Erl Salak Tinggi to Kl Sentral Schedule
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
READY-MIXED CONCRETE / Points of Sale Listing Points of Sale Map
READY-MIXED CONCRETE / Points of Sale Listing Points of Sale Map Kota Bharu Balik Pulau Bayan City Changkat Sri Sinar (Segambut) Mont Kiara Salak Kuchai Klang Kinrara Kajang Saujana Putra Balakong Bangi Nilai Skudai Points of Sale Senai 01 PULAU PINANG Bertam Balik Pulau Lot 2085, MK 6, Jalan Bertam, Lot 392, MK F, D.B.D., Jalan Balik Pulau, 13200 Kepala Batas, Pulau Pinang. 11000 Balik Pulau, Pulau Pinang. Juru Machang Bubok Lot 6673, MK 11, Bukit Tengah, Lot 1680, MK 17, Jalan Kulim Batu Tiga, 14000 Bukit Mertajam, Pulau Pinang. 14007 Bukit Mertajam, Pulau Pinang. Bayan City Changkat No. 9596 & 15054, Jalan Mayang Pasir, Lot 1498, Jalan Changkat, Bayan Baru, 11950 Bayan Lepas, 14300 Nibong Tebal, Pulau Pinang. Pulau Pinang. PERLIS Bayan City Jalan Ulu Pauh, Padang Besar, Kampung Tengah, 02600 Ulu Pauh, Perlis Indera Kayangan. PAHANG PAHANG Cameron Highland Lembah Ruil, Lot 353, PN 2519, Mukim Tanah Rata, Cameron Highland, Pahang Darul Makmur. 02 KEDAH Mergong Sungai Ular PT 1215, Kawasan Perindustrian Mergong, Lot 8, Bandar Seri Mahkota, Batu 5, Jalan Lencong Barat, 05150 Alor Setar, Kampung Sungai Ular, 09000 Kulim, Kedah Darul Aman. Kedah Darul Aman. KELANTAN Kota Bharu Gua Musang Lot 76, Off Jalan Jambatan Sultan Yahya Petra, Kuala Betis Estate, 18300 Gua Musang, Mukim Kampung Sireh, 15050 Kota Bahru, Kelantan Darul Naim. Kelantan Darul Naim. KUALA LUMPUR Mont Kiara Sri Sinar Lot 2065, Jalan Bukit Prima Pelangi, Lot 440B (Pembancuh Simen), Jalan Lang Emas, Taman Prima Pelangi, Segambut, Taman Sri Bintang, Kepong, 52100 Kuala Lumpur, 51200 Kuala Lumpur, Wilayah Persekutuan. Wilayah Persekutuan. Kuchai Lot 1247, 1248 & 1249, Loji Pembancuh Simen, Jalan 1/127 Off Jalan Kuchai Lama, Taman Gembira, 58200 Kuala Lumpur, Wilayah Persekutuan. -
Media Release Final Tunnel Boring Machine Breakthrough for the Mrt Putrajaya Line
MEDIA RELEASE FINAL TUNNEL BORING MACHINE BREAKTHROUGH FOR THE MRT PUTRAJAYA LINE Kuala Lumpur, 17 July 2020: The MRT Putrajaya Line (previously known as the MRT Sungai Buloh-Serdang-Putrajaya Line) saw its final tunnel boring machine (TBM) breakthrough at the Ampang Park MRT Station site today, marking a major milestone for the project. The TBM, codenamed TBM 774, was launched in September 2019 from Conlay MRT Station site and excavated a section of the MRT tunnel beneath Jalan Stonor, Persiaran KLCC, Jalan Binjai and Jalan Ampang as well as the LRT Kelana Jaya Line tunnels to the Ampang Park MRT Station site, a distance of 917 metres. The breakthrough – where a TBM completes its excavation work and bores through the wall and breaks into a station box or shaft – was witnessed by Datuk Mohd Zarif Hashim, the newly appointed Chief Executive Officer of Mass Rapid Transit Corporation Sdn Bhd (MRT Corp). “We congratulate MMC Gamuda for the TBM breakthrough today. This is a major milestone for the project,” he said during the event. He added that today’s breakthrough also showed that the project was able to achieve good progress despite the Covid-19 pandemic. Also present at the breakthrough were MRT Corp’s Project Director MRT Putrajaya Line Dato’ Amiruddin Ma’aris, MMC Gamuda KVMRT (PDP SSP) Sdn Bhd Directors Dato’ Ir Paul Ha and Datuk Seri Che Khalib Mohd Noh as well as MMC Gamuda MRT Putrajaya Line Project Director Dato’ Wong Wai Ching. MMC Gamuda is the turnkey contractor for the construction of the MRT Putrajaya Line. -
Section 7 Potentially Significant Impacts and Mitigation Measures During the Operation Stage
