Council Housing Land Audit 2020

Midlothian Council Housing Land Audit 2020 1 - Introduction

The Housing Land Audit (HLA) is the established means of monitoring and managing the housing land supply. Audits are undertaken annually (based on the financial year of 31st March – 1st April) and establish the availability of effective housing land at that time, for the next five years and beyond. The Audit also indicates the progress of sites through the planning process, house completions and a programme of development to ensure that there is enough effective housing land for at least five years. The Audit is shared with Homes for (HfS) and other infrastructure providers.

HLA 20 is an assessment of the housing land supply in Midlothian at 31st March 2020. It comprises the following six schedules:

 Summary – an overview of the supply situation;  Main Schedule – information on the status of and indicative programming for effective sites in the supply;  Completions – numbers of units completed at sites, both in the 2019/20 financial year specifically and in total on sites with completions in previous financial years;  Constrained Sites – sites in the supply which are not effective;  Safeguarded Sites – sites associated with housing allocations which have potential for further expansion in the longer term and which could be brought forward through the next development plan, if required;  Site Notes – additional information on sites, including their planning application and building warrant references.

The schedules include all new housing development, redevelopment, conversion and sub-division consisting of five or more units. Refurbishment of existing housing stock is excluded. Small sites (of four units or less) are shown as an aggregation for each settlement and are combined with allocated and windfall sites to provide a summary of the housing situation for each settlement in Midlothian. These in turn are aggregated to the Housing Market Area (HMA) level. There are two of these in Midlothian and their boundaries and the settlements they contain are shown in figure 1 on the next page. A map of the sites within the Audit is included at the back of this document and an online version with interactive site information is also available. It can be found here:

www.midlothian.gov.uk/info/205/planning_policy/458/housing_land_audit

The Council will continue to work with HfS, house builders and other agencies to ensure the delivery of housing in Midlothian.

1

Midlothian Council Housing Land Audit 2020

Figure 1: Midlothian’s Housing Market Areas and the main settlements within them.

2

Midlothian Council Housing Land Audit 2020 2 - Site Schedules – Abbreviations Used

Table 1: HLA 20 Abbreviations.

Abbreviation Description

Affd. Affordable housing B/Brf. Brownfield land (land previously developed) C Site with planning consent G/Grf. Greenfield land (previously undeveloped land) ha Area of site in hectares HfS Homes for Scotland HLA Housing Land Audit HMA Housing Market Area DPP/FUL/MSC Detailed/Full Planning Permission Site that is minded to be consented (legal agreement for MC developer’s contributions still to be finalised) MLDP Midlothian Local Development Plan (2017) MLP 2003 2003 Midlothian Local Plan MLP 2008 2008 Midlothian Local Plan NC Site with no planning consent PAC Pre-Application Consultation PPP/OUT Planning Permission in Principle/Outline Planning Permission Strategic Housing Investment Plan (Midlothian Council’s plan for SHIP the delivery of affordable housing) SLP Shawfair Local Plan (2003) UC Site under W Windfall site

3

Midlothian Council Housing Land Audit 2020 3 – Housing Supply Summary

In addition to the seven sites that were completed during the financial year, there are a total of 100 sites in the Main Schedule of HLA 20. This partly reflects the original Shawfair site (h43) now being split into its various plots in the Audit and the same approach being taken with site h58 at north-west Penicuik, however even accounting for this, 100 is the largest number of sites in an Audit for at least a decade, with the exception of last year. 67 of these are at greenfield locations and the remaining 33 are on previously-developed land. The following two figures provide a further breakdown of the sites by planning application status and by land supply source.

Sites without consent

Sites with consent or minded to consent (but not under construction)

Sites under construction

Sites completed this year (2019/20)

Figure 2: Breakdown of HLA 20 sites by planning status. Note: breakdown is by the number of sites rather than their capacity.

MLDP sites

MLP 2008 sites

MLP 2003 sites

SLP sites

Windfall sites

Other sites

Figure 3: Breakdown of HLA 20 sites by land supply source. Notes: 1) ‘Other sites’ are those from prior to the 2003 MLP: the former Dalkeith High School (h12) and Gorton Loan (h22&h52). 2) Breakdown is by the number of sites rather than their capacity.

4

Midlothian Council Housing Land Audit 2020

The Midlothian housing market is characterised by the presence of a range of house builders. Table 2 provides a summary of its major-players alongside the number of sites they are taking forward and the total capacity of these. It is also worth noting that a number of other site developers/promoters and smaller house builders also operate within Midlothian. These are excluded from the table below for conciseness, however full details are provided in the Main Schedule of the Audit.

Table 2: Breakdown of Main Schedule sites by developer. Note: ‘Number of Units’ represents the total site capacity (i.e. it includes units already built). Number Number Developer Notes of Sites of Units Number of units excludes the 98 affordable Avant Homes 5 594 dwellings proposed for Hs20 in a joint application with Stewart Milne Homes. Barratt are at 4 locations – many are split into Barratt Homes 7 1,222 multiple entries in the Audit. Homes 3 435 622 of their 936 units are those proposed for site CALA 6 936 Hs1, Newton Farm. CALA are at 4 locations – many are split into multiple entries in the Audit. Cruden/Hart Builders (who are part of the Cruden Cruden Homes 4 200 Group) develop many affordable housing sites for the Council. Dandara Homes 4 302 Includes 51 affordable units as part of their joint application with CALA at Hs19(AreaA) – the phasing David Wilson Homes 2 214 schedule with the application lists them under David Wilson Homes. Mactaggart and 2 413 Two adjacent sites at Shawfair. Mickel Oakridge Group 2 387 Persimmon Homes 2 252 3 281 Number of units excludes the 98 affordable Stewart Milne Homes 2 348 dwellings proposed for Hs20 in a joint application with Avant Homes. 6 1,807 The entry in the number of sites column counts the plots of the Walker sites at Bonnyrigg separately. Figures also include the various Springfield / Walker 10 1,268 Mayfield/Newtongrange sites and are based on MLDP capacities – site constraints mean it is not clear how much of this is deliverable.

HLA 20 identifies a total established housing land supply of 11,941 units and a programmed supply of 5,496 house completions over the period 2020/21 to 2024/25, which equates to an effective housing land supply of 6.1 years (based on current delivery estimates)1. This compares favourably with both Midlothian’s past ten-year average of

1 This is based on dividing the year into 10. It does not mean 6 years and 1 month.

5

Midlothian Council Housing Land Audit 2020

4,900 and to equivalent figures from other Scottish Local Authorities (as reported in their past Planning Performance Framework reports). Moreover, it should also be borne in mind that this figure does not account for new windfall sites that will inevitably enter the supply over the coming five years.

HLA 20 identifies 611 housing unit completions in the Audit year. This is a decrease of 11% on the previous year (which was the highest figure since 2008/09) and compares to a five-year rolling average prior to the current Audit year of 630 units per annum. 611 units is broadly in line with a plateauing of yearly completions since around 2014 – in years prior to this fewer units were built (figure 4 below). It should be noted that the fall in completions between 2019/20 and the previous year is not due to the Coronavirus outbreak (see section 5).

750 700 650 600 550

Completed 500

450 Units 400 350 300 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Figure 4: Ten-year trend of housing completions in Midlothian.

In terms of the distribution of dwellings built across Midlothian’s settlements (figure 5), the most notable feature is the emergence of Shawfair as where most completions took place during 2019/20. The previous year was the first occasion where the number of units built there reached into three figures and activity has accelerated since, with another 143 units built. This is due to work proceeding at pace at MacTaggart & Mickel’s development in Shawfair itself and Bellway and Miller’s sites at South . Though Miller Homes will be completed during 2020/21, it is probable that Shawfair will continue to be Midlothian’s fastest growing settlement. This is due to MacTaggart & Mickel having a second phase to move on to, pending applications from Barratt Homes and Stewart Milne Homes for 163 units and 143 units respectively and Dandara starting construction at their development there during the Audit year.

Penicuik, Bonnyrigg/Lasswade and Gorebridge form a group of settlements in which around 100 units were built in 2019/20. It is expected that completions at Penicuik will increase in future given that Bellway became the third house-builder on site at h58, North West Penicuik, alongside CALA and Avant. In Gorebridge, meanwhile,

6

Midlothian Council Housing Land Audit 2020

Taylor Wimpey’s development of 211 units at Harvieston is nearing completion while Persimmon have progressed the final area of their h36 site considerably, with the first phase of this being sold out.

2019/20 saw the final private units completed at the original Hopefield housing allocation in Bonnyrigg. This major residential development has seen 1,300 units, a new distributor road and a primary school built on land set aside in the 2003 Local Plan. It has been the main in Bonnyrigg overtaking Penicuik to become the most populous settlement in Midlothian. A planning application has since been submitted for 16 affordable homes and a retail unit for the small remaining undeveloped part of the original Hopefield allocation, while Taylor Wimpey intend to take forward the newer allocations from the MLDP there – they submitted an application for consent in principle for 1,000 units at site Hs12 and its associated ‘safeguarded’ allocation.

Completions at Loanhead remained steady, with housing sites there being in a later phase of the development cycle. The two small windfall housing sites at Clerk Street and the Former Loanhead Hospital are expected to be completed during 2020/21, the second of the three portions of the Ashgrove site was completed during the Audit year and the first occupations took place at Barratt’s development of the former Paradykes Primary School site. This means that, at the current time, there are no units planned to be built in the beyond 22/23 (with the exception of small sites or less than 5 units).

200 180 160 140 120 100 Completed

80 60 Houses 40 20 0

2019/20 2018/19 Figure 5: Comparison of units completed in 2019/20 and 2018/19 by settlement.

7

Midlothian Council Housing Land Audit 2020

HLA 19 was the first Audit from Midlothian Council to provide a breakdown of completions between the market and affordable sectors. It reported 119 affordable units built together with another 18 properties purchased by Housing Services on the open market. The equivalent figures for 2019/20 were 70 units built and 48 properties purchased. Further details on this topic are provided in the latest Strategic Housing Investment Plan report. A link to this is provided in Section 6.

The 2019/20 financial year saw a number of applications for major developments approved. These are listed in the table below alongside their relevant planning application reference numbers, which can be looked up on the Planning and Building Standards Portal on the Midlothian Council website. A link to it is also provided in Section 6. A link is also provided to direct readers to Planning Committee documents which include updates on the progress of major applications for every meeting.

Table 2: Notable housing applications approved in 2019/20. Site Number of Application Settlement Reference Units Reference(s) Bonnyrigg/Lasswade Hs10 78 18/00539/MSC Dalkeith Hs2 & Hs3 134 19/00010/MSC Roslin/Bilston Hs19 221 18/00535/PPP Roslin/Bilston h55 190 19/00321/MSC Dalkeith h46 109 18/00678/MSC Roslin/Bilston Hs18 304 18/00499/MSC Roslin/Bilston Hs19 51 18/00703/DPP Penicuik h58 91 19/00727/DPP Bonnyrigg/Lasswade Hs10 70 19/00685/MSC 17/01001/DPP, /rural area (West) AHs1 381 17/00980/PPP Shawfair Area Hs0 350 14/00910/PPP 19/00263/DPP, Penicuik h58 83 19/00256/DPP Note: many of these applications are amendments to earlier consents or are applications for detailed planning permission at sites that already had consent in principle. For this reason, the number of units consented at specific sites should not be compared between years – the information in the table should be viewed as a one-year snap-shot.

8

Midlothian Council Housing Land Audit 2020

4 – Property Market Summary

House price data adds context to the Midlothian housing supply situation in the six schedules on the following pages that comprise the HLA. This data was obtained from Registers of Scotland and a link to it is provided in Section 62. It is important to note that they refer to the prices of properties sold only, as it is at this point where the transaction value becomes available. Prices of the stock more generally may differ from those that come on the market.

There were approximately 1,900 property transactions in Midlothian during 2019/20, which is comparable to the number seen over the past five years. The total value of these transactions was £430 million during the 2019/20 year, somewhat higher than the previous year (£390 million).

