This is the Annual Monitoring Report prepared by Borough Council’s Forward Planning Team under the requirements of the Planning and Compulsory Purchase Act 2004.

The new information mainly covers the period 1 April 2011 to 31 March 2012. Some information, particularly, in relation to housing has been extended to 31 August 2012.

Any queries relating to the information should be directed to:

Dorothy Barratt, Forward Planning Manager 01827 719250 Mike Dittman Senior Planning Policy Officer 01827 719451 Tracey Curran Planning Information Officer 01827 719456

Email: [email protected]

CONTENTS PAGE

Housing Core Indicators 1 & 2

Business Development Completions 3

Small Sites Land Supply & Development Summary 4 (under 0.4 ha)

Five Year Housing Supply as at 31 August 2012 5 – 17

Housing Trajectory 2012 – 2028 18

Gross completions 2006 – 2012 19 - 28

Housing – Core Indicators

Table 1: H1 & H1(b): Plan Period and Housing Targets Core Start of Plan Period End of Plan period Total housing required Source of plan target Indicator H1 1996 2011 3200 WASP feeds into Local Plan adopted 2006 H1 (b) 2006 2028 3800 Core Strategy

02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 Rep Rep Rep Rep Rep Cur Rep = Reporting year Cur = Current year

Table 2: H2a: Net additional dwellings in previous years 100 120 104 106 167 142 106 93 98

H2b: Net additional dwellings for the reporting year 75

Table 3: H2c: Net additional dwellings in future years a) Net additions 166 190 269 274 309 346 270 213 181 165 157 145 136 95 90 c)Target 150 150 150 164 164 164 164 164 164 164 164 164 248 248 248 248 248 248

1

02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Rep Rep Rep Rep Rep Cur Rep = Reporting year Cur = Current year

Table 4: H3: New and converted dwellings - on previously developed land Gross 105 126 117 107 174 124 128 93 88 64 % gross on PDL 90 94 85 99 99 87 98 98 90 94

Table 5: H4: Net additional pitches (Gypsy and Traveller) Permanent Temporaryt Total 1 2 3

Table 6: H5: Gross affordable housing completions Social rent homes provided Intermediate homes provided Affordable homes Total 30 0 30

2

Summary Tables Business Development

Completions on Sites over 0.4 hectares in hectares and by floorspace

COMPLETED IN HECTARES COMPLETED FLOORSPACE

SITE NAME SITE OFFICE RETAIL LIGHT INDUSTRY B2 B8 B1\B2\B8 combined combined B1\B2 combined B1 NOTSPECIFIED TOTALHA. COMPLETED OFFICE RETAIL LIGHT INDUSTRY B2 B8 B1\B2\B8 combined combined B1\2 combined B1 NOTSPECIFIED TOTALFLSPCE COMPLETED Birch Coppice Business Park 14.25 0.19 14.44 142580 650 143230

Completions on Sites under 0.4 hectares in hectares and by floorspace

COMPLETED IN HECTARES COMPLETED FLOORSPACE

SITE NAME SITE OFFICE RETAIL LIGHT INDUSTRY B2 B8 B1\B2\B8 combined combined B1\B2 combined B1 NOTSPECIFIED TOTALHA. COMPLETED OFFICE RETAIL LIGHT INDUSTRY B2 B8 B1\B2\B8 combined combined B1\2 combined B1 NOTSPECIFIED TOTALFLSPCE COMPLETED Astley Castle 0.19 0.19 1865.66 1865.66 Vicarage Hill Farm, Middleton 0.05 0.05 98 98 Church View, Fillongley 0.12 0.12 1202.25 1202.25 65 Station St, Atherstone 0.01 0.01 46.45 70.06 116.51 Rear of 75 Long St, Atherstone 0.01 0.01 66 43.52 109.52 23A Long St, Atherstone 0.01 0.01 148 148 39 Hollybank, Coleshill 0.06 0.06 670 670 59 Long St, Atherstone 0.11 0.11 1138 1138 0.56 5347.94 Information provided as part of the RELS return 2011/12 3 Summary Tables

SMALL SITES LAND SUPPLY AND DEVELOPMENT SUMMARY (under 0.4 hectare in size)

Commitments within the Monitoring Year Hectares Floorspace (sqm)

TOTAL COMMITMENTS (below 0.4 ha) 2.13 17130.71

READILY AVAILABLE 2.03 16671.71

Completions during Monitoring Year Hectares Floorspace (sqm)

TOTAL COMPLETIONS (below 0.4 ha) 0.56 5347.94

GREENFIELD COMPLETIONS < 0.4 ha 0.02 226.03

BROWNFIELD COMPLETIONS < 0.4 ha 0.54 5121.91

4 Five Year Housing Supply As at 31st August 2012

1. Introduction

1.1 This statement sets out the latest situation with the Borough Council’s five year housing supply. It looks at the various sites with planning permission; the sites brought forward from the saved Local Plan 2006 as well as considering other sites that the Borough Council is confident will come forward. This includes those from the Local Investment Plan, those that have been granted planning permission since April 2012 and finally those sites that are awaiting a decision or are strong pre-applications.

