City of Kuna 2019 Comprehensive Plan

Total Page:16

File Type:pdf, Size:1020Kb

City of Kuna 2019 Comprehensive Plan City of Kuna 2019 Comprehensive Plan JULY 16, 2019 Envision Kuna Comprehensive Plan 1 ------------------------This page intentionally left blank------------------------ Envision Kuna Comprehensive Plan 2 Table of Contents Acknowledgements ......................................................................................................................... 4 Council Resolution .......................................................................................................................... 6 Table of Acronyms …………………………………………………………………………………………………………….9 Executive Summary ..................................................................................................................... 10 Goal Area 1: Economically Diverse and Vibrant. ........................................................................ 23 Goal Area 2: Healthy and Safe .................................................................................................... 35 Goal Area 3: Desirable, Distinctive and Well-Designed ............................................................. 56 Goal Area 4: Connected ............................................................................................................... 76 Goal Area 5: Educated and Celebrated. ................................................................................... 102 Goal Area 6: Governing Collaboratively and Effectively ........................................................... 113 Glossary ...................................................................................................................................... 122 List of Figures Figure 1: Project Timeline ............................................................................................................ 12 Figure 2: Plan Focus Areas.......................................................................................................... 13 Figure 3: Guide to Navigating the Comprehensive Plan ........................................................... 21 Figure 4: Parks and Recreation Map .......................................................................................... 40 Figure 5: Natural Hazards Map ................................................................................................... 48 Figure 6: Future Land Use Map .................................................................................................. 58 Figure 7: 2015 Land Use Categories and Proposed Future Land Use Categories ................. 59 Figure 8: Downtown Areas Map .................................................................................................. 65 Appendices Appendix A – Comprehensive Plan Maps and References Appendix B – Context and Existing Conditions Appendix C – Public Input and Planning Process Appendix D – Community Engagement Overview Appendix E – Phase 3 Public Input Summary Appendix F – Department Capital Improvement Plans Appendix G – Kuna’s Early History Appendix H – Attorney General Review Questions Envision Kuna Comprehensive Plan 3 Acknowledgements City of Kuna Envision Kuna Advisory Committee Mayor and City Council Arisa McRoberts – Citizen Representative Alexis Pickering – Central District Health Department Joe Stear – Mayor Amy Schroeder – Idaho Transportation Department Briana Buban-Vonder Haar – Council President Blake Watson – Idaho Power Richard Cardoza – Council Member Bob Bachman – City of Kuna Warren Christensen – Council Member Bobby Withrow – City of Kuna Greg McPherson – Council Member Bryce Durrant – Citizen Representative Planning and Zoning Commission Carl Miller – Community Planning Association of Southwest Idaho Lee Young – Chairman Cathy Smith – Business Representative Dana Hennis – Vice Chair Connie Tilley – Business Representative Stephen Damron – Commissioner Curtis Derr – Citizen Representative Cathy Gealy – Commissioner David Corcoran – Ada County Highway District John Laraway – Commissioner David Gronbeck – Business Representative Planning and Zoning Ginny Greger – Citizen Representative Wendy Howell – Director Jason Ashby – Business Representative Troy Behunin – Planner III Jenny Ulmer – Citizen Representative Jace Hellman – Planner II Jon McDaniel – Kuna Police Chief Trevor Kesner – Planner II Josh Hoffman – Citizen Representative Sam Weiger – Planner I Josh Ulmer – Citizen Representative Andy McClelland – Permit Technician Kelli Badesheim – VRT Dawn Stephens – Customer Service Specialist Kim Bekkedahl – Kuna School District La Donna Tuinstra – Citizen Representative Public Works Laura Landers – Saint Alphonsus Bob Bachman – Director Linda Sullivan –Citizen Representative Mike Borzick – GIS Manager Liz Warhurst – Saint Alphonsus Mark Wasdahl – ITD Economic Development Maureen Gresham – ACHD Commuteride Lisa Holland – Director Mike Smith – Business