold ourselves bound by any laws in which we have no voice or representation.” Day One Walking Tour From the hotel, head south on 16th St. to Lafayette Square. The large building at H St. and Madison Place is Dolley Madison House. The stately home was built in 1820 by Congressman Richard Cutts who was married to Dolley Madison’s sister Anna.
    [Show full text]
  • Where to Go Camping
    There was a statement in an older version of the Boy Scout Handbook that said: “Have you ever dreamed of hiking the wilderness trails that were worn down under moccasins hundreds of years ago? Do you hear in your imagination the almost soundless dip, dip of Indian canoe paddles or the ring of the axe of an early pioneer hewing a home out of the American wilderness? Have you followed with you mind’s eye the covered wagon on the trek across our continent? Yes, it’s fun to be a Boy Scout! It’s fun to go hiking and camping with your best friends…..to swim, to dive, to paddle a canoe, to wield the axe…..to follow in the footsteps of the pioneers who led the way through the wilderness…..to stare into the glowing embers of the campfire and dream of the wonders of the lift that is in store for you…” This is the heart of Scouting, but we don’t always know the best place to go on these outings. How better can the Order of the Arrow fulfill a part of their responsibility of service to others than to make this camping guide available? A great guide to the best camping, boating, hiking and sightseeing both in and out of the Council, but, of course, one of the best places to do real camping is at one of the Council’s reservations. Richard A. Henson or Rodney Scout Reservation, both long term camping during the summer months, or weekends through the year, affords a maximum of program.
    [Show full text]
  • White House U.S
    Connecticut Department To Farragut West of Veterans To McPherson Square Metro station Ave Affairs Metro station blue, orange, and silver lines St. John’s blue, orange, and silver lines 16th Street Church Ave Vermont H Street Decatur Von Steuben Kosciuszko House statue statue White House U.S. Court of Historical LAFAYETTE Appeals and Association Baruch U.S. Court Bench of of Claims New Executive Inspiration Jackson Office Building statue White House Conference Pennsylvania Ave PARK Center Treasury Jackson Place Renwick Blair-Lee Rochambeau Lafayette Madison Place Annex Gallery House statue statue New York Ave Pennsylvania Avenue Northwest Northeast Gate Gate Gallatin G Street NORTH LAWN statue G Street To Metro Center Metro station blue, orange, silver, and red lines Dwight D. Eisenhower Department 17th Street Executive Office of the Treasury 15th Street Building White House Liberty Bell Replica F Street F Street East Executive Park West Executive Ave West To SOUTH Octagon Hamilton House statue Pennsylvania Ave State Place Alexander Hamilton North Southwest Southeast Gate Place New York Ave Gate Enter here for tours by SHERMAN reservation only First Division PERSHING PARK Monument Sherman statue To Federal Triangle Corcoran Metro station Gallery of Art LAWN blue, orange, and PARK silver lines E Street E Street Pennsylvania Ave E Street South Butt–Millet Ellipse Visitor American Fountain Pavilion White House Visitor Center National Zero Red Cross Milestone Enter under blue awnings National Christmas Tree D Street Daughters of Boy Scout the American Memorial Revolution ELLIPSE Original Patentees C Street Memorial Department of Commerce Organization of American States Second Division Bulfinch Memorial Bulfinch Gatehouse Gatehouse Haupt Fountains Haupt Fountains To Lincoln and To Smithsonian Vietnam Veterans Institution Memorials Constitution Avenue Lock To World War II, To Washington Monument Keepers F.
    [Show full text]
  • New Employee Orientation Library of Congress New Employee Orientation Guide
    The Library of Congress New Employee Orientation Library of Congress New Employee Orientation Guide Table of Contents About the Library of Congress ........................................................................................ 1 Organizational Structure .................................................................................................. 1 Service Units ................................................................................................................... 1 Library of Congress Regulations ................................................................................. 3 Using Your Telephone and Voice Mail .......................................................................... 4 Facilities Information ......................................................................................................... 5 Entry and Exit ................................................................................................................. 5 Map: Library of Congress Campus ............................................................................ 6 Map: Capitol Hill Complex .......................................................................................... 7 Emergency Instructions .................................................................................................... 8 Human Resources Services ............................................................................................. 8 Library Employment .........................................................................................................