Selling prices of homes in Midlothian have risen steadily in the past few years, from an average of £180,000 in 2014/15 to nearly £230,000 in 2019/20. Homes in Midlothian are also some of the most expensive in Scotland – the average selling price across the country in 2019/20 was £180,000. At certain points during the year, average selling prices in Midlothian have reached £240,000, which was the highest for at least five years. Prices in the areas are generally amongst the highest in Scotland, with neighbouring and East Lothian also being expensive. For comparison, the lowest average house prices were in East Ayrshire. Table 3 summarises the most expensive and most affordable Councils in Scotland by house selling price for the final quarter of the Audit year.

Table 3: Top five most and least expensive Council areas by house selling price. Average House Price in Council Area Q4 2019/20 East Dunbartonshire £276,000 East Renfrewshire £267,000 Top Five Most Expensive Edinburgh £263,000 East Lothian £242,000 Midlothian £230,000 Inverclyde £133,000 North Ayrshire £124,000 Top Five Least Expensive Na h-Eileanan Siar £123,000 West Dunbartonshire £122,000 East Ayrshire £118,000

Figure 6 provides a visual comparison of average selling prices for homes in Midlothian against the Scottish average. It can be seen that while prices have generally

2 Note that Registers of Scotland house price data is based on average sale prices, which means that prices can be skewed upwards by a small number of sales of particularly expensive properties.

9

Midlothian Council Housing Land Audit 2020

increased over recent years, they have increased more in Midlothian than across the country as a whole. This has led to a situation where the gap between house prices in Midlothian and Scotland has widened. This trend may be due to newer housing developments in Midlothian being composed of a higher portion of larger, family homes than is typical for the region – in other words, it may reflect a change in composition of the local housing stock rather than solely an increase in price. It may also reflect increased demand for homes within the as buyers could become priced out of the Edinburgh market or seek better value close to but outside the .

£250,000

£200,000

£150,000

£100,000

£50,000

£0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Midlothian Scotland Difference

Figure 6: Trend in average house selling prices in Midlothian and Scotland, and the difference between them.

5 – Implications of the Coronavirus Outbreak

The Coronavirus outbreak of 2020 has had some notable implications for housing activity in Midlothian and for how this Audit was put together.

It was noted earlier that 611 completions for 2019/20 is lower than the five-year rolling average (630 units/year) and the total for 2018/19 (685 units). This was fall was not due to the ‘lockdown’ and its associated impacts on housing matters such as the cessation of building work, the temporary closure of the application record by Registers of Scotland from late-March and the advice from the to delay moving home wherever possible. Such impacts occurred after the end of the financial year and will therefore be reflected within HLA 21.

The Coronavirus restrictions have also had implications for the methodology used in this year’s Audit. The draft is traditionally shared with HfS who consult their members

10

Midlothian Council Housing Land Audit 2020

on anticipated programming, compile it and bring it to a meeting with Council staff where programming is mutually agreed. This procedure was followed again, albeit remotely rather than in physical proximity, along with several other means which were used this year to obtain programming which is as accurate as possible. These include:  Direct contact with house-builders – all of the major-players in Midlothian were sent requests for programming;  More site visits than usual – all developments that were under construction before lockdown were visited to determine both whether building work had recommenced and the state of play regarding the number of units being worked on, that were nearing completion and that were occupied;  Consulting Planning Officer’s case files and building warrants for the most recent activity regarding sites;  Research on housing market activity, including news articles - particularly those regarding Construction Scotland’s site Restart Plan – as well as direct contact with sales staff at sites;  Reviewing past completions figures for sites that had previously delivered finished units in prior Audits;  Reviewing HfS guidelines on programming.

For these reasons, the programming is as accurate as possible under the circumstances of the virus restrictions and its consequences. It should be noted that it reflects the situation at the time of writing (late 2020) and any if restrictions were imposed again, this would have knock-on effects for site programming.

6 – Sources of Further Information

Further information on housing sites, applications and general housing matters in Midlothian can be found at the following links.

 Interactive HLA map https://midlothian.maps.arcgis.com/apps/webappviewer/index.html?id=0b4cb c1f44364150bc4e82314231d1c1

 Map of Housing Sites Completed in the Last Five Years https://midlothian.maps.arcgis.com/apps/webappviewer/index.html?id=039a7 72e006f4d75887fb183c17ee509

 Planning and Building Standards Portal https://planning-applications.midlothian.gov.uk/OnlinePlanning/

 Planning Committee Meetings and Documents https://midlothian.cmis.uk.com/live/Council,CabinetandCommittees/tabid/62 /ctl/ViewCMIS_CommitteeDetails/mid/381/id/8/Default.aspx

 Local Development Plan

11

Midlothian Council Housing Land Audit 2020

https://www.midlothian.gov.uk/info/205/planning_policy/286/development_p lans_and_polices

 Strategic Housing Investment Plan Report https://www.midlothian.gov.uk/downloads/download/597/strategic_housing_i nvestment_plans_ship

 Registers of Scotland House Price Statistics https://www.ros.gov.uk/data-and-statistics/house-price-statistics/_nocache

12

SUMMARY

Total Programmed Completions Total Site All Completions Total Dwellings Status Affordable Total Post Capacity by 31/03/20 Remaining 20/21 21/22 22/23 23/24 24/25 25/26 26/27 Units 20/25 2027 Under Construction 3,526 469 1,131 2,395 605 680 560 329 115 2,289 62 16 13 Consented 6,850 1,722 6,850 6 223 582 734 753 2,298 693 575 3,291 No Consent 2,255 636 2,255 0 40 103 285 376 804 358 256 782 Small Sites 105 105 26 24 13 33 9 105 0 0 0 Total Effective Supply 12,736 2,827 1,131 11,605 637 967 1,258 1,381 1,253 5,496 1,113 847 4,086

Constrained 336 336

Total Established Supply 13,072 11,941 MAIN SCHEDULE

Planning Consent Programmed Completions Area Density Brf/ Total Affd. Complete Remaining Site Ref. Site Name Developer (or Owner) Status UC Date Houses Flats Total Post (ha) (units/ha) Grf Type Date Units Units by 03/20 at 04/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 20/25 2027 Midlothian West HMA Loanhead h54(III) Ashgrove Phase 3 Dandara Homes 4.2 21.9 G UC MSC Nov-18 Apr-19 92 92 0 0 3 89 30 30 29 0 0 89 0 0 0 279 Former Loanhead Hospital Eskgrove Homes 0.7 12.9 B UC DPP Mar-13 Dec-13 9 9 0 0 8 1 1 0 0 0 0 1 0 0 0 2018LH1 Former Paradykes Primary School Barratt Homes 2.8 30.7 B UC MSC Nov-18 Aug-19 86 70 16 21 7 79 36 36 7 0 0 79 0 0 0 2019LH1 Clerk Street Cruden Homes 0.7 37.8 B UC DPP Feb-19 Sep-19 28 0 28 28 0 28 28 0 0 0 0 28 0 0 0 Small sites 10 0 10 2 1 5 2 0 10 0 0 0 Totals for Loanhead 225 171 44 49 18 207 97 67 41 2 0 207 0 0 0

Roslin/Bilston Hs18 Roslin Institute Taylor Wimpey 16.6 18.3 B C MSC Jul-19 304 272 32 76 0 304 0 0 60 60 60 180 60 39 25 Hs19(AreaA) Roslin Expansion Area A David Wilson Homes & CALA 11.7 18.9 G C PPP Jun-19 221 177 44 55 0 221 0 0 60 60 43 163 43 15 0 Hs19(AreaB) Roslin Expansion Area B David Wilson Homes 3.6 14.2 G UC DPP Jul-19 Oct-19 51 43 8 13 0 51 8 30 13 0 0 51 0 0 0 h57 Penicuik Road CALA 4.5 17.6 G UC MSC Mar-17 Jun-17 79 71 8 0 65 14 14 0 0 0 0 14 0 0 0 Hs16(AreaA) Seafield Road Area A Taylor Wimpey 8.7 25.6 G UC DPP Sep-18 Nov-19 222 155 36 56 0 222 0 70 70 67 0 207 0 0 0 Hs16(Rem) Seafield Road Remainder Taylor Wimpey 15.4 14.2 G NC None 218 N/A N/A 55 0 218 0 0 0 70 70 140 63 0 0 Hs17^ Pentland Plants (Private) 3.5 21.4 B NC None 75 N/A N/A 19 0 75 0 0 0 0 0 0 25 25 25 h55(AreaA) Seafield Moor Road Area A Barratt Homes 9.9 19.2 G UC MSC Jun-19 Jan-20 190 155 35 47 0 190 15 36 56 52 31 190 0 0 0 University of Edinburgh / Barratt h55(Rem) Seafield Moor Road Remainder 6.6 13.6 G C PPP Feb-17 90 N/A N/A 23 0 90 0 0 0 0 0 0 15 50 25 Homes 2019RB1 Castlelaw Terrace Mears Group 0.1 57.1 B UC DPP Jan-19 Mar-20 8 0 8 8 0 8 8 0 0 0 0 8 0 0 0 Small sites 5 0 5 1 1 0 2 1 5 0 0 0 Totals for Roslin/Bilston 1,463 873 171 352 65 1,398 46 137 259 311 205 958 206 129 75

Penicuik Hs22 Kirkhill Road Cruden Homes 1.0 21.0 B UC DPP Mar-19 Oct-19 21 5 16 21 0 21 8 13 0 0 0 21 0 0 0 h58(AreaA1) Belwood CALA (at NW Penicuik) CALA 6.4 11.7 G UC DPP Sep-18 Mar-19 75 75 0 0 19 56 19 31 6 0 0 56 0 0 0 h58(AreaA2) Belwood Avant (at NW Penicuik) Avant Homes 5.7 15.3 G UC DPP Sep-18 Mar-19 87 87 0 0 9 78 15 30 30 3 0 78 0 0 0 h58(AreaB1) Nursery West (at NW Penicuik) Avant Homes 2.8 8.9 G C DPP Sep-18 25 25 0 0 0 25 0 0 0 0 0 0 10 15 0 h58(AreaB2) Nursery North (at NW Penicuik) Avant Homes 4.5 11.8 G C DPP Sep-18 53 53 0 0 0 53 0 0 0 15 30 45 8 0 0 h58(AreaB3) Nursery East (at NW Penicuik) Melville Housing Association 2.6 21.9 G C DPP Sep-18 57 13 44 57 0 57 0 28 29 0 0 57 0 0 0 h58(AreaC) Mauricewood (at NW Penicuik) CALA 5.2 19.2 G C DPP Sep-18 100 100 0 0 0 100 0 0 22 28 28 78 22 0 0 h58(AreaD) Mauricewood North (at NW Penicuik) CALA 2.7 3.7 G C DPP Sep-18 10 10 0 0 0 10 0 0 0 0 0 0 6 4 0 h58(AreaE) Deanburn (at NW Penicuik) Bellway Homes 6.9 13.2 G UC DPP Oct-19 Nov-19 91 91 0 0 0 91 10 30 30 21 0 91 0 0 0 h58(AreaF) Rullion Road (at NW Penicuik) Midlothian Council 6.2 11.0 G C DPP Sep-18 68 16 52 68 0 68 0 0 0 25 25 50 18 0 0 h25 Greenlaw and Adjacent Land Taylor Wimpey 29.5 16.2 G UC DPP Jan-16 Apr-17 477 429 48 24 149 328 45 60 60 60 60 285 43 0 0 2019PK1 The Square Mr Chris Bartholomew 0.1 60.0 B C DPP May-19 6 0 6 0 0 6 0 3 3 0 0 6 0 0 0 Small sites 4 0 4 1 0 0 3 0 4 0 0 0 Totals for Penicuik 1,074 904 166 170 177 897 98 195 180 155 143 771 107 19 0

Villages and rural remainder (Midlothian West HMA)

