ANNEXURE – 2 LIST OF PROJECT EXECUTED on 2015-2016 Sl. Name of the Work No. Construction of Concrete Market Link Road at Sauri Bus Stand from Ekharukhi Chandi High School, 1 Sauri KotBar G.P.(Chain 0 point 1000 M)(Part-I) under Paschim Medinipur Zilla RMC Construction of Concrete Market Link Road at Sauri Bus Stand from Ekharukhi Chandi High School, 2 Sauri Kotbar G.P.(Chain 1 KM to 2 KM)(Part-II) under Paschim Medinipur Zilla RMC Construction of Concrete Market Link Road at Sauri Bus Stand from Ekharukhi Chandi High School, 3 Sauri KotBar G.P. (Chain 2 KM to 3.05KM)(Part-III) under Paschim Medinipur Zilla RMC

Construction of Farmer Shed at Porolda, J.L. No. 276, Dag No. 2672, Datan-II P.S under Paschim 4 Medinipur Zilla RMC

Construction of Concrete Road from Saithal Ram Murmu house to Singarpur Primary School via Sital 5 Bhakta Para, Jalimandra G.P. under Debra Panchayet Samity under Paschim Medinipur Zilla RMC

Construction of Community Shed at MouzaBarakhankri, J.L. No. 78 Plot No. 385 under Nayagram PS 6 under Paschim Medinipur Zilla RMC Construction of Concrete Approach Road including Drain at SM Yard under Paschim 7 Medinipur Zilla RMC Construction of Concrete Market Link Road at Kasmuli Bazar to Porolda , P.S. , Porolda GP. 8 (Chain 0 to 950 M.) under Paschim Medinipur Zilla RMC 9 Construction of Fish Shed at Radhanagar SM Yard under Paschim Medinipur Zilla RMC. Sinking of Mark- II Tubewell at Mouza Barakhankri, J.L. No. 78 Plot No. 385 under Nayagram PS 10 under Paschim Medinipur Zilla RMC Re- Construction of RCC Auction Shed including Construction of 17 Nos. of Stalls at Hoomgarh SM 11 Yard under Paschim Medinipur Zilla RMC Construction of Concrete Road at Aparnapally under 12 -III P.S. area in the Dist of Paschim Medinipur (PH -1) under Paschim Medinipur RMC

Construction of Concrete Road (2.5 M X 434 M) NH-60 to Kharikarh Passenger Shed to Sitala 13 Mandir under Paschim Medinipur Zilla RMC Construction of Work Shed Godown with Show Room for Preparation of Saal Leaf Product at Mouza 14 Barakhankri, J .L. No. 78 Plot No. 385 under Nayagram PS under Paschim Medinipur Zilla RMC 15 Construction of Vegetable Auction Platform at Bazar under Paschim Medinipur Zilla RMC

Construction of Bituminous Road at Kalaikunda (Beldabgiri / Beldangri) from Ramesh Mahato’s 16 house to Beldangri Club, Kalaikunda G.P., – I Block (length 115 Mtr.) under Paschim Medinipur Zilla RMC

Construction of Market Link Road (Morum) from Nanjara to Nahalia Morth 7 No. GP Dantan-II P.S. 17 Under Paschim Medinipur Zilla RMC

Construction of Market Link Road (Morum) at Charaigram Pry. School to Santal Para 6 No. GP 18 Dantan-II P.S. Under Paschim Medinipur Zilla RMC Construction of Community Shed at Mouza Barakhankri, J.L. No. 78 Plot No. 385 under Nayagram 19 PS under Paschim Medinipur Zilla RMC Sinking of Mark- II Tubewell 50mm dia with 100 mm dia Top Enlargement of 44 mm depth 3 (three) 20 nos. different places at Porolda, Jalgoda Charaigram, Dantan-II P.S. Under Paschim Medinipur Zilla RMC

ANNEXURE – 2

LIST OF PROJECT EXECUTED on 2016-2017 Sl. Name of the Work No. Construction of 18 nos. of stall within existing cover shed at 1 Improvised Krishak Bazar under PMZRMC . Construction of Fish Shed at Krishak Bazar under Paschim 2 Medinipur Zilla RMC. Repairing of 3(Three) nos. existing Auction Shed at Chandrakona-II Krishak 3 Bazarunder PMZRMC Construction of Fish Shed at Krishak Bazar under Paschim Medinipur 4 Zilla RMC. Construction High Drain at Chandrakona Improvised Krishak Bazar runder 5 PMZRMC Construction of Concrete Market Link Road at Bansole Ranapara to Bansole 6 Majzid , Chandra GP, Medinipur Sadar Block under Paschim Medinipur Zilla RMC

LIST OF PROJECT EXECUTED on 2017-2018 Sl. Name of the Work No.

Construction of Concrete Road from Sahid Smriti Road to Jana para under 1 -II GP , Debra P.S. under Paschim Medinipur Zilla RMC