ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986)

(2018 – 2019)

for COMPOSITE SAND MINING PLAN in the RIVERBED OF AJOY RIVER (J. K. ROPEWAYS AREA) Limited

Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal Ltd.) G. T. Road (West End) - 713 304

CMPDI

ISO 9001:2015 Company

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

ENVIRONMENTAL STATEMENT FOR Composite Sand Mining Plan in Ajoy Riverbed

Environmental statement for the financial year ending 31st March, 2019

FOR THE YEAR: 2018-19

CONTENTS

SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-5 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 6-9

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 10-15 II GROUND WATER QUALITY REPORT 16 III GROUNDWATER LEVEL 17

PLATES

I PLAN SHOWING SAND GHATS II PLAN SHOWING LOCATION OF MONITORING STATIONS

1

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

CHAPTER – I

INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement (Form-V) for Composite Sand Mining in Ajoy Riverbed was entrusted to CMPDI by GM (Environment & Forest), Eastern Coalfields Limited.

1.2 PROJECT DESCRIPTION:

Sand for the sole purpose of stowing in underground mines is being extracted by ECL from Ajoy Riverbed for the last 40 years on the basis of temporary leases / permits obtained from the Govt. of . There are in all 21 stations of sand mining in the Ajoy Riverbed spread in stations over 30 kms of its course along the northern boundary of the Coalfield. Since obtaining environment clearance is now mandatory for sand mining to continue, a composite plan for extracting sand from the Ajoy Riverbed has been prepared covering all the 21 stations with combined mining leasehold area of 1023.48 Acre (414.36 Ha). Total quantity of sand proposed to be extracted is 2.0 million m3 per annum at peak level of extraction. Sand mining is carried out manually at all the above stations in Ajoy Riverbed up to a maximum depth of 1.0 m (average depth 0.5 m) with the help of hand shovels, loaded on trucks and transported either directly to the linked underground mines or stored in depots at transfer points for subsequent transport to the mines. Sand extraction and transportation activities are outsourced to experienced contractors and carried out under the supervision and guidelines of ECL. The proposal is for extraction of 2.0 million m3 of sand per annum from 21 stations in the riverbed of Ajoy River, flowing along the northern portion of in the Burdwan and Birbhum districts of West Bengal. The combined lease area of the 21 stations is 1023.48 Acre (414.36 Ha) spread over 30 kms of the course of Ajoy along Raniganj Coalfield. Sand is available in the riverbed of Ajoy River up to depths ranging from 10 m to 12.2 m as per studies carried out. As per the sand replenishment studies carried out for this proposal, the annual replenishment is up to 1.275 m of sand which gets evenly distributed on the riverbed and, thus, the depth up to which sand can be extracted annually at the designated stations is 1m. Thus, it has been proposed to mine sand from the designated stations up to an average depth of 0.5 m only in order to maintain sufficient surplus sand in the riverbed each year. EC was obtained vide letter no. J-11015/269/2012-IA.II (M)(Pt.) dated 26.05.2016 for production capacity of 2.0 Mm3 in ML area of 414.36 Ha. Total sand extraction during 2018-19 was 1.41 Mm3. Total manpower as on 31.03.2019 is 185. Total no. of working

2

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

days were 303 days in GM office and 305 days in Agent Office. Sand is loaded manually into the trucks mostly of 9 cum capacity from designated ghats to sand bunkers distance of which varies from 5km to 30km for different bunkers. Location of the plan is shown in Plate no. – 1.

Mouza & Plotwise land in Ajoy Riverbed where sand is being extracted for stowing purpose Maximum Sand Area Station J.L. Gram extraction P.S. Mouza Mining Plot No. (Acre) No. No. Panchayat per year site (M Cum) 1 236 4.00 2 1, 3, 24, 444, 890, 897, 130 50.00 1 Pandaveswar 3 Ramnagar Kendra 6, 38, 49, 50, 51, 1166, 0.150 3 100.00 1167, 1275 4 1193, 1194, 1144, 895, 896 70.00 1 543 4.00 1, 32, 32/296, 36, 37, 484, 35, 34, 33, 150, 149, 284, 0.050 2 Pandaveswar 6 Gobindapur Baidyanathpur 2 80.65 297, 40, 41, 148, 287, 289, 288, 309 3 296 10.00 0.050 1 278 4.00 3 Pandaveswar 7 Konda Baidyanathpur 2 593 20.39 0.050 3 149 12.41 4 64 Bagdiha 1 2/763 4.00 0.050 1 480 4.00 5 Pandaveswar 67 Chatrishgonda Samla 0.100 2 980 50.00 1 1155/2378 4.00 6 Pandaveswar 66 Samla Samla 2 2760 50.00 0.616 3 2457, 2458, 2454, 2456 17.00 7 Faridpur 5 Bhaburia Gourbazar 1 1384 30.00 0.100 1 175, 610 50.00 8 Pandaveswar 8 Deshlopa Baidyanathpur 2 68 50.86 0.150 3 651, 652 0.63 9 Faridpur 4 Gogla 1 2378 30.00 0.05 1 3400 20.00 10 Khairasole 113 Barjora Kendgore 2 3420 41.60 0.05 3 3375/3398 28.58 1 2098 20.00 11 Khoirasole 144 Rashidpur Kendgore 2 1893 5.00 0.05 3 1894, 2027, 2028 8.00 12 Dubrajpur 154 Palasdanga Loba 1 2905, 2456 30.00 0.05 13 Khairasole 146 Bolta Panchra 1 1131, 1136 30.00 0.05 1 244/265, 265/271 30.00 14 Khairasole 147 Parulboni Panchra 0.05 2 271 9.00 1 626/663 32.86 15 Khairasole 143 Ratanpur Kendgore 2 663 5.00 0.05 3 6642, 2669 3.00 16 Pandaveswar 4 Baidyanathpur 1 1700 56.00 0.05 17 Khairasole 144 Beldanga Kendgore 1 227 5.00 0.05 18 Faridpur 7 Shyamsundarpur Baidyanathpur 1 4982 8.00 0.05 19 Khairasole 137 Churur Kendgore 1 1208 5.50 0.05 20 Khairasole 97 Nabason Parasundi 1 2258 20.00 0.05 21 Khairasole 92 Jamalpur Parasundi 1 855 20.00 0.05 Total 1023.48 1.966 i.e. 414.36 Peak: 2.0 Ha Location of sand mining stations on the Riverbed of Ajoy River is shown in Plate no. 2.

