GOVERNMENT OF DEPARTMENT OF GEOLOGY AND MINING

DISTRICT SURVEY REPORT FOR ROUGHSTONE

(Prepared as per Gazette Notification S.O.3611 (E) Dated 25.07.2018 of Ministry of Environment, Forest and Climate Change MoEF & CC)

MAY 2019

DISTRICT SURVEY REPORT SALEM DISTRICT Page Chapter Content No. 1. Introduction 1 2. Overview of Mining/ Quarrying Activity in the District 4 3. General Profile of the District 11 4. Geology and Mineral Wealth of the District 12 5. Drainage of Irrigation pattern 21 6. Land Utilisation Pattern in the District: Forest, Agricultural, 25 Horticultural, Mining etc., 7. Surface Water and Ground Water scenario of the District 28 8. Rainfall of the District and climatic condition 29 9. Details of quarrying Leases in the District 35 10. Details of Revenue received in last three years 68 11. Details of Production of Minor Mineral in last three years 69 12. Mineral Map of the District 70 13. List of Letter of Intent (LOI) Holder in the District along with 71 its validity 14. Total Mineral Reserve available in the district 73 15. Quality/Grade of Mineral available in the district 107 16. Use of Mineral 107 17. Demand and supply of the Mineral in the last three years 107 18. Mining Leases marked on the map of the district 108 19. Details of the area of where there is a cluster of the mining 110 leases 20. Details of Eco-sensitive area 110 21. Impact on the environment due to Mining activity 110 22. Remedial measures to mitigate the impact of mining on the 112 environment 23. Reclamation of the mined out area 114 24. Risk assessment & Disaster Management Plan 114 25. Details of Occupational health issue in the District 115 26. Plantation and Green belt development in respect of leases 116 already granted in the district 27. Any other information 117

Page No. Figure. LIST OF FIGURE

Fig1 District Map of Salem 3 Fig 2 Geological map of Tamil Nadu and 12 Fig 3 Google image showing the existing major and minor mineral mines / 19 quarries along with existing ML awarded for major minerals Fig 4 Map showing the locations of fieldwork carried out along with 20 commodity Fig 5 Stages of River 23 Fig 6 Area of accumulation of sediments 24 Fig 7 Land use land cover map of Salem District 2010 27 Fig 8 Season-wise Rainfall for Salem District 31 Fig 9 Rainfall recorded for the year of 2017-18 32 Fig 10 District Rainfall map Tamil Nadu 32 Fig 11 Roughstone Minerals Occurrence in Salem District (an Overview) 34 Fig 12 Showing the location of Overall Mining and Quarries leases granted in 108 Salem District. Fig 13 Showing the of location Roughstone and Gravel quarries 109

Fig 14 Roughstone quarry, Charnockite, mining suspended due to the 116 objection from near by farm land in P.N. Patti, Tk Fig 15 Horizontal distance from the quarry to the farm land 116

Fig 16 Quarry/mine in the close vicinity of highway (>150m); 116 Loc: Thalavaipatti Fig 17 Dumping of mine waste on patta/ poramboke land outside of the lease 116 area. Fig 18 Quarry on the road side without fencing, name/sign boards and lease 117 area corner pillars; mine waste dumped on the road side; unsafe for the locales using the road Fig 19 Systematic and scientific method of mining by bench making, fencing, 117 pitching of pillars, water sprinklers, Plantation, safety measures etc carried out by SRC Project Pvt. Ltd in Gajjelnaickenpatty patti

1. Introduction

Salem is located at 110 14’ N - 120 53’ N to 770 44’ E - 780 50’ E, at an average elevation of 278 m (912 ft). The city is surrounded by hills: Nagaramalai on the North, Jarugumalai on the south, Kanjamalai on the West, Godumalai on the East and the on the NorthEast. Kariyaperumal Hill is in SouthWestern Salem. The Thirumanimutharu River flows through the city, dividing it in two. The fort area is the oldest part of Salem.

Salem has a tropical savanna climate (Köppen climate classification Aw). January and February are generally pleasant; the hot Summer begins in March, with the year's highest temperatures during April. Pre-Monsoon thunderstorms occur during April and May. The SouthWest Monsoon season lasts from June to September. The NorthEast Monsoon occurs from October to December.

Salem is a Geologist’s paradise, surrounded by hills and the landscape dotted with hillocks. The district is rich in mineral deposits like Magnesite, Bauxite, Granite, Limestone, Quartz and Iron ore. Mining Allied industries like Cement Industry, Refractory Bricks manufacturing, Smelting Plant etc thrive well.

Latitude 110 14’ N - 120 53’ N Longitude 770 44’ E - 780 50’ E

AREA & POPULATION 1. Area (Sq.kms) 5950 2. Population 3482056 3. Population Density (Sq.kms) 665 REVENUE ADMINISTRATION 1. Divisions (4) Salem Mettur Sangakiri

[District Survey Report, Salem District] Page 1

2. Taluks (13) Salem Salem West Salem South Valapadi Attur P.N.Palayam Mettur Sangakiri 3. Firkas 44 4. Revenue Villages 655 LOCAL ADMINISTRATION 1. Corporation (1) Salem 2. (4) Attur Mettur Edappady Narasingapuram ( 3rd Grade ) 3. Panchayat Unions (20) Salem Veerapandi Panamarathupatty Ayothiyapattinam Valapady Yercaud Attur Gengavalli Kolathur Omalur Kadayampatty Sangakiri Magudanchavadi Edappadi 4. Town Panchayats (33) Ayothiapattanam Attayampatty Kolathur Konganapuram Mechari Omalur [District Survey Report, Salem District] Page 2

P.N.Patty P.N.Palayam Sankari Tharamangalam

Thammampatty Valapadi

Belur Eadanganasalai Gangavalli Kadayampatty Karuppur Keeripatty Mallur Panamarathupatty

Sendarapatty Thedavoor Yethapur Nangavalli Poolampatty

4. Village Panchayats (385)

Feg.1: District Map of Salem

[District Survey Report, Salem District] Page 3

2. Overview of Mining Activity in Salem District

Salem is a part of Western Tamil Nadu and is located at the base of the popular tourist destination of the Yercaud hills. Salem boasts large Textile, Steel, Automotive, poultry and sago industries. Salem also has one of the largest Magnesite deposits in . As per the Department of Geology and Mining, a major part of the mineral wealth of Tamil Nadu is confined to Salem District, where a variety of important minerals like Magnesite, Dunite, Bauxite, Limestone, Iron ore, Quartz, Feldspar and Soapstone, Granites etc, are found.

EXISTING LEASES IN AS ON 30.04.2019

Patta Under Sl. I.Major EC Under Patta Poramboke & Total Non- No Minerals Obtained operation Poramboke operation 1 Limestone 42 5 5 52 3 3 49

2 Magnesite & 1 2 - 3 - - 3 Dunite 3 Magnesite 2 8 - 10 2 2 8

4 Bauxite - 1 - 1 1 - 1

Total 45 16 5 66 6 5 61 II.Minor Mineral 1 Black 14 10 - 24 8 8 16 Granite 2 Colour 39 7 - 46 12 12 34 Granite 3 Rough stone 43 66 - 109 92 91 18

4 Soil/gravel 7 - - 7 7 7 0

5 Quartz & 19 3 - 22 2 2 20 Feldspar

Total 122 86 5 208 121 120 88

Grand 167 102 5 274 127 125 149 Total

[District Survey Report, Salem District] Page 4

In Salem district a total of 274 numbers of leases for Major and Minor minerals have been awarded as on 30.04.2019. Inrespect Major Minerals, out of which 61 were non- working due to want of EC, 6 were EC obtained and 5 were working mines. For minor minerals, a total of 208 numbers of leases were awarded as on 30.04.2019, out of which, 88 numbers were not working due to want of EC, and 120 mines were working out of 121 leases obtained EC.