Hs20 Auchendinny Stewart Milne Home & Avant Homes 21.9 16.0 G NC None 350 N/A N/A 88 0 350 0 0 45 66 66 177 66 66 41

Part PPP, AHs1 Rosslynlee, near Penicuik Oakridge Group 25.9 14.7 B C Dec-19 381 355 26 0 0 381 6 37 43 59 83 228 50 50 53 Part DPP 2018VR5 Former Howgate Restaurant Mr Cameron Hogg 0.5 14.6 B C b Oct-18 7 7 0 0 0 7 0 0 3 4 0 7 0 0 0 Small sites 16 0 16 1 3 1 7 4 16 0 0 0 Totals for villages and rural remainder (Midlothian West HMA) 754 362 26 88 0 754 7 40 92 136 153 428 116 116 94

Totals for Midlothian West HMA 3,516 2,310 407 659 260 3,256 248 439 572 604 501 2,364 429 264 169

Midlothian East HMA Bonnyrigg/Lasswade Hs10(AreaA) Dalhousie Mains Area A Walker Group / Springfield 2.3 11.7 G UC DPP Dec-17 Dec-18 27 28 0 0 19 8 8 0 0 0 0 8 0 0 0 Hs10(AreaB) Dalhousie Mains Area B Walker Group / Springfield 3.4 22.9 G UC MSC Apr-19 Feb-20 78 78 0 0 0 78 15 30 30 3 0 78 0 0 0 Hs10(AreaD) Dalhousie Mains Area D Walker Group / Springfield 1.3 53.0 G C MSC Oct-19 70 34 36 70 0 70 0 35 35 0 0 70 0 0 0 Hs10(Rem) Dalhousie Mains Remainder Walker Group / Springfield 5.1 16.9 G C PPP Feb-18 87 N/A N/A 0 0 87 0 0 0 15 30 45 30 12 0 Hs11(AreaA) Dalhousie South Area A Walker Group / Springfield 19.8 12.5 G MC DPP May-19 247 247 0 7 0 247 0 0 0 15 30 45 30 30 142 Hs11(AreaB) Dalhousie South Area B Walker Group / Springfield 1.8 40.6 G MC PPP May-19 73 N/A N/A 73 0 73 0 0 0 0 15 15 30 28 0 Hs12 Hopefield Farm 2 Taylor Wimpey 32.3 11.6 G NC None 375 N/A N/A 94 0 375 0 0 0 20 70 90 70 70 145 2018BL2 Former Bonnyrigg Market MNM Developments (Scotland) Ltd. 0.3 48.3 B UC DPP Feb-18 Feb-19 14 7 7 0 6 8 8 0 0 0 0 8 0 0 0 Lasswade Townhouse Development 243 Former garage, Elm Row 0.2 30.0 B UC FUL May-05 Jan-10 6 6 0 0 2 4 0 2 2 0 0 4 0 0 0 Company 2020BL1 Lasswade High Street Dimension Homes Ltd. 0.6 14.3 B C DPP Jan-20 8 8 0 0 0 8 0 3 3 2 0 8 0 0 0 Small sites 11 0 11 2 4 3 2 0 11 0 0 0 MAIN SCHEDULE

Planning Consent Programmed Completions Area Density Brf/ Total Affd. Complete Remaining Site Ref. Site Name Developer (or Owner) Status UC Date Houses Flats Total Post (ha) (units/ha) Grf Type Date Units Units by 03/20 at 04/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 20/25 2027 Totals for Bonnyrigg/Lasswade 996 408 43 244 27 969 33 74 73 57 145 382 160 140 287

Dalkeith Hs2 Larkfield West Dandara Homes 4.9 17.1 G UC MSC May-19 Oct-19 84 84 0 0 0 84 30 30 24 0 0 84 0 0 0 Hs3 Larkfield South West Dandara Homes 2.8 17.9 G C MSC May-19 50 34 16 34 0 50 0 0 6 30 14 50 0 0 0 Hs5^ Thornybank North (Buccleuch Estates) 2.0 15.0 B NC None 30 N/A N/A 8 0 30 0 0 0 0 0 0 15 15 0 h46 Cowden Cleugh Bellway Homes 8.8 12.4 G UC MSC Jun-19 Dec-19 109 101 8 27 0 109 10 30 30 30 9 109 0 0 0 h12 Former Dalkeith High School Midlothian Council 3.3 27.9 B NC None 92 N/A N/A 92 0 92 0 40 48 4 0 92 0 0 0 Buccleuch Property / LAR Housing 2018DK2 Wester Cowden Farm 1.8 13.7 B C PPP Feb-18 25 25 0 3 0 25 0 0 25 0 0 25 0 0 0 Trust 2019DK1 Glenesk House Viewpoint Housing Association 1.3 22.6 B C DPP Mar-19 30 0 30 30 0 30 0 0 0 30 0 30 0 0 0 Small sites 10 0 10 4 1 0 5 0 10 0 0 0 Totals for Dalkeith 430 244 54 194 0 430 44 101 133 99 23 400 15 15 0

Gorebridge Hs7 Redheugh West (Phase 2) (Old Road Securities Plc) 24.3 8.2 G NC None 200 N/A N/A 50 0 200 0 0 0 0 0 0 0 0 200 (Old Road Securities Plc) / Barratt h50(A) Redheugh / Prestonholm new community (Phase 1A) 7.6 17.8 G C PPP Nov-17 135 N/A N/A 34 0 135 0 0 0 35 70 105 30 0 0 Homes (Old Road Securities Plc) / Barratt h50(Rem) Redheugh / Prestonholm new community remainder 28.0 20.2 G C PPP Nov-17 565 N/A N/A 141 0 565 0 0 0 0 0 0 25 70 470 Homes h23 Harvieston Taylor Wimpey 12.1 17.4 G UC DPP Feb-16 Nov-16 211 199 12 21 174 37 37 0 0 0 0 37 0 0 h24 Newbyres Persimmon Homes 4.8 15.8 B NC None 76 N/A N/A 19 0 76 0 0 0 30 40 70 6 0 0 h36(AreaA) North Gorebridge Area A Persimmon Homes 6.7 26.3 G UC FUL Aug-11 Jun-19 176 170 6 0 29 147 51 65 31 0 0 147 0 0 0 h40 Vogrie Road Balfour Beatty Homes 6.9 13.5 G UC DPP Dec-11 Feb-12 93 93 0 5 77 16 0 2 14 0 0 16 0 0 0 h51 Robertson's Bank (Carlsson Properties Ltd) 2.7 20.4 B NC None 55 N/A N/A 14 0 55 0 0 0 0 15 15 0 0 0 292 Land at 4 Powdermill Brae Oakridge Homes 0.4 15.0 B UC DPP Apr-14 Sep-18 6 6 0 0 5 1 1 0 0 0 0 1 0 0 0 2018GB2 Former Arniston Gas Works Pegasus Flooring 1.2 8.1 B C PPP Apr-18 10 10 0 0 0 10 0 0 0 0 0 0 5 5 0 Small sites 8 0 8 3 3 0 1 1 8 0 0 0 Totals for Gorebridge 1,535 478 18 284 285 1,250 92 70 45 66 126 399 66 75 670

Mayfield/Newtongrange h48 Bryans Cruden Homes 2.8 25.7 B C DPP Mar-19 72 28 44 72 0 72 0 10 40 22 0 72 0 0 0 h41 North Mayfield Gladman Developments 8.5 7.4 G NC None 63 N/A N/A 16 0 63 0 0 0 15 30 45 18 0 0 h38(Rem) South Mayfield Remainder Springfield 40.9 10.7 G NC None 439 N/A N/A 110 0 439 0 0 0 0 0 0 50 50 339 h49 Dykeneuk Springfield 8.0 6.3 G NC None 50 N/A N/A 13 0 50 0 0 0 25 25 50 0 0 0 h34(Rem) East Newtongrange Remainder Springfield 13.1 4.6 G NC None 60 N/A N/A 15 0 60 0 0 0 15 30 45 15 0 0 h35 Lingerwood Springfield 8.9 15.4 G NC None 137 N/A N/A 34 0 137 0 0 0 15 30 45 30 30 32 h37 Cockpen Miller Homes 10.5 12.5 G UC MSC Sep-16 Mar-17 131 131 0 0 80 51 19 32 0 0 0 51 0 0 0 2018MN1 Former Mayfield Inn Whiteadder Ltd 0.2 117.6 B UC DPP Feb-18 Jul-18 20 0 20 20 0 20 20 0 0 0 0 20 0 0 0 2018MN2^ Bryans Road & Morris Road Junction T & V Builders Ltd 0.3 50.0 B C DPP Jun-18 16 5 11 0 0 16 0 0 0 0 0 0 0 0 16

2018MN3 Land South West of Newbattle Community High School Cruden Homes 2.7 29.6 B C DPP Jan-19 79 29 50 79 0 79 0 22 29 28 0 79 0 0 0

Small sites 9 0 9 3 5 0 1 0 9 0 0 0 Totals for Mayfield/Newtongrange 1,076 193 125 359 80 996 42 69 69 121 115 416 113 80 387

Shawfair Area Hs0 Cauldcoats Paladin Ventures Ltd 19.0 18.4 G C PPP Jul-19 350 N/A N/A 88 0 350 0 0 0 50 50 100 60 60 130 Hs1 Newton Farm CALA 38.7 16.1 G MC DPP Jan-19 622 500 122 155 0 622 0 0 15 30 80 125 100 80 317 h43(A) Shawfair (Block A) Shawfair LLP 1.8 37.8 G C OUT Aug-14 68 N/A N/A 14 0 68 0 0 0 0 0 0 0 0 68 h43(B) Shawfair (Block B) Shawfair LLP 12.3 31.1 G C OUT Aug-14 382 N/A N/A 76 0 382 0 0 0 0 0 0 0 0 382 h43(C) Shawfair (Block C) Shawfair LLP 4.5 43.8 G C OUT Aug-14 197 N/A N/A 39 0 197 0 0 0 0 0 0 0 0 197 h43(E) Shawfair (Block E) Shawfair LLP 4.1 45.4 G C OUT Aug-14 186 N/A N/A 37 0 186 0 0 0 0 15 15 30 30 111 h43(F) Shawfair (Block F) Shawfair LLP 4.8 59.6 G C OUT Aug-14 286 N/A N/A 57 0 286 0 0 0 0 15 15 30 30 211 h43(H) Shawfair (Block H) Shawfair LLP 0.4 182.5 G C OUT Aug-14 73 N/A N/A 15 0 73 0 0 0 0 0 0 0 0 73 h43(I) Shawfair (Block I) Shawfair LLP 5.4 53.7 G C OUT Aug-14 290 N/A N/A 58 0 290 0 0 0 0 0 0 0 0 290 h43(K) Shawfair (Block K) Shawfair LLP 8.4 36.8 G C OUT Aug-14 309 N/A N/A 62 0 309 0 0 0 0 15 15 30 30 234 h43(L) Shawfair (Block L) Shawfair LLP 4.3 52.6 G C OUT Aug-14 226 N/A N/A 45 0 226 0 0 0 0 0 0 0 0 226 h43(M) Shawfair (Block M) Shawfair LLP 1.6 19.4 G C OUT Aug-14 31 N/A N/A 6 0 31 0 0 0 0 0 0 0 0 31 h43(O) Shawfair (Block O) Dandara Homes 2.6 29.2 G UC MSC Mar-19 Jan-20 76 58 18 24 0 76 20 30 26 0 0 76 0 0 0 h43(P) Shawfair (Block P) Shawfair LLP 5.0 37.0 G C OUT Aug-14 185 N/A N/A 37 0 185 0 0 0 0 0 0 0 0 185 h43(Qb & R) Shawfair (Blocks Qb & R) Barratt Homes 5.6 22.0 G C OUT Aug-14 123 N/A N/A 25 0 123 0 0 44 44 42 130 0 0 0 h43(S) Shawfair (Block S) Mactaggart & Mickel 5.2 32.4 G UC FUL Jul-15 Oct-15 170 77 93 32 102 68 64 4 0 0 0 68 0 0 0 h43(SRem) Shawfair (Block S Remainder) Barratt Homes 3.9 23.5 G C OUT Aug-14 91 N/A N/A 18 0 91 0 0 33 0 0 33 0 0 58 h43(Ta) Shawfair (Block Ta) Mactaggart & Mickel 12.1 20.1 G C MSC Mar-19 243 219 24 48 0 243 0 24 60 60 36 180 36 27 0 h43(Tb) Shawfair (Block Tb) Shawfair LLP 1.9 6.8 G C OUT Aug-14 13 N/A N/A 3 0 13 0 0 0 0 13 13 0 0 0 MAIN SCHEDULE

