The list of participants that attended training on Project Management Information System (PMIS) The training was conducted By Implementation Monitoring and Evaluation Division (IMED)

Power Division Name, Designation & Date & Time SL. No. Project Name with Code Mobile No. 5605-5067 Shekol Baha 225 Megaward Duel Fuel ABM Fakhrul Alam 20.05.2018- 1 CombaindCycle Power plant Development project Executive Engr. 22.05.2018 01755635109 10.00 am - 1.30 pm 5605-5129 Power Distribution System Md. Shahidul Islam 20.05.2018 to 2 Development project Chittagong Zone BPDB Executive Engr. 22.05.2018 01866955443 10.00 am - 1.30 pm 5065-5063 Conversion of Baghabari 100 MW to Mohammad Erfanul 20.05.2018 to 150 MW combined cycle Power Plant Haque 22.05.2018 3 Executive Engineer 10.00 am - 1.30 pm 01779294755 5065-5063 Conversion of Baghabari 100 MW to Khadiza Umme Tahera 20.05.2018 to 4 150 MW combined cycle Power Plant Assistant Engineer 22.05.2018 01680581379 10.00 am - 1.30 pm 5605-5094 Pre- Payment metering project for Md. Nazmul Hasan 20.05.2018 to Distribution and Zone. Bhuiyan 22.05.2018 5 Sub Divisional Eng. 10.00 am - 1.30 pm 01718050864 5605-5094 Pre- Payment metering project for Monami Islam 20.05.2018 to 6 Distribution Comilla and Mymensingh Zone. Assistant Eng. 22.05.2018 01677555735 10.00 am - 1.30 pm 5605-5135 Power Distribution System Uttpol Saha 20.05.2018 to 7 Development project, Zone,BPDB, Executive Engr. 22.05.2018 Rajshahi. 01711187927 10.00 am - 1.30 pm 5605-5135 Power Distribution System Mehedi Hassan Khan 20.05.2018 to 8 Development project, Rajshahi Zone,BPDB, Asst. Engr. 22.05.2018 Rajshahi. 01922-230095 10.00 am - 1.30 pm 5605-5095 Coal Based Power Plant Farhana Akhter 20.05.2018 to 9 connecting Road, BPDB Executive Engr. 22.05.2018 01839060604 10.00 am - 1.30 pm 5605-5095 Khulna Coal Based Power Plant Md. Asif Reza Taraque 20.05.2018 to 10 connecting Road, BPDB Dhaka Assistant Eng. 22.05.2018 01737392104 10.00 am - 1.30 pm 5007 Power Distribution System Development Md. Lutful Haider 20.05.2018 to project Rangpur Zone BPDB , Rangpur Chowdhuri 22.05.2018 11 Executive Engr. 10.00 am - 1.30 pm 01755582415 5007 Power Distribution System Development Md.Ashadul Haque 20.05.2018 to 12 project Rangpur Zone BPDB , Rangpur Senior Asst. Director 22.05.2018 01745225983 10.00 am - 1.30 pm 5064 Ghonashal 365 MW combined Cycle Power Amartya Roy 20.05.2018 to 13 Plant Project Ghonashal, Palash, Narsingdi Sub.Divisional Engr. 22.05.2018 01712534608 10.00 am - 1.30 pm 5605-5014 construction of Bibiyana-3 400MW ccdp Ratan Kumar Paul 20.05.2018 to 14 project. Superintending Engineer 22.05.2018 01708510200 10.00 am - 1.30 pm 5605-5061 conversion of 150MW ST to Khan Muhammad Ali 20.05.2018 to 15 225MW ccppp project XEN 22.05.2018 01777760016 10.00 am - 1.30 pm Ghorasal 3rd unit Repowering project 5605-5134 Md. Moktar Hossain 20.05.2018 to 16 Executive Engineer 22.05.2018 01722044335 10.00 am - 1.30 pm Installation of 7.4MWP solor PV grid connected Pranoy Acharjee 20.05.2018 to 17 generation Plant at Kaptai 5605-5039 Assistant Engineer 22.05.2018 01824780037 10.00 am - 1.30 pm 5605-5026 Aminbazar - Maowa - Mongla 400 icv S M Nurul Islam Faruk 20.05.2018 to 18 Transmission Line project Executive Eng. 22.05.2018 01777760420 10.00 am - 1.30 pm 5605-5026 Aminbazar - Maowa - Mongla 400 icv Md. Juel Hasan 20.05.2018 to 19 Transmission Line project Sub. Divisional Eng. 22.05.2018 01717978934 10.00 am - 1.30 pm 2.50 Million Consumer Connection Through Rural Md. Shafiqur Rahman 23.05.2018 to 20 Electrification Program 5605-5044 Project Director 26.05.2018 01921033112 10.00 am - 1.30 pm Replacement of 70000 nos overloaded distribution Syed Mahbubur Rahman 23.05.2018 to 21 transformer under rural electrification Project Director 26.05.2018 program.5605-5033 01711985671 10.00 am - 1.30 pm 5605-5041 Rural Electrification Expansion in Sylhet Md. Masud Mia 23.05.2018 to 22 Division and Infrastructure Development of BREB Assistant Eng. 26.05.2018 Headquarter (RER-SDP AND ID) 01918252796 10.00 am - 1.30 pm 5605-5088 UP-GRADATION, REHABILITATION Md. Latiful Haque 23.05.2018 to AND INTENSIFICATION OF DISTRIBUTION Deputy Director 26.05.2018 23 SYSTEM (RAJSHAHI, RANGPUR, KHULNA AND 01552449431 10.00 am - 1.30 pm DIVISIONS) 5605-5088 UP-GRADATION, REHABILITATION S. M Lutfor Rahman 23.05.2018 to AND INTENSIFICATION OF DISTRIBUTION Assistant Engineer 26.05.2018 24 SYSTEM (RAJSHAHI, RANGPUR, KHULNA AND 01923435131 10.00 am - 1.30 pm BARISAL DIVISIONS) 5605-5105 Rural Electrification Expansion Dhaka Adhir Ch. Barman 23.05.2018 to 25 Division Program-II. Deputy Director Finance 26.05.2018 01715431658 10.00 am - 1.30 pm 5605-5105 Rural Electrification Expansion Dhaka Md. Selim Hossain 23.05.2018 to 26 Division Program-II. Assistant Director 26.05.2018 01914955937 10.00 am - 1.30 pm 5605-5082 Dhaka-Chittagong Main Power Grid Md. Mahmudul Hasan 23.05.2018 to 27 Strengthening Project Sub Divisional Eng. 26.05.2018 01777760425 10.00 am - 1.30 pm 5605-5082 Dhaka-Chittagong Main Power Grid Mstakim Refat 23.05.2018 to 28 Strengthening Project Assistant Eng. 26.05.2018 01709997835 10.00 am - 1.30 pm 5605-9767 Enhancement of Capacity of Grid Md. Shakowak Hossain 23.05.2018 to Substations and Transmission Lines (ECGSTL) for Khan 26.05.2018 29 Rural Electrification Deputy Manager Finance 10.00 am - 1.30 pm 01777760396

