UTTIPEC WG-IIB Meeting Walkability Plan -

Dhrupad Consultants Pvt. Ltd. dh 1 Presentation Outline

1 Site Location and Context

2 Ped-Shed Analysis

3 Activity Mapping

4 Walkability Audit

5 Major Walkability Issues

6 Overall Proposals

2 Site Location and Context

Study area lies in Zone F of the Master Plan Navjeevan Major Roads (with ROW) Vihar Malviya a. Mehrauli Badarpur Road Nagar (76.2 m) b. Press Enclave Road (45 m) c. Pramod Mahajan Road (21 m) Malviya Nagar d. IGNOU Road Metro Station Saket e. Westend Marg District f. Rashid Road Qutub Golf Centre Max Saket City Course Hospital Hospital Major Landmarks Lado Sarai • Institutional (Max Hospital, Saket City Hospital, Gyan Saket Pushp Bharati School, Red Roses Saket Vihar Public School, Vidya Niketan Sr. Sec. School) Saket Metro • Residential (Malviya Nagar, Station Saket, Said-Ul-Ajaib) • Commercial (Saket Comminity Centre) Qila Rai Pithora • Recreational (DDA Sports Complex-Saket, Qutub Golf Course, Garden of Five Senses) Said-ul-ajaib Hauz Rani City Forest • Transport Service Points (Malviya Nagar Metro Station, Saket Metro Station, Garden Of DTC Bus Stops) Five Senses 3 Ped-Shed Analysis: Rashid Road

Catchment Areas Geetanjali Enclave 2 min H Malviya Nagar Block-F 4 min

5 min Malviya Nagar Metro Station H

Max Malviya Nagar Hospital

Saket Block-C

DDA Sports Complex

Saket Community Center Saket Block-D Saket Block-E

₹ Saket Metro Station ₹ ₹

Said-ul-Ajaib

4 Activity Mapping Geetanjali Enclave

Malviya Nagar Metro Station

Malviya Nagar

Saket Block-C Qutub Golf Course

Lado Sarai Saket Block-D

Saket Community Centre

Bus stops Saket Metro Station Saket Block-E

Qila Rai Pithora

Said-ul-Ajaib Hauz Rani City Garden of Five Forest Senses 5 Activity Mapping Geetanjali Enclave

Malviya Nagar Metro Station

Malviya Nagar

Saket Block-C Qutub Golf Course

Lado Sarai Saket Block-D

Saket Community Centre

Bus stops Saket Metro Saket Block-E Parking Station

Qila Rai Pithora

Said-ul-Ajaib Hauz Rani City Garden of Five Forest Senses 6 Activity Mapping Geetanjali Enclave

Malviya Nagar Metro Station

Malviya Nagar

Saket Block-C Qutub Golf Course

Lado Sarai Saket Block-D

Saket Community Centre

Bus stops Saket Metro Saket Block-E Parking Station

IPT Pick/Drop Qila Rai Pithora

Said-ul-Ajaib Hauz Rani City Garden of Five Forest Senses 7 Activity Mapping Geetanjali Enclave

Malviya Nagar Metro Station

Malviya Nagar

Saket Block-C Qutub Golf Course

Lado Sarai Saket Block-D

Saket Community Centre

Bus stops Saket Metro Saket Block-E Parking Station

IPT Pick/Drop Qila Rai Pithora Street vendors

Said-ul-Ajaib Hauz Rani City Garden of Five Forest Senses 8 Activity Mapping Geetanjali Enclave

Malviya Nagar Metro Station

Malviya Nagar

Saket Block-C Qutub Golf Course

Lado Sarai Saket Block-D

Saket Community Centre

Bus stops Saket Metro Saket Block-E Parking Station

IPT Pick/Drop Qila Rai Pithora Street vendors Public Amenities Said-ul-Ajaib Hauz Rani City Garden of Five Forest Senses 9 Footpath Availability

Navjeevan Vihar Footpath Present Malviya Nagar Footpath Absent

Malviya Nagar Footpath less than 1800mm Metro Station Saket District Centre

Overall Stretch Length: 7512 m

Footpath Length: 5275 m Qutub Golf Course Footpath 1.8m Width: 4431 m Pushp Lado Sarai Saket Vihar

