“Chief Minister Solar Agriculture Feeder Scheme”
Total Page:16
File Type:pdf, Size:1020Kb
WELCOME Koradi Sakri (Thermal) (Solar) Uran Koyna (Gas) (Hydro) MAHARASHTRA STATE POWER GENERATION CO. LTD. 1 OVERVIEW AND HIGHLIGHTS Current generation Gas Solar Second largest capacity is 13602 672 180 Generating company MW Hydro MW, MW, in the country Long term PPAs with 2580 4.8% 1.3% MSEDCL MW, 18.4% First in Country to Adopted RE policy for utilize sewage treated Thermal establishing 2500 MW water for power 10170 MW, Solar Power generation at its 75.5% Koradi plant 2 POWER GENERATION OVERVIEW Installed Capacity - 13602 MW Conventional Renewable Coal (75.5%) Gas (4.8%) Hydro(18.4%) Solar (1.3%) 2920 Chandrapur 432 1956MW MW Uran Koyana Chandrapur 5 MW 2400 MW Koradi MW West . H. 240 Small 1340 374 MW Khaperkheda Recovery MW Hydro (21) Sakri, Dhule 125 MW MW Ghatghar 250 Paras 500 MW 672 MW Total Shirsufal 50 MW 1170 Parli MW MW Total 2580 MW 1210 Bhusawal MW Total 180 MW Nasik 630 MW Total 10170 MW 3 MAHAGENCO’S ROADMAP FOR SOLAR PROJECTS “Chief Minister Solar Agriculture feeder Scheme” “An initiative towards Low cost power for Agricultural Consumers through the Green Power…..” Mahagenco’s Existing Solar PV Power Plants Sr. No. Location of Project Capacity(MW COD ) 1 Tal. Dist. Chandrapur 1 09.04.2010 2 Tal. Dist.Chandrapur 2 18.10.2011 3 Tal. Dist.Chandrapur 2 12.02.2012 4 Shivajinagar Tal.Sakri, Dist. 50 29.03.2013 Dhule 5 Shivajinagar Tal.Sakri, Dist. 75 29.03.2013 Dhule 6 Shirsuphal Tal. Baramati 36 19.12.2014 Dist. Pune 7 Shirsuphal Tal. Baramati 14 31.03.2015 Dist. Pune Total 180 Photographs of Existing Solar PV Power Plants 5MW Chandrapur 125 MW Sakri Dhule 50 MW Shirsuphal Pune Chief Minister Solar Agriculture feeder Scheme • “Hon. CM Solar Agriculture feeder Scheme” dated 14 June 2017 envisages 1. Low cost Power to Agri-consumers 2. Availability of electricity in day time. 3. Reduction in cross subsidy on Industrial & Commercial consumers. • Mahagenco with the help of MSEDCL and MEDA to implement under PPP mode, on pilot basis at Ralegan Siddhi in Ahmednagar district and Kolambi at Yavatmal district in Maharashtra. • Project to be located on Govt./ Private land in the periphery of 5-10KM from 11KV to 132KV substations. Considering the load on AG feeders (Separated) the capacity of Solar power project will be finalized. • Exemption from all fees/charges/ cess levied by State Govt./ authority for the projects. Responsibilities of Utilities • MAHAGENCO : a. Mahagenco will develop the land and infrastructure. b. Mahagenco will sign tripartite PPA with the SPD and MSEDCL for 25 years. • MSEDCL : MSEDCL will provide evacuation facility. • MEDA: MEDA will register the project and provide VGF for the infrastructure. • SOLAR PROJECT DEVELOPER (SPD) : SPD will develop the project including O&M for the period of 25 years. Bidding process for Pilot Projects • NIT for Kolambi & Ralegan Siddhi for 2MW solar Ag project at site were published on 19.05.2017. • The RFP document for these bids were prepared on basis of REVA & BADALA solar park bids of SECI. • Bidder selected by Reverse bidding process with Rs. 3.00/kWh or the minimum tariff quoted by bidder whichever is