5605-9767 Enhancement of Capacity of Grid Md. Ismail Hossain 23.05.2018 to Substations and Transmission Lines (ECGSTL) for Superintending Engineer 26.05.2018 30 Rural Electrification 01711644804 10.00 am - 1.30 pm 5605-5036 National Power Transmission Network Mahbub Ahmed 23.05.2018 to 31 Development Project. Project Director 26.05.2018 01713041482 10.00 am - 1.30 pm 5605-5036 National Power Transmission Network Prodip Kumar Sutradhar 23.05.2018 to 32 Development Project. Deputy Porject Director 26.05.2018 01711620862 10.00 am - 1.30 pm 5605-5097 Power Grid Network Strengthening Md. Abdur Rashid 23.05.2018 to Project Under PGCB Superintending Engineer 26.05.2018 33 01714073888 10.00 am - 1.30 pm

5605-5097 Power Grid Network Strengthening Mahafuja Khatun 23.05.2018 to 34 Project Under PGCB Sub Assistant Eng. 26.05.2018 01704876175 10.00 am - 1.30 pm 5605-5137 Capacity Upgradation (500 (MW) of the Mt. Alega Ferdousi 23.05.2018 to 35 Existing (Bheramara)- India Assistant Manager 26.05.2018 (Bahrampur) Grid Interconnection. 01777760352 10.00 am - 1.30 pm 5605-5137 Capacity Upgradation (500 (MW) of the Mohammed Rezaul 23.05.2018 to Existing Bangladesh (Bheramara)- India Hossain 26.05.2018 36 (Bahrampur) Grid Interconnection. Sub. Assistant Eng. 10.00 am - 1.30 pm 01914137978 5605-5107 [Rural Electrification Expansion Md. Mehedi Hasan 23.05.2018 to 37 Rajshahi- Program-II (Revised)] Assistant Eng. 26.05.2018 01765917769 10.00 am - 1.30 pm 5605-5107 [Rural Electrification Expansion Md. Samim Hossian 23.05.2018 to Rajshahi-Rangpur Division Program-II (Revised)] Deputy Director Finance 26.05.2018 38 01912799022 10.00 am - 1.30 pm