Saket Saket Metro Footpaths Present Station 70.2%

Qila Rai Pithora Walkable Footpaths 49.6% Said-ul-ajaib Hauz Rani City Forest Garden of Five Senses 10 Walkability Audit Walkability Audit Parameters: Walkability Index Formula as per CRRI Method

Modal Conflict - The extend of conflict between pedestrians and vehicles Walkability Index: QOS : ∑ A(n) * B(n) Availability of Walking Paths - It reflects the need for, availability, condition and continuity of A(n) = importance weights walking paths. B(n) = satisfaction rating Grade Crossing Safety - This refers to waiting time, exposure time to vehicles, necessary infra. Motorist Behaviour - Behaviour of motorist towards pedestrians. Scoring Based on Walkability Index

Amenities - Amenities such as benches, street lights, public toilets, trees etc. Quality of Walkability Obstructions Services Index - Permanent and temporary obstructions to pedestrian movement on pathways A ≥ 124 Universally Accessible B < 124 – 106 - Availability, positioning and maintenance of infrastructure for the differently abled. C < 106 – 70 Sense of Security D < 70 – 52 - The general feeling of security against crime, walkability at night etc. on the footpaths. E < 52

11 Overall walkability score C1 C2 A1 B1 A2 B2 D2 D1

H1 E2 E1 H2 I1 J1 G2 G1 I2 J2 F1 F2 A & B C D & E F G H, I & J PARAMETERS WEIGHT- Press Enclave Marg Rashid Road Pramod Mahajan Road IGNOU Road West End Mehrauli Badarpur Road CONSIDERED AGE Marg A1 A2 B1 B2 C1 C2 D1 D2 E1 E2 F1 F2 G1 G2 H1 H2 I1 I2 J1 J2 Footpath Surface 4 4 2 3 3 2 3 3 3 1 3 1 2 1 1 2 3 3 1 3 2 Footpath Width 3 4 1 1 1 2 2 2 2 1 2 1 2 1 2 2 4 3 1 3 2 Obstructions 4 4 1 1 2 2 2 2 2 1 2 1 2 1 2 3 2 2 1 2 2 Vehicular Conflict 3 3 1 1 2 3 3 3 3 1 2 1 2 1 3 3 3 3 1 3 2

Continuity 4 3 2 2 2 2 2 3 3 1 2 1 1 1 2 3 4 3 1 3 2 Encroachment 3 4 2 1 2 2 2 3 2 1 2 1 1 2 2 2 2 3 2 3 2 Availability of 2 crossing facilities 3 3 2 1 2 3 2 2 2 2 2 1 1 1 1 2 3 3 3 3 Security 3 4 1 2 1 2 2 3 3 2 3 2 2 1 2 2 2 3 2 2 1 Comfort 4 4 2 2 2 3 2 2 2 1 2 1 2 1 1 2 3 2 1 3 2 Walking 4 Environment 4 1 2 2 2 3 2 2 2 3 2 2 1 2 3 3 3 1 3 2 Walkability Index 133 59 63 66 79 87 89 86 47 83 47 61 39 63 81 94 100 50 101 73

QOS A D D D C C C C F C F D F D C C C F C C12 Walkability Index – Quality of Footpaths

Legend QOS Index A ≥ 124

B < 124 - 106 C < 106 - 70 D < 70 - 52

E < 52

13 Major Walkability Issues

• Inadequate footpath width • Absence of footpath and discontinuity due to property access and minor roads • Presence of utilities • Encroachment due to street vendors and parking • Absence of safe pedestrian crossing facilities

14 Issue 01: Inadequate Footpath Width

1

Clear width is <1.8m 1

Solution: Existing: Proposed:

Existing width of Footpath: 1.1m Proposed width of Footpath: 3m

Butterfly Butterfly park Metro station park car parking Metro station car parking

• Widening of footpath by acquiring land from DMRC parking area • 1 tree cutting/relocating required EXISTING PROPOSED for road widening 15 Issue 01: Inadequate Footpath Width 2

