Scoping Report MAXWELL SOLAR FARM

Total Page:16

File Type:pdf, Size:1020Kb

Scoping Report MAXWELL SOLAR FARM Scoping Report MAXWELL SOLAR FARM JANUARY 2019 www.nghenvironmental.com.au e [email protected] Sydney Region Canberra - NSW SE & ACT Brisbane 18/21 mary st 8/27 yallourn st (po box 62) 8 trawalla st surry hills nsw 2010 (t 02 8202 8333) fyshwick act 2609 (t 02 6280 5053) the gap qld 4061 (t 07 3511 0238) Newcastle - Hunter and North Coast Wagga Wagga - Riverina and Western NSW Bega - ACT and South East NSW unit 2, 54 hudson st suite 1, 39 fitzmaurice st (po box 5464) 89-91 auckland st (po box 470) hamilton nsw 2303 (t 02 4929 2301) wagga wagga nsw 2650 (t 02 6971 9696) bega nsw 2550 (t 02 6492 8333) Document Verification Project Title: Maxwell Solar Farm Project Number: 17-420 Project File Name: 17-420 Maxwell Scoping Report Final 2.1 Revision Date Prepared by (name) Reviewed by (name) Approved by (name) Draft 1.0 5/12/18 Lauren Byrne Fiona McKay Nick Graham-Higgs Draft 2.0 13/12/18 Lauren Byrne Fiona McKay Fiona McKay Final 1.0 17/12/18 Lauren Byrne Fiona McKay Fiona McKay Final 2.0 23/01/19 Fiona McKay Nick Graham-Higgs Fiona McKay Final 2.1 30/01/19 Fiona McKay Minor changes regarding Fiona McKay consultation NGH Environmental prints all documents on environmentally sustainable paper including paper made from bagasse (a by- product of sugar production) or recycled paper. NGH Environmental Pty Ltd (ACN: 124 444 622. ABN: 31 124 444 622) www.nghenvironmental.com.au e [email protected] Sydney Region Canberra - NSW SE & ACT Brisbane 18/21 mary st 8/27 yallourn st (po box 62) 8 trawalla st surry hills nsw 2010 (t 02 8202 8333) fyshwick act 2609 (t 02 6280 5053) the gap qld 4061 (t 07 3511 0238) Newcastle - Hunter and North Coast Wagga Wagga - Riverina and Western NSW Bega - ACT and South East NSW unit 2, 54 hudson st suite 1, 39 fitzmaurice st (po box 5464) 89-91 auckland st (po box 470) hamilton nsw 2303 (t 02 4929 2301) wagga wagga nsw 2650 (t 02 6971 9696) bega nsw 2550 (t 02 6492 8333) Scoping Report Maxwell Solar Farm CONTENTS 1 INTRODUCTION ........................................................................................................................ 5 1.1 PURPOSE OF THIS DOCUMENT ............................................................................................................5 1.2 BACKGROUND ......................................................................................................................................5 1.3 THE PROPOSAL .....................................................................................................................................7 1.3.1 Site description .................................................................................................................................... 10 1.3.2 Proposal description ............................................................................................................................ 12 2 ALTERNATIVES AND JUSTIFICATION ........................................................................................ 13 2.1 ALTERNATIVES CONSIDERED ............................................................................................................. 13 2.2 STRATEGIC JUSTIFICATION ................................................................................................................ 13 2.2.1 Climate change .................................................................................................................................... 13 2.2.2 Electricity supply .................................................................................................................................. 14 2.2.3 Socio-economic benefits...................................................................................................................... 14 3 CONSULTATION ...................................................................................................................... 15 4 PLANNING CONTEXT .............................................................................................................. 16 4.1 NSW LEGISLATION ............................................................................................................................. 16 4.1.1 Environmental Planning and Assessment Act 1979............................................................................. 16 4.1.2 State Environmental Planning Policy (State and Regional Development) 2011 .................................. 16 4.1.3 State Environmental Planning Policy (Infrastructure) 2007 ................................................................ 17 4.1.4 Roads Act 1993 .................................................................................................................................... 