Planning Consent Programmed Completions Area Density Brf/ Total Affd. Complete Remaining Site Ref. Site Name Developer (or Owner) Status UC Date Houses Flats Total Post (ha) (units/ha) Grf Type Date Units Units by 03/20 at 04/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 20/25 2027 h44 North Danderhall Stewart Milne Homes 11.0 17.3 G C OUT Aug-14 190 N/A N/A 38 0 190 0 24 36 64 19 143 0 0 47 h45(B) South Danderhall (Plot B) Miller Homes 3.9 29.7 G UC MSC Oct-17 Feb-18 116 98 18 23 98 18 18 0 0 0 0 18 0 0 0 h45(C&D) South Danderhall (Plots C & D) Bellway Homes 8.8 26.7 G UC MSC Jun-17 Nov-17 235 211 24 47 96 139 30 45 45 19 0 139 0 0 0 2019SA1 Cauldcoats Steading Janis Laird 1.2 10.4 B C DPP Nov-19 12 12 0 0 0 12 0 3 3 3 3 12 0 0 0 Small sites 5 0 5 2 1 0 1 1 5 0 0 0 Totals for Shawfair Area 4,479 1,175 299 947 296 4,183 134 131 262 271 289 1,087 286 257 2,560

Rosewell Hs14 Rosewell North Banks Property Development 6.6 15.2 G MC DPP Oct-19 100 96 4 25 0 100 0 0 15 30 30 75 25 0 0 h52&h22 Gorton Loan & Rosewell Mains Avant Homes 14.3 20.3 G UC DPP Dec-15 May-16 290 290 0 40 149 141 20 40 40 41 0 141 0 0 0 h69 Whitehill House The Proprietors of Whitehill House 0.2 130.0 B UC DPP Jul-12 Oct-18 26 0 26 0 0 26 0 0 8 18 0 26 0 0 0 h70 Grounds of Whitehill House The Proprietors of Whitehill House 36.0 2.6 B UC FUL Jul-12 Apr-15 94 88 6 7 10 84 0 0 7 14 15 36 19 16 13 2018RW1 Land East of Gorton Loan Estate 0.3 45.2 B C PPP Apr-18 14 N/A N/A 0 0 14 0 0 0 7 7 14 0 0 0 Small sites 0 0 0 0 0 0 0 0 0 0 0 0 Totals for Rosewell 524 474 36 72 159 365 20 40 70 110 52 292 44 16 13

Villages and rural remainder (Midlothian East HMA) h59 Crichton Road, Pathhead Muir Homes 2.4 14.6 G NC None 35 N/A N/A 9 0 35 0 0 10 25 0 35 0 0 0 h60 Borthwick Castle Road, North Middleton Miller Homes 1.8 18.9 G UC DPP Feb-18 May-19 34 34 0 5 19 15 15 0 0 0 0 15 0 0 0 2018VR1 Fordel, near Dalkeith Crief Fordel Investment Ltd 3.2 18.8 B C MSC Nov-18 60 16 44 44 0 60 0 24 18 18 0 60 0 0 0 2018VR2 Lawfield Farm, near Dalkeith WS Dunsire & Sons Ltd 0.8 10.0 B UC DPP Apr-16 Dec-16 8 8 0 0 5 3 1 2 0 0 0 3 0 0 0 2018VR4 Former Cousland Primary School, Cousland Almond Branch Developments 0.4 15.0 B UC DPP Mar-18 Oct-18 6 6 0 0 0 6 1 2 2 1 0 6 0 0 0 2019VR1 Crichton Drive, Pathhead Midlothian Council 0.3 33.3 B C DPP Jul-19 10 0 10 10 0 10 0 10 0 0 0 10 0 0 0 Small sites 27 0 27 7 5 4 9 2 27 0 0 0 Totals for villages and rural remainder (Midlothian East HMA) 180 64 54 68 24 156 24 43 34 53 2 156 0 0 0

Totals for Midlothian East HMA 9,220 3,036 629 2,168 871 8,349 389 528 686 777 752 3,132 684 583 3,917

Totals for Midlothian 12,736 5,346 1,036 2,827 1,131 11,605 637 967 1,258 1,381 1,253 5,496 1,113 847 4,086

^ Non-effective site. COMPLETIONS

Completions Total Affd. Remaining at Site Completed in Site Ref. Site Name In Total to Affd. Only Units Units To Mar-19 In 19/20 Apr-20 19/20? Mar-20 19/20 Midlothian West HMA Loanhead h54(II) Ashgrove Phase 2 90 0 71 19 90 0 0 Yes h54(III) Ashgrove Phase 3 92 0 0 3 3 0 89 279 Former Loanhead Hospital 9 0 7 1 8 0 1 2018LH1 Former Paradykes Primary School 86 21 0 7 7 5 79 Small sites (sites with completions only) 6 Total completions for Loanhead 36 5

Roslin/Bilston h57 Penicuik Road 79 0 36 29 65 0 14 Small sites (sites with completions only) 2 Total completions for Roslin/Bilston 31 0

Penicuik h58(AreaA1) Belwood CALA (at NW Penicuik) 75 0 0 19 19 0 56 h58(AreaA2) Belwood Avant (at NW Penicuik) 87 0 0 9 9 0 78 h25 Greenlaw and Adjacent Land 477 24 91 58 149 0 328 2017PK1 Lamb's Pend 5 0 0 5 5 0 0 Yes Small sites (sites with completions only) 0 Total completions for Penicuik 91 0

Villages and rural remainder (Midlothian West HMA) Small sites (sites with completions only) 6 Total completions for villages and rural remainder (Midlothian West HMA) 6 0

Total completions for Midlothian West HMA 164 5 Midlothian East HMA Bonnyrigg/Lasswade Hs10(AreaA) Dalhousie Mains Area A 28 0 0 19 19 0 9 h28rem(PlotB) Hopefield (Plot B) 60 0 18 42 60 0 0 Yes h28rem(PlotL2) Hopefield (Plot L2) 16 0 0 16 16 0 0 Yes 2018BL2 Former Bonnyrigg Market 14 0 0 6 6 0 8 Former Poltonhall Labour Club Site, 29A Eskdale 288 24 24 12 12 24 12 0 Yes Terrace Small sites (sites with completions only) 5 Total completions for Bonnyrigg/Lasswade 100 12

Dalkeith Hs4 Thornybank East 82 22 79 3 82 0 0 Yes 2018DK1 Woodburn Terrace 10 10 0 10 10 10 0 Yes Small sites (sites with completions only) 3 Total completions for Dalkeith 16 10

Gorebridge h23 Harvieston 211 21 110 64 174 0 37 h36(AreaA) North Gorebridge Area A 176 0 0 29 29 0 147 COMPLETIONS

Completions Total Affd. Remaining at Site Completed in Site Ref. Site Name In Total to Affd. Only Units Units To Mar-19 In 19/20 Apr-20 19/20? Mar-20 19/20 292 Land at 4 Powdermill Brae 6 0 0 5 5 0 1 Small sites (sites with completions only) 0 Total completions for Gorebridge 98 0

Mayfield/Newtongrange h37 Cockpen 131 0 44 36 80 0 51 Small sites (sites with completions only) 1 Total completions for Mayfield/Newtongrange 37 0

Shawfair area h43(S) Shawfair (Block S) 170 32 75 27 102 15 68 h45(B) South Danderhall (Plot B) 116 23 33 65 98 23 18 h45(C&D) South Danderhall (Plots C & D) 235 47 46 50 96 0 139 Small sites (sites with completions only) 1 Total completions for Shawfair 143 38

Rosewell h52&h22 Gorton Loan & Rosewell Mains 290 40 117 32 149 0 141 Small sites (sites with completions only) 0 Total completions for Rosewell 32 0

Villages and rural remainder (Midlothian East HMA) h60 Borthwick Castle Road, North Middleton 34 5 0 19 19 5 15 Small sites (sites with completions only) 2 Total completions for villages and rural remainder (Midlothian East HMA) 21 5

Total completions for Midlothian East HMA 447 65

Total for Midlothian 611 70 CONSTRAINED SITES

Area Site Ref. Site Name Settlement Developer (Or Owner) Brf/Grf Total Units Summary of Constraint(s) Comments (ha) MLDP Additional Housing Development Opportunities AHs2 Burghlee Loanhead (Private) 10.5 B 175 Access and landscaping. No applications since 06/00181/OUT, which was withdrawn. Part B, AHs3 Belwood Crescent Penicuik (Private) 1.6 25 No application. part G AHs4 Pomathorn Mill, by Penicuik Villages/rural (west) (Private) 3.3 B 50 Access and prominence of site. No application. Part B, Access restrictions; potential to incorporate adjacent land (RD2 - Application 20/00144/DPP received in March 2020 and is pending decision. Applicant is Lochay Homes, who AHs5 Wellington School, by Howgate Villages/rural (west) Lochay Homes 6.8 50 - 60 part G Wellington) to assist in overcoming these. propose 54 units (all bungalows).

Other Sites • Application 11/00131/DPP and building warrant 16/00349/BDERSD. Dalidichen Investments 282 25 Newbattle Road Mayfield / Newtongrange 0.4 B 8 Ownership - see "Comments". • Consent was granted in September 2013 and is still valid as work on foundations was started. No activity on Ltd site since means it was marked as stalled during the production of HLA19. • There have been applications for this site since 2008. The consent associated with 08/00094/FUL was extended by application 12/00667/DPP, which was then extended by 15/01006/DPP. There was also an Kuritol Preservation R B application to amend the legal agreement associated with it which was granted in 2017 (17/00619/LA). 2018BL1 51B High Street Bonnyrigg / Lasswade 0.3 B 23 Ownership - see "Comments". Scheme • The most recent consent was due to expire during the "Emergency Period" as defined by the Coronavirus (Scotland) Act 2020. It was therefore extended under this until April 2021. • There has been no activity on this site, and businesses continue to actively use it.

Total 336

*Figure uses the mid-point of the number of units for site AHs5 SAFEGUARDED SITES

Total Affd. Site Ref. Site Name Developer (Or Owner) Area (ha) Brf/Grf Units Units Midlothian West HMA Roslin/Bilston Hs16 SC Seafield Road, Safeguarded Capacity (Private) 11.5 G 200 50 Totals for Roslin/Bilston 200 50

Totals for Midlothian West HMA 200 50 Midlothian East HMA Bonnyrigg/Lasswade Hs12 SC Hopefield Farm 2, Safeguarded Capacity (Private) 23.5 G 375 94 Totals for Bonnyrigg / Lasswade 375 94

Gorebridge

Hs7 SC Redheugh West (Phase 2), Safeguarded Capacity (Private) 17.4 G 400 100 Totals for Gorebridge 400 100

Shawfair Area Hs0 SC Cauldcoats, Safeguarded Capacity (Private) 10.5 G 200 50 Hs1 SC Newton Farm, Safeguarded Capacity (Private) 21.1 G 220 55 Totals for Shawfair Area 420 105

Totals for Midlothian East HMA 1,195 299

Totals for Midlothian 1,395 349 SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20? Midlothian West HMA Loanhead

Site completed in 2019/20 and will not appear in HLA 21. This means that two of the three portions h54(II) H12 (II) Ashgrove Phase 2 CALA MLP 2008 09/00354/OUT, 15/00754/MSC 15/00480/BDERMD - 90 units that h54 was split into are now complete, with 205 units constructed on them in total.