Representative Mitra Mehta-Cooper – Ada County Paul Schepper – Kuna Fire Department Consultant Team Perry Palmer –Kuna Fire Department Randy Shroll – Idaho Dept. of Commerce Agnew::Beck Consulting Robert Henderson – Citizen Representative J.U.B. Engineers, Inc. Sandra Henderson – Citizen Representative Planning and Facility Management Scott Noriyuki – Business Representative Sid Anderson – Citizen Representative Stephen Hunt – Valley Regional Transit Terry Gammel – Kuna Fire Department Theresa McLeod – St. Luke's Health Systems Photos and images included in this plan are attributed to the City of Kuna, Troy Behunin, Agnew::Beck Consulting, and J-U-B Engineers. Envision Kuna Comprehensive Plan 4 This plan is dedicated to everyone who lives, works, and plays in Kuna. Your continued support and energy are what makes this community thrive. Special thanks to the builders, developers, students, senior citizens, members of the public, agency representatives, and everyone else who participated in our Envision Kuna workshops, open houses, surveys and community events. Envision Kuna Comprehensive Plan 5 Council Resolution Envision Kuna Comprehensive Plan 6 Envision Kuna Comprehensive Plan 7 Envision Kuna Comprehensive Plan 8 Table of Acronyms AAA – American Automobile Association KSD – Kuna School District AASHTO – American Association of State LED – Light Emitting Diode Highway and Transportation Officials LEED – Leadership in Environmental and ACCEM – Ada City-County Emergency Energy Design Management LIHTC – Low Income Housing Tax Credit ACI/AOI – Area of City Impact/Area of Impact LLC – Limited Liability Corporation ACHD – Ada County Highway District MPO – Metropolitan Planning Organization ADA – Americans with Disabilities Act NIETC – National Interest Electric ALS – Advanced Life Support Transmission Corridors BAC – Bicycle Advisory Committee NPDES – National Pollutant Discharge Elimination System BID – Business Improvement District RTP – Recreational Trails Program BLM – Bureau of Land Management SWOT – Strengths, Weaknesses, BOI – Boise Airport Opportunities and Threats BVEP – Boise Valley Economic Partnership TAP – Transportation Alternatives Program CID – Community Infrastructure District TND – Traditional Neighborhood Development CIM – Communities in Motion URA – Urban Renewal Agency COMPASS – Community Planning Association VRT – Valley Regional Transit of Southwest Idaho YMCA – Young Men’s Christian Association EPA – Environmental Protection Agency FEMA – Federal Emergency Management Agency FERC – Federal Energy Regulatory Commission FFA – Future Farmers of America FHWA – Federal Highway Administration FLUM – Future Land Use Map HOA – Home Owner’s Association IFYWP – Integrated Five-Year Work Program IHFA – Idaho Housing and Finance Association IPUC – Idaho Public Utilities Commission ITD – Idaho Transportation Department KRFD – Kuna Rural Fire District Envision Kuna Comprehensive Plan 9 Executive Summary Envision Kuna Comprehensive Plan Executive Summary 10 Executive Summary Preface The Kuna Comprehensive Plan (“the Plan”) is a document that guides the future actions of the community. It presents a vision for the future, with short-term and long-range goals and objectives for all activities that affect the community. This comprehensive plan and vision of the community was developed with input from the Envision Kuna Advisory Committee, city of Kuna, and relied heavily on comments received from Kuna’s citizens throughout the course of the planning process (see Appendix C). A Comprehensive Plan is a document that cities are required to adopt and utilize for land use development within their area of jurisdiction according to Idaho State statute. The Local Land Use Planning Act: Idaho Code §67-6508i provides: “It shall be the duty of the planning or planning and zoning commission to conduct a comprehensive planning process designed to prepare, implement, and review and update a comprehensive plan, hereafter referred to as the Plan. The Plan shall include all land within the jurisdiction of the governing board. The Plan shall consider previous and existing conditions, trends, desirable goals and objectives, or desirable future situations for each planning component. The Plan with maps, charts, and reports shall be based on the following components as they may apply to land use regulations and actions unless the Plan specifies reasons why a particular component is unneeded.” The Plan is legally intended to be a guide for governmental bodies; although it is not a law that must be adhered to in the most stringent sense. The Plan is a statement of long-range public intent; whereas zoning is an exercise of police power which, in the long run, should be consistent with that intent.” (Idaho
Recommended publications
  • Understanding the 1984 Swan Falls Settlement
