LIST OF COMPLETED FRI PROJECTS

Entity Project Name Contract Amount Final Report Date City of Boulder City I-11 Boulder City Bypass Utility Crossings $ 1,200,000.00 4/11/2019 City of Henderson I-515 at I-215 Interchange Improvements $ 2,000,000.00 3/12/2020 City of Henderson I-15 at Starr Avenue Interchange $ 35,280,000.00 3/12/2020

City of Henderson Neighborhood Rehab: Green Valley - Arroyo Grande Blvd (Arroyo Grande, Horizon Ridge to Sunset) $ 7,471,000.00 3/12/2020 Neighborhood Rehab: Green Valley - Arroyo Grande Blvd (Arroyo Grande/Mayan, City of Henderson Helmsdale/Harwick, Sunset near Scimitar) City of Henderson Downtown Henderson Complete Streets $ 12,000,000.00 3/12/2020 City of Henderson Valle Verde Dr: Horizon Ridge Pkwy/Warm Springs Rd $ 3,694,000.00 3/12/2020 City of Henderson Horizon Dr, Pacific Ave to Boulder Hwy $ 1,500,000.00 1/9/2020 City of Henderson Neighborhood Rehab: Anthem (Anthem Parkway at Anthem Country Club Entry) City of Henderson Neighborhood Rehab: Anthem (Anthem/Eastern/Pecos Ridge) $ 2,275,000.00 11/14/2019 City of Henderson Neighborhood Rehab: Anthem (Reunion, Anthem to Anthem loop) City of Henderson Neighborhood Rehab: Anthem (Anthem Parkway at Anthem Country Club Entry) City of Henderson West Henderson Roads (Bermuda, Volunteer to St. Rose) City of Henderson West Henderson Roads (Bruner, Gilespie to Executive Airport) $ 300,000.00 11/14/2019 City of Henderson West Henderson Roads (Gilespie, Volunteer to St. Rose) City of Henderson Eastern Avenue; Pecos Ridge Pkwy and Beckler Dr. $ 750,000.00 9/12/2019 City of Henderson Center St: Burkholder Blvd/ Pkwy $ 1,700,000.00 7/11/2019 City of Henderson Sunset Rd: Annie Oakley Dr/Sunset Wy $ 2,450,000.00 12/13/2018 City of Henderson Warm Springs Rd: Lake Mead Pkwy/Racetrack Rd $ 150,000.00 12/13/2018 City of Henderson Starr Ave: Blvd/St. Rose Pkwy $ 5,150,000.00 12/13/2018 City of Henderson Pueblo Blvd: Newport Dr/Warm Springs Rd $ 275,000.00 12/13/2018 City of Henderson Stephanie St: Galleria Dr/Russell Rd $ 18,539,000.00 8/9/2018 City of Henderson Volunteer Blvd: Las Vegas Bl/Anthem - Executive Airport Dr: Volunteer Bl/St. Rose Pkwy $ 6,901,000.00 7/12/2018 City of Henderson Racetrack Rd: Boulder Hwy/Athens Ave $ 3,421,000.00 6/14/2018 City of Henderson Mission/Paradise Neighborhood Stabilization (College, Paradise Hills to 515) City of Henderson Mission/Paradise Neighborhood Stabilization (Paradise Hills, Greenway to College) $ 2,492,000.00 5/24/2018

