List of Ongoing Infrastructure projects with loan assistance from NCRPB (as on September 2015)

Loan Actual Loan Implementing Date of Estimated cost S.No. Name of the Projects Sanctioned (in Amount released Agency sanction (in Cr.) Cr.) (till Sep-15) (in Cr.) Sub Region Transport Sector project (14 nos.) Improvement by way of four laning of Kot Kasim Road upto NH-8, Shahjahanpur Rewari road upto 6 km., PWD (B&R), 1 Nov-08 106.07 79.55 67.55 Rewari Road (SH26), Rewari Mohindergarh Haryana Road, Rewari Dadri road upto proposed bypass New construction of roads from Kaluka to NH-8, Sheoraj Majra to Sangwari, Barriawas to NH-8, Rojka to Asadpur, PWD (B&R), 2 Nov-08 41.4 31.05 25.80 Bikaner to Gurukawas, Rewari Jhajjar road to Rewari Haryana Narnaul road via Rewari Dadri road Improvement of 5 Roads in Distt. (reduced by PWD (B&R), 3 Nov-09 44.01 10 Cr. from August) Govt. of Har. 90.36 67.77 Construction of 2 lane ROB at Jatal road on Dec-12 31.85 13.26 PWD (B&R), 4 Ambala railway line at L/C No. 52-C in Panipat 10.63 Haryana District Construction of 2 lane ROB at Hodal Hassanpur road Dec-12 24.10 13.76 PWD (B&R), 5 on Delhi Mathura Railway line at L/C No. 553 6.88 Haryana Two lane ROB at Sonepat Purkhas road near sugar PWD (B&R), Dec-12 40.37 16.42 6 8.21 mill on Delhi Ambala Railway line L/C No. 29 Haryana Construction of By-pass at Chhara, in PWD (B&R), Dec-12 47.16 35.37 7 25.60 of Haryana Haryana Construction of By-Pass at Kosli, Haryana PWD (B&R), Dec-12 27.68 20.76 8 16.60 Haryana Widening & Strengthening of Gohana Lakhanmajra Dec-12 99.77 74.83 PWD (B&R), 9 road upto district boundary road from 59.90 Haryana km. 0.000 to 37.700 Widening & Strengthening of UP border Sonepat Dec-12 176.26 132.20 PWD (B&R), 10 Gohana upto district Sonepat boundary road from km. 109.25 Haryana 11.600 to 74.000 Widning & upgradation of Gurgaon-Chandu-Badli- PWD (B&R), Dec-12 244.10 183.08 11 109.85 Road Haryana Construction of Road from NH-10 to NH-71 at PWD (B&R), Dec-13 / May-15 27.66 20.75 12 8.30 southern Bye Pass in Haryana Four lanning of Jhajjar Farukhnagar-Gurgaon road PWD (B&R), Dec-13 290.84 218.13 13 0.00 in Jhajjar/ Haryana Up gradation of 3 roads in Rewari Division (Haily Dec-13 / May-15 83.53 62.65 PWD (B&R), 14 25.06 mandi to Pahlawas road, kosli-Guryani to Pahlawas Haryana NH-71 and Dahina- Road 1331.15 969.58 517.64 Sewerage Sector Projects (9 nos.) Development of Sewerage System and Construction of 15 PHED Haryana Feb-06 44.25 33.20 33.20 two STPs at Rohtak town. Providing sewerage facilities in village kosli, and 16 PHED Haryana Oct-07 8.70 6.53 5.22 Railway station area of Kosli, Dist. Rewari Providing sewerage scheme and Treatment Plant for Gohana 17 PHED Haryana Jun-09 16.00 9.18 7.98 Town District Providing sewerage scheme and treatment plant for 14.50 18 PHED Haryana Aug-11 10.87 8.27 Pataudi Town, Gurgaon District Providing sewerage scheme for Punhana Town in Mewat 12.50 19 PHED Haryana Aug-11 9.37 7.73 Distt. Providing sewerage scheme and treatment plant for Nuh 10.27 20 Town, Mewat District PHED Haryana Aug-11 7.71 7.71 Providing sewerage scheme and treatment plant for 21 Hathin Town, PHED Haryana Aug-11 12.3 9.23 8.00 Providing Sewerage Scheme and Treatment Plant for 11.48 8.61 22 PHED Haryana Nov-11 2.58 Farrukh Nagar Town, Gurgaon District. 23 Construction of Storm Water Drain in Sonepat Town, PHED Haryana Dec-12 21.72 16.29 12.72 Haryana 151.71 110.98 93.41

Water Sector Projects (7 nos.)