3

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

1.3 ENVIRONMENTAL SCENARIO: CMPDI has been engaged to carry out routine Environmental monitoring of the clusters falling in the Raniganj Coalfield. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air and compared with NAAQS, 2009 for quality. There are no specific air quality monitoring stations within the core zone of the project. However, the boundary of Ajoy River is shared by Cluster No. 12 (Group of 15 mines of ECL). Hence, 5 nos. of permanent stations and 3 nos. of pre-monsoon stations have been selected to represent the monitored air quality around the project (buffer zone). The details of the sampling stations are given below: Station Code Type of Station Name of Station ARA1/12A1 Permanent Air Station In Kendra village ARA2/12A3 Permanent Air Station In Danya village ARA3/12A7 Pre monsoon In Barajora village ARA4/12A8 Pre monsoon In Konda village ARA5/12A9 Pre monsoon In Tajpur village ARA6/12A11 Permanent Air Station Mandarboni village near Railway siding ARA7/12A12 Permanent Air Station Pandaveswar village near Railway siding ARA8/12A13 Permanent Air Station Madhaipur village near Railway siding Similarly, Groundwater level in the cluster area is monitored by taking measurements at 2 earmarked dugwells in the months of January, May, August and November every year. These dugwells are near the River bank located in the buffer zone. Location of dugwells is shown below: Station Code Location of dugwell ARGW1/12GWL2 Dugwell at Konda Regional Hospital ARGW2/12GWL7 Dugwell at roadside of Churat village near Barjore village Samples of groundwater from these wells, which are utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500:2012 standards for drinking water quality. Location of the monitoring stations of air & water are shown in Plate- II. The environmental monitoring results for 24 fortnights ending 31st March, 2019 are appended as Annexures – I, II & III. The environmental monitoring results for the year 2018-19 are summarized below:

AMBIENT AIR QUALITY 3 The PM10 concentration was found in the range of 83.3 to 97.2 µg/m and was within the 3 limits. The PM2.5 concentration was found in the range of 31.7 to 56.7 µg/m and was within 3 the standards of NAAQS, 2009.The SO2 concentration remained below 10.0 µg/m and NOX concentration was in the range of 12.7 to 24.8 µg/m3 and was within the limit.

4

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

ENVIRONMENTAL STANDARDS: Environmental Standards for Ambient air quality (AAQ):

Environmental standard for Raniganj Coalfield National Ambient Air Quality vide MOEF, Govt. of India, Gazette Standards (NAAQS), 2009 Notification No. GSR 742 (E) dated for industrial, residential and Station 25.09.2000 for 24 hourly samples at 500 rural areas for 24 hours Category meters from dust generating point samples Pollutant Concentration (µg/m3) PM10 SO2 NOx PM2.5 Industrial 300.0 120.0 120.0 60.0 Residential 100.00 80.0 80.0

WATER QUALITY AND GROUNDWATER LEVEL The analysis results reveal that most of the parameters of water are below permissible limits prescribed in IS 10500:2012 standards for groundwater quality. It can be observed from water level data that groundwater level varies from 1.60 m to 5.05 m below ground level during FY 2018-19.

5

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V Environmental statement for the financial year ending March, 2019

PART – A SL. NO. HEADING PARTICULARS (I) NAME AND ADDRESS OF THE Composite Sand Mining Plan in Ajoy Riverbed; PROJECT Office of the General Manager, J K Ropeways, PO: Kajoragram, Paschim Bardhaman, West Bengal (II) INDUSTRY CATEGORY Red (III) PRODUCTION CAPACITY 2.0 Mm3 in a ML area of 414.36 Ha PRODUCTION DURING 2018-19 1.41 Mm3 (IV) YEAR OF ESTABLISHMENT 30.08.2016 (date of grant of CTE) (V) DATE OF THE LAST This is the first time the report is being ENVIRONMENTAL STATEMENT submitted SUBMITTED

PART – B WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION (Cu.m/day) Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 0.0 0.0 B. COOLING (in radiators of trucks/HEMM/workshop) 5.0* 5.0* C. DOMESTIC (Bore hole, PHE water and mine water 274.0* 274.0* from Central Colliery) TOTAL 279.0* 279.0* *Workshop and colonies are common for both the sand mining plans operating under J K Ropeways

Name of Process water consumption per Product unit of product output (l/day/cum) During previous During current FY 2017-18 FY 2018-19 Sand 0.002$ 0.002$ $Total water consumption per unit product output considering production from both the Rivers

(II) RAW MATERIAL CONSUMPTION : Name of raw Name of Consumption of raw material per material products unit of product During previous During current FY 2017-18 FY 2018-19 1. Explosive - - 2. Diesel Sand 0.34 l/cum 0.34 l/cum 3. Lubricants 0.007 l/cum 0.007 l/cum