lower, as the base price. Competitive Bidding • Competitive bidding for both tenders were carried out on 16.06.2017. • Price offered in reverse bidding For Ralegansiddhi is Rs. 2.94/KWH • Price offered in reverse bidding For Kolambi is Rs. 2.97/KWH Status of civil works Ralegan Sidhi Work Remarks Topographical survey Work completed Work completed soil investigation / exploration WBM Road Work in progress. Fencing along the periphery Work is in progress Status of civil works Kolambi Work Remarks Topographical survey Work completed soil investigation / exploration Work completed WBM Road Work completed Fencing along the periphery Work completed Status of 200 MW AG Feeder Projects • Marathwada region – 50MW • Vidarbha region – 50MW • Northen region – 50MW • Western Maharashtra - 50 MW • The tariff rate for all the projects was finalized by reverse bidding to Rs. 3.15/kWh. • The LoA for the developer is issued on dtd. 14.11.2017. PPA & Evacuation Arrangement • Petition for PPA & PSA is submitted in MERC on dtd. 27.11.2017 for all AG Feeder solar projects under “Mukhya Mantri Saur Krishi Vahini Yojana” including Ralegan siddhi & Kolambi. The hearing for this is on dtd. 02.01.2018 • Evacuation scheme is finalized by MSEDCL for both Ralegan Sidhi & Kolambi • All land details for phase-I, 200MW AG feeder solar power projects are submitted to MSEDCL for evacuation arrangement. • The letter regarding evacuation arrangement for SPP at Gavhankund is submitted to Director (Projects), MSEDCL on dtd. 16.12.2017 Evacuation Arrangement Status Ralegansiddhi: LoA issued by MSEDCL to M/s. Prabharanjan Electricals Ahmednagar in JV with Green Flame Pvt. Ltd. Pune on 26.12.2017.( Amount Rs. 32.27 Lakhs) Manjarda (Kolambi): 1. LoA issued by MSEDCL to M/s. Neha Electricals Nanded for Bay construction on 08.12.2017.( Amount Rs. 11.85 Lakhs) 2. LoA issued by MSEDCL to M/s. Star Electricals & Engg, Amravati for Line erection on 08.12.2017.( Amount Rs. 18.98 Lakhs) Gavhankund: Estimation is in progress by MSEDCL. Phase I (200 MW) Implementation Progress • “Bhoomipujan ceremony” for 20 MW AG Feeder cluster at Gavhankund Tal. Warud, Dist. Amravati is arranged on 24.12.2017. • The LoA is issued to M/s. Sangam Advisors Pvt. Ltd. On dtd. 14.11.2017. • The solar power from this project will be supplied to nearby 9 nos. of 33 kV & 11kV substations and 18896 farmers will be benefited from this project. • Approx. 3.33 Mus per year can be generated from this Solar project. • The expenditure for infrastructure development & evacuation arrangement is as around Rs. 2 Cr which will be done by MSPGCL & MEDA. • The project cost as around Rs. 80 Cr. will be done by developer. Land Acquisition Status 300 MW AG Feeder Projects (Phase-II): • Land acquisition process has started vide GR no. जमीन-2017/प्र.