BUDGET 2021-22

Department of Treasury and Finance 19 The Mall GPO Box 1974, Darwin NT 0801 Budget Paper No. 4 Telephone: +61 8 8999 7406 www.budget.nt.gov.au THE INFRASTRUCTURE PROGRAM The Infrastructure Program

Budget Paper No. 4

The Infrastructure Program Contents Overview 3 Program details by agency 15 Department of the Chief Minister and Cabinet 16 Department of the Legislative Assembly 16 Auditor‑General’s Office 16 Northern Territory Electoral Commission 17 Office of the Independent Commissioner Against Corruption 17 Ombudsman’s Office 17 Department of Treasury and Finance 17 Northern Territory Police, Fire and Emergency Services 18 Department of Industry, Tourism and Trade 19 Department of Health 20 Department of Infrastructure, Planning and Logistics 21 Department of Environment, Parks and Water Security 26 Territory Wildlife Parks 26 Department of Education 27 Department of Territory Families, Housing and Communities 28 Department of the Attorney‑General and Justice 30 Department of Corporate and Digital Development 30 Aboriginal Areas Protection Authority 30 Glossary 31

| 1 Budget 2021-22

2 | The Infrastructure Program Overview Budget Paper No. 4 details the Northern Territory’s infrastructure program for 2021‑22. It includes information on major and minor capital works, capital grants, repairs and maintenance, and infrastructure‑related expenses for all Territory general government agencies. Total infrastructure program and payments The 2021‑22 infrastructure program provides for substantial investment across the Territory to unlock economic opportunities, create jobs for Territorians and support social outcomes.Total infrastructure payments of $1.62 billion in 2021‑22, comprises $1.27 billion in general government payments and $344.9 million in payments by public non financial corporations, including the Power and Water Corporation, Territory Generation, Land Development Corporation and Indigenous Essential Services Pty Ltd. The total value of the government’s 2021‑22 capital works program is $2.76 billion. In 2020‑21, Government is expected to achieve total infrastructure expenditure of $1.55 billion, a reduction of around $200 million compared to the original budget. This is a result of the revised timing of expenditure for Commonwealth‑funded programs, as well as additional time required for planning and preliminary works on large Territory Government‑funded projects. The Power and Water Corporation also reduced its 2020‑21 capital program by $91.9 million, contributing to the total variation from the 2020‑21 Budget. In 2021‑22, $951.7 million is allocated to the capital works program for the general government sector, including headworks to support land release and additional Commonwealth funding for road programs and remote Aboriginal housing to match the Territory Government’s Remote Housing Investment Package. The repairs and maintenance program is maintained at the long‑term average level, and an elevated level of funding is provided for infrastructure‑related expenses for master planning and project development for significant upcoming projects. Capital grants expenditure returns to historical levels, following one‑off increases in 2020‑21 for stimulus projects including the Home Improvement Scheme, and funding for the Darwin Education and Community Precinct as part of the City Deals agreement. Table 1 sets out the total approved program for general government sector major works and minor works, and budgeted payments (cash) for all components of the infrastructure program.

Table 1: Total infrastructure payments 2020‑21 Budget 2020‑21 Revised 2021‑22 Budget Program Cash Program Cash Program Cash $M $M $M $M $M $M GENERAL GOVERNMENT Capital works 2 544 863 2 521 768 2 760 952 Northern Territory funded 494 440 400 Externally funded 369 328 552 Capital grants1 236 244 92 Repairs and maintenance 216 204 215 Infrastructure‑related expenses 20 9 15 TOTAL GENERAL GOVERNMENT 1 335 1 225 1 274

PUBLIC NON FINANCIAL CORPORATIONS Capital works 315 230 243 Repairs and maintenance 100 95 102 TOTAL PUBLIC NON FINANCIAL CORPORATIONS 415 325 345 TOTAL INFRASTRUCTURE PAYMENTS 1 750 1 551 1 619 1 Excludes grants on‑passed to public non financial corporations. Overview | 3 Budget 2021-22 Capital works for the general government sector The $2.76 billion capital works program in 2021‑22 remains above long‑term average levels, with a number of major projects continuing from 2020‑21. New projects commencing in 2021‑22 ($1.01 billion) will improve transport infrastructure for tourism and industry and access to remote and regional communities, as well as construct and upgrade community and economic infrastructure. Table 2 disaggregates the general government sector major and minor works programs in 2020‑21 into revote and new projects. It provides an estimate of the value of capital projects that will revote, or carry over into 2021‑22, and identifies new major and minor works programs for 2021‑22.

Table 2: Capital works and estimated expenditure Revote Minor Major new Total capital Revote in new works works works Cash out $M $M $M $M $M $M 2020‑21 Revised TOTAL GENERAL GOVERNMENT 1 445.8 63.2 1 012.1 2 520.7 768.3 1 752.4 2021‑22 Budget TOTAL GENERAL GOVERNMENT 1 752.4 72.2 935.8 2 760.4 951.7 1 808.8

Capital works by function Table 3 summarises the capital works program by Classification of the Functions of Government – Australia (COFOG‑A) categories, which is a framework for classifying government expenditure reported by all Australian jurisdictions. Transport investment has increased from prior years, such that roads and other transport works will receive the highest level of investment in the 2021‑22 infrastructure program at over 45%, followed by housing and community amenities investment at over 25%. Around 60% of the total infrastructure program is allocated to new and upgraded infrastructure in remote and regional communities.