Section 7 Potentially Significant Impacts and Mitigation Measures During The Operation Stage Proposed Light Rail Transit Line 3 from Bandar Utama to Johan Setia Detailed Environmental Impact Assessment SECTION 7 : POTENTIALLY SIGNIFICANT IMPACTS AND MITIGATION MEASURES DURING THE OPERATIONAL STAGE 7. SECTION 7 : POTENTIALLY SIGNIFICANT IMPACTS AND MITIGATION MEASURES DURING THE OPERATIONAL STAGE 7.1 INTRODUCTION This section of the report examines the potentially significant impacts that could arise during the operational phase of the Project. The impacts are assessed in terms of magnitude, prevalence, duration and frequency of occurrence whichever is applicable, and their consequences. This section also discusses the mitigation measures which can be implemented to ensure the adverse impacts are kept to a minimum. 7.2 SENSITIVE RECEPTORS The receptors of the potential impacts from the Project would include all the various communities and land uses located along the alignment, which have been identified and described in Section 4.4 of this report. 7.3 POTENTIALLY SIGNIFICANT IMPACTS The main potentially significant impacts expected during the operational stage are as follows: Noise – from the operation of the trains, especially for premises located close to the station and at bends Vibration – from the operation of the trains, particularly along the underground section Traffic – the Project is expected to contribute the overall traffic improvement, particularly at Klang areas Visual impacts – the elevated structures may affect the existing landscape along certain stretch of the alignment, particularly at residential areas Air quality – the Project is expected to contribute to overall air quality improvement in the Klang Valley in terms of avoided emissions Social impacts – people in Klang, Shah Alam and Petaling Jaya are expected to benefit in terms of better public transport system as well as enhanced economic activities, especially those located within the certain radius of the stations. -
The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in the Klang Valley and Kuala Lumpur, Malaysia
JOURNAL OF SOCIAL TRANSFORMATION AND REGIONAL DEVELOPMENT VOL. 2 NO. 2 (2020) 1-10 © Universiti Tun Hussein Onn Malaysia Publisher’s Office Journal of Social Transformation JSTARD and Regional Journal homepage: http://publisher.uthm.edu.my/ojs/index.php/jstard Development e-ISSN : 2682-9142 The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in The Klang Valley and Kuala Lumpur, Malaysia Mohd Sahrul Syukri Yahya1*, Edie Ezwan Mohd Safian1, Burhaida Burhan1 1Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, MALAYSIA *Corresponding Author DOI: https://doi.org/10.30880/jstard.2020.02.02.001 Received 20 July 2020; Accepted 30 October 2020; Available online 30 December 2020 Abstract: The development and distribution pattern of the railway network has significantly increased in urban public transport with the current situation to move fast towards the fourth industrial revolution (4IR). In Malaysia, the problem issues are related to traffic congestion and many user cars on the roadway in daily lives. One alternative mode of using a rail network is commuter, LRT, Monorail, MRT and ETS. Therefore, the Geographic Information System (GIS) technology is then used to map and produce the railway networks history and developments in urban public transportation (UPT). The goal of this research is to identify the heatmap trends of the Klang Valley railway stations which included Kuala Lumpur as urban public transport sectors. It was based on the OSM image layer from the year 1990 to 2019 and studied the growth of railway networks through a polyline pattern analysis. -