    UNDERSTANDING THE 1984 SWAN FALLS SETTLEMENT CLIVE J. STRONG & MICHAEL C. ORR FULL CITATION: Clive J. Strong & Michael C. Orr, Understanding the 1984 Swan Falls Settlement, 52 IDAHO L. REV. 223 (2016). This article Copyright © 2016 Idaho Law Review. Except as otherwise expressly provided, permission is hereby granted to photocopy this article for classroom use, provided that: (1) Copies are distributed at or below cost; (2) The author of the article and the Idaho Law Review are properly identified; (3) Proper notice of the copyright is affixed to each copy; and (4) Notice of the use is given to the Idaho Law Review. UNDERSTANDING THE 1984 SWAN FALLS SETTLEMENT CLIVE J. STRONG & MICHAEL C. ORR TABLE OF CONTENTS I. INTRODUCTION ............................................................................................... 224 II. BACKGROUND ................................................................................................ 226 III. THE SWAN FALLS CONTROVERSY AND SETTLEMENT ....................... 230 A. The Lawsuits ............................................................................................ 231 B. The Legislative Subordination Battle ....................................................... 234 C. The Negotiations ...................................................................................... 235 D. The Settlement “Framework” ................................................................... 237 E. The “Trust” Concept ................................................................................. 239
    [Show full text]
  • How to Apply the National Register Criteria for Evaluation
    NATIONAL REGISTER BULLETIN Technical information on the the National Register of Historic Places: survey, evaluation, registration, and preservation of cultural resources U.S. Department of the Interior National Park Service Cultural Resources National Register, History and Education How to Apply the National Register Criteria for Evaluation The mission of the Department of the Interior is to protect and provide access to our Nation's natural and cultural heritage and honor our trust responsibilities to tribes. The National Park Service preserves unimpaired the natural and cultural resources and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The Park Service cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world. This material is partially based upon work conducted under a cooperative agreement with the National Conference ofState Historic Preservation Officers and the U.S. Department of the Interior. Date of publication: 1990; revised 1991, 1995, 1997. Revised for Internet 1995. Cover (Top Left) Criterion B - Frederick Douglass Home, Washington, D.C. From 1877- 1899, this was the home of Frederick Douglass, the former slave who rose to become a prominent author, abolitionist, editor, orator, and diplomat. (Walter Smalling, Jr.) (Top Right) Criterion D - Francis Canyon Ruin, Blanco vicinity, Rio Arriba County, New Mexico. A fortified village site composed of 40 masonry-walled rooms arranged in a cluster of four house blocks. Constructed ca. 1716-17 42 for protection against raiding Utes and Comanches, the site has information potential related to Na­ vajo, Pueblo, and Spanish cultures.
    [Show full text]
  • Snake River Fall Chinook a Primer: 1900-1975
    Snake River Fall Chinook A Primer: 1900-1975 Mark Schuck – Washington Department of Fish and Wildlife. Acknowledgements and note to the reader. The majority of the structure of the presentation was developed by Dr. Billy Connor (USFWS) and through extensive history research by Jim Chandler (Idaho Power Company). Additional insights and historical perspective were provided by several persons from numerous agencies involved with fall Chinook management {Stuart Rosenberger, IPC - GIS Division, Jay Hesse (NPT), Pete Hassemer (IDFG), and several other biologist and researchers that indirectly provided data for slides}. It was my privilege to assemble that information into this presentation. While some of the content from slides in the original presentation provided to the ISRP and attendees on August 6, 2013 will be included in this narrative and slide references are provided in the text that follows, I suggest the best approach to reviewing the history is to read this in concert with the slide presentation, available on the LSRCP website at: http://www.fws.gov/lsnakecomplan/ The purposes of this overview are: • Provide a history of the near demise of Snake Fall Chinook • Review the actions that resulted in the need for, and authorization of, the LSRCP in 1975 • Put everyone on the same plane so that they better understand fall Chinook history • Provide context to better evaluate the success or failure of the LSRCP fall Chinook program, because: We can’t know where we are going if we don’t know where we’ve been. Introduction Chinook are a cultural icon of the Pacific Northwest. King, Tyee or Chinook, the terms convey the aura of big hard fighting fish of the most splendid flavor.
