Paving *Sep 2019

Total Page:16

File Type:pdf, Size:1020Kb

Paving *Sep 2019 STANDARD CONSTRUCTION DETAILS PAVING REVISED -SEPTEMBER 2019 TABLE OF CONTENTS PAVING GENERAL NOTES SD-PO1 REINFORCED CONCRETE PAVEMENT SD-P02 PARABOLIC PAVEMENT CROWN SD-P03 M4D PAVEMENT SD-P04 M4D, M6D PAVEMENT SD-P05 CURB AND GUTTER SD-P06 ASPHALT PAVING CROSS SECTION SD-P07 GENERAL NOTES FOR ALLEYS AND DRIVEWAYS SD-P08 ALLEY SECTIONS SD-P09 ALLEY TURN 75° OR GREATER SD-P10 ALLEY TURN 30° - 75° SD-P11 ALLEY INTERSECTING ALLEY SD-P12 ALLEY TURN 60°- 120° SD-P13 ALLEY RETURN DETAILS SD-P14 EXISTING ALLEY RETURN MODIFICATIONS (CONCRETE) SD-P15 EXISTING ALLEY RETURN MODIFICATIONS (ASPHALT) SD-P16 ALLEY ENTRANCE ONTO EXISTING STREET SD-P17 MEDIAN DETAILS SD-P18 MEDIAN PAVING STONE DETAIL SD-P19 MEDIAN MAINTENANCE ACCESS (MEDIAN CURB LAY-DOWN) SD-P20 STREET HEADER SD-P21 PAVEMENT REPAIR HEADER SD-P22 RAIL HEADER SD-P23 JOINT DETAILS SD-P24 CONCRETE BUTT JOINT SD-P25 TRANSVERSE EXPANSION JOINT SD-P26 SPACING DIAGRAM FOR TRANSVERSE JOINTS SD-P27 INTERSECTION CONDUIT LAYOUT SD-P28 TYPICAL CONTOURS FOR MAJOR-MAJOR INTERSECTION SD-P29 CONCRETE SIDEWALK SD-P30 CONCRETE SIDEWALK (CONTINUED) SD-P31 SIDEWALK BRICK PAVERS SD-P32 CURB AND LEAD WALK REPAIR SD-P33 BARRIER FREE RAMPS TYPE "A" & "B" SD-P34 BARRIER FREE RAMPS TYPE "C" & "D" SD-P35 BARRIER FREE RAMPS TYPE "E" SD-P36 BARRIER FREE RAMPS TYPE "F" SD-P37 BARRIER FREE RAMPS TYPE "G" SD-P38 BARRIER FREE GENERAL NOTE & DETECTABLE SURFACE SD-P39 BARRIER FREE RAMPS, DRIVEWAYS & ALLEYS SD-P40 DRIVEWAY RETURN DETAILS, STREET (RESIDENTIAL & COMMERCIAL) SD-P41 SIDEWALKS AND DRIVEWAYS SD-P42 DRIVEWAY RETURN FOR ALLEY SD-P43 STREET CONNECTION SD-P44 SIDEWALK FLUME DETAIL SD-P45 ALTERNATE STREET R.O.W. SECTION FOR MOUNTABLE CURB SD-P46 MAILBOX DETAIL SD-P47 STANDARD CONSTRUCTION DETAILS PAVING GENERAL NOTES DATE: REV DATE: SHEET : DEPARTMENT OF ENGINEERING MAY 1991 SEPT 2019 SD-P01 50' ROW 10' 30' 10' 6" 8' 14' 8' 6" 1 1/4"/FT. 1/4"/FT. CURB HEIGHT 6" CROWN HEIGHT 6" VARIES SEE SPECIAL NOTES ONE MOVING LANE / TWO PARKING LANES (RESIDENTIAL) R2U NTS R.O.W. P W P 6" A B B A 6" 1/4"/FT. 1 2* 1 1/4"/FT. CURB HEIGHT 6" CROWN HEIGHT 7" 3" 1'-6" 6" 1'-6" VARIES 6" SEE SPECIAL NOTES * FULL WIDTH PAVEMENT OF 36' WIDTH STREETS IS ALLOWED WHERE APPROVED BY THE CITY OF ALLEN. STREET TYPE STREET A B R.O.W. P WIDTH (W) WIDTH C2U 36' * 8' 10' 60' 12' COLLECTOR 44' 10' 12' 70' 13' COLLECTOR 48' 12' 12' 70' 11' FOUR MOVING LANES OR TWO MOVING LANES / TWO PARKING LANES NTS STANDARD CONSTRUCTION DETAILS PAVING REINFORCED CONCRETE PAVEMENT DATE: REV DATE: SHEET : MAY 1991 MAY 2017 SD-P02 1/4 POINT FULL CROWN 3/4 POINT MID POINT SLIP-FORM PAVEMENT MUST MEET CROWN GRADES AT GUTTERS, AT MID-POINTS AND