FORM – 1

(Submitted to SEIAA)

BY

KRUSHI DEFENCE COLONY - II (KRUSHI INFRAPROJECTS PVT LTD) (RESIDENTIAL GROUP HOUSING COMPLEX)

Proposed at: Sy. No. 275, 287, 288, 289 & 290 Patancheru (V), Patancheru Mandal ,

Prepared by

6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | | |- 500082|Phone: + 91-40-23314270 / 71| E mail: [email protected] |www.pioneerenvirolabs.com | PEOPLE | SAVE ENVIRONMENT | KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

APPENDIX I (See paragraph – 6) FORM - 1 S. No (I) Basic Information 1 Name of the project Krushi Defence Colony - II (Krushi Infra Projects India Pvt Ltd) 2 S. No. in the schedule 8(b) 3 Proposed capacity / area / length / No. of Villas - 104 (G + 2 floors) & Amenities tonnage to be handled / command area (G + 2 floors) / lease area/number of wells to be Types of Villas – 5 drilled Total Built up area – 22,539.12 Sq.m

Total area – 26,381.76 (6.53 acres) Road affected area – 1,274.3 Sq.m Net area - 25,107.46 (6.2 acres) 4 New / Expansion / Modernization New 5 Existing capacity/Area etc. No 6 Category of project i.e. ‘A’ or ‘B’. B 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify. 9 Location Plot/Survey / Khasra No. 275, 287, 288, 289 & 290 Village Patancheru Village, Tehsil / Mandal Patancheru Mandal District Sangareddy District State Telangana 10 Nearest railway station/airport along Nearest Railway station: Patancheru at a with distance in kms. distance of 1.4 Kms. Airport – 23 Kms (not in operation) Rajiv Gandhi International Airport – 38 Kms 11 Nearest Town, city, District Hyderabad Headquarters along with distance in kms 12 Village Panchayats,Zilla Parishad, The project site falls under GHMC Municipal corporation, Local body(complete postal addresses with telephone no.s to be given) 13 Name of the applicant Krushi Infraprojects India Pvt. Ltd 14 Registered Address Krushi Infraprojects India Pvt. Ltd., 5-9-22/94, Adarsh Nagar, Hyderabad Pin code : 500063 15. Address for correspondence:

1 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

Name B. Ramchandra Reddy Designation(owner/partner/CEO) Managing Director Address Krushi Infraprojects India Pvt. Ltd., 5-9-22/94, Adarsh Nagar, Hyderabd Pin code 500063 E-Mail [email protected] Telephone No. 9246588516, 7729999142 Fax No. -- Details of Alternative sites examined, if No alternate sites are considered 16. any. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves No approval/clearance under; if yes, details of the same and their status to be given. a) The Forest (conservation)Act,1980 b) The Wildlife(protection)Act,1972 c) The C.R.Z Notification,1991? Whether there is any a government No 22. order/policy relevant/relating to the site? 23. Forest land involved(hectares) No 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project.

2 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

(II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist Yes/No quantities /rates, wherever possible) with confirmation source of information data 1.1 Permanent or temporary change Yes Present use of land for the proposed in land use, land cover or project is dry and barren land and falls topography including increase in under Multi-utility zone as per HMDA G.O. intensity of land use (with MS No. 33 M.A dated 24-01-2013. respect to local land use plan) Greenbelt / greenery will be developed with in the premises as per the norms. Hence there will not be any adverse impact due to the change in land use pattern due to the proposed Residential Group Housing project. 1.2 Clearance of existing land, Yes Land is dry and barren with sparse vegetation and buildings? vegetation mainly shrubs and bushes.

Greenbelt developed in the project premises as per the norms. 1.3 Creation of new land uses? Yes Land use will be converted to Residential purpose. 1.4 Pre-construction investigations Yes Soil bearing strength will be measured e.g. bore houses, soil testing? before starting the construction project. Ground water from bore holes will be utilized during construction of the Project 1.5 Construction works? No Construction work will be taken-up only after obtaining the Prior Environmental clearance from SEIAA and Consent For Establishment from TSPCB. 1.6 Demolition works? No No Demolition works are required 1.7 Temporary sites used for Yes Construction workers will be from local construction works or housing of area only. Temporary housing is proposed construction workers? for construction workers. 1.8 Above ground buildings, Yes Most of the structures will be above the structures or earthworks ground. However excavations will be including linear structures, cut involved for foundations. Excess cut will and fill or excavations be used for Flooring & internal road laying 1.9 Underground works including No No mining and tunneling will be involved in mining or tunneling? the proposed activity. 1.10 Reclamation works? No No reclamation works are envisaged in proposed project. 1.11 Dredging? No No dredging activity will be involved. 1.12 Offshore structures? No No offshore structures are envisaged in

