In the High Court of Karnataka at Bengaluru

Total Page:16

File Type:pdf, Size:1020Kb

In the High Court of Karnataka at Bengaluru 1 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 13TH DAY OF MARCH, 2015 BEFORE THE HON’BLE MR. JUSTICE S ABDUL NAZEER W.P No.10164 of 2015 (GM – R/C) BETWEEN SRI DURGAPARAMESHWARI TEMPLE KUKKIKATTE, BELLAMPALLI, PUNCHUR-576 124, UDUPI TALUK & DISTRICT, REPRESENTED BY ITS HEREDITARY TRUSTEE, SRI.B.HARISH HEGDE, S/O LATE RAMANNA HEGDE AGED ABOUT 51 YEARS, R/O MADAHAVA NIVAS, BELLAMPALLI, PUNCHUR-576 124, UDUPI TALUK AND DISTRICT. .. PETITIONER (By Sri VIGHNESHWAR S SHASTRI, ADV.) AND 1. RAJYA DHARMIKA PARISHAD REPRESENTED BY ITS MEMBER SECRETARY AND COMMISSIONER FOR HINDU RELIGIOUS AND CHARITABLE ENDOWMENTS, CHAMARAJPET, BANGALORE-560 004. 2 2. STATE OF KARNATAKA REPRESENTED BY ITS SECRETARY, MUJARAI DEPARTMENT, MS BUILDING, BANGALORE -560 001. 3. DEPUTY COMMISSIONER HINDU RELIGIOUS INSTITUTIONS AND CHARITABLE ENDOWMENTS DEPARTMENT, RAJATADRI, MANIPAL-576 104, UDUPI DISTRICT. 4. ADDITIONAL DEPUTY COMMISSIONER HINDU RELIGIOUS INSTITUTIONS AND CHARITABLE ENDOWMENTS DEPARTMENT AND PRESIDENT, ZILLA DHARMIKA PARISHAD, UDUPI-576 104 5. SRI HARISH NAIK S/O KITTA NAIK, AGED ABOUT 25 YEARS R/O KALSANKA MANE, BELLAMPALLI VILLAGE AND POST, UDUPI TALUK & DISTRICT-576 124 6. SMT SUMITHRA N ACHARYA W/O NARASIMHA ACHARYA, AGED ABOUT 30 YEARS BELLAMPALLI POST, VIA PERDUR, UDUPI TALUK-576124 UDUPI DISTRICT 7. SMT ASHA D SHETTY W/O DIWAKAR SHETTY, AGED ABOUT 30 YEARS R/O "NADUMANE" 3 BELLAMPALLI POST, UDUPI TALUK-576124 UDUPI DISTRICT 8. SRI BABU A KOTIYAN S/O ACHHU B KOTIYAN, AGED ABOUT 60 YEARS "SWARNAKEERTHI" BELLAMPALLI-DODDANNAGUDDE, BELLAMPALLI POST, UDUPI TALUK-576124 UDUPI DISTRICT 9. SRI PRAVEEN S/O K RAMA ACHARYA AGED ABOUT 30 YEARS BELLAMPALLI-KUKKIKATTE, PUNCHUR, BELLAMPALLI POST, UDUPI TALUK-576124 UDUPI DISTRICT 10. SRI B GOVINDARAJ HEGDE S/O B SANJEEVA HEGDE AGED ABOUT 65 YEARS "RAJASHRI" BELLAMPALLI POST, VIA PERDUR, UDUPI TALUK-576124 UDUPI DISTRICT 11. SRI GANAPATHI PRABHU S/O LATE NARASIMHA PRABHU, AGED ABOUT 45 YEARS "SARASWATHI NILAYA" NEAR TEMPLE,KUKKIKATTE, BELLAMPALLI POST, UDUPI TALUK-576124 UDUPI DISTRICT 4 12. SRI B VIJAY KUMAR HEGDE S/O LATE P SUDHAKAR HEGDE, AGED ABOUT 45 YEARS "SANNAMANE", BELLAMPALLI POST AND VILLAGE, UDUPI TALUK-576124 UDUPI DISTRICT. .. RESPONDENTS (By Sri K S CHANDRAHASA, ADV. FOR R5 TO R11) THIS WP IS FILED UNDER ARTICLES 226 AND 227 OF THE CONSTITUTION OF INDIA, PRAYING TO QUASH THE ORDER / PROCEEDINS PASSED BY R-4 DTD.14.2.2013 AT ANNEX-H, QUASH THE ORDER DTD.7.3.2015 PASSED BY R-1 VIDE ANNEX-N AND DIRECT THE R-1 TO 4 TO CONSTITUTE MANAGING COMMITTEE SRI DURGAPARAMESHWARI TEMPLE, KUKKIKATTE BY RECOGNIZING THE RIGHTS OF HEREDITARY TRUSTEES AND ARCHAKS AND OTHER ELIGIBLE PERSONS. THIS W.P. COMING ON FOR ORDERS THIS DAY, THE COURT DELIVERED THE FOLLOWING: O R D E R Learned counsel for the petitioner seeks permission of this Court to withdraw this writ petition with liberty to file an appeal under Section 63-A of the Karnataka Hindu Religious Institutions and Charitable Endowments Act, 1997. 2. The submission is placed on record. The writ petition is dismissed as withdrawn with liberty as above. 5 All contentions on merits are kept open. The Registry is directed to return the order at Annexure-N to the learned Advocate appearing for the petitioner after retaining its xerox copy. Sd/- JUDGE Bkm. .
