Station Renovation with the inauguration of the “Ueno-Tokyo Line”
• Takuji Ito • Manager, East Japan Railway Company, Japan • 2-B Design1 Contents
Part 1 Outline of the Ueno-Tokyo Line
Part 2 Station Renovations ・Tokyo Station ・Shimbashi Station
Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 3 Outline of Ueno-Tokyo line
【Outline of Ueno-Tokyo Line】 ・Line added between Ueno-Tokyo Line Ueno and Tokyo stations Omiya ・Construction start: May 2008 (opened Mar. 2015) Line opened: March 2015 【 】 Purpose Tsuchiura ・Alleviation of congestion Tokyo Metropolitan Akabane ・Reduction of travel time Area Kita-senju
Ikebukuro Ueno-Tokyo line Ueno Hachioji Tachikawa Shinjuku Chiba
Tokyo Shin-kiba Shonan- Ebisu Shinagawa Shinjuku Line Direct through- (opened Dec. 2001) services with Kawasaki Rinkai Line Yokohama (opened Dec.2002) Shinkansen Direct through services of Tokyo Metropolitan Area Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 4 Outline of Ueno-Tokyo line 【Outline 】 ・Takasaki /Utsunomiya Lines ⇒Direct through-service of Tokaido Line Congestion ・Joban Line Ueno Ueno ⇒Direct though-service for Shinagawa station Akihabara Akihabara Change of passenger flow Tokyo Tokyo at stations Passengers transfer at different ( ⇒ Yurakucho Yurakucho stations Ueno Tokyo,Shimbasi) 【Station Renovation】 Shimbashi Shimbashi
■Tokyo station Hamamatucho Hamamatucho ・Enlargement of North Concourse ・Development of new commercial Tamachi Tamachi Tokaido area Shinagawa Shinagawa ■Shimbashi station ・Concourse improvement 【Before】 【After】 ・Construction of large train cover5 Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” Tokyo station
Outline of Tokyo station Concourse outside ・Average daily passengers : 420,000/day ticket gates ・Opened: 1914 North concourse ・Lines: Conventional lines/ 9 Platforms 18 Lines Unused space ( ) Shinkansen/ 5 Platforms 10 Lines embankment
Development
shop shop Area 2012~2020
Concourse inside Concourse inside ticket gates ticket gates Narrow space
shop South concourse Central concourse Central
Station Concourse inside staff room ticket gates (Shinkansen) Subject
・Congestion ofラチ外コンコース North Concourse ・ Development of unused space 6 Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” Tokyo station Development of ground floor Widening of north concourse (first phase) 6.8 m ⇒ 12m Concourse Unused space outside (embankment) ticket gates
stairs 店舗 added shop shop
shop
Concourseラチ内コンコース inside Concourse inside ticket gates ticket gates
Concourse inside Station ticket gates staff room (Shinkansen)新幹線コンコース Development of new commercial area before after 7 Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” Tokyo station Development of underground B1 floor (second phase) Station Development of new commercial area staff room (10,600㎡)
Unused space (embankment) shop
Concourse inside Concourse inside ticket gates ticket gates
Station Station staff room staff room
Unused space Unused space (embankment) (embankment)
Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 8 Tokyo station
Construction
Image after completion(North Concourse)
Image after completion Construction (underground) Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 9 Shimbashi station
Outline of Shimbashi station Outline of Improvement ・Average daily passengers: 250,000/day ・Integrated north and south ・Opened: 1872 concourses into one single concourse ・Lines: Conventional lines / 4 Platform 8 Lines ・ Concourse outside Enlarged platforms for Tokaido Line Before ticket gates ・Installed stairs and elevators to improve accessibility Station staff room shop
Concourse inside ticket gates Image after completion After Station staff room
Concourse outside Concourse inside ticket gates Concourse outside ticket gates ticket gates
Current photo (Planned)
Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 10 Shimbashi station
Before Outline of Improvement Congestion on Tokaido platforms ・Enlarged platform for Tokaido Line ・Construction of big train shed 東 海 道 新 幹 東 東 海 海 京 山 山 京
線 道 道 浜 手 手 浜 下 上 南 ( ( 北
外 内 行
行
り り ) )
After Construction of large train cover Enlarged platforms(max 0.8m)
東 海 道 新 東 幹 東 海 海 京 山 山 京
線 道 道 浜 手 手 浜 上 南 ( 北
下 外( 内
り 行 行
り ) )
Image after completion Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 11 Shimbashi station
Slide construction of large train cover
Step 0 Step 1 Step 2 gantry Large train cover
slide
Step 3 Step 4
Ito – JR East – Station renovation with the inauguration of the “Ueno-Tokyo Line” 12 THANK YOU • ITO TAKUJI/East Japan Railway company – [email protected] – http://www.jreast.co.jp/