Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhan A progressive journey since 2014 Singhbhum Parliamentary Constituency PREFACE

Indian Railways is the lifeline of the Nation and a catalyst for ’s progress and economic development. It plays a significant role in the socio-economic development of every region of the country including the State of . With a view to improve railway infrastructure and to extend the railway network in Jharkhand, Ranchi Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and cooperation to Indian Railways towards development of the state and improvement of services for the people.

Godda

Shivpur

Sanki

Tatisilwai

Map Not to scale

In a mission mode, railways have achieved many visible milestones in Jharkhand in the last seven years in different fields i.e. construction of new lines, doubling, development of stations etc. On the freight side, loading has reached a new milestone where the potentiality of the state enriched with minerals played the lead role. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with topmost priority. In the wake of COVID-19 pandemic, Indian Railways is playing a significant role by taking various measures to combat the situation. With a view to contain the spread of Novel Coronavirus, Indian Railways is producing PPE Kits, Reusable Face Masks, Hand Sanitizer etc. In addition, coaches have been converted to COVID Care Centres. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the State of Jharkhand are being highlighted in this Pamphlet. It may be noted that the budget allocated to various projects is not apportioned State wise but ref lects the cost of the project. INPUTS BY RAILWAY IN SINGHBHUM CONSTITUENCY SINGHBHUM PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : , Manoharpur, , C haibasa, Gua, Sonua, Chakradharpur Jagannathpur, Seraikella & Majhgaon Pendrasali , Kunki, Posoita, Dongaposi, Lotapahar, Maluka, , Kendposi B. WORKS COMPLETED IN LAST SEVEN YEARS: Jinkpani, Mahadevsal, B.1 Infrastructural Developments: u A d ditional foot over bridge at Chakradharpur u E x tension of Foot Over Bridge in Up & Dn platform & Goilkera station platform No.1 to 2. at ,Sonua & Gua stations & Kendposi Station u u Limited Height Subway at different level I m provemment to station façade, circulation crossing gate at a cost of Rs.19.39 crores area and station approach road at Chakradharpur station u D i version of road between -Sini to u U p gradation of mechanized laundry at newly constructed Road Under Bridge by Chakradharpur station Jharkhand Development Corporation Limited at a cost of Rs.1.38 crores u Provision of Ballastless track on platform no.1 u Replacement of corroded PS tanks by new at Chakradharpur station PVC tanks to improve water facility at Chaibasa, u E x tention of platform no. 1 at Gua station. Dongoaposi, Barajamda and in u R a ising of rail level to high level of platform no Chakdharpur Division 3 & 4(down line) at Gamharia station u u P rovision of 6 quad cable in between E x tension of foot over bridge with cover shed S ip a-Jhinkpani-Tabu-Kendposi, Noamundi- & provision of shed in front of PRS building at Barajamda-Gua-Barbil-Bolanikhadan Section Kandra station u : at a cost of Rs.2.31 crores K e ndposi and Pendrasali : New foot over bridge connecting platform No. 1 & 2. u R e placement of regulating equipment, cantilever u D e velopment of various passenger amenity assembly, isolator, contact wire at a cost works at Mahadevshal station of Rs.26.37 crores u P r ovision of four seated stainless steel chairs u R e placement of with associated for Chakradharpur station items at a cost of Rs.3.13 crores u P r oposal for new foot over bridge of 30.5 mtrs B.2 Passenger Amenities at Posoita station u P la tform raising at Dongoaposi, Barajamda C. ON-GOING WORKS: and Sonua stations at a cost of Rs.2.70 crores u D o ubling of Goilkera-Monaharpur Third Line u P la tform shelter at Adityapur and Chakradharpur (27 KM) at a cost of Rs.397 crores stations at a cost of Rs.1.12 crores u C o nversion of unregulated overhead electrification to regulated overhead u P r ovision of water cooler in Chakradharpur station electrification Phase-II at a cost of Rs.8.77 u P r ovision of security surveillance system with crores. CCTV cameras at Tatanagar, Chakradhapur, u L im ited Height Subway at level crossing Rourkela and Jharkhand railway stations No.178, 181, unmanned level crossing No.186, Water booth at various platforms of 187, 188, 189, 192, 193 at KM 365 in lieu of Chakradharpur, Chaibasa and Dongoaposi existing manned level crossing at a cost of u D e velopment of Chaibasa station as per Rs.20.45 crores norms of D category of Adarsh Station u S u bway in lieu of manned level crossing u R a ising of platform, extension of platform, No.RBK 36, 38, 39 and 43 at a cost of Rs.8.99 platform surfacing, provision of platform crores shelter, foot over bridge & improvement to circulating area at different station viz. Barajamda, Naomundi, Adityapur, Goilkera

SOME IMPORTANT PHOTOS

Platform Surfacing at Goelkera Station Passenger Reservation Centre (PRS) at Adityapur Station