6

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

PART – C POLLUTION GENERATED Name of the Pollution Quantity of pollutants discharged Concentration of Percentage variation Project (mass/day) pollutants from prescribed discharged standards with reasons (mass/volume) Composite Sand WATER Nil 1. The main air 1. Ambient air quality Mining Plan for AIR* Total pollutant load of PM10 is 543.98 pollutant is results show that the Ajoy Riverbed kg/day while it is around 114.23 kg/day for suspended PM10 and values of PM10, PM2.5, SO2 PM2.5. PM2.5. The air quality and NOx are well within the results are prescribed standards. appended as Annexure-I. *PM10 and PM2.5 estimation has been done using empirical formula by using Emission Factors derived from S&T studies done by CMPDI.

PART – D HAZARDOUS WASTE (As specified under Hazardous Waste (Management and Handling) Rules, 1989) Hazardous waste* Total quantity During previous During current Disposal FY 2017-18 FY 2018-19 method A) From process i)Used oil 5000 litres 6600 litres ii)Lead-Acid Batteries Dealt in a. Automobile batteries 8 nos. Nil Part – F b. Cap-lamp batteries NA NA iii) Used Cotton waste Nil Nil iv) Metal Scrap NA 1179 Te *figures are given for both the sand mining plans operating under the administrative control of J K Ropeways

Approximate values may be given where actual values are not available. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form- 13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

PART – E SOLID WASTE NIL

7

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

PART – F PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH THESE CATEGORIES OF WASTE Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Used oil is re-used as lubricants of pulleys, wheel and axle of coal tubs. HEMM batteries and metal scrap are stored at area store and auctioned to authorized recyclers. Out of the total metal scrap, 605 Tonnes has already been auctioned & lifted while 574 Tonnes auctioned but yet to be lifted.

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1. AIR POLLUTION CONTROL MEASURES: a) Manual loading is being carried out for sand extraction at designated sand ghats. b) Sand is transported from sand ghats to bunkers by tarpaulin covered trucks to avoid spillage. c) Total plantation on 83.5 Ha done in sand mining related areas during 2018-19. d) Local species such as Gamar, Chatim, Neem, Krishnachura etc. have been planted with survival rate of 75%. e) Regular monitoring will be carried out fortnightly in future also and appropriate action will be taken, if needed.

2. WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water) a) Routine monitoring and level measurement is being done in dugwells located in the surrounding areas and based on the analysis result, appropriate mitigation measures will be taken, if required. b) Filter plant has been established to supply filtered water for domestic consumption.

3. NOISE POLLUTION CONTROL MEASURES: a) Regular maintenance of machines and other equipment. b) Providing green belt around core activity area, along road side in colony and in other vacant space. c) Equipment and light vehicles are provided with silencers.

8

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION a) Plantation will be carried out as per proposed plan in future. b) 30kW solar plant connected to grid and is working properly. c) Different activities has been carried out under CSR by the Areas associated with sand mining in 2018-19 for composite sand mining plans in riverbeds of both the rivers . An amount of Rs. 295.02 Lakh has been spent on these activities. d) Development of 2 nos. of Eco Park in JK Ropeways area office colony. e) The Environmental monitoring of the cluster will be continued fortnightly as per the guidelines of Ministry of Environment, Forests & Climate Change (MoEF&CC).

PART – I ANY OTHER PARTICULAR IN RESPECT OF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action, if needed.

9

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Annexure – I AMBIENT AIR QUALITY