DETAILS OF EXISTING MINES /QUARRIES AS ON 30.04.2019.

Number of Name of the S.No existing Extent in Hects. Mineral leases

I Major Minerals

1. Limestone 52 414.60.0

2. Magnesite 10 345.60.2

3. Magnesite and 3 1155.88.0 Dunite 4. Bauxite 1 190.84.0

Total-(A) 66 2106.92.2

II Minor Minerals

1. Black Granite 24 99.10.8

2. Colour Granite 46 143.78.5

3. Roughstone 109 160.59.0

4. Gravel 7 12.31.0

III Other 31 Minerals

1 Quartz & 22 35.31.0 Feldspar Total-(B) 208 451.10.3

Grand Total 274 2558.02.5 (A+B)

[District Survey Report, Salem District] Page 5

NOTIFIED MINERALS

1. BAUXITE:

Bauxite, ore of Aluminium, occur in the form of cappings in the Shevaroy hills of . The shevaroy hills are chiefly made up of the Charnockite group of rocks interBanded with metasedimentary units and cut across by dykes of dolerite. Only low grade bauxite available at the depth of maximum 2m in all the hills followed by ferruginous clay.

2. IRON ORE:

A) KANJAMALAI

The Iron ore deposits of Kanjamalai hill is of Banded Magnetite Quartzite. Kanjamalai is situated about 8 Km West of Salem Town. It is about seven kilometres long and four kilometres wide and rises to a maximum height of 986 metres above Mean sea level. The Iron ore outcrops of scattered, generally the Magnetite Quartzites occur at three distinct levels. The first or lowermost band occurs near to the base of the Kanjamalai. It can be traced over a length of some 13 Kilometres. The width is very variable (probably depending to some extent on the degree of tight folding) but the average width is about 25 metres. The second or middle band occurs some 300 metres about the plain. In outcrop it is discontinuous over its strike length of about 6 kilometres. The third and uppermost and occurs some 60 metres higher than the second band at a height of some 350 to 370 metres above ground level. The band is about 10 kilometres long (around the complete elliptical outcrop) and about 10 metres wide.

The ore in the first and second bands appears similar with an iron content of 33 to 39% Fe. In the band cropping out at the highest level the rock is much more siliceous with a much lower iron content and there is more hematite present. This rock is best described as a ferruginous Quartzite and is of less economic potential than the lower bands. The Iron ore reserves in the first band (lower band) of Kanjamalai 99.3 Million Tonnes and second band reserves (middle band) is about 50 to 60 million tonnes.

[District Survey Report, Salem District] Page 6

A) GODUMALAI

The Godumalai hill in which the ore crops out is about 7 Kms long and about 3 Kms wide at the Eastern end but in the Western end the iron bands are only some 3 metres wide. The Iron ore bands occupy the crest of the East-West striking ridge and form a series of disjointed folds; in some areas the bands are completely folded in on themselves. The apparent thickness at the Eastern end of the hill is due to this type of tight folding. In some localities the ore is crushed, sheared and fine grained. It contains some hematite and jasper not commonly reported from the Tamil Nadu iron ores, was noted here. The average Fe content of the ore is about 34% and the estimated reserves from this area are 60 to 70 million tonnes.

3. LIMESTONE:

The crystalline limestone of Precambrian age occurs in the form of lenticular and linear bands in the Sankari Taluk which is exploited for the production of Cement by India Cements Limited, Sankari West. The calc-Gneisses and crystalline limestone represent ancient calcareous sediments which have suffered repeated metamorphism, intrusions by Granites and folding during the Archean age. The harder pink Granites which are abundant in the region stand out as hills and knolls resisting erosion. The disposition of the crystalline limestone bands in this region reveals that they maintain a structural conformity with the batholith, by a pattern of skirting around granitic mass from West to East and continuing southward from Sankaridrug to and beyond.

MAJOR MINERAL

1. MAGNESITE:

The origin and occurrence of the Magnesite deposits of the Chalk Hills in Salem District has been elaborately discussed by Mr.C.S.Middlemiss (Ref. Geological survey of India-XXIX, 31,1896). Later a short report on the mineralization of the Chettichavadi Jaghir was made by Mr.Vinayaka Rao of Geological Survey of India (Ref. Geological Survey of India L XIII, 46, 1929).

[District Survey Report, Salem District] Page 7

In 1939, the Magnesite Deposits of Chettichavadi Jaghir was examined in detail by Mr. A.M.Comber to justify further development of the Magnesite resources to provide raw material for a large industry, with substantial investments. The whole area is impregnated with white Magnesite veins of good quality. Hence, the area is called as Chalk Hills of Salem. The Chalk Hills of Salem mainly consists of the ultra basic suite of rocks. The Magnesite deposits of the area occur in two detached belts. The smaller belt is on the Southern side and the larger on is on the Northern side. The ultra basic suite formed due to differentiation of magma has intruded into the older metamorphic rocks of the neighbourhood consisting mainly of Biotite Hornblende Gneisses and Charnockite. The two belts of ultra basic rocks are separated by Metagabro and Charnockite rocks. Stratigraphic succession is that the older Archaen Gneisses are intruded by younger ultra basic suite of rocks-Dunite, Peridotite and Pyroxenite.

The most prominent deposit of Magnesite is located in Chalk hills of Salem over an area of 17 Sq. Kms and estimated to be 44 million tonnes. This is mined by Burn & Co (SAIL Ltd), TANMAG, Ponguru Magnesite Mines and Dalmia Bharath Sugars and Industries Limited.

MINOR MINERALS

DIMENSIONAL STONES: (Multi-Colour Granite and Black Granite)

1. MULTI- COLOUR GRANITE

Peninsular Gneiss is the rock wide spread in many parts of Salem District. The rock formation is popularly known as Granite Gneiss essentially made up of a supra crustal assemblages of Quartz and feldapar as major constituents, closely inter Banded with calc-silicate rocks and dolomite, as well as Granite Gneiss or schist, occurring within a vast area of Biotite Gneiss. The rock type is leucocratic, euhedral, medium to fine grained, equigranular texture. This rock commercially called as Imperial White and Thippu White. The rock formations are found in the area of Edappadi, Sankari, Attur and Yercaud Taluks.

[District Survey Report, Salem District] Page 8

2. BLACK GRANITE (DOLERITE):

The Dolerite dyke rocks, commercially called as Black Granite occur in Paithur, Seeliampatty Manjini, Umayalpuram of and in Yellikaradu, Sampalli, Kaveripuram and Kannamoochi of . The Black Granites mainly occur in Attur, Gangavalli, Mettur, P.N.Palayam, Valapady and Yercaud Taluks which is extensively quarried for building and ornamental purposes,

3. ROUGH STONE / CHARNOCKITE:

The major parts of the hilly terrain of the area are formed of Charnockites of varying chemical composition from acid variety Charnockite of granitic composition (Hypersthene - Granite) to basic variety. They are mesocratic to Melanocratic, Medium to Coarse grained rocks consisting of Blue Quartz, Grey Coloured Feldspar, Hypersthene with accessory minerals like Garnets, Magnetite and Biotite. The basic Charnockite is mostly fine grained, dark coloured and occurs as thin lensoid body within the charnocktie. Charnockite is mainly used as rough stone and is being quarried for road metals, jelly and making of M-sand. The total available Geological reserves in the leased out area in Salem District is 5,34,06,589 M3.

4. Gravel:

Gravel is a loose aggregation of rock fragments. Gravel is classified by particle size range and includes size classes from granule- to boulder-sized fragments. Gravel is categorized into granular gravel (2 to 4 mm or 0.079 to 0.157 in) and pebble gravel (4 to 64 mm or 0.2 to 2.5 in). ISO 14688 grades gravels as fine, medium, and coarse with ranges 2 mm to 6.3 mm to 20 mm to 63 mm. The Gravel/ Brick Earth/ Red soil mainly occurs in Salem, Sankari, Mettur and Attur Taluk and in and arrond in Salem District. The total available Geological reserves in the leased out area is 3,09,555 M3.