5605-5131 Rural Electrification Expansion Barisal Rashedul Hasan 23.05.2018 to 39 Division Program-2. Assistant Director 26.05.2018 01944442200 10.00 am - 1.30 pm 5605-9680 132 KV GNDP in ER Power GRID Co.of Mohammad Hasanul 23.05.2018 to Bangladesh Ltd Islam 26.05.2018 40 Executive Eng. 10.00 am - 1.30 pm 01777760374 5605-9680 132 KV GNDP in ER Power GRID Co.of Adnan Maruf 23.05.2018 to 41 Bangladesh Ltd Sub. Divisional Eng. 26.05.2018 01777760407 10.00 am - 1.30 pm 5605-5076 Energy Efficiency in Grid Based Power Md. Humayan Kabir 23.05.2018 to 42 Supply Project 26.05.2018 10.00 am - 1.30 pm 5605-5076 Energy Efficiency in Grid Based Power Md. Zaman Ali 23.05.2018 to 43 Supply Project Sub Assistant Eng. 26.05.2018 01670987371 10.00 am - 1.30 pm Up-gradation, Rehabilitation and Intensification of Md Amzad Hossain 23.05.2018 to 44 Distribution System (Dhaka, Mymensingh, Assistant Director 26.05.2018 Chittagong and Sylhet Divisions). 5605-5087 01716237665 10.00 am - 1.30 pm 5605-5087 Up-gradation, Rehabilitation and Md. Rashidul Islam 23.05.2018 to 45 Intensification of Distribution System (Dhaka, Assistant Eng. 26.05.2018 Mymensingh, Chittagong and Sylhet Divisions). 01725744191 10.00 am - 1.30 pm 5605-5003 Pre-Paymeent e-Metering in Dhaka Md. Rafiqul Islam 23.05.2018 to 46 Division under Rural Electrification Program (Phase- 26.05.2018 1) 10.00 am - 1.30 pm 5605-5104 Upgradation of Rural Electricity Paritosh Sutradhar 23.05.2018 to 47 Distribution System (Dhaka, Chittagong & Sylhet Deputy Director (Tech) 26.05.2018 Division) 01674723030 10.00 am - 1.30 pm 5605-5104 Upgradation of Rural Electricity Saddam Hossain 23.05.2018 to Distribution System (Dhaka, Chittagong & Sylhet Deputy Director (Finance) 26.05.2018 48 Division) 01717432320 10.00 am - 1.30 pm

