MARINE HEALTH SECTOR » 2

<< NEIL SHAWCROSS The adjacent painting was created by artist Neil Shawcross to illustrate the evolution of the McLaughlin & Harvey brand from 1853 to the present. It symbolises that while our face has changed, our values remain the same.

“NOTHING CHANGES & YET EVERYTHING IS COMPLETELY DIFFERENT” ALDOUS HUXLEY MARINE » 4

OUR APPROACH

For over 160 years McLaughlin & Harvey has combined traditional values and experience, with an advanced innovative approach.

Ferry Infrastructure We operate throughout the United We have a strong commitment to Kingdom and , and pride delivering quality cost effective solutions STENALINE LOCH RYAN PORT ourselves on delivering quality building for our customers within a safe, DEVELOPMENT construction, fit-out, civil engineering, considerate working environment. and facilities management projects. | £55m Through proactive stakeholder We work in various sectors including engagement we have implemented a health, education, industrial, retail, strong Corporate Social Responsibility sporting venues, marine and rivers, (CSR) strategy, facilitating a sustainable transport infrastructure, offshore, business which supports the health, energy, commercial, and leisure. safety, welfare, and well-being of our workforce, customers, supply chain and the local communities in which we work.

Our core values and strengths are: • Hands on accessible leadership • Strong relationships, collaboration and communication • Corporate resilience and capacity Commercial Ports PD PORTS TEESPORT BERTH 1 RECONSTRUCTION Middlesbrough | £32m PROJECTS PROVIDING PORT FACILITIES FOR OVER 3 MILLION PASSENGERS AND 70 MILLION TONNES OF FREIGHT MARINE » 8

Ferry Infrastructure Ferry Infrastructure STENALINE HARBOUR LOCH RYAN PORT COMMISSIONERS DEVELOPMENT VICTORIA TERMINAL 4 Cairnryan | £55m Belfast | £37m MARINE » 10

Ferry Infrastructure Ferry Infrastructure CMAL PORT ELLEN P&O CAIRNRYAN QUAY EXTENSION BERTH 1 LINKSPAN & RECLAMATION Isle of Islay | £5m Cairnryan | £13m MARINE » 12

Ferry Infrastructure Ferry Infrastructure HIGHLAND COUNCIL SCONSER FERRY CMAL KENNACRAIG TERMINAL FERRY TERMINAL Isle of Skye | £2m Argyll | £4m MARINE » 14 Commercial Ports CROMARTY FIRTH PORT AUTHORITY INVERGORDON SERVICE BASE PHASE 3 Invergordon | £18m

Commercial Ports GLOBAL ENERGY GROUP NIGG SOUTH QUAY Cromarty Firth | £19m MARINE » 16

Commercial Ports HARBOUR BOARD TORRY QUAY REDEVELOPMENT PHASE 2 Aberdeen | £16m

Commercial Ports ABERDEEN HARBOUR BOARD TORRY QUAY REDEVELOPMENT PHASE 3 Aberdeen | £14m MARINE » 18

Cruise Berths Jetties ORKNEY ISLANDS COUNCIL HATSTON RNLI PIER EXTENSION JETTY Montrose | £420k Kirkwall | £9m MARINE » 20

Fishing Harbours FRASERBURGH Fishing Harbours HARBOUR KILKEEL HARBOUR COMMISSIONERS REPAIRS PHASES 1-3 HARBOUR DEEPENING Kilkeel | £10m Fraserburgh | £14m MARINE » 22

ROYAL VICTORIA HOSPITAL

Royal Victoria Hospital Critical Care Unit, Belfast £120m

Marine Structure Repair Marine Structure Repair CMAL COLONSAY PORT OF LARNE LINKSPAN Larne | £25m REFURBISHMENT Isle of Colonsay | £500k MARINEMARINE » 24 » 24

Historic Restoration Historic Restoration HAMILTON DOCK GRAVING DOCK SEA DEFENCE Belfast | £400k Belfast | £1m MARINE » 26

Coastal Defences SUMBURGH AIRPORT COASTAL DEFENCE Shetland Isles | £14m

Coastal Defences BARNBOUGLE CASTLE Edinburgh | £600k MARINE » 28

Leisure Marinas PORTGLENONE MARINA Portglenone | £400k

Leisure Marinas GLENARM HARBOUR Glenarm | £5m MARINE » 30

Pontoons Pontoons FOYLE MOORING RNLI FACILITY PONTOON Londonderry | £2m Stromness | £400k Lock & Dock Gates Flood Defence LOCK GATES CITY OF EDINBURGH SUPPORT STRUCTURE COUNCIL WATER OF LEITH PHASE 2 Milford Haven | £5m Edinburgh | £14m MARINE » 34

Flood Defence Flood Defence COLERAINE LODGE HIGHLAND COUNCIL BURN FLOOD RIVER NESS FLOOD ALLEVIATION SCHEME ALLEVIATION Coleraine | £2m SCHEME PHASE 2 Inverness | £10m MARINE » 36

Flood Defence DP WORLD SITE X ENVIRONMENTAL MITIGATION Kent | £4m

Land Remediation CULMORE LANDFILL REMEDIATION Londonderry | £7m MARINE » 38

Offshore Offshore SUBSEA DRILLING SR2000 TECHNOLOGY FOUNDATION PHASE 2 INSTALLATION | £500k Orkney | £1m MARINE » 40

Offshore Offshore DEEP GREEN OPENHYDRO OCEAN KITE TEST PLATFORM INSTALLATION INSTALLATION Strangford Lough | £200k Orkney | £4m Port Warehouses Port Warehouses PEEL PORTS ALEXANDRA DOCK COMMISSIONERS WAREHOUSING STORMONT WHARF Liverpool | £15m Belfast | £9m Belfast Glasgow Edinburgh London Bristol Liverpool

15 Trench Road Heathfi eld House 20-22 Griffi n Court Unit 10B 6 Pall Mall Newtownabbey Phoenix Crescent Torphichen Street Farringdon Duckmoor Road Liverpool Strathclyde Edinburgh London Bristol L3 6AL BT36 4TY Business Park EH3 8HX EC1A 9PN BS3 2BJ Bellshill [email protected] ML4 3NJ www.mclh.co.uk +44 28 9034 2777 +44 141 848 8000 +44 131 285 1749 +44 203 542 8308 +44117 450 9878 +44 151 317 5444