31 MINOR MINERALS

1. QUARTZ AND FELDSPAR:

Quartz and Feldspar deposits associated with Granitic Pegmatites occur in various places of Sankari, Omalur, Mettur and Edappady taluk. The Pegmatite bands occurring in this area are of the simple acid type consisting chiefly of coarse grained Quartz and Feldspar with subordinate amounts of Biotite. The Quartz and Feldspar crystals range from a few cms. to as much as a half metre across. The Quartz found in this area in both colourless and milky white with little of impurities. The associated Feldspar is Coarse grained being pink to flesh red in colour and perthitic in texture.

[District Survey Report, Salem District] Page 9

2. DUNITE:

Dunite is a ultrabasic igneous rocks, associated with Magnesite. Dunites are medium grained Grey green rocks almost entirely consisting of olivine. In chalk hills there are patches with a mixture of Pyroxene and the rock is transitional to peridotite. Accessory minerals of Dunite are Chromite and Garnet.

3. SOAPSTONE / STEATITE:

The deposits of Talc and Steatite, which are derived from ultramacfic rocks, are more abundant than those in magnesian limestone and dolomites. Usually they are derived from Serpentine, which are formed at first and later transformed into Steatite. Thus, it is evident that Talcose substances are the alteration products of magnesium- bearing minerals which may be primary or secondary in character. The deposit found in Periyasoragai, Aranganur, Tholasampatty, Marakottai and Kongupatty of Omalur Taluks.

4. CALCITE:

Calcite, which is the predominating mineral ingredient in all the limestone formations, is formed in large masses of contact metasomatic deposits by the process of recrystallisation of limestones. The deposit found in Sankari Taluk.

[District Survey Report, Salem District] Page 10

3. General profile of the District

Salem is one of the biggest districts and it is centrally situated in Tamil Nadu. It is a Geologist‟s paradise, surrounded by hills and the landscape dotted with hillocks. Salem has vibrant culture dating back to the ancient . As a district, Salem has its singinficance in various aspects such as Mango Cultivation, Silver Ornaments, Textiles, Sago industries and Steel production. It has thirteen taluks. Salem West, Salem South, Kadayampatti and Pethanaikkanpalayam are newly formed taluks in this district. There are many things in Salem that are noteworthy by its virtue of its location and social set-up.

AREA AND POPULATION

Salem district’s geographical area is 5950 sq.kms. While Salem district occupies the 9th rank among the districts in Tamil Nadu in regard to size, the population of Salem district occupies 5th rank among districts in Tamil Nadu. As per 2001 census 53.65% persons are in Rural areas and remaining 46.35% persons are in Urban areas. The population of Scheduled Castes and Scheduled Tribes in the district are 15.5% and 3.50% respectively. The density of population as per 2001 census 573.

As per the population census 2011, the total population of the district is 34, 82,056 of which 17, 81,571 are males and the remaining 1700485 are females. The percentage of decadal growth rate of population has declined to 15.37 % during 2001-11 from 17.2& of 1991-2001. The sex ratio has gone up to 954 females per 1000 males as per census 2011 when compared to 929 females per 1000 males in 2001 census. It is ranked as 31st among all districts of the State in respect of sex ratio. The population density per square kilometer has increased to 663 in census 2011 from 575 of the pervious census 2001.

Salem District has been ranked at 5th place according to the most populous district in the State and its share to the State‟s total population is 4.82%.

The overall literacy rate of Salem District as per 2011 census is 73.86% with males‟ literacy rate at 80.24 % and females‟ literacy rate at 65.15%. The corresponding literacy rates of combined, males and females were 65.09%, 74.4% and 55.2% respectively in 2001 census.

[District Survey Report, Salem District] Page 11

4. Geology and Mineral wealth of the District Crystalline rocks of Archaean to late Proterozoic age occupy over 80% of the area of the state of Tamilnadu, while the rest is covered by Phanerozoic sedimentary rocks mainly along the coastal belt and in a few inland River valleys. The hard rock terrain comprises predominantly of Charnockite and Khondalite groups and their migmatitic derivatives, supracrustal sequences of and Kolar groups and Peninsular Gneissic Complex (Bhavani Group), intruded by ultramafic-mafic complexes, basic dykes, Granites and Syenites. The sedimentary rocks of the coastal belt include fluviatile, fluvio-marine and marine sequences, such as Gondwana Supergroup (Carboniferous to Permian and Upper Jurassic to Lower Cretaceous), marine sediments of Cauvery basin (Lower Cretaceous to Paleogene), /Pannambarai Formation (Mio-Pliocene) and sediments of Quaternary and Recent age. Geological map of Tamil Nadu is given below:

Fig 2: Geological map of Tamil Nadu.

[District Survey Report, Salem District] Page 12

The geology of the area is characterised by contrasting lithological associations that are grouped under Sathyamangalam Group, Khondalite Group, Charnockite Group, Migmatite Complex, and Bhavani Gneissic Complex of Archaean/ Pre-Cambrain age, younger basic and acid intrusives are of Proterozoic age and kankar/ calcretes belonging to Quaternary age.

The Sathyamangalam Group of rocks comprises Quartzites  Fuchsite  Sillimanite, Talc-Tremolite, Actinolite schist, Amphibolite, Amphibolite, Gabbro and Pyroxenite. These litho units occur as thin bands, pods and lenses of various dimensions within Charnockites and Hornblende Biotite Gneisses. Quartzite bands is co-folded with Amphibolite and Pyroxenite. Talc-Tremolite-Actinolite schists occur as small oval to bean-shaped bodies in Hornblende Biotite Gneiss in the Southeast. Gabbros and Pyroxenites are distributed in the valley portion in the NorthEast and in Southern plains. A thin band of Amphibolite occurs in the North.

The Charnockite Group is represented by Charnockite and Banded Magnetite Quartzite. Charnockite, a greasy looking rock, is confined to the Northern part occupying the hills and the intervening valley. It is light to dark Grey in colour, medium to coarse to Pegmatoidal and consists of bluish Grey Quartz, Grey Feldspars, Pyroxenes (opx)  Hornblende  Biotite and opaques. It has a NNW-SSE trend with moderate to steep dips towards SSE or vertical in disposition. The rock is intruded by basic and ultrabasic rocks and basic dykes. Banded Magnetite Quartzite occurs as very thin bands within Charnockite.

The Khondalite Group is represented by Quartzite, Garnetiferous Sillimanite Gneiss and Calc Granulite. Quartzite occurs as thin bands associated with basic Granulites in a Gneissic country in the central part. Garnet Sillimanite Gneiss is restricted to the East where it forms persistent bands upto 50 m width occupying higher elevation of Perumal Malai. The rock is associated with Pyroxene Granulite and Garnetiferous Quartzofeldspathic Gneiss. Calc Granulite is confined to the NorthEast and shows typical ribbed weathering and contains Calcite, Plagioclase, Feldspar, Garnet and Diopside.

The Bhavani Gneissic Complex, comparable to the Peninsular Gneissic Complex, is roughly confined to the Southern half of the area. It is made up of Hornblende-Biotite and Biotite Gneisses exhibiting a distinct fissility. The Gneisses contain enclaves of the Sathyamangalam Supracrustals.

[District Survey Report, Salem District] Page 13

The Migmatite Complex consists mainly of Garnetiferous Quartzo feldspathic Gneiss and occurs in the North bordering the Charnockite. The rock exhibits Gneissosity defined by alternate layers of felsic and mafic minerals. The felsic minerals comprise Quartz and Feldspar and the mafic minerals include Garnet  Biotite. The Migmatites Complex is intruded by basic and ultrabasic rocks and is formed due to migmatisation of Charnockite.