• 18/00296/BDERMD is for plots 1 to 7 and 87 to 92. These are the units nearest Mayburn Terrace at the west of the site. 09/00354/OUT, 18/00243/MSC, 18/00296/BDERMD - 13 units, h54(III) H12 (III) Ashgrove Phase 3 Dandara Homes MLP 2008 • An amendment application for this site has been received and approved since the end of the 18/00469/MSC, 18/00556/MSC 18/00310/BDERMD - 79 units financial year (20/00264/DPP). It does not change the overall number of units or their plot numbers. • The site will be completed in four phases, moving from west to east.

279 Former Loanhead Hospital Eskgrove Homes Windfall 11/00730/DPP, 14/00131/DPP 13/00340/BDERMD - 9 units Site visit in July 2020 confirmed the final unit is nearly complete. • Construction work started on this site in the last year. • Initial completions are plots 40 to 46 and the affordable homes in the western corner. A site visit in 2018LH1 Former Paradykes Primary School Barratt Homes Windfall 15/00712/PPP, 18/00060/MSC 18/00175/BDERMD - 86 units July 2020 confirmed that they were nearing completion and that work was well underway on plots 14 to 22 as well. • SHIP site. • A report to Council in February 2020 expected this site to be complete by September 2020. This 2019LH1 Clerk Street Cruden Homes Windfall 18/00492/DPP 18/00581/BDERMD - 28 units has been pushed back due to the Coronavirus outbreak. A site visit in July 2020 confirms that site completion in 20/21 is realistic but some units may run into early 21/22. • Ten units across seven sites. Small sites • Two sites have no building warrant application, two have building warrants pending consideration, one has a building warrant granted and two are under construction. Loanhead

Roslin/Bilston

• Development will be in six phases starting from next to the B7006. The affordable units will be completed as part of phases one and three, with 38 units built in each. 13/00877/PPP, 18/00499/MSC, 20/00011/MSC • The two pending MSC applications refer to conditions regarding drainage systems, play areas and Hs18 Roslin Institute Taylor Wimpey MLDP 19/00318/BDERMD (pending) - 304 units. (pending), 20/00196/MSC (pending) ground investigations as per application 13/00877/PPP. These are likely to be determined in autumn 2020 and another MSC application is expected to be submitted and determined by November 2020. • Site visit in July 2020 confirmed site enabling works had started.

• 20/00146/MSC is from CALA and David Wilson Homes. It proposes 213 units. The figure of 221 units in the Main Schedule refers to that in the consented PPP application. It will be changed if/when the MSC application is approved. It is expected to be determined by October 2020. David Wilson Homes & Hs19(AreaA) Roslin Expansion Area A MLDP 18/00535/PPP, 20/00146/MSC (pending) • Programming is based on the schedule provided by both house-builders as part of 20/00146/MSC as CALA well as direct feedback from CALA. The schedule specifies 4 phases from David Wilson Homes and 2 from CALA. It plans for both builders on site as well as the simultaneous delivery of the affordable units, thus 1st year completions are higher than normal for a new site.

Site visit in July 2020 confirmed that more work had taken place than the building warrant records Hs19(AreaB) Roslin Expansion Area B David Wilson Homes MLDP 18/00703/DPP 19/00086/BDERMD - 51 units suggest. • Most of the detached homes are complete, with the remaining units being the flats and semi- h57 H15 Penicuik Road CALA MLP 2008 12/00743/PPP, 16/00299/MSC 15/00479/BDERMD - 79 units detached homes next to the Penicuik Road. • Site visit in July 2020 confirms all units are nearing completion. Hs16(AreaA) Seafield Road Area A Taylor Wimpey MLDP 17/00968/DPP 18/00267/BDERMD - 191 units This is the western portion of Hs16. The whole Hs16 site is allocated for 350 units. • This is the portion of Hs16 that is not covered by Hs16(AreaA). • The capacity entered in the Main Schedule is the total allocation for Hs16 minus those already consented at Hs16(AreaA), or 350 - 191 = 159. 19/01019/DPP (pending), 19/01039/PPP Hs16(Rem) Seafield Road Remainder Taylor Wimpey MLDP • Application 19/01019/DPP is for 31 units and is for north of Hs16(AreaA). If approved it will be (pending) called Hs16(AreaB) and Hs16(Rem) will be reduced in area and capacity in response. • Application 19/01039/PPP proposes around 214 units and a new access into Hs16 from the south east. Site is currently non-effective - no developer interest at present and garden centre business remains Hs17 Pentland Plants (Private) MLDP None operating on site.

• This is the southern half of the h55 site. The PPP application covers the whole of h55. 18/00338/BDERMD - 35 units, h55(AreaA) H13 Seafield Moor Road Area A Barratt Homes MLP 2008 12/00814/PPP, 19/00321/MSC • Flooding considerations on the northern portion may delay or prevent its development. 18/00341/BDERMD - 155 units • 18/00338/BDERMD is for the 35 flats at plots 120 to 154. 18/00341/BDERMD is for the 155 houses. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

• MSC application is from Barratt, but flooding considerations meant that they have taken forward an application on h55(AreaA). • The PPP consent was originally for the whole of h55 and proposed 200 to 250 units. The northern University of Edinburgh / h55(Rem) H13 Seafield Moor Road Remainder MLP 2008 12/00814/PPP, 17/00428/MSC (pending) portion is the smaller area and accounts for around 40% of the site. Therefore the site capacity of 90 Barratt Homes in the Main Schedule is taken from 40% of the mid-point of the PPP unit number (225 * 0.4 = 90). • The PPP consent is still valid since it covers the whole of h55 and work has begun on the southern portion (h55(AreaA)).

• SHIP site. • A report to Council on 11/02/20 noted that site completion was expected in March 2020. The 2019RB1 Castlelaw Terrace Mears Group Windfall 18/00685/DPP 18/00571/BDERMD - 8 units Coronavirus outbreak has delayed progress since but a site visit in July 2020 confirmed that completions will still be in 20/21. • Five units across four sites. Small sites • One site has planning permission in principle only, one has no building warrant application, one has a building warrant granted and one is under construction. Roslin/Bilston

Penicuik

• SHIP site. • An update on the Council Housing Building Programme was presented to Council on 11/02/20. This specified that the site was expected to be complete by August 2020. Progress has been delayed since Hs22 Kirkhill Road Cruden Homes MLDP 18/00494/DPP 18/00594/BDERMD - 21 units due to the Coronavirus outbreak. • A site visit in July 2020 showed that work on the 8 units at the south east of the site was further advanced than the other 13 at the north west. This is reflected in the site programming.

• Phase 1 of h58. h58(AreaA1) h58 Belwood CALA (at NW Penicuik) CALA MLP 2008 17/00068/DPP 18/00039/BDERMD - 75 units • The first occupations on this site were in late 2019. • Phase 1 of h58. • 18/00847/DPP amends the house types approved in the original application but does not change h58(AreaA2) h58 Belwood Avant (at NW Penicuik) Avant Homes MLP 2008 17/00068/DPP, 18/00847/DPP 18/00099/BDCOMD - 87 units the overall number of units. • The first occupations on this site were in late 2019. • Plots A54 - A78. • Avant have three parts of the whole h58 site. The phasing schedule has h58(AreaA2) being built h58(AreaB1) h58 Nursery West (at NW Penicuik) Avant Homes MLP 2008 17/00068/DPP first. Given the layout of the site and its access point, it assumed that this portion will be built last out of the three, with it coming after h58(AreaB2).

• Plots A01 - A53. h58(AreaB2) h58 Nursery North (at NW Penicuik) Avant Homes MLP 2008 17/00068/DPP • Avant have three parts of the whole h58 site. Their phasing schedule has this portion commencing following the completion of h58(AreaA2). This is reflected in the programming.

• SHIP site. • Application 19/00576/DPP adds another 5 units compared to the original consent. Melville Housing • Application 20/00088/DPP changed the heights of the two blocks of flats. It does not alter the h58(AreaB3) h58 Nursery East (at NW Penicuik) MLP 2008 17/00068/DPP, 19/00576/DPP, 20/00088/DPP 19/00560/BDERMD (pending) - 57 units Association number of units or their plot numbers. • This site is dependent on access from Avant’s development at h58(AreaB2). A site visit in July 2020 confirmed that work on this had started as well as site enabling works. • Plots 1 - 100 of 18/00134/BDERMD. • In their building plan for h58, CALA treat h58(AreaC) and h58(AreaD) as one phase, and they also h58(AreaC) h58 Mauricewood (at NW Penicuik) CALA MLP 2008 17/00068/DPP 18/00134/BDERMD (pending) - 110 units share the same building warrant. Given the site layout and access, h58(AreaC) will likely be built prior to h58(AreaD). • Likely to be plots 101 - 110 of 18/00134/BDERMD. • In their building plan for h58, CALA treat h58(AreaC) and h58(AreaD) as one phase, and they also h58(AreaD) h58 Mauricewood North (at NW Penicuik) CALA MLP 2008 17/00068/DPP 18/00134/BDERMD (pending) - 110 units share the same building warrant. Given the site layout and access, h58(AreaC) will likely be built prior to h58(AreaD).

• Site previously had consent for 74 units as part of the wider CALA and Avant application for h58 (17/00068/DPP). h58(AreaE) h26 Deanburn (at NW Penicuik) Bellway Homes MLP 2003 17/00068/DPP, 19/00727/DPP 19/00241/BDERMD - 91 units • Bellway took over this portion and initially submitted an application for 91 houses (19/00299/DPP) but this was withdrawn later. They submitted a new application, also for 91 houses, which was consented in October 2019 (19/00727/DPP). Work on site has since started.

• SHIP site. h58(AreaF) h58 Rullion Road (at NW Penicuik) Midlothian Council MLP 2008 17/00068/DPP • This is the second (and last) affordable phase of h58. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

• Construction is taking place at the west of the site initially. Further amendments are expected for the final phases of the site in the east. The site may be split in future audits to reflect this. • Applications 19/00256/DPP and 19/00263/DPP were approved in early 2020 and are for 83 units at 10/00543/BWERD - 92 units, 12/00745/DPP, 18/00014/DPP, plots now numbered 501 to 583. They replace 65 units from the original application, therefore h25 C Greenlaw and Adjacent Land Taylor Wimpey MLP 2003 18/00043/BDERMD - 88 units, 19/00256/DPP, 19/00263/DPP adding a further 18 and taking the site total from 459 to 477. 19/00280/BDERMD (pending) - 83 units • A site visit in July 2020 showed that new plots for sale were those in the areas covered by the applications listed above. Work on previous phases was nearing completion and site enabling works had begun on this new phase.