1.2 Following the analysis it is clear that the Borough Council does have a five year housing supply, with an element of flexibility.

2 Sites with Planning Permission

a: Calculation of the 5 Year Housing Supply: Identified sites with planning permission

2.1 The following approach has been taken:

a) Identify sites allocated for development in the North Warwickshire Local Plan b) Individually identify all large sites of 10 or more dwellings on sites of 0.4 ha and above with planning permission and their development status at 1st April 2012 c) Individually identify all medium sites with planning permission for 10 or more dwellings on sites up to 0.4 and their development status at 1st April 2012. d) Individually identify all smaller sites, with planning permission, of 5 to 9 dwellings net capacity and their development status at 1st April 2012. e) For sites of 1-4 dwellings, with planning permission, identify the total capacity not started or under construction at 1st April 2012.

b: Sites identified in North Warwickshire Local Plan 2006

2.2 Five sites were identified in the adopted local plan following the Inspectors report. Of these only two are still available for development following successful completion on the other two sites and one site awaiting construction work to commence. The two remaining sites are:

Site 1 Brittania Mill, Coleshill Road, Atherstone Site 2 Father Hudsons, Coventry Road, Coleshill

2.2 It should be noted that detailed planning applications for sites 1 and 2 are in the process of being discussed. (Table 1)

c: Large sites of 10 or more dwellings on sites of 0.4 ha and above with planning permission.

2.3 There are eight sites which fall within this category giving a gross total of 274 dwellings. Two of the sites have work in progress. They are Kingsbury Hall, Kingsbury and Phoenix Yard, Atherstone. (Table 2)

5

Five Year Housing Supply As at 31st August 2012

d: Medium sites of 10 or more dwellings on sites below 0.4 ha with planning permission.

2.4 There are ten sites which fall within this category giving a gross total of 151 dwellings. One of the sites has work in progress at the present time. This is The Sportsmans Arms, Perryman Drive, Piccadily. (Table 3)

e: Smaller sites of 5-9 dwellings with planning permission

2.5 Five sites fall within this category giving a gross total of 34 dwellings, with an average of 7 dwellings per site. One of these sites has work in progress. This is The Parish Room, Spon Lane, Grendon. One of the sites, Chapel House, Dunns Lane, Dordon has submitted a full planning application which is currently pending. (Table 4)

f: Small sites of 1-4 dwellings with planning permission

2.6 There are fifty seven sites within this category, too many to list individually. However, of the possible gross total of 95 dwellings with consent, 6 sites require demolitions amounting to 6 dwellings. This then gives an overall net figure of 86 dwellings units. Of the 57 sites, 9 are still outline applications only. Out of the remaining sites 2 sites may expire during 2011/12 with the loss of 2 units. (Table 5)

Summary Table of Planning Permissions

Gross Net Site Gross Net Table Site Area Area Capacity Capacity (ha) (ha) Adopted Local Plan - Land Allocation 1 And Proposals 3.74 2.88 206 206 Large Sites Of 10 Or More Dwellings On 2 Sites Of 0.4 Ha And Above With Planning Permission 6.14 5.56 274 268 Medium Sites Of 10 Or More Dwellings 3 On Sites Below 0.4 Ha 2.5 2.5 151 145 Smaller Sites Of 5-9 Dwellings With 4 Planning Permission 0.97 0.93 34 28 Small Sites Of 1-4 Dwellings With 5 Planning Permission 11.75 11.71 95 86 TOTAL 25.10 23.58 760 733

3 Other Sites

3.1 In addition to the sites with planning consent and saved Local Plan allocations there are three other sources of housing supply: 1. The Borough Council is working with the Homes & Communities Agency to deliver its Local Investment Plan. This plan has identified and is delivering on a number of sites. Some of these are already identified above but others are new sites. These are list in Table 6. 2. The Borough Council is aware of a number of housing sites that have been applied for or are strong pre-applications. Table 7 gives a list of these. 3. The final source of housing supply is those sites that have received planning permission since April 2012 until 31st August 2012. These are shown in Table 8. 4 All Sites 6