3 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

the proposed project. 1.13 Production and manufacturing No Not applicable as proposed project processes? involves construction of Villas for residential purpose. 1.14 Facilities for storage of goods or Yes Raw materials will be stored as per norms. materials? The raw materials like Cement, Sand, Bricks, Steel, Wood, Paint & aggregates will be stored at site only. Cement & Paint will be stored at indoors & remaining will be at outdoors. 1.15 Facilities for treatment or Yes Wastewater generated after occupancy of disposal of solid waste or liquid the Villas will be treated in sewage effluents? treatment plant. Treated wastewater will be utilized for non-potable purposes like Greenbelt development & flushing purpose. Treatment and disposal of wastewater & solid waste will be in accordance with the CPCB/TSPCB norms. 1.16 Facilities for long term housing of No No permanent housing will be provided for operational workers? the construction workers. 1.17 New road, rail or sea traffic Yes There will be a slight increase in traffic during construction or operation? volume during construction and operation of the proposed Residential villas project. The proposed residential Group Housing project site is at a distance of 2 Kms from NH # 9 and 100m from Outer Ring road. The site is well connected by Outer Ring Road and NH # 9. 1.18 New road, rail, air waterborne or No No new road / rail / air transport other transport infrastructure infrastructure is proposed. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No closure or diversion of existing transport routes or infrastructure transport routes is envisaged. leading to changes in traffic movements? 1.20 New or diverted transmission No Water required for the proposed project lines or pipelines? will be sourced from ground water resources during construction & after occupancy. 1.21 Impoundment, damming, No No culverting, realignment are envisaged. culverting, realignment or other There will not be any changes to the changes to the hydrology of hydrology of watercourses or aquifers. watercourses or aquifers? 1.22 Stream crossings? No No stream crossing is involved 1.23 Abstraction or transfers of water Yes Water required for the proposed project

4 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

form ground or surface waters? will be sourced from ground water resources during construction & municipal supply during operation of Residential villas. 1.24 Changes in water bodies or the No No changes in water bodies, drainage and land surface affecting drainage land surface are anticipated as the site is or run-off? more or less flat without many undulations. Separate storm water drains will be provided. 1.25 Transport of personnel or Yes There will be a slight increase in traffic materials for construction, volume during construction and after operation or decommissioning? occupancy of Residential Group Housing complex which is well connected by Outer Ring road and NH# 9 followed by road connecting the both. The existing roads can handle this additional increase in vehicular traffic.

Hence there will not be any adverse impact on road traffic due to the proposed Residential Group Housing complex. 1.26 Long-term dismantling or No No such works are envisaged decommissioning or restoration works? 1.27 Ongoing activity during No No such works are envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to the area either No Temporary labour required for the temporarily or permanently? construction activity will be met from the local places. 1.29 Introduction of alien species? No No such activity is envisaged 1.30 Loss of native species or genetic No As a part of greenbelt / greenery diversity? development plan native species that are suitable to that soil condition will be developed. 1.31 Any other actions? No Nil

5 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

2.0 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Details thereof (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data 2.1 Land especially undeveloped Yes Present use of land for the proposed project or agricultural land (ha) is dry and barren land and will be converted for Residential Group Housing complex. The proposed project site is situated in Multi- utility zone as per HMDA G.O M.s No. 33 MA dated 24-01-2013 Total area – 26,381.76 (6.53 acres) Road affected area – 1,274.3 Sq.m Net area - 25,107.46 (6.2 acres) 2.2 Water (expected source & Yes Water required for the proposed Residential competing users) unit: KLD Group Housing complex will be met from ground water resources. Total water demand is about 6 KLD during Construction of Residential Group Housing complex & 82 KLD during operation of Residential villas.