Hendry Thomson • Conversion of offices into 5 flats. 2017PK1 Lamb's Pend Windfall 16/00474/DPP 17/00302/BDCOMD - 5 units Developments Ltd. • Site completed in 2019/20 and will not appear in HLA 21. 2019PK1 The Square Mr Chris Bartholomew Windfall Yes 19/00297/DPP 20/00008/BDCOMD (pending) - 6 units • A neighbouring development will also see two flats built (application 19/00800/DPP). • Four units across three sites. Small sites • Two sites have no building warrant application and one is under construction. Penicuik

Villages and rural remainder (Midlothian West HMA) • Planning application proposes 395 units across 8 phases. Stewart Milne Homes & • If approved, Stewart Milne and Avant will build two and three phases of private housing Hs20 Auchendinny MLDP 20/00089/DPP (pending) Avant Homes respectively while the remaining three will comprise social housing. Building work would start from the access point off the B7026 and move south. • Site is split into four areas: North Park, South Park, Rosslyn Grange and the Core. • Application 17/00980/PPP is for up to 280 new build units, which consist of 166 at North Park and 114 at South Park. Application 17/01001/DPP includes 72 units at Rosslyn Grange, which comprises 63 conversions from the hospital itself and 9 new builds. The application also includes 29 units at the Village Core, which comprises 21 new builds and 8 conversions. AHs1 Rosslynlee, near Penicuik Oakridge Group MLDP 17/00980/PPP, 17/01001/DPP, 18/00061/LBC 19/00380/BDAEX - 2 units • Details on the split between houses and flats is available in 17/01001/DPP. It consists of 26 flats and 46 houses (37 of which are conversions of the old hospital building). • Past applications (16/00716/DPP and 16/00720/LBC) are superseded. • Work on site will commence with the renovation of existing buildings on Firth Road. This is what the building warrant refers to. A site visit in July 2020 confirmed that this had started since the end of the audit year. • Two units will be conversions from the restaurant building. Five will be new builds. • Application 20/00274/LA was submitted in May 2020. It seeks to modify the S75 so that the 2018VR5 Former Howgate Restaurant Mr Cameron Hogg Windfall 18/00148/DPP infrastructure payment is delayed, in order to increase the site’s commercial viability. The applicant states that this was one reason behind the site not attracting interest despite being marketed for a year by Rettie. • 16 units across 15 sites. • Four sites have planning permission in principle only, seven have no building warrant application, Small sites one has a building warrant pending consideration, two have building warrants granted and one is under construction. Villages and rural remainder (Midlothian West HMA)

Midlothian East HMA Bonnyrigg/Lasswade • Site is a small portion of the south of the wider Hs10 allocation (see rows below). This is the first of five phases for Hs10, which generally move from south to north. Walker Group / • A site visit in July 2020 confirmed that it is finished (though it will only be marked as such in the Hs10(AreaA) Dalhousie Mains Area A MLDP 16/00712/PPP, 16/00855/DPP, 18/00333/DPP 17/00437/BDERMD - 27 units Springfield Audit when completions certificates come through). • There were initially supposed to be 28 units on this site, with the final plot being on the other side of the road, however this has not been built.

Walker Group / • This is the second phase of Hs10, following the completion of Hs10(AreaA) earlier this year. Hs10(AreaB) Dalhousie Mains Area B MLDP 16/00712/PPP, 18/00539/MSC 19/00141/BDERMD - 78 units Springfield • A site visit in July 2020 confirmed that work had started.

• The application submitted for this site is only for Hs10’s affordable units. There will be other private units constructed as part of AreaD, therefore this entry will grow in capacity and area in future years. Walker Group / • A report to Council on 11/02/20 noted that works were expected to start on site in mid-2020, Hs10(AreaD) Dalhousie Mains Area D MLDP 16/00712/PPP, 19/00685/MSC 19/00468/BDERMD (pending) - 70 units Springfield though this has been delayed due to the Coronavirus outbreak. Programming from previous years and that outlined in the SHIP report has been pushed back to account for this. • Note that this is not called AreaC as there is another portion of Hs10 that is labelled as such on plans submitted with the PPP application. Detailed proposals for this have yet to come forward. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

• Application 16/00712/PPP covers the whole of Hs10 and is for the principle of 300 units. The masterplan shows 235 to the north of the Pittendreich Burn, so the number in Hs10(Rem) is 235 – 78 for Hs10(AreaB) and - 70 for Hs10(AreaD), which equals 87. Walker Group / • The final phase will be called Hs10(AreaC) if/when an application is approved for it. Hs10(Rem) Dalhousie Mains Remainder MLDP 16/00712/PPP, 18/00399/MSC, 18/00538/MSC Springfield • Applications 18/00399/MSC and 18/00538/MSC relate to conditions over matters such as phasing schedules and landscaping works for the whole of Hs10. They are not related to unit layout and numbers. A further application for Hs10(Rem) will be brought forward for this. • Programming is based on earlier phases of Hs10 being completed and follows on from them.

Walker Group / Hs11(AreaA) Dalhousie South Area A MLDP 18/00740/DPP (pending) Site has been consented since the end of the audit year. Springfield • This is the exclusively affordable portion of Hs11, though 7 more affordable units are on Hs11(AreaA) too. Walker Group / Hs11(AreaB) Dalhousie South Area B MLDP 18/00743/PPP (pending) • Site has been consented since the end of the audit year. Springfield • Programming is assumed to be after units are completed on Hs11(AreaA), as AreaB is at its centre and depends on access from the wider site.

• Application covers both Hs12 and Hs12 SC as it was agreed in pre-application discussions that both would be included in the masterplan to ensure the best possible design and their integration. Hs12 Hopefield Farm 2 Taylor Wimpey MLDP 20/00151/PPP (pending) • Application proposes around 1,000 units across both Hs12 and Hs12 SC. • Taylor Wimpey completed their remaining sites on the original Hopefield allocation during 2019/20.

• 17/00573/DPP is for site B2 and 17/00545/DPP is for B1. 17/00025/BDERMD is for both. • Site completed in 2019/20 and will not appear in HLA 21. h28rem(PlotB) G Hopefield (Plot B) Taylor Wimpey MLP 2003 17/00545/DPP, 17/00573/DPP 17/00025/BDERMD - 60 units • The completion of this site and h28rem(PlotL2) means that the whole of the original allocation at Hopefield has now been built out. This comprised 1,300 units in total. • Site completed in 2019/20 and will not appear in HLA 21. h28rem(PlotL2) G Hopefield (Plot L2) Taylor Wimpey MLP 2003 17/00504/DPP 17/00455/BDERMD - 16 units • The completion of this site and h28rem(PlotB) means that the whole of the original allocation at Hopefield has now been built out. This comprised 1,300 units in total. • This development is split into 3 blocks. Block 1 contains all 7 flats while blocks 2 and 3 contain 2 MNM Developments and 5 houses respectively. 2018BL2 Former Bonnyrigg Market Windfall 17/00012/DPP 18/00381/BDERMD - 14 units (Scotland) Ltd. • A site visit in July 2020 confirmed that it is essentially finished, with only the completions certificates to be processed. Former Poltonhall Labour Club Site, 29A 13/00350/BDERMD - 18 units, • SHIP site, also known as 'Petendreia Court'. 288 LAR Housing Trust Windfall 08/00811/FUL Eskdale Terrace 18/00280/BDERMD - 6 units • Site completed in 2019/20 and will not appear in HLA 21.

• Originally, consent was granted for four new houses and the conversion of the former garage building into two houses (03/00390/FUL). This went ahead under building warrant 09/00449/BWALCO. • Before construction started, another application was submitted (07/00721/FUL) for six new houses Lasswade Townhouse 03/00390/FUL, 07/00721/FUL, 19/00742/DPP 243 Former garage, Elm Row Windfall 09/00449/BWALCO - 2 units and the conversion of the former garage building into two houses. This was not determined prior to Development Company (pending) the previous application expiring, therefore work started under that and this new application was left to expire without any further work taking place. This means the prior application is still valid. • A new application for 6 units was submitted in May 2019 (19/00470/DPP) but was later withdrawn. Another new application was submitted in September 2019 for four houses (19/00742/DPP).

• A previous application for 9 units at this site (16/00727/DPP) was refused at appeal due to impacts on the Conservation Area and the amenity of neighbouring properties. 2020BL1 Lasswade High Street Dimension Homes Ltd. Windfall Yes 18/00382/DPP 19/00212/BDERMD - 8 units • Site is on the Scottish Vacant and Derelict Land Survey. • Site enabling work has started since the end of the audit year. • 11 units across 10 sites. Small sites • Two sites have no building warrant application, three have building warrants pending consideration, three have building warrants granted and two are under construction. Bonnyrigg/Lasswade

Dalkeith • Hs2 and Hs3 are being taken forward as one development, though work will not start on Hs3 until Hs2 is complete. • Application 19/00010/MSC proposes 134 units in total, with 84 on Hs2 and 50 on Hs3. It also 14/00420/PPP, 18/00457/MSC (pending), 18/00499/BDERMD - 23 units, supersedes application 17/00882/MSC. Hs2 Larkfield West Dandara Homes MLDP 18/00500/MSC, 19/00010/MSC, 20/00192/DPP 19/00372/BDERMD - 61 units • 19/00372/BDERMD is for plots 11 – 67 and 81 – 84 while 18/00499/BDERMD is for plots 1 – 10 and 68 (pending) – 80. This means that these two building warrants cover all the units on Hs2. • 20/00192/DPP proposes altering some of the layout of Hs2. If approved this would add in another three units. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20? • Hs2 and Hs3 are being taken forward as one development, though work will not start on Hs3 until Hs2 is complete. 14/00420/PPP, 18/00457/MSC (pending), Hs3 Larkfield South West Dandara Homes MLDP 19/00427/BDERMD (pending) - 50 units • Application 19/00010/MSC proposes 134 units in total, with 84 on Hs2 and 50 on Hs3. It also 18/00500/MSC, 19/00010/MSC supersedes application 17/00882/MSC. • 19/00427/BDERMD has been granted since the end of the financial year. 15/00344/BDERMD - 60 units, Hs4 Thornybank East Barratt Homes MLDP 15/00616/DPP Site completed in 2019/20 and will not appear in HLA 21. 15/00419/BDERMD - 22 units An application was submitted in March 2020 by Aldi for a supermarket here (20/00220/DPP). The proposal covers around half of the site - the portion nearest the road. The developer is arguing that Hs5 Thornybank North (Buccleuch Estates) MLDP None the original capacity of 30 units would still be achievable on the remainder of the site. Given this and a lack of developer interest, this site is currently non-effective. • 109 units being built across four phases. The affordable homes will be built in phase two. 18/00548/BDERMD - 82 units, h46 H1 Cowden Cleugh Bellway Homes MLP 2008 14/00444/PPP, 18/00678/MSC, 19/00338/MSC • Programming in 20/21 was based on a site visit in August 2020. 20/00101/BDERMD (pending) - 27 units • 18/00548/BDERMD is for the 82 market units. • SHIP site. Known in SHIP documents as 'Newmills Road'. • Application 19/01016/DPP is for 44 units and 19/01024/DPP is for 48 extra care units. 19/01016/DPP (pending), 19/01024/DPP 19/00528/BDERMD (pending) - 44 units, • A report to Council on 11/02/2020 noted that a contractor had been appointed and that enabling h12 H Former Dalkeith High School Midlothian Council Pre-2003 MLP (pending) 19/00535/BDERMD (pending) - 48 units works would start on site in March 2020 at the earliest. This timetable will have been delayed by the Coronavirus outbreak. • Both building warrants have been granted since the end of the audit year. • SHIP site. 2018DK1 Woodburn Terrace Cruden Homes Windfall 18/00063/DPP 18/00163/BDERMD - 10 units • Site completed in 2019/20 and will not appear in HLA 21. • 16/00359/PPP is for a maximum of 25 units. There was an application (18/00759/S42) to modify its conditions to allow more, but it was refused at the LRB. This is unlikely to prevent proposals for 25 units or less being taken forward however, as the Council’s latest SHIP report includes the site and Buccleuch Property / LAR 2018DK2 Wester Cowden Farm Windfall 16/00359/PPP notes that funding is in place for it. Housing Trust • Site programming has been pushed back a year compared to the SHIP report to account for delays associated with the Coronavirus outbreak. • Application received since the end of the Audit year for 25 units (20/00468/MSC). • SHIP site consisting of extra care housing. Viewpoint Housing • Programming follows timescales detailed in the Council’s annual SHIP report. 2019DK1 Glenesk House Windfall 18/00586/DPP 18/00596/BDERMD (pending) - 30 units Association • There are a further four specialist need units expected to be developed at this site in the future too. • 10 units across 7 sites. Small sites • Three sites have no building warrant application, one has a building warrant granted and three are under construction. Dalkeith

Gorebridge

• Dependent on the bridge over the Borders Rail line being constructed to enable access to h50 to the east. • 20/00446/PAC received in July 2020. Given this, and that Hs7 will rely on access via h50 using a Hs7 Redheugh West (Phase 2) (Old Road Securities Plc) MLDP None new bridge over the rail line, this shows that the applicant is sufficiently confident in access being resolved to pursue development of Redheugh. • Programming assumes the completion of both portions of h50 prior to works starting on Hs7.