Augmentation of rural drinking water supply for Mewat Nov 04 rev in 24 PHED Haryana 300.49 225.36 217.58 region- Phase- I, Haryana, revised in nov 09 Nov 09 25 Water Suply at Town & Rojka Meo Industrial Area,SohnaPHED Haryana Nov-08 65.34 24.50 24.50 Water Supply scheme for Nalhar Medical College and 150.00 26 PHED Haryana Aug-11/May-15 112.50 68.13 Nuh Town Providing Water Supply Scheme for Samalkha town 11.94 27 PHED Haryana Aug-11 8.96 7.65 Distt. Panipat. Augmentation of Water Supply for Pataudi and adjoining 41.15 30.86 28 town of Haily Mandi along with surrrounding seven PHED Haryana Nov-11/May-15 16.90 villages. Augmentation of Water Supply for Farrukh Nagar Town & 13.90 10.43 29 PHED Haryana Nov-11/May-15 3.13 Five Villages, Gurgaon District. Loan Actual Loan Implementing Date of Estimated cost S.No. Name of the Projects Sanctioned (in Amount released Agency sanction (in Cr.) Cr.) (till Sep-15) (in Cr.) Water supply project at IMT Manesar by HSIIDC Haryana State 223.80 155.65 Industrial & 30 Infrastructure May-15 0.00 Development Corporation 806.62 568.26 337.89 Power Sector Projects (3 nos.) Project for creating power infrastructure in Haryana Haryana Vidyut 31 Jul-07 117.45 82.01 82.01 subregion of NCR Prasaran Nigam Scheme for strengthening power infrastructure in NCR Haryana Vidyut 32 Nov-08 79.43 59.58 59.58 area of Haryana – Augmentation of Transmission Works, Prasaran Nigam Scheme for HVDS/LVDS & Reallocation of meters under Dakshin Haryana 33 Nov-08 138.47 103.85 103.85 DHBVN in NCR area Bijli Vitran Nigam 335.35 245.44 245.44 Social Sector (1 nos.) Establishment of Technical Institutions at Rohtak DTETechnical May-10 197.00 67.50 67.50 34 education, GoH 197.00 67.50 67.50 Haryana Sub Total (34 nos.) 2821.83 1961.76 1261.89 Uttar Pradesh Sub Region Land Development Sector (2 nos.) 35 Bulandshahr Khurja Nov-04 / May- Ganga Nagar residential scheme, Bulandshahr 69.14 48.09 35.09 Development 10 Authority 36 Hapur Pilkhua Anand Vihar Housing Scheme at Hapur Development Oct-07 178.40 133.80 50.00 Authority 247.54 181.89 85.09 Transport Sector project (1 nos.) 37 Bulandshahr Khurja Transport Nagar Scheme, Bulandshahr, UP Nov-04 33.71 20.65 17.79 Development Authority 33.71 20.65 17.79 Water Sector project (2 nos.) 38 Raw Water Conveyance Main from Intake at Dehra 183.19 137.39 (Ghaziabad) to WTP site at Palla (Greater Noida) GNIDA Aug-13 14.00 Clear Water Main from WTP site to Master Reservoir

39 Primary Treatment Works at Dehra (Ghaziabad), 210 121.48 87.16 MLD Water Treatment Plant at Palla (Greater Noida) GNIDA Aug-13 11.00 and Allied Works 304.67 224.55 25.00 Sewerage Sector project (2 nos.) 40 Construction of 20 MLD Sewage Treatment Plant and 28.15 Pumping Station at Ecotech-III, Greater Noida GNIDA Aug-13 21.10 2.25