Net water requirement after recycling of treated sewage (for Greenbelt & flushing) will be 52 KLD. 2.3 Minerals (MT) Yes Sand - 25000 m3 2.4 Construction material – Yes All construction materials such as Ready mix stone, aggregates, sand / soil Concrete, Cement, Sand, Aggregate, Aerated (expected source – MT) Auto clave, Concrete Brick (nos.), Reinforcement Steel, Wood material, Painting material, Flooring Material, Sanitary Material, Electrical Material, Plumbing material will be sourced from other areas such as Hyderabad, Chennai etc. 2.5 Forests and timber (source – No Wood material required for Windows & Doors MT) of Imported Quality will be procured from the areas in and around Hyderabad 2.6 Energy including electricity Yes The total energy requirement for the proposed and fuels (source, competing project is 600 KvA (Maximum peak demand). It users) Unit: fuel (MT), energy will be taken from TSSPDCL. However DG set (MW) will be provided for emergency Backup Power Supply. 2.7 Any other natural resources No Not applicable

6 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

(use appropriate standard units)

7 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 3.1 Use of substances or Yes The hazardous wastes like empty containers materials, which are of paints, petroleum products, thinners, hazardous (as per MSIHC adhesives will be given to authorized rules) to human health or recyclers. All the hazardous materials will be the environment (flora, stored as per HWM rules. fauna, and water supplies) 3.2 Changes in occurrence of No Not Applicable disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people No Not Applicable as the proposed project is e.g. by changing living Residential purpose and will create direct / conditions? indirect employment opportunities in the area and thereby contributing in the improvement of socio-economic status of people in the area. Land prices will increase substantially. 3.4 Vulnerable groups of people No  Approach roads to the Group Housing who could be affected by complex will be paved the project e.g. hospital  Speed of the vehicles will be reduced in patients, children, the the Group Housing complex premises elderly etc.,  Greenbelt will be developed By following the above the dust generation will be minimized. The Solid waste in the form of garbage will be segregated at each section distinguishing wet waste and dry waste. Kitchen and food waste will be converted to manure through organic convertors. Remaining will be taken away by Municipal Corporation. Wastewater generated from the complex will be treated in sewage treatment plant and treated Sewage will be utilized for non- potable purpose like for Flushing & Greenbelt development and surplus will be discharged to the nearest drain Hence there will not be any adverse impact on vulnerable groups.

8 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data 4.1 Spoil, overburden or mine Yes The dug soil during excavation will be wastes used for filling of low lying areas. 4.2 Municipal waste (domestic and Yes The Solid waste in the form of garbage or commercial wastes) will be segregated at each section distinguishing wet waste and dry waste. Kitchen and food waste will be converted to manure through organic convertors. Remaining will be taken away by Municipal Corporation. 4.3 Hazardous wastes (as per Yes Used batteries & Waste oil will be given Hazardous Waste to TSPCB approved vendors Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes Sewage sludge generated will be stored from effluent treatment in HDPE bags and will be used as manure. 4.7 Construction or demolition Yes At the time of construction of the wastes proposed project, there will be some recyclable material like Steel, metal, Plastic material, Wood etc., will be sent to reuse / recycle and other wastes like Bricks, cement waste will be used for leveling. The disturbed slopes shall be well stabilized before the onset of the monsoon. 4.8 Redundant machinery or No No redundant machinery will be kept in equipment the premises. 4.9 Contaminated soils or other No No contamination of soils or no materials contaminated materials will be kept in the plant. 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable.

9 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate

Information/Checklist quantities/rates, wherever possible) with S.No. Yes/No confirmation source of information data

5.1 Emissions from combustion of Yes Emissions of concern will be PM, SO2 fossil fuels from stationary or NOx & CO. mobile sources The emissions will be mainly from Vehicular traffic & from D.G. sets provided for Backup power supply. 5.2 Emissions from production No Not applicable. processes 5.3 Emissions from materials Yes  Raw materials will be brought to the handling including storage or site through covered trucks / transport Trolleys.

 Minimum water spraying will be done.

 All the materials will be properly covered to prevent the dust emissions during high winds.