Station No Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX Sampling ARA1/12A1 In Kendra village April First 07-Apr-18 86.5 32.4 <10.0 16.6 ARA1/12A1 In Kendra village April Second 28-Apr-18 85.8 32.1 <10.0 16.1 ARA1/12A1 In Kendra village May First 02-May-18 89.1 34.5 <10.0 17.1 ARA1/12A1 In Kendra village May Second 25-May-18 91.3 36.3 <10.0 16.8 ARA1/12A1 In Kendra village June First 14-Jun-18 90.2 35.6 <10.0 18.3 ARA1/12A1 In Kendra village June Second 20-Jun-18 91.1 36.4 <10.0 19.7 ARA1/12A1 In Kendra village July First 04-Jul-18 89.6 34.9 <10.0 17.8 ARA1/12A1 In Kendra village July Second 28-Jul-18 91.5 35.6 <10.0 18.4 ARA1/12A1 In Kendra village August First 02-Aug-18 92.7 36.5 <10.0 17.2 ARA1/12A1 In Kendra village August Second 23-Aug-18 92.3 36.1 <10.0 16.8 ARA1/12A1 In Kendra village September First 15-Sep-18 92.1 36.1 <10.0 16.8 ARA1/12A1 In Kendra village September Second 29-Sep-18 91.6 36.8 <10.0 16.3 ARA1/12A1 In Kendra village October First 11-Oct-18 90.7 35.8 <10.0 17.1 ARA1/12A1 In Kendra village October Second 26-Oct-18 91.3 36.2 <10.0 17.5 ARA1/12A1 In Kendra village November First 07-Nov-18 91.2 34.5 <10.0 16.2 ARA1/12A1 In Kendra village November Second 28-Nov-18 90.8 33.4 <10.0 16 ARA1/12A1 In Kendra village December First 13-Dec-18 91.9 35.6 <10.0 16.7 ARA1/12A1 In Kendra village December Second 28-Dec-18 92.3 35.9 <10.0 17.5 ARA1/12A1 In Kendra village January First 10-Jan-19 92.6 39.7 <10.0 18.7 ARA1/12A1 In Kendra village January Second 18-Jan-19 92.8 42.6 <10.0 19.8 ARA1/12A1 In Kendra village February First 05-Feb-19 92.6 41.7 <10.0 21.7 ARA1/12A1 In Kendra village February Second 18-Feb-19 92.7 40.3 <10.0 20.7 ARA1/12A1 In Kendra village March First 12-Mar-19 93.2 54.3 <10.0 24.8 ARA1/12A1 In Kendra village March Second 19-Mar-19 93.6 56.7 <10.0 23.8 ARA6/12A11 Mandarboni village near April First 12-Apr-18 86.5 31.7 <10.0 14.4 Railway siding ARA6/12A11 Mandarboni village near April Second 20-Apr-18 86.1 33.7 <10.0 16.2 Railway siding ARA6/12A11 Mandarboni village near May First 02-May-18 93.2 37.7 <10.0 15.2 Railway siding ARA6/12A11 Mandarboni village near May Second 19-May-18 92.2 37.6 <10.0 16.3 Railway siding ARA6/12A11 Mandarboni village near June First 09-Jun-18 94.1 38.7 <10.0 16.4 Railway siding ARA6/12A11 Mandarboni village near June Second 21-Jun-18 93.7 37.8 <10.0 17.3 Railway siding ARA6/12A11 Mandarboni village near July First 06-Jul-18 93.3 37.5 <10.0 17.7 Railway siding ARA6/12A11 Mandarboni village near July Second 20-Jul-18 92.8 36.6 <10.0 17.2 Railway siding ARA6/12A11 Mandarboni village near August First 14-Aug-18 97.2 42.5 <10.0 19.1 Railway siding ARA6/12A11 Mandarboni village near August Second 20-Aug-18 96.6 41.7 <10.0 18.3 Railway siding ARA6/12A11 Mandarboni village near September First 12-Sep-18 96.6 40.6 <10.0 18.7 Railway siding ARA6/12A11 Mandarboni village near September Second 25-Sep-18 97.2 41.3 <10.0 19.3 Railway siding

10

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Station No Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX Sampling ARA6/12A11 Mandarboni village near October First 12-Oct-18 96.1 40.2 <10.0 19.2 Railway siding ARA6/12A11 Mandarboni village near October Second 26-Oct-18 95.7 39.3 <10.0 20.1 Railway siding ARA6/12A11 Mandarboni village near November First 07-Nov-18 94.4 37.8 <10.0 19.4 Railway siding ARA6/12A11 Mandarboni village near November Second 22-Nov-18 93.4 36.2 <10.0 19.1 Railway siding ARA6/12A11 Mandarboni village near December First 13-Dec-18 95.1 37.7 <10.0 18.5 Railway siding ARA6/12A11 Mandarboni village near December Second 22-Dec-18 95.4 37.5 <10.0 19.1 Railway siding ARA6/12A11 Mandarboni village near January First 01-Jan-19 95.7 38.2 <10.0 19.3 Railway siding ARA6/12A11 Mandarboni village near January Second 17-Jan-19 95.1 39.6 <10.0 18.6 Railway siding ARA6/12A11 Mandarboni village near February First 07-Feb-19 95.3 42.4 <10.0 21 Railway siding ARA6/12A11 Mandarboni village near February Second 21-Feb-19 95.6 42.8 <10.0 22.4 Railway siding ARA6/12A11 Mandarboni village near March First 14-Mar-19 96.2 53.9 <10.0 24.5 Railway siding ARA6/12A11 Mandarboni village near March Second 25-Mar-19 96.5 52.6 <10.0 21.8 Railway siding ARA7/12A12 Pandaveswar village near April First 12-Apr-18 85.2 32.5 <10.0 15.4 Railway siding ARA7/12A12 Pandaveswar village near April Second 20-Apr-18 84.1 32.3 <10.0 17.4 Railway siding ARA7/12A12 Pandaveswar village near May First 05-May-18 90.9 35.6 <10.0 15.9 Railway siding ARA7/12A12 Pandaveswar village near May Second 19-May-18 91.3 35.6 <10.0 15.2 Railway siding ARA7/12A12 Pandaveswar village near June First 09-Jun-18 91.7 35.8 <10.0 16.7 Railway siding ARA7/12A12 Pandaveswar village near June Second 21-Jun-18 91.2 36.2 <10.0 16.7 Railway siding ARA7/12A12 Pandaveswar village near July First 06-Jul-18 91.3 35.4 <10.0 16.7 Railway siding ARA7/12A12 Pandaveswar village near July Second 26-Jul-18 91.1 34.9 <10.0 16.9 Railway siding ARA7/12A12 Pandaveswar village near August First 02-Aug-18 94.5 38.9 <10.0 16.9 Railway siding ARA7/12A12 Pandaveswar village near August Second 16-Aug-18 93.7 38.4 <10.0 16.2 Railway siding ARA7/12A12 Pandaveswar village near September First 12-Sep-18 93.3 38.6 <10.0 16.4 Railway siding ARA7/12A12 Pandaveswar village near September Second 25-Sep-18 94.6 39.2 <10.0 17.3 Railway siding ARA7/12A12 Pandaveswar village near October First 05-Oct-18 93.3 39.1 <10.0 17.6 Railway siding ARA7/12A12 Pandaveswar village near October Second 27-Oct-18 93.9 40.1 <10.0 18.5 Railway siding