CENTERLINE. WIDTHS OF PAVEMENT ARE FACE TO FACE. ROADWAY TOTAL MID-POINT WIDTH (W) CROWN HEIGHT 3/4 POINT 1/4 POINT 30' 6" 3 - 3/8" 1 - 1/2" 3/8" 36' 7" 3 - 7/8" 1 - 3/4" 3/8" 44' 7" 3 - 7/8" 1 - 3/4" 1/2" 48' 7" 3 - 7/8" 1 - 3/4" 1/2" 60' 7" 3 - 7/8" 1 - 3/4" 1/2" 2-34' 5" 3 - 3/8" 1 - 1/2" 3/8" TABLE OF CROWN HEIGHTS AND ORDINATES FOR VARIOUS PARABOLIC SECTIONS NTS STANDARD CONSTRUCTION DETAILS PAVING PARABOLIC PAVEMENT CROWN DATE: REV DATE: SHEET : MAY 1991 AUG. 2006 SD-P03 ROW = 90' 12.5' 24' 8.5' 8.5' 24' 12.5' USUAL 12' 12' 12' 12' USUAL 3 1/2"/FT. 1 1 1 1/4"/FT. 1/4"/FT. 1/4"/FT. 1/4"/FT. 3 1 SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. M4D PAVEMENT REGULAR SECTION NTS 1 SAWED LONGITUDINAL DUMMY JOINT 2 CONSTRUCTION JOINT (FULL WIDTH PAVEMENT IS ALLOWED WHERE APPROVED BY THE CITY OF ALLEN). DELETE IF PAVING IS 25 FT. WIDTH TO BE WIDENED LATER. INSTALL CURB IF PAVING IS LESS THAN FULL WIDTH OF 33'-36'. 3 A NUMBER 3 BAR CONTINUOUS SHALL BE PROVIDED FOR CURB REINFORCEMENT ROW = 90' 12.5' 24' 6' 35 12.5' USUAL 12' 12' 11' 12' 12.5' USUAL 3 2.5' 1 1 2 1/4"/FT. 1/4"/FT. 1 1/4"/FT. 3 1 SLOPE TOWARD MEDIAN MAY BE REQUIRED IF LEFT TURN CURB IS SEE GENERAL NOTES (SD-P01) HIGHER THAN OPPOSITE MEDIAN CURB. SECTION "G" FOR BAR SIZE AND SPACING. MINIMUM 6" TOP SOIL AND GRASS, GROUND COVER (TYP.) ALL SLOPES, MEDIAN AND PARKWAYS PER M4D PAVEMENT NCTCOG SPECIFICATION LEFT TURN SECTION LATEST EDITION. NTS STANDARD CONSTRUCTION DETAILS PAVING MD4 PAVEMENT DATE: REV DATE: SHEET : MAY 1991 FEB 2017 SD-P04 R.O.W 12.5' OR 15.5' 12.5' OR 15.5' 24' OR 36' 17' 24' OR 36' 10' OR 11' 3:1 3:1 1/4"/FT. 1/4"/FT. 1/4"/FT. 1/4"/FT. 3:1 3:1 SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. CONSTRUCT KEYWAY OR LONGITUDINAL BUTT JOINT IF NOT POURED MONOLITHIC. TYPE M4D,M6D PAVEMENT RIGHT TURN OR DECELERATION LANE SECTION NTS 120' 15.5' 36' 17' 36' 15.5' 12' 12' 12' 8.5' 8.5' 12' 12' 12' 3:1 2 2 1/4"/FT. 1 1/4"/FT. 1/4"/FT. 1 1/4"/FT. 3:1 SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. 1 SAWED LONGITUDINAL DUMMY JOINT. TYPE M6D PAVEMENT REGULAR SECTION NTS 2 CONSTRUCTION JOINT (FULL WIDTH PAVEMENT IS ALLOWED WHERE APPROVED BY THE CITY OF ALLEN). DELETE IF PAVING IS 25 FT. WIDTH TO BE WIDENED LATER. INSTALL CURB IF PAVING IS LESS THAN FULL WIDTH OF 33'-36'. 3 A NUMBER 3 BAR CONTINUOUS SHALL BE PROVIDED FOR CURB REINFORCEMENT. 