. Building the Reservoirs . Watershed Development & TMDLs . TMDL Implementation . Retrofit Design . MS4 Cooperation . Phosphorus Reductions . Lessons Learned & Retrofit Program Now 2
2 3
3 4
New Amsterdam Water Supply
4 5 NYC Population Growth 80,000
60,000
40,000
20,000
0 1650 1750 1800
5 6
First Water Pollution Law in North America?
Prohibited dumping “filth, garbage or dirt” into pond - 1778.
The pond was filled in - 1811.
6 7
Search for a Reliable Water Supply NYC grew from 80,000 to 200,000 between 1800 and 1830
1835 City issued a $2.5M bond to build a Croton River dam & aqueduct to NYC
7 8
8 9
9 10 High Bridge over the Harlem River
10 11 1841 – Croton Aqueduct
11 12
NYC Population continues to grow:
1830 – pop. 200,000 1850 – pop. 700,000 1900 – pop. 3,400,000
12 13
13 14
East Branch Reservoir
14 15
West Branch Reservoir
15 16
Amawalk Reservoir
16 17 Titicus Reservoir
17 18 Croton Falls Reservoir
18 19
Bog Brook Reservoir
19 20
20 21 Muscoot & Cross River Reservoirs
21 22 Population increase in Croton Watershed
Westchester & Putnam Counties increase by 500,000: . 1940 – 590,000 . 2010 – 1,050,000 23
NYC Reservoir TMDLs 1995 - 303d Listed 19 NYC Reservoirs Nutrient Pollution
2000 – 19 TMDLs approved 108 WWTPs to be upgraded WOH in compliance after upgrades EOH req’d reductions beyond WWTP upgrades
23 24
2003: EOH Watershed designated MS4s: Beekman Lewisboro T & V/Pawling Mount Kisco East Fishkill North Castle Kent North Salem Southeast Pound Ridge Carmel Somers Cortlandt Yorktown Patterson Putnam County Brewster Dutchess County Putnam Valley Westchester County Bedford NYSDOT
24 New York City EOH Watershed 25
25 26
2008 MS4 Permit Heightened Requirements:
MS4s in impaired watersheds are required to submit an approvable plan to construct stormwater retrofits, and a timetable for their implementation.
Q: What is an Approvable Plan?
26 27
Croton Watershed TMDL Implementation Plan 2009 TMDL Load Allocation target = 6,741 kg/yr . Watershed model results: HID land = 2,400 kg/yr . 50% of developed load = 1,200 kg/yr . 50% efficiency for retrofits = 600 kg/yr . A Starting Point…
Phosphorus Reduction Requirement: 600 kg/yr . Over each 5-year MS4 Permit Cycle . Watershed-wide
Subject to Public Review . No comments dissenting (too high or too low) on assigned load values
27 28 EOH MS4 5-year allocations (kg/yr)
Bedford 32.2 Village of Pawling 4.3 Brewster 9.2 Town of Pawling 3.5 Carmel 72.0 Pound Ridge 9.5 Cortlandt 11.6 Putnam Valley 1 Kent 33.6 Somers 50.0 Lewisboro 35.5 Southeast 31.1 Mount Kisco 18.7 Yorktown 54.0 New Castle 25.1 Beekman 1 North Castle 1 East Fishkill 3.2 North Salem 19.1 Dutchess County 3.1 Putnam County 30.9 Westchester County 8.2 Patterson 17.2 NYS DOT 125
28 29
Approvable Retrofit Design 1. What is the phosphorus load?
2. What is the BMP efficiency?
29 30
Phosphorus to be Treated
Phosphorus Load = runoff *concentration • runoff = 90th percentile storm
30 31 Phosphorus Concentrations Impervious: 0.50 mg/l Residential 0.41 mg/l Developed Open Space: 0.30 mg/l Forest: 0.15 mg/l
31 32
Retrofit Efficiencies Wet Extended Detention Pond 55% Bioretention 65% Dry Swale 50% Sand Filter 60% Organic Filter 60% Shallow Wetland 43%
32 33
Retrofit Sizing Design per NYS Stormwater Design Manual • treat 90th% ~1.3” Storm • Smaller retrofits get partial credit
Hydrodynamic Separators • Treat Peak Flow Rate from 90% Storm • Smaller retrofits get partial credit
Channel Stabilization • Calculate eroded volume of soil • 100% of phosphorus in soil is credited 34 Regional MS4 Group
. Group of MS4s, aka Regional Stormwater Entity (RSE) to submit retrofit plan
. 19 Municipalities across three Counties worked together
. Individual MS4s compliant if RSE meets combined load
34 35
East of Hudson Watershed Corporation
Two full-time Engineering staff now manage over 200 projects: . design . DEC approval . bid process . contract award . construction . project certification 36
Funding the Projects
Year 1-5 Funding: • $20 million NYC + $20 million Putnam and Westchester Counties WQ money
• O&M paid for by MS4 Municipalities
Additional Funding: WQIP Grant Program Prioritizes MS4-required Retrofits 37
Extended Detention Pond
37 38
Pocket Pond
38 39
Wet Pond
39 40
Extended Detention Shallow Wetland
40 41 Micropool Detention
41 42
Outfall Stabilization
42 Bioretention 43
43 44
Extended Detention Pond
44 45
Channel Stabilization
45 46
Pervious Pavers
46 47
22 MS4s – 3 Counties 48
200+ stormwater retrofit projects 49
Phosphorus Reductions: 600+ kg/yr 50
Future Phosphorus Reduction
EOHWC Year 6-10 Retrofit Plan approved • Over 155 New Retrofit Projects Proposed • Estimated 750+ kg/yr • More Channel Stabilization Projects • More Municipal Property https://nysdec.maps.arcgis.com/home/index.html 51
MS4 Retrofit Program 2018 and beyond
https://nysdec.maps.arcgis.com/home/index.html 52
Thank You!