41 Construction of 15 MLD Sewage Treatment Plant and 21.17 GNIDA Aug-13 15.87 2.00 Pumping Station at Ecotech-II, Greater Noida 49.32 36.97 4.25 UP Sub Total (7 nos.) 635.24 464.06 132.13 Rajasthan Sub Region (6 nos.) Water Sector (5 nos.) PHED Rajasthan Aug/Oct 2013 42 Alwar Water Supply Upgradation Project 174.86 131.14 0.00 PHED Rajasthan Aug/Oct 2013 43 Tijara Water Supply Upgradation Project 16.46 12.35 0.00 PHED Rajasthan Aug/Oct 2013 44 Rajgarh Water Supply Upgradation Project 20.24 15.18 0.00 PHED Rajasthan Aug/Oct 2013 45 Behror Water Supply Upgradation Project 26.02 19.51 0.00 PHED Rajasthan Aug/Oct 2013 46 Bhiwadi Water Supply Improvement Project 40.69 30.52 1.69 278.27 208.70 1.69 Other (1 nos.) Solar Bus Shelters with Solar Lantern Recharging UIT Alwar 7.22 5.00 47 Dec-12 2.00 Stations in Alwar District 7.22 5.00 2.00 Total (Rajasthan) 285.49 213.70 3.69 Delhi Sub Region (1 no.) Other (1 nos.) 48 Construction of Multi-storied office building at 101.65 76.24 Karkardooma Institutional area at Shahdara South EDMC Dec-13 20.00 Zone by EDMC Total (Delhi) 101.65 76.24 20.00 Counter Magnet Areas Loan Actual Loan Implementing Date of Estimated cost S.No. Name of the Projects Sanctioned (in Amount released Agency sanction (in Cr.) Cr.) (till Sep-15) (in Cr.) Projects in Punjab - CMA Town Patiala Sewer Sector in Patiala (1 No.) 49 Patiala Urban Extension & Augmentation of Water Supply, Sewerage & Development Sep-02 59.93 44.95 44.95 Solid Waste Mgmt, Patiala Authority Total Sewer Sector in Patiala (1 No.) 59.93 44.95 44.95 Total Projects in Punjab - CMA Town Patiala (1 no.) 59.93 44.95 44.95 Projects in UP CMA Town Bareilly Land Development Sector in Bareilly (1 no.) 50 Bareilly Dev. Ram Ganga Nagar residential scheme in Bareilly Dec-04 99.37 37.00 37.00 Authority Projects in UP CMA Town Bareilly (1 no.) 99.37 37.00 37.00 Projects in Haryana- CMA Town Power Sector Sector in Hisar Improvement & Upgradation of Sub transmission of Dakshin Haryana 51 Nov-08 40.01 30.01 21.02 distribution network in Hisar Bijli Vitran Nigam Total Projects in Haryana- CMA Town Hisar (1 no.) 40.01 30.01 21.02 Projects in Rajasthan- CMA Town Kota Water Sector in Kota (1 no.) 52 Augmentation of Water Supply in Kota, Rajasthan UIT Kota Aug-11 181.77 136.33 108.45 Total Water Sector in Kota (1 no.) 181.77 136.33 108.45 Total Projects in Rajasthan- CMA Town Kota (1 no.) 181.77 136.33 108.45 Projects in Madhya Pradsh - CMA Town SADA Gwalior Land Development Projects (1 no.) 53 Infrastructure Development of Residential Schemes in SADA, Gwalior Nov-09 31.54 SADA, Gwalior 76.07 42.05 Sewerage (1 no.) 76.07 42.05 31.54 54 Providing Sewerage Scheme and Treatment Plant for Nov-11 28.38 21.28 SADA, Gwalior 0.00 SADA Gwalior. 28.38 21.28 0.00 Total Projects in CMA Town Gwalior (2 nos.) 104.45 63.33 31.54 Counter Magnet Areas-Total (7 nos.) 485.53 311.62 242.96 TOTAL 4329.74 3027.38 1660.67