11

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Station No Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX Sampling ARA7/12A12 Pandaveswar village near November First 07-Nov-18 92.2 37.9 <10.0 17.7 Railway siding ARA7/12A12 Pandaveswar village near November Second 22-Nov-18 91.6 36.6 <10.0 17.3 Railway siding ARA7/12A12 Pandaveswar village near December First 14-Dec-18 93.5 36.7 <10.0 17.9 Railway siding ARA7/12A12 Pandaveswar village near December Second 22-Dec-18 93.8 36.5 <10.0 18.2 Railway siding ARA7/12A12 Pandaveswar village near January First 09-Jan-19 94.2 36.5 <10.0 16.8 Railway siding ARA7/12A12 Pandaveswar village near February First 07-Feb-19 94.2 41.8 <10.0 20.8 Railway siding ARA7/12A12 Pandaveswar village near February Second 20-Feb-19 94.3 41.6 <10.0 21.8 Railway siding ARA7/12A12 Pandaveswar village near January Second 21-Feb-19 94 37.4 <10.0 16.5 Railway siding ARA7/12A12 Pandaveswar village near March First 14-Mar-19 95.8 54.4 <10.0 24.5 Railway siding ARA7/12A12 Pandaveswar village near March Second 25-Mar-19 96.2 51.2 <10.0 23.7 Railway siding ARA8/12A13 Madhaipur village near April First 12-Apr-18 84.4 34.5 <10.0 16.4 Railway siding ARA8/12A13 Madhaipur village near April Second 28-Apr-18 83.3 34.2 <10.0 17.2 Railway siding ARA8/12A13 Madhaipur village near May First 05-May-18 90.2 34.9 <10.0 16.9 Railway siding ARA8/12A13 Madhaipur village near May Second 25-May-18 90.9 34.9 <10.0 16.2 Railway siding ARA8/12A13 Madhaipur village near June First 13-Jun-18 91.1 35.9 <10.0 17.3 Railway siding ARA8/12A13 Madhaipur village near June Second 21-Jun-18 90.7 35.4 <10.0 17.1 Railway siding ARA8/12A13 Madhaipur village near July First 13-Jul-18 90.8 34.6 <10.0 16.6 Railway siding ARA8/12A13 Madhaipur village near July Second 20-Jul-18 89.5 33.5 <10.0 15.9 Railway siding ARA8/12A13 Madhaipur village near August First 09-Aug-18 91.1 37.2 <10.0 16.1 Railway siding ARA8/12A13 Madhaipur village near August Second 21-Aug-18 91.6 37.6 <10.0 16.6 Railway siding ARA8/12A13 Madhaipur village near September First 13-Sep-18 91.8 37.6 <10.0 16.1 Railway siding ARA8/12A13 Madhaipur village near September Second 25-Sep-18 92.4 38.2 <10.0 16.8 Railway siding ARA8/12A13 Madhaipur village near October First 10-Oct-18 91.9 37.4 <10.0 16.2 Railway siding ARA8/12A13 Madhaipur village near October Second 27-Oct-18 92.4 38.3 <10.0 16.7 Railway siding ARA8/12A13 Madhaipur village near November First 07-Nov-18 91.5 36.4 <10.0 16.1 Railway siding ARA8/12A13 Madhaipur village near November Second 22-Nov-18 91.2 36 <10.0 15.9 Railway siding