1/8 LIST OF COMPLETED FRI PROJECTS

$ 2,492,000.00 5/24/2018 City of Henderson Mission/Paradise Neighborhood Stabilization (Mission, College to UPRR) City of Henderson Gibson Rd: Horizon Ridge Pkwy/I-215 $ 925,000.00 12/14/2017 City of Henderson Horizon Ridge Pkwy: Gibson Rd/Las Palmas Entrada $ 1,081,000.00 12/14/2017 City of Henderson I-515 and I-215 Interchanges Studies: Galleria Dr to Eastern Ave $ 450,000.00 12/14/2017 City of Henderson Paseo Verde Pkwy: St. Rose Pkwy/Green Valley Pkwy $ 900,000.00 12/14/2017 City of Henderson Warm Springs Rd: Arroyo Grande Blvd/Boulder Hwy $ 3,222,000.00 10/12/2017 City of Henderson Montelago Blvd and Pkwy $ 1,007,000.00 6/8/2017 City of Henderson Neighborhood Rehab: Green Valley (High View, Green Valley to Velle Verde) $ 3,124,000.00 4/13/2017 City of Henderson Neighborhood Rehab: Green Valley (Valle Verde, Warm Springs to High View) City of Henderson Gibson Rd: Warm Springs Rd to Sunset Rd $ 474,000.00 2/9/2017 City of Henderson Pecos Rd: Windmill La/Robindale Rd $ 215,500.00 2/9/2017 City of Henderson Eastern Ave: Coronado Center Dr/Silverado Ranch Blvd $ 1,044,000.00 11/10/2016 City of Henderson Whitney Ranch Dr: Sunset Rd/Russell Rd $ 2,164,000.00 11/10/2016 City of Las Vegas Charleston Blvd:Rancho Dr/Martin L. King Blvd $ 1,500,000.00 3/12/2020 City of Las Vegas Lake Mead Blvd between Comstock Dr and Stella Lake St and Hulapai Wy at Crestdale Ln $ 2,000,000.00 3/12/2020 City of Las Vegas Summerlin Parkway, CC-215 to US-95 $ 8,500,000.00 3/12/2020 City of Las Vegas Kyle Canyon Interchange at US-95 $ 2,158,000.00 3/12/2020 City of Las Vegas 6th St: Bridger Ave/Stewart Ave $ 1,667,000.00 3/12/2020 City of Las Vegas Shadow La: Alta Dr/Charleston Bl $ 1,000,000.00 3/12/2020 City of Las Vegas Pedestrian Safety: Street Lighting Upgrades (63) City of Las Vegas Pedestrian Safety: Street Lighting Upgrades (24) City of Las Vegas Pedestrian Safety: Street Lighting Upgrades (32) $ 1,050,000.00 2/13/2020 City of Las Vegas Pedestrian Safety: Street Lighting Upgrades (33) City of Las Vegas Pedestrian Safety: Street Lighting Upgrades (79) City of Las Vegas Gass Ave: Main St/Charleston Blvd $ 8,270,000.00 1/9/2020 City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Alta Dr, Decatur to Valley View) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Alta Dr, Rainbow to Decatur) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Smoke Ranch, Jones to Rancho) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Smoke Ranch, Rainbow to Jones)

$ 7,844,000.00 12/12/2019 2/8 LIST OF COMPLETED FRI PROJECTS

City of Las Vegas Arterial Reconstruction Program - Package 2 (Smoke Ranch/James Bilbray - Ped City of Las Vegas Flasher) $ 7,844,000.00 12/12/2019 City of Las Vegas Arterial Reconstruction Program - Package 2 (Smoke Ranch/James Bilbray - Ped City of Las Vegas Flasher) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Smoke Ranch/Maverick - Ped Flasher) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Valley View, US-95 to Washington) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 2 (Washington, Rainbow to MLK) City of Las Vegas Main St./Commerce St. One-Way Couplet $ 57,365,000.00 12/12/2019 City of Las Vegas Coolidge Ave: Main St/4th St $ 1,483,000.00 12/12/2019 City of Las Vegas I-15 Frontage Roads Study: Washington Ave/Lake Mead Blvd $ 2,500,000.00 9/12/2019 City of Las Vegas Charleston Blvd: Grand Central Pkwy/Fremont St $ 300,000.00 8/8/2019 City of Las Vegas Arterial Reconstruction Program - Package 1 (Decatur Blvd, US-95 to Lake Mead City of Las Vegas Blvd) City of Las Vegas Arterial Reconstruction Program - Package 1 (Decatur Blvd/Westmoreland Dr - City of Las Vegas Ped Flasher) City of Las Vegas Arterial Reconstruction Program - Package 1 (Eastern Ave, Sahara Ave to Cedar City of Las Vegas Ave) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 1 (Eastern Ave/Exley Ave - Ped Flasher) City of Las Vegas Arterial Reconstruction Program - Package 1 (Lake Mead Blvd, Hills Center Dr to $ 8,935,000.00 5/23/2019 City of Las Vegas Rock Springs Dr City of Las Vegas Arterial Reconstruction Program - Package 1 (Lake Mead Blvd, Rainbow Blvd to City of Las Vegas Rancho Dr) City of Las Vegas Arterial Reconstruction Program - Package 1 (Lake Mead Blvd/Arpa Wy - Ped City of Las Vegas Flasher) City of Las Vegas Arterial Reconstruction Program - Package 1 (Lake Mead Dr/James Bilbray Dr - City of Las Vegas Ped Flasher) City of Las Vegas Las Vegas Blvd: Stewart Ave/Sahara Ave $ 2,000,000.00 4/11/2019 City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 2 (Curb Extensions - 7) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 2 (Curb Extensions - 3) $ 1,285,000.00 4/11/2019 City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 2 (Curb Extensions - 2)

