Activities and Tools

Total Page:16

File Type:pdf, Size:1020Kb

Activities and Tools Activities and Tools PHASE ACTIVITIES TOOLS DEFINE Project Name and Purpose Brainstorming Everyone should Complete Project Charter (Required) Project Charter Template understand the goal, Develop a High-Level Process Map (Required) Graphing Software/House of Quality projected timeline and Identify Process Owner, Champion, Team Stakeholder’s Analysis projected benefit of the Define Customers and Requirements (CTQ) SIPOC Diagram/VOC Gathering project Align Goals with Business Initiatives Historical Data Determine Projected ROI ROI Formulas and Cost/Benefit Analysis MEASURE Detailed Process Map Graphing Software Get a clear snapshot of Collect Data Data Collection Plan what is happening today Take Measurements Benchmarking, Balanced Scorecard, CTQs Histogram, Pareto Chart, Scatter Diagram Control Chart, Sigma Level, ROI, FMEA Measure your Measurement System Validate, Gage R&R, Observation, Test Information multiple times ANALYZE Define Performance Objectives Value-Stream, VOC/VOE/VOP/VOB Analyze the data to Identify Value/Non-Value Tim Woods, VSA, Historical Data discover variation, Determine the Root Cause 5 Whys, Fishbone, Hypothesis testing, DOE, variance, root cause and ANOVAs the impact of these Analyze Data Histogram, Pareto Chart, Scatter Diagram, Control activities on the project SPC Charts, Statistical Analysis IMPROVE List Potential Solutions Analysis, Brainstorming Multipurpose phase: Rank Solutions Pugh (Decision) Matrix/SWOT Analysis, Choose the solution Capability Study, VOC/VOE Pilot the solution Select Solution and Try Pilot, Simulation, Focus Group Mistake proof Double Check Results FMEA, VOC/VOE Roll out Roll Out Execution/Deployment Plan, Project Plan Evaluate Result Evaluate and Correct Evaluation Plan, House of Quality CONTROL Verify Benefit Sigma, ROI, Balance Scorecard, Control Chart Verify the ROI, benefits, Document Procedures to Standardize Tips/Tricks Document, Best Practices, Control Plan cost saving/ cost Document, Control Plan Form avoidance Re-Write/Update Standard Operating Procedures or Policies Historical Data Implement Control and Transition Plan Transition Plan Document or Template Transition Plans Close Out Project and Celebrate Project Management Methods for Closing Close Out project SSD Global, Inc. © DMAIC Activities and Tools Lean Six Sigma Accelerated Workshop www.SSDGlobal.net 1-888-339-7483 Toll Free Lean Six Sigma DMAIC Roadmap Purpose Key Tools Key Outputs Primary Metric Process Map Project Charter Project Plan * Process Map * Gather VOC * Translate VOC to CTQ's Everyone should * QFD/HOQ understand the goal, * COPQ projected time line and * Primary & Secondary Metrics Define projected benefit of the * Establish Project Charter project * Stakeholder Analysis * Team Selection * Project Plan C&E SIPOC FMEA Cpk * Early Y=f(x) Hypothesis * Detailed Process Map * SIPOC * Cause & Effect Diagram Get a clear snapshot of * Cause & Effect Matrix what is happening today * FMEA Measure * Basic Statistics * Normality Test * Capability Analysis * Gage R&R Normality Test ANOVA 2 Sample t-test Equal Variances * Narrowed Y=f(x) * 1 & 2 Sample t-tests Analyze the data to * 1 & 2 Proportions tests discover variation, * Equal variance tests variance, root cause * Normality tests and the impact of * ANOVA Analyze these activities on the * Moods Median project * Mann Whitney * Paired t-test * Chi-Squared test Pugh Matrix Linear Regression Binary Logistic Regression DOE * Refined Y=f(x) * Pugh Matrix Multipurpose phase: Choose the solution * Correlation Pilot the solution * Simple Linear Regression Mistake proof * Multiple Linear Regression Improve Roll out * Binary Logistic Regression Evaluate Result * Full Factorial DOE * Fractional Factorial DOE Control Plan SOP's Communication Plan SPC * Control Plan Verify the ROI, benefits, * Training Plan cost saving/ cost * Refined FMEA avoidance * Communication Plan Implement Control and * Standard Operating Procedures Transition Plans * Five-S Audit Control Close Out project * Poke Yoke * Visual Controls * Statistical Process Control.