Economic Performance and Prospects
(FRQRPLF 3HUIRUPDQFHDQG 3URVSHFWV Chapter 3.indd 47 9/30/11 4:42:27 AM 48 Chapter 3.indd 48 9/30/11 4:42:27 AM Economic Performance and Prospects Overview by the Government such as tax incentives and liberalisation measures to attract investment, Economy continues to expand particularly in the oil and gas as well as services sectors. Public expenditure is envisaged to remain he Malaysian economy continued to expand supportive of economic activities with expansion Tdespite the more challenging external in capital spending by the Non-Financial Public environment. Real Gross Domestic Product Enterprises (NFPEs). (GDP) registered a growth of 4.4% during the first half of 2011. The moderation was On the supply side, all sectors are expected due to slowing exports following the weaker- to post positive growth, except mining due than-expected United States (US) economic to lower production of crude oil. In tandem performance, deepening euro sovereign debt with robust private consumption, the services crisis, global supply chain disruptions resulting sector is envisaged to grow strongly led by from earthquake and tsunami in Japan as well the wholesale and retail trade, finance and as rising global inflation. The moderation was insurance, real estate and business services as also partly attributed to the high-base effect well as communication sub-sectors. Despite the as GDP grew at a strong pace of 9.5% during contraction in output of electrical and electronics Economic Performance and the same period in 2010. However, the growth (E&E) and transport equipment in the first half momentum is expected to pick up in the second of 2011, the manufacturing sector is expected to half of the year on the back of resilient private record positive growth supported by strong output Prospects consumption and strong private investment. -
Section 3 Project Description Projek Mass Rapid Transit Laluan 2 : Sg
Section 3 Project Description Projek Mass Rapid Transit Laluan 2 : Sg. Buloh – Serdang - Putrajaya Detailed Environmental Impact Assessment SECTION 3 : PROJECT DESCRIPTION 3. SECTION 3 : PROJECT DESCRIPTION 3.1 INTRODUCTION The main objective of the Project is to facilitate future travel demand in the Klang Valley and to complement the connectivity to Kuala Lumpur by improving the current rail coverage and increasing accessibility of public transport network to areas not currently served or covered by public transport. The SSP Line will serve the existing residential areas, minimize overlapping with existing rail service and provide convenient access to Kuala Lumpur city centre. This section describes the Project in terms of the proposed alignment and stations, the planning and design basis, operation system and the construction methodology. 3.2 PLANNING AND DESIGN BASIS The over-arching principles in the development of the KVMRT is even network coverage, entry into the city centre, location of stations in densely populated areas and ability to sustain future expansion. The GKL/KV PTMP has identified key issues in the rail network such as capacity and quality of existing systems, integration between modes, gaps in network coverage and mismatch in land use planning. Considering the gap in the network, particularly in the northwest – southern corridor, the SSP Line is designed to serve the city centre to Sg Buloh, Kepong, Serdang and Putrajaya areas. The SSP Line will traverse through high density residential and commercial areas and has the capacity to move large volumes of people from the suburban areas to the employment and business centres. In terms of planning basis, the main objectives of the Project are as follows:- • To meet the increasing demand for rail based urban public transportation • To increase the railway network coverage and its capacity • To provide better integration between the new SSP Line and existing rail lines such as LRT, Monorail, SBK Line and KTM lines as well as the future High Spee Rail. -