Table 3: Capital works by COFOG‑A category 2021‑22 Category Capital works $M % Transport 1 271.5 46.1 Housing and community amenities 753.4 27.3 Recreation, culture and religion 202.8 7.3 Economic affairs 159.7 5.8 Health 137.4 5.0 Public order and safety 119.6 4.3 Environmental protection 46.8 1.7 Education 37.0 1.3 Social protection 28.2 1.0 General public services 4.1 0.2 TOTAL GENERAL GOVERNMENT 2 760.4 100.0

4 | Overview The Infrastructure Program Transport The 2021‑22 infrastructure program provides an increase in transport infrastructure, with around $1.3 billion for roads, aerodromes, jetties and barge landings. Roads and transport investment is being progressed in 2021‑22 through the five‑year National Partnership Agreement on Land Transport Infrastructure Projects. The agreement provides funding for a number of programs, including Roads of Strategic Importance and infrastructure stimulus packages. In 2021‑22, the programs include upgrading and sealing of: • ($150 million) • ($78.1 million) • Tiwi Islands roads ($61.1 million) • Port Keats Road ($59.6 million) • ($53 million) • ($42.3 million) • ($22.2 million) • Kakadu National Park roads ($17 million). Funding is also included in 2021‑22 through the National Partnership Agreement on Land Transport Infrastructure Projects for the Roads to Recovery, Black Spot, Road Safety and National Network upgrade and maintenance programs. Other major Territory Government‑funded projects in 2021‑22 include commencing lock replacement at Frances Bay Mooring Basin ($20 million) and constructing a new marine facility at Mandorah ($48.1 million). Housing and community amenities The 2021‑22 infrastructure program provides $753.4 million to construct new and refurbish existing housing in remote and urban areas, and progress central business district (CBD) redevelopment works and residential land release across the Territory. A further $20.6 million is provided in capital grants, including essential services to outstations and the grants provided through Community Benefit Fund, bringing the total value of projects and grants to $774 million. The 2021‑22 infrastructure program includes a total of $614.5 million for remote Aboriginal housing across the Territory, with significant investment from both the Territory and Commonwealth governments, including: • Remote Housing Investment Package works through HomeBuild NT, Room to Breathe and government employee housing ($217.1 million) • land servicing to support the Remote Housing Investment Package ($151.9 million) • ongoing works to build new and improve existing housing through the national partnership agreements for Remote Housing, funded by the Commonwealth ($241.9 million).

Overview | 5 Budget 2021-22

A further $60.3 million is provided for urban public housing in 2021‑22, including: • continuing redevelopment of John Stokes Square in Nightcliff including public housing and a multi‑agency hub ($26.1 million) • continuing government’s stimulus program for major and minor works to public housing properties across the Territory ($17.7 million). The infrastructure program includes $11.7 million for government employee housing in 2021‑22 to construct and upgrade housing in regional and remote communities for key workers such as teachers, nurses and police. Other community projects include continuing the Civic and State Square Redevelopment in the Darwin CBD, supported by increased investment by the Territory Government ($38.4 million), revitalising infrastructure in the Alice Springs town centre ($11.5 million), and continuing residential headworks and land release across the Territory ($5.7 million). Recreation, culture and religion The 2021‑22 infrastructure program includes $202.8 million for works to construct new and upgrade existing sporting, recreation and park infrastructure facilities. Major projects in 2021‑22 include: • the National Aboriginal Art Gallery in Alice Springs ($46.9 million) • the State Square Art Gallery in Darwin CBD ($44.5 million) • continuing to enhance recreational fishing infrastructure across the Territory ($32.5 million) • continuing extensions to art galleries in Arnhem Land, Katherine and Tennant Creek to create an Arts Trail ($20 million) • a National Indigenous Cultural Centre in Alice Springs ($19.4 million). Economic affairs The 2021‑22 infrastructure program includes $159.7 million for economic and community infrastructure, including funding by the Territory Government towards the future of Jabiru, and continuing headworks infrastructure to support mixed‑use developments and commercial and industrial land release. Significant works in 2021‑22 include: • progressing a range of projects to upgrade infrastructure in Kakadu and support the township of Jabiru to transition from a mining town to a tourism and regional services hub ($74.6 million) • new and continuing headworks and subdivision works in Berrimah North, Kalkarindji and Alice Springs ($35.5 million) • continuing headworks and subdivision works to support the development of the Katherine Logistics and Agribusiness Hub ($28.9 million) • continuing works to upgrade Berrimah Farm, including new laboratory facilities and modern infrastructure ($16.8 million). An additional $28.7 million is provided in capital grants, including the Roadhouse to Recovery grant program, Visitor Experience Enhancement Program, and Jabiru and Kakadu works, bringing the total investment in economic infrastructure to $188.4 million (excluding roads and housing).

6 | Overview The Infrastructure Program Health The 2021‑22 infrastructure program includes $137.4 million to construct and upgrade new and existing hospital and health facilities. Capital grants of $2.1 million bring the health investment to $139.5 million. Significant projects for 2021‑22 include: • continuing expansion and upgrade of the mental health inpatient unit at Royal Darwin Hospital ($31.8 million) • new ambulatory care centre at Alice Springs Hospital ($25.7 million) • upgrades to central sterilisation services departments at Territory hospitals ($17.9 million) • continuing construction of a multistorey carpark at Alice Springs Hospital ($11.3 million) • continuing fire remediation works at Gove District Hospital ($11.2 million) • establishing a mental health stabilisation assessment and referral area at Royal Darwin Hospital ($7.5 million) • constructing a staff accommodation block at Tennant Creek Hospital ($3.2 million). Public order and safety The 2021‑22 infrastructure program includes $119.6 million in community safety infrastructure to expand and upgrade police, emergency services and youth justice facilities. Significant projects in 2021‑22 include: • continuing to construct and redevelop contemporary youth justice centres in Darwin and Alice Springs ($64.4 million) • continuing works to construct a new Palmerston regional fire rescue and emergency services complex ($17.8 million) • continuing works to construct multipurpose police stations in Maningrida ($15.8 million) and Ngukurr ($3.7 million) • continuing additions to the Tennant Creek watch house ($3.2 million). Environmental protection The 2021‑22 infrastructure program provides $46.8 million for environmental protection works, including flood mitigation. A further $2.6 million is provided in capital grants for the Aboriginal Ranger Grants Program, bringing the total environmental protection investment to $49.4 million. Major projects in 2021‑22 include: • continuing flood mitigation and headworks in Katherine ($10.1 million) • progressing flood mitigation works in Alice Springs ($10 million) • continuing works to mitigate flooding across the Territory ($9.3 million) • new works to provide water quality and security in remote communities ($7 million).