17 4.1.5 Biodiversity Conservation Act 2016 ..................................................................................................... 17 4.1.6 National Parks and Wildlife Act 1974 .................................................................................................. 17 4.1.7 Heritage Act 1977 ................................................................................................................................ 18 4.1.8 Crown Lands Act 1989 ......................................................................................................................... 18 4.2 LOCAL GOVERNMENT ....................................................................................................................... 18 4.2.1 Muswellbrook Local Environmental Plan 2009 ................................................................................... 18 4.3 COMMONWEALTH LEGISLATION ...................................................................................................... 19 4.3.1 Environment Protection and Biodiversity Conservation Act 1999 ...................................................... 19 5 PRELIMINARY ENVIRONMENTAL ASSESSMENT ........................................................................ 21 5.1 METHODOLOGY ................................................................................................................................ 21 5.2 ASSESSMENT OF KEY ENVIRONMENTAL MATTERS ........................................................................... 21 5.2.1 Biodiversity .......................................................................................................................................... 21 5.2.2 Visual amenity ..................................................................................................................................... 23 17-420 Final 2.1 i Scoping Report Maxwell Solar Farm 5.2.3 Aboriginal heritage .............................................................................................................................. 24 5.2.4 Land use and resources ....................................................................................................................... 26 5.2.5 Noise .................................................................................................................................................... 27 5.3 OTHER ENVIRONMENTAL MATTERS ................................................................................................. 27 6 CONCLUSION ......................................................................................................................... 33 7 REFERENCES ........................................................................................................................... 34 APPENDIX A SITE PHOTOGRAPHS ................................................................................................ 35 APPENDIX B FATAL FLAWS ANALYSIS ........................................................................................... 38 APPENDIX C DATABASE SEARCHES .............................................................................................. 39 APPENDIX D HUNTER ECO ECOLOGICAL REPORT .......................................................................... 40 APPENDIX E AHIMS REGISTERED SITES STATUS ............................................................................ 41 17-420 Final 2.1 ii Scoping Report Maxwell Solar Farm ABBREVIATIONS AND ACRONYMS ABS Australian Bureau of Statistics ACHA Aboriginal Cultural Heritage Assessment ACHCRP Aboriginal Community Consultation Requirements for Proponents AEMO Australian Energy Market Operator AHD Australian Height Datum AHIMS Aboriginal Heritage Information Management System ARAS Archaeological Risk Assessment Services Pty Ltd BC Act Biodiversity Conservation Act 2016 (NSW) CCC Community Consultative Committee CCP Community Consultation Plan CL Coal Lease CoA Conditions of Approval DECCW Department of Environment Climate Change and Water DP&E Department of Planning and Environment (NSW) DPI Department of Primary Industries DRG Division of Resources and Geoscience EEC Endangered Ecological Community (listed under NSW BC Act) EIS Environmental Impact Statement EPBC Act Environment Protection and Biodiversity Conservation Act 1999 (Cwth) EP&A Act Environmental Planning and Assessment Act 1979 (NSW) GW Gigawatt ha hectares Heritage Act Heritage Act 1977 (NSW) ISEPP State Environmental Planning Policy (Infrastructure) 2007 (NSW) km kilometres kV kilovolt LEP Local Environment Plan LGA Local Government Area LLS Local Land Services m metres MAC Mt Arthur Coal MNES Matters of National Environmental Significance under the EPBC Act MOP Mining Operations Plan MW megawatts NEM National Energy Market NPW Act National Parks and Wildlife Act 1974 (NSW) NSW New South Wales 17-420 Final 2.1 iii Scoping