3/8 LIST OF COMPLETED FRI PROJECTS

City of Las Vegas Carson Ave: Casino Center Blvd/9th St $ 900,000.00 4/11/2019 City of Las Vegas Rancho Dr: Bonanza Rd/Rainbow Blvd $ 115,000.00 3/14/2019 City of Las Vegas Oakey Blvd/Wyoming Ave: Rainbow Blvd/Industrial Rd $ 2,200,000.00 3/14/2019 City of Las Vegas Alta Dr: Rancho Dr to Main St $ 1,300,000.00 3/14/2019 City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Bonanza/Lillian - Ped Flasher) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Buffalo/Gilmore - Ped Flasher) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Decatur/Eldora - HAWK) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Gowan/Shermcrest - Ped Flasher) $ 701,000.00 3/14/2019 City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Rancho/Redondo - Ped Flasher) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Sahara/Las Verdes - Ped Flasher) City of Las Vegas City of Las Vegas Pedestrian Safety Upgrades - Package 1 (Town Center/Spring Gate - Ped Flasher) City of Las Vegas Casino Center Blvd: Stewart Ave/US-95 $ 500,000.00 1/10/2019 City of Las Vegas Bus Turnouts: Charleston Blvd, Boulder Hwy/Nellis Blvd $ 600,000.00 1/10/2019 City of Las Vegas Meadows Neighborhood Rehabilitation $ 2,000,000.00 1/10/2019 City of Las Vegas Downtown Pedestrian Streetlight Upgrades $ 854,000.00 12/13/2018 City of Las Vegas Cliff Shadows Pkwy:Novat St Traffic Signal $ 375,000.00 10/11/2018 City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 3 (Buffalo, Sky Pointe to Grand Teton) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 3 (Cimarron, Sky Pointe to Grand Teton) City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 3 (Elkhorn, US-95 to Tenaya) $ 4,540,000.00 8/9/2018 City of Las Vegas City of Las Vegas Arterial Reconstruction Program - Package 3 (Town Center/Crestdale - Ped Flasher) City of Las Vegas Arterial Reconstruction Program - Package 3 (Town Center, Charleston to City of Las Vegas Summerlin) City of Las Vegas Rancho Dr/Decatur Bl Intersection Improvements (1) $ 4,050,000.00 2/8/2018 City of Las Vegas Rancho Dr/Decatur Bl Intersection Improvements (2) City of Las Vegas City of Las Vegas Traffic Signals - Package 1 (Alexander/Torrey Pines) City of Las Vegas City of Las Vegas Traffic Signals - Package 1 (Bonanza/Page) $ 1,395,000.00 6/9/2016 City of Las Vegas City of Las Vegas Traffic Signals - Package 1 (Lamb/Owens) City of Mesquite Exit 118 Interchange on I-15 $ 20,000,000.00 7/13/2017 City of North Las Vegas Las Vegas Bl: Tonopah Ave/Carey Ave City of North Las Vegas Sawtooth Roads II (Alexander, N 5th to Losee)