Recommended publications
  • Improving Performance of Epidemic Healthcare Management During COVID-19 Outbreak Using LSS DMAIC Approach: a Case Study for Bangladesh Aquib Irteza Reshad, Md
    Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management, Detroit, Michigan, USA, August 10 - 14, 2020 Improving Performance of Epidemic Healthcare Management during COVID-19 Outbreak using LSS DMAIC Approach: A Case Study for Bangladesh Aquib Irteza Reshad, Md. Mozibur Rahman and Naquib Mahmud Chowdhury Department of Industrial and Production Engineering Bangladesh University of Engineering and Technology(BUET) Dhaka-1000 [email protected], [email protected], [email protected] Abstract The recent outbreak of coronavirus (COVID-19) pandemic has exposed the weakness of the existing healthcare facilities in developing countries like Bangladesh. The increasing amount of patients has made this condition more vulnerable. There is a high possibility that, these increasing amount of symptomatic patients might create a shortage in RT-PCR test kits in upcoming days. The objective of this study is to use Define, Measure, Analyze, Improve, and Control (DMAIC) in improving the epidemic healthcare management system during the COVID-19 outbreak in Bangladesh. The goal of this study is to use LSS methodology, especially the DMAIC improvement format in the existing dedicated healthcare management system for coronavirus treatment. The root cause analysis behind the higher response time and improper service for the Institute of Epidemiology, Disease Control and Research (IEDCR), and other dedicated healthcare providers regarding, coronavirus treatment in the current situation has been performed. FMEA (Failure Mode and Effect Analysis) was conducted in order to assess the potential failure modes in the existing healthcare management system. A simulation study regarding the implementation of pooled testing in Bangladesh for improving efficiency and optimizing the usage of RT-PCR test kits has also been carried out.
    [Show full text]
  • Create Your Own Lean Training
    Create Your Own Lean Training Presented by Susan Weum Six Sigma Black Belt Lean Certified Continuous Improvement Leader 1 Background and Experience • Retired Senior Project Engineer and Continuous Improvement Leader from Smiths Medical. • Six Sigma Black Belt and Lean Practitioner. • Chemical and Materials Engineer, Michigan State University. • Six Sigma Green Belt Instructor since 2005. 2 Keys for Training Development • Start by Listing Tools & Concepts. • Understand your Audience. • Choose the delivery method. • Use examples and be flexible. • Ask students for examples. Engage at every opportunity. • Give targeted Homework. • Homework applies the concepts and tools. • Student presentations are optimal. • Students will use a variety of tools on their project. 3 Create Your Own Training Program Where do you start when developing training? Start with an overview…the BIG picture. • List what you specifically want to teach. • Steps • Concepts • Tools Let’s look at an example from Six Sigma… 4 DMAIC Process Overview -What’s the -Key Input & -Identify root -Develop -Develop SOPs & problem? Output Variables Causes Solutions Training Plan -What matters? -What data is -Confirm -Evaluate & Select -Process Control -What’s the available? Relationship of Solutions -Update VSM scope? -Validate Root Cause to -Anticipate Risks -Confirm Project -Who are Measurement Output -Cost/Benefit Results stakeholders? System -Prioritize Issues Analysis -Transition to -Financial/ Quality -Baseline data -Statistical -Benchmarking Process Owner Benefit collection
    [Show full text]
  • A DMAIC Framework for Improving Software Quality in Organizations: Case Study at RK Company Team Composition
    MCGILL UNIVERSITY Montreal, Quebec September 20 – 21, 2016 A DMAIC Framework for Improving Software Quality in Organizations: Case Study at RK Company Team Composition • Racha Karout • Anjali Awasthi Outline 1. Introduction 1.1 Background 1.2 Problem Definition 1.3 Research Objectives 2. Literature Review 3. Solution Approach 4. Conclusions and Future Works 1.1 Background • To compete in today‘s world, every business needs to improve. • Software has increasingly become a critical component in many industries (telecoms, banking, insurance, … etc.). • Software quality is crucial and poor quality is not acceptable. • Software development has not been consistently successful. What is Software Quality? • Software quality is the degree to which a system, component or process meets specified requirements, in other words, the degree to which a system, component or process meets customer or user needs or expectation (IEEE, 1991). • The software should not have bugs that reduce the quality attributes (functionality, reliability, usability and maintainability) (Chang et al., 2006). • There should not be issues that affect its ability to maintain or re-establish its level of performance. • Easy to use and maintain. 1.2 Problem Definition • In today’s market competition and the need for rapid delivery, software quality is often sacrificed, leading to the failure of the software project • The use of traditional methodology (waterfall) with the current market pace, continuous change of customer requirements and rapid development of technology plays a major role in poor software quality. • People jump to solutions without fully understanding the problem or finding the root cause of poor quality. 1.3 Research Objectives 1.