The alkali complex comprises ultramafic rocks of ‘chalk hills’ viz., Dunite, Peridotite and Pyroxenite and Olivine Gabbro and lamprophyre dykes confined to the North just a few kilometres NW of Salem. The ultramafic rocks are altered to workable Magnesite veins. Epidote Hornblende Gneiss occurs in the NorthWest. It appears to have been derived by the hydrothermal alteration of the country rock as a result of alkaline magmatic activity.

Alkaline intrusives represented by Syenite, generally form hills and are saturated Syenites. Based on colour and textural variations, five distinct varieties of Syenites viz., pink Pegmatoidal Syenite, Gneissic Syenite, pink / medium grained Grey Syenite, Grey porphyritic Syenite and pink coarse grained Syenite. Incidence of molybdenum is noticed in Syenite in some places. The Syenites of the area are formed to contain linear lenticular bodies of Pyroxenite and Carbonatite and shows intense brecciation near the contact of the Carbonatite body. Fenitisation in the form of alkalization of the surrounding Syenite is also noticed. The Carbonatite bodies are mostly Sovite with minor Ankerite and appear to have been emplaced along fault trending in N30E – S30W direction. Associated with the Carbonatite bodies are a number of thin Quartz-Baryte veins.

Numerous basic sills and dykes of Doleritic composition intrude the Charnockite. Two sets of dykes are present in the area: one set has a trend of NW-SE while the other set is disposed along NNE-SSW direction. The dykes vary in length from 200 m. to 5 km.

Younger acid intrusives include Granite, Pegmatite and Quartz veins and are found mostly in the West – Granite intrusives in the Kanjamalai hills, Quartz veins in the SouthWest and Pegmatite veins in the North. The Charnockites, Migmatite complex and the Bhavani Gneissic Complex are intruded by younger Granite bodies of various dimensions. The Granites intrusives as seen in the Migmatite complex are of smaller dimensions. Granite is widely distributed in the Southern part forming hillocks and linear mounds.

[District Survey Report, Salem District] Page 14

The Granite is mostly pink colour and is fine / medium grained to Pegmatoidal. The pink Pegmatoidal Granite hosts Uranium and other Radioactive Minerals. White Pegmatoidal variety shows elevated S and W. The Carbonatites and the associated Pyroxenites show enrichment of Monazite and Allanite.

The Quaternary Alluvium occurs all along the course of the Sarabhanga River in the central part.

Structurally, the area shows polyphase deformation resulting in three phases of folding. Later, brittle and ductile deformations have resulted in development of faults, shearing and mylonitisation. Bedding, the primary planar fabric is displayed by the Banded Magnetite Quartzite. Foliation, the secondary planar feature is well developed. The strike of foliation of the rocks swerves from ENE-WSW through WNW-ESE to NE-SW with moderate dips on either side thereby indicating a series of Antiforms and Synforms. Closures of tight, isoclinal antiformal folds with Westerly plunges (50) are seen at a few places. Marker beds like Pyroxene Granulite define the fold pattern clearly in the SouthWest where a major Synformal fold is present. The strike of foliation is generally NE-SW with moderate dips towards NW. The area in the SouthWest contains Amphibolite bands, which are folded and re-folded into F2 and F3 folds respectively. The area in the West in the Kanjamalai hills show a broad basinal structure formed as a result of interference of two folds (F2 and F3) characterizing a doubly plunging synform. The earliest fold (F1) occurs as tight rootless folds on mesoscopic scale. A near North-south shear zone has been delineated for a length of 8km in the NorthWest. A major NE-SW trending Gangavalli shear passes through in the NorthWest, and extends for nearly 23 km and upto 1.25 km wide. The rocks occurring along this shear show intense shearing, brecciation, mylonitisation and phyllonitisation. This shear zone is offset by another set of ENE- WSW trending shear.

Mineral occurrences in Salem District

Salem District has wide occurrence of major minerals that includes Bauxite, Magnesite, Iron ore and Limestone. The minor minerals includes Quartz, Feldspar, Moonstone Dunite, Colour Granite, Dolerite (Black Granite), Rough stone, Mica, Steatite, and Gravel.

[District Survey Report, Salem District] Page 15

The Charnockites and the Migmatites (Gneiss) occurring as massive bodies are used as building stones and road metal. Usually the chrnockites occur as residual hills and mounds with positive topography. The Gneiss generally occupy the plains as it easily weathers and erodes due to the fissile nature. The basic dykes mainly Dolerite (Black Granite) occurring as dykes is used as building stones and decorative/ ornamental stones.

Economic minerals like Magnesite, Bauxite, Steatite, Mica, Feldspar and Garnet has wide industrial applications. The magneiste is developed due to the hydrothermal alterations of ultramafic rock and occur as veins within the parent rock, dunite. The bauxite and laterite occur in the form of cappings in the Sherveroy hills which is formed due to the chemical weathering of Charnockite in the humid sub-tropical climate conditions.

In addition to the mines in the revenue land, Arasu Magnesite Mines operated by Tvl. Tamil Nadu Magnesite Limited (TANMAG), a fully owned by Undertaking is carrying out Mining of Magnesite and Dunite in Thathiengarpatti Village, Kurumbapatti Reserve Forest, Shevaroys South Range lying in between the latitude and longitude of N 110 45’ 33.38” to N110 44’ 59 .49” and E 780 09’ 30.63” to E 780 08’ 55.22” at an AMSL of 372m. The available Geological reserves of Magnesite is 24,82,697 M.T and Dunite is 22,80,430 M.T in respect of Tvl. TANMAG.

Further, Tvl. Tamil Nadu Minerlas Limited (TAMIN) a fully owned by Government of Tamil Nadu Undertaking is carrying out quarrying of Black Granite over an extent of 5.62.0 in Palamalai Reserve Forest, Yellikkaradu Bit-I, Mettur Taluk for a period of 10 years from 10.06.2009 to 09.06.2019. The quarry lease renewal applied on 28.03.2019. The same was forwarded to the Governmetn for Orders. The area lies in Eastern Longitude from E 770 46’ 46.99” to E 770 46’ 58 .49” and Northern Latitude from N 110 46’ 11.59” to N 110 46’ 22.01”.

Then, another one of quarrying of Black Granite over an extent of 16.72.0 in Palamalai Reserve Forest, Yellikkaradu Bit-II, Mettur Taluk. The area lies in Eastern Longitude from E 77046’54” to77047’19” and Northern Latitude from N11046’35” to N11046’25”. The Precise Area Comunicatd issued by the Government for grant of further lease period.

Limestone occurs in the form of crystalline variety as veins with pinch and swell nature. At places, the limestone bands are intercalated with veins of Calcite with more than 90% CaO.

[District Survey Report, Salem District] Page 16

The Quartz and Feldspars are associated with granitic activity and occur in form of veins of varied dimensions and in the form of sheet rocks. Mica (Biotite) occur in the form of books within Pegmatites. The vermiculite occur as altered product along the shear planes.

The Gravel and Brick Clay occur associated with quaternary alluvial deposits and are few in occurrences.

The Sand deposits all along the Adipalar to Kottaiyur stretch of 10 KM in S.F.No. 1 of Kaveripuram Village. The area lying in between the latitude and longitude of N 110 56’ 51” to N110 55’13 ” and E 770 40’ 58” to E 770 45’ 20”. The average depth of sand deposit is 5 meter. In this connection, the Executive Engineer, PWD, WRO, Sarabanga Basin Division, is directed to submit a Mining Plan approved by the Deputy Director of Mines, Salem and Clearance from Concerned authority and Tamil Nadu Pollution Control Board (TNPCB) for passing final order in respect of grant of sand quarrying permission in S.F.No. 1 (Part) over an extent of 4.96.0 Hects of Cauvery River in Poramboke land (620m North South * 80 m in East West Direction) Near Kottaiyur Parisalthurai in Kaveripuram Village of Mettur Taluk, Salem District. The mining plan is awaited from PWD.