Five Year Housing Supply As at 31st August 2012

Tables Gross Net Committed planning consents up to 1-5 760 733 31 March 2012 & allocation from 2006 Plan Local Investment Plan allocation not covered in 6 141 141 tables 1-5 above Pending sites from 1 April 2012 – 31 August 2012 7 awaiting decision 180 176 8 Planning applications granted since 1 April 2012 19 13 Total 1100 1063

5 Conclusion

5.1 Existing planning consents (up to 31 March 2012) provide the potential to produce 733 net dwellings (760 gross). This is 116 under the projected requirement of 164 units per annum giving a 4.47 year supply. The sites from the Local Investment Plan and the planning applications granted since 1 April 2012 are expected to come forward and this will provide an additional 154 net dwellings giving a 5.40 year supply (733 +154 = 887 / 164 = 5.4). A 6.48 year housing supply will be achieved if the pending sites are given consent, giving 204 dwellings over the projected requirement of 859. This equates to around 23% additional housing.

7

Five Year Housing Supply As at 31st August 2012

Table 1: Adopted Local Plan - Land Allocation and Proposals

Gross Net Site Gross Net Site Area Area Comments Site Address Capacity Capacity Site Status (ha) (ha) Britannia Mill, Coleshill Planning application discussion currently 0.44 0.40 56 56 - Road, Atherstone underway

Father Hudson’s, 3.30 2.48 150 150 - Pre Planning discussion being held Coventry Road,Coleshill

TOTAL 3.74 2.88 206 206

8

Five Year Housing Supply As at 31st August 2012

Table 2: Large Sites Of 10 or More Dwellings on Sites Of 0.4 Ha And Above With Planning Permission

Gross Net Site Date of Gross Net Application No Site Area Area Site Comments Site Address Permission Capacity Capacity (ha) (ha) Status

Phoenix Yard, Church St, PAP/2007/0528 16/10/07 0.77 0.69 73 69 U/C 4 completions Atherstone 157-159 Long St, PAP/2007/0594 22/02/08 0.49 0.44 40 40 N/S Atherstone Kingsbury Hall, PAP/2008/0482 06/05/09 1.16 0.87 29 28 U/C 15 U/C Kingsbury Land rear of 29-41, New PAP/2006/0182 30/11/06 0.71 0.64 31 30 N/S Road, Former Michael Drayton Outline PAP/2007/0336 15/11/10 0.94 0.85 35 35 N/S Middle School, Hartshill permission Wagstaff Farm, PAP/2009/0592 13/12/10 0.67 0.67 14 14 N/S Miners Welfare Centre, Outline PAP/2010/0399 17/03/11 0.92 0.92 37 37 N/S Arley permission Land rear of 17-21 PAP/2011/0646 20/03/12 0.48 0.48 15 15 N/S Queensway, Hurley TOTAL 6.14 5.56 274 268

9

Five Year Housing Supply As at 31st August 2012

Table 3: Medium Sites Of 10 or More Dwellings on Sites Below 0.4 Ha

Gross Net Site Date of Gross Net Application No Site Area Area Site Comments Site Address Permission Capacity Capacity (ha) (ha) Status

Land r/o Barge & Bridge PAP/2010/0477 13/12/10 0.10 0.10 11 11 N/S PH, Atherstone 12 Fosters Yard Hotel, Outline PAP/2008/0634 20/02/12 0.15 0.15 12 12 N/S Polesworth permission 17-19 Long Street, PAP/2009/0045 11/05/09 0.11 0.11 13 13 N/S Atherstone Ex Corley Motors Site off Outline PAP/2006/0839 31/03/10 0.21 0.21 13 13 N/S George St, Arley permission Land adj to the Dog Inn Outline PH, Marsh Lane, Water PAP/2010/0009 14/10/10 0.33 0.33 31 31 N/S permission Orton Ivy House, Atherstone PAP/2011/0187 19/10/11 0.36 0.36 14 14 N/S The Sportsmans Arms, 6 completed, PAP/2010/0592 19/05/11 0.34 0.34 19 13 U/C Piccadilly 13 U/C Bridge House, Atherstone PAP/2010/0172 12/04/11 0.17 0.17 14 14 N/S Arley Working Mens Club, Outline PAP/2012/0008 20/03/12 0.38 0.38 10 10 N/S Arley permission

Almshouses, Middleton PAP/2009/0420 26/03/12 0.35 0.35 14 14 N/S

TOTAL 2.5 2.5 151 145

10

Five Year Housing Supply As at 31st August 2012

Table 4: Smaller Sites of 5-9 Dwellings with Planning Permission

Gross Net Site Date of Gross Net Application No Site Area Area Site Comments Site Address Permission Capacity Capacity (ha) (ha) Status