    [Show full text]
  • Capitol Hill Element
    Comprehensive Plan Capitol Hill Area Element Proposed Amendments DELETIONS ADDITIONS April 2020 Page 1 of 40 Comprehensive Plan Capitol Hill Area Element Proposed Amendments 1500 OVERVIEW Overview 1500.1 The Capitol Hill Planning Area encompasses the 3.1 square miles loCated east of the U.S. Capitol, north of I-695, and south of Florida Avenue NE and Benning Road NE. Boundaries of the Planning Area are shown on the Capitol Hill map. Map at left. Most of this area has historiCally been Ward 6 and is now partially in Ward 7, although in past deCades parts have been included in Wards 2 and 5. 1500.1 1500.2 The Planning Area is bounded on the west by Central Washington and on the south by the Lower AnaCostia Waterfront/Near Southwest Planning Area. BeCause plans for these twothis area areas is are of partiCular concern to Capitol Hill residents, this chapter includes cross-references to relevant seCtions of the Central Washington and Lower AnaCostia Waterfront /Near Southwest Planning Area Elements. Changes along the waterfront—partiCularly at Reservation 13 and in the Near Southeast—are extremely important to the future of Capitol Hill. The Planning Area is bounded to the north by Florida Avenue NE and Benning Road NE. To the south, the area is bounded by Southeast Boulevard. To the west, the area is bounded generally by 1st Street NE. The Anacostia River provides a natural border to the east. 1500.2 1500.3 In many respeCts, Capitol Hill is a “City within the city.” The community has well- defined physiCal boundaries that enhance its sense of identity.
    [Show full text]
  • 1701 Pennsylvania Avenue Nw
    1701 PENNSYLVANIA AVENUE NW 1701 PENNSYLVANIA AVE NW CENTRAL BUSINESS DISTRICT TOTAL RETAIL SF WASHINGTON, DC 20006 4,277 TURN-KEY FAST CASUAL SPACE NEAR THE WHITE HOUSE SPACE A SPACE B 2,419 TOTAL SF 1,858 TOTAL SF OUTDOOR SEATING OPPORTUNITY DELIVERY: Immediate SPACE AVAILABLE DEMOGRAPHIC SNAPSHOT (A) 2,419 SF Total — Former Eatsa: 1,818 SF (ground floor) + 601 SF (mezzanine) (B) 1,858 SF Total — Former Brewood Engravers: $ 1,289 SF (ground floor) + 569 SF (mezzanine) DETAILS POPULATION EMPLOYEES AVERAGE HHI WALKER’S PARADISE 1/4 mi — 89 1/4 mi — 35,206 1/4 mi — $108,100 (99) Very Walkable • Former Eatsa fast casual restaurant space 1/2 mi — 5,922 1/2 mi — 142,780 1/2 mi — $120,212 Daily errands do not require a car. and Brewood Engravers retail space available immediately in turn-key condition. • Prime Pennsylvania Ave location, adjacent to the White House, Renwick Gallery, Eisenhower Executive Building, and the World Bank. EDUCATION MEDIAN AGE RIDERSHIP • Both spaces include mezzanine levels and (Bachelor’s Degree+) 1/4 mi — 23.7 (Farragut West) opportunity for significant outdoor seating. 1/4 mi — 88.6% 1/2 mi — 20.9 18,451 AWPB 1/2 mi — 84.5% Jared Meier Andrew Poncher Julia Weber 240-479-7195 202-730-9890 203-919-1377 [email protected] [email protected] [email protected] 1701 PENNSYLVANIA AVE NW CORRIDOR MAP WASHINGTON, DC 20006 The Beacon Hotel 199 Rooms WASHINGTON,DC CBD 29,200VPD (2013) corridor retail map MAY 2017 Sales - $750psf 20TH STREET NW 20TH Prepared By: Courtyard Marriott 158 Rooms Hotel 6,442 Total Rooms
    [Show full text]
  • Pennsylvania Avenue Cultural Landscape Inventory
    National Park Service Cultural Landscapes Inventory Pennsylvania Avenue, NW-White House to the Capitol National Mall and Memorial Parks-L’Enfant Plan Reservations May 10, 2016 Pennsylvania Avenue, NW-White House to the Capitol National Mall and Memorial Parks-L’Enfant Plan Reservations Table of Contents Inventory Unit Summary & Site Plan ............................................................................................ Page 3 Concurrence Status ...................................................................................................................... Page 10 Geographic Information & Location Map ................................................................................... Page 11 Management Information ............................................................................................................. Page 12 National Register Information ..................................................................................................... Page 13 Chronology & Physical History ................................................................................................... Page 24 Analysis & Evaluation of Integrity .............................................................................................. Page 67 Condition Assessment .................................................................................................................. Page 92 Treatment ....................................................................................................................................