Geomorphology: Salem district forms part of the Upland Plateau Region of Tamil Nadu with many hill ranges, hillocks and undulating terrain with a gentle slope towards East. The prominent geomorphic units identified in the district through interpretation of Satellite imagery are 1) Plateau, 2) Structural hills, 3) Bazada zone, 3) Valley fill, 4) Pediments, 5) Shallow Pediments and 6) Buried Pediments. A number of hill ranges are located in the Northern and NorthEastern parts of the district, whereas the Southern, Western and Eastern parts of the district are gently undulating and dotted with a few isolated hillocks. The important hill ranges in the district are Yercaud hills, Kanjamalai hills, Godumalai hills and Pachamalai hills.

Soil: The soils can be broadly classified into 6 major soils types viz., Red insitu, Red Colluvial Soil, Black Soil, Brown Soil, Alluvial and Mixed Soil. Major part of the district is covered by Red insitu and Red Colluvial soils. Block soils are mostly seen in Salem, Attur, Omallur and sankari taluks. Brown Soil occupies major portion of Yercaud and parts of Salem and Omallur taluks and the Alluvial Soil is seen along the river courses in Omallur and Sankari taluks. Mixed soil is occurring only in Attur taluk.

[District Survey Report, Salem District] Page 17

[District Survey Report, Salem District] Page 18

Fig 3- Google image showing the existing major and minor mineral mines/ quarries along with existing ML awarded for major minerals

[District Survey Report, Salem District] Page 19

Fig 4: Map showing the locations of fieldwork carried out along with commodity

[District Survey Report, Salem District] Page 20

5. Drainage of Irrigation Pattern:

Sl. No. Source of Irrigation Year : 2017-18 1. Net Area irrigated by (Hectares) a. Government Canals 210.000 b. Private Canals -- c. Tanks -- d. Tube wells 18431.53 e. Other wells 104669 f. Other sources -- Total Net Area Irrigated 123310.53 2. Gross Area irrigated 121783.09 3. Name of Rivers Cauveri, Sarabanga Nathi, Vasista Nathi and Suvetha Nathi 4. Name of Lakes Govindavadi Eri, Ayyanar Koil Eri, Mookaneri Eri, Attur Pudu Eri, Umayalpuram Eri, Thedavoor Eri, Arangaloor Eri, Sendarapatty Eri, Eri, Sarvoy Periya Eri Jangamasamuthiram Eri and Vadaman Eri.

Source: District G-return 2017-18 of Salem

Basin and Sub-Basin: The district is a part of Cauvery and Ponnaiar river basins and Sarabanga, Tirumanimuttar, Vasista and Suveda are the important watersheds/sub basins.

Drainage: Salem district is drained by tributaries of Cauvery and Vellar rivers. Cauvery River, which is perennial in nature, flows along the Western and Southern boundaries of the district. Sarabanga and Tirumanimuttar are important tributaries of Cauvery River and originate in the Shevroy hills. The Swetha and Vasishta rivers are tributaries of Vellar River. The Swetha River originates in the Kollimalai and flows Eastwards and joins the Vellar River. The Vasishta River originates in the chitteri hills and flows southwards and joins the Vellar River. In general, the district is characterized by dentritic drainage.

[District Survey Report, Salem District] Page 21

5.1 Processes of deposition of sediments in the rivers of the District

The breaking down of rocks due to weathering and erosion by the natural agents like river results in the formation of river sediments. These sediments will be transported for a long distance depending on the energy condition of the river and deposits in the area, in and adjacent to the river banks. The deposition of sediments takes place due to the lowering of river velocity by decrease in volume of water, declination of slope, sediment load etc.

The high energy condition of the river generally prevails in the young and mature stage of rivers proximity to the origin, where river erosion is active. Whereas, in the old stage where the energy condition lowers and develops the sinous pattern of flow called meandering, the deposition takes place.

Also, segregation of sedimets based on size fraction takes place due to the energy condition of the river. In the mature stage where both ersum and deposition is active, the sediments ranging in the size fraction of gravel, cobble, pebble etc, size of more than 10mm gets deposited. Whereas in the old stage of river, in low energy condition, after reaching the plain terrain, sediments ranging in the size of sand, silt and clay gets deposited. Also, during the time of flood where large volume of water overflowing the river banks, will form flood plain deposits, accumulating sediments of sand, silt and clay.

Generally, the sand size sediments with size fraction of 1mm and less, deposited in the river course of old stage of river and along the flood plain has varied applications particularly for construction purposes. The silt size fraction of sediments, grain size less than 0.5mm best suits of brick making. Hence, the river borne sediments like sand and silt always have a great demand. Also the other size fractions including silty clay and clay with high water holding capacity and mineral value, suits best for agriculture purpose.

[District Survey Report, Salem District] Page 22

Fig.5: Stages of River [District Survey Report, Salem District] Page 23

The main drainage flows in Salem District is river Cauvery that flows from Mettur in the North to Bahavani in the south for a total length of 45 kms approximately.

R.Ca uver y

The Cauvery, a non perennial river, is in a mature stage of river flows in a straight line with kinks produced by NW-SE Shear planes in Kothampatti Therkukottai and Kadappa nallur. Also, the river is dissected by series of chack dams and reservoirs that act as energy brakers and reduces the sediment load capacity of the river thereby facilitating sediment (sand) accumulation in downstream of Koneripatti to Bhavani as pointbars, braided stream deposits, levee and flood plain deposits. Fig.6: Area accumulation of sedimates

[District Survey Report, Salem District] Page 24

Deposition of river sand in the Cauvery river flowing in Salem district is very less due to the pre-mature stage of the river and also imperenial (seasonal) flow of water. The replenishing of river sand may be less due to the non- availability of supply of materials and prevailing of high energy condition during river flow. The poor sorting co-effficient of river sediments due to the high energy condition and the poor spherucity index of the river sediments due to the less distance transportation may disqualify the river sand for building and masonary purposes.

6. Land Utilisation Pattern in the District (Forest, Agricultural, Horticultural, Mining etc.,) Salem is a city and a corporation in Salem district. It is the 5th largest Municipal Corporation and Urban agglomeration in Tamil Nadu next to , , and Trichy. (Wikipedia) Regarding the land use and land cover pattern of Salem district, majority of the lands are occupied by the agricultural land followed by mining and industrial area.

The various land use and land cover categories in Salem are 1) Agricultural land which consist of shrub land, grass/herb, dense/grass fallow; 2) Forest consisting of closed forest, open forest and reserve forest; 3) Urban areas; 4) Bare land; 5) Water bodies and 6) Unclassified lands.

LULC of Salem district in 1973: The land use and land cover pattern based on unsupervised classification for 1973, carried out by Tamilenthi et al., (http://www.aiscience.org/journal/aj3g) is given below table.The highest level occupied was crop and plantation are of 8630.03 acres with 35.92% and the loWest level occupied was tanks area of 84.28 acres accounting for 0.35%. The occupied an area of 3409.98 acres with 14.19% in and the sub-urban area was 4037.35 acres with 16.80%. The commercial and industrial activity as covered with 36.22 acres of 1.40%. It was 128.54 acres with 0.53% to dedicate mining activities for the great demand of minerals in and around the district. The crop land and plantation part was 8630.03 acres with 35.92 % and the land with shrub area was 3186.66 acres with 13.26%.The scrub forest was occupied 501.05 acres with 2.08 % and the fallow land was 1139.55 acres with 4.74%. The area occupied for the tank it was 84.28 acres with 0.35% in 1973 and the river occupied area is 196.49 acres with 0.81%. The Barren and rocky surface land occupied area was 2080.28 acres with 8.66%.