क्र.197/ज-1 dtd. 29.11.2017 • Letters to all district collectors are dispatched. • The submission of proposals for land acquisition are under process Registration of projects with MEDA: • The proposals for registration of the projects at Ralegansiddhi & Kolambi are submitted to MEDA along with requisite documents. • The proposals for registration of 200 MW AG feeder Solar Power Projects are submitted to MEDA along with available documents. Evacuation Arrangement for 500 MW AG feeder projects • All land details for phase-I, 200MW and 300 MW (Phase-II) AG feeder solar power projects are submitted to MSEDCL for evacuation arrangement. • The letter regarding evacuation arrangement for cluster AG feeder Solar power project at Gavhankund (Under Vidarbha region Phase-I) is submitted to Director (Projects), MSEDCL on dtd. 16.12.2017 Marathwada region (Phase –I) Sr.No. Name of project District Name of the 33/11Kv Gov. land Gat No. Of the Distance from Propo.Solar Land reqd Land Status Site Substation Available land S/S in KM plant Cap. in ( for project in ( Hector) M.W.) (Hector) PHASE-I (200MW) 1 Chauka, A'bad Chauka Proposals Submitted to 18.63 25 3 3 6 collector office 2 Gangapur, A'bad Gangapur Proposals Submitted to 49.6 281/A 4 7 14 collector office 3 Ansarwada Latur Ansarwada Adjacent to S/S Joint Measurement Nilanga,Tal.Latur Nilanga,Tal.Latur 4 23,56 2 4 Completed on 02/11/17 4 Nathara, Tal. Beed Nathara, Tal. Adjacent to S/S Proposals Submitted to 30.53 21,182 8 16 Parli,Beed. Parli,Beed. collector office 5 Waghe Beed Waghe Adjacent to S/S Proposals Submitted to 13 16 3 6 Babhulgaon,Tal.Kej Babhulgaon,Tal.Kej collector office 6 Bavi Tal Bhoom Osmanabad Warud Joint Measurement 4 Gavthan 3 2 4 Completed on 19/09/17 7 Bor-Ranjani , Jalana Jalna Bor-Ranjani , Jalana Proposals Submitted to 137 531 1 2 4 collector office 8 Talni & Koli Nanded Talni Tal. Hadgaon 0.5 Proposals Submitted to 29.09 900,901,902 6 12 collector office 9 Yeldari Parbhani Yeldari Sawangi Proposals Submitted to 1.2 5 10 37.91 39,41,169 collector office 10 Kolha Parbhani Kolha Proposals Submitted to 4.59 1,2 6 2 4 collector office 11 Ghordari Tal. Hingoli Ghordari Adjacent to S/S Proposals Submitted to Sengaon 4 2 4 collector office 256 12 Kedarkheda Jalna Kedarkheda Tal. Proposals Submitted to 40 22 3 8 16 Tal.Bhokardan Bhokardan collector office 50 100 372.35 North Maharashtra (Phase-I) Sr.NoName of the project District Name of the Land Status Distance . Site 33/11Kv Gov. land Proposed Land reqd Gat No. of from Substation Available in ( Capacity in for project the land Substation in Hector) (MW) in (Hector) KM PHASE- I (200MW) 1 Vadalibhoi Nashik Vadalibhoi NOC not received from 15.75 309 0.5 8 15.75 ,Tal.Chandwad Grampanvhayat 2 Vadgaon Pangu Nashik Vadgaon Pangu NOC received,proposal ,Tal.Chandwad 24.9 83,84 0.5 4 8 submitted. 3 Vinchur Tal. Niphad Nashik Vinchur NOC received,proposal 72 93 6.5 3 6 submitted. 4 Jaitane Taluka- Sakri Dhule Jaitane Land in passation with Mahagenco 11KV line 18 128/1 5 9 18 passing through plot. Letter given to CIVIL for land development 06.01.18 5 Lamkani Dhule Lamkani 568(7.61H)- NOC received,proposal 18 569(4.94H)- 3 8 16 submitted. 570(5.75H) 6 Nimgul , Sindkheda Dhule Nimgul NOC not received from 66 342 3.7 5 10 Grampanvhayat 7 Holmohida Nandurbar Mohide 57/2 NOC received,proposal Tal.Shahada Tal.Shahada 39.99 (23.25H),225 3 8 16 submitted /1 8 Wadangali Tal.Sinnar Nashik Wadangali NOC received,proposal Tal.Sinnar 79.48 26/1/1A 0.5 5 10 submitted 334.12 22.7 50 99.75 Vidarbha Region (Phase-I) Sr.N Name of Project District Name of the 33/11Kv Gov.