Overview | 7 Budget 2021-22 Education The 2021‑22 infrastructure program provides $37 million to upgrade schools and education facilities to support improved student outcomes. A further $33.1 million is provided in capital grants, including for the Darwin Education and Community Precinct, bringing the total education investment to $70.1 million. Major projects in 2021‑22 include: • continuing to provide transportable classrooms for better learning environments for students and teachers, and to support enrolment peaks ($6.1 million) • continuing infrastructure investment for students with additional needs ($2.8 million) • upgrades to Homeland Learning centres ($2 million) • continuing upgrades to the Tennant Creek High School Juno Centre, as part of the Revitalising TAFE Campuses Across Australia initiative ($1.5 million). Social protection The 2021‑22 infrastructure program includes $28.2 million to support youth diversion and homelessness programs. A further $5.4 million is provided in capital grants, including the Homelessness Integrated Supported Accommodation Program, bringing the total social protection investment to $33.6 million. Major works in 2021‑22 include: • continuing fitout of facilities to support youth diversion programs ($9.3 million) • transitional accommodation facilities ($6.1 million). General public services The 2021‑22 infrastructure program provides $4.1 million to support the functions of government. Projects in 2021‑22 include: • continuing fitout of the Wadeye government business centre ($1 million) • continuing works at Government House ($0.7 million) • continuing fitout works under the Northern Territory Government Leased Property Stimulus Scheme ($0.6 million). Minor works and capital grants The 2021‑22 infrastructure program includes $92.9 million in minor works, comprising $72.2 million in new projects and $20.7 million revoted works. Minor works are projects up to $0.5 million in value and provide agencies with the flexibility to undertake construction projects to improve the serviceability of assets. Capital grants are provided to fund the construction or upgrade of significant assets owned by entities outside the budget sector. The 2021‑22 infrastructure program includes $92.4 million for capital grants, comprising the Darwin Education and Community Precinct ($27.3 million), capital grants provided through the Community Benefit Fund ($8.5 million) and essential services to outstations ($7.6 million).

8 | Overview The Infrastructure Program Repairs and maintenance The 2021‑22 infrastructure program includes $214.5 million for general government repairs and maintenance. Repairs and maintenance funding is held centrally by the Department of Infrastructure, Planning and Logistics, and notionally allocated per agency. Agency allocations may change during the year as needs arise. Significant allocations in 2021‑22 include: • Territory roads ($46 million) • remote housing ($31.8 million) • schools and education facilities ($30.4 million) • hospital and health facilities ($25 million) • public and government employee housing ($19.6 million) • national network roads ($16.7 million) • sport, park and art facilities ($10.4 million). General government infrastructure commitments Tables 4 and 5 summarise the general government sector major works, minor works, capital grants, and repairs and maintenance programs in 2020‑21 and 2021‑22 by agency. Further detail on capital grants is provided at Table 6.

Overview | 9 Budget 2021-22

Table 4: General government infrastructure program summary 2020‑21 Revised Major Minor Capital Repairs and works works grants maintenance $000 $000 $000 $000 Department of the Chief Minister and Cabinet 89 655 1 450 67 500 319 Department of the Legislative Assembly 754 1 505 1 758 Auditor‑General’s Office 2 Northern Territory Electoral Commission 6 Office of the Independent Commissioner Against Corruption 176 5 Ombudsman’s Office 4 Department of Treasury and Finance 100 19 Northern Territory Police, Fire and Emergency Services 62 595 3 098 6 047 Department of Industry, Tourism and Trade 63 333 1 451 125 836 4 009 Department of Health 131 167 7 099 3 323 20 823 Department of Infrastructure, Planning and Logistics Infrastructure development 356 192 17 004 14 042 16 289 National network 176 504 2 900 20 380 Territory roads 661 354 6 405 44 649 Department of Environment, Parks and Water Security 33 152 4 531 4 023 Territory Wildlife Parks 2 780 800 550 Department of Education 47 644 15 431 7 793 27 126 Department of Territory Families, Housing and Communities 789 485 21 508 21 335 55 630 Department of the Attorney‑General and Justice 5 010 3 640 3 618 Department of Corporate and Digital Development 13 656 300 4 500 267 Aboriginal Areas Protection Authority 8 TOTAL GENERAL GOVERNMENT 2 433 458 87 222 244 329 205 532

10 | Overview The Infrastructure Program

Table 5: General government infrastructure program summary 2021‑22 Budget Major Minor Capital Repairs and works works grants maintenance $000 $000 $000 $000 Department of the Chief Minister and Cabinet 75 315 950 27 300 328 Department of the Legislative Assembly 380 1 000 1 885 Auditor‑General’s Office 2 Northern Territory Electoral Commission 6 Office of the Independent Commissioner Against Corruption 112 5 Ombudsman’s Office 4 Department of Treasury and Finance 100 19 Northern Territory Police, Fire and Emergency Services 42 837 3 600 7 264 Department of Industry, Tourism and Trade 53 109 1 650 27 566 4 235 Department of Health 125 510 7 150 2 056 25 015 Department of Infrastructure, Planning and Logistics Infrastructure development 386 376 17 000 15 485 National network 332 959 4 300 16 736 Territory roads 749 348 10 000 45 977 Department of Environment, Parks and Water Security 24 416 5 500 2 615 5 164 Territory Wildlife Parks 2 431 750 566 Department of Education 18 459 13 200 2 886 30 373 Department of Territory Families, Housing and Communities 852 693 22 550 17 448 57 359 Department of the Attorney‑General and Justice 811 4 800 3 762 Department of Corporate and Digital Development 2 821 300 12 500 275 Aboriginal Areas Protection Authority 8 TOTAL GENERAL GOVERNMENT 2 667 577 92 850 92 371 214 468

