M.I.Division Kandhamal.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
STATUS OF IRRIGATION SUPPLIED DURING KHARIFF AS ON SEPTEMBER 2015 IN KANDHAMAL DISTRICT Length of canal system in Ayacut in Ha. Km Sl Reason for less/ excess of ayacut Name of District Name of Block Name of MIP Actual length Water supplied No. Actual irrigated/ Reason for not reaching tail end Design in which Designed during khariff up Potential length water Ayacut to 30th September Created supplied 2015 1 2 3 4 5 6 7 8 9 10 Balance area not assessed due to Abadi ajogya 1 Kandhamal Baliguda Changudibali 0.90 0.90 80.00 40.00 12.00 anabadi & Private upland Balance area not assessed due to forest land 2 Kandhamal Baliguda Japimaska 1.70 1.00 109.00 29.05 10.00 like Patra Jangal & Sal jungle. 3 Kandhamal Chakapada Batari 3.38 2.40 185.00 194.04 70.00 Less Rainfall Canal siltedup from RD 3000 to 8000m water 4 Kandhamal Chakapada Hatibadi 8.69 6.20 480.00 169.64 140.00 could not reach at tail end. 5 Kandhamal Chakapada Kambaguda 1.50 0.90 60.00 41.24 31.00 Canal silted up from RD 900 to 1500m 6 Kandhamal Chakapada Lajurimunda 2.07 1.45 68.00 42.53 37.00 Canal silted up from RD 1110 to 1560m Canal silted up from RD 4000 to 7000m & 7 Kandhamal Chakapada Nandini 7.04 5.78 360.00 183.04 140.00 seepage in canal syphon. Water could not reach at tail end due to undersection of canal embankment and some 8 Kandhamal Chakapada Paitagaon 6.30 5.40 560.00 294.14 218.00 area not assessed due to Abadi ajogya anabadi & Private upland 9 Kandhamal Daringibadi Cradigappa 1.75 0.75 60.00 60.00 50.00 Less Rainfall 10 Kandhamal G.Udayagiri Durgamunda 1.40 0.73 46.00 45.53 31.00 Due to damage of canal Structure 11 Kandhamal G.Udayagiri Gamuli 2.96 1.80 68.00 76.89 40.00 Scanty Rainfall Canal syphon damaged at RD 1400 & Canal 12 Kandhamal G.Udayagiri Kakalbaki 10.50 5.00 486.00 228.41 210.00 silted up at RD 2000 to 4900 of LMC, from RD 1400 to 4000m of RMC. Canal runs in heavy cutting zone, canal bed 13 Kandhamal G.Udayagiri Kalanaju 5.25 2.80 283.00 184.63 160.00 choked due earth sliding and under section of canal. 14 Kandhamal G.Udayagiri Madhujhori 4.15 2.30 148.00 171.32 72.00 Less Rainfall Canal runs in heavy cutting zone, canal bed 15 Kandhamal K.Nuagaon Billabadi 1.44 0.44 50.00 40.00 10.00 choked due earth sliding and under section of canal. Canal runs in heavy cutting zone, canal bed 16 Kandhamal K.Nuagaon Boneigaon 1.60 1.10 40.00 45.69 40.00 choked due earth sliding and under section of canal. 17 Kandhamal K.Nuagaon Goibandha 3.72 3.00 180.00 180.00 100.00 Less Rainfall 18 Kandhamal K.Nuagaon Gunjibadi 1.10 0.80 80.00 47.14 35.00 Required extension of canal. 19 Kandhamal K.Nuagaon Katari 7.41 5.20 480.00 398.84 280.00 Required extension of canal. 20 Kandhamal K.Nuagaon Sarangagada 2.37 2.00 250.00 257.45 182.00 Scanty Rainfall 21 Kandhamal K.Nuagaon Sirtiguda 1.77 1.20 90.00 64.00 50.00 Required for extension of canal. 22 Kandhamal K.Nuagaon Tambalamba 3.32 2.52 80.00 76.12 60.00 Less Rainfall Balance area overlapping due to Pilasalki 23 Kandhamal Khajuripada Balaskumpa 4.76 3.35 497.00 259.75 200.00 Medium Irrigation Canal. Length of canal system in Ayacut in Ha. Km Sl Reason for less/ excess of ayacut Name of District Name of Block Name of MIP Actual length Water supplied No. Actual irrigated/ Reason for not reaching tail end Design in which Designed during khariff up Potential length water Ayacut to 30th September Created supplied 2015 1 2 3 4 5 6 7 8 9 10 The balance area not assessed due to private 24 Kandhamal Khajuripada Jamujhori 0.99 0.40 50.00 42.84 22.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 25 Kandhamal Khajuripada Krandimaska 1.43 0.40 50.00 46.66 16.