The Buckinghamshire County Council

Total Page:16

File Type:pdf, Size:1020Kb

The Buckinghamshire County Council THE BUCKINGHAMSHIRE COUNTY COUNCIL The Council has made The Buckinghamshire County Council (Bradenham Road, West Wycombe in the Parish of West Wycombe CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Bradenham Road from Railway Bridge to Pedastal roundabout. Alternative route: West Wycombe Road, Bradenham Road, Wycombe Road, Lee Road, Oxford Road, Abbey Way, St Mary Street, Queen Victoria Road, Abbey Way Gyratory, Crendon Street, Amersham Road, Whielden Lane, Amersham Bypass, London Road, Missenden Bypass, Aylesbury Road, Wendover Bypass, Nash Lee Road, Risborough Road, Station Road, New Road and vice versa. The closure is required whilst surface dressing works take place commencing on 1st January 2018 between 0700 and 1900. The proposed Order will come into operation on 1January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council has made The Buckinghamshire County Council (Frogmoor, High Wycombe) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Frogmoor outside number 5. Alternative route: Frogmoor, Oxford Street, Oxford Road, Arch Way and Glenisters Road. The closure is required whilst sewer cover replacement works take place commencing on 4January 2018 between 2100 and 0200. The proposed Order will come into operation on 4January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council has made The Buckinghamshire County Council (Grove Lane, Great Kimble in the Parish of Great and Little Kimble cum Marsh CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Grove Lane from Station road to Grove Lane under the train bridge. Alternative route: Grove Lane, Lower Icknield Way, Thame Road, Longwick Road, Aylesbury Road, Risborough Road and Station Road. The closure is required whilst water service works take place commencing on 06 January 2018. The proposed Order will come into operation on 06 January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council intends to make The Buckinghamshire County Council (B482 Marlow Road, Marlow in the Parish of Great Marlow CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in B482 Marlow Road outside Spital Croft. Alternative route: Marlow Road, Clay Lane, Cressex Road, Holmers Farm Way, New Road, John Hall Way, Handy Cross Roundabout, A404 M40 J4 Roundabout, A404 From M40 To A4155, M40 Junction 4From Junction 3Off Slip, A404 From M40 J4 Roundabout To JA4155 S, A404 Southbound Off Slip To A4155, A404 JA4155 Leave S, A404 Through JA4155 S, Little Marlow Road, Chapel Street, Dean Street, Seymour Court Road and Berwick Road. The closure is required whilst new water connection works take place commencing on 8January 2018 between 19:00 and 05:30. The proposed Order will come into operation on 8January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council intends to make The Buckinghamshire County Council (Winchbottom Lane, Flackwell Heath in the Parish of Little Marlow CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Winchbottom Lane for 70 metres from Valley View Cottage. Alternative route: Winchbottom Lane, Marlow Road, School Lane, Sheepridge Lane and Heath End Road. The closure is required whilst cabling works take place commencing on 9January 2018 between 0930 and 1530. The proposed Order will come into operation on 9January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council intends to make The Buckinghamshire County Council (Hammersley Lane, Tylers Green in the Parish of Chepping Wycombe CP) (Temporary Prohibition of Through Traffic) Order, 2017 which will temporarily prohibit any vehicle from proceeding, except for access, in Hammersley Lane outside number1. Alternative route: Hammersley Lane, London Road, Knaves Beech, White Hill, Wycombe End, Burkes Road, Station Road, Penn Road, Witheridge Lane, Church Road, School Road and Elm Road. The closure is required whilst new gas connection works take place commencing on 8January 2018. The proposed Order will come into operation on 8January 2018, as signed, with maximum 18 months duration. Dated: 22 December 2017 The Council intends to make The Buckinghamshire County Council (Fieldhouse Lane, Marlow) (Temporary Prohibition of Waiting) Order, 2018, which will temporarily prohibit any vehicle from waiting in Fieldhouse Lane, Marlow which commences opposite Parkway between junctions for full length, Westside junction protection marking for 20 meters at each junction and 10 meters from entrance to Luna House. The restriction is required to ensure access is maintained for works to take place commencing on 14 January 2018 for 18 months. The proposed Order will come into operation on 14 January 2018, as signed, with amaximum duration of 18 months duration. Dated: 22 December 2017.