    [Show full text]
  • Ruggles, Olivia, M Title: Standardized Work Instruction
    1 Author: Ruggles, Olivia, M Title: Standardized Work Instruction The accompanying research report is submitted to the University of Wisconsin-Stout, Graduate School in partial completion of the requirements for the Graduate Degree/ Major: MS Technology Management Research Adviser: Jim Keyes, Ph.D. Submission Term/Year: Summer, 2012 Number of Pages: 56 Style Manual Used: American Psychological Association, 6th edition I understand that this research report must be officially approved by the Graduate School and that an electronic copy of the approved version will be made available through the University Library website I attest that the research report is my original work (that any copyrightable materials have been used with the permission of the original authors), and as such, it is automatically protected by the laws, rules, and regulations of the U.S. Copyright Office. My research adviser has approved the content and quality of this paper. STUDENT: NAME Olivia Ruggles DATE: 8/3/2012 ADVISER: (Committee Chair if MS Plan A or EdS Thesis or Field Project/Problem): NAME Jim Keyes, Ph.D. DATE: 8/3/2012 --------------------------------------------------------------------------------------------------------------------------------- This section for MS Plan A Thesis or EdS Thesis/Field Project papers only Committee members (other than your adviser who is listed in the section above) 1. CMTE MEMBER’S NAME: DATE: 2. CMTE MEMBER’S NAME: DATE: 3. CMTE MEMBER’S NAME: DATE: --------------------------------------------------------------------------------------------------------------------------------- This section to be completed by the Graduate School This final research report has been approved by the Graduate School. Director, Office of Graduate Studies: DATE: 2 Ruggles, Olivia M. Standardized Work Instruction Abstract Mercury Marine is a world-wide manufacturing company in the marine industry.
    [Show full text]
  • Statistical Process Control for Monitoring Nonlinear Profiles: a Six Sigma Project on Curing Process
    This is the author’s final, peer-reviewed manuscript as accepted for publication. The publisher-formatted version may be available through the publisher’s web site or your institution’s library. Statistical process control for monitoring nonlinear profiles: a six sigma project on curing process Shing I. Chang, Tzong-Ru Tsai, Dennis K. J. Lin, Shih-Hsiung Chou, & Yu-Siang Lin How to cite this manuscript If you make reference to this version of the manuscript, use the following information: Chang, S. I., Tsai, T., Lin, D. K. J., Chou, S., & Lin, Y. (2012). Statistical process control for monitoring nonlinear profiles: A six sigma project on curing process. Retrieved from http://krex.ksu.edu Published Version Information Citation: Chang, S. I., Tsai, T., Lin, D. K. J., Chou, S., & Lin, Y. (2012). Statistical process control for monitoring nonlinear profiles: A six sigma project on curing process. Quality Engineering, 24(2), 251-263. Copyright: Copyright © Taylor & Francis Group, LLC. Digital Object Identifier (DOI): doi:10.1080/08982112.2012.641149 Publisher’s Link: http://www.tandfonline.com/doi/abs/10.1080/08982112.2012.641149 This item was retrieved from the K-State Research Exchange (K-REx), the institutional repository of Kansas State University. K-REx is available at http://krex.ksu.edu Statistical Process Control for Monitoring Nonlinear Profiles: A Six Sigma Project on Curing Process Shing I Chang1, Tzong‐Ru Tsai2, Dennis K.J. Lin3, Shih‐Hsiung Chou1 & Yu‐Siang Lin4 1Quality Engineering Laboratory, Department of Industrial and Manufacturing Systems Engineering, Kansas State University, USA 2Department of Statistics, Tamkang University, Danshui District, New Taipei City 25137 Taiwan 3Department of Statistics, Pennsylvania State University, USA 4Department of Industrial Management, National Taiwan University of Science and Technology, Taipei, Taiwan ABSTRACT Curing duration and target temperature are the most critical process parameters for high- pressure hose products.