5605-9691 Pre- payment metering project for 6 A H M Mohiuddin 27.05.2018 to 49 NOCS Under DPDC Project Director 29.05.2018 01730335182 10.00 am - 1.30 pm 5605-5037 Supervisory control & data acquisation ( Md Monjurul Haque 27.05.2018 to 50 SCADA ) in DESCO Area. Project Director 29.05.2018 01713090606 10.00 am - 1.30 pm 5605-5037 Supervisory control & data acquisation ( Sazzad Nazmul Alam 27.05.2018 to 51 SCADA ) in DESCO Area. Sub Divisional Eng. 29.05.2018 01755637503 10.00 am - 1.30 pm 5605-0029 Consultancy services for GIS ( Swpan Kumar Bhowmik 27.05.2018 to Geographical information system ) Based Project Director 29.05.2018 52 Distribution Network System and Preparation of a 01730335309 10.00 am - 1.30 pm 20 years Master Plan for DPDC 5605-0029 Consultancy services for GIS ( Bipul Prosad Roy 27.05.2018 to Geographical information system ) Based Assistant Eng. 29.05.2018 53 Distribution Network System and Preparation of a 01730335186 10.00 am - 1.30 pm 20 years Master Plan for DPDC 5605-0029 Consultancy services for GIS ( Masbah ul Islam 27.05.2018 to Geographical information system ) Based Assistant Eng. 29.05.2018 54 Distribution Network System and Preparation of a 01730335130 10.00 am - 1.30 pm 20 years Master Plan for DPDC 5605-5092 Construction of 11 Kv switching stations Rashid Ahmed 27.05.2018 to 55 at Bangabhaban, Ganabhaban & Prime Ministory Assistant Eng. 29.05.2018 Office 01708155519 10.00 am - 1.30 pm 5605-5085 Expansion and Strengthening of power Shah Md. Rezwanul 27.05.2018 to 56 System Network Under DPDC Area Haque 29.05.2018 01730335128 10.00 am - 1.30 pm 5605-5049 Construction of 132/33/11 KV Grid Md. Rashidur Rahman 27.05.2018 to 57 Substations in DESCO Area Project Director (Grid) 29.05.2018 01713038386 10.00 am - 1.30 pm 5605-5049 Construction of 132/33/11 KV Grid Mahadi Hasan Rana 27.05.2018 to 58 Substations in DESCO Area Assistant Eng. 29.05.2018 01755637602 10.00 am - 1.30 pm 5605-5132 Rural Electrification Expansion Khulna Md. Burhan Uddin 27.05.2018 to 59 Division Programme-2 01711975569 29.05.2018 10.00 am - 1.30 pm Technical Assistant project for Institutional Md.Mustafizur Rahman 27.05.2018 to 60 Strenghtening of RE program 56055139 01674281602 29.05.2018 10.00 am - 1.30 pm Technical Assistant project for Institutional A N M Rashad hasan 27.05.2018 to 61 Strenghtening of RE program 56055139 Assistant Director 29.05.2018 01723833238 10.00 am - 1.30 pm 5605-5035 Augmentation and Rehabilitation of Jyotish Chandra Roy 27.05.2018 to 62 Distribution System in DESCO Area. 01713443032 29.05.2018 10.00 am - 1.30 pm 5605-5035 Augmentation and Rehabilitation of Md. Shariar Pervaz 27.05.2018 to Distribution System in DESCO Area. Assistant Director 29.05.2018 63 Finance 10.00 am - 1.30 pm 01730794819 5605-5074 Instalation Upgradation & Conversion of Sanatan Datta 27.05.2018 to 64 33 KV Under ground cable pan DESCO Area JIS Specialist 29.05.2018 01713443028 10.00 am - 1.30 pm 5605-5074 Instalation Upgradation & Conversion of Md. Rezwanul Haque 27.05.2018 to 65 33 KV Under ground cable pan DESCO Area Superanding Eng. 29.05.2018 01755637538 10.00 am - 1.30 pm 5605-0014,5605-0022 Design, supply,Installation, Md. Masudur Rahman 27.05.2018 to Testing and Commissioning of New 33/11 KV GIS DPD 29.05.2018 66 sub-station at BGB on turnkey Basis. 01730335292 10.00 am - 1.30 pm

5605-0014,5605-0022 Design, supply,Installation, Ahsan Md.Sadik Hussain 27.05.2018 to Testing and Commissioning of New 33/11 KV GIS Assistant Engr. 29.05.2018 67 sub-station at BGB on turnkey Basis. 01708143135 10.00 am - 1.30 pm

5605-5032 Construction and Expansion of Abul Fazal Md. Badrul 27.05.2018 to Distribution Network of North and South Zone Alam 29.05.2018 68 Under DPDC project Director 10.00 am - 1.30 pm 01713255012 5605-5032 Construction and Expansion of Md. Abu Saaklayen 27.05.2018 to 69 Distribution Network of North and South Zone Assistant Engr. 29.05.2018 Under DPDC 01730335174 10.00 am - 1.30 pm 5605-9692 Construction of New 132/33 KV & 33/11 Md Moshiur rahman 27.05.2018 to 70 KV substations under DPDC Assistant Engr. 29.05.2018 01730335117 10.00 am - 1.30 pm 5605-5073 Uttana Q Basundhara 132/33/11 KV Md. Moinuddin Khan 27.05.2018 to 71 Grid sub. Augmen Lution & Rehabilitation project. Project Director 29.05.2018 01713443043 10.00 am - 1.30 pm 5605-5073 Uttana Q Basundhara 132/33/11 KV Khandoker Istiaque 27.05.2018 to Grid sub. Augmen Lution & Rehabilitation project. Ahmad 29.05.2018 72 sub.Divisional Engr 10.00 am - 1.30 pm .01755637502 5605-0029 Consultancy services for GIS ( Mohammed Shahjahan 27.05.2018 to Geogrophical Information System) Based Assistant Eng. 29.05.2018 73 Distribution Network System and Preparation of a 01730335047 10.00 am - 1.30 pm 20 Years Master Plan for DPDC. 5605-5099 Prepayment Metering Project for Md. Wahidu zzaman 30.05.2018 to 74 SNOCS Division under DPDC Assistant 02.06.2018 01730335116 10.00 am - 1.30 pm 5606-5066 Land Acquisition for 100MWp Solar & Dr. Kazi Muhammad 30.05.2018 to 100MW wind power plant project, sinagazi, Fani Humayun Kabir 02.06.2018 75 Project Director 10.00 am - 1.30 pm 01713303349 5606-5066 Land Acquisition for 100MWp Solar & Md. Elias Hossain 30.05.2018 to 76 100MW wind power plant project, sinagazi, Fani Executive Engineer 02.06.2018 01708497637 10.00 am - 1.30 pm 5605-7500 Construction of Ashugonj 480 MW Kshitish chandra Biswas 30.05.2018 to cenbired cycle power plant (North) project APSCL 02.06.2018 77 01711145585 10.00 am - 1.30 pm

