Grid Presentation

Presentation for OREF by Colin Risbridger

[email protected] Orkney Distribution Network March 2013 33/11kV substations and other equipment

Westray Sub Station 4MVA

Eday Sub Station 1MVA

Rousay Sub Station 1MVA Sanday Sub Station 1MVA Burgar Hill Sub Sation 2.5 & 0 .4MVAr Reactor 8MVA 4.75MVAr Reactor

Stronsay Sub Station 1MVA EMEC Sub Station 1MVA 1&0.6MVAr Reactors 2MVAr Reactor sub station 8MVA

Shapinsay Sub Station 1MVA

North Sub Sub Station 0.15MVA Station 48MVA Scorrodale Static Var compensation

St Marys Sub Station 4MVA Sub Station 1MVA Sub Station 8MVA

2 x Submarine Cables (20MVA & 32MVA) [email protected] Orkney Generators - March 2013

[email protected] Orkney Generation - March 2013

Newark 0.5MW 11kV

Total local Generation, therefore connections 80MW Hammer 0.5MW 415V

Gallowhill 0.9MW 11kV Gallowhill 1.8MW 11kV Wind 0.9MW 11kV Sigurd 1.5MW 11kV Microgeneration 0.559MW 2MVAr Reactor Thorfi nn 4. 3MW 11kV Microgeneration 0 .148MW NWP 5.0MW Burgar Hill 2.3MW Hammers Hill 4.5MW Wind 0.9MW 11kV Evie Wind 2.3MW Microgeneration 0.434MW Luddenhill 0.5MW Spurness 7.5MW Microgeneration 0.719MW Spurness 2.45MW 4.75MVAr Reactor 2.5 & 0.4MVAr Reactor Microgeneration 0.427MW

EMEC 4MW 11kV DounbyWind 0.9MW 11kV Bu Farm 2.7MW Wind 0.9MW Wind 0.9MW Hatston 0.9MW 11kV 1&0.6MVAr Reactors Microgeneration 0.059MW Microgeneration 0 .078MW EMEC 7MW 11kV Renn ibist er 0 .9MW Stromness Micro 0.668MW Cleat 0.08MW 11kV

Thorkell 0.9MW 11kV

Barns of 2.7MW Storage Park 2MW Dale Spot 0.08MW Scorrodale Static Var Towerhill 0.08MW Salmon Fish Farm 0.055MW 11kV compensation Scapa Wind 0.08MW Fea Wind 0.08MW 11kV Microgen 0.703MW New Holland 0.5MW 11kV Microgeneration 0.927MW

Burray 0.9MW 11kV

Ore Brae 0.9MW 11kV Microgeneration 0.121MW West Hill 2MW 11kV 2 x Submarine Cables (20MVA & 32MVA)

Flotta 10.5MW Firm connection 26.455MW Pinch Point Monitoring Intertrip connected 19.4MW ANM connected 28.55MW Microgeneration 4.967MW Produced by Colin Risbridger for Grid Working Group – [email protected] Orkney Distribution Network March 2013 Cable Capacities (Spring/Autumn)

Eday Cable 12MVA Eday Cable 12MVA

Westray Cable 12MVA

Rousay Cable 12MVA Sanday Cable 16MVA

Burgar Hill Cable 24.9MVA

Stronsay Cable 16MVA

Rendall Cable 18.1MVA

Shapinsay Cable 12MVA Scorradale Cable 16.1MVA Stromness Cable 15.7MVA

Scorradale Cable 16.1MVA

Stromness Cable 15.7MVA

St Marys Cable 22.3MVA

Burray Cable 3.5 MVA

North Hoy Cable 14MVA Flotta Cable 14MVA LynessCable 16.6 MVA [email protected] Orkney Distribution Network March 2013 Power Flows

Zone 1 – 15.141MW Eday Cable 12MVA Eday Cable 12MVA Westray Cable 12MVA Zone 2a – 14.055MW

Rousay Cable 12MVA Sanday Cable 16MVA

Burgar Hill Cable 24.9MVA

Zone 1a – 16.619MW Stronsay Cable 16MVA

Rendall Cable 18.1MVA Shapinsay Cable 12MVA

Zone 2 – 0.959MW Scorradale Cable 16.1MVA Stromness Cable 15.7MVA

Scorradale Cable 16.1MVA

Stromness Cable 15.7MVA Zone 3 – 13.145MW CZCore Zone – 13. 946MW St Marys Cable 22.3MVA Zone 4 – 5.507MW [email protected] Burray Cable 3.5 MVA

North Hoy Cable 14MVA Flotta Cable 14MVA LynessCable 16.6 MVA Generation in red Orkney Grid Presentation Performance in terms of kWh – Large Scale ROC Generators

[email protected] Orkney Grid Presentation Numbers – SmallScale FiT Generators <50kW

Capacity Factors for small generators taken from Orkney Database of 47 of the 444 small scale generators. Email me if you would like to join the database and share information with others.

[email protected] Orkney Grid Presentation What about the future?

• We need to think kWh and not kW – Income based on kWh, grid costs on kW • We need to think about kVArs and not just kWh – Flexible commercial connection terms • We need to think Volts not just kVArs – Stability of network and security of supply • We need to think about thermal limits – Cable Failures and Equipment failures • We need to think about safety of those working on the network – Switching to keep power on • We need to distribute the benefits from RE wider in society – Fuel Poverty scandalous • We need to identify the short term fixes and implement solutions – Not just Transmission • Look for demand solutions where sensible as they cause harm – Electric heating for microgen

[email protected]