CAREC Corridor Implementation Progress, Planned Actions, and Support Needs

MONGOLIA Implementation Progress of the TTFS 2020 projects

Completed CAREC projects Road Planned Safety Actual for Compon Completed Comple ent (for Current (km) tion Project Target Road Countr IP Project Title Funding Impleme (km) Corridor Sector Status Cost ($ Lengt projects) y No. Source(s) ntation million) h (km) ? Period Cumul Yes/No ative 2018 2017 up to onwards 2016

Western Regional Road Development (PRC MON Government, 1995– MON IP 1 4a Road Border at Yarant– Completed 145 743.1 Yes 493.4 N/A ADB & PRC 2018 – Ulgii – Ulaanbaishint) ADB, MON Government (31.5) ADB, MON Regional Road Government Development (58.8) 1995– MON IP 2 4b Road (Construction of Completed 126 Millenium 434 Yes 434 N/A 2014 Altanbulag-- Challenge Zamiin-Uud) Corporation (65.8) ADB, MON Govenrment (24.1) Implementation Progress of the TTFS 2020 projects Ongoing CAREC projects Planned Road for Safety Current Actual Completed (km) Comple Project Target Componen Project Title Funding Implemen Country IP No. Corridor Sector Status Cost ($ Length t (for Road tion Source(s) tation million) (km) projects)? (km) Period Cumulati Yes/No 2018 ve up to 2017 onwards 2016

JICA/MON Operatio Airport Construction of New Government 2008- n will MON IP 5 4b-c and Civil International Airport in Ongoing 591 ; Japanese N/A N/A N/A N/A start 2018 Aviation Ulaanbaatar Government october, soft loan 2018 Access Road to the EXIM 2015- Construction MON IP 10 4b Road New International Ongoing 140 Bank soft 32 Yes 0 32 2018 work - 65% Airport in Ulaanbaatar loan Western Regional Road Development 2012- Construction MON IP 11 4a Road Phase 2 MFF—Bayan Ongoing 120 ADB 189.7 Yes 0 189.7 2019 work - 40% Ulgii and Khovd Aimags (provinces) Baruun-Urt – Bichigt 272 km road is already Undurkhaan (AH32)– Concession Based (120)/ tendered. At Baruun-Urt–Bichigt– 2014– MON IP 101 4c Road Ongoing 268 MON 495 Yes 223 the this time, 272 Huludao/ Chifeng– 2020 Government tendering Jinzhou Road (12.6+36.9) process ongoing, short listed Implementation Progress of the TTFS 2020 projects Planned CAREC projects Road Plann Safety Actual ed for Compo Completed Comp nent Targe (km) letion Project Current (for t (km) Count IP Corrido Project Title Cost ($ Funding Implemen Road Sector Status Lengt ry No. r million Source(s) tation project h Cumul ) Period s)? 2018 (km) ative Yes/No 2017 onwa up to rds 2016

IP Railway Rolling Stock 2019- MON 4b-c Railway Planned 59 TBD N/A N/A N/A N/A N/A 12 Maintenance Depot 2021 IP Railway Centralized 2019- MON 4b-c Railway Planned 29 TBD N/A N/A N/A N/A N/A 13 Traffic Control Center 2021 Project area is IP Ulaanbaatar City Railway 2019- ready MON 4b-c Railway Planned 36 TBD N/A N/A N/A N/A 14 Passenger Station 2021 for constr uction. PROGRESS HIGHLIGHTS OF PROJECTS

Ханх IP2 IP11 Сүхбаатар Баянтэс

Дархан

Мянгад

Ховд

Цахир Налайх

Багануур IP1 Багахангай Булган

IP 10 Айраг IP101

Гашуун Сухайт

IP2 Ulaanbaishint IP11 Цагааннуур Completed 189.7 km paved road Olgiy 4b Undurkhaan construction project 4c Толбо IP101 funded by GOM and Мянгад Baruun Urt ADB, completion rate is IP 10 40 % and will be Hovd Choir completed by 2018 Access Road to the New International 4aДарви Airport in Ulaanbaatar. Completion rate is 65 % Baruun-Urt – Bichigt 272 and will be completed km road is included to Булган IP 5 IP1 by 2018 the Concession list. Yarant DBOT type. Present Completed moment, tendering Construction of New process is ongoing and International Airport in short listed Ulaanbaatar. Construction works is completed. Operation will start october, 2018 Completed road construction projects On going road construction projects Other National Priority Actions, planned for 2018-2020 and beyond 2020 Highway corridors West corridor - Total length is 741 km. Construction work is ongoing and will be complete in 2018. Central corridor East corridor Central corridor - Total length is 990 West corridor km. Construction work is completed. Reconstruction work for the 345 km road of direction Ulaanbaatar- Horizontal corridor Altanbulag will be start in 2018 by ADB soft loan. AH-4 Needs to be done reconstruction work for other sections as well. To be find finance.