Recommended publications
  • 43253-027: Karnataka Integrated Urban
    Resettlement Plan Document Stage: Updated Project Number: 43253-027 April 2020 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – 24x7 Water Supply Distribution Network for Udupi City Package No: 02UPD01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. CURRENCY EQUIVALENTS (As of March 2020) Currency Unit = Indian Rupee (₹) ₹1.00 = $0.014 $1.00 = ₹72 ABBREVIATIONS ADB — Asian Development Bank AMRUT — Atal Mission for Rejuvenation and Urban Transformation BPL — below poverty line CAPRRC — community awareness, participation, rehabilitation and resettlement consultant CDP — comprehensive development plan CLIP — city level investment plan CMC — city municipal council DC — Deputy Commissioner DLRC — district level resettlement committee DPR — detailed project report ELSR — elevated level storage reservoir GLSR — ground level storage reservoir GoK — Government of Karnataka GRC — grievance redressal committee HSC — House Service Connections IWRM — integrated water resource management KUIDFC — Karnataka Urban Infrastructure Development and Finance Corporation KUWSDB — Karnataka Urban Water Supply and Drainage Board KUIWMIP — Karnataka Integrated Urban Water Management Investment Program LA and R&R — land acquisition and resettlement and rehabilitation MFF — multitranche financing facility NGO — nongovernment organization OBC — other backward castes PIU — project implementation unit PMDSC — project management and design supervision consultant PMU — project management unit RPMU — regional project management unit ROW — right of way SDO — Social Development Officer SPS — Safeguard Policy Statement STP — sewage treatment plant ULB — urban local body WSS — water supply and sanitation WTP — water treatment plant WEIGHTS AND MEASURES ha — hectare kL — kiloliter km — kilometer lpcd — liters per capita per day mld — million liters per day m — meter m2 — square meter NOTE In this report, "$" refers to Unites States dollars.
    [Show full text]
  • Application of Geo-Informatics and Geophysical Survey for the Study Of
    Application of Geo-Informatics and Geophysical survey for the study of disaster impact on infrastructure and earth resources due to lightning (A case study of Udupi District) PI: P ROF K.N.L OKESH DEPT OF CIVIL ENGINEERING , NITK , SURATHKAL CO-PI-Dr.B.Naveenchandra AGM; I NFORMATION TECHNOLOGY PROJECT CIRCLE , BSNL, P UNE Udupi district is a place of high lightning incidence occurring compared to most of the other parts in Karnataka Damages to Natural resources like tall trees, buildings, structures etc Telecom/power sites are badly affecting which causes huge loss to the department. The present state of affairs show that in a year the months April, May, October and November have relatively much higher lightning incidence. The relatively severe impact of the hazard on the state and observed the very high casualty rates of 71 deaths, 112 injuries and 188 accidents per annum. 2 3 Loss to telephone sector/Power sector is very high not only to the networked systems but also to the electronic equipment of telecom system. The infrastructure sites are constructed on the hill and on rock with sandy area which has high soil resistivity and it is difficult to improve the ground resistance to the standard (less than 0.5 ohms). 4 Study Area 5 Objectives To understand the role of geology and soil type in lightning impact and to update the existing geological map by carrying out a detailed lithological, structural and soil mapping using Satellite imageries. To conduct palaeomagnetic studies of the different lithologies and Natural Remanent Magnetisation directions of the rocks and their intensities.