Recommended publications
  • Eraring Battery Energy Storage System Scoping Report
    Eraring Battery Energy Storage System Scoping Report IS365800_Scoping Report | Final 25 March 2021 Origin Energy Eraring Pty Limited Scoping Report Origin Energy Eraring Pty Limited Scoping Report Eraring Battery Energy Storage System Project No: IS365800 Document Title: Scoping Report Document No.: IS365800_Scoping Report Revision: Final Document Status: For Lodgement Date: 25 March 2021 Client Name: Origin Energy Eraring Pty Limited Project Manager: Thomas Muddle Author: Ada Zeng, Carys Scholefield & Thomas Muddle File Name: IS365800_Origin_ Eraring BESS_Scoping Report_Final Jacobs Group (Australia) Pty Limited ABN 37 001 024 095 Level 4, 12 Stewart Avenue Newcastle West, NSW 2302 PO Box 2147 Dangar, NSW 2309 Australia T +61 2 4979 2600 F +61 2 4979 2666 www.jacobs.com © Copyright 2019 Jacobs Group (Australia) Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document history and status Revision Date Description Author Checked Reviewed Approved 05 25/3/2021 Final A Zeng C Scholefield T Muddle T Muddle
    [Show full text]
  • Coastal Upland Swamps in the Sydney Basin - Likely to Occur Australia, 2006
    150°30'E 151°0'E 151°30'E Mogo Creek This map has been compiled from existing landscape scale datasets UNNAMED that do not specifically map the defined national ecological community Yarramalong (EC) and vary in scale and accuracy. Ground-truthing is required to verify the presence of the EC for site based projects, planning or investment decisions. Such decisions should refer to the text of the Conservation Advice at www.environment.gov.au/cgibin/ Peats sprat/public/sprat.pl Ridge Wyong For current information published by the Department on your area of interest youare advised to use the Protected Matters SeCaorlcoh Tool at www.environment.gov.au/epbc/pmst/index.html Heights Yengo LITTLE MOONEY Lower MOONEY Mangrove Gosford S S ' ' 0 0 3 3 ° ° 3 3 3 3 Pittwater Kurrajong Berowra Galston Terrey Hills Katoomba Pennant Hills Lane Cove Sydney Cumberland Wolli Creek S S ' ' 0 0 ° Kurnell ° 4 4 3 Minto 3 Heights Lucas Heights Campbelltown Bundeena LAKE BURRAGORANG WORONORA Waterfall Picton Helensburgh Appin Sydney Cataract LAKE CATARACT LAKE NEPEAN LAKE CORDEAUX Wollongong Mittagong LAKE AVON S S ' ' 0 0 3 Illawarra 3 ° ° 4 4 3 Moss 3 Vale Robertson 0 2.5 5 10 15 20 Approx. Kms 150°30'E 151°0'E 151°30'E Legend Source: Locality Coastal Upland Swamps Coastal Upland Swamps data supplied by David Keith, NSW DEH. Major roads Localities 1:250,000 © Commonwealth of Australia, Geoscience Australia, 2002. Drainage in the Sydney Basin Major roads 1:5,000,000 © Commonwealth of Australia, Geoscience Australia, 2002. Coastline and State Borders, 1:250,000 © Commonwealth of Australia, Geoscience Coastal Upland Swamps in the Sydney Basin - Likely to occur Australia, 2006.
    [Show full text]
  • REVIEW 11 Ravensworth Rail Unloader Expansion 1
    MACQUARIE GENERATION 2001 REVIEW 11 Ravensworth rail unloader expansion 1 10 Technology upgrade for Liddell 16 Sawmill waste for renewable energy 19 Aussie Climb 2000—an epic fundraiser 20 Gas-fuelled power plant proposed REVIEW 2001 CONTENTS FINANCIAL PERFORMANCE* 4 PERFORMANCE HIGHLIGHTS 5 CHAIRMAN’S REVIEW 6 CHIEF EXECUTIVE’S REPORT 7 FOUNDATIONS FOR THE FUTURE—LIDDELL UPGRADE, RAIL UNLOADER EXPANSION, INDUSTRY ZONE, TOMAGO GAS TURBINE 10 ENVIRONMENTAL PERFORMANCE 14 RENEWABLE ENERGY PORTFOLIO—BIOMASS CO-FIRING, HYDROELECTRIC PLANT, WIND POWER STUDIES 16 IN THE COMMUNITY—AUSSIE CLIMB 2000 19 FORESTRY TRIALS, SAFETY WINNERS 20 * Macquarie Generation’s 2001 Financial Statements presented to the New South Wales Parliament are available from the Corporation’s web site or by contacting our Newcastle office. Contact details appear on the back cover of Review 2001. Cover: Water vapour rises from Bayswater Power Station’s cooling towers. 11 Ravensworth rail unloader expansion 1 10 Technology upgrade for Liddell 16 Sawmill waste for renewable energy 19 Aussie Climb 2000—an epic fundraiser 20 Gas-fuelled power plant proposed REVIEW 2001 CONTENTS FINANCIAL PERFORMANCE* 4 PERFORMANCE HIGHLIGHTS 5 CHAIRMAN’S REVIEW 6 CHIEF EXECUTIVE’S REPORT 7 FOUNDATIONS FOR THE FUTURE—LIDDELL UPGRADE, RAIL UNLOADER EXPANSION, INDUSTRY ZONE, TOMAGO GAS TURBINE 10 ENVIRONMENTAL PERFORMANCE 14 RENEWABLE ENERGY PORTFOLIO—BIOMASS CO-FIRING, HYDROELECTRIC PLANT, WIND POWER STUDIES 16 IN THE COMMUNITY—AUSSIE CLIMB 2000 19 FORESTRY TRIALS, SAFETY WINNERS 20 * Macquarie Generation’s 2001 Financial Statements presented to the New South Wales Parliament are available from the Corporation’s web site or by contacting our Newcastle office. Contact details appear on the back cover of Review 2001.