Recommended publications
  • CFA10, Dunsmore, Wendover and Halton
    AP ES Volume 2 CFA10, Dunsmore, Wendover and Halton 5 Overview of the amendments 5.1.1 Table 3 provides a summary of the amendments in the Dunsmore, Wendover and Halton community forum area (CFA10) and Figure 4 shows the locations. Figure 4: Locations of amendments in the Dunsmore, Wendover and Halton area © Crown copyright and database rights 2014 Ordnance Survey Licence Number 100049190 18 AP ES Volume 2 Table 3: Summary of amendments in the Dunsmore, Wendover and Halton area (CFA10) CFA Amendments Description of the original scheme Description of the revised scheme 10 Additional land The temporary reconductoring (i.e. re-stringing of overhead power lines) Additional land is required temporarily to erect scaffolding to support required for utility as part of the works to realign the 400kV overhead power lines 50m to the netting over the Marylebone to Aylesbury Line in order to undertake the works and access to south of their existing route south of Wendover. reconductoring works. Additional land is also required temporarily for a the south of Small working area to undertake the reconductoring works to the pylon south Dean Lane of Small Dean Lane. AP1-010-003 10 Additional land The temporary diversion, 70m to the south, of the existing 400kV The amendment relates to additional land required temporarily for a required for utility overhead power line, with permanent reinstatement along its existing working area to undertake the works to one temporary pylon to the north works to the north alignment west of Wendover. of Wellwick Farm. of Wellwick Farm AP1-010-004 10 Change to land The permanent realignment of Nash Lee Lane and junction with B4009 The road layout requires additional land to reconfigure the junction and required for Nash Lee Road and provision of a junction for maintenance access to the an amendment on the Bill plans and in the Bill to the description of the reconfiguration of original scheme.
    [Show full text]
  • Buckinghamshire Care and Support Services Directory 2014/15
    Buckinghamshire Care and Support Services Directory 2014/15 Georgian neoclassical Stowe School in Aylesbury Information and advice on choosing and paying for your care and support Home support • Housing options • Care helpline • Care homes Publications In association with www.buckscc.gov.uk At Centurion Care we aim to provide a quality service to meet residents’ individual care needs –social, emotional, spiritual and physical. Our approach is one that allows residents to retain the right to dignity, privacy, choice, independence and fulfilment. Chilterns Manor 24 hour residential care • Single rooms, all with call bells • Highly trained staff and Personalised Care Plans • Comfortable lounge and dining areas • Beautiful landscaped gardens • Home cooked food prepared by our chef • Activities programme Telephone: 01628 528676 Northern Heights, Bourne End, Buckinghamshire SL8 5LE Chartridge Lane Residential care for adults with learning disabilities • Person-centred approach • Residents are actively supported to maintain their skills • Promotes “self direction, social inclusion and participation” • Empowering individuals to make informed decisions 69 Chartridge Lane, Chesham, Bucks HP5 2RG Telephone: 01494 810117 Brook House 24 hour nursing care • Qualified nursing staff and Personalised Care Plans • 35 bedrooms offer all the facilities to ensure comfort and care • Positive approach to individual care • Nurse call systems are fitted in all bedrooms • Varied activities programme • Home cooked meals prepared by our chef Telephone: 01628 528228 28 The Green, Wooburn Green, Buckinghamshire HP10 0EJ Penley Grange Residential care for adults with learning disabilities • Specialising in challenging behaviour and/or autism • Professional and dedicated fully trained support workers • Holistic approach to service provision in accordance with each person’s needs and aspirations, which encompasses all aspects of social support, leisure and recreation.