12

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Station No Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX Sampling ARA8/12A13 Madhaipur village near December First 12-Dec-18 92.4 35.5 <10.0 17.2 Railway siding ARA8/12A13 Madhaipur village near December Second 22-Dec-18 92.7 35.7 <10.0 17.7 Railway siding ARA8/12A13 Madhaipur village near January First 09-Jan-19 93.1 40.8 <10.0 15.2 Railway siding ARA8/12A13 Madhaipur village near January Second 21-Jan-19 93.2 36.8 <10.0 17.3 Railway siding ARA8/12A13 Madhaipur village near February First 05-Feb-19 93.4 42.3 <10.0 21.3 Railway siding ARA8/12A13 Madhaipur village near February Second 20-Feb-19 93.5 42.4 <10.0 20.4 Railway siding ARA8/12A13 Madhaipur village near March First 2-Mar-19 94.4 53.9 <10.0 23.8 Railway siding ARA8/12A13 Madhaipur village near March Second 25-Mar-19 94.8 53.5 <10.0 22.9 Railway siding ARA2/12A3 In Danya village April First 09-Apr-18 83.4 32.4 <10.0 17.4 ARA2/12A3 In Danya village April Second 16-Apr-18 84.5 33.5 <10.0 17.7 ARA2/12A3 In Danya village May First 03-May-18 89.7 33.6 <10.0 17.1 ARA2/12A3 In Danya village May Second 19-May-18 88.8 31.9 <10.0 16.7 ARA2/12A3 In Danya village June First 09-Jun-18 90.6 35.4 <10.0 17.8 ARA2/12A3 In Danya village June Second 20-Jun-18 90.9 35.6 <10.0 18.2 ARA2/12A3 In Danya village July First 03-Jul-18 89.7 35.1 <10.0 16.9 ARA2/12A3 In Danya village July Second 26-Jul-18 92.3 36.2 <10.0 17.9 ARA2/12A3 In Danya village August First 02-Aug-18 94.2 37.1 <10.0 17.2 ARA2/12A3 In Danya village August Second 24-Aug-18 93.7 36.9 <10.0 16.9 ARA2/12A3 In Danya village September First 15-Sep-18 94.6 37.6 <10.0 16.8 ARA2/12A3 In Danya village September Second 26-Sep-18 95.2 37.8 <10.0 16.2 ARA2/12A3 In Danya village October First 05-Oct-18 94.7 37.1 <10.0 16.3 ARA2/12A3 In Danya village October Second 26-Oct-18 94.1 37.2 <10.0 16.6 ARA2/12A3 In Danya village November First 03-Nov-18 93.5 36.1 <10.0 16.2 ARA2/12A3 In Danya village November Second 29-Nov-18 92.7 35.8 <10.0 15.9 ARA2/12A3 In Danya village December First 13-Dec-18 93.9 36.3 <10.0 16.6 ARA2/12A3 In Danya village December Second 28-Dec-18 94.3 37.1 <10.0 17.5 ARA2/12A3 In Danya village January First 10-Jan-19 94.6 37.8 <10.0 19.6 ARA2/12A3 In Danya village January Second 24-Jan-19 94.7 41.3 <10.0 17.5 ARA2/12A3 In Danya village February First 06-Feb-19 94.8 41.8 <10.0 19.8 ARA2/12A3 In Danya village February Second 21-Feb-19 94.6 41.8 <10.0 22.8 ARA2/12A3 In Danya village March First 12-Mar-19 95.2 41.3 <10.0 20.5 ARA2/12A3 In Danya village March Second 19-Mar-19 95.7 42.6 <10.0 17.3 ARA3/12A7 In Barajora village April First 03-Apr-18 85.5 31.7 <10.0 18.4 ARA3/12A7 In Barajora village April Second 23-Apr-18 86.7 34.4 <10.0 13.5 ARA3/12A7 In Barajora village May First 03-May-18 91.2 33.7 <10.0 18.2 ARA3/12A7 In Barajora village May Second 28-May-18 90.3 34.6 <10.0 17.9 ARA3/12A7 In Barajora village June First 13-Jun-18 92.4 36.1 <10.0 19.3 ARA3/12A7 In Barajora village June Second 26-Jun-18 91.3 35.8 <10.0 19.1 ARA3/12A7 In Barajora village July First 12-Jul-18 91.9 35.8 <10.0 18.6 ARA3/12A7 In Barajora village July Second 26-Jul-18 92.6 36.4 <10.0 19.5 ARA3/12A7 In Barajora village August First 07-Aug-18 95.7 39.4 <10.0 18.5 ARA3/12A7 In Barajora village August Second 23-Aug-18 94.7 38.7 <10.0 18.2 ARA3/12A7 In Barajora village September First 13-Sep-18 95.4 39.1 <10.0 18.3

13

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Station No Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX Sampling ARA3/12A7 In Barajora village September Second 24-Sep-18 94.8 40.2 <10.0 18.7 ARA4/12A8 In Konda village April First 04-Apr-18 84.2 32.6 <10.0 18.7 ARA4/12A8 In Konda village April Second 27-Apr-18 84.3 32.2 <10.0 13.2 ARA4/12A8 In Konda village May First 02-May-18 90.3 35.6 <10.0 18.3 ARA4/12A8 In Konda village May Second 28-May-18 90.7 36.7 <10.0 18.5 ARA4/12A8 In Konda village June First 14-Jun-18 91.7 36.7 <10.0 19.6 ARA4/12A8 In Konda village June Second 20-Jun-18 91.2 36.3 <10.0 18.7 ARA4/12A8 In Konda village July First 13-Jul-18 91.2 35.9 <10.0 19.1 ARA4/12A8 In Konda village July Second 28-Jul-18 92.5 36.5 <10.0 20.5 ARA4/12A8 In Konda village August First 14-Aug-18 96.2 41.2 <10.0 19.7 ARA4/12A8 In Konda village August Second 24-Aug-18 95.6 40.2 <10.0 19.3 ARA4/12A8 In Konda village September First 13-Sep-18 95.7 40.2 <10.0 19.4 ARA4/12A8 In Konda village September Second 24-Sep-18 95.1 41.1 <10.0 19.9 ARA5/12A9 In Tajpur village April First 10-Apr-18 85.7 33.2 <10.0 12.7 ARA5/12A9 In Tajpur village April Second 20-Apr-18 86.5 34.7 <10.0 14.5 ARA5/12A9 In Tajpur village May First 02-May-18 91.7 36.7 <10.0 14.7 ARA5/12A9 In Tajpur village May Second 25-May-18 90.6 35.5 <10.0 15.1 ARA5/12A9 In Tajpur village June First 13-Jun-18 92.2 36.4 <10.0 15.8 ARA5/12A9 In Tajpur village June Second 20-Jun-18 92.5 36.8 <10.0 17.3 ARA5/12A9 In Tajpur village July First 06-Jul-18 91.7 35.5 <10.0 16.7 ARA5/12A9 In Tajpur village July Second 26-Jul-18 92.3 36.1 <10.0 17.7 ARA5/12A9 In Tajpur village August First 01-Aug-18 96.7 40.9 <10.0 17.2 ARA5/12A9 In Tajpur village August Second 23-Aug-18 95.9 40.7 <10.0 16.8 ARA5/12A9 In Tajpur village September First 12-Sep-18 96.1 40.7 <10.0 18.3 ARA5/12A9 In Tajpur village September Second 24-Sep-18 96.6 41.3 <10.0 18.7