120' 15.5' 36' 6' 11' 36' 15.5' 12' 12' 12' 2.5' 8' 12' 12' 12' 3:1 1/4"/FT. 2 1 2 1 1 1/4"/FT. 1/4"/FT. 1/4"/FT. 3:1 SLOPE TOWARD MEDIAN MAY BE SEE GENERAL NOTES (SD-P01) REQUIRED IF LEFT TURN CURB IS SECTION "G" FOR BAR SIZE AND SPACING. HIGHER THAN OPPOSITE MEDIAN CURB. TYPE M6D PAVEMENT 120' R.O.W. NTS 140' 9' 47' 6' 11' 58' 9' 11' 12' 12' 12' 8' 3' 11' 12' 12' 12' 11' 3:1 2 1 1 1/4"/FT. 2 1 1/4"/FT. 1/4"/FT. 1/4"/FT. 3:1 SLOPE TOWARD MEDIAN MAY BE SEE GENERAL NOTES (SD-P01) REQUIRED IF LEFT TURN CURB IS SECTION "G" FOR HIGHER THAN OPPOSITE MEDIAN CURB. BAR SIZE AND SPACING. TYPE M6D PAVEMENT 140' R.O.W. NTS STANDARD CONSTRUCTION DETAILS PAVING MD4, MD6 PAVEMENT DATE: REV DATE: SHEET : MAY 1991 FEB 2017 SD-P05 SEPARATE CURB-AND-GUTTER (ASPHALT) SEPARATE CURB-AND-GUTTER (CONCRETE) STANDARD CONSTRUCTION DETAILS PAVING CURB-AND-GUTTER DATE: REV DATE: SHEET : MAY 1991 MAY 2017 SD-P06 2" H.M.A.C. (TYPE D) SURFACE COURSE 4" HMAC (TYPE C) BASE COURSE 2" 4" 6" 6" LIME STABILIZED SUBGRADE ASPHALT PAVING CROSS SECTION NOTE : CUT OF 6" INTO EXISTING PAVEMENT IS REQUIRED FOR CONSTRUCTION JOINT WITH NEW POURS TO GET A SMOOTH FINISH STANDARD CONSTRUCTION DETAILS PAVING ASPHALT PAVING CROSSECTION DATE: REV DATE: SHEET : MAY 1991 MAY 2017 SD-P07 GENERAL NOTES FOR ALLEYS AND DRIVEWAYS 1. CONCRETE FOR ALLEY RETURNS AND DRIVEWAYS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS IDENTICAL TO THAT SPECIFIED FOR THE STREET PAVEMENT OR BASE WHEN BUILT AS COMPONENTS OF A CONCRETE PAVING PROJECT. WHEN BUILT SEPARATELY, THE STRENGTH SHALL BE AS SPECIFIED ON THE CONSTRUCTION PLAN. 2. SPACING AND CONSTRUCTION OF JOINTS SHALL CONFORM TO PARABOLIC STREET PAVEMENT. STANDARD CONSTRUCTION DETAILS PAVING GENERAL NOTES ALLEY AND DRIVEWAYS DATE: REV DATE: SHEET : SEPT. 1991 MAY 2017 SD-P08 ALLEY HALF SECTION INVERT WIDTH WIDTH DEPTH (A) (L) (d) GENERAL NOTE: ALL ALLEYS TO BE 12' 6' 6" LIMED IN ACCORDANCE 16' 8' 6" WITH ITEM C, SD PO1 20' 10' 6" 2' A PL PL L L SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR CL SIZE AND SPACING. 1" / FT. 1" / FT. 8" d 4" 3" 3" 3600 PSI COMP. SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. 4"- 3600 PSI COMP STANDARD 12', 16' & 20' ALLEY SECTION PL NTS PL 2' 12' 2' 6" 6' FOR 12' ALLEY 6' SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. CL 1" / FT. 1" / FT. 6" 8" 6" 4" 3" 3600 PSI COMP. SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. NOTE : CURBS NOT ALLOWED IN RESIDENTIAL AREAS EXCEPT AS APPROVED BY THE CITY. STANDARD ALLEY SECTION WITH CURB # 3 BAR CONTINUOUS IN CURB. NTS PL 2' 12' 6' OR 12' ALLEY 6' 6" SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR SIZE AND SPACING. CL 1" / FT. 6" 8" 6" 3" 3" 3" 3600 PSI COMP. 12" 12" 18" 18" 18" 18" 12" 18" NOTE : SEE GENERAL NOTES (SD-P01) SECTION "G" FOR BAR CURBS NOT ALLOWED SIZE AND SPACING. IN RESIDENTIAL AREAS EXCEPT AS APPROVED BY THE CITY. ALTERNATE 12' ALLEY SECTION / CURB # 3 BAR CONTINUOUS IN CURB. NTS C D OUTSIDE EDGE OF ALLEY OUTSIDE EDGE 6" OF ALLEY INVERT NOTE : ALLEY PAVING TO BE PLACED IN SHADED AREA WHEN SCREENING WALL IS ALONG PROPERTY LINE. SEE COA SCREENING WALL DETAIL.