    [Show full text]
  • Two Centuries of Botanical Exploration Along the Botanists Way, Northern Blue Mountains, N.S.W: a Regional Botanical History That Refl Ects National Trends
    Two Centuries of Botanical Exploration along the Botanists Way, Northern Blue Mountains, N.S.W: a Regional Botanical History that Refl ects National Trends DOUG BENSON Honorary Research Associate, National Herbarium of New South Wales, Royal Botanic Gardens and Domain Trust, Sydney NSW 2000, AUSTRALIA. [email protected] Published on 10 April 2019 at https://openjournals.library.sydney.edu.au/index.php/LIN/index Benson, D. (2019). Two centuries of botanical exploration along the Botanists Way, northern Blue Mountains,N.S.W: a regional botanical history that refl ects national trends. Proceedings of the Linnean Society of New South Wales 141, 1-24. The Botanists Way is a promotional concept developed by the Blue Mountains Botanic Garden at Mt Tomah for interpretation displays associated with the adjacent Greater Blue Mountains World Heritage Area (GBMWHA). It is based on 19th century botanical exploration of areas between Kurrajong and Bell, northwest of Sydney, generally associated with Bells Line of Road, and focussed particularly on the botanists George Caley and Allan Cunningham and their connections with Mt Tomah. Based on a broader assessment of the area’s botanical history, the concept is here expanded to cover the route from Richmond to Lithgow (about 80 km) including both Bells Line of Road and Chifl ey Road, and extending north to the Newnes Plateau. The historical attraction of botanists and collectors to the area is explored chronologically from 1804 up to the present, and themes suitable for visitor education are recognised. Though the Botanists Way is focused on a relatively limited geographic area, the general sequence of scientifi c activities described - initial exploratory collecting; 19th century Gentlemen Naturalists (and lady illustrators); learned societies and publications; 20th century publicly-supported research institutions and the beginnings of ecology, and since the 1960s, professional conservation research and management - were also happening nationally elsewhere.
    [Show full text]
  • The University of Sydney
    THE UNIVERSITY OF SYDNEY Copyright and use of this thesis This thesis must be used in accordance with the provisions of the Copyright Act 1968. Reproduction of material protected by copyright may be an infringement of copyright and copyright owners may be entitled to take legal action against persons who infringe their copyright. Section 51 (2) of the Copyright Act permits an authorized officer of a university library or archives to provide a copy (by communication or otherwise) of an unpublished thesis kept in the library or archives, to a person who satisfies the authorized officer that he or she requires the reproduction for the purposes of research or study. The Copyright Act grants the creator of a work a number of moral rights, specifically the right of attribution, the right against false attribution and the right of integrity. You may infringe the author’s moral rights if you: - fail to acknowledge the author of this thesis if you quote sections from the work - attribute this thesis to another author -subject this thesis to derogatory treatment which may prejudice the author’s reputation For further information contact the University’s Copyright Service. sydney.edu.au/copyright A STRUCTURAL ANALYSIS OF THE SOUTHERN HORNSBY PLATEAU, SYDNEY BASIN, NEW SOUTH WALES by Anthony Richard Norman, B.Sc. (Hons) A thesis submitted in fulfilment of the requirements for the degree of Master of Science DEPARTMENT OF GEOLOGY AND GEOPHYSICS UNIVERSITY OF SYDNEY September, 1986 ABSTRACT The Hornsby Plateau rises north of Sydney. Aerial photo interpretation of an area north of Hornsby and south of the Hawkesbury River revealed two well defined extensive traces.