Klang Valley Rail Transit Map April 2020
Klang Valley Rail Transit Map April 2020 2 P Tanjung Malim 5 P Kuala Kubu Baru Gombak P 1 P Rasa Taman Melati P Batu Caves P Batang Kali Wangsa Maju P P P P Serendah Taman Wahyu P P Sri Rampai P 3 Sri Sri P Metro P Rawang Damansara Damansara Kepong Sri Prima Ampang P Sentral Timur Baru Jinjang Delima 4 3 Setiawangsa P P Kuang Sentul Cahaya Kampung P Jelatek P Sri Batu P Timur P Damansara Kepong Sentral P Barat P Kentonmen Dato’ Keramat Kepong Damansara Batu Kentomen Damai Cempaka P Sentul P Jalan Damai Ipoh *Sungai Sentul P P P Segambut Sentul Buloh Pandan Indah P Barat Hospital Raja Ampang *Kampung Titiwangsa Kuala Lumpur Uda Park Selamat *Rubber Research Institute 8 KLCC Pandan Jaya P *Kwasa Chow Kit P Damansara 9 12 Putra PWTC Medan Tuanku Kampung Baru Persiaran KLCC Kwasa P Sentral Sultan Ismail Dang Wangi Bukit Nanas Kota Conlay Damansara Raja Chulan Surian Bank Negara Bandaraya Tun Razak Mutiara Exchange (TRX) Damansara Bukit Bintang Cochrane Maluri P Bandar Bukit Bintang P Masjid Utama Jamek Imbi S01 P Miharja P Plaza Hang Rakyat Tuah Pudu S02 Taman Tun 11 Dr Ismail Taman Pertama Chan Phileo P Merdeka Sow Lin Damansara Taman Midah P S03 P Kuala Lumpur Cheras Taman Mutiara Bukit Kiara Bandar Malaysia P Muzium Negara Pasar Utara Seni Maharajalela Taman Connaught S04 Salak Selatan P KL Sentral P Bandar Malaysia Taman Suntex Selatan P P Tun Sambanthan Semantan KL Sentral 8 Pusat Bandar Sri Raya P S05 Damansara P Mid Valley Seputeh Salak Selatan Bandar Tun Bandar Tun Razak P Hussein Onn 10 Bangsar P P P P P S06 Batu 11 Cheras Skypark -
Eleventh Malaysia Plan 2016-2020 Anchoring GRowth on People
ELEVENTH MALAYSIA PLAN 2016-2020 ANCHORING G ROWTH ON PEOPLE ISBN 978-9675842085 For further information refer to: Director General, Economic Planning Unit, Prime Minister’s Department, Block B5 & B6, Federal Government Administrative Centre, 62502 Putrajaya. MALAYSIA. http://www.epu.gov.my email: [email protected] Tel.: 603-8000 8000 Fax: 603-8888 3755 Released on 21st May 2015 Reprinted on 29th May 2015 Publisher’s Copyright© All rights reserved. No part of this publication may be reproduced, copied, stored in any retrieval system or transmitted in any form or by any means – electronic, mechanical, photocopying, recording or otherwise; without prior permission of Economic Planning Unit, Prime Minister’s Department, Malaysia. Printed by Percetakan Nasional Malaysia Berhad, Kuala Lumpur, 2015 www.printnasional.com.my Email: [email protected] Tel: 03-92366895 Fax: 03-92224773 ELEVENTH MALAYSIA PLAN 2016-2020 ANCHORING G ROWTH ON PEOPLE Foreword Dato’ Sri Mohd Najib bin Tun Haji Abdul Razak Prime Minister of Malaysia i The Eleventh Malaysia Plan, 2016-2020, marks a momentous milestone in our nation’s history. With 2020 now just five years away, the Eleventh Plan is the next critical step in our journey to become an advanced nation that is inclusive and sustainable. In the last five years, although Malaysia encountered headwinds from a global economic slowdown, our economy has done extremely well with GDP growth among the fastest in the region. The quality of life of the rakyat has also improved as reflected by the increase in both per capita income and the average household income. This was made possible by the numerous reforms that were put in place by the Government to improve the quality of life of the people. -