    [Show full text]
  • 158 Marlow – High Wycombe
    Marlow County Rider Marlow - High Wycombe Marlow - Maidenhead (Wednesdays Only) 155 / 158 / 160 MONDAY-FRIDAY Excluding bank holidays MONDAY, TUESDAY, THURSDAY & FRIDAY ONLY WEDNESDAYS ONLY 160 160 160 155 155 155 Marlow Court Garden 0905 1145* 1400* Maidenhead Frascati Way 1230 Marlow High Street 0906 1146 1401 Furze Platt 1237 Marlow Brittania 0910 1150 1405 Marlow Court Garden depart 0905 | 1345 Little Marlow Winchbottom Lane 0911 1151R 1406R Marlow High Street 0906 | 1346 Little Marlow Church Road 0915 1155R 1410R Marlow Brittania 0910 | 1350 Westhorpe Caravan Park 0919 1159 1414 Little Marlow Winchbottom Lane 0911 1245R 1351R Marlow Wiltshire Road 0926 1206 1421 Little Marlow Church Road 0915 1249R 1355R Marlow Bottom High Heavens Wood 0932 1212 1427 Westhorpe Caravan Park 0919 1253 1359 Marlow Bottom Post Office 0936 1216 1431 Marlow Wiltshire Road 0926 1300 1406 Hillside Woodland Way 0938 1218 1433 Marlow Bottom High Heavens Wood 0932 1306 1412 Marlow Oak Tree Road Shops 0939 1219 1434 Marlow Bottom Post Office 0936 1310 1416 Marlow High Street 0942 1222 1437 Hillside Woodland Way 0938 1312 1418 Marlow Court Garden 0943 1223 1438 Seymour Park Road 0939 1313 1419 Sunnybank | 1315 | 160 160 Sandy Gate Road 0943 1317 1423 Marlow Court Garden 0945 1225 Terrington Hill 0947 | | Pound Lane 0946 1226 Pound Lane 0952 | | Terrington Hill 0952 1232 Marlow Court Garden arrive 0953 1327 1427 Sandy Gate Road 0956 1236 Marlow Court Garden depart 0955 Sunnybank 0958 1238 Marlow High Street 0956 Hillside Woodland Way | 1240 Marlow Brittania 1000
    [Show full text]
  • HS2 Draft Environmental Statement Buckinghamshire Councils
    HS2 Draft ES: response of the Buckinghamshire Councils HS2 DRAFT ENVIRONMENTAL STATEMENT Buckinghamshire Councils response part 3 CFA 10 Dunsmore, Wendover and Halton The area is within the Chilterns AONB – a nationally recognised and protected landscape. We feel, however, that the draft ES does not fully recognise this and suggests poor and inadequate mitigation. There are serious concerns about the impact of the maintenance loop on this community area; a concern compounded by the fact that no noise assessment has been carried out. There is also serious concern about the disruption that will be caused by HGV traffic in the area, particularly with regards to the use of some of the narrower, more rural roads. The impact of construction and operation on the setting of grade II* listed buildings within Wendover are not adequately assessed – particularly in the case of St Mary’s church, an active place of worship within 200m of the green tunnel portal. Comments on Part B: Description of the proposed scheme 2.2.2 We are concerned about impact of the maintenance loop on the wider landscape. There is very little information on the visual appearance and operation of the maintenance loop given. 2.2.5 Further, the HS2 route and maintenance loop will be on an embankment in this area increasing its visibility. We are concerned about the impact of this in particular since the draft ES suggests that Risborough Road over bridge would rise to 15m. Appropriate assessment of the visual impact and mitigation is crucial but currently not included in the draft ES.