Shoulder

Tree-Line 2 1

Proposed: *Existing Guardrails to be removed and replaced by bollards *Paved shoulder to be used by Pedestrians Existing: *Parking of Vehicles to be restricted on the paved shoulder Utility duct Drain

Guardrails Guardrails Bollards Bollards 1.9m 1.8m As Per Existing Site 1.5m 1.6m 1.9m 1.8m As Per Existing Site 1.5m 1.6m

Railing

Paved Paved Paved

Shoulder Shoulder

Footpath Footpath Unpaved Shoulder Unpaved Shoulder Footpath Footpath 16 Issue 02: Absence/ Discontinuous footpath

2

1

1 Existing Proposed

Saket Block-D Saket Block-D

Footpath is absent Footpath is provided by maintaining the same width of carriageway as existing. Said-ul-Ajaib Said-ul-Ajaib 17 Issue 02: Absence/ Discontinuous footpath

2 2

1

Existing Proposed

Malviya Nagar Malviya Nagar

Buffer space Footpath is Existing Dhalao Dhalao to be Footpath of 2.5m absent relocated is provided

18 Issue 03: Presence of utilities in walkable width

1 1

2

Utilities such as dustbin, junction box, electric pole, signages etc to be relocated in buffer zone

2 Solution:

Transformer relocation position

Transformer to be relocated

No Clear footpath width available 19 Issue 04: Encroachment – due to street vendors and parking

1 3

2

1

2

3 Guardrails and encroachment to be removed Solution: • Street vendors relocated to spaces where there is extra space available • Authorized parking is to be demarcated to prevent and enforce the over spilling of parked vehicles Footpath is encroached by parking 20 Issue 05: Absence of safe pedestrian crossing facilities

1

2 1 Solutions:

No kerb ramp for universal accessibility and No refuge space on median

2 No crossing facilities Provision of Table top Universal Accessibility is absent

Pedestrian crosswalk with kerb ramps and proper refuge areas

Extension of island

No refuge space on median and Obstruction on refuge space

21 Existing : Part A

KEY MAP

DMRC Car Malviya Nagar Metro Parking Station

22 Proposals : Part A

IPT Pick/Drop-off Bays (MMI plan)

Existing Entry retained KEY MAP

DMRC Car Malviya Nagar Metro Parking Station IPT Stand IPT Pick/Drop

IPT Entry

Property access through table top Bus Stop relocation Staggered Crossing

Widening of median at pedestrian Buffer Space crossing for Refuge Space)

Part A • IPT Stand circulation improvement • Bus stop relocation • Intersection improvement Existing : Part B

Saket Block-C Saket Block-E

KEY MAP

Saket Community Centre

Saket Block-D Proposals : Part B

Existing: Property access through table top

Saket Block-C Saket Block-E

KEY MAP Uniformity in Carriageway width to be maintained

Proposed: Saket Community Centre

Saket Block-D Bollards Bollards

Railing

A *Existing Guardrails to be removed, replaced by bollards A’ *Paved shoulder to be used by Pedestrians *Parking of Vehicles to be restricted on the paved shoulder Existing : Part C

KEY MAP

DMRC Parking Saket Metro Station Proposals : Part C

Pick-up/Drop-off Bays Bus Stop relocation Dhalao relocation and geometry KEY MAP improvement

Transformer relocation position Widening of median (3M) at pedestrian DMRC Parking Saket Metro Station crossing for Refuge Space) Widening of footpath IPT Pick up and drop off Transformer to be relocated Intersection geometry improvement with pedestrian Parallel Car Parking facilities

Intersection geometry improvement with pedestrian facilities

27 Proposals : Part C

CISF CAMPUS

Bus Stop IPT Pick-up/ relocated Pick- Drop-off up/Drop off bays

Pedestrian Toilet Block Plaza

Wayfinding Existing signage Metro Car Parking

Footpath (2.5m)

Buffer space for utilities and signages

Table top (for speed TO MEHRAULI calming and universal accessibility) TO BADARPUR 28 Proposals : Part C

Table top (for speed Pedestrian Street calming and universal accessibility)