Recommended publications
  • Module 6. Hov Treatments
    Manual TABLE OF CONTENTS Module 6. TABLE OF CONTENTS MODULE 6. HOV TREATMENTS TABLE OF CONTENTS 6.1 INTRODUCTION ............................................ 6-5 TREATMENTS ..................................................... 6-6 MODULE OBJECTIVES ............................................. 6-6 MODULE SCOPE ................................................... 6-7 6.2 DESIGN PROCESS .......................................... 6-7 IDENTIFY PROBLEMS/NEEDS ....................................... 6-7 IDENTIFICATION OF PARTNERS .................................... 6-8 CONSENSUS BUILDING ........................................... 6-10 ESTABLISH GOALS AND OBJECTIVES ............................... 6-10 ESTABLISH PERFORMANCE CRITERIA / MOES ....................... 6-10 DEFINE FUNCTIONAL REQUIREMENTS ............................. 6-11 IDENTIFY AND SCREEN TECHNOLOGY ............................. 6-11 System Planning ................................................. 6-13 IMPLEMENTATION ............................................... 6-15 EVALUATION .................................................... 6-16 6.3 TECHNIQUES AND TECHNOLOGIES .................. 6-18 HOV FACILITIES ................................................. 6-18 Operational Considerations ......................................... 6-18 HOV Roadway Operations ...................................... 6-20 Operating Efficiency .......................................... 6-20 Considerations for 2+ Versus 3+ Occupancy Requirement ............. 6-20 Hours of Operations ..........................................
    [Show full text]
  • Town Standards Index (Select to View) • Collector Street Cross Section
    Town Standards Index (select to view) • Collector Street Cross Section - Standard #3.00 • Collector Street Cross Section w/ Bike Lanes - Standard #3.01 • Local Street Cross Section - Standard #3.02 • Local Street Cross Section (No Curb) - Standard #3.03 • Industrial Street Cross Section - Standard #3.04 • 4-Lane Divided Street Cross Section - Standard #3.05 • Alley Cross Section - Standard #3.06 • Greenway Asphalt Path Cross Section - Standard #3.07 • Utility Trench Pavement Repair - Standard #3.08 • Typical Pavement Repair - Standard #3.09 • Standard Driveway Turnout - Standard #3.12 • Standard Curb & Gutter - Standard #3.13 • Median Curb - Standard #3.14 • Rolled Curb - Standard #3.15 • Residential Cul-de-sac - Standard #3.16 • Barricade for Dead End Streets - Standard #3.17 • Standard Concrete Drop Inlet - Standard #4.10 • Standard Brick Drop Inlet - Standard #4.11 • Standard Drop Inlet Grates - Standard #4.12 • Standard Concrete Catch Basin - Standard #4.13A • Standard Concrete Catch Basin - Standard #4.13B • Standard Brick Catch Basin - Standard #4.14A • Standard Brick Catch Basin - Standard #4.14B • HDPE Pipe - Standard #4.16 • Trench Installation for HDPE - Standard #4.16A • Polypropylene Pipe - Standard #4.17 • Trench Installation for Polypropylene - Standard #4.17A • Dissimilar Pipe Connections to RCP - Standard #4.18 • Curb Ramps - Standard #5.00 • Curb Ramps - New Development - Standard #5.01 • Curb Ramps - New Development - Standard #5.02 • Curb Ramps - New Development - Standard #5.03 • Curb Ramps - Retrofit - Standard #5.04
    [Show full text]
  • Replacement of Davis Avenue Bridge Over Indian Harbor Bridge No