    [Show full text]
  • The Old Capitol As Completed
    CHAPTER VI THE OLD CAPITOL AS COMPLETED 1 HE old Capitol was situated in a park of 22 ⁄2 acres [Plate 87], The eastern entrance, according to Mills, had spacious gravel inclosed by an iron railing.1 There were nine entrances to the walks, through a “dense verdant inclosure of beautiful shrubs and trees, grounds, two each from the north and south for carriages, two circumscribed by an iron palisade.” 3 An old print, made from a draw- on the east and three on the west for pedestrians. The western ing by Wm. A. Pratt, a rural architect and surveyor in 1839, gives a Tentrances at the foot of the hill were flanked by two ornamental gate or clear idea of the eastern front of the building and its surroundings at watch houses [Plate 81]. The fence was of iron, taller than the head of this period [Plate 90]. an ordinary man, firmly set in an Aquia Creek sandstone coping, which The old Capitol building covered 67,220 square feet of ground. covered a low wall [Plate 82]. The front was 351 feet 4 inches long. The depth of the wings was 131 On entering the grounds by the western gates, passing by a foun- feet 6 inches; the central eastern projection, including the steps, 86 feet; tain, one ascended two flights of steps to the “Grand Terrace” [Plate 88]. the western projection, 83 feet; the height of wings to the top of Upon the first terrace was the Naval Monument, erected to those balustrade, 70 feet; to top of Dome in center, 145 feet.
    [Show full text]
  • Pennsylvania Avenue NHS, Demonstrations, National
    DEMONSTRATIONS, NATIONAL CELEBRATIONS, AND SPECIAL EVENTS First Amendment gatherings and marches, na- tional celebrations, and special events all draw CONTENTS crowds that may stand or sit on bleachers placed on the sidewalks to watch the events on the The Avenue’s Importance.............................. 1 street. Generally the avenue can sustain repeated NPS Regulations ............................................. 1 use because it is paved, as are the adjacent side- Regulating Public Use............................ 1 walks. While DC manages the 100-foot-wide Recreational Activities........................... 3 roadway, where many parades and activities Soliciting.................................................. 3 occur, NPS manages the adjacent sidewalks and Sales.......................................................... 3 park areas. Permitting and managing activities NPS-Permitted Activities............................... 3 with large crowds requires a great deal of First Amendment Activities .................. 3 coordination among many agencies and organi- Special Events ......................................... 3 zations to address circulation, health and safety, National Celebrations — Inaugural security and security checkpoints, and gathering Parades........................................ 4 and dispersal locations. (It should be noted that Commercial Filming and Photography4 Constitution Avenue is also used for many occa- Visitor Capacities............................................ 4 sions — typically for the Fourth of July,
    [Show full text]
  • Pennsylvania Avenue Development Corporation 671
    PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION 671 For further information, contact the Press Office, Peace Corps, 1990 K Street NW., Washington, DC 20526. Phone, 202±606±3010; or toll-free, 1±800±424±8580. Fax, 202±606±3108. PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION Suite 1220 North, 1331 Pennsylvania Avenue NW., Washington, DC 20004±1703 Phone, 202±724±9091 Board of Directors: Chairman RICHARD A. HAUSER Vice Chairman EDWARD E. ALLISON Directors CATHERINE M. BOUCREE, ELEANOR LYONS WILLIAMS, PETER TERPELUK, JR., JAYNE B. IKARD,W ALTER J. GANZI, JR., JEANNETTE NAYLOR COPE Officials: Executive Director LESTER M. HUNKELE III Assistant Director, Legal ROBERT E. MCCALLY Assistant Director, Development JERRY M. SMEDLEY Director, Finance and Administration ALEXANDER K. MILIN Director, Public Improvements RICHARD SITEK Director, Design and Planning JAN F. FRANKINA Director, Corporate Affairs and Congressional ANNE P. HARTZELL Relations Administrative Officer/Secretary, Board of DIANE G. SMITH Directors The Pennsylvania Avenue Development Corporation is a Federal agency responsible for revitalizing Pennsylvania Avenue between the White House and the Capitol. A comprehensive plan, prepared by the agency and approved by Congress in 1975, guides development in a 21-block section of Pennsylvania Avenue and the adjacent blocks north of the avenue. The Pennsylvania Avenue Development Activities Corporation was established as a wholly owned Federal corporation by the The Corporation's activities to revitalize Pennsylvania Avenue Development Pennsylvania Avenue take two forms. Corporation Act of 1972, as amended First, using funds appropriated by (40 U.S.C. 871). Congress, the Corporation undertakes The Corporation is governed by a 15- projects which improve the public areas member Board of Directors.