    [Show full text]
  • Snake River Flow Augmentation Impact Analysis Appendix
    SNAKE RIVER FLOW AUGMENTATION IMPACT ANALYSIS APPENDIX Prepared for the U.S. Army Corps of Engineers Walla Walla District’s Lower Snake River Juvenile Salmon Migration Feasibility Study and Environmental Impact Statement United States Department of the Interior Bureau of Reclamation Pacific Northwest Region Boise, Idaho February 1999 Acronyms and Abbreviations (Includes some common acronyms and abbreviations that may not appear in this document) 1427i A scenario in this analysis that provides up to 1,427,000 acre-feet of flow augmentation with large drawdown of Reclamation reservoirs. 1427r A scenario in this analysis that provides up to 1,427,000 acre-feet of flow augmentation with reservoir elevations maintained near current levels. BA Biological assessment BEA Bureau of Economic Analysis (U.S. Department of Commerce) BETTER Box Exchange Transport Temperature Ecology Reservoir (a water quality model) BIA Bureau of Indian Affairs BID Burley Irrigation District BIOP Biological opinion BLM Bureau of Land Management B.P. Before present BPA Bonneville Power Administration CES Conservation Extension Service cfs Cubic feet per second Corps U.S. Army Corps of Engineers CRFMP Columbia River Fish Mitigation Program CRP Conservation Reserve Program CVPIA Central Valley Project Improvement Act CWA Clean Water Act DO Dissolved Oxygen Acronyms and Abbreviations (Includes some common acronyms and abbreviations that may not appear in this document) DREW Drawdown Regional Economic Workgroup DDT Dichlorodiphenyltrichloroethane EIS Environmental Impact Statement EP Effective Precipitation EPA Environmental Protection Agency ESA Endangered Species Act ETAW Evapotranspiration of Applied Water FCRPS Federal Columbia River Power System FERC Federal Energy Regulatory Commission FIRE Finance, investment, and real estate HCNRA Hells Canyon National Recreation Area HUC Hydrologic unit code I.C.
    [Show full text]
  • Swan Falls Project Consultation Appendix
    Idaho Power Company Consultation Technical Appendix CONSULTATION SUMMARY, RELATED CHARTS, AND CORRESPONDENCE APPLICATION FOR NEW LICENSE SWAN FALLS PROJECT FERC NO. 503 Narrative Summary of Idaho Power Company’s Consultation Efforts New License Application for the Swan Falls Hydroelectric Project Consultation Appendix Swan Falls Project June 2008 FERC No. 503 © 2008 Idaho Power Idaho Power Company Consultation Appendix TABLE OF CONTENTS Table of Contents............................................................................................................................. i Introduction......................................................................................................................................1 Consultation Overview ....................................................................................................................1 Informal Consultation ......................................................................................................................2 First Stage Formal Consultation Pursuant to 18 CFR § 16.8...........................................................5 Formal Consultation Package, Including Study Recommendations—March 2005 ..................5 Aquatic Resources ...............................................................................................................5 Wildlife Resources...............................................................................................................6 Botanical Resources.............................................................................................................6
    [Show full text]
  • Evaluation of Seepage and Discharge Uncertainty in the Middle Snake River, Southwestern Idaho
    Prepared in cooperation with the State of Idaho, Idaho Power Company, and the Idaho Department of Water Resources Evaluation of Seepage and Discharge Uncertainty in the Middle Snake River, Southwestern Idaho Scientific Investigations Report 2014–5091 U.S. Department of the Interior U.S. Geological Survey Cover: Streamgage operated by Idaho Power Company on the Snake River below Swan Falls Dam near Murphy, Idaho (13172500), looking downstream. Photograph taken by Molly Wood, U.S. Geological Survey, March 15, 2010. Evaluation of Seepage and Discharge Uncertainty in the Middle Snake River, Southwestern Idaho By Molly S. Wood, Marshall L. Williams, David M. Evetts, and Peter J. Vidmar Prepared in cooperation with the State of Idaho, Idaho Power Company, and the Idaho Department of Water Resources Scientific-Investigations Report 2014–5091 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior SALLY JEWELL, Secretary U.S. Geological Survey Suzette M. Kimball, Acting Director U.S. Geological Survey, Reston, Virginia: 2014 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1–888–ASK–USGS For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this information product, for the most part, is in the public domain, it also may contain copyrighted materials as noted in the text.