Hence there will not be any significant dust emissions due to raw material storage & transportation. 5.4 Emissions from construction Yes Some dust emissions will be generated activities including plant and during construction. Dust curtains will equipment be provided all round the area to minimize the dust emissions. 5.5 Dust or odours from handling of Yes Adequate precautionary measures will materials including construction be taken up to control the Odour from materials, sewage and waste the Construction materials like Paint material & Sewage. 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of waste No All such wastes will be disposed along in open air (e.g. slash materials, with Municipal Solid Waste. construction debris) 5.8 Emissions from any other No Nil sources

10 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) with confirmation source of information data with source of information data 6.1 From operation of equipment e.g. Yes All the D.G. Sets & Motor pumps engines, ventilation plant, crushers manufactured in accordance with the noise level standards stipulated by MOEF vide notification dated 14-02- 2000, will be employed 6.2 From industrial or similar Yes The sources of noise generation in the processes proposed project will be DG sets, pumps etc. All machinery will be manufactured as per OSHA / MOEF guidelines. Ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be <55 dBA during daytime and < 45 dBA during night time. 6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment. 6.4 From blasting or piling No No such operations are involved. 6.5 From construction or operational Yes There will be slight increase in traffic traffic noise during construction and operation of the proposed Residential township.  Speed of the vehicles will be reduced in the Group Housing complex premises  Greenbelt will be developed By following above control measures noise levels will be minimized. 6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable

11 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Information/Checklist Details thereof (with approximate S.No. confirmation Yes/No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or Yes Good housekeeping practices will be spillage of hazardous materials followed to prevent any spillage of hazardous materials. 7.2 From discharge of sewage or Yes Wastewater generated from the project other effluents to water or the site will be treated in sewage treatment land (expected mode and place plant and treated Sewage will be of discharge) utilized for non-potable purposes like flushing & gardening. Surplus treated waste water will be discharged into the nearest municipal drain. Hence there will not be any impact on land and water environment due to the proposed project 7.3 By deposition of pollutants No  Raw materials will be brought to the emitted to air into the land or site through covered trucks / into water Trolleys.  Minimum water spraying will be done  All the materials will be properly covered to prevent the dust emissions during high winds Hence there will not be any significant dust emissions due to raw material storage & transportation. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build No Not applicable up of pollutants in the environment from these sources?

12 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 8.1 From explosions, spillages, fires etc Yes Good housekeeping practices will be from storage, handling, use or maintained. Hence there will not be production of hazardous any spillage, due to handling and substances usage of hazardous chemicals. 8.2 From any other causes No Not applicable 8.3 Could the project be affected by No Not applicable natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

13 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate S. No. Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, No No such activities are envisaged power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later Yes With the improvement in the socio- developments economic status of the people in the area, later developments are expected. 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

14 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

(III) Environmental Sensitivity Name/ Aerial distance S.No. Areas Identity (within 15 km.) Proposed project location boundary 1 Areas protected under international KBR Botanical garden 13.0 Kms conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Timmakka cheruvu 0.97 Kms ecological reasons - Wetlands, watercourses or other water bodies, Ameenapur lake 6.0 Kms coastal zone, biospheres, mountains, Komaroni Cheruvu & 1.9 Kms forests other ponds Kodakanchi RF 4.8 Kms Pottaguda RF 7.5 Kms Wailal RF 9.0 Kms KBR Botanical garden 13.0 Kms 3 Areas used by protected, important or Nil Nil within 15 Km sensitive species of flora or fauna for radius breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground Under ground water Available at the site waters

5 State, National boundaries ---- No inter-state boundary, No international boundary. 6 Routes or facilities used by the public for Outer ring road 0.35 Kms access to recreation or other tourist, pilgrim areas NH# 9 2 Kms

7 Defence installations Nil Not applicable 8 Densely populated or built-up area Yes The site falls in the GHMC area 9 Areas occupied by sensitive man-made Hospital & Schools There are many land uses (hospitals, schools, places of Hospitals and worship, community facilities Schools nearby 10 Areas containing important, high quality Underground water Available at the site or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or --- Not applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard --- Based on the which could cause the project to historical data, the present environmental problems site is not likely to (earthquakes, subsidence, landslides, prone to earthquakes, erosion, flooding or extreme or adverse floods, etc. climatic conditions)

15 KRUSHI DEFENCE COLONY - II RESIDENTIAL GROUP HOUSING COMPLEX FORM – 1

(IV). PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

As the proposed project is a construction project with built up area is below 1,50,000 Sq.m. no terms of reference for EIA studies is proposed. However we are here with enclosing Environmental Management Plan for your kind reference. The EMP consists the following  Air emission management  Effluent treatment & disposal  Solid waste generation, storage & disposal  Greenbelt development plan  Rain water harvesting

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project may be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 14-03-2018 Place: Hyderabad

Yours faithfully, for KRUSHI INFRA PROJECTS INDIA PVT LTD.,

B. RAMCHANDRA REDDY MANAGING DIRECTOR

16