    [Show full text]
  • Operational Excellence
    Chapter 6 Operational Excellence ©2016 Montgomery County Community College Objectives This chapter provides an introduction to the role that Operational Excellence (OPEX or OE) plays in the continuous improvement of biomanufacturing operations. The chapter is not intended to serve as a comprehensive guide to every quality improvement, but rather as an overview of tools and techniques which illustrate many of the basic principles of Statistical Process Control (SPC). SPC is a methodology that uses statistical tools and analysis to monitor variations in a process in order to manage and control it. After completing this chapter the student will be able to: describe a process identify potential sources of waste in a process define when a process is “in control” versus “out of control” explain the simple tools used in Lean and Six Sigma improvement methodology list the steps in a Six Sigma process improvement select and apply general Lean Six Sigma tools to simulated problems recognize deployment challenges to OEX strategies 28 Chapter 6 - Operational Excellence Terms 5S (Sort, Straighten, Shine, Standardize, and Sustain): a workplace discipline used to ensure reliable work practices and a clean working environment; used in the West but originally from Japan. The term 5S is derived from the original Japanese usage of S-prefix words: Seiri, Seition, Seiso, Seiketsu, and Shitsuke. Andon: a visual management tool and component of the lean philosophy; these are lights placed on or adjacent to machines or production lines to indicate operation status. Correlation: a statistical relation between two or more variables such that systematic changes in the value of one variable are accompanied by systematic changes in the other.
    [Show full text]
  • Using Six Sigma and Lean Principles to Improve Laboratory Operations
    Using Six Sigma and Lean Principles to Improve Laboratory Operations Big Bang Makeover of the Clinical Laboratory: Key Lessons for Work Flow, Analyzers, and Service Improvements Atlanta, GA Purpose/Objectives • Purpose: – To provide an overview of using Six Sigma and Lean Principles in chartering, designing and implementing a full scale Lean project in a large laboratory setting. • Objectives: – Understand how each phase of DMAIC was used to execute a full scale Lean design effort – Understand which key Lean tools were used in measure/design/implementation – Understand how interactions of physical, process, technological, and organizational changes contribute to a large scale Lean effort. 1 Outline • Who we are • Why Improving Lab Operations is Important to Quest Diagnostics • The Journey • Key Learnings Who we are • Focus: – Patients – Growth – People • Vision: – Dedicated People Improving the Health of Patients Through Unsurpassed Diagnostic Insights • Company Background – 40,000+ Employees – 900+ Clinical Scientist PhDs/MDs – Patient Service Centers – Rapid Response to Esoteric Laboratories – 145 million patient encounters annually • Values: – Quality, Integrity, Innovation, Accountability, Collaboration, Leadership • Six Sigma/Lean Journey – 2000?2008 2 Why Improving Lab Operations is Important to Quest Diagnostics PATIENTS 1. Reduce Patient Anxiety Time 2. Reduce tests not performed PEOPLE 1. Shortage of technical workforce GROWTH 2. Staffing of night shift 1. Improve equipment utilization 3. Improve technical skills 2. Improve productivity 4. Reduce potential blood exposure 3. Improve supply utilization 5. Reduce ergonomic Injuries 6. Improve staff involvement The Journey 3 The Journey – Integrating Six Sigma Design DMAIC DMADV Lean Three Major Improvement Six Sigma Process Methodologies Management Measurement Systems Integration Complex project required adequate training/development Using DMAIC & Lean to Define Project PATIENTS 1.