    REPLACEMENT OF DAVIS AVENUE BRIDGE OVER INDIAN HARBOR BRIDGE NO. 05012 November 19, 2019 1 MEETING AGENDA • Project Team • Project Overview • Existing Conditions • Alternatives Considered • Traffic Impacts • Proposed Alternative • Railing Options • Construction Cost / Schedule • Contact Information • Questions 2 PROJECT TEAM Town of Greenwich Owner Alfred Benesch & Company Prime Consultant, Structural, Highway, Hydraulic, Drainage Design GZA GeoEnvironmantal Inc. Environmental Permitting Didona Associates Landscape Architects, LLC Landscaping Services, Planning 3 LOCATION MAP EXIT 4 EXIT 3 BRIDGE LOCATION 4 AERIAL VIEW BRIDGE LOCATION 5 PROJECT TIMELINE CURRENT PROJECT STATUS INVESTIGATION ALTERNATIVES PRELIMINARY FINAL CONSTRUCTION PHASE ASSESSMENT DESIGN DESIGN Spring to Fall 2020 February 2018 to June 2018 to January 2019 to May 2019 to May 2018 January 2019 April 2019 December 2019 6 PROJECT GOALS • Correct Existing Deficiencies of the Bridge (Structural and Functional) • Improve Multimodal Traffic Flow at Bridge Crossing (Vehicles / Bicycles / Pedestrians) • Maintain / Enhance Safety at Bridge Crossing • Meet Local, State, and Federal Requirements 7 EXISTING BRIDGE – BRIDGE PLAN 8 EXISTING BRIDGE – CURRENT PLAN VIEW 9 EXISTING BRIDGE Existing Bridge Data • Construction Year: 1934 • Structure Type: Concrete Slab Supported on Stone Masonry Abutments and Pier • Structure Length: 37’‐3” (17’‐1” Span Lengths) • Bridge Width: 43’+ (Outside to Outside) • Lane Configuration: Two Lanes, Two 4’ Sidewalks • Existing Utilities: Water, Gas (Supported
    [Show full text]
  • CONCRETE Pavingtechnology Concrete Intersections a Guide for Design and Construction
    CONCRETE PAVINGTechnology Concrete Intersections A Guide for Design and Construction Introduction Traffic causes damage to pavement of at-grade street and road intersections perhaps more than any other location. Heavy vehicle stopping and turning can stress the pavement surface severely along the approaches to an intersection. The pavement within the junction (physical area) of an intersection also may receive nearly twice the traffic as the pavement on the approaching roadways. At busy intersections, the added load and stress from heavy vehicles often cause asphalt pavements to deteriorate prematurely. Asphalt surfaces tend to rut and shove under the strain of busses and trucks stopping and turning. These deformed surfaces become a safety concern for drivers and a costly maintenance problem for the roadway agency. Concrete pavements better withstand the loading and turning movements of heavy vehicles. As a result, city, county and state roadway agencies have begun rebuilding deteriorated asphalt intersections with con- crete pavement. These agencies are extending road and street system maintenance funds by eliminating the expense of intersections that require frequent maintenance. At-grade intersections along business, industrial and arterial corridor routes are some of the busiest and most vital pavements in an urban road network. Closing these roads and intersections for pavement repair creates costly traffic delays and disruption to local businesses. Concrete pavements provide a long service life for these major corridors and intersections. Concrete pavements also offer other advantages for As a rule, it is important to evaluate the existing pave- intersections: ment condition before choosing limits for the new concrete pavement. On busy routes, it may be desir- 1.