    [Show full text]
  • Minutes of Oral Evidence
    PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE On the HIGH SPEED RAIL (LONDON – WEST MIDLANDS) BILL Wednesday, 18 November 2015 (Afternoon) In Committee Room 5 PRESENT: Mr David Crausby (Chair) Mr Henry Bellingham Sir Peter Bottomley Geoffrey Clifton-Brown Mr Mark Hendrick _____________ IN ATTENDANCE Mr Timothy Mould QC, Lead Counsel, Department for Transport Mr Marcus Rogers WITN ESSES Mr Ne il Ta ylo r Mr Antony Pearce Mr Yazd i Batki Mr David Starr Mrs Eileen Stewart Mr Paul Walter Mr John Jakobi Mr Paul Gaisford Ms Ruth Ga is fo rd Ms Ama nia C la rk Mr John Vince Mr John Cooper and Mrs Christine Cooper Ms Trisha Woodcock _____________ IN PUBLIC SESSION INDEX Subject Page The Lord Carrington’s 1963 Settlement Introduction from Mr Mould 3 Submissions by Mr Taylor 4 Response from Mr Mould 6 Antony Pearce Introduction from Mr Mould 7 Submissions by Mr Pearce 8 Response from Mr Mould 13 Stoke Mandeville Parish Council, Stoke Mandeville Action Group and others Introduction from Mr Mould 17 Submissions by Mr Rogers 19 Evidence of Mr Starr 22 Evidence of Mrs Stewart 24 Evidence of Mr Rogers 26 Evidence of Mr Walter 27 Evidence of Mr Jakobi 28 Response from Mr Mould 30 Closing submissions by Mr Rogers 39 Michael Gaisford and others Introduction from Mr Mould 43 Submissions by Mr Gaisford 43 Submissions by Ms Gaisford 46 Response from Mr Mould 51 Closing submissions by Mr Gaisford 60 Ama nia C lark Introduction from Mr Mould 61 Submissions by Ms Clark 62 Response from Mr Mould 64 John Vince Introduction from Mr Mould 66 Submissions by Mr Vince 66 Response from Mr Mould 68 John and Christine Cooper Introduction from Mr Mould 70 Submissions by Mr Cooper 71 Response from Mr Mould 74 Tenants of Layby Farm Business Park Introduction from Mr Mould 75 Submissions by Mrs Woodcock 76 Response from Mr Mould 79 2 (at 14.00) 1.
    [Show full text]
  • Local Government Commission for England with the Permission of Controller Her Majesty's Stationery Office, © Crown Copyright
    P School R I ROAD M REES R D T O A S O E R H Y I L E NUE L L L Recreation M VE L AI EES A HI N R LOCAL GOVERNMENT COMMISSION FOR ENGLAND N R T 'S Naphill Common Ground OA E W D RG O 8 EO D 2 1 G 4 A Cryers Hill S U Allotment Gardens E N N N A Y D L A CO Widmer End L E B OM O BE IL V A L LA R O N PERIODIC ELECTORAL REVIEW OF WYCOMBE O NE L M K BRACKLEY ROAD D R U IL G C IN H H D W L E NE S E S LA R I L BE E F A OM Y H N CO R S E A C D School S HILL BRIMMER CR Y L Final Recommendations for Ward Boundaries in High Wycombe ER O S W H E King George's IL R L D L L L L I L A A H A Field N O C V O E D IT E A R G November 2001 R P Y E LL S S O W L E B A A D E S R H E N Y R E I S V T E R A S O R R A U ID D O E F K E S Hunt's Hill E T CEDAR A U R VENUE N E BRADENHAM CP E L V D R EN A Recreation ARR L A LANE E W IL 4 ILL TH H 0 S H Ground S 1 UNT L 0 H O Uplands U G H L D A A N O Schools R I WAY E GREATER HUGHENDEN WARD N GER BLEDLOW AND BRADENHAM WARD H E K BAD E T N R R A 04 L M 4 O T A A N U H N N A T Z D S L R E E IV H M E C E R E HAZLEMERED NORTH WARD V EA I BLEDLOW-CUM-SAUNDERTON CP M E HUGHENDEN CP S W Y EAS AR A M TER 4 N 1 D 2 EN 8 E D A O R M NORTH PARISH WARD A P H A S R R K E D LA M A NE A O R N DOWNLEY CP E E R G Golf Course L Four Ashes R E CH S U E T R E C M R H L L L G O A O X NE R B BE HAZLEMEREH CP O AUMONT W RO AY HI LL DOWNLEY AND PLOMER HILL WARD Downley M RO Common AD GRE EN STREET B R A D G E R N O K H V I A N E M G R R S O T SOUTH PARISH WARD O H A R A I D L I D N L P Recreation I E R T H NN Y IG O HFI R Ground R ELD O A W
    [Show full text]
  • Playground Improvements