    [Show full text]
  • EIS 305 Salinity in the Hunter River
    EIS 305 Salinity in the Hunter River: a report on the generation, treatment and disposal of saline minewater SALINITY IN THE HUNTER RIVER A REPORT ON THE GENERATION, TREATMENTAND DISPOSAL OF SALINE MINEWATER NEW SOUTH WALES COAL ASSOCIATION SALINITY IN THE HUNTER RIVER I. r A REPORT ON THE GENERATION, TREATMENT AND DISPOSAL OF SALINE MINEWATER I PREPARED FOR: PREPARED BY: NEW SOUTH WALES COAL ASSOCIATION CROFT & ASSOCIATES PTY. LIMITED • EAGLE HOUSE 125 BULLSTREET 25 WATT STREET P.O. BOX 5131B NEWCASTLE 2300 NEWCASTLE WEST 2302 049 26118 049261828 NATIONAL MUTUAL CENTRE LEVEL 2 IL 44 MARKET STREET SYDNEY 2000 02 297 202 DECEMBER 1983 91 if tiwtsiiiui'ti 1 TABLE OF CONTENTS Page SECTION 1: INTRODUCTION 1.1 STUDY BACKGROUND 1 1.2 STUDY OBJECTIVES 2 1.3 COMPANION STUDIES 3 1.4 ACKNOWLEDGEMENTS 3 SECTION 2: THE HUNTER REGION 2.1 GEOGRAPHY 4 2.2 GEOLOGY AND SOILS 4 2.3 METEOROLOGY 5 . 2.4 LAND USE 7 2.5 SURFACE WATERS 7 2.6 GROUNDWATER 8 SECTION 3: PROPOSED DEVELOPMENTS 3.1 REGIONAL DEVELOPMENT 9 3.2 COAL DEVELOPMENT 9 3.3 POWER GENERATION 11 3.4 COAL LIQUEFACTION 11 3.5 URBAN GROWTH 11 O 3.6 AGRICULTURE 12 3.7 FUTURE WATER REQUIREMENTS 12 SECTION 4 ORIGINS OF SALINITY 4.1 HISTORY OF SALINITY 14 4.2 HYDROLOGIC PROCESSES 14 4.3 TYPES OF LAND SALINISATION 15 4.4 DRY LAND SALINISATION 16 4.5 IRRIGATION SALINITY 16 SECTION 5 SALINITY MODEL FOR THE HUNTER RIVER 5.1 MODEL SPECIFICATION 18 5.2 DATA SOURCES 18 5.3 WATER RESOURCES COMMISSION MODEL 19 5.4 LOGIC NETWORK 19 5.5 METHODOLOGY 21 5.6 MODEL OUTPUT 24 SECTION 6: COLLIERY WATER BALANCES .
    [Show full text]
  • Review of State Conservation Areas
    Review of State Conservation Areas Report of the first five-year review of State Conservation Areas under the National Parks and Wildlife Act 1974 November 2008 Cover photos (clockwise from left): Trial Bay Goal, Arakoon SCA (DECC); Glenrock SCA (B. Peters, DECC); Banksia, Bent Basin SCA (M. Lauder, DECC); Glenrock SCA (B. Peters, DECC). © Copyright State of NSW and Department of Environment and Climate Change NSW. The Department of Environment and Climate Change NSW and State of NSW are pleased to allow this material to be reproduced for educational or non-commercial purposes in whole or in part, provided the meaning is unchanged and its source, publisher and authorship are acknowledged. Specific permission is required for the reproduction of photographs. Published by: Department of Environment and Climate Change 59–61 Goulburn Street PO Box A290 Sydney South 1232 Ph: (02) 9995 5000 (switchboard) Ph: 131 555 (environment information and publications requests) Ph: 1300 361 967 (national parks information and publications requests) Fax: (02) 9995 5999 TTY: (02) 9211 4723 Email: [email protected] Website: www.environment.nsw.gov.au ISBN 978-1-74122-981-3 DECC 2008/516 November 2008 Printed on recycled paper Contents Minister’s Foreword iii Part 1 – State Conservations Areas 1 State Conservation Areas 4 Exploration and mining in NSW 6 History and current trends 6 Titles 7 Assessments 7 Compliance and rehabilitation 8 Renewals 8 Exploration and mining in State Conservation Areas 9 The five-year review 10 Purpose of the review 10
    [Show full text]
  • NZMT-Energy-Report May 2021.Pdf
    Acknowledgements We would like to thank Monica Richter (World Wide Fund for Nature and the Science Based Targets Initiative), Anna Freeman (Clean Energy Council), and Ben Skinner and Rhys Thomas (Australian Energy Council) for kindly reviewing this report. We value the input from these reviewers but note the report’s findings and analysis are those of ClimateWorks Australia. We also thank the organisations listed for reviewing and providing feedback on information about their climate commitments and actions. This report is part of a series focusing on sectors within the Australian economy. Net Zero Momentum Tracker – an initiative of ClimateWorks Australia with the Monash Sustainable Development Institute – demonstrates progress towards net zero emissions in Australia. It brings together and evaluates climate action commitments made by Australian businesses, governments and other organisations across major sectors. Sector reports from the project to date include: property, banking, superannuation, local government, retail, transport, resources and energy. The companies assessed by the Net Zero Momentum Tracker represent 61 per cent of market capitalisation in the ASX200, and are accountable for 61 per cent of national emissions. Achieving net zero emissions prior to 2050 will be a key element of Australia’s obligations under the Paris Agreement on climate (UNFCCC 2015). The goal of the agreement is to limit global temperature rise to well below 2 degrees Celsius above pre-industrial levels and to strive for 1.5 degrees. 2 Overall, energy sector commitments are insufficient for Australia to achieve a Paris-aligned SUMMARY transition to net zero. Australia’s energy sector This report finds none of the companies assessed are fully aligned with the Paris climate goals, and must accelerate its pace of most fall well short of these.