    [Show full text]
  • (E.3.1-2) (Executive Summary) Feasibility of Reintroduction of Anadromous Fish Above Or Within the Hells Canyon Complex
    Feasibility of Reintroduction of Anadromous Fish Above or Within the Hells Canyon Complex James A. Chandler Editor Technical Report Appendix E.3.1-2 December 2001 Hells Canyon Complex FERC No. 1971 Copyright © 2003 by Idaho Power Company Idaho Power Company Feasibility of Reintroduction of Anadromous Fish Executive Summary The feasibility of reintroducing anadromous fish above Hells Canyon Dam has been discussed in numerous forums. In the late 1980s during a workshop initiated by Senator James McClure, the workshop participants concluded that reintroduction was possible if three prerequisites could be met: 1) smolt passage problems at existing lower Snake and Columbia river dams were solved, 2) flows in the lower Snake River reservoirs were improved to enable successful smolt passage, and 3) a reintroduction program were not developed at the expense of existing fisheries programs in the Snake and Columbia rivers. In the final recommendations to the National Marine Fisheries Service, the Snake River Salmon Recovery Team recommended that the issue of reintroduction for fall chinook salmon (Oncorhynchus tschawytscha) be examined again in the future, especially if smolt collectors that were harmless to the fish could be developed. The issue of the feasibility of reintroducing anadromous fish was also identified by regional interests represented in the Aquatic Resources Work Group as part of the relicensing process of the Hells Canyon Complex (HCC). In addition, the issues of anadromous fish passage and habitat availability continually arise in discussions relating to other Idaho Power Company (IPC) projects along the mainstem Snake River above the HCC that are also involved in the process of relicensing.
    [Show full text]
  • Download This
    NPS Form 10-900 (Oct. 1990) United States Department of the Interior National Park Service National Register of Historic Places NAT. REGlStlR OF HilfORie Registration Form NATIONAL PARK SERVI This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in How to Complete the National Register of Historic Places Registration Form (National Register Bulletin 16A). Complete each item by marking "x" in the appropriate box or by entering the information requested. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional entries and narrative items on continuation sheets (NPS Form 10-900a). Use a typewriter, word processor, or computer, to complete all items. 1. Name of Property historic name: Salmon Falls Dam_______________________________ other name/site number: 83-17897_____________________________ 2. Location street & number Three Creek Highway ] not for publication city or town Roqerson X] vicinity state IDAHO code ID county Twin Falls code 083 zip code 83301 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I hereby certify that this [ X ] nomination [ ] request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property [ X ] meets [ Jdoes not meet the National Register Criteria. I recommend that this property be considered significant [ ] nationalkf [ ] state\yide [ XJ^CTjally^f ]9/&e continuation sheet for additional comments.] Signature of certifying official/Tim Kenneth C.
    [Show full text]
  • Overview of the Swan Falls Settlement
    Overview of the Swan Falls Settlement Brief History: The Swan Falls Settlement resolved an ongoing controversy over how to balance water uses for agriculture and water needs for hydropower generation in the Snake River Basin. In the late 1970s, a group of Idaho Power Company’s ratepayers initiated a lawsuit against the Company, contending that it had failed to adequately protect its water rights for hydropower generation at the Swan Falls Dam. As a result of the Company’s alleged failure to protest junior water uses upstream from Swan Falls Dam, the ratepayers claimed, the Company had less water for power generation, resulting in higher electricity rates for its customers. Idaho Power Company, in its initial response, maintained that all of its water rights for hydropower generation were subordinated as a result of the subordination condition on its rights at the Hells Canyon Complex. The Idaho Supreme Court, however, decided the issue in favor of the ratepayers, holding that the subordination at Hells Canyon did not extend upstream to the Swan Falls water rights. Following the decision, Idaho Power Company initiated a lawsuit against the holders of approximately 7,500 water rights upstream from its Swan Falls facility, seeking curtailment of those rights based on their junior priority relative to the Company’s hydropower rights. Given the catastrophic consequences that such curtailment would have had on agriculture in southern Idaho, the State, through the Governor and the Attorney General, entered into negotiations with Idaho Power Company to resolve the litigation. The State’s primary interests were to protect existing water uses, and to ensure that the State would control the allocation of water between hydropower and other uses.