Kuala Lumpur, Malaysia's Dazzling Capital City
CONTENTS 4 DOING THE SIGHTS 38 SENSATIONAL SHOPPING 5 Prestigious Landmarks 39 Shopping Malls 6 Heritage Sites 42 Craft Centres 10 Places of Worship 43 Street Markets and Bazaars 12 Themed Attractions 44 Popular Malaysian Souvenirs 14 TROPICAL ENCLAVES 45 EATING OUT 15 Perdana Botanical Gardens 46 Malay Cuisine 16 KLCC Park 46 Chinese Cuisine 17 Titiwangsa Lake Gardens 46 Indian Cuisine 17 National Zoo 46 Mamak Cuisine 17 Bukit Nanas Forest Reserve 47 International Cuisine 47 Malaysian Favourites 18 TREASURE TROVES 49 Popular Restaurants in KL 19 Museums 21 Galleries 52 BEYOND THE CITY 22 Memorials 53 Kuala Selangor Fireflies 53 Batu Caves 23 RELAX AND REJUVENATE 53 Forest Research Institute of Malaysia 24 Spa Retreats (FRIM) 25 Healthcare 54 Putrajaya 54 Port Dickson 26 ENTHRALLING PERFORMANCES 54 Genting Highlands 27 Premier Concert Halls 55 Berjaya Hills 27 Cultural Shows 55 Cameron Highlands 28 Fine Arts Centres 55 Melaka 29 CELEBRATIONS GALORE 56 USEFUL INFORMATION 30 Religious Festivals 57 Accommodation 31 Events and Celebrations 61 Getting There 62 Getting Around 33 ENTERTAINMENT AND 65 Useful Contacts EXCITEMENT 66 Malaysia at a Glance 34 Theme Parks 67 Saying it in Malay 35 Sports and Recreation 68 Map of Kuala Lumpur 37 Nightlife 70 Tourism Malaysia Offices 2 Welcome to Kuala Lumpur, Malaysia’s dazzling capital city Kuala Lumpur or KL is a modern metropolis amidst colourful cultures. As one of the most vibrant cities in Asia, KL possesses a distinct and charming character. Visitors will be greeted by the Petronas Twin Towers, a world-renowned icon of the country. The cityscape is a contrast of the old and new, with Moorish styled buildings standing alongside glittering skyscrapers. -
ASIA-PACIFIC CLIMATE CHANGE ADAPTATION FORUM 2014, 1 – 3 OCTOBER 2014 PWTC 1 Transportation Between Airports and Putra World T
ASIA-PACIFIC CLIMATE CHANGE ADAPTATION FORUM 2014, 1 – 3 OCTOBER 2014 PWTC Transportation between Airports and Putra World Trade Centre (PWTC) 1. KUALA LUMPUR INTERNATIONAL AIRPORT (KLIA) Kuala Lumpur International Airport (KLIA) is the main aviation hub in Malaysia. It is located in Sepang district, in the southern part of the state of Selangor bordering Negeri Sembilan, approximately 50 km from the capital city, Kuala Lumpur. Most international flights arrive at Terminal C which is located at the Satellite Building of KLIA. An aerotrain provides a complimentary shuttle service for passengers between the Main Terminal Building and the Satellite Building every 3 – 5 minutes. The aerotrain takes just about 2 minutes to travel into a tunnel that runs underneath an airport taxiway and into the Satellite Building. For more information about KLIA, please visit the following link www.klia.com.my Please take note of the options for transportation from the KLIA to the forum venue, PWTC, and back to KLIA. Please note that travel duration may vary depending on intermediated stop and traffic conditions. Option 1: Airport Taxi / Limo Upon arrival at the KLIA, the authorised airport taxi counters can be found at the Arrival Hall, Main Terminal Building after Customs, before the public arrival waiting area. If you disembark at the Satellite Building or the Terminal C, please take the aerotrain to reach the Main Terminal Building. The airport taxi service is operated by Airport Limo (M) Sdn. Bhd. Taxi fares are charged according to destination and the type of taxi or limo required. There are 4 types of airport taxi available to choose from: Type of Taxi / Limo Capacity (depending on the car model) Budget Taxi 3 – 4 passengers only Premier Limo 4 to 5 passengers only Super Luxury 3 passengers only Family Service 8 passengers only Source: www.klia.com.my Please tell the person in charge your destination (e.g. -