14

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

AIR QUALITY METAL ANALYSIS Station No Station Name Month Fortnig Date of Chromiu Arsenic Cadmium Mercury Nickel Lead ht Sampling m (ng/m3) (µg/m3) (µg/m3) (ng/m3) (µg/m3) (µg/m3) ARA1/12A1 In Kendra village Sept First 15-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA1/12A1 In Kendra village Sept Second 29-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA1/12A1 Kendra village March First 12-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA6/12A11 Mandarboni village Sept First 12-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA6/12A11 Mandarboni village Sept Second 25-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA6/12A11 Mandarboni village March First 14-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA7/12A12 Pandaveswar village Sept First 12-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA7/12A12 Pandaveswar village Sept Second 25-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA7/12A12 Pandaveswar village March First 14-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Rly siding ARA8/12A13 Madhaipur village Sept First 13-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA8/12A13 Madhaipur village Sept Second 25-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA8/12A13 Madhaipur village March First 2-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Railway siding ARA2/12A3 In Danya village Sept First 15-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA2/12A3 In Danya village Sept Second 26-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA2/12A3 Danya village March First 12-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA3/12A7 In Barajora village Sept First 13-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA3/12A7 In Barajora village Sept Second 24-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA3/12A7 Barajora village March First 7-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA4/12A8 In Konda village Sept First 13-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA4/12A8 In Konda village Sept Second 24-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA4/12A8 Konda village March First 7-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA5/12A9 In Tajpur village Sept First 12-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA5/12A9 In Tajpur village Sept Second 24-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 ARA5/12A9 Tajpur village March First 11-Mar-19 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005

Environmental standards: National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial and rural areas for 24 hourly/yearly samples: Arsenic (As) Cadmium (Cd) Chromium (Cr) Mercury (Hg) Nickel (Ni) Lead (Pb) Heavy Metal (ng/m3) (µg/m3) (µg/m3) (µg/m3) (ng/m3) (µg/m3) Concentration 6 Not specified Not specified Not specified 20 0.5

15

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Annexure – II GROUNDWATER QUALITY Project No Composite Sand Mining for Ajoy Riverbed Station No ARGW/212GW7 ARGW1/12GW2 Indian Station Name Dugwell at roadside of Churat Dugwell at Konda Drinking Water Standard village near Barjor village Regional Hospital (IS-10500:2012) Month May'18 May'18 Fortnight Second Second Date of sampling Permissible Acceptable Limit 02-May-18 03-May-18 Limit Colour, Hazen unit 5 2 5.0 15.0 Max Odour Unobjectionable Unobjectionable Agreeable Agreeable Taste Agreeable Agreeable Agreeable Agreeable Turbidity, NTU Max 3 1 1.0 5.0 pH 8.14 7.45 6.5-8.5 No relaxation Total Hardness 584 84 200.0 600.0 Iron <0.06 <0.06 0.30 No relaxation Chlorides 130 13 250.0 1000.0 Res Free chlorine 0.05 0.09 0.20 1.0 Dissolved Solids 934 174 500.0 2000.0 Calcium 240 38 75.0 200.0 Copper <0.03 <0.03 0.05 1.5 Manganese <0.02 <0.02 0.1 0.3 Sulphate 114 50 200.0 400.0 Nitrate 16.20 14.40 45.0 No relaxation Fluoride <0.02 0.16 1.0 1.5 Selenium <0.005 <0.005 0.01 No relaxation Arsenic <0.005 <0.005 0.01 0.05 Lead <0.005 <0.005 0.01 No relaxation Zinc 0.03 0.02 5.0 15.0 Total Chromium <0.01 <0.01 0.05 No relaxation Boron <0.01 <0.01 0.5 1.0 Coliforms (MPN) Shall not be detectable in any 100 ml Nil Nil sample Phenolics <0.001 <0.001 0.001 0.002 Alkalinity 208 168 200.0 600.0 Cadmium <0.001 <0.001 0.003 No relaxation Note: All parameters in mg/l unless otherwise specified

16

Environmental Statement (Form-V) for Composite Sand Mining Plan in Ajoy Riverbed 2018-19

Annexure – III GROUNDWATER LEVEL Station No Station Name Month Fortnight Date of Ground Water Sampling Level BGL (mtr) ARGW1/12GW2 Dugwell at Konda Regional Hospital May First 03-May-18 5.05 ARGW1/12GW2 Dugwell at Konda Regional Hospital August First 25-Aug-18 2.9 ARGW1/12GW2 Dugwell at Konda Regional Hospital November First 08-Nov-18 3 ARGW1/12GW2 Dugwell at Konda Regional Hospital January First 22-Jan-19 3.10 ARGW2/12GW7 Dugwell at roadside of Churat village near May First 02-May-18 5.2 Barjor village ARGW2/12GW7 Dugwell at roadside of Churat village near August First 30-Aug-18 1.6 Barjor village ARGW2/12GW7 Dugwell at roadside of Churat village near November First 08-Nov-18 2.7 Barjor village ARGW2/12GW7 Dugwell at roadside of Churat village near January First 24-Jan-19 1.70 Barjor village

17

19-06-2019

Plate – 1 Location of Ajoy River Job 111653

West Bengal

Raniganj Coalfield

Ajoy River

Burdwan District

1

P.F. BaraRampur Penchalia Chhotalia P.F. Gramdangal E.Rly.Kasta Branch Eklabpur P.F. P.F. Kharimati Bahadurdih Barakunri P.F. Bherpara P.F. Santaldih P.F. P.F. Bardhandangal SCALE :- Sultanpur Pahargora P.F. Kasta P.F. P.F. P.F. Kharikabad Pialsola LOCATION OF SAMPLING STATIONS Tulsipara P.F. Beldanga Karrabad P.F. Lakhanpur Nakrakonda ARA1/12A1 IN KENDRA VILLAGE Andhaira Mohidnagar Husumnagar Lachmanpur Baguli Bhadulia P.F. Bhendi Gopalpur ARA2/12A3 IN DANYA VILLAGE Madhabpur Paharpur Lado P.F. Belsara INDEX Afzalpur Diguli ARA3/12A7 IN BARAJORA VILLAGE Barhra Kalyanpur Chinchurbil Kankartala Settlement Kumarbandra Arjunsali Sarsha IN KONDA VILLAGE R.S. E.Rly.Andal Loop ARA4/12A8 Road Lauberia Barkola Parsundih Rasa Sahapur ARA5/12A9 IN TAJPUR VILLAGE Khayrasol Dangalpara Namukenan Rail Line Churulia Taldanga Tamra ARA6/12A11 MANDARBONI VILLAGE NEAR RS Forest Beldanga Hazaratpur Kasai kandar Pansiuri