• The whole of h50 is covered by 15/00045/PPP, and this portion - the area between the rail line and the A7 - will be developed first. It coming forward likely depends on the rail bridge being put in as Redheugh / Prestonholm new community (Old Road Securities Plc) / the developer may not want to pursue this part of h50 alone. h50(A) H8 MLP 2008 15/00045/PPP (Phase 1A) Barratt Homes • Given that the applicant submitted 20/00446/PAC in July for Hs7, which would require access from h50, this indicates that they are sufficiently confident in access being resolved to pursue the development at Redheugh. • This is the portion of h50 that is dependent on the bridge being constructed over the Borders Rail line, therefore the programming is later than h50(A). It will be developed in two phases. The first is Redheugh / Prestonholm new community (Old Road Securities Plc) / h50(Rem) H8 MLP 2008 15/00045/PPP 300 units off the Cockpen Road and second is the remainder of the site, consisting of around 265 remainder Barratt Homes units. • See notes in rows above for sites Hs7 and h50(A). Site visit in July 2020 showed more units nearing completion than building warrant records 15/00437/BDERMD - 149 units, h23 A Harvieston Taylor Wimpey MLP 2003 14/00481/DPP suggested. Given this, and that this site has delivered 85 and 64 completions in the last 2 years, it is 18/00091/BDERMD - 62 units highly likely that it will be fully built out within 2020/21.

• This application was held in abeyance for a significant period of time whilst the applicant changed the site layout. Amended plans have been submitted for consideration and consultation on these 15/00448/BDERMD - 92 units, h24 B Newbyres Persimmon Homes MLP 2003 17/00435/DPP (pending) proposals are ongoing. The application is expected to be reported to Planning Committee later in 15/00449/BDERMD - 29 units 2020. Programming has been rolled back from the last HLA to account for this. • The building warrants are valid until 2021, having had their approval extended. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

• This is the last remaining portion of the wider h36 Persimmon site, the whole of which was covered by 07/00352/FUL. • The plots in Area A are listed at the end of building warrant 07/00251/BWERD and start at number 07/00251/BWERD - 500 units, 4010. 19/00580/BDERMD will replace some of the units on the old building warrant. h36(AreaA) Part of h36 / S North Gorebridge Area A Persimmon Homes MLP 2003 07/00352/FUL, 14/00251/DPP, 18/00671/DPP 19/00580/BDERMD (pending) - 117 units • All the properties in phase 1 of this site have been sold. • Site visit in July 2020 showed more units nearing completion than the building warrant records suggested. Programmed completions have been based on this, Persimmon’s previous build rates at other finished portions of the wider h36 site and direct contact with Persimmon.

• 17/00824/DPP refers to a new plan for phase 3 which replaces 11 units with 14. Building warrant 10/00558/BWERD is for the original 90 units and 10/00558/BWERD/E refers to the area formerly with 11 plots that now has 14. 11/00104/DPP, 11/00105/DPP, 10/00558/BWERD - 79 units, • Developer was formerly Mansell Homes, who are now part of Balfour Beatty. h40 W Vogrie Road Balfour Beatty Homes MLP 2003 11/00107/DPP, 17/00824/DPP 10/00558/BWERD/E - 14 units • Site visit in July 2020 showed that building work had stopped on the remaining 2 units of phase 2. Phase 3 consent is due to expire in June 2021. Given this, the 14 phase 3 units are programmed for a start in 2021/22 and completion in 2022/23. This will be reviewed in the next HLA year, with the development potentially being moved to the list of constrained sites if no further work takes place.

Owner has previously stated that it is still their intention to put forward an application for this site. h51 H9 Robertson's Bank (Carlsson Properties Ltd) MLP 2008 None Resources are constraining their time as opposed to issues about the site itself. Initial design done, requires some amendments.

Construction was effectively complete here at the time of the site visit in July 2020. When the one 292 Land at 4 Powdermill Brae Oakridge Homes Windfall 12/00646/DPP 14/00526/BDERMD - 6 units remaining completion certificate has come through, this site will drop off the Audit.

• Allowed at the Local Review Body after an initial refusal. • Previous issues regarding site ownership and developer contributions have been resolved. 2018GB2 Former Arniston Gas Works Pegasus Flooring Windfall 15/00335/PPP • Programming follows timescales needed to keep consents valid. This will be reviewed next year given that consent was issued in April 2018 but no further activity has taken place since.

• Eight units across six sites. Small sites • One site has planning permission in principle only, one has no building warrant application, two have building warrants granted and two are under construction. Gorebridge

Mayfield/Newtongrange

• SHIP site. Known in SHIP documents as ‘Conifer Road’. • A report to Council on 11/02/20 noted that progress with the site is ‘currently held up due to h48 H4 Bryans Cruden Homes MLP 2008 19/00042/DPP 19/00201/BDERMD - 72 units Scottish Water infrastructure capacity issues which are outwith Council control – the revised date of commencement is late-2020’. This has been delayed due to the Coronavirus outbreak.

• The Design Statement which accompanies the application specifies ‘up to 170 units’ on site. The numbers in the Main Schedule will be changed if this application is approved. h41 X North Mayfield Gladman Developments MLP 2003 19/00981/PPP (pending) • The application will likely go to the September 2020 Planning Committee for determination, with a subsequent MSC application anticipated early/mid 2021 if it is approved.

• Site issues relate to noise from the nearby industrial estate, ground conditions and new roads into the site from Mayfield. Requires a new masterplan from developer in light of these issues. h38(Rem) U rem South Mayfield Remainder Springfield MLP 2003 None • Site ownership change in the last 18 months and associated new interest. If no proposals come of this, given that the site was allocated in the 2003 Plan, the Council intends to review its allocation for housing at the next LDP.

Site ownership change in the last 18 months and associated new interest. If no proposals come of h49 H7 Dykeneuk Springfield MLP 2008 None this, given that the site was allocated in the 2008 Plan, the Council intends to review its allocation for housing at the next LDP. Site ownership change in the last 18 months and associated new interest. If no proposals come of h34(Rem) Q rem East Newtongrange Remainder Springfield MLP 2003 None this, given that the site was allocated in the 2003 Plan, the Council intends to review its allocation for housing at the next LDP. Site ownership change in the last 18 months and associated new interest. If no proposals come of h35 R Lingerwood Springfield MLP 2003 None this, given that the site was allocated in the 2003 Plan, the Council intends to review its allocation for housing at the next LDP. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

• 131 new houses and another 8 intended from the conversion of the farm steading (no building warrant application received for the latter). • Applications 15/00969/MSC and 15/00970/LBC refer to the conversion of the farm steading. It was delisted by Historic Environment Scotland in July 2020. • Application 18/00704/DPP is for amendments to plots 61 and 62 but doesn't change the overall 09/00056/OUT, 15/00968/MSC, numbers. 15/00969/MSC (pending), 15/00970/LBC h37 T Cockpen Miller Homes MLP 2003 15/00442/BDERMD - 131 units • Application 19/00824/DPP proposes replacing 28 units at plots 77 to 104 with 33 units at plots 201 (pending), 16/00601/MSC, 18/00704/DPP, to 233. 19/00824/DPP (pending) • Application 16/00601/MSC has been approved since the end of the audit year. It relates to some of the conditions of the original outline application and does not change unit numbers. • Programming is based on the remainder of the original consent being built (19 units in 2020/21) before work moving on to the portion covered by application 19/00824/DPP and then the farm steading in later years.

• SHIP site. Known in SHIP documents as ‘Limekilns Inn’. 2018MN1 Former Mayfield Inn Whiteadder Ltd Windfall 17/00170/DPP 18/00041/BDERMD - 20 units • Site visit in August 2020 and previous SHIP reports suggest site completion later in 2020.

• 16/00809/DPP was approved at appeal. This superseded a previous application (16/00207/DPP). 2018MN2 Bryans Road & Morris Road Junction T & V Builders Ltd Windfall 16/00809/DPP • No activity in relation to this site since planning consent was granted, other than a site visit in August 2020 showing it was for sale. Site therefore marked as non-effective as a result.

• SHIP site. Known in SHIP documents as ‘Morris Road’. • It was found that there were Scottish Water assets on the site, preventing development from going Land South West of Newbattle Community High ahead. A report to Council on 11/02/2020 noted that works to alter these utilities had commenced 2018MN3 Cruden Homes Windfall 18/00308/DPP 18/00394/BDERMD - 79 units School and that house building was expected to start in June 2020. The Coronavirus outbreak delayed this but a site visit in August 2020 confirmed works to divert utilities were ongoing. • Programming is based on the SHIP report and the site layout.

• Nine units across six sites. Small sites • One site has no building warrant application, three have building warrants granted and two are under construction. Mayfield/Newtongrange

Shawfair Area • 14/00910/PPP covers both Hs0 and Hs0 SC and proposed 165 affordable and 485 market units. Hs0 would be a first phase with another 200 units on Hs0 SC in the second. The consent applies only for 350 units on Hs0, though an application to increase this to 430 was submitted after the end of the Hs0 Cauldcoats Paladin Ventures Ltd MLDP 14/00910/PPP audit year (20/00312/S42). • The Committee Report specifies that ‘the construction programme indicates a five year build programme for phase 1 and 2, based on three house builders being active at any one time, each building 35 units a year’. • The complete Hs1 site includes 506 units at Newton Farm (17/00408/DPP) and 116 at Wellington Farm (17/00409/DPP). These applications were recommended for approval at the January 2019 17/00408/DPP (pending), 17/00409/DPP Planning Committee, subject to a legal agreement being concluded. Hs1 Newton Farm CALA MLDP (pending) • Programming is based on CALA’s intentions of a mid-2021 start on site with the first completions around Q3 2022, building up to having multiple builders on site with affordable completions every second year.

• Note that the ‘OUT’ consented status in the Main Schedule for many of the Shawfair blocks refers to the original outline planning permission for the whole of the south east wedge. Further detailed consents are required for work to start on individual blocks. • Application 19/00112/PPP, for community facilities including a primary and secondary school, covers Shawfair blocks D, J, and part of M and N. It was approved in October 2019. It will involve a h43 Shawfair Shawfair LLP SLP 02/00660/OUT land swap with residential units going on two sites north and south of Newton Church Road in the gap between Newton Village and Danderhall as per 19/00891/MSC. That application has been approved since the end of the Audit year and these blocks will be added next year. o Because of this, blocks D and J have been removed from the audit and the capacity of M has been reduced in half (as about half of it overlapped with application 19/00112/PPP). There were no residential units planned for block N, so it was not in the Audit beforehand in any case.

h43(A) Shawfair (Block A) Shawfair LLP SLP 02/00660/OUT h43(B) Shawfair (Block B) Shawfair LLP SLP 02/00660/OUT h43(C) Shawfair (Block C) Shawfair LLP SLP 02/00660/OUT h43(E) Shawfair (Block E) Shawfair LLP SLP 02/00660/OUT

Application 18/00155/DPP was approved for this site in October 2018. It is for use of the site for the h43(F) Shawfair (Block F) Shawfair LLP SLP 02/00660/OUT storage of soil for five years, therefore no development will take place here before October 2023. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20?

Application 18/00155/DPP was approved for this site in October 2018. It is for use of the site for the h43(H) Shawfair (Block H) Shawfair LLP SLP 02/00660/OUT storage of soil for five years, therefore no development will take place here before October 2023.

Application 18/00155/DPP covers part of this site and was approved in October 2018. It is for the h43(I) Shawfair (Block I) Shawfair LLP SLP 02/00660/OUT storage of soil for five years, therefore no development may take place here before October 2023.

h43(K) Shawfair (Block K) Shawfair LLP SLP 02/00660/OUT h43(L) Shawfair (Block L) Shawfair LLP SLP 02/00660/OUT

• Application 19/00112/PPP for community facilities including a primary and secondary school covers Shawfair Blocks D, J, part of M and N and was approved in October 2019. It will involve a land swap with residential units going on two sites north and south of Newton Church Road in the gap between h43(M) Shawfair (Block M) Shawfair LLP SLP 02/00660/OUT Newton Village and Danderhall. • The capacity of Block M has been reduced by half in comparison to the Shawfair Masterplan to account for the above application which covers approximately half of this area.