[District Survey Report, Salem District] Page 25

Class Land cover in 1973 (Acres) Area (%) Urban 3409.98 14.19 Sub-urban 4037.35 16.80 Com.& Industry 291.78 1.21

Roads 336.50 1.40

Mining activities 128.54 0.53 Crop & Plantation 8630.03 35.92 Land with shrub 3186.66 13.26 Scrub forest 501.05 2.08 Fallow land 1139.55 4.74

Tanks 84.28 0.35 River 196.49 0.81 Barren rocky surface 2080.28 8.66 Total 24019.55 100 Table: Land use and land cover for 1973 LULC of Salem district in 2010: The highest level occupied was Sub-urban area of 8368.50 acres with 34.84 % and the loWest level occupied was river area of 67.17 acres with 0.27%. The urban area occupied an area of 5466.41 acres with 22.75% in and the sub-urban area was 8368.50 acres with 34.84%. The commercial and industrial activity occupied is 710.32 acres with 2.95% and the roads covered with 758.43 acres of 3.15 %. It is 471.92 acres with 1.96 % to dedicate mining activities for the great demand of minerals in and around the district. The analysis reveals that the crop land and plantation part was 3210.49 acres with 13.36% and the land with shrub area was 1846.76 acres with 7.68 %. The scrub forest is occupied 1095.07 acres with 4.55 % and the fallow land is 353.39 acres with 1.49 %. The area occupied for the tank is 272.19 acres with 1.13% and the river occupied area is 67.17 acres with 0.27%. The Barren and rocky surface land occupied area is 1392.86 acres with 5.79%

Area change 1973 2010 Change Class (1973-2010) (Acres) (Acres) (%) (Acres) Urban 3409.98 5466.41 2056.42 +60.30 Sub-urban 4037.35 8368.50 4331.14 +107.27 Com.& Industry 291.78 710.32 418.54 +143.44 Roads 336.50 758.43 421.92 +125.38 Mining Activities 128.54 471.92 343.37 +267.12 Crop 8630.03 3210.49 5419.54 -62.79 Plantation Land with Shrub 3186.66 1846.76 1339.90 -42.04

[District Survey Report, Salem District] Page 26

Scrub Forest 501.05 1095.07 594.01 +118.55 Fallow land 1139.55 359.39 780.16 -68.46 Tanks 84.28 272.19 187.90 +222.93 River 196.49 67.17 129.31 -65.81 Barren Rocky 2080.28 1392.86 687.42 -33.04 Surface Total 24019.6 24019.6 - - Table: Land use and land cover change for 1973-2010

From the above two tables, it is inferred that the mining activity has changed from 128.54 acres in 1973 to 471.92 acres in 2010 showing drastic increase by 267.12%.

Fig 7. Land use land cover map of Salem 2010

[District Survey Report, Salem District] Page 27

7. Surface Water and Ground Water scenario of the District:

Ground water: Ground Water is an important source of water in most of the Districts in the State. Ground Water is withdrawn for Agriculture, Municipal and industrial use. The depth at which the ground water is found is called Ground water Table.The district is classified into different blocks based on the ground water abstraction rate.

The status of Categorization of firkas as of March 2013 for the District is shown below. Categorisation Based On No. of Firkas Extraction (As On March 2013) Firkas Attur, Edappadi, Ernapuram, Gangavalli, Kadayampatti, Karippatti, Kattukkottai, Konganapuram, Malliyakarai, Mecheri, Nangavalli, Omalur, Palamalai, Panamarathuppatti, Pethanaickanpalayam, Over Exploited (>100%) 27 Salem Town, Sankari East, Sankari West, Semmandappatti, Thalaivasal, Tharamangalam, Thirumalaigiri, Valasaiyur, Vazhappadi, Veerapandi, Vembadithalam, Yethapur. Critical (90%-100%) 2 ,Suramangalam Karupur, Kolathur, Belur, Pottaneri, Thevur, Semi Critical (70%-90%) 7 Veeraganoor,Mettur.

Arunoothumalai, Kalrayanmalai, Puthur(S), Safe (<70%) 6 Vellakkadai, Yercaud, Patchamalai

Others (Poor& Saline) - Total 42

Surface water:

In Tamil Nadu, the surface water resources are fully utilized by various stake holders. The demand of water is increasing day by day.

So, groundwater resources play a vital role for additional demand by farmers and Industries and domestic usage leads to rapid development of groundwater.

[District Survey Report, Salem District] Page 28

About 63% of available groundwater resources are now being used. However, the development is not uniform all over the State, and in certain districts of Tamil Nadu, intensive groundwater development had led to declining water levels, increasing trend of Over Exploited and Critical Firkas, Saline Water intrusion, etc.

8. Rainfall of the District and Climatic condition:

The district receives the rain under the influence of both SouthWest and NorthEast Monsoons. The NorthEast Monsoon chiefly contributes to the rainfall in the district. The normal annual rainfall over the district varies from about 800 mm to 1600 mm. It is the minimum around Sankari (800 mm) in the SouthWestern part of the district. It gradually increases towards North, NorthEast and East and attains a maximum around Yercaud (1594.3 mm) in the Northern part. The district enjoys a tropical climate. The weather is pleasant during the period from November to January. Mornings in general are more humid than the afternoons, with the humidity exceeding 75% on an average. In the period June to November the afternoon humidity exceeds 60% on an average. In the rest of the year the afternoons are drier, the Summer afternoons being the driest. The hot weather begins early in March, the highest temperature being reached in April and May. Weather cools down progressively from about the middle of June and by December, the mean daily maximum temperature drops to 30.2°C, while the mean daily minimum drops to 19.2°C and 19.6°C in January in Salem and respectively.

Rainfall is a single most important factor for success of crops in the farming areas. The district receives the rain under the influence of both SouthWest and Northest Monsoons. The NorthEast Monsoon chiefly contributes to the rainfall in the district. Salem district received actual rainfall of 1001.5 mm in the year 2014-15, when compared with the normal rainfall of 997.9 mm. In 2013-14, Salem district has received 902.5 mm of rainfall. i.e., 10.97% of rain fall increased when compared with previous year.

[District Survey Report, Salem District] Page 29

TEMPERATURE (IN DEGREE CELCIUS) 2017-18

Plains 1. Maximum 37.5 2. Minimum 19.5 RAINFALL ( MM )2017-18 Normal 1. South West 440.6 2. North East 370.5 Actual 1. South West 369.8 2. North East 332.5 Source: Indian Meteorological Department

FOREST

S.No Subject Year :2017-18 1. Forest Area (Hect.) a. Reserved Forests 126540 b. Unclassified Forests 103104 c. Reserved Lands 858.190 2. Out-Turn of Forest Products a. Firewood (MT) 2699.752 b. Sandalwood (Heart wood) (MT) 101426.750 c. Sandalwood (Sapwood) (MT) 2000.000 d. Tamarind (MT) 58.767 e. Curry Leaves (MT) 2.300 f. Eanchi (MT) 3.300 g. Vilangai (MT) 0.100 h. Jack Fruits (MT) 1.200 i. Pulpwood (MT) 327.914 j. Other MFP (MT) 2.985 k. Coconut (Nos.) 164 l. Palmyra Fruits (Nos.) 3200 Source: Conservator of Forests, Salem Circle, Salem

[District Survey Report, Salem District] Page 30

MONTHLY RAINFALL FOR THE DISTRICT (in mm) Year: 2017-18

Period Normal Rainfall Actual Rainfall 1 2 3 1.South West Monsoon Period Total 440.6 487.7 Jun‟17 65.1 24.5 Jul‟17 96.4 37.4 Aug‟17 119.6 199.4 Sep‟17 159.5 223.4 2.North East Monsoon Total 370.5 341.9 Oct‟17 190.9 212.1 Nov‟17 123.8 64.0 Dec‟17 55.8 65.8 3.Winter-Period Total 16.0 15.4 Jan‟18 8.5 2.4 Feb‟18 7.5 13.0 4.Hot-Weather Period Total 170.8 179.2 Mar‟18 16.0 31.1 Apr‟18 54.0 10.4 May‟18 100.8 137.7 WHOLE YEAR 997.9 1021.2 Source: Indian Meteorological Dept. Chennai – 600 006.