AH-3 East corridor - Total length is 695 km. Construction work will start in 2018. To be find finance

Roads from Capital city to Centre of provinces was included in the Mongolian Government action plan 2016-2020. Total length is 5100 km.

At the present, Totally 904 km of roads to western 5 provinces namely Bayn- Ulgii, Khovd, Uvs, Govi-altai, Zavkhan are under the construction. Construction work is will be complete in 2020. Other National Priority Actions, planned for 2018-2020 and beyond 2020 Railroad BOGDKHAN – RAILROAD Passenger railroad

BOGDKHAN - Access PLANNED road to RAILROAD NUBIA

NEW AIRPORT OF ULAANBAATAR

Planned logistic centre Suburb city of airport

Construction of “Bogdkhan” railway bypass Ulaanbaatar with connection with new international airport and perspective Existing railroad Planned railroad multimodal logistics hub. To be find finance.

Western railway corridor is included in the “State policy on railway transportation” adopted 2010 by Under the Concession agreement North State Hural (Parliament of ). corridor -Ovoot 542 km of railroad The Government of Mongolia planning to connect construction will start in 2019. the western railway corridors to the international railway network. Construction of Tavantolgoi to Gashuunsuhait Pre-feasibility studies of the western railway railway was started in 2013. Due to luck of corridor are planned for 2019-2020. investment construction work is stopped and To be find finance. Government of Mongolia is working to find finance for accomplish residual works Other National Priority Actions, planned for 2018-2020 and beyond 2020 Aviation № Projects and Activities Upgrade airport of Umnugovi province to alternative airport in Southern 1 Region 2 Upgrade Choibalsan airport of to alternative airport in Eastern Region 3 Upgrade Khovd airport of to alternative airport in Western Region 4 Expand air navigation system 5 Open new entry/exit points Upgrade “Choibalsan” airport of Dornod Ханх Хандгайт Улаанбайшинт province. (Estimated investment 16 million Эрээнцав Арцсуурь Бага-ИлэнхЗэлтэр Улаангом Хатгал Алтанбулаг Цагааннуур USD) Наранбулаг Түшиг Чулуунхороо БаянтэсЦагаан-Уул Мөрөн ТэшигСүхбаатар Ульхан Тариалан Өлгий ЭрдэнэбүрэнДөргөн Дархан Толбо Сонгино Тосонцэнгэл Баян-Уул Мянгад Нөмрөг Хавирга Даян Норовлин Тэлмэн Эрдэнэт Ховд Булган Баянхошуу Улиастай Тариат Манхан Цахир Өндөр-Улаан Улаанбаатар Баян Овоо Аршаан Манхан Бүрэгхангай Лүн Налайх Дөрвөлжин Чойбалсан Дарви Цагаанхайрхан Батцэнгэл Өндөрхаан Зуунмод Багануур Мөнххаан Рашаант Багахангай Мөст Гурванбулаг ЦэцэрлэгХархорин Дэлгэр Галуут Баруун-Урт Булган Эрдэнэцагаан Үенч Төгрөг Бууцагаан Баянхонгор Алтай Бичигт Чойр Айраг Бугат Арвайхээр Нарийнтээл Богд Мандалговь Бургастай Сайншанд

Баянлэг Цогтовоо Эрдэнэ Замын Үүд

Цогтцэций Гурвантэс Даланзадгад Upgrade “ Gurvansaikhan” airport of Umnugovi Upgrage “ Khovd” airport of Khovd province. Гашуун Сухайт province. ( Estimated investment 120 million ( Estimated investment 20 million USD)Шивээ Хүрэн USD) CAREC Transport Vision for 2030 Technical assistance and Investment projects support needs Impleme Eastern Finances, No Name of projects ntation highway usd Western period corridor To develop integrated data 2018 - railway 1 systems for roads and 600.000 2020 corridor transport Feasibility study of Railway 2018 – 2 Centralized Traffic Control 500.000 2019 Center To prepare of Regional Road 3 Development and Maintenance 2020 400.000 Project - II Phase. Eastern railway corridor - Detail drawing of multimodal Eastern highway Since Total length is 695 km. corridor - Total 1 logistic center in Hushigt 1,5 million Western railway corridor was 2020 length is 695 km. valley (near new airport) included for State policy on Construction work Support the introduce of railway transportation. Since will start in 2018. 2 logistics international 1.0 million The Government of Mongolia 2020 planning to connect the The Mongolian standards in Mongolia western railway corridors to government The systematical analysis on Since the international railway planning to include 3 1.0 million network. on the CAREC road the Mongolian road sector 2020 Pre-feasibility studies of the network as the Detail drawing of “Bogdkhan” Since western railway corridor are 4 1.5 million eastern highway railway 2020 planned for 2019-2020. To be corridor. find finance. To be find finance Since 5 Road safety introduction 1.0 million 2020

Those investment projects was included on Economical corridor between Mongolia, Russia, China THANK YOU FOR ATTENTION