    [Show full text]
  • Download Complete Curriculum
    L E A N S I X S I G M A G R E E N B E LT C O U R S E T O P I C S Copyright ©2019 by Pyzdek Institute, LLC. LEAN SIX SIGMA GREEN BELT COURSE TOPICS LESSON TOPIC Overview A top-level overview of the topics covered in this course What is Six Sigma? A complete overview of Six Sigma Lean Overview 1 Waste and Value Lean Overview 2 Value Streams, Flow and Pull Lean Overview 3 Perfection Recognizing an Linking your Green Belt activities to the organization’s Opportunity vision and goals Choosing the Project- How to pick a winning project using Pareto Analysis Pareto Analysis Assessing Lean Six Sigma How to carefully assess Lean Six Sigma project candidates Project Candidates to assure success Develop the Project Plan 1 Team selection and dynamics; brainstorming; consensus decision making; nominal group technique Develop the Project Plan 2 Stakeholder analysis, communication and planning, cross functional collaboration, and Force Field Analysis Develop the Project Plan 3 Obtain a charter for your project Develop the Project Plan 4 Work breakdown structures, DMAIC tasks, network diagrams Develop the Project Plan 5 Project schedule management; project budget management Develop the Project Plan 6 Obstacle avoidance tactics and management support strategies High Level Maps 1 L-Maps, linking project charter Ys to L-Map processes High Level Maps 2 Mapping the process from supplier to customer (SIPOC) High Level Maps 3 Product family matrix 2 Voice of the Customer (VOC) 1 Kano Model, getting the voice of the customer using the critical incident technique VOC 2-CTQ Specification Link the voice of the customer to the CTQs that drive it Principles of Variation 1 How will I measure success? Are my measurements trustworthy? Scales of measurement, data types, measurement error principles.
    [Show full text]
  • Lean Six Sigma Rapid Cycle Improvement Agenda
    Lean Six Sigma Rapid Cycle Improvement Agenda 1. History of Lean and Six Sigma 2. DMAIC 3. Rapid Continuous Improvement – Quick Wins – PDSA – Kaizen Lean Six Sigma Lean Manufacturing Six Sigma (Toyota Production System) DMAIC • T.I.M.W.O.O.D • PROJECT CHARTER • 5S • FMEA • SMED • PDSA/PDCA • TAKT TIME • SWOT • KAN BAN • ROOT CAUSE ANALYSIS • JUST IN TIME • FMEA • ANDON • SIPOC • KAIZEN • PROCESS MAP • VALUE STREAM MAP • STATISTICAL CONTROLS Process Improvement 3 Lean Manufacturing • Lean has been around a long time: – Pioneered by Ford in the early 1900’s (33 hrs from iron ore to finished Model T, almost zero inventory but also zero flexibility!) – Perfected by Toyota post WWII (multiple models/colors/options, rapid setups, Kanban, mistake-proofing, almost zero inventory with maximum flexibility!) • Known by many names: – Toyota Production System – Just-In-Time – Continuous Flow • Outwardly focused on being flexible to meet customer demand, inwardly focused on reducing/eliminating the waste and cost in all processes Six Sigma • Motorola was the first advocate in the 80’s • Six Sigma Black Belt methodology began in late 80’s/early 90’s • Project implementers names includes “Black Belts”, “Top Guns”, “Change Agents”, “Trailblazers”, etc. • Implementers are expected to deliver annual benefits between $500,000 and $1,000,000 through 3-5 projects per year • Outwardly focused on Voice of the Customer, inwardly focused on using statistical tools on projects that yield high return on investment DMAIC Define Measure Analyze Improve Control • Project Charter • Value Stream Mapping • Replenishment Pull/Kanban • Mistake-Proofing/ • Process Constraint ID and • Voice of the Customer • Value of Speed (Process • Stocking Strategy Zero Defects Takt Time Analysis and Kano Analysis Cycle Efficiency / Little’s • Process Flow Improvement • Standard Operating • Cause & Effect Analysis • SIPOC Map Law) • Process Balancing Procedures (SOP’s) • FMEA • Project Valuation / • Operational Definitions • Analytical Batch Sizing • Process Control Plans • Hypothesis Tests/Conf.