GOLF COURSE

Dhalao Relocated

CISF CAMPUS

Pedestrian Pick- Plaza up/Drop off bays

Buffer space for utilities and signages DRAIN

TO BADARPUR TO MEHRAULI 29 Existing : Part D

Qila Rai Pithora KEY MAP

Said-ul-ajaib

30 Proposals : Part D Footpath 1.8m wide at the drain culvert portion

Qila Rai Pithora KEY MAP

Proposed Uniform Carriageway of 12m undivided

Raised thermoplastic Said-ul-ajaib marking to channelize traffic

Buffer Space (Pick/drop area, vending zone )

Uniform footpath of 3m wide Core Group Minutes incorporation (22-12-2020)

S.No. Minutes Status

The Stage-I proposals submitted by the consultant were found in order. For the next stage of 1 submission, the consultant will prepare a report highlighting the major interventions proposed by them in order to achieve the intent of walkability.

The consultant was asked to highlight all the proposals integrated with the WalkPlan for better 2 Integrated understanding. The consultant was asked to share the plans with all the concerned road - owning agencies, OTC, 3 Shared Traffic Police, DMRC, etc

The consultant will also prepare a development plan of the entire stretch showing the existing 4 and proposed layout side-by-side in the same drawing. An illustration for graphical representation is Prepared attached as Annexure- 'B'.

A transformer located along MB Road covered the width of the footpath and a part of the carriageway. 5 It was suggested that the DTL/BSES should explore alternate options for design or relocation of the Incorporated said transformer, as it presents a hazard on site. The proposal of provision of an IPT stand in the existing parking of the MalviyaNagar Metro Station 6 Incorporated needs approval/ NOC from the CE, General, DMRC before moving ahead with the proposal. The proposal of widening of a footpath taking additional space from the existing parking of the Saket 7 Metro Station needs approval/ NOC from the CE, General, DMRC before moving ahead with the Incorporated proposal. Amenities Mapping

Bus stops Toilets Dustbins

34 Lighting Bus shelter Proposed location of 4 Advertising panel Bus – shelter head cover (advertising panel)

3

1 Pelican Switch panel 4

3 2 Flag Type Signboards for : • Advertising Malviya Nagar • Road Signs मालवीय नगर • Information Signs 2 Lado Sarai लाडो सारै Video Monitoring for 3 Existing location of

Adchini pedestrians and Vehicles M अद्चिनी Advertising panel 4 Lighting at different heights 2.5

for footpath and carriageway

Boundary Boundary wall 2.4m (min.)2.4m 1

600mm (min.)

• Typical design of multi utility poles • Typical bus shelter design ITS Implementation

Access controlled footpaths Pelican Light

ANPR Flushed manhole covers

Manhole covers should be designed as flushed covers

• MS manhole covers can be fitted with locking mechanisms to avoid vandalism of public property. • RCC covers can also be made flushed by proper onsite casting of rim and covers

Location: Tokyo, Japan Source: Dhrupad Consultants Pvt. Ltd.

Manhole covers can be cladded with same tiles/texture as that of footpath, Entirely Flushed MS giving a sense of drain cover detail seamlessness, without any hindrance

Location: Tokyo, Japan Source: Dhrupad Consultants Pvt. Ltd. Walkability Plans : Features

Parameters Interventions Stake holders participation • Discussed with NDMC and Traffic Police. • All the inputs have been incorporated Seamless connectivity • Provision for seamless movement of pedestrian has been ensured • Through kern ramps and table top. Provision for public utilities and • Designated space for public utilities has been provided along the footpath services • Long term provision of underground utility ducts and trenches has been proposed. Provision of public infrastructure • Provision of street infrastructure, kiosks, public amenities has been proposed strategically. and amenities Water conservation • Use of grass pavers and brick jaalis has been proposed in green / buffer areas. User safety and universal • Proposed walk plan ensures safety of pedestrians, especially the vulnerable groups (like accessibility differently abled, old people, women, children, etc.) through design interventions • Wider footpaths, refuge space, bollards, CCTV cameras, pelican lights on multi utility poles • And universal accessibility has been ensured through table tops and Kerb ramps for differently abled and old people Access controlled footpaths • Provision of controlled access points along footpaths through 3 row bollard arrangement • Guide rails at intersection upto 25M on all arms and on median to prevent jaywalking.