Outline permission – Chapel House, Dordon PAP/2006/0258 15/08/06 0.24 0.22 9 8 N/S current application pending

The Bungalow, Coleshill PAP/2007/0754 26/05/11 0.25 0.23 5 4 N/S 4 completed, Parish Room, Grendon PAP/2010/0582 25/03/11 0.12 0.12 6 2 U/C 2 U/C 151 Plank Lane, Water PAP/2008/0369 14/09/11 0.20 0.20 8 8 Orton N/S Land at Old Farm Road, PAP/2011/0657 20/03/12 0.16 0.16 6 6 Mancetter N/S

TOTAL 0.97 0.93 34 28

11

Five Year Housing Supply As at 31st August 2012

Table 5: Small Sites of 1- 4 Dwellings with Planning Permission

Gross Site Net Site Area Gross Net Comments Site Address Area (ha) (ha) Capacity Capacity There are currently 57 Of the 57 sites, 9 sites are Outline only at small sites covering North 11.75 11.71 95 86 the present time. 2 sites may expire Warwickshire Borough during 2011/12 with the loss of 2 units. area TOTAL 11.75 11.71 95 86

12

Five Year Housing Supply As at 31st August 2012

Table 6: Strategic Housing Sites for Warwickshire’s Local Investment Plan

Note: The following tables show the development sites within North Warwickshire Borough Councils will be looking to develop within its area and which align with the Homes and Communities Agency three key programme priorities, namely: o Housing Supply – to include new build (rural and urban) o Place Making and Regeneration o Existing Stock – to include empty homes (private and public).

All land identified within this section has been prioritised by the Local authority as being of strategic importance within the next three to five years and therefore are expected to start within the lifespan of the Local Investment Plan which currently ends March 2015. As such, it has been agreed that there is no need for any type of prioritisation of projects. It is to be noted that windfall sites and new development opportunities will emerge over time and that this schedule will need to be updated regularly.

Sites for North Warwickshire

Potential Affordable Local HCA Priority Identified Description of overall Housing Delivery Partner Action Stage Authority Grouping site site units. Element Local authority Queensway, On site. North Existing owned site that is See table Waterloo Housing Hurley 12 to 15 Warwickshire Stock being assessed 2 above Group 2012/13 for development. North This is a local Awaiting Warwickshire Old Farm authority owned archaeological dig

Housing Road, site in a rural See table Waterloo Housing requirements 6 Supply Mancetter location that is 4 above Group

being assessed 2012/13

for development

13

Five Year Housing Supply As at 31st August 2012

Potential Affordable Local HCA Priority Identified Description of overall Housing Delivery Partner Action Stage Authority Grouping site site units. Element Awaiting Off Church Place Making County owned Extra Care archaeological dig North Walk, and rural site 80 80 Development evidence. Warwickshire Mancetter Regeneration

2013/14 North Warwickshire Currently getting Church This is a rural site North Housing Borough plans Walk, owned by the 18 18 Warwickshire Supply Council/Waterloo Mancetter Local Authority Housing Group 2014/15 Planning been Arley Miners This is a private granted Starting North Housing See table Cassidy Welfare Hall, site which is in a 15 on site in August Warwickshire Supply 2 above Group/Bromford New Arley rural location 2012/13 This is a private Outline planning Arley owned rural granted North Housing Working exception site to See table 10 Midland Heart Warwickshire Supply Men’s Club, provide 100% 3 above 2013/14 New Arley affordable

housing. This is a local North Currently at Housing authority owned Warwickshire feasibility stage Supply site in a rural Waterloo Housing Lister Road, location that has Group/North Atherstone 28 28 Place making the potential for Warwickshire 2013/14 and delivering extra Borough Council

Regeneration care.

14

Five Year Housing Supply As at 31st August 2012

Potential Affordable Local HCA Priority Identified Description of overall Housing Delivery Partner Action Stage Authority Grouping site site units. Element Currently at St Georges Rural site owned North Housing North Warwickshire feasibility stage Road, by the Local 9 9 Warwickshire Supply Borough Council Atherstone authority 2013/14 Rural site owned Currently at Watling North Housing by the Local Waterloo Housing feasibility stage Street, 6 6 Warwickshire Supply Authority Group 2013/14 Atherstone

Church Private site owned On site due to be North Housing See table Waterloo Housing Lane, by Samuel White 10 finished within Warwickshire Supply 3 above Group Middleton Trust 2012/13

North Private site in a Currently going Warwickshire Place Making rural location that through pre app and has been included Father advice with Regeneration in the SHLAA for See table Hudsons, 26 Planning development 1 above Coleshill Housing within the next 2014/15 Supply five years.