    [Show full text]
  • Concrete Sidewalk Specifications
    CONCRETE SIDEWALK SPECIFICATIONS GENERAL Concrete sidewalks shall be constructed in accordance with these specifications and the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Current Edition (hereafter “Standard Specifications”). Concrete sidewalks shall conform to the lines and grades established by the City Engineer. All removal and replacements will be made as ordered by the City Engineer. The Contractor shall construct one-course sidewalks of a minimum thickness of four (4) inches in accordance with the plans and specifications. Sidewalk through a driveway section shall be a minimum thickness of six (6) inches. Concrete driveway approaches shall be a minimum thickness of six (6) inches. SUBGRADE A new sub-base may be required by the Engineer if, in his opinion, the soil in the subgrade is soft or spongy in places and will swell or shrink with changes in its moisture content. If a new sub- base is required, it shall consist of granular material and shall be spread to a depth of at least three (3) inches and thoroughly compacted. While compacting the sub-base the material shall be thoroughly wet and shall be wet when the concrete is deposited but shall not show any pools of water. If the Contractor undercuts the subgrade two (2) inches or more, he shall, at his expense, bring the subgrade to grade by using gravel fill and it shall be thoroughly compacted. Where sidewalk is placed over excavations such as tree roots or sewer laterals, four (4) one-half (1/2) inch reinforcing bars shall be placed to prevent settling or cracking of the sidewalk.
    [Show full text]
  • Concrete Pavementspavements N a a T T I I O O N N a a L L
    N N a a t t i i o o n n a a Technical Services l l , R R o o u u n n d d a a b b o o Vail, Colorado u u t t May 22-25, 2005 Steve Waalkes, P.E. C C o o n n f f e e r r e e Managing Director n n c American Concrete Pavement Association c e e 2 2 0 0 0 0 5 5 TRB National Roundabouts Conference D D Concrete Roundabouts R R Concrete Roundabouts A A F F T T N N a a Flexible Uses liquid asphalt as binder Pro: usually lower cost Con: requires frequent maintenance & rehabilitation t t i i Asphalt o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C Terminology Terminology o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 D D R R A A Rigid Uses cement as binder Pro: longer lasting Con: higher cost Concrete F F T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o s n n c f f e i e r r t e e n n e y c c t e h e t 2 2 e 0 0 f s 0 0 aterials onstructability a e conomics 5 erformance (future maintenance) 5 Why Concrete Roundabouts? Why Concrete Roundabouts? D D E C P M R R • • • • •S •A A A F F T T Realize there is a choice N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 What performance characteristics of Where do we typically use concrete pavement? (situations, traffic conditions, applications, etc.) concrete pavement make it the best choice for roundabouts? 5 5 Why Concrete Roundabouts? Why Concrete Roundabouts? D D R R 1.
    [Show full text]
  • 1.1 What Is Concrete Masonry?
    1.1 What is Concrete Masonry? Introduction Concrete masonry construction (or as it is more and Specifiers are using Architectural Masonry in commonly called, concrete blockwork) is based on more commercial and residential applications. thousands of years experience in building structures of stone, mud and clay bricks. Blockwork masonry Using the various textures of Fair Face, Honed and units are hollow and are filled with concrete and Splitface is adding a lot more variety to the features allow for the integration of reinforcing steel, a feature of the wall. essential for earthquake resistant design. Concrete blockwork provides a structural and architectural advantage in one material and is recognised worldwide as a major contributor to the construction and building industry. Types of Concrete Blockwork The workhorse of concrete masonry has traditionally been stretcher bond blockwork forming structural, fire and acoustic functions from residential to large commercial buildings as well as the special use in retaining walls. With the introduction of coloured masonry Architects Figure 1: Commercial Stretcher Bond Blockwork Figure 2: Coloured Honed Blockwork Figure 3: Coloured Honed Blockwork Figure 4: Coloured Fairface, Honed and Splitface Blockwork Figure 5: Splitface Blockwork New Zealand Concrete Masonry Association Inc. Figure 6: Honed Half High Blockwork Figure 7: Honed Natural Blockwork There are also masonry blocks that include polystyrene inserts which provide all the structural benefits of a normal masonry block with the added advantage of built-in insulation. Building with these blocks removes the need for additional insulation - providing the added design flexibility of a solid plastered finish both inside and out. The word “Concrete Masonry” also encompasses a wide variety of products such as, brick veneers, retaining walls, paving and kerbs.
