/\/\OUNTAIN CREE ASINI WACHI NEHIYAWAK/Bobtail Descendants Traditional Band Administrative Office 718 * Blackfalds, Alberta * CANADA TOM OJO * 1-403-885-2991 www.inewhistory.com c/o
[email protected] ____________________________________________________________________________________________ MOUNTAIN CREE Position Paper NOVA GAS TRANSMISSION LTD. 2017 System Expansion Project File 0F-Fac-Gas-N081-2014-20 02 National Energy Board Hearings 2015 May 2016v2 prepared by J. Fromhold, Ph.D. (pend.), C.B.A., C.E.O. Mountain Cree Band ISBN 978-1-365-32357-7 Copyright 2016 J. Fromhold /\/\OUNTAIN CREE (ASINI WACHI NEHIYAWAK/Bobtail Descendant Traditional Band) ____________________________________________________________________________________________ MOUNTAIN CREE Position Paper NOVA GAS TRANSMISSION LTD. 2017 System Expansion Project File 0F-Fac-Gas-N081-2014-20 02 National Energy Board Hearings 2015 PREAMBLE In July of 2016 the Asini Wachi Nehiyawak Band (AWNTB) was contacted by the Major Projects Management Office (MPMO) of Natural Resources Canada to inquire if AWNTB would be willing to meet with MPMO representatives and other Government representatives to discuss AWNTB concerns about the National Energy Board Hearings into the NOVA GAS TRANSMISSION LTD. 2017 System Expansion Project. Specifically, the question posed were • What are your outstanding concerns with respect to project-related impacts on your Aboriginal and treaty rights – particularly for issues that may not be captured in the NEB’s proposed conditions? • What accommodation measures might you propose to address these outstanding concerns? AWNTB has prepared the following summary. /\/\OUNTAIN CREE (ASINI WACHI NEHIYAWAK/Bobtail Descendant Traditional Band) ____________________________________________________________________________________________ CONTENTS Preamble 3 Table of Contents 4 Abbreviations Statement of Limitations Position Statement 5 Issues 6 A. Failure to Consult B.