Currently in for Shown in Rowland planning North Housing pending Way, Private site 26 Redrow Homes permission with Warwickshire Supply sites table Atherstone detailed drawings below 2013/14 TOTAL 141

15

Five Year Housing Supply As at 31st August 2012

Table 7: Pending sites from 1 April 2012 – 31 August 2012

Eighteen sites have come forward during this period of which two have outline planning permission with a total of four gross dwellings. The remaining sixteen sites have a gross capacity of 180 dwellings. If these applications are granted permission, upon completion this equates to 176 net additional dwellings taking into account losses through conversion, change of use and demolitions.

Site Dwelling capacity Net Reynolds Cottage, Corley 1 32 Parkfield Road, Coleshill 14 Corley Nursery, Corley 4 Land at Rowland Way, Atherstone 88 68 Station Street, Atherstone 4 Plot 29 & 30, Charnwood Drive, Hartshill 2 Medical Centre, Spring Hill, New Arley - outline 3 58-60 Coventry Road, Coleshill 6 31 Plough Hill Road, Chapel End 12 109 Watling Street, Grendon 3 The Vicarage, Newlands Road, Baddesley 2 Whitacre Garden Centre, 33 Prince Regent House, Coleshill 3 Fillongley Social Club 1 Land between 15&19 School Hill, Hartshill 2 Uplands Cottage, Fillongley 1 Old House Farm, Nether Whitacre - outline 1 19 Dordon Road, Polesworth 4 Total 180 176

16

Five Year Housing Supply As at 31st August 2012

Table 8: Determined Sites from 1 April 2012 – 31 August 2012

Site Dwelling capacity Net 10/11 Friary Road, Atherstone 1 Brookfield Bungalow, Nether Whitacre 1 61 Long St, Dordon 2 The Elms, Warton 3 42 Bretts Hall, Ansley 2 7 Shawbury Cottages, Fillongley 2 Lower Farm, Bodymoor Heath 1 Scout Hut, Polesworth 4 Land adj 40 Kiln Way, Polesworth – Outline 2 225 Long Street, Dordon 1 Total 19 13

Ten sites have had planning permission granted during this period with a dwelling capacity of 19. Out of the ten sites, one has outline planning permission. Taking into account losses through conversion, change of use and demolitions this equates to 13 net additional dwellings.

17

Appendix A: Housing Trajectory for North Warwickshire – 2012 to 2028

Housing Trajectory

400

350

300

250 Annual Requirement Projected delivery 200 Tamworth requirement Trend projected delivery

150 Number of Number dwellings

100

50

0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Year

18

GROSS COMPLETIONS 2006 - 2012

SETTLEMENTS HIERARCHY FOR NORTH WARWICKSHIRE

CATEGORY 1 NON GREEN BELT MARKET TOWNS AND ADJOINING SETTLEMENTS

Atherstone with Mancetter Polesworth with Dordon

CATEGORY 2 GREEN BELT MARKET TOWN

Coleshill

CATEGORY 3 LOCAL SERVICE CENTRES

Old & New Arley (together as a single network of villages) Kingsbury Grendon/Baddesley Ensor (together as a single network of villages) Water Orton Hartshill with Ansley Common

CATEGORY 4 OTHER SETTLEMENTS WITH A DEVELOPMENT BOUNDARY

Ansley Piccadilly Austrey Shuttington Curdworth Shustoke Fillongley Warton Hurley Whitacre Heath Newton Regis Wood End

CATEGORY 5 OTHER SETTLEMENTS/HAMLETS GREEN BELT NON GREEN BELT

Bassetts Pole Alvecote Corley & Corley Moor Freasley Ridge Lane Middleton

19

YEAR: 2006/07

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 64 55 CALDECOTE 3 8 0 MANCETTER 1 1 1 AUSTREY 4 1 1 POLESWORTH 1 4 2 ASTLEY 4 2 0 COLESHILL 2 3 2 FILLONGLEY 4 1 1 NEW ARLEY 3 2 0 GRENDON 3 2 2 BADDESLEY 3 2 0 ANSLEY COMMON 3 2 0 KINGSBURY 3 2 2 WATER ORTON 3 2 0 HURLEY 4 7 7 WHITACRE HEATH 4 4 2

TOTAL 95 73 TOTAL 12 2 TOTAL BY SETTLEMENT CATEGORY 1 69 58 TOTAL BY SETTLEMENT CATEGORY 1 0 0 TOTAL BY SETTLEMENT CATEGORY 2 3 2 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 12 4 TOTAL BY SETTLEMENT CATEGORY 3 8 0 TOTAL BY SETTLEMENT CATEGORY 4 11 9 TOTAL BY SETTLEMENT CATEGORY 4 4 2 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 0 0