Overview | 11 Budget 2021-22

Table 6: Capital grants

2020‑21 2021‑22 Revised Budget $000 $000 Department of the Chief Minister and Cabinet Barkly Regional Deal 500 Darwin Education and Community Precinct 45 000 27 300 Jabiru and Kakadu Futures 2 000 Local Jobs Fund 20 000 Department of Industry, Tourism and Trade Alcohol Secure 300 Business Improvement grant 11 138 Business Security Assistance Program 6 115 1 586 Charles Darwin University 2 526 2 526 Community Benefit Fund infrastructure grants 8 676 8 500 Customer Experience Enhancement Program 5 000 Future Skills Training Infrastructure Fund 1 000 Home and Business Battery Scheme 4 434 2 841 Home Improvement Scheme 66 995 Home Renovation grant 2 700 Immediate Work grant 10 781 Renewable Remote Power Program 300 4 000 Roadhouse to Recovery grant program 4 000 4 000 Training infrastructure grant 43 363 Visitor Experience Enhancement Program 1 828 3 750 Department of Health Increase capacity at Howard Springs quarantine facility for repatriated Australians 1 889 622 St John Ambulance Australia NT 1 434 1 434 Department of Infrastructure, Planning and Logistics Black Spot Program 2 195 Borroloola sports courts and cyclone shelter 2 500 Gove marine infrastructure 1 000 Improving strategic local roads infrastructure 1 490 Palmerston Economic Development projects 3 250 Pirlangimpi subdivision 3 607 Department of Environment, Parks and Water Security Aboriginal Ranger Grants Program 2 615 Department of Education Boarding facilities 3 000 435 Building Better Schools – non‑government schools 2 100 Capital Subsidy Scheme – non‑government schools 2 693 2 451 continued

12 | Overview The Infrastructure Program

2020‑21 2021‑22 Revised Budget $000 $000 Department of Territory Families, Housing and Communities Barkly Regional Deal – social and affordable housing 1 900 Child and family support centres 1 918 1 957 Community facilities development 344 347 Elliott town camps – housing and infrastructure upgrade 1 200 1 168 Essential services to outstations 5 757 7 562 Homelessness Integrated Supported Accommodation Program 4 997 3 054 National Iconic Arts Trail – East Arnhem Art Gallery extensions 600 National Iconic Arts Trail – Katherine Art Gallery extensions 1 500 Remote Community Sports Infrastructure Program 3 019 Utopia homelands upgrades 2 000 1 460 Department of Corporate and Digital Development Jabiru and Kakadu Futures – mobile connectivity 2 500 Jabiru and Kakadu Futures – National Broadband Network rollout 500 4 000 Remote Telecommunications Co‑Investment Program 4 000 4 000 Upgrade Arnhem Land fibre optic backbone 2 000 TOTAL CAPITAL GRANTS 244 329 92 371

Public non financial corporations The Power and Water Corporation, Territory Generation and Indigenous Essential Services Pty Ltd, as government owned corporations, determine their own capital investment program to ensure current service standards for supply reliability are met. The remaining government owned corporation, Jacana Energy, does not have a major capital investment program as its primary business is electricity retailing to customers. The Land Development Corporation is a government business division that determines its own capital investment program to provide strategic industrial land and marine infrastructure, and facilitate the delivery of residential and mixed‑use developments. The corporations’ combined projected capital investment for 2021‑22 is $243.2 million, with a further $101.6 million committed for repairs and maintenance. Information presented in this budget paper Where appropriate, summary tables have been rounded to one decimal place. Totals may not add due to rounding. Projects and figures are correct as at time of publishing. Program amounts shown are exclusive of GST.

Overview | 13 Budget 2021-22

14 | The Infrastructure Program

Program details by agency

Program details by agency | 15 Budget 2021-22 Department of the Chief Minister and Cabinet

Program $000

MAJOR WORKS 75 315

MINOR WORKS 950

CAPITAL GRANTS 27 300

REPAIRS AND MAINTENANCE 328

TOTAL INFRASTRUCTURE PROGRAM 103 893

Revoted works from 2020‑21 75 315

Top End

Infrastructure to reposition Jabiru post‑mining as a tourism and regional services hub 74 638

Greater Darwin

Government House upgrades 677

Total major works 75 315

Department of the Legislative Assembly

Program $000

MAJOR WORKS 380

MINOR WORKS 1 000

REPAIRS AND MAINTENANCE 1 885

TOTAL INFRASTRUCTURE PROGRAM 3 265

Revoted works from 2020‑21 380

Greater Darwin

Installation of an audiovisual control system for Parliament House's chamber and 380 committee room to maintain recording and broadcast of Legislative Assembly meetings

Total major works 380

Auditor‑General’s Office

Program $000

REPAIRS AND MAINTENANCE 2

TOTAL INFRASTRUCTURE PROGRAM 2

16 | Program details by agency The Infrastructure Program Northern Territory Electoral Commission

Program $000

REPAIRS AND MAINTENANCE 6

TOTAL INFRASTRUCTURE PROGRAM 6

Office of the Independent Commissioner Against Corruption

Program $000

MAJOR WORKS 112

REPAIRS AND MAINTENANCE 5

TOTAL INFRASTRUCTURE PROGRAM 117

Revoted works from 2020‑21 112

Greater Darwin

Improve existing office fitout including the hearing room to meet security, technology and 112 access requirements

Total major works 112

Ombudsman’s Office

Program $000

REPAIRS AND MAINTENANCE 4

TOTAL INFRASTRUCTURE PROGRAM 4

Department of Treasury and Finance

Program $000

MINOR WORKS 100

REPAIRS AND MAINTENANCE 19

TOTAL INFRASTRUCTURE PROGRAM 119

Program details by agency | 17 Budget 2021-22 Northern Territory Police, Fire and Emergency Services

Program $000

MAJOR WORKS 42 837

MINOR WORKS 3 600

REPAIRS AND MAINTENANCE 7 264

TOTAL INFRASTRUCTURE PROGRAM 53 701

Revoted works from 2020‑21 42 837

Barkly

Additions to Tennant Creek watch house 3 200

Big Rivers

Construct a multipurpose police complex in Ngukurr, including residential housing and 3 709 visiting officer quarters, multifunction room/court house, associated boat and storage sheds, communications tower and backup generator1