Feg 8. Season-wise Rainfall for Salem District for the Year 2017-18

[District Survey Report, Salem District] Page 31

Fig 9:- Rainfall for the year of 2017-18

Fig 10: District Rainfall map- Tamil Nadu

[District Survey Report, Salem District] Page 32

SOIL CLASSIFICATION Year: 2017-18

Sl. No. Type of Soil Places in District Parts of Salem, Athur, , Mettur 1. Red Calcareous and Omalur taluks in Salem District 2. Red Non Calcareous ---- do ---- Parts of Salem, Mettur and Omalur taluks in 3. Brown Soil Calcareous Salem District Parts of Salem, Sankagiri, Mettur, Omalur 4. Red Collurial Caleareous taluks in Salem District. Parts of Sankagiri and Mettur taluks in 5. Red Collurial Non Calcareous Salem District Parts of Salem, Athur, Sankagiri, Mettur 6. Black Soils and Omalur taluks in Salem District 7. Alluvial Calcareous Parts of Sankagiri and Mettur Taluks 8. Brown soil Non Calcareous Yercaud Taluk Source: Asst. Soil Chemist, Salem

[District Survey Report, Salem District] Page 33

Fig 11. Roughstone Minerals Occurrence in Salem District (an Overview)

Sl. Name of the Name of the Name of the Total No. of Name of the Villages No Mineral Division Taluk Leases Granted 1 Salem Salem Erumapalayam 18 2 Kuralnatham 1 3 Santhiyur 5 4 Vellaiayampatti 1 5 Gajjelnaickenpatti 3 6 Pallitheupatti 1 7 Panamarathupatti 4 8 Udayapatti 1 9 Salem South Parapatti 1 10 Pasuvanathampatti 1 11 Valapady Masinaickenapatti 3 12 Mettupatti 1 13 Periyagoundapuram 3 14 Eripudur 1 15 1 16 Karumapuram 1 17 1 Total 47 18 Sankari Sankari Alathur 1 19 Devannagoundanur 1 20 Olakkachinnanur 2 21 Thevur 1 22 Pullagoundam patty 2 Agraharam Roughstone 23 Edappadi Vellirivelli 2 Total 9 24 Mettur Mettur Moolakkadu 3 25 P.N.Patti 1 26 Periyasathapadi 1 27 Pukkampatti 6 28 Sampalli 4 29 Sinkiripatti 2 30 Vellar 1 31 Omalur Edayapatti 1 32 Kullamanaickenpatti 2 33 Vellalapatti 1 34 Kadayampatti Kadayampatti 2 35 Denishpet 1 36 Kandayampatti North 4 37 Nadupatti 8 38 Marakottai 1 39 Gundukkal 1 40 Deevattipatti 4 41 Veppillai 6 Total 49 42 Attur Attur Arasanatham 2 43 Gangavalli 2 Total 4 Grand Total 109

[District Survey Report, Salem District] Page 34

9. Details of the quarrying leases in the District as per the following format: (Roughstone)

Period of Period of Obtained Status Mining Mining lease Environmental Method of Mining Area of Date of (Working / Location of the Sl. Name of Address & Lease (1st /2nd Captive clearance Mining Name of the Lease Mining Commencem Non-Working Mining Lease No the Contact No. of (Initial) ….renewal) / Non- (Yes/No), If (Opencast/ Lessee Grant order Lease ent of Mining /Temp. (Latitude & Mineral Lessee Captive yes letter No. Under- No. & Date (Ha.) Operations Working for Longitude) From To From To with date of ground) dispatch etc.,) grant of EC. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Collector’s S/o.Andiappa SEIAA-

Proceeding

Rough gounder, TN/F.No. Roc.310/ 11°48'54.78"N Open Cast- Stone- D.No.12/46, 1923/EC- 1 A.Manickam 2013/ 0.50.0 - - 15.07.2014 Working - to Semi Jelly Desai Nagar, 1(a)/1265/ Mines-A/ 78°49'25.89"E

(Rule-19) P.N.Patty, 2013 dated mechanized 14.7.2019 dated 15.7.2014 Mettur Dam, 15.07.2014 12.05.2014.

S/o.Anaigaou

nder, Collector’s SEIAA-

Rough Anaigounder Proceeding TN/F.No.1906 Open Cast- Stone- valavu, New Roc.216/20 /EC-1(a)/ 11°45'49"N to 2 A.Selvakumar 0.82.0 - - 16.07.2014 Working - Semi Jelly 5th, 13/ Mines- 1264/ 2013 77°58'25"E

(Rule-19) Tharamangala A/ dated dated mechanized 14.7.2019 m, Omalur, 15.07.2014 15.7.2014 13.05.2014. Salem

10°27'23.74"N Collector’s SEIAA-

S/o.Thangavel to

Rough Proceeding TN/F.No.2135 , Pagalpatty 10°27'23.76"N Open Cast- Stone- Roc.214/20 / EC-1(a)/ 3 T.Gnanvelu, Village, 3.68.5 - - 17.07.2014 Non-Working - and Semi Jelly 13/ Mines- 1288/2014 , 78°45'.11.05"E

(Rule-19) A/ dated dated mechanized 14.7.2019 Salem 15.7.2014 to 15.07.2014 20.05.2014. 78°45'.15.04"E

[District Survey Report, Salem District] Page 35

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Sl Mining Area of (1st /2nd Non- Location of the Method of Name of Address & (Initial) Commencem Captive clearance N Name of the Lease Mining ….renewal) Working Mining Lease Mining(Open the Contact No. of ent of / Non- (Yes/No), If yes o Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Mineral Lessee Mining Captive letter No. with No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 16 S/o.Gopal, Collector’s

23/7, Proceeding SEIAA-

Rough Duraisamy Roc.152/ TN/F.No.2110/E Open Cast- Stone- Non- 11°53'36.05"N 4 S.G.Thangavel Nagar Main 2013/ 1.00.0 - - 04.08.2014 - C-1(a)/ Jelly Working and 78°50'50.2"E Semi

Road, Mines-A/ 1252/2013 dated 1.8.2019 (Rule-19) 2.8.2014 mechanized Pallapatty, dated 12.05.2014. Salem-9. 02.08.2014 Collector’s S/o.Chinnusa

Proceeding SEIAA-

Rough my Roc.31/ TN/F.No.1556/E Open Cast- Stone- Velluvankadu, 11°56.987"N to 5 C.Nallaian 2013/ 2.80.0 - - 03.09.2014 Working - C-1(a)/ Jelly Kollapatty, 78°07.883"E Semi

Mines-A/ 1292/2013 dated 1.9.2019 (Rule-19) Karuppur 2.9.2014 mechanized dated 23.05.2014. Post, Salem 02.09.2014 SEIAA-TN/ S/o.Rama Collector’s F.No.2043/EC/1(

samy, B1,

Proceeding a)/1560/2014 Rough Brindhavan N11051’11.28 to Roc.240/ dated 14.08.2014 Open Cast- Stone- Apartment,So 11051’23.02 6 R.Gopal 2013/ 2.65.5 - - 22.11.2014 Working - and DEIAA- Jelly uth East E78005’20.79 to Semi

Mines-A/ DIA/TN/MIN/14 0 mechanized 19.11.2019 (Rule-19) layout, 20.11.2014 78 05’27.28 dated 460/2018-SLM- Brindavan 20.11.2014 EC.No.12/2018 Road, Salem-4 dated 17.05.2018

Collector’s

W/o. SEIAA- Rough Proceeding samy, Thevur TN/F.No.1990/E Open Cast- Stone- Roc.198/20 11°30'04.00"N 7 P.Kavitha Post, Sankari 1..97.5 - - 16.07.2014 Working - C/1(a)/1250/ Jelly 13/ Mines- to77°45'05.58"E Semi