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 26 Kandhamal Khajuripada Lambagudari 1.28 1.00 80.00 61.41 47.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 27 Kandhamal Khajuripada Mankadagada 0.85 0.85 45.00 42.84 35.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 28 Kandhamal Khajuripada Sitagudri 1.28 1.28 100.00 63.30 60.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 29 Kandhamal Khajuripada Sombepadar 2.70 1.90 160.00 113.05 88.00 upland and Govt. land as per joint verification. 30 Kandhamal Kotagarh Kotagarh 4.25 2.25 280.00 280.00 225.00 Scanty Rainfall The balance area not assessed due to private 31 Kandhamal Phiringia Balandapada 0.31 0.31 50.00 41.52 22.00 upland and Govt. land as per joint verification. 32 Kandhamal Phiringia Gopingia 1.18 1.18 81.00 82.41 50.00 Scanty Rainfall The balance area not assessed due to private 33 Kandhamal Phiringia Kanipenu 7.18 3.00 170.00 164.82 100.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 34 Kandhamal Phiringia Kuduki 0.94 0.53 80.00 60.24 20.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 35 Kandhamal Phiringia Nuapadar 1.59 1.25 50.00 32.45 30.00 upland and Govt. land as per joint verification. 36 Kandhamal Phiringia Tandrigaon 1.64 1.35 60.00 57.89 30.00 Scanty Rainfall The balance area not assessed due to private 37 Kandhamal Phiringia Uppersahi 0.81 - 60.00 52.59 30.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 38 Kandhamal Phulbani Bisipada 1.28 - 102.00 87.71 upland and Govt. land as per joint verification. The balance area not assessed due to private 39 Kandhamal Phulbani Budhadani 0.79 0.79 45.00 35.22 30.00 upland and Govt. land as per joint verification. Length of canal system in Ayacut in Ha. Km Sl Reason for less/ excess of ayacut Name of District Name of Block Name of MIP Actual length Water supplied No. Actual irrigated/ Reason for not reaching tail end Design in which Designed during khariff up Potential length water Ayacut to 30th September Created supplied 2015 1 2 3 4 5 6 7 8 9 10 The balance area not assessed due to private 40 Kandhamal Phulbani Dakangi 5.35 0.80 101.00 80.62 15.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 41 Kandhamal Phulbani Gumagada 2.24 2.24 120.00 106.00 50.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 42 Kandhamal Phulbani Kanganinalla 9.75 4.00 400.00 366.80 200.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 43 Kandhamal Phulbani Mallikpada 1.63 0.50 45.00 35.92 15.00 upland and Govt. land as per joint verification. The balance area not assessed due to private 44 Kandhamal Phulbani Minia 0.81 - 40.00 27.80 - upland and Govt. land as per joint verification. 45 Kandhamal Raikia Admahanala 1.95 1.25 63.00 60.44 31.00 Less Rainfall 46 Kandhamal Raikia Basantisagar 4.20 2.10 80.00 0 38.00 Losses of water due to damage of canal H/R 47 Kandhamal Raikia Gundhani 1.52 1.10 80.00 68.54 26.00 Due to damage of canal Structure Left main canal under construction and delay 48 Kandhamal Raikia Indragada 3.96 2.90 640.00 195.15 120.00 due to L.A problems. 49 Kandhamal Raikia Madhurimunda 0.67 - 60.00 54.05 Balance area not assessed due to Abadi ajogya 50 Kandhamal Tikabali Bonangia 5.80 4.80 280.00 153.10 110.00 anabadi & Private upland Canal siltedup from RD 2400 to 3600 and 51 Kandhamal Tikabali Burbinaju 7.00 3.40 320.00 73.98 50.00 some area not assessed due to private upland and Govt. lands. 52 Kandhamal Tikabali Tentuligada 3.90 2.00 92.00 71.53 40.00 Due to damage of canal Structure 53 Kandhamal Tumudibandha Tumudibandha 5.60 1.00 240.00 240.00 85.00 Due to damage of canal Structure TOTAL: 167.93 99.59 8764.00 5928.33 3763.00.