5605-7500 Construction of Ashugonj 480 MW B M Fathul Raza 30.05.2018 to 78 cenbired cycle power plant (North) project 01715259422 02.06.2018 10.00 am - 1.30 pm 5605-5004 Ashuganj 400MW CCPP (East) project Engr. K C Biswas 30.05.2018 to 79 Project Director 02.06.2018 01711145585 10.00 am - 1.30 pm 5605-5004 Ashuganj 400MW CCPP (East) project Md. Imrose Islam 30.05.2018 to 80 Executive Engr. 02.06.2018 01711100873 10.00 am - 1.30 pm 5605-5004 Ashuganj 400MW CCPP (East) project Aminul Islam 30.05.2018 to 81 Assistant Engr. 02.06.2018 01739653761 10.00 am - 1.30 pm 5606-9636 Siddhirganj 335 MW Combined cycle A K M Wahiduzzaman 30.05.2018 to 82 power plant peoject Manager (Accounts) 02.06.2018 01914634673 10.00 am - 1.30 pm 5606-9636 Siddhirganj 335 MW Combined cycle Mohsinul Haque Shakif 30.05.2018 to 83 power plant peoject Executive Engr. 02.06.2018 01708497633 10.00 am - 1.30 pm 5605-5103 Land Acquisition and Resettlement for Mohammad Morshed 30.05.2018 to Implementation of Munshigonj 300-400 MW super Alam 02.06.2018 84 critical coal Base power plant project EGCB Ltd. Superanding Eng. 10.00 am - 1.30 pm 01714133150 5605-5075 Land Acquisition Land Development Md. Mizanur Rahman 30.05.2018 to 85 and protection for payra 1320 Mw thermal power Project Director 02.06.2018 plant project. 01730066978 10.00 am - 1.30 pm 5605-5075 Land Acquisition Land Development Arun Kumar Datta 30.05.2018 to 86 and protection for payra 1320 Mw thermal power Executive Engr. 02.06.2018 plant project. 017777736405 10.00 am - 1.30 pm 5605-9667 Bheramara combined cycle power Engr. A T M Jahangir 30.05.2018 to plant (360 MW) Development project. Kabir 02.06.2018 87 Chief Engineer 10.00 am - 1.30 pm 01730066980 5605-9667 Bheramara combined cycle power Md. Istakinul Haq 30.05.2018 to 88 plant (360 MW) Development project. SDE 02.06.2018 01777736499 10.00 am - 1.30 pm 5605-9667 Bheramara combined cycle power Engr. Md. Saiful Islam 30.05.2018 to 89 plant (360 MW) Development project. Superanding Eng. 02.06.2018 01730066986 10.00 am - 1.30 pm 5605-5093 Matarbari 2x600 MW USC- CFPP Md. Tozzammel Hossain 30.05.2018 to Assistant Manager 02.06.2018 90 01736149947 10.00 am - 1.30 pm

5605-5093 Matarbari 2x600 MW USC- CFPP Mohammad Fazlul Karim 30.05.2018 to Manager Finance 02.06.2018 91 01777787763 10.00 am - 1.30 pm