Taluk, Salem 2013 dated mechanized 15.7.2014

(Rule-19) A/ dated 14.7.22019 District 12.05.2014 15.07.2014

[District Survey Report, Salem District] Page 36

Period of Period of Status Obtained Mining Mining lease (Working / Sl Date of Environmental Mining Area of Lease (1st /2nd Non- Location of the Method of . Address & Commence Captive clearance Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open N Contact No. of ment of / Non- (Yes/No), If yes the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- o Lessee Mining Captive letter No. with No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/o.P.Rajendr Collector’s SEIAA-

an, Veppillai Proceeding

TN/F.No.2625 Rough Village, Roc.536/ 11°57'23.03"N to Open Cast- 15 /EC/1(a)/ 11°57'29.37"N and 8 Stone-Jelly R.Thillaikkarasi K. Morur 2013/ 1.34.5 - - 28.04.2015 Working - Semi 1706/ 2014 78°11'19.58"E to (Rule-19) Post, Omalur Mines-A/

dated 78°11'25.16"E mechanized 26.4.2020 Taluk, dated 27.4.20 Salem District 27.04.2015 04.03.2015

Collector’s 3/6A/69-A, SEIAA-

Proceeding

Tvl.Mettur Rajaganapathy TN/F.No.2587 Rough Roc.501/ Open Cast- S.P.R.Blue Metal Nagar, West /EC/1(a)/ 11°48'23.14"N 9 Stone-Jelly 2012/ 2.20.5 - - 26.06.2015 Working - Semi & Construction Main Road, 2038/ 2014 to77°46'06.97"E (Rule-19) Mines-A/

Pvt. Ltd., Mettur Dam- dated mechanized 24.6.2020 dated 25.6.2015 636 401 25.06.2015 01.04.2015

Collector’s SEIAA- Proceeding

TN/F.No.1952

Rough S/o.K.Sekaran Roc. Open Cast- /EC-1(a)/ 11°31'5.7N 10 Stone-Jelly S.Aruldas No.7, Kottai 192/2013/ 1.05.5 - - 06.08.2014 Working - Semi 1297/2013 to77°53.21.6"E (Rule-19) Street, Sankair Mines-A/

dated mechanized 4.8.2019 dated 5.8.2014 05.08.2014 20.05.2014.

[District Survey Report, Salem District] Page 37

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Sl Mining Area of Lease (1st /2nd Non- Location of the Name of Address & Commence Captive clearance Mining(Ope N Name of the Lease Mining (Initial) ….renewal) Working Mining Lease the Contact No. of ment of / Non- (Yes/No), If yes ncast/ o Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Collector’s

SEIAA-

S/o. Raji, Proceeding Rough TN/F.No.3524 Ku.Kuttapatty, Roc.624/ Open Cast- Stone- /EC-1(a)/ 11°56'29.59"N 11 R.Chinnathampi Thinnapatty 2014/ 2.07.0 - - 24.02.2016 Working - Semi Jelly 2496/2015 to78°07'39.83"E

Post, Omalur Mines-A/ mechanized 21.2.2021 (Rule-19) 22.2.2016 dated Taluk, dated 22.02.2016 14.12.2015. S/o.Shanmu Collector’s SEIAA-

ganathi, Proceeding Rough TN/F.No.3623 Parappatti Roc.239/ Open Cast- Stone- /EC/1(a)/ 11°34'26"N to 12 S.Somasundaram Post, Mallur 2015/ 1.61.0 - - 03.08.2016 Working - Semi Jelly 2839/ 2015 78°08'01"E Via., Salem Mines-A/ 1.8.2016 mechanized (Rule-19) 30.7.2021 dated Taluk and dated District. 29.07.2016 15.02.2016

W/o.V.Vadivelu Collector’s

1/99,thirumthika Proceeding SEIAA-TN/ Rough 11°56'49.71"N to ttuvalu, Roc.639/ F.No.5594/EC- Open Cast- Stone- 11°51'44.53"N and 13 V.Kalaiselvi Deevattipatti 2015/ 0.95.5 - - 04.12.2016 Working - 1(a)/EC.No.37 78°05'24.93"E to Semi Jelly Post, Omalur

Mines-A/ 09/2016 dated 78°05'17.95"E mechanized 2.12.2021 (Rule-19) 3.12.2016 Taluk, dated 06.09.2016. Salem-351 24.11.2016 Collector’s

W/o.Parama SEIAA-

Proceeding Rough sivam, Thinda TN/F.No. Roc.225/ 11°56'31.23"N to Open Cast- Stone- P.Dhana mangalam, 2620/EC/1(a) 11°56'39.73"N and 14 2013/ 2.90.5 - - 15.12.2016 Working - Semi Jelly bakkiyam Panakattur /2470/ 2015 78°08'15.34"E to

Mines-A/ 78°08'20.93"E mechanized 13.12.2021 (Rule-19) Post, Omalur, 14.12.2016 dated dated Salem-455 14.12.2016 15.09.2016

[District Survey Report, Salem District] Page 38

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Mining Area of Lease (1st /2nd Non- Location of the Sl. Name of Address & Commencem Captive clearance Mining Name of the Lease Mining (Initial) ….renewal) Working Mining Lease No the Contact No. of ent of / Non- (Yes/No), If yes (Opencast/ Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D/o.M.Rathin avelu, Collector’s

SEIAA-TN/

Rough Sakthivinayak Proceeding 11°46'58"N to F.No.4742/EC- Open Cast- Stone- ar Blue Metal, Roc.664/20 11°47'06"N and 15 R.Mogana, 2.22.0 - - 14.12.2016 Working - 1(a)/EC.No.34 Semi Jelly 178-83- 14/ Mines- 77°45'32" E to 39/2016 dated

(Rule-19) A,Hospital A/ dated 77°45'38" E mechanized 13.12.2021 colony, Mettur 30.11.2016 14.12.2016 29.07.2016. Dam, Salem

S/o.K.Nachim Collector’s SEIAA-

Rough uthu, No.4, Proceeding TN/F.No.3368 Open Cast- Stone- Kalaimagal Roc.619/20 Non- /EC-1(a)/ 11°29'45"N to 16 N.Harishkumar 3.95.5 - - 20.07.2016 - Semi Jelly kalvi nilaiyam 14/ Mines- Working 2639/2015 77°45'56" E mechanized

(Rule-19) Street, - A/ dated ehŸ 18.7.2021 638 001 19.07.2016 19.7.2016 05.01.2016.

S/o.K.C.S.Kan nan, 286/51, Collector’s

Nainampatty SEIAA-TN/

Rough Proceeding 11°35'44"N to Road Street, F.No.4253/1(a Open Cast- Stone- Roc.321/20 11°35'41"N and 17 K.Ravisuthan, Gandhi Nagar, 0.81.0 - - 14.03.2017 Working - )/EC.No.3467/ Semi Jelly 15/ Mines- 77°46'28" E to Vellandivalas 2016 dated

(Rule-19) A/ dated 77°46'25" E mechanized 13.3.2022 u, Edappadi 14.3.2017 08.02.2017 29.07.2016. Taluk, Salem District

[District Survey Report, Salem District] Page 39

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive clearance Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open No Contact No. of ment of / Non- (Yes/No), If the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. No. & Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o. Periya Collector’s thampi, SEIAA-

Proceeding

Thuttampatty TN/F.No.3288 Rough Roc.241/ 11°52'47.74"N Open Cast- Post, / 1(a)/ 18 Stone-Jelly P.Krishnan 2013/ 4.92.5 - - 22.05.2017 Working - to77°59'01.97" Semi Chinnappam Ec.No.2912/2 (Rule-19) Mines-A/ E mechanized

patty Via., 1.5.2017 015 dated 20.5.2022 dated 2 