4/8 $ 2,250,000.00 3/12/2020 LIST OF COMPLETED FRI PROJECTS

City of North Las Vegas Sawtooth Roads II (Commerce, Cheyenne to Centennial) City of North Las Vegas Sawtooth Roads II (Gowan, Allen to Losee) $ 2,250,000.00 3/12/2020 City of North Las Vegas Sawtooth Roads II (Revere, Carey to Colton) City of North Las Vegas Sawtooth Roads II (Alexander, N 5th to Losee) City of North Las Vegas Sawtooth Roads II (N 5th/Centennial) City of North Las Vegas Cheyenne Ave at Commerce St City of North Las Vegas Tropical Pkwy/Hollywood Blvd: Linn Ln to I-15 $ 2,740,000.00 3/12/2020 City of North Las Vegas Lake Mead Blvd Couplet $ 1,140,000.00 8/8/2019 City of North Las Vegas Traffic Signal Improvements (Alexander/Clayton) City of North Las Vegas Traffic Signal Improvements (Ann/Commerce) $ 3,500,000.00 8/8/2019 City of North Las Vegas Traffic Signal Improvements (Gowan/Commerce) City of North Las Vegas Traffic Signal Improvements (Bruce/Centennial) City of North Las Vegas Carey Ave: Revere St/Pecos Rd $ 500,000.00 7/11/2019 City of North Las Vegas Las Vegas Bl: Evans Ave to Pecos Rd $ 1,662,000.00 5/23/2019 City of North Las Vegas City of North Las Vegas Pedestrian Upgrades $ 1,158,000.00 5/23/2019 City of North Las Vegas Losee Rd/Lone Mountain Rd Pedestrian Bridge $ 2,484,000.00 3/14/2019 City of North Las Vegas Simmons St.: Cheyenne Ave./Red Coach Ave. $ 6,850,000.00 9/13/2018 City of North Las Vegas Sawtooth Infill: N. 5th St: Alexander Rd/Centennial Pkwy $ 1,620,000.00 7/12/2018 City of North Las Vegas Decatur Bl: Craig Rd/Lone Mountain Rd $ 1,600,000.00 6/14/2018 City of North Las Vegas Carey Ave: Revere St/I-15 $ 2,129,000.00 4/12/2018 City of North Las Vegas Losee Rd.: Craig Rd./CC-215 (Roadway) $ 12,600,000.00 4/12/2018 City of North Las Vegas Losee Rd.: Craig Rd./CC-215 (Traffic Signals) City of North Dr: Cheyenne Ave/Tropical Pkwy $ 3,780,000.00 4/12/2018 City of North Las Vegas Decatur Blvd: Chuckwagon Ave/Lone Mountain Rd (Sidewalk Project) $ 380,000.00 3/8/2018 City of North Las Vegas Centennial Pkwy: Camino Eldorado to Lamb Bl $ 5,426,725.00 1/11/2018 City of North Las Vegas Centennial/Black Oaks City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Alexander/Arcata) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Centennial/Bruce) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Centennial/Donna) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Centennial/Goldfield)