5605-5008 Land Acquisition of protectional Md. Rokibul Islam 30.05.2018 to 92 Fcasbility singapasc 700 MW Ultra swpcvi critical Sub Divisional Eng. 02.06.2018 coal Finc power plant. 01787678678 10.00 am - 1.30 pm 5605-5069 Household Energy Platfrom program in Md. Milon uddin 30.05.2018 to 93 Bangladesh Project Officer 02.06.2018 01719814017 10.00 am - 1.30 pm 5605-0002 Sirajgonj 225 MW combined cycle Md. Kamruzzaman 30.05.2018 to 94 power plant ( 2nd Unit Dual Fuel ) project Assistant Eng. 02.06.2018 01708152292 10.00 am - 1.30 pm 5605-0003 Sirajgonj 225MW combined cycle power Md Jahangir Alam 30.05.2018 to 95 plant ( Dual Fuel 3rd Unit) project Assistant Eng. 02.06.2018 01788111115 10.00 am - 1.30 pm 5605-5124 Smart pre-payment Metering project for Md. Mizanur Rahman 30.05.2018 to 96 west Zone power Distribotion company Ltd Asst. Engr. 02.06.2018 (WZPDCL) Area. 01721429935 10.00 am - 1.30 pm 5605-5068 Expansion & Upgradation of power Md. Ershed Shaikh 30.05.2018 to 97 Distribution System project, WZPDCL, Khulna Ass. Engr. 02.06.2018 01916763120 10.00 am - 1.30 pm 5605-5109 Strengthening power Distribution Saiful Islam 30.05.2018 to 98 System project Assistant Eng. 02.06.2018 01955921047 10.00 am - 1.30 pm 5605-9667 Bheramara CCPP (360 MW) DP Mohammad Monir 30.05.2018 to Hossain 02.06.2018 99 Executive Eng. 10.00 am - 1.30 pm 01755630014 Md. Masoom Alom 23.05.2018 to Bakshi 26.05.2018 100 Chief Engineer 10.00 am - 1.30 pm 01714119422 5605-5076 Energy Efficiency in Grid Based Power Supply Project Engr. Md Mahabub Alam 11.07.2018 - 14.07.2018 Deputy Manager 10:00 am-1:30 pm 101 01740-877554

Nasim Ben Zafar 15.07.2018 - 17.07.2018 Assistant Eng. 10:00 am-1:30 pm 102 01709997820

5605-5000 Western Grid Network Development Jewel Biswas 15.07.2018 - 17.07.2018 103 Project. Sub Assistant Eng. 10:00 am-1:30 pm 01724590024 Md. Tazal Islam 15.07.2018 - 17.07.2018 Deputy Manager Account 10:00 am-1:30 pm 104 01716487114

5605-5130 Construction Of Bibiyana south 400 Md. Shahadur Rahman 15.07.2018 - 17.07.2018 105 MW Gas based CCPP construction Project. 10:00 am-1:30 pm

5601-5026 Technical Assistance Project for Wind Md. Atiqur Rahman 15.07.2018 - 17.07.2018 106 Resource Mapping 10:00 am-1:30 pm

Farhana Akhtar 15.07.2018 - 17.07.2018 Executive Eng. 10:00 am-1:30 pm 107 5605-5002 Land development,Protection & Building 01839060604 Boundary wall for 2nd Block of Rampal power plant project Area. Md. Asifreza Taraque 15.07.2018 - 17.07.2018 108 Assistant Eng. 10:00 am-1:30 pm 01737392104 Md. Mustafizur Rahman 12.08.2018 - 14.08.2018 109 Ass. Director 10:00 am-1:30 pm 5605-5104 Upgradation of Rural Electricity 01674281602 Distribution System (Dhaka, Chittagong & Saddam Hossain 12.08.2018 - 14.08.2018 110 Deputy Director 10:00 am-1:30 pm 01717432320 5605-5133 Ashugonj-Bhulta 400 KV Transmission Kazi Istiaque Hassan 12.08.2018 - 14.08.2018 111 Line Project Project Director 10:00 am-1:30 pm 01714099363 5605-5103 Land Acquisition and Resettlement Mohammed Morshed 12.08.2018 - 14.08.2018 for Implementation of Munshiganj 300-400 MW Alam 10:00 am-1:30 pm 112 Super Critical Coal Based Power Plant Project, Project Director EGCB Ltd 01714133150 5605-5001 New Haripur Power Plant Md. Anisul Alam 12.08.2018 - 14.08.2018 Development Project (Long Term Service Deputy Manager 10:00 am-1:30 pm 113 Agreement and Others Support Services for Haripu 01912861123 412 MW Combined Cycle Power Plant).

Md. Rafikul Islam 12.08.2018 - 14.08.2018 114 Sub-Divisional Engineer 10:00 am-1:30 pm 01861805230 5605-5009 Land Acquisition, Resettlement, Md. Hasan Zahidul Islam 12.08.2018 - 14.08.2018 EIA & Feasibility study for implementation of 2 x Executive Eng. 10:00 am-1:30 pm 115 600 MW Ultra Super Critical Coal based Power 01755692971 Plant Project at Pekua, Cox's Bazar under EGCB Ltd. 5605-5125 Power Distribution System Md. Refatul Kabir 12.08.2018 - 14.08.2018 Development Project, Cumilla Zone Executive Eng. 10:00 am-1:30 pm 116 01762217624

5605-9733 Extension of Boropukuria Coal Rumana Afroze 12.08.2018 - 14.08.2018 Fired Thermal Power Station by 275 M.W. (3rd Executive Eng. 10:00 am-1:30 pm 117 Unit). 01847162992