    [Show full text]
  • Tranche 2: Udupi Water Supply System (Package No. 02UDP01)
    Initial Environmental Examination Document stage: Final Project Number: 43253-027 February 2019 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – Improvements for 24 x 7 Water Supply System – Distribution System for City Municipal Council in Udupi Package No: 02UDP01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. This final initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination Document stage: Final Project Number: 43253-027 February 2019 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – Improvements for 24x7 Water Supply System – Distribution System for City Municipal Council, Udupi Package No: 02UDP01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2017) Currency unit – Indian rupee (₹) ₹1.00 = $0. 0149 $1.00
    [Show full text]
  • (AQAR) of the IQAC During the Academic Year 1St August 2017
    Vaikunta Baliga College of Law The Annual Quality Assurance Report (AQAR) of the IQAC (NAAC Track ID-KACOGN23273) During the academic year 1st August 2017 to July 31, 2018 Part – A I. Details of the Institution 1.1 Name of the Institution Vaikunta Baliga College of Law 1.2 Address Line 1 Kunjibettu Address Line 2 Udupi City/Town Udupi State KARNATAKA Pin Code 576102 Institution e-mail address [email protected] Contact Nos. 0820-2520373: 0820-2529173 Name of the Head of the Prof.Prakash Kanive Institution: Tel. No. with STD Code: 0820-2520373 Mobile: 9449944533 Name of the IQAC Co-ordinator: Dr.Nirmala Kumari.K Mobile: 9844376839 pg. 1 ​ IQAC e-mail address: [email protected] 1.3 NAAC Track ID KACOGN23273 ​ 1.4 NAAC Executive Committee No. & EC(SC)/17/A&A/1041 ​ Date: 15-09-2016 1.5 Website address: Web-link of http://vbclaw.edu.in/AQAR/2017-18. the AQAR: 1.6 Accreditation Details Year of Sl. No. Cycle Grade CGPA Validity Period Accreditation 5Years 1st 1 ​ B+ 2.67 2016 Valid up to Sept Cycle th 15 ​ 2021 ​ 1.7 Date of Establishment of IQAC : 01/08/2011 1.8 AQAR for the year: 2017-18 1.9 Details of the previous year’s 2016-17 AQAR submitted to NAAC after the ​ ​ ​ ​ latest Assessment and Accreditation by NAAC 1.10. Institutional Status Grants in Aid pg. 2 ​ University State Affiliated College Yes Autonomous college of UGC No Regulatory Agency approved Yes. BCI approved Institution Type of Institution Co-education Financial Status Grant-in-aid UGC 2(f) UGC 12B 1.11 Type of Faculty/Programme Law 1.12 Name of the Affiliating University Karnataka State Law University (for the Colleges) 1.13 Special status conferred by Central/ UGC State Government 2.
    [Show full text]
  • 43253-027: Karnataka Integrated Urban
    Initial Environmental Examination Document stage: Updated Project Number: 43253-027 June 2020 IND: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) – Improvements for 24x7 Water Supply System – Distribution System for City Municipal Council, Udupi (PART A) Package No: 02UDP01 Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2017) Currency unit – Indian rupee (₹) ₹1.00 = $0. 0149 $1.00 = ₹67.090 ABBREVIATIONS ADB – Asian Development Bank ASI – Archaeological Survey of India CTE – consent to establish CTO – consent to operate CMC – City Municipal Council Central Public Health and Environmental Engineering CPHEEO – Organization CPCB – Central Pollution Control Board CRZ – coastal regulation zone EHS – environmental, health and safety EIA – environmental impact assessment EMP – environmental management plan GLSR – ground level service reservoir GRC – grievance redress committee GRM – grievance redress mechanism HDPE – high density polyethylene IEE – initial environmental examination IFC – International Finance Corporation Karnataka Integrated Urban Water Management Investment KIUWMIP – Program KSPCB – Karnataka State Pollution Control Board Karnataka Urban Infrastructure Development and Finance KUIDFC – Corporation MOEFCC – Ministry of Environment, Forest and Climate Change NGO – nongovernment organization OHS – occupational health and safety OHT – overhead tank PIU – program implementation unit
    [Show full text]