    [Show full text]
  • Pavement Marking Handbook
    Pavement Marking Handbook August 2004 © 2004 Texas Department of Transportation All rights reserved Pavement Marking Handbook August 2004 Manual Notices Manual Notice 2004-1 To: Recipients of Subject Manual From: Carlos A. Lopez, P.E. Traffic Operations Division Manual: Pavement Marking Handbook Effective Date: August 2004 Purpose and Content This handbook provides information on material selection, installation, and inspection guidelines for pavement markings. It is targeted for two audiences — engineering personnel and field personnel. The portion for engineering personnel provides information on selecting pavement marking materials for various applications. The portion for field personnel provides information on pavement marking installation and inspection. Additional information about TxDOT specifications, procedures, and standards applicable to pavement markings are included in an appendix. The manual may be used by designers to help with pavement marking material selection and inspectors in the field. Instructions This is a new manual, and it does not replace any existing documents. Content Cover Table of Contents Chapters 1 through 3 Appendix A & B Review History This manual is the product of a Texas Department of Transportation (TxDOT) research project. The TxDOT project director is Greg Brinkmeyer of the Traffic Operations Division. The research supervisor is Gene Hawkins of the Texas Transportation Institute (TTI). Tim Gates and Liz Rose of TTI developed most of the material in the handbook. Wade Odell was the research liaison engineer for the TxDOT Research and Technology Implementation Office. (continued...) Review History (continued) This handbook became a reality because numerous individuals were willing to contribute their time, ideas, and comments during the development process. Special credit should be given to a group of TxDOT staff who meet on a regular basis to review drafts and develop material for the handbook.
    [Show full text]
  • ( Crcp ) Transverse Construction Header Joint
    OKLAHOMA DEPARTMENT OF TRANSPORTATION STANDARD REVISIONS T DESCRIPTION DATE N . E T M I E C A ONG L L S P R E R ' 26'-0'' CONTINUOUS REINFORCED LONGITUDINAL CONSTRUCTION JOINT DIRECTION L O A A 12 SEE DETAIL B F AN B CONCRETE PAVEMENT ( SEE DETAIL THIS SHEET ) OF TRAFFIC SEE DETAIL A C . L I S 12'-0'' 14'-0'' F PAVEMENT DESIGN DATA - ( C.R.C.P. ) T T I N R JOINTED CONC. I M E E W C C W SHOULDER 90 I L FIRST BAR Y LONGITUDINAL L FIRST BAR T V L R TRANS. NO. LBS. JOINT DESIGN SLAB BAR SPACING DES. #5 BAR OF PER 2 / TYPE THICK- SIZE (%) RAMP T LENGTH BARS SY 90 TAPER T JUNCTURE CC RAMP NESS W Y ECTION OINTED P DIR DOWEL J IC A1 8" 25'-1 1/2" #6 4 7/8" 7 3/4" 40 25.3 0.71 F TRAFF O T TRANSVERSE BAR LENGTH W MINUS W MINUS N A 9" 25'-0 3/16" #6 5 9/16" 6 11/16" 46 27.7 0.72 " E ETE OR 1/2 BAR DIA. 1/2 BAR DIA. 0 - NCR M O ' INTED C NT B 10" 24'-11 3/4" #7 5 11/16" 8 1/8" 38 30.2 0.73 JO EME E ETE PAV TYPICAL DOWEL JOINTED ENTRANCE RAMP CONCR 26 HALT ) B1 11" 25'-1 1/2" #7 4 13/16" 7 3/8" 42 33.5 0.73 SP T A ANS AV ( SEE PL 26'-0" WIDE PAVEMENT SECTION P N .
    [Show full text]
  • Rmanent Steel Plates 3" Xo.D‰" 6 " 6 " ( T Y P
    ````` (Opposite Handle Not Shownfor Lifting Handle Steel TubeSleeve 6" x‰" Permanent Steel Plates 3" xO.D‰" 6" 6" (Typ.) Bollard Clarity) Clear (Typ.) ˆ" O.D. x‰"Steel 2 •"x A Tube Post 3" (Typ.) REMOVABLE SQUAREBOLLARD 2" (Typ.) 6" (Typ.) (Typ.) …" Rad. Two Each-6"x‰"SteelPlates SECTION A-A Yellow Reflective Lane Width+1' Sheeting (Typ.) PLAN BOLLARD PLACEMENT 2" Wide ‚" ELEVATION VIEW 1 •" 1 •" 1 ƒ" •" ƒ " Slot 18" 1" Bikeway | ƒ " ‚ " ‚" 6" (Typ.) ‚" 1 • " ‚" ‚ " Bollard Removable Steel Plate Rod (Typ.) Solid Steel ‰" dia. Handles Lifting Lane Width+1' A (Opposite Handle Not Shownfor Lifting Handle 6" x‰" Steel Plates 6" 6" (Typ.) Clarity) B Nominal Steel Steel Pipe 3" Nominal Pipe Post Sleeve REMOVABLE ROUNDBOLLARD 2 •" 2" (Typ.) Clear ‘" Bollard Permanent (Typ.) …" Rad. Two Each-6"x‰"SteelPlates SECTION B-B PLAN ‚" 1 Š" •" 1 Œ" 1 —" 1" ƒ " Slot