    [Show full text]
  • James E West Challenge Questions
    History Of Scouting Trail Inaugural James E. West - OA 100th Anniv. Hike HOST May 2015 Hike Challenge Questions Edition HCQ Copyright 2015 Yippee, Yippee, Scout Historian “P-B”, Chairman, and the entire H.O.S.T. Committee We’ll have some fun! You can hike,and would like to welcome you to the start of the History Of Scouting Trail’s I can run! Arf! James E. West / Order of the Arrow 100th Anniversary Hike! The famous Scouting Founder Baden-Powell “B-P” with Chevy Scout! Chief Scout Executive James E. West Famous American Indian Chiefs are Sherlock Scout says that Chevy Scout, his faithful dog companion is waging his tail honored here for you to see and ready to start. Chevy Scout, who has met the President of the United States, is hot throughout the Hike on the trail and will lead you to the clues and challenges so you can find the answers. Challenge Questions. Chevy says: They were accurately portrayed over 100 years “Yes-sir-ree, don’t you know, yes-sir-ree, don’t be slow.” ago in these drawings. If you go by METRO, you will get off at L’Enfant Plaza Station.( Frenchman Mr. Pierre L’Enfant, with his assistant, Benjamin Banneker, was the man who designed the layout for the District of Columbia.) Go to Independence Ave. Find the park that is at the intersection of Maryland Ave., 6th Street & Independence Ave. and in front of the Department of Education. This park is your starting point. This is the future site for the President Eisenhower Memorial.
    [Show full text]
  • The Shape and History of the Ellipse in Washington, D.C
    The Shape and History of the Ellipse in Washington, D.C. Clark Kimberling Department of Mathematics University of Evansville 1800 Lincoln Avenue, Evansville, IN 47722 email: [email protected] 1 Introduction When conic sections are introduced to mathematics classes, certain real-world examples are often cited. Favorites include lamp-shade shadows for hyperbolas, paths of baseballs for parabolas, and planetary orbits for ellipses. There is, however, another outstanding example of an ellipse. Known simply as the Ellipse, it is a gathering place for thousands of Americans every year, and it is probably the world’s largest noncircular ellipse. Situated just south of the White House in President’sPark, the Ellipse has an interesting shape and an interesting history. Figure 1. Looking north from the top of Washington Monument: the Ellipse and the White House [19] When Charles L’Enfant submitted his Plan for the American capital city to President George Washington, he included many squares, circles, and triangles. Today, well known shapes in or near the capital include the Federal Triangle, McPherson Square, the Pentagon, the Octagon House Museum, Washington Circle, and, of course, the Ellipse. Regarding the Ellipse in its present size and shape, a map dated September 29, 1877 (Figure 7) was probably used for the layout. The common gardener’smethod would not have been practical for so large an ellipse –nearly 17 acres –so that the question, "How was the Ellipse laid out?" is of considerable interest. (The gardener’s method uses three stakes and a rope. Drive two stakes into the ground, and let 2c be the distance between them.
    [Show full text]