    [Show full text]
  • Riparian Reference Areas in Idaho: a Catalog of Plant Associations and Conservation Sites
    This file was created by scanning the printed publication. Errors identified by the software have been corrected; however, some errors may remain. USDA United States ~ Department -· of Agriculture .Riparian Reference Areas Forest Service in Idaho: a Catalog of Rocky Mountain Research Station General Technical Plant Associations and Report RMRS-GTR-20 January 1999 Conservation Sites Mabel Jankovsky-Jones Steven K. Rust Robert K. Moseley Abstract Jankovsky-Jones, Mabel; Rust, Steven K.; Moseley, Robert K. 1999. Riparian reference areas in Idaho: a catalog of plant associations and conservation sites. Gen Tech. Rep. RMRS-GTR-20. Ogden, UT: U.S. Department of Agriculture, Forest Service, Rocky Mountain Research Station. 141 p. Idaho land managers and regulators need knowledge on riparian reference sites. Reference sites are ecological controls that can be used to set meaningful management and regulatory goals. Since 1984, the Idaho Conservation Data Center, Boise, ID, has compiled information in a series of interrelated databases on the distribution and condition of riparian, wetland, and terrestrial plant associations in high quality reference sites in Idaho. This report summarizes association-specific and reference area-specific information from our databases and presents a standardized classification of Idaho riparian and wetland plant associations. Each plant association entry includes the current global and state conservation rank, and the plant association's occurrence in reference areas (if any). This is followed by a summary of each
    [Show full text]
  • Swan Falls Dam Spanning Snake River Kuna Vicinity Owyhee County
    Swan Falls Dam HAER No. ID-20 Spanning Snake River Kuna Vicinity Owyhee County (b.da County) Idaho K I- PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DAT A FIELD RECORDS Historic American Engineering Record Western Regional Office National Park Service U.S. Department of the Interior San Francisco, California 94102 HISTORIC AMERICAN ENGINEERING RECORD Swan Falls Dam HAER No. ID-20 Location: Spanning the Snake River, about 40 miles southwest of Boise, Idaho, and 18 miles south of Kuna, Idaho, in the SE 1/4of Section 18, Township 2 South, Range 1 East, Boise Meridian, UTM: 11/550520/478786C0wyhee County is on the southwest left bank; Ada County is on the northeast right bank Date of Construction: 1900-0l;altered in 1907, 1910, 1913, 1918021,1936, 1944, 1986 Designer: Andrew J. Wiley Builder: Trade Dollar Mining Company, Silver City, Idaho Present Owner: Idaho Power Company, 1220 Idaho Street, P.O. Box 70, Boise, Idaho 83707 Present Use: Hydroelectric power generation Significance: Swan Falls Dam was the first hydroelectric dam on Snake River in Idaho, and one of the earliest built in the Pacific Northwest. A J. Wiley, a brilliant western irrigation engineer and an. early assistant of engineer Arthur D. Foote, designed the project. The dam was built to supply power for the operation of gold mines in Silver City, Idaho, which has long previously run out of wood for fuel. It soon supplied power for Silver City, Nampa, Caldwell, and other Idaho towns. The Idaho Power Company, which acquired the dam in 1916 during a major consolidation of southern Idaho power companies in receivership, expanded the capacity of the dam and added new equipment in two phases.
    [Show full text]
  • Research Guide on Snake River Ferries
    Research Guide on Snake River Ferries Created by SHRA: January 2017 Introduction to Research Guide The history of ferry crossings and pioneer travel throughout Idaho’s Snake River region is rich and highly relevant to Idaho’s transportation history and development. The Snake River historically could be a fast and fierce river that made fording or wading across it nearly impossible. As a result, ferry boats and ferry crossings emerged as the primary means of crossing the Snake River from the mid-1800s through the early-to-mid 1900s. Before the era of bridges and automobiles, pioneers and settlers established ferries at narrow stretches of the Snake River to transport goods, people, livestock, wagons, and later, automobiles from one bank to the other. In the summer of 2016, the Idaho Transportation Department (hereinafter referred to as ITD) contracted with Stevens Historical Research Associates (hereinafter referred to as SHRA) to locate primary and secondary source materials on Snake River ferry locations within ITD’ District 3 boundary. This update emerged as part of mitigation work necessitated by ITD’s replacement of the historic Loveridge Bridge located on the border of Owyhee and Elmore Counties in section 33 of Township 5 South, Range 6 East, and section 4 of Township 6 South, Range 6 East (legal description references will hereafter be formatted thus: T6SR6E). Although ITD’s District 3 includes ten counties – Valley, Boise, Gem, Elmore, Owyhee, Ada, Canyon, Payette, Washington, and Adams Counties – the Snake River only crosses through or touches seven of them, and therefore, this updated portion of this reference series only reflects the ferry history of the Snake River Region within District 3.
    [Show full text]