Use of ITS for enhancing • ANPR system, pelican lights, CCTV cameras, VMS has been proposed. pedestrian user experience Working Group Minutes Incorporation (16.06.2021)

S. No Minutes Status 1 As the traffic proposed widening of footpaths will have no effect on the existing width of carriageways on all Noted the roads, it appears unlikely that it will create any hindrance on the smooth movement of traffic. 2 The plan proposes replacing guardrails with bollards on the entire footpath stretch along with paved Complied along with provision shoulders. This may be promote roadside parking as people will tend to avoid authorized parking spaces, of railing of height 1.2m on creating congestion. Further, pedestrians may cross the road from any place on footpath leading to accidents. median to avoid random In view of the same, it may be proposed that the bollards are only installed at zebra crossings as well as crossing of pedestrian and entry/exit of footpaths and guardrails are used for the remaining length of footpaths in order to discourage provision of bollards with road side parking and promote pedestrian safety. 1.2m wide refuse space on median at proposed designated crossings. Proposed ANPR Cameras for challaning of un-authorized parking 3 A concrete proposal for relocation of street vendors to be provided, as lack of clarity may result in shifting of Incorporated bottleneck from one point to another. 4 Similarly, the location for shifting of Dhalaos and transformer should also be demarcated. Incorporated 5 No concrete proposal has been provided to ensure adequate footpath width along the carriageway leading Require removal of from Malviya Nagar Metro Station T-point till Hauz Rani T-point. encroachment from ROW (Under Process) 6 DMRC is in the process of preparing MMI Plan for Malviya Nagar Metro Station, and same will be submitted Integrated to UTTIPEC shortly. 7 BSES agreed to shift (relocate) a Transformer located on MB Road and completely covering the footpath and Incorporated protruding into the carriageway. 8 A joint visit for the same is requested to be carried out for demarcation of space and preparation of the Incorporated as per estimate for the said work accordingly. discussion. 9 Alternative to the current proposal of providing bollards to restrict movement of the two-wheelers on Incorporated footpath to be explored, as the same is not favorable from the point of view of universal accessibility. Comments from SDMC

S. Minutes Status No 1 5 meter width for left turning vehicle (from Westend Marg) is less. Also, shown geometry Incorporated of the island heavy vehicle cannot turn easily. Please refer IRC SP 41 for geometry.

2 The left turning from Press Enclave Marg to Rashid Road has been closed in the proposal. Incorporated This will make a lot of wrong turn activities. Existing entry to Rashid Road has been retained, and table top is provide to facilitate safe pedestrian movement.

3 Two-way hazard marker to be placed at the tip of the hazard. Also, the hazard marker is Incorporated upside down.

4 Tactile Tiles can continue on the Table top as well. Incorporated

5 Dustbin right at the intersections to be avoided. Incorporated Proposals

Part A • IPT Stand circulation improvement • Bus stop relocation • Intersection improvement • Table top at property Access

Part B • Pedestrian plaza at Saket Metro station (Saket side) • Parking bays at Mehrauli- Badarpur Road • Bus stop and Dhalao relocation

Part C • Intersection Improvements • Pedestrian plaza at Saket Metro station (Saket side) • Parking bays at Mehrauli- Badarpur Road • Bus stop, Transformer & Dhalao relocation • Designated Vendor Zones

Part D • Provision of Footpath with a minimum width of 1.8m

41 Thank You

Please share your observations on [email protected]

Key Service Areas: • Feasibility Studies of Urban Transport Infrastructures Dhrupad Consultants Pvt. Ltd. • Urban Transport Infrastructure Design 7E, Pocket-B, Siddharth Extension, New -110014 • Traffic Simulation • Traffic Management Plans Phone (O) : 011-49270513, +91 99 580 56 935 • Traffic Impact Assessment [email protected] • Parking Management Studies www.dhrupadconsultants.com dh