YEAR: 2007/08

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 56 45 SECKINGTON 4 2 0 POLESWORTH 1 3 3 NETHER WHITACRE 4 1 0 DORDON 1 3 3 CORLEY 5 5 0 COLESHILL 2 42 42 GRENDON 3 6 6 BADDESLEY 3 3 3 HARTSHILL 3 1 1 KINGSBURY 3 4 0 CURDWORTH 4 15 15 FILLONGLEY 4 2 1

TOTAL 135 119 TOTAL 8 0 TOTAL BY SETTLEMENT CATEGORY 1 62 51 TOTAL BY SETTLEMENT CATEGORY 1 0 0 TOTAL BY SETTLEMENT CATEGORY 2 42 42 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 14 10 TOTAL BY SETTLEMENT CATEGORY 3 0 0 TOTAL BY SETTLEMENT CATEGORY 4 17 16 TOTAL BY SETTLEMENT CATEGORY 4 3 0 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 5 0 20

YEAR: 2008/09

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 9 7 KINGSBURY 3 12 0 POLESWORTH 1 7 1 HARTSHILL 3 1 0 DORDON 1 8 8 NETHER WHITACRE 4 1 1 COLESHILL 2 27 25 SHUSTOKE 4 1 0 GRENDON 3 1 0 WHITACRE HEATH 4 1 0 HARTSHILL 3 4 0 ANSLEY COMMON 3 12 12 WATER ORTON 3 1 0 WOOD END 4 45 45

TOTAL 114 98 TOTAL 16 1 TOTAL BY SETTLEMENT CATEGORY 1 24 16 TOTAL BY SETTLEMENT CATEGORY 1 0 0 TOTAL BY SETTLEMENT CATEGORY 2 27 25 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 18 12 TOTAL BY SETTLEMENT CATEGORY 3 13 0 TOTAL BY SETTLEMENT CATEGORY 4 45 45 TOTAL BY SETTLEMENT CATEGORY 4 3 1 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 0 0

YEAR: 2009/10

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 9 6 MANCETTER 1 1 1 POLESWORTH 1 4 4 MAXSTOKE 4 1 0 DORDON 1 30 19 WISHAW 4 1 1 COLESHILL 2 8 7 OVER WHITACRE 4 1 1 ARLEY 3 1 1 CORLEY 5 1 1 NEW ARLEY 3 1 1 HARTSHILL 3 22 22 WATER ORTON 3 1 1 ANSLEY 4 14 14

TOTAL 90 75 TOTAL 5 4 TOTAL BY SETTLEMENT CATEGORY 1 43 29 TOTAL BY SETTLEMENT CATEGORY 1 1 1 TOTAL BY SETTLEMENT CATEGORY 2 8 7 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 25 25 TOTAL BY SETTLEMENT CATEGORY 3 0 0 TOTAL BY SETTLEMENT CATEGORY 4 14 14 TOTAL BY SETTLEMENT CATEGORY 4 3 2 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 1 1

21

YEAR: 2010/11

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 11 5 KINGSBURY 3 14 2 POLESWORTH 1 2 2 WISHAW 4 1 1 DORDON 1 1 1 BIRCHLEY HEATH 4 1 1 COLESHILL 2 1 0 NO MANS HEATH 4 2 2 ARLEY 3 23 23 MIDDLETON 5 1 1 GRENDON 3 4 4 BADDESLEY 3 1 1 HARTSHILL 3 23 21 KINGSBURY 3 10 9 WATER ORTON 3 10 10

TOTAL COMPLETIONS 86 76 TOTAL COMPLETIONS 19 7 TOTAL BY SETTLEMENT CATEGORY 1 14 8 TOTAL BY SETTLEMENT CATEGORY 1 0 0 TOTAL BY SETTLEMENT CATEGORY 2 1 0 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 71 68 TOTAL BY SETTLEMENT CATEGORY 3 14 2 TOTAL BY SETTLEMENT CATEGORY 4 0 0 TOTAL BY SETTLEMENT CATEGORY 4 4 4 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 1 1

YEAR: 2011/12

INSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD OUTSIDE DEVELOPMENT BOUNDARY SETTLEMENT NO. OF NEW BUILD HIERARCHY COMPLETIONS COMPLETIONS HIERARCHY COMPLETIONS COMPLETIONS CATEGORY CATEGORY ATHERSTONE 1 32 25 CALDECOTE 3 6 0 POLESWORTH 1 2 0 FILLONGLEY 4 2 2 DORDON 1 1 1 CORLEY 5 1 1 COLESHILL 2 6 4 ARLEY 3 14 14 GRENDON 3 6 6 BADDESLEY 3 0 0 HARTSHILL 3 3 3 KINGSBURY 3 2 2 WATER ORTON 3 1 1 CURDWORTH 4 1 1 FILLONGLEY 4 4 4 WOOD END 4 1 0 PICCADILLY 4 6 6