Md. Enamul Haque 12.08.2018 - 14.08.2018 118 Project Director 10:00 am-1:30 pm 5605-3265 Construction of Patuakhali - 01730333265 Payra 230 Kv Transmission Line Jagadish Chandra Halder 12.08.2018 - 14.08.2018 119 01755677454 10:00 am-1:30 pm

5605-5110 Development of Power Sheikh Sakib Hossain 12.08.2018 - 14.08.2018 Distribution System In Three Hilly Districts Executive Eng. 10:00 am-1:30 pm 120 01766675005

5605- 5053 Power Distribution System Md. Fazlul Karim 12.08.2018 - 14.08.2018 Development Project, Bangladesh power Deputy Project Director 10:00 am-1:30 pm 121 Development Board, Sylhet 01725300299

Md. Kobir Hossen 12.08.2018 - 14.08.2018 Assistant Eng. 10:00 am-1:30 pm 122 01921221426 5605-5052 400/230/132 KV Grid Network Development Project 12.08.2018 - 14.08.2018 Md. Imran Hossen 10:00 am-1:30 pm 123 Sub Assistant Eng. 01750814831 Md. Altaf Hossain 12.08.2018 - 14.08.2018 Project Director 10:00 am-1:30 pm 124 5605-5062 Conversion of 2x35 MW Shahjibazar 01777760040 Gas Turbine Power Plant To 105 MW Combined Cycle Power Plant Shazib Bhumik 12.08.2018 - 14.08.2018 125 Sub Assistant Eng. 10:00 am-1:30 pm 01675743444 Jyotirmaya Halder 12.08.2018 - 14.08.2018 126 Project Director 10:00 am-1:30 pm 5605-5101 Construction of Khulna 330 MW 01730442795 Combined Cycle Power Plant Project Md. Zahid Hossain 12.08.2018 - 14.08.2018 127 10:00 am-1:30 pm

Poritosh Kumar Pal 12.08.2018 - 14.08.2018 Executive Eng. 10:00 am-1:30 pm 128 01730452969 5606-9636 Siddirganj 335 MW Combined Cycle Power Plant Project 12.08.2018 - 14.08.2018 Mohsinul Haque 10:00 am-1:30 pm 129 Executive Eng. 01708497633 Md. Al-Amin Rasel 12.08.2018 - 14.08.2018 Assistant Eng. 10:00 am-1:30 pm 130 01615004545 5605-5043 Solar Street Lighting Programme in the City Corporation 12.08.2018 - 14.08.2018 Dinesh Chandra Mistry 10:00 am-1:30 pm 131 Executive Eng. 01712951123 Ma. Awlad Hossain 12.08.2018 - 14.08.2018 Deputy Project Director 132 01712503747 10:00 am-1:30 pm 5605-5005 1.5 million Consumer Connection Through Rural Electrification Expansion Md. Abul Khair Bhuiyan 12.08.2018 - 14.08.2018 Assistant Director 10:00 am-1:30 pm 133 Finance 01930018041 5605-0009 Mongla-Khulna (S) 230 kv Md. Hizbul Bahar 12.08.2018 - 14.08.2018 Transmission Line Ass. Emgineer 134 01770790482 10:00 am-1:30 pm

5605-5084Materbari-Madunaghat 400 kV Engr. Morshed Alam 12.08.2018 - 14.08.2018 Transmission Line Project Khan 10:00 am-1:30 pm 135 Project Director 01799985286 Md. Mamun Hasan 12.08.2018 - 14.08.2018 136 01730783335 10:00 am-1:30 pm

5605-5000 Western Grid Network Md. Ashiqur Rahman 12.08.2018 - 14.08.2018 Development Project. Executive Eng. 10:00 am-1:30 pm 137 01777760351

5605-9691 Per-Payment Metering Project for A. H. M Mohiuddin 08.08.2018 - 11.08.2018 6 NOCS Division under DPDC. Project Director 138 01730335182 10:00 am-1:30 pm

5605-5124 Smart Pre-Payment Metering project for Eng. Md.Shadiul Alam 08.08.2018 - 11.08.2018 139 West Zone Power Distribution Company Ltd. Project Director 10:00 am-1:30 pm (WZPDCL) Area. 01711298373 5605-0001 Construction of Bibiyana South Md. Tofazzal Hossain 23.09.2018 - 25.09.2018 140 400+10% MW Gas Based Combined Cycle Power Superanding Eng. 10:00 am-1:30 pm Plant. 01712563415 Mezanur Rahman 26.09.2018 - 29.09.2018 Computer Oparetor 10.00 am-1.30 pm 141 5601-5029 Technical Assistance Project for 01943533826 Development of Sustainable Renewable Energy Power Generation (SREPGen).(1st Revised) Md. Rubel Hossain 26.09.2018 - 29.09.2018 142 Assistant Officer 10.00 am-1.30 pm 01710672907 5605-5111 Construction of Patuakhali - Payra Md. Abu Shale Amran 30.09.2018 - 02.10.2018 230 kV Transmission Line Sub Assistant Eng. 10.00 am-1.30 pm 143 01728533246