    [Show full text]
  • Lane Cove River Coastal Zone Management Plan
    A part of BMT in Energy and Environment "Where will our knowledge take you?" Lane Cove River Coastal Zone Management Plan Offices Prepared For: Lane Cove River Estuary Management Committee Brisbane (LCREMC), Hunters Hill Council, Lane Cove Council, Denver City of Ryde, Willoughby Councli Mackay Melbourne Newcastle Perth Prepared By: BMT WBM Pty Ltd (Member of the BMT group of Sydney companies) Vancouver Acknowledgement: LCREMC has prepared this document with financial assistance from the NSW Government through the Office of Environment and Heritage. This document does not necessarily represent the opinion of the NSW Government or the Office of Environment and Heritage. lANE COVE RIVER CZMP FINAL DRAFT DOCUMENT CONTROL SHEET BMT WBM Pty Ltd Document : Lane Cove River CZMP FINAL BMT WBM Pty Ltd DRAFT Level 1, 256-258 Norton Street PO Box 194 Project Manager : Reid Butler LEICHHARDT NSW 2040 Australia Client : Lane Cove River Estuary Management Committee, Hunters Tel: +61 2 8987 2900 Hill Council, Lane Cove Council, Fax: +61 2 8987 2999 City of Ryde, Willoughby Council ABN 54 010 830 421 www.bmtwbm.com.au Client Contact: Susan Butler (Lane Cove Council) Client Reference: Lane Cove River CZMP Title : Lane Cove River Coastal Zone Management Plan Author/s : Reid Butler, Smita Jha Synopsis : This report provides a revised management plan for the Lane Cove River Estuary under the requirements of the NSW OEH Coastal Zone Management Planning Guidelines. REVISION/CHECKING HISTORY REVISION DATE OF ISSUE CHECKED BY ISSUED BY NUMBER 0 24/05/2012 SJ
    [Show full text]
  • Upper Hunter Country Destinations Management Plan - October 2013
    Destination Management Plan October 2013 Upper Hunter Country Destinations Management Plan - October 2013 Cover photograph: Hay on the Golden Highway This page - top: James Estate lookout; bottom: Kangaroo at Two Rivers Wines 2 Contents Executive Summary . .2 Destination Analysis . .3 Key Products and Experiences . .3 Key Markets . .3 Destination Direction . .4 Destination Requirements . .4 1. Destination Analysis . .4 1.1. Key Destination Footprint . .5 1.2. Key Stakeholders . .5 1.3. Key Data and Documents . .5 1.4. Key Products and Experiences . .7 Nature Tourism and Outdoor Recreation . .7 Horse Country . .8 Festivals and Events . .9 Wine and Food . .10 Drives, Walks, and Trails . .11 Arts, Culture and Heritage . .12 Inland Adventure Trail . .13 1.5. Key Markets . .13 1.5.1. Visitors . .14 1.5.2. Accommodation Market . .14 1.5.3. Market Growth Potential . .15 1.6. Visitor Strengths . .16 Location . .16 Environment . .16 Rural Experience . .16 Equine Industry . .17 Energy Industry . .17 1.7. Key Infrastructure . .18 1.8. Key Imagery . .19 1.9. Key Communications . .19 1.9.1. Communication Potential . .21 2. Destination Direction . .22 2.1. Focus . .22 2.2. Vision . .22 2.3. Mission . .22 2.4. Goals . .22 2.5. Action Plan . .24 3. Destination Requirements . .28 3.1. Ten Points of Collaboration . .28 1 Upper Hunter Country Destinations Management Plan - October 2013 Executive Summary The Upper Hunter is a sub-region of the Hunter Develop a sustainable and diverse Visitor region of NSW and is located half way between Economy with investment and employment Newcastle and Tamworth. opportunities specifi c to the area’s Visitor Economy Strengths.