5/8 $ 548,075.00 1/11/2018 LIST OF COMPLETED FRI PROJECTS

City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Lake Mead/Bassler) $ 548,075.00 1/11/2018 City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Las Vegas Blvd/McCarran) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (N 5th/Las Vegas Wash) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (Pecos/Geist) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (MLK/June) City of North Las Vegas Rapid Flashing Pedestrian Crossing Improvements (MLK/Brooks) City of North Las Vegas Clayton St: Centennial Pkwy/Hammer La $ 1,500,000.00 2/11/2016 Clark County Eastern Ave., Warm Springs Rd. to Desert Inn Rd. $ 6,250,000.00 3/12/2020 Clark County Maryland Pkwy: Russell Rd/Twain Ave $ 7,014,000.00 3/12/2020 Clark County Tropicana Ave: Hualapai Wy/Ft. Apache Rd $ 10,000,000.00 3/12/2020 Clark County Rainbow Boulevard, Erie Avenue to Blue Diamond Road $ 8,000,000.00 3/12/2020 Clark County CC-215: Decatur Blvd to N. 5th St $ 43,150,000.00 3/12/2020 Clark County Jones Blvd:Blue Diamond Rd/Windmill Ln $ 1,500,000.00 2/13/2020 Clark County Eastern Ave: Wigwam Pkwy to Warm Springs Rd $ 2,100,000.00 1/9/2020 Clark County Fort Apache Road: Warm Springs Road/ $ 12,400,000.00 1/9/2020 Clark County Traffic Signals: Ft. Apache Rd at Maule Ave and Warm Springs Rd Clark County Las Vegas Blvd: St. Rose Pkwy/Silverado Ranch Blvd $ 12,000,000.00 9/12/2019 Clark County CC-215: Airport Connector, Phase II $ 29,500,000.00 6/13/2019 Clark County Decatur Boulevard, Cactus Avenue to Warm Springs Road $ 350,000.00 4/11/2019 Clark County Carey Ave: Nellis Blvd/Toiyabe St $ 200,000.00 4/11/2019 Clark County Complete Streets: Desert Inn Rd, Sir George Dr and Winterwood Blvd $ 2,300,000.00 3/14/2019 Clark County Casa Linda and Pebble Canyon Neighborhood Rehabilitation $ 2,250,000.00 12/13/2018 Clark County Rainbow Blvd: Warm Springs Rd/Tropicana Ave $ 4,100,000.00 11/8/2018 Clark County CC-215: Grand Montecito Parkway Bridge $ 10,163,000.00 5/24/2018 Clark County Neighborhood Rehab: Craig Park and Paradise Palms $ 3,800,000.00 5/24/2018 Clark County Sunset Rd: Rainbow Bl/Decatur Bl $ 200,000.00 2/8/2018 Clark County Traffic Improvements: Lake Mead Blvd/Sloan La $ 919,000.00 2/8/2018 Clark County Traffic Improvements: Decatur Bl/Tropicana Ave and Tropicana Ave/Lindell Rd $ 1,552,000.00 2/8/2018 Clark County Los Feliz St: Sahara Ave/Charleston Blvd $ 22,561.31 7/13/2017 Clark County Durango Dr: Tropicana Ave/Spring Mountain Rd $ 3,406,819.63 6/8/2017

6/8 LIST OF COMPLETED FRI PROJECTS

Clark County Hacienda Ave: Durango Dr/Rainbow Blvd $ 2,175,905.76 6/8/2017 Clark County CC-215: Ft. Apache Rd Bridge/Durango Dr Bridge $ 9,790,000.00 6/9/2016 Clark County Traffic Signal/Intersection Improvements: Tenaya Wy/Warm Springs Rd $ 500,000.00 5/19/2016 Clark County Neighborhood Rehab: Rancho Las Brisas $ 257,000.00 5/19/2016 Clark County Desert Inn Rd: Paradise Rd to Mojave Rd $ 5,510,000.00 9/10/2015 Clark County Lamb Blvd: Owens Ave/Las Vegas Bl $ 1,690,000.00 9/10/2015 Department of $ 6,400,000.00 Transportation US-95: Ann Rd/Durango Dr 4/11/2019 Nevada Department of $ 10,000,000.00 Transportation Interstate 11, I-515 to US-95 4/11/2019 Regional Transportation $ 3,000,000.00 Commission Maryland Pkwy: Stewart Ave/Russell Rd 3/12/2020 Regional Transportation $ 52,847,000.00 Commission Interstate 11, US-95 to Hoover Dam Bridge 3/12/2020 Regional Transportation $ 6,999,000.00 Commission Flamingo Rd: Boulder Hwy/Hualapai Wy 7/2/2019 Regional Transportation Commission Western/Southern CC-15 Beltway and Arterial ITS (15 to Cheyenne) $ 5,224,500.00 4/11/2019 Regional Transportation Commission Western/Southern CC-15 Beltway and Arterial ITS (15 to 515) Regional Transportation Commission Northern CC-215 Beltway and Arterial ITS (215, Tenaya to Aliante)

$ 6,775,500.00 4/11/2019

7/8 LIST OF COMPLETED FRI PROJECTS

Regional Transportation $ 6,775,500.00 4/11/2019 Commission Northern CC-215 Beltway and Arterial ITS (Nellis, Lake Mead to Flamingo) Regional Transportation Commission Northern CC-215 Beltway and Arterial ITS (Stewart, Pecos to Nellis) Regional Transportation $ 2,970,000.00 Commission Paradise Rd: Transportation Investment Strategy Study 10/13/2016

8/8