    LITTLE MARLOW PARISH COUNCIL YOUR COUNCIL FOR YOUR AREA NEWSLETTER NO: 34 AUTUMN/WINTER 2017 1 Dear Little Marlow Resident, It is that time of year again when the days get shorter, the sky turns greyer, the temperature drops and then just to cheer you up, the Autumn/Winter edition of the Little Marlow Parish newsletter lands on your door-mat! This is another bumper edition with lots of news about what has been going on in Little Marlow, what your Parish Council has been doing on your behalf and what some of our local organisations and clubs are up to. Regular readers will know that the Autumn/Winter edition usually includes a copy of the Annual Report which the Chairman gives every year at the Annual Parish meeting in May. If you want to know what your Parish Council has achieved in the past year, that would be a good place to start. Thanks in large part to Emma, our very active Clerk, the Council, has initiated a number of improvements around the Parish over the summer. Details are in the articles on the Spade Oak Car Park, the Brig (!), Abbotsbrook Hall and the Cemetery. We are conscious that the Pavilion is looking rather the worse for wear. Read the article on the Pavilion to see what we are going to do about it! The Pavilion provides a venue for a number of organisations including the Little Marlow Pre-school. I am sure that you will wish to join me in congratulating the Pre-school for winning a Highly Commended award in the Pre-school of the Year category in the annual National Nursery World awards.
    [Show full text]
  • Buckinghamshire and Oxfordshire Summer 2021 3-Month Construction Look Ahead
    Buckinghamshire and Oxfordshire Summer 2021 3-month construction look ahead Buckinghamshire and Oxfordshire Summer 2021 This forward look covers HS2 associated work in Buckinghamshire and Oxfordshire. The document includes: • A forward look of construction activities planned in the next three months • Works to be aware of that will take place in the next 12 months, but may not yet have been confirmed The dates and information included in the forward look are subject to change as programme develops. These will be updated in the next edition of the forward look. If you have any queries about the information in this forward look, the HS2 Helpdesk is available all day, every day on 08081 434 434 or by emailing [email protected] Page 2 Buckinghamshire and Oxfordshire Contents Map 1 – Turweston to Mixbury................................................................................................ 4 Map 2 – Finmere to Twyford .................................................................................................... 7 Map 3 – Calvert ....................................................................................................................... 10 Map 4 – Quainton ................................................................................................................... 12 Map 5 – Waddesdon to Stoke Mandeville ............................................................................ 14 Map 6 – Wendover .................................................................................................................
    [Show full text]
  • Buckinghamshire and Oxfordshire Spring 2021 3-Month Construction Look Ahead Buckinghamshire and Oxfordshire
    Buckinghamshire and Oxfordshire Spring 2021 3-month construction look ahead Buckinghamshire and Oxfordshire Spring 2021 This forward look covers HS2 associated work in Buckinghamshire and Oxfordshire. The document includes: • A forward look of construction activities planned in the next three months • Works to be aware of that will take place in the next 12 months, but may not yet have been confirmed The dates and information included in the forward look are subject to change as programme develops. These will be updated in the next edition of the forward look. If you have any queries about the information in this forward look, the HS2 Helpdesk is available all day, every day on 08081 434 434 or by emailing [email protected] Page 2 Buckinghamshire and Oxfordshire Contents Map 1 – Turweston to Mixbury................................................................................................ 4 Map 2 – Finmere to Twyford .................................................................................................... 6 Map 3 – Calvert ......................................................................................................................... 9 Map 4 – Quainton ................................................................................................................... 11 Map 5 – Waddesdon to Stoke Mandeville ............................................................................ 13 Map 6 – Wendover .................................................................................................................