East Arnhem

Construct a new permanent police post including a multifunction area at Angurugu1 1 436

Top End

Construct a multipurpose police complex in Maningrida, including residential housing and 15 768 visiting officer quarters, multifunction room/court house, associated boat and storage sheds, communications tower and backup generator1

Greater Darwin

Construct new Palmerston regional fire, rescue and emergency services complex 17 826

Peter McAulay Centre – main building roof replacement – stage 1 898

Total major works 42 837

1 Commonwealth funding provided for these projects.

18 | Program details by agency The Infrastructure Program Department of Industry, Tourism and Trade

Program $000

MAJOR WORKS 53 109

MINOR WORKS 1 650

CAPITAL GRANTS 27 566

REPAIRS AND MAINTENANCE 4 235

TOTAL INFRASTRUCTURE PROGRAM 86 560

Revoted works from 2020‑21 53 109

Barkly

New visitor experiences including gold rush and ore mining interpretative displays in 3 839 Tennant Creek

Greater Darwin

Berrimah Farm

Replace the ageing Berrimah agricultural laboratory building with new laboratory 16 506 facilities and modern infrastructure

Upgrade essential site infrastructure and field laboratory facilities, new office 260 accommodation and extend the veterinary laboratory to include a new molecular laboratory wing1

Across regions

Enhance recreational fishing infrastructure across the Territory 32 504

Total major works 53 109

1 Joint funding by the Territory and Commonwealth governments.

Program details by agency | 19 Budget 2021-22 Department of Health

Start date Program $000

MAJOR WORKS 125 510 MINOR WORKS 7 150 CAPITAL GRANTS 2 056 REPAIRS AND MAINTENANCE 25 015

TOTAL INFRASTRUCTURE PROGRAM 159 731

Revoted works from 2020‑21 108 260 Central Australia Alice Springs Hospital Hybrid operating theatre 4 400 Multistorey carpark 11 330 New ambulatory care centre1 25 700 Relocation of substation above the flood level 1 148 Upgrade outpatient department 500 Replacement of a mobile oral health dental unit for Central Australia 632 Barkly Tennant Creek Hospital – staff accommodation block1 3 175 Big Rivers Katherine Hospital – new specialist consulting rooms1 936 East Arnhem Gove District Hospital Fire remediation works 11 174 Upgrade imaging department2 155 Greater Darwin Royal Darwin Hospital Central sterilisation services department trolley washer and reverse osmosis system 600 Establish mental health stabilisation assessment and referral area unit 7 500 Mental health inpatient unit expansion1 30 000 Mental health inpatient unit upgrades 1 760 PET scanner and cyclotron infrastructure works and purchase major equipment2 3 771 Remedial repairs to concrete spalling 3 465 Replace fire indication panel 900 Upgrade fire doors and frames 437

Ward 2B bathroom upgrade 677 New works in 2021‑22 17 250 Across regions Territory hospitals – upgrade the central sterilisation services department Q2, 2022 17 250 Total major works 125 510

1 Commonwealth funding provided for this project. 2 Joint funding by the Territory and Commonwealth governments. 20 | Program details by agency The Infrastructure Program Department of Infrastructure, Planning and Logistics

Program $000

MAJOR WORKS 1 468 683

MINOR WORKS 31 300

REPAIRS AND MAINTENANCE 78 198

INFRASTRUCTURE‑RELATED 15 163

TOTAL INFRASTRUCTURE PROGRAM 1 593 344

Revoted works from 2020‑21 905 488

Infrastructure development – revoted works 325 876

Central Australia

Alice Springs flood mitigation 10 000

Delivery of industrial land in Alice Springs 8 150

Headworks infrastructure and subdivision works to support development of Kilgariff 838

Revitalising infrastructure in the Alice Springs town centre 11 537

Big Rivers

Headworks and subdivision works to support the development of the Katherine Logistics 28 948 and Agribusiness Hub

Headworks infrastructure and subdivision of residential, commercial and industrial land in Kalkarindji 3 916

Katherine flood mitigation and headworks to support release of flood‑free land in the 10 100 Katherine East Neighbourhood Centre1

Subdivision works to support the release of 35 residential lots in Borroloola 3 498

East Arnhem

Cyclone rectification works – ongoing transitional accommodation during construction 1 224 and associated cyclone remediation works

Marine infrastructure works at Gove 541

Transport access

Galiwin'ku and Ramingining – improve barge landings 1 847

Gapuwiyak – improve the barge landing and goods handling facilities 1 755

Upgrade the Elcho Island aerodrome to meet Civil Aviation Safety Authority standards – stage 21 4 356

Top End

Common user ship lift facility, including ship lift, wet berths and additional hard stand 87 760 area for ship repair and maintenance works

Construct a new marine facility at Mandorah to improve safety and meet disability standards 47 914

Upgrade barge landing and hardstand at Wadeye 1 184

Wadeye aerodrome – airstrip pavement and seal widening 2 500

continued

Program details by agency | 21 Budget 2021-22

Program $000

Greater Darwin

Berrimah North Area Plan – headworks 13 156

City Deals (Darwin) – State Square Art Gallery 44 521

City Deals project to redevelop State Square 8 783

Fisherman's Wharf repairs 703

Headworks to support Palmerston East 1 400

Howard Springs quarantine facility

Facility improvements 1 110

Repatriation improvements2 1 416

Infrastructure for Growth – headworks infrastructure and subdivision designs to support 1 059 the development of land

Ludmilla Creek and Kulaluk trunk drains extension 3 200

Palmerston bus interchange park and ride car park upgrade 360

Redeveloping Richardson Park as a community recreation facility and providing access to 6 387 Ludmilla Primary School

Waterfront headworks and landscaping 3 333

Waterfront infrastructure upgrades3 2 200

Across regions

Border checkpoints – demountable relocation and ancillary structures 572

Design and concept development services for future projects 1 072

Infrastructure for Growth – headworks infrastructure and subdivision designs to support the development of land 1 266