TOTAL COMPLETIONS 79 67 TOTAL COMPLETIONS 9 3 TOTAL BY SETTLEMENT CATEGORY 1 35 26 TOTAL BY SETTLEMENT CATEGORY 1 0 0 TOTAL BY SETTLEMENT CATEGORY 2 6 4 TOTAL BY SETTLEMENT CATEGORY 2 0 0 TOTAL BY SETTLEMENT CATEGORY 3 26 26 TOTAL BY SETTLEMENT CATEGORY 3 6 0 TOTAL BY SETTLEMENT CATEGORY 4 12 11 TOTAL BY SETTLEMENT CATEGORY 4 2 2 TOTAL BY SETTLEMENT CATEGORY 5 0 0 TOTAL BY SETTLEMENT CATEGORY 5 1 1

22

SUMMARY

NUMBER OF COMPLETIONS FROM 2006 – 2012 SPLIT BETWEEN TOTAL & NEW BUILD

TOTAL COMPLETIONS 2006/2012 = 668

INSIDE DEVELOPMENT BOUNDARY COMPLETIONS OF WHICH OUTSIDE DEVELOPMENT BOUNDARY COMPLETIONS OF WHICH NEW BUILD NEW BUILD TOTAL BY SETTLEMENT CATEGORY 1 247 (36.98%) 188 TOTAL BY SETTLEMENT CATEGORY 1 1 (0.15%) 1 TOTAL BY SETTLEMENT CATEGORY 2 87(13.02%) 80 TOTAL BY SETTLEMENT CATEGORY 2 0 (0%) 0 TOTAL BY SETTLEMENT CATEGORY 3 166 (24.85%) 145 TOTAL BY SETTLEMENT CATEGORY 3 41 (6.14%) 2 TOTAL BY SETTLEMENT CATEGORY 4 99 (14.82%) 95 TOTAL BY SETTLEMENT CATEGORY 4 19 (2.84%) 11

TOTAL BY SETTLEMENT CATEGORY 5 0 (0%) 0 TOTAL BY SETTLEMENT CATEGORY 5 8 (1.20%) 3

23

250

200

150

Completions inside development boundary

New Build completions inside development boundary Completions outside development boundary 100

New Build completions outside development boundary

50

0

1 2 3 4 5

Category Category Category Category Category

24

COMPLETIONS INSIDE THE DEVELOPMENT BOUNDARY 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD ATHERSTONE 64 55 56 45 9 7 9 6 11 5 32 17 MANCETTER 1 1 0 0 0 0 0 0 0 0 0 0 POLESWORTH 4 2 3 3 7 1 4 4 2 2 2 0 DORDON 0 0 3 3 8 8 30 19 1 1 1 1 COLESHILL 3 2 42 42 27 25 8 7 1 0 6 5 NEW ARLEY 2 0 0 0 0 0 1 1 0 0 0 0 ARLEY 0 0 0 0 0 0 1 1 23 23 14 14 GRENDON 2 2 6 6 1 0 0 0 4 4 6 6 BADDESLEY 2 0 3 3 0 0 0 0 1 1 0 0 HARTSHILL 0 0 1 1 4 0 22 22 23 21 3 3 ANSLEY COMMON 2 0 0 0 12 12 0 0 0 0 0 0 KINGSBURY 2 2 4 0 0 0 0 0 10 9 2 2 WATER ORTON 2 0 0 0 1 0 1 1 10 10 1 1 ANSLEY 0 0 0 0 0 0 14 14 0 0 0 0 CURDWORTH 15 15 0 0 0 0 0 0 0 0 1 1 FILLONGLEY 0 0 2 1 0 0 0 0 0 0 4 4 HURLEY 7 7 0 0 0 0 0 0 0 0 0 0 WHITACRE HEATH 4 2 0 0 0 0 0 0 0 0 0 0 WOOD END 0 0 0 0 45 45 0 0 0 0 1 0 PICCADILLY 6 6 TOTAL 110 88 120 104 114 98 90 75 86 76 79 60