    [Show full text]
  • Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 10 | Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 10 I Dunsmore, Wendover and Halton High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/10 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10 I Contents Contents Draft Volume 2: Community Forum Area Report – Dunsmore, Wendover and Halton/No 10 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2
    [Show full text]
  • No.138, Winter 2005/2006
    THE HIGH WYCOMBE SOCIETY MERRY MERRY CHRISTMAS newsletter CHRISTMAS NUMBER 138 WINTER 2005/2006 After Eden AT LAST the reshaping of our historic market town has begun. Bridge Street Car Park, called the “Western Desert” by our predecessors 30 years ago, no longer contains cars, but is a massive construction site humming with activity from cranes and giant drilling rigs. The new bus station will be operational in 2006, and the new shops from early 2008. Across the Oxford Road, the new Sainsbury’s will displace Magnet and Blockbuster, making a dramatic new approach to the town from the west. Much work has been going on to ensure that the close-up experience is good too, with our Society about to play its part in a competition for “public art” for the new development. A lot of thought is now going on to make sure that the roof and what is placed upon it are not a blot upon cherished views from above (see page 8). That is just the start. Already Wycombe District Council has declared its intention, in due course, to move the A40, dismantle Abbey Way and open up the River Wye. Now, in the remarkable public consultation called “Imagine the Future”, that vision is being filled out further. Can the green of the “magic roundabout” at the foot of Marlow Hill be reclaimed for townspeople? What new vistas can be opened up linking the old town with the new? Elsewhere in our region there is widespread cynicism over public consultation, but Wycombe District’s planning department takes public consultation seriously.
    [Show full text]
  • 2015 - 2016 Annual Network Update Plans Definition of Terms
    2015 - 2016 Annual Network Update Plans Definition of Terms Site Status Definition: Site Built: Site is built but may or may not be taking call traffic. To open the Annual Network Update Plans for each operator please click on the relevant tab at the bottom left hand corner of this spreadsheet. Three - Annual Network Update Plans Spreadsheet 2015 - 2016 Operator Definitions: Three - a site operated by Three only Three & EE- a consolidated site operated jointly by Three and EE Limited Please note that consolidated sites are shown on both Three and EE's 2015 - 2016 Annual Network Update Plans. EE Limited (T-Mobile & ex Orange) and Three, through their joint venture company, Mobile Broadband Network Ltd (MBNL) has consolidated their 3G networks. This has resulted in the joint use of existing base station site infrastructure & hardware which results in one set of equipment on site and is enabling the reduction of duplicate sites. For Enquiries relating to the Annual Network Update Plans for Three please contact : William Comery, Community Affairs Manager - [email protected] or Mark Shaw, Health & Safety & Community Affairs Manager - [email protected] Authority National Parks Operator Operator Reference Easting Northing Site Name Site Address Post Code Status Wycombe Three and EE 26413 486300 188200 PUMP FARM - 2505 153697 O2 2505, Pump Farm, Marlow, Bucks SL7 3RB Site Built Wycombe Three and EE 26365 484932 191036 WYCOMBE BADMINTON CENTRE Wycombe Badminton Centre, Crest Road, High HP11 1UA Site Built 187914 Wycombe, Buckinghamshire Wycombe Three and EE 23206 482890 198890 HIGH WYCOMBE PWQH NORTH MD High Wycombe Pwqh North MD, Naphill, High HP14 4TZ Site Built 221524 Wycombe, Bucks Wycombe Three and EE 23196 487701 191111 CHEPPING WYCOMBE (THS) 7341 CHEPPING WYCOMBE, Abbey Barn Lane, HP10 9QQ Site Built Flackwell Heath, High Wycombe, Bucks.
    [Show full text]