    [Show full text]
  • The Mapping Tree Hierarchical Tool Selection and Use
    The Mapping Tree Hierarchical Tool Selection and Use 1 Session Objectives . Discuss the hierarchical linkage and transparency of mapping using this methodology. Understand how and when to apply each mapping tool and its application in the Lean tool set. Understand how mapping helps to reveal Value and Non-Value Added actions as well as Constraints in the process. 2 Why Do We Care? “Hierarchical Mapping“is necessary because: • Hierarchical mapping is critical in maintaining the organization’s strategic plan during a Lean deployment. • Hierarchical mapping is critical in achieving greater “Value to the Customer”, in revealing of wastes and improving processes. • Until we know all of the “players in the process”, we cannot begin to understand the process, its “Value to the Customer” and the impact on the strategic plan. 3 Keys To Success . Always use your team of experts for mapping exercises. Mapping in “silos” is a “design for failure”. Always follow a hierarchical procedure for mapping to root cause. Always begin at the high level first, then capture detailed maps as needed. 4 Why use the Mapping Tree methodology ? • Before any improvement exercise is undertaken, a clear definition of “what to work on” must be developed. • Without utilizing a mapping hierarchy, any attempt to attack a process for improvement effort would be just a “shot in the dark”. • We need a methodology that will link the lowest level effort to the high level organizational objectives, and do it transparently. • The hierarchical approach of the Mapping Tree helps to ensure that the lowest task efforts remain focused on the Customer requirements and support the Strategic Objectives.
    [Show full text]
  • Six Sigma Project Charter
    rev 12 Six Sigma Project Charter Name of project: Streamline Incomplete Applicant Follow-ups Black belt: Green belt: X Submitted by: Emily Vazquez & Angela Love E-mail: [email protected] & [email protected] Date submitted: October 4, 2012 I. Project Selection Process Item Yes No Comments Key business issue x Linked to a define process x Customers identified x Applicants & Admissions Defects clearly defined x Describe how and why project was selected. Reference any tools used, such as SIPOC, VOC plan, Affinity diagram, KANO model, CTS tree, etc…. II. Project Description Project Title Streamline Incomplete Applicant Follow-ups Date Charted Target Completion Date Actual Completion Date 05/17/12 Project Leader Team Facilitator Team Champion Emily Vazquez & Pamela Horne Rebekkah Porter & Angela Love Debra Emerson Estimated Cost Savings Actual Cost Savings Costs of implementing project There is not really a cost savings; it’s more of an efficiency savings. Team members Emily Vazquez, Angela Love, Rebekkah Porter, Debra Emerson, Pamela Horne Problem Statement The current process of sending follow-up notifications to applicants, who have been incomplete for 45 days and 90 days, is a five-step process within three different computer systems. Each entry term (spring, summer and fall) must be ran individually, which adds to the amount of time it takes. Because it is so time consuming, what should be a daily task, has become a weekly one. Y = process time. Defect occurs when process time is 5+ steps. Project Goal and Metrics Stream line the follow-up procedure to improve/condense processing time. 1 rev 12 Describe the challenges and support required While on the quest to improve the current follow-up procedure, we are also challenged to learn the existing process (In short, we must learn it, so that we can change/improve it).
    [Show full text]
  • Using DMAIC in Improvement of Customer Satisfaction and Facilities Provided at Commuter Stations
    International Journal of Academic Research in Business and Social Sciences 2016, Vol. 6, No. 12 ISSN: 2222-6990 Using DMAIC in Improvement of Customer Satisfaction and Facilities provided at Commuter Stations Roslina Mustapha1, Nurul Fadly Habidin2 1Department of Business Management, Faculty of Management and Economics, Universiti Pendidikan Sultan Idris, 35900 Tanjung Malim, Perak, Malaysia 2Department of Management and Leadership, Faculty of Management and Economics, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak, Malaysia DOI: 10.6007/IJARBSS/6-i12/2564 URL: http://dx.doi.org/10.6007/IJARBSS/v6-i12/2564 Abstracts This paper discusses the use of six sigma approach to improvement of customer service and facilities at commuter stations. The management of commuter stations should be sensitive to the needs and desires of the passengers. In this study, DMAIC approach taking into accounts the views of the customer (VOC) to the dissatisfaction of commuter services and facilities available at commuter stations. Keywords: Six sigma, DMAIC, customer satisfaction, business management 1. Introduction The performance of a business, whether private or public sector is depends on customer satisfaction. For commuter service almost 20 years of presence in Malaysia, there are still some problems, especially to people with disabilities (PWDs) who want to use the commuter service. Using the six-sigma approach is one way to solve the problem of quality of service. Problem solving is an activity to change what is actually happening to what is supposed to happen (Evans & Lindsay, 2007). People with disabilities are not left behind in the services for commuters as it is one of the convenient public transports, safe and cheap.
    [Show full text]