Measuring the Suitability Index of Transit Oriented Development in Kl Sentral Station and Bandar Tasek Selatan Station Noor Farr
MEASURING THE SUITABILITY INDEX OF TRANSIT ORIENTED DEVELOPMENT IN KL SENTRAL STATION AND BANDAR TASEK SELATAN STATION NOOR FARRIS AQMAL BIN KAMARUNZAMAN A thesis submitted in partial fulfilment of the requirements for the award of the degree of Master of Science (Transportation Planning) Faculty of Built Environment and Surveying Universiti Teknologi Malaysia JANUARY 2019 DEDICATION Specially dedicated to my beloved family, To my father, Kamarunzaman Bin Abd Hamid, my mom Tengku Tun Nooraini bt Tengku Senawi, my loving wife, Nurazwani Binti Ahmad and my beloved son, Syawal Amsyar Bin Noor Faris Aqmal. Thanks for being the lovely people that surrounding my life. All o f you are giving me inspiration to complete this master program. Thank you for your kindly support and please forgive me for being less in spending time with all of you. Thanks to whom that have direct and indirectly support me in dealing with myself through the hard days, through the hard night and telling me to keep on. To all my sibling, my lecture, my friend, may Allah bless you all. iii ACKNOWLEDGEMENT All praise and thanks belong to Allah, because giving me strength, willingness, idea, and patience in completing this research. Without His help, I would never finish this research entitled “Measuring the Suitability Index of Transit Orientated Development in KL Sentral Station and Bandar Tasek Selatan Station”. I would like to dedicate a very special thanks to my supervisor Dr Gobi Krishna A/L Sinniah, for giving me guidance, suggestion and teach me so much in conducting this research from beginning and ending. -
CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO
Senarai COVID-19 Assessment JABATAN KESIHATAN Centre (CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO. TELEFON LOKASI CAC WAKTU OPERASI NO. TELEFON ISNIN-JUMAAT KK KUANG 03-60371092 011-64055718 10.00 PG – 12.00 TGH STADIUM MELAWATI (Telegram) ISNIN – JUMAAT SEKSYEN 13, 011-58814350 KK RAWANG 03-60919055 9.00 PG – 12.00 TGH ISNIN- KHAMIS SHAH ALAM 011-58814280 KK SELAYANG BARU 2.00 – 4.00 PTG 03-61878564 (Hanya waktu operasi sahaja) KK TAMAN EHSAN JUMAAT 03-62727471 2.45 – 4.00 PTG KK SUNGAI BULOH 03-61401293 PKD KLANG ---------------------- LOKASI CAC WAKTU OPERASI NO. TELEFON KK BATU ARANG 03-60352287 NO. TEL. BILIK KK GOMBAK SETIA 03-61770305 ISNIN – KHAMIS GERAKAN CDC 8.30 PG – 12.30 TGH KK AU2 DAERAH 03-42519005 Patient Clinical Assesment ( ) KK BATU 8 03-61207601/7607/ 03-61889704 2.00 – 5.00 PTG 7610 STADIUM HOKI (Home Assessment Monitoring) 010-9797732 KK HULU KELANG 03-41061606 PANDAMARAN (WhatsApp) JUMAAT (Hanya waktu operasi sahaja) 8.30 – 11.30 PG PKD SEPANG (Patient Clinical Assesment) 3.00 – 5.00 PTG LOKASI CAC WAKTU OPERASI NO. TELEFON (Home Assessment Monitoring) ISNIN – KHAMIS 011-11862720 8.00 PG – 1.00 PTG (Hanya waktu operasi sahaja) PKD KUALA LANGAT STADIUM MINI JUMAAT 019-6656998 BANDAR BARU LOKASI CAC WAKTU OPERASI NO. TELEFON 8.00 PG – 12.15 TGH (WhatsApp) SALAK TINGGI (Hanya waktu operasi sahaja) KK TELOK PANGLIMA SABTU & CUTI UMUM Email: GARANG ISNIN – KHAMIS 9.00 PG – 12.00 TGH [email protected] 2.00 PTG – 4.00 PTG KK TELOK DATOK JUMAAT 03-31801036 / PKD HULU SELANGOR 3.00 PTG – 4.30 PTG KK BUKIT 014-3222389 LOKASI CAC WAKTU OPERASI NO.