New infrastructure to mitigate flooding 9 270

National network – revoted works 107 155

Barkly

Provide entry statements along the into Tennant Creek 569

Roads of Strategic Importance – strengthening and widening works on the Tennant Creek 179 to Townsville corridor2

Big Rivers

Roads of Strategic Importance – strengthening and widening works on the Newman to Katherine corridor2 6 773

Greater Darwin

Improve safety and connectivity in and around the Coolalinga commercial precinct2 27 057

Provide better heavy vehicle access into Pinelands through an intersection upgrade at McKinnon Road 5 319

Across regions COVID‑19 stimulus Shovel ready projects including Stuart Highway and Carpentaria Highway strengthening and widening, 5 459 and the Urban Asphalt Program1 Targeted road safety projects on the Stuart Highway, , , 5 652 and Litchfield Park Road1 continued

22 | Program details by agency The Infrastructure Program

Program $000

Northern Territory National Network highway upgrades2 43 990 Road Safety Program, including intersection upgrades, improvements for pedestrian 7 462 safety including new shared path connections, street lighting, truck parking bays and rest areas, signage and various shoulder works across the network2 Roads of Strategic Importance Road safety and fatigue management works on the Alice Springs to Darwin corridor2 2 651 Strengthening and widening works on the Alice Springs to Darwin corridor2 2 044 Territory roads – revoted works 472 457 Central Australia Heavy Vehicle Safety and Productivity Program – – construct truck parking bays1 1 488 Outback Way Upgrade various sections of the Plenty Highway1 22 306 Upgrade various sections of Tjukaruru Road1 7 850 Roads of Strategic Importance Schwarz Crescent and Stuart Highway intersection upgrade1 7 785 Selected upgrades of Maryvale Road1 14 268 Selected upgrades on the Alice Springs to Halls Creek corridor, including upgrading 18 061 Tanami Road and completing the seal to Yuendumu1 Barkly

Upgrades to Carpentaria Highway1 150 000

Big Rivers

Buntine Highway Upgrade Program1 37 233

Lajamanu Road upgrades 838

Roads of Strategic Importance – – seal between Roper and Wilton River bridges1 10 671

Upgrade and seal selected sections of the Roper Highway between Fizzer Creek and Ngukurr1 788

East Arnhem

Central Arnhem Road Upgrade Program1 40 767

Top End

Road upgrades to support industry 6 843

Roads of Strategic Importance – selected upgrades on the Adelaide River to Wadeye 35 481 corridor, including sealing Port Keats Road between Wadeye and Palumpa1

Upgrade roads on the Tiwi Islands to support economic and social development1 23 930

Upgrade various roads within Kakadu National Park to support tourism growth2 2 000

Greater Darwin

Howard Springs Nature Park – carpark and road upgrades 332

New intersection works on and Osgood Drive to cater for airport 5 997 development and improve safety4

Northern Australia Roads Program – upgrade the Arnhem Highway on the Adelaide River 1 508 floodplain to improve flood resilience, safety and productivity1

continued

Program details by agency | 23 Budget 2021-22

Program $000

Roads of Strategic Importance

Arnhem Highway – Adelaide River Floodplain upgrade, including Beatrice Hill section1 20 659

Upgrade and seal selected roads to improve the productivity of the mango industry5 8 518

Across regions

Arnhem Link Road upgrades1 12 265

Black Spot Program for road safety projects at targeted locations2 241

Continue five‑year program to replace corrugated steel culverts on various roads 1 774

COVID‑19 stimulus

Local roads and community infrastructure program2 7 372

Shovel ready projects including Stuart Highway and Carpentaria Highway 5 016 strengthening and widening, and the Urban Asphalt Program1

Targeted road safety projects on the Stuart Highway, Barkly Highway, Victoria Highway, 1 440 Tiger Brennan Drive and Litchfield Park Road1

Ongoing program to continue upgrades across regions: strengthening and widening the 7 339 road network, traffic management road treatment and landscaping road verges

Ramingining and Central Arnhem Road lift and seal 927

Road safety improvements across multiple locations, including safety upgrades 609

Road Safety Program, including intersection upgrades, improvements for pedestrian 6 218 safety including new shared path connections, street lighting, truck parking bays and rest areas, signage and various shoulder works across the network2

Roads to Recovery Program on targeted local roads2 10 372

Strengthen and widen selected sections of the Territory rural arterial road network 585

Upgrade and seal Maningrida‑Ramingining Road 976

Start date

New works in 2021‑22 563 195

Infrastructure development – new works 60 500

Central Australia

Delivery of industrial land in Alice Springs Q2, 2022 8 000

Barkly

Ali Curung aerodrome – seal and line mark airstrip Q2, 2022 2 500

Greater Darwin

Civic and State Square redevelopment Q2, 2022 30 000

Frances Bay Mooring Basin – lock replacement Q1, 2022 20 000

National network – new works 225 805

Barkly

Roads of Strategic Importance – corridor upgrades including sealing, strengthening and Q2, 2022 20 000 widening, and road safety improvements2

continued

24 | Program details by agency The Infrastructure Program

Start date Program $000

Big Rivers

Roads of Strategic Importance – corridor upgrades including sealing, strengthening and Q2, 2022 10 000 widening and road safety improvements2

Across regions

Road Safety Program1 Q3, 2021 183 286

Roads of Strategic Importance – corridor upgrades including sealing, strengthening and Q2, 2022 12 519 widening and road safety improvements2

Territory roads – new works 276 890

Central Australia

Roads of Strategic Importance – Alice Springs to Halls Creek corridor – Tanami Road1 Q3, 2021 24 262