Bollards (Typ.) ƒ " ‚ " ‚" See DETAIL"A" Š" Permanent Bollard (Typ.) 1 • " ‚" ‚ " Steel Plate Removable Steel Rod(Typ.) ‰" dia.Solid BOLLARD PLACEMENT B PLAN VIEW Note: PlacePadlockon | the SideFacingAway Bikeway From Intersection. Lifting HandlesNotShownforClarity roadwayClearZone. belocatedoutsidethe * NOTE:Bollardsshould 30' (min.) From Pavement Edge Unless Otherwise Shown on the Plans * | Roadway 1'-0" PLAN VIEW DETAIL "A" 1'-0" shall beomitted.Encasepostsdirectlyinconcrete. Bollards, exceptthatthesteelplates,sleevesandliftinghandles PERMANENT BOLLARDS:PermanentBollardsshallbethesameasRemovable (drawn seamlesstubes&plates),B211(rods),andF901(bolts). meeting thefollowingASTMSpecifications:B209(plate),210or241
    [Show full text]
  • Concrete Joints
    THE CITY OF GALVESTON CONCRETE JOINTS SECTION 02523 CONCRETE JOINTS PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Joints for concrete paving; concrete sidewalks; and curbs, and curb and gutter. B. Saw-cutting existing concrete or asphalt pavements for new joints. 1.02 UNIT PRICES A. No separate payment will be made for concrete joints under this Section. Include payment in unit price for Concrete Paving. B. No separate payment will be made for formed or sawed street pavement contraction joints and longitudinal weakened plane joints. Include payment in unit price for Concrete Paving. C. No separate payment will be made for joints or sawcutting for Curb, Curb and Gutter; Concrete Sidewalks; Wheelchair Ramps; and Concrete Driveways. Include payment in unit price for Curb and Gutter; Concrete Sidewalks; Wheelchair Ramps; and Concrete Driveways. 1.03 SUBMITTALS A. Submit product data and samples in accordance with requirements of all sections and provisions of these specifications. B. Submit product data for joint sealing compound and proposed sealing equipment for approval. C. Submit samples of dowel cup, metal supports, and deformed metal strip for approval. PART 2 P R O D U C T S 2.01 MATERIALS A. Board Expansion Joint Material: Filler board of selected stock. Use wood of density and type as follows: 1. Clear, all-heart cypress weighing no more than 40 pounds per cubic foot, after being oven dried to constant weight. 02523-1 THE CITY OF GALVESTON CONCRETE JOINTS 2. Clear, all-heart redwood weighing no more than 30 pounds per cubic foot, after being oven dried to constant weight.
    [Show full text]
  • Chapter 3. Driveways, Sidewalks, and Other Non- Motorized Facilities
    CHAPTER 3. DRIVEWAYS, SIDEWALKS, AND OTHER NON- MOTORIZED FACILITIES 3.1 Driveways This section provides driveway standards for connections to public and private roads. It is not the intent of these Standards to govern design or location of driveways on private property except where they connect to the road right-of-way. No new driveway connection shall be constructed which does not conform to this chapter and minimum sight distance criteria established in 2.12 and 2.13. A. Dimensions, slope, and detail shall be as indicated in Figures 3-003, through 3-009, as further specified in the following subsections. See Section 2.13 for entering sight distance and 2.12 for stopping sight distance requirements. B. New Driveways Requirements: 1. Driveways directly giving access to arterials will be denied if alternate access is available. 2. Maintenance of driveway approaches shall be the responsibility of the owner whose property they serve. 3. Driveways shall be paved with asphalt, or approved surface, between the edge of the paved surface and the right-of-way line, except when on curb and gutter section roadways. See Figure 3-003. 4. For driveways crossing an open ditch section, culverts shall be adequately sized to carry anticipated storm water flows and in no case be less than 12 inches in diameter, and at a minimum the culvert shall be equal to or larger than existing pipes within 500 feet upstream. Pipe should be long enough to allow for the minimum 3:1 beveled ends, figure 7-001. The property owner making the installation shall be responsible for determining proper pipe size.
    [Show full text]