Samuldihi Bagasola Dishermohan Binodepur ARA7/12A12 PANDAVESWAR VILLAGE NEAR RS River/Nallah Madhudanga Jaynagar Bheleni Mainadal Amjola Tanks Kendragaria ARA8/12A13 MADHAIPUR VILLAGE NEAR RS

Palpain Mamudpur ARGW1/12GW2 DUGWELL AT KONDA REGIONAL HOSPITAL Sandbed Pursunda Brajdihi Nabasan Sira ARA3/12A7 Dubrajpur Birkulti Ranipathar Binul Jamalpur Nayakpur Barajora Krishnapur DUGWELL AT ROADSIDE OF CHURAT VILLAGE Bhabaniganj ARGW2/12GW7 Nanid Jor Panchra ƒ ƒ ARGW2/12GWL7 Gopalpur Rampur Madantanr s s D Darbardanga W Bhimgara ƒ Sagna Budhgram Sattore Sikandarpur Uttardaha Shymla Simuldih Sal Nadi Prembazar Laborsol Bagdiha Isgara Tulidanga Bidhpur Shyamsunderpur Bhuri HINGLA RIVER garangi Arwa Taltore Beledanga Metegram Ghorapara Ahamadpur Rengua Palsara Kendra RS Suryapur Parui Lalbazar Chattrishganda Jhirul ARA1/12A1 BhimgaraRatanpur Bahadurpur Jhiladanga Kumardiha Biruli Basahari Layekdanga Rasidpur Jambad ARA8/12A12 Tajpur Beledanga Ambri Shibpur ARA5/12A9 Sankhari Ramnagar Khorkedanga Angargodia Palta Chapla Parulbona Bhaluka Paduma Patharchur Chandipur A D J A Y R I V E R Debipur Kamalpur

Baidyanathpur Loba Kaithi Nandi Jawdanga Jamsol Konda Gobindapur RS Pansiuli Barari Jamuria Hormadanga Hijalgora Chak Tulsi Khottadih ARA4/12A8 Madhabpur Fakirbera RS Palashdanga Pandaveswar ARGW1/12GWL2 ARA6/12A11 ARA2/12A3 Gogla Nutandanga Haderdanga khagran Suri Road Babupur Damodarpur of Saika Mahal Banagram Kota Ramchandrapur Chichuria Danya Madhaipur Bijaynagar Kumar Jamsol Chichuria Gogla ARA7/12A13 Bramhandih Damodar Nala Joalbhanga Sekpur RS Diversion Bazari Laskarbandh Ikra Bahadurpur Bodhgaon Sannabandhi Shyamsundarpur Akhalpur Dahuka Sonpur Bara Naw Gaon Basabdanga 100 TUMNI NALA Sunut Palasbon Vetarkona Bhaluka Chandardanga Kharui Mondalpur Dhasal Chakdola Dhasal Haripur NayaKanchanpur Kumarkhela Balijuri Dobrana Goenka- Ikra Chora Hansdiha Sirsa Kendulia Kajora Tarapur Nakrakonda Banali Krishnanagar Sunmani Rangpur Khaskenda Haripur Benebandi Baidyanathpur Kanchanpur Sarthakpur Kumardihi Srikrishnapur Haludguri Balanpur Banbahal Kalikapur Sukdala Joba Konda Andal Saithia Line Basudebpur Paranchak Chora Bhabanipur ƒ Pure Jambad Satapur ƒ 1 Borachak Rashidchak Shankarpur P.F Binodepur Ekdala Amdohi Baidyapur North Jambad Sahapur Shyamsundarpur Madhaiganj Itadanga RS UKHRA P.F Bedpahar Jambad Ukhra Chanchani Jagannathpur Tikarbera Parashkol Siduli Ukhra Jamgora RS Rajhat Namobeta Jaydeb Kenduli Jamdan Chhotachak Siduli Kalinagar Suka Bandh Dihibeta Nabagram Sugar Beniadidanga Mukundapur Dangapara Bheljhuri Janubazar Madhujore Gajadar Kajora Bansia Katagaria EASTERN COALFIELDS LTD. PLATE NO.- 3 Sarpi Khas Kajora Gopdanga Majhidanga To Ilambazar Madhusudanpur Rautdihi Daiarpur ENVIRONMENTAL STATEMENT AJOY RIVERBED Akamba 111653 UKHRA P.F UKHRA P.F Bhubaneswar Pure Kajora Amlauka Raghunahpur Shibpur Damariband LOCATION PLAN OF Banshgora Kshudarpur Pratappur BaraGoria Santashpur SAMPLING STATIONS Banguri Ichhapur Kajora Dakshinkhanda SCALE:- 1 : 63360 RS CMPDI Kajora Open Mixed Jungle Jotgaria Patsaora Nachan