19/00378/BDERMD - 58 units, Site visit during July 2020 showed that around 10 units had their superstructure in place and another h43(O) Shawfair (Block O) Dandara Homes SLP 02/00660/OUT, 18/00520/MSC 19/00486/BDERMD - 18 units 10 had their foundations built. h43(P) Shawfair (Block P) Shawfair LLP SLP 02/00660/OUT • Application 19/00894/MSC proposes 163 units across h43(Qb), h43(R) and the eastern part of h43(SRem). • The proposal involves combining h43(Qb) and h43(R) into one block while 33 units would be 19/00602/BDERMD (pending) - 110 units, h43(Qb & R) Shawfair (Block Qb) Barratt Homes SLP 02/00660/OUT, 19/00894/MSC (pending) developed at h43(SRem). 19/00607/BDERMD (pending) - 20 units • Programming for this site is based on Barratt’s phasing schedule, which plans for this area to be completed last. It has been adjusted for delays such as those associated with the Coronavirus outbreak. Programming may appear ambitious but the site visit in July 2020 confirmed it is realistic. Most of 02/00660/OUT, 04/00417/FUL, 07/00285/BWERD - 143 units, h43(S) Shawfair (Block S) Mactaggart & Mickel SLP the remaining units are nearing completion and the remainder of the site is higher density with many 16/00140/DPP, 19/00457/DPP 14/00476/BDERMD - 15 units blocks of flats. • The capacity of Block S Remainder is calculated as its capacity in the Shawfair Masterplan of 261 minus the 170 units that are under construction. • Application 19/00894/MSC proposes 163 units across h43(Qb), h43(R) and the eastern part of h43(SRem). 33 units would be developed at this part of h43(SRem) and if approved, this entry would h43(SRem) Shawfair (Block S Remainder) Barratt Homes SLP 02/00660/OUT, 19/00894/MSC (pending) 19/00612/BDERMD (pending) - 33 units become h43(SArea2). The part left of h43(SRem) left over would be a new entry and reduced in capacity. • Barratt’s proposal involves building these 33 units as part of the first phase of 19/00894/MSC. The programming takes this, their phasing schedule and delays such as those associated with the Coronavirus outbreak into account.

• 19/00246/MSC proposes minor layout changes but overall numbers remain the same as 17/00858/MSC. • 19/00877/MSC proposed changing the layout of the western corner of the site and adding a further 02/00660/OUT, 17/00858/MSC, 5 units but it has been withdrawn since the end of the Audit year. A new application (20/00444/MSC) h43(Ta) Shawfair (Block Ta) Mactaggart & Mickel SLP 19/00246/MSC (pending), 19/00877/MSC 18/00278/BDERMD (pending) - 195 units has been submitted since the end of the Audit year for 248 units. (pending) • The 48 affordable units will be Council homes and a report to Council on 11/02/20 stated that works are expected to start on site in autumn 2020. This may well be delayed due to the Coronavirus outbreak, however Mac & Mic have confirmed site programming since.

h43(Tb) Shawfair (Block Tb) Shawfair LLP SLP 02/00660/OUT • Application from Stewart Milne received in July 2019. • It proposes 143 units (127 houses and 16 flats). This compares to an allocation of 190, though this application is slightly smaller than the boundaries of the h44 allocation. The application is not consented, which is why the capacity remains at 190 though programming is based on the Stewart h44 North Danderhall Stewart Milne Homes SLP 02/00660/OUT, 19/00568/MSC (pending) Milne proposals of 143. • Programming assumes 28 affordable unit completions in 23/24. This timing has been pushed back from the original SHIP report programming due to it being produced before the Coronavirus outbreak. • Site visit in July 2020 showed that all remaining units are well underway and the site is likely to be 17/00058/BDERMD - 93 units, h45(B) South Danderhall (Plot B) Miller Homes SLP 02/00660/OUT, 16/00818/MSC completed in 2020/21. 17/00353/BDERMD - 23 units • 17/00353/BDERMD is for the 23 affordable units at plots 94 - 116. • Building warrant 17/00073/BDERMD is for the market units. The affordable units are still to be completed. 17/00073/BDERMD - 188 units, • Site visit in July 2020 showed that the area towards Newton Church Road is being built next, with h45(C&D) South Danderhall (Plots C & D) Bellway Homes SLP 02/00660/OUT, 16/00673/MSC 19/00389/BDERMD - 47 units around 30 units either sold or for sale there. Some were at their early stages of construction, therefore slightly lower programming is expected for 2020/21, with it then picking up to previous year’s levels in later on. Development comprises the conversion of existing steading buildings to form 7 houses and building 5 2019SA1 Cauldcoats Steading Janis Laird Windfall Yes 16/00306/DPP new houses. SITE NOTES

New Site for Site Ref. Former Ref. Site Name Developer (Or Owner) Land Supply Source Planning Application Reference(s) Building Warrant Reference(s) Comments HLA 20? • Five units across four sites. Small sites • One site has planning permission in principle only, one has no building warrant application, one has a building warrant granted and one is under construction. Shawfair Area

Rosewell

• A condition of consent was that the affordable housing mix needed to be changed. The overall numbers will be the same, however. Banks Property Hs14 Rosewell North MLDP 18/00403/DPP (pending) • The gap in programming is due to the need for a house-builder for this site. Development • The legal agreement is nearing completion. Depending on any backlog with Registers of Scotland due to their Coronavirus restrictions, planning consent could be issued in autumn 2020.

14/00371/BDERMD - 25 units, Expected completions are lower in 20/21 than in previous years for this site due to the shutdown MLP 2008 & Pre-2003 h52&h22 H10 & M147 Gorton Loan & Rosewell Mains Avant Homes 14/00518/DPP 15/00412/BDERMD - 225 units, associated with the Coronavirus outbreak. A site visit in July 2020 confirms this, based on the MLP 16/00177/BDERMD - 40 units number of non-occupied units that had been started. • This entry is linked with site h70. • One of the building warrant approvals was extended but still expired in December 2019. The other The Proprietors of 12/00277/BWALCO - 18 units (expired), h69 275 Whitehill House Windfall 09/00374/DPP, 09/00372/LBC is valid and work relating to it started in October 2018. Whitehill House 15/00175/BDCOMD - 8 units • Continued work on renovating and converting Whitehill House depends on cross-funding from homes at h70, therefore programming for both sites have been linked.

• This entry is linked with site h69. • Building warrant 12/00443/BWERD is for 10 units which have been completed at Cluster D. The Proprietors of • The owner is looking to redesign the remaining clusters to improve their marketability and the gap h70 276 Grounds of Whitehill House Windfall 09/00370/FUL 12/00443/BWERD - 10 units Whitehill House in programming and expected completions reflects this. It assumes one cluster completed per year. • Continued work on renovating and converting Whitehill House (site h69) depends on cross-funding from homes at h70, therefore programming for both sites have been linked.

• The application did not specify a number of units, but the site could take a maximum of 14 and the 2018RW1 Land East of Gorton Loan The Crown Estate Windfall 14/00471/PPP S75 agreement has been prepared on this basis. • Site layout and other details were being examined by the owner in 2019/20. Small sites There are no small sites in Rosewell. Rosewell

Villages and rural remainder (Midlothian East HMA) • Application from Muir Homes for 64 units (19/00579/DPP) was withdrawn due to issues with layout and the number of units proposed. h59 VH1 Crichton Road, Pathhead Muir Homes MLP 2008 None • The Council’s understanding is that the developer remains interested in the site and a revised application may well be submitted in due course.

Of the remaining plots, four are nearing completion and another four are well underway. Given this, h60 VH2 Borthwick Castle Road, North Middleton Miller Homes MLP 2008 17/00224/DPP 17/00623/BDERMD - 34 units and that 19 units were completed last year, it is likely that this site will be complete within 2020/21.

• The PPP consent was for 60 units, which is the site capacity listed in the Main Schedule. • A phasing plan included with application 18/00344/MSC shows that there are plans for 78 units across the site in three phases. The existing MSC applications cover the first two. Crief Fordel Investment 13/00780/PPP, 18/00343/MSC, • Applications 18/00343/MSC and 18/00344/MSC are for a combined total of 44 flats while 2018VR1 Fordel, near Dalkeith Windfall Ltd 18/00344/MSC, 19/00691/MSC 19/00691/MSC is for the repositioning of some blocks which are covered by 18/00343/MSC. • LAR Housing Trust will develop 24 units and have had non-material variations to the scheme approved since the end of the Audit year. The remainder of the site is under two different ownerships. 16/00082/BDCOSD - 1 unit, 15/00376/DPP, 16/00579/DPP, 16/00239/BDERMD - 2 units, 2018VR2 Lawfield Farm, near Dalkeith WS Dunsire & Sons Ltd Windfall 19/00532/BDERMD is for units 2 and 7, which were not covered by other building warrants. 17/00547/DPP, 17/00878/DPP, 18/00629/DPP 16/00472/BDERMD - 3 units, 19/00532/BDERMD (pending) - 2 units

According to the building warrants, three plots are under construction, two of which started just Almond Branch 18/00120/BDERMD - 4 units, 2018VR4 Former Cousland Primary School, Cousland Windfall 17/00996/DPP, 17/00945/DPP prior to lockdown and the other one some time before. The programming reflects this and the fact Developments 18/00053/BDERSD - 1 unit that one unit is not covered by the existing warrants and will require a new application.

• SHIP site. 2019VR1 Crichton Drive, Pathhead Midlothian Council Windfall Yes 18/00977/DPP 19/00398/BDERMD - 10 units • A report to Council on 11/02/20 noted that work on site was expected to start in January or February 2020. This has been delayed due to the Coronavirus outbreak. • 27 units across 18 sites. • One site has planning permission in principle only, six have no building warrant application, four Small sites have building warrants pending consideration, two have building warrants granted and five are under construction. Villages and rural remainder (Midlothian East HMA) Hs0 Hs0 SC

2019SA1 h43(C) h43(B) h43(B) h43(I) h44 h43(A) h43(E) h43(F) h43(M) h43(K) h43(L) h43(Qb & R) h43(P) h43(P) h43(S) Hs1 h45(B) h43(O) h43(SRem) h45(C&D) h43(Tb) h43(Ta) Hs1 SC

2018VR4

Hs5 h46 Hs4

h12 2018DK1 2018DK2

Hs2 2019DK1 2018VR1 Hs3 h54(II) h54(III)

2020BL1 243 279 2018LH1 2019LH1

Hs10(AreaD) 2018VR2 Hs16 SC Hs17 2018BL1 Hs10(Rem) Hs16(Rem) 288 Hs10(AreaA) 2018MN1 h48 h41 AHs2 2018MN3 Hs16(AreaA) 2018MN2 Hs11(AreaA) 282 h55(Rem) Hs11(AreaB) 2019RB1 h28rem(PlotL2)

h55(AreaA) h28rem(PlotB) h34(Rem) 2019VR1 Hs19(AreaB) Hs12 h38(Rem) h59 Hs18 Hs12 SC h37 Hs19(AreaA) h35 h49 h57 Hs14

Hs7 Hs7 SC h50(Rem) h36(AreaA) h52&h22 2018RW1 AHs3 h50(A) h58(AreaA1) Hs20 h70 h58(AreaB2) h25 2018GB2 h69 h58(AreaD) h58(AreaB3) h58(AreaC) h58(AreaE) h24 h58(AreaF)

292 h40 h51 AHs1 Legend

h23 Sites Under Construction Hs22

2017PK1 2019PK1 Sites With Consent or Minded to Consent

AHs4 Sites Without Consent h60

Windfall Sites

Constrained Sites

Safeguarded Sites

2018VR5 Sites Completed in 2019-20 AHs5