    [Show full text]
  • Climate Variability and Water Security for Power Generation
    Hydro-climatology: Variability and change (Proceedings of symposium JH02 held during 233 IUGG2011 in Melbourne, Australia, July 2011) (IAHS Publ. 344, 2011). Climate variability and water security for power generation ADAM M. WYATT & STEWART W. FRANKS University of Newcastle, Callaghan, New South Wales 2308, Australia [email protected] Abstract A reliable supply of fresh water is a critical component of coal fired power generation. During periods when water supplies are reduced, power generation may be limited, with obvious impacts on power consumers. Using the reconstructed historical streamflow series contained in the IQQM water allocation model, and simple water balance modelling, the water supply security of the Bayswater Power Station in the Hunter Valley, Australia, is assessed. The study revealed that the supply of water to the Bayswater Power Station is sensitive to extended dry periods, with some historical periods experiencing water shortfalls so severe that the station would be shut down without alternative water supplies. Key words climate variability; water supply security; water balance modelling; IQQM; Hunter Valley, Australia INTRODUCTION The purpose of this study is to determine the impact that climate processes such as the El Nino – Southern Oscillation have on the reliability of the water supply within the Hunter Valley, Australia. Specifically this study focuses on the water supply security necessary for power generation by Macquarie Generation at the Bayswater and Lake Liddell power stations. The generation of electricity using coal fired power stations such as Bayswater and Lake Liddell is dependent on a reliable supply of fresh water to replenish losses due to the operations of the power stations.
    [Show full text]
  • Model Bush Fire Risk Management Plan 2006
    Page 2 of 41 Amendment List Amendment Entered Number Date Signature Date Page 4 of 41 Table of Contents Glossary 7 1.1 Background 9 1.2 Aim and Objectives 9 1.3 Description of the Muswellbrook BFMC area 10 1.3.1 Location and land tenure 10 1.3.2 Climate and bush fire season 10 1.3.3 Population and demographic information 11 1.3.4 History of bush fire frequency and ignition cause 11 Chapter 2. Identifying and assessing the bush fire risk 13 2.1 Process 13 2.2 Communication and consultation 13 2.3 Identifying the bush fire risk 14 2.3.1 Assets 14 2.3.2 Assessing the bush fire risk - consequence 15 2.3.3 Assessing the bush fire risk - likelihood 17 2.3.4 Identifying the level of risk 17 2.3.5 Evaluating the bush fire risk 17 2.3.6 Prioritising treatments 17 2.3.7 Risk acceptability 17 Chapter 3. Treating the risk 18 3.1 Bush Fire Management Zones 18 3.2 BFMC wide treatments 20 3.3 Asset specific treatments 22 3.4 Fire thresholds 23 3.5 Annual works programs 24 3.6 Implementation 24 Chapter 4. Performance monitoring and reviewing 25 4.1 Review 25 4.2 Monitoring 25 4.3 Reporting 25 4.4 Performance Measurements 25 Appendix 1: Community Participation Strategy 26 Appendix 2: Asset Register 32 Appendix 3: Treatment Register 36 Appendix 4: Maps 41 Page 5 of 41 List of Tables Table 1.1 Land tenure 10 Table 3.1 Bush Fire Management Zones: Purpose, objectives and characteristics 19 Table 3.2 Asset specific treatments used in the Muswellbrook BFMC area 22 Table 3.3 Fire Thresholds for Vegetation Categories 23 List of Figures Figure 2.1 Overview of the risk assessment process ..............................................................................13 Page 6 of 41 Glossary Assets: anything valued by the community which includes houses, crops, livestock, heritage buildings and places, infrastructure, the environment, businesses, and forests, that may be at risk from bush fire.
    [Show full text]