2012/13 2013/14 2014/15 2015/16 2016/17 TOTAL TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS ATHERSTONE 181 135 MANCETTER 1 1 POLESWORTH 22 12 DORDON 43 32 COLESHILL 87 81 NEW ARLEY 3 1 ARLEY 38 38 GRENDON 19 18 BADDESLEY 6 4 HARTSHILL 53 47 ANSLEY COMMON 14 12 KINGSBURY 18 13 WATER ORTON 15 12 ANSLEY 14 14 CURDWORTH 16 16 FILLONGLEY 6 5 HURLEY 7 7 WHITACRE HEATH 4 2 WOOD END 46 45 PICCADILLY 6 6 TOTAL 599 501

25

COMPLETIONS OUTSIDE THE DEVELOPMENT BOUNDARY 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 TOTAL NEW BUILD TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW COMPLETIONS COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD CALDECOTE 8 0 0 0 0 0 0 0 0 0 6 0 AUSTREY 1 1 0 0 0 0 0 0 0 0 0 0 ASTLEY 2 0 0 0 0 0 0 0 0 0 0 0 FILLONGLEY 1 1 0 0 0 0 0 0 0 0 2 2 SECKINGTON 0 0 2 0 0 0 0 0 0 0 0 0 NETHER WHITACRE 0 0 1 0 1 1 0 0 0 0 0 0 CORLEY 0 0 5 0 0 0 1 1 0 0 1 1 KINGSBURY 0 0 0 0 12 0 0 0 14 2 0 0 MANCETTER 0 0 0 0 0 0 1 1 0 0 0 0 MAXSTOKE 0 0 0 0 0 0 1 0 0 0 0 0 WISHAW 0 0 0 0 0 0 1 1 1 1 0 0 OVER WHITACRE 0 0 0 0 0 0 1 1 0 0 0 0 BIRCHLEY HEATH 0 0 0 0 0 0 0 0 1 1 0 0 NO MANS HEATH 0 0 0 0 0 0 0 0 2 2 0 0 MIDDLETON 0 0 0 0 0 0 0 0 1 1 0 0 HARTSHILL 0 0 0 0 1 0 0 0 0 0 0 0 SHUSTOKE 0 0 0 0 1 0 0 0 0 0 0 0 WHITACRE HEATH 0 0 0 0 1 0 0 0 0 0 0 0

TOTAL 12 2 8 0 16 1 5 4 19 7 9 3

2012/13 2013/14 2014/15 2015/16 2016/17 TOTAL TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW TOTAL NEW BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS BUILD COMPLETIONS CALDECOTE 14 0 AUSTREY 1 1 ASTLEY 2 0 FILLONGLEY 3 3 SECKINGTON 2 0 NETHER WHITACRE 2 1 CORLEY 7 2 KINGSBURY 26 2 MANCETTER 1 1 MAXSTOKE 1 0 WISHAW 2 2 OVER WHITACRE 1 1 BIRCHLEY HEATH 1 1 NO MANS HEATH 2 2 MIDDLETON 1 1 HARTSHILL 1 0 SHUSTOKE 1 0 WHITACRE HEATH 1 0

TOTAL 69 17

26

UNDER CONSTRUCTION AS AT 31/3/2012

NUMBER UNDER NUMBER UNDER CONSTRUCTION IN CONSTRUCTION IN 2011/12 2011/12 Atherstone 69 Ansley 2 Coleshill 3 Baddesley 4

Fillongley 1 Polesworth 1

Grendon 3 Water Orton 1

Hartshill 6 Piccadilly 13 Kingsbury 15

Shustoke 1 TOTAL 119

OUTSTANDING WITH FULL PLANNING PERMISSION

WITH FULL PLANNING WITH FULL PLANNING WITH FULL PLANNING WITH FULL PLANNING PERMISSION NOT YET PERMISSION NOT YET PERMISSION NOT YET PERMISSION NOT YET STARTED STARTED STARTED STARTED

Atherstone 101 Astley 1 Hurley 16 Mancetter 6 Caldecote 4 Polesworth 6 Ansley Common 2 Whitacre Heath 1

Dordon 3 Kingsbury 20 Shustoke 14

Coleshill 14 Water Orton 40 Middleton 15

Arley 1 Ansley 2 Chapel End 3

Shuttington 1 Grendon 1 Curdworth 1

Baddesley 2 Fillongley 1 TOTAL 255

27

OUTSTANDING WITH OUTLINE PLANNING PERMISSION

WITH OUTLINE WITH OUTLINE PERMISSION PERMISSION Atherstone 4 Water Orton 31

Polesworth 17 Hartshill 37

Dordon 9 Kingsbury 4

Coleshill 1

Arley 60

TOTAL 163

ADOPTED LOCAL PLAN

SITE NO. OF DWELLINGS

FATHER HUDSONS, COLESHILL 150

BRITANNIA MILL, ATHERSTONE 56

TOTAL 206