Big Rivers

Buntine Highway upgrade1 Q3, 2021 15 761

Roads of Strategic Importance – Northern Territory gas industry road upgrades

Buchanan Highway upgrades2 Q2, 2022 56 000

Gorrie Dry Creek Road upgrades2 Q2, 2022 1 000

Western Creek Road upgrades2 Q2, 2022 1 000

East Arnhem

Central Arnhem Road upgrade1 Q3, 2021 36 391

Top End

Roads of Strategic Importance – Adelaide River to Wadeye corridor – Port Keats Road1 Q2, 2022 24 076

Tiwi Island road upgrades1 Q2, 2022 37 130

Upgrade of various roads within Kakadu National Park to support tourism growth2 Q1, 2022 15 000

Across regions

Continue Black Spot Program for road safety projects at targeted locations on Territory Q3, 2021 1 870 and local government roads2

Continue five‑year program to replace corrugated steel culverts on various roads Q1, 2022 2 000

Road Safety Program1 Q3, 2021 36 830

Roads to Recovery Program2 Q3, 2021 6 570

Rolling investment and upgrade Q3, 2021 19 000

Total major works 1 468 683

1 Joint funding by the Territory and Commonwealth governments. 2 Commonwealth funding provided for these projects. 3 Funding provided by external sources. 4 Joint funding by the Territory government and external sources. 5 Joint funding by the Territory and Commonwealth governments and Litchfield Council.

Program details by agency | 25 Budget 2021-22 Department of Environment, Parks and Water Security

Program $000

MAJOR WORKS 24 416

MINOR WORKS 5 500

CAPITAL GRANTS 2 615

REPAIRS AND MAINTENANCE 5 164

TOTAL INFRASTRUCTURE PROGRAM 37 695

Revoted works from 2020‑21 24 416

Central Australia

Central Australia – new multi‑day walking track 5 600

West MacDonnell National Park – new adventure cycling track 11 309

Big Rivers

Nitmiluk National Park – new walking trails linking with mountain bike trails 530

Top End

Litchfield National Park – East Reynolds new adventure hub, opening new swimming 5 696 areas, campgrounds, picnic areas and 4WD tracks

Across regions

Upgrade and replace hybrid solar power systems at ranger stations 1 281

Total major works 24 416

Territory Wildlife Parks

Program $000

MAJOR WORKS 2 431

MINOR WORKS 750

REPAIRS AND MAINTENANCE 566

TOTAL INFRASTRUCTURE PROGRAM 3 747

Revoted works from 2020‑21 2 431

Greater Darwin

Infrastructure enhancements at Territory Wildlife Park 2 431

Total major works 2 431

26 | Program details by agency The Infrastructure Program Department of Education

Program $000

MAJOR WORKS 18 459

MINOR WORKS 13 200

CAPITAL GRANTS 2 886

REPAIRS AND MAINTENANCE 30 373

TOTAL INFRASTRUCTURE PROGRAM 64 918

Revoted works from 2020‑21 18 459

Barkly

Tennant Creek High School – Juno Centre upgrades1 1 541

East Arnhem

Homeland learning centre upgrades 2 000

Shepherdson College – replace verandahs 799

Greater Darwin

Alawa and Nemarluk Schools – traffic management upgrades 270

Casuarina Senior College – upgrade science, technology, engineering and mathematics 1 430 (STEM) facilities2

Driver Primary School – new shade structure 729

Forrest Parade School – stage 2 bus shed and carpark extension3 889

Leanyer Primary School – replace transportable classrooms2 333

Across regions

Acoustic upgrade program 1 541

New transportable classrooms to provide better learning environments for students and teachers1 6 138

Students with additional needs infrastructure investment4 2 789 Total major works 18 459

1 Joint funding by the Territory and Commonwealth governments and school representative body. 2 Funding contribution provided by the school representative body. 3 Joint funding by the Territory government and school representative body. 4 Commonwealth funding provided for this project.

Program details by agency | 27 Budget 2021-22 Department of Territory Families, Housing and Communities

Program $000

MAJOR WORKS 852 693

MINOR WORKS 22 550

CAPITAL GRANTS 17 448

REPAIRS AND MAINTENANCE 57 359

TOTAL INFRASTRUCTURE PROGRAM 950 050

Revoted works from 2020‑21 497 293

Central Australia

Alice Springs youth justice centre upgrade 11 959

Fitout youth justice centre in Alice Springs 2 900

National Aboriginal Art Gallery in Alice Springs 46 851

National Indigenous Cultural Centre in Alice Springs 19 385

Barkly

Arts Trail – Tennant Creek art and culture upgrades 7 972

Barkly Regional Deal – Tennant Creek visitor park1 5 000

Barkly youth work camp 3 546

Big Rivers

Arts Trail – Katherine art gallery extensions 4 500

East Arnhem

Arts Trail – Arnhem Land art gallery extensions 7 500

Remote Aboriginal housing – cyclone rectification works in Galiwin'ku 3 010

Greater Darwin

CasCom Centre office fitout 1 008

Darwin Plaza level 6 fitout 590

Don Dale Youth Detention Centre upgrades to maintain services and general amenity 1 449

John Stokes Square redevelopment including public housing, Nightcliff police station and 26 152 multi‑agency hub

Leanyer Recreation Park repairs and maintenance 614

New Darwin youth justice facility 43 280

Staged upgrade and replacement of heating, ventilating and airconditioning system at the 1 405 Museum and Art Gallery of the Northern Territory

Across regions

Government employee housing for teachers1 4 758

Public housing – transitional accommodation facilities1 6 064

Regional youth justice facilities 4 962

Remote Aboriginal housing – Commonwealth investment1 91 874

continued

28 | Program details by agency The Infrastructure Program

Program $000

Remote housing – fencing program1 581

Remote Housing Investment Package

Government employee housing 21 440

HomeBuild NT 66 420

Land servicing 57 085

Room to Breathe 30 526

Upgrades to remote housing 8 759

Urban public housing stimulus

Community living areas 333

New dwellings 15 612

Upgrades to housing complexes 1 758

Start date

New works in 2021‑22 355 400

Greater Darwin

Darwin youth justice centre fitout Q2, 2022 4 800

Across regions

Government employee housing – National Partnership on Northern Territory Remote Q3, 2021 3 800 Aboriginal Investment – education workforce capital works1