5605-5104 Upgradation of Rural Electricity Paritosh Sutradhar 30.09.2018 - 02.10.2018 Distribution System (Dhaka, Chittagong & Sylhet 01674723030 10.00 am-1.30 pm 144 Division)

Md. Rafiqul Islam 30.09.2018 - 02.10.2018 Project Director 10.00 am-1.30 pm 145 01730335208 5605-0013 Pre-payment Metering System for 03 NOCS Division under DPDC on Turnkey Basis Md. Abdul Karim Miah 30.09.2018 - 02.10.2018 (Satmosjid Shere Bangla Nagar, Mugdapara). 01755541457 10.00 am-1.30 pm 146

Md. Fazlur Rahman 30.09.2018 - 02.10.2018 Project Director 10.00 am-1.30 pm 147 01730331349 5605-5001 New Haripur Power Plant Development Project (Long Term Service Agreement and Others Md. Anisul Alam 30.09.2018 - 02.10.2018 Support Services for Haripu 412 MW Combined Deputy Manager Finance 10.00 am-1.30 pm Cycle Power Plant). 148 01912861123

5605-5124 Smart Pre-Payment Metering project for Md. Tofazzel Hossain 30.09.2018 - 02.10.2018 West Zone Power Distribution Company Ltd. 01700709722 10.00 am-1.30 pm 149 (WZPDCL) Area.

Saadi Sabyasachi 30.09.2018 - 02.10.2018 Assistant Eng. 10.00 am-1.30 pm 150 01741774354 5606-5009 Land acquisition , resettlement , EIA and feasibility study for Implementation of 2 x 600 MW ultra super critical coal based power plant Sharmin Akter 30.09.2018 - 02.10.2018 project at pekua , Cox's Bazar under EGCB Ltd . Sub Divisional Eng. 10.00 am-1.30 pm 151 01923752107

Md. Zahangir Mozumder 30.09.2018 - 02.10.2018 Sub Divisional Eng. 10.00 am-1.30 pm 152 01817095769

5605-5019 Re-powering project of Ghorasal 4th unit 5605-5019 Re-powering project of Ghorasal 4th unit Ferdaushi Alam Bipasha 30.09.2018 - 02.10.2018 Assistant Eng. 10.00 am-1.30 pm 153 01982417979

Md. Harun-Ar-Rashid 30.09.2018 - 02.10.2018 Assistant Eng. 10.00 am-1.30 pm 154 01747385655 5605-0008 Amnura 132/33 kv Grid substation with Associated 132 KV Transmission Line Md. Abubaker Siddique 30.09.2018 - 02.10.2018 Assistant Manager 10.00 am-1.30 pm 155 01777760301

5605-5026 Aminbazar-Maowa-Mongla 400 KV Md. Juel Hossain 19/04/2016 TO 156 Transmission Line Project. 21/05/2016 5605-5133 Ashuganj-Bhulta 400 KV Transmission Abdur Rahim 19/04/2016 TO 157 Line Project. 21/05/2016 5605-5003 Pre-Paymeent e-Metering in Dhaka Md. Rafiqul Islam 19/04/2016 TO 158 Division under Rural Electrification Program (Phase- 21/05/2016 1) 5605-5004 Ashuganj 400 (+ -5%) MW Combined Md Anwar Hossain 19/04/2016 TO 159 Cycle Power Plant (East) 21/05/2016

5605-5001 New Haripur Power Plant Development Md Anwar Hossain 19/04/2016 TO Project (Long Term Service Agreement and Others 21/05/2016 160 Support Services for Haripu 412 MW Combined Cycle Power Plant). 5605-5045 Upgradation of Khulna 150 M.W. Md. Abdullah AL Hossain 19/04/2016 TO 161 Peaking Power Plant to 225 M.W. Combined Cycle 21/05/2016 Power Plant Project. 5605-5068 Expansion and Upgradation of Power Md. Rakib Uddin 19/04/2016 TO 162 Distribution System Project 21/05/2016 Per-Payment Metering Project for 6 A. H. M Mohiuddin 19/04/2016 TO 163 NOCS Division under DPDC. 21/05/2016