Remote Aboriginal Housing – Commonwealth contribution to match the Territory's Q3, 2021 150 000 investment1

Remote Housing Investment Package

Government employee housing Q3, 2021 20 000

HomeBuild NT Q3, 2021 50 000

Land servicing Q3, 2021 94 800

Room to Breathe Q3, 2021 20 000

Rolling program to provide water quality and security in remote communities Q3, 2021 7 000

Rolling program to refresh the Territory's urban public housing stock Q4, 2021 5 000

Total major works 852 693

1 Commonwealth funding provided for these projects.

Program details by agency | 29 Budget 2021-22 Department of the Attorney‑General and Justice

Program $000

MAJOR WORKS 811

MINOR WORKS 4 800

REPAIRS AND MAINTENANCE 3 762

TOTAL INFRASTRUCTURE PROGRAM 9 373

Revoted works from 2020‑21 811

Central Australia

Alice Springs Correctional Centre security system upgrade 811

Total major works 811

Department of Corporate and Digital Development

Program $000

MAJOR WORKS 2 821

MINOR WORKS 300

CAPITAL GRANTS 12 500

REPAIRS AND MAINTENANCE 275

TOTAL INFRASTRUCTURE PROGRAM 15 896

Revoted works from 2020‑21 2 821

Top End

Fitout of the Wadeye government business centre 1 000

Greater Darwin

Make good relinquished buildings following relocation to Manunda Place 430

Support for the Back on Track program to provide youth training facilities and a drop‑in centre 788

Across regions

Territory Government Leased Property Stimulus Scheme – fitout works1 603

Total major works 2 821

1 Funding provided by external sources. Aboriginal Areas Protection Authority

Program $000

REPAIRS AND MAINTENANCE 8

TOTAL INFRASTRUCTURE PROGRAM 8

30 | Program details by agency The Infrastructure Program Glossary Capital grants Grants provided to fund the construction or upgrade of significant assets owned by entities outside the budget sector (grant recipients). Works may be managed by either the grant recipient, to which the grant is provided directly, or the Department of Infrastructure, Planning and Logistics, in which case grant funds are held by the agency during construction. Capital works Building and engineering works that create an asset, as well as constructing or installing facilities and fixtures associated with and forming an integral part of those works. Capital works projects would typically include constructing buildings, roads and bridges, installing large air conditioning plants or lifts, upgrading or extending existing buildings, and major roadworks that upgrade existing roads. Capital works can consist of major and minor works (see definitions below). Excludes capital items, which are capital purchases where limited construction or fabrication is required such as equipment and vehicles. Repairs and maintenance works are also excluded as these works relate to maintaining an existing asset in a workable condition, not constructing or upgrading an asset. Capital works cash The funding expected to be spent on a project or projects in a financial year. Capital works program The total amount approved to deliver a project or projects. Classifications of the Functions of Government of Australia (COFOG‑A) A framework to classify government outlays or expenditure by the purpose served, for example, health or education. General government sector Defined in Government Finance Statistics as an entity or group of entities mainly engaged in the production of goods and or services outside the normal market mechanism. Goods and services are provided free of charge or at nominal charges well below costs of production. Government owned corporation A corporatised commercial entity within the terms of the Government Owned Corporations Act 2001 and not included in the general government sector due to its commercial nature. Territory government owned corporations are the Power and Water Corporation, Territory Generation and Jacana Energy. Infrastructure program Combines capital works, capital grants, repairs and maintenance, and infrastructure‑related expenses. It represents the Territory Government’s total commitments to the construction and maintenance of assets across the Territory, including both government and non‑government‑owned assets.

Glossary | 31 Budget 2021-22 Infrastructure‑related expenses Operational costs that directly relate to the infrastructure program, including strategic infrastructure‑related studies, investigations, master planning, project development and consultancy costs not specific to an asset. Major works Construction projects with an estimated value greater than $0.5 million that relate to improvements to or construction of a new Territory Government asset. Minor works Construction projects with an estimated value of up to $0.5 million that relate to improvements to or construction of a new Territory Government asset. In this budget paper, only the total program level per agency is identified for minor works projects. New works Projects approved to start in the 2021‑22 financial year. Individual new works projects are recorded in this budget paper for projects over $0.5 million (major new works), with projects of $0.5 million or less (minor new works) recorded in aggregate for each agency. Public non financial corporations Public enterprises primarily engaged in the production of goods or services of a non financial nature, for sale in the market place, at prices that aim to recover most of the costs involved. In this budget paper, public non financial corporations include the Land Development Corporation, Indigenous Essential Services Pty Ltd and government owned corporations. Repairs and maintenance Works undertaken to maintain existing assets in working condition. Repairs and maintenance keep an asset functioning at its current capacity and do not enhance the asset significantly or extend its useful life. This is in contrast to capital works on existing assets, which will substantially change or improve the asset through expansion or upgrade. Repairs and maintenance funding is appropriated to the Department of Infrastructure, Planning and Logistics, which manages works on behalf of client agencies. Revoted works Capital works initiated in previous years and carried forward into the budget year. As construction of larger projects will often span more than one financial year, the works not completed at the end of the financial year are revoted into the new financial year. These incomplete portions of projects are referred to as revoted works and are distinct from new works. Start date Refers to the calendar year quarter that construction is anticipated to commence for new works, with design work and planning completed. Note, this date is the best assessment construction authorities are able to provide at budget time and is subject to change. It can be affected by a number of factors in the preparatory stages, which can change the timeframe, such as delays in obtaining clearances, weather conditions, design modifications and consultation processes.

32 | Glossary The Infrastructure Program Total infrastructure payments A summary of payments for infrastructure projects and grants at the total public sector. The total infrastructure payments table is the primary infrastructure budget table, which identifies the total approved program for general government sector major works and minor works, and budgeted expenditure. Total public sector A consolidation of all sectors of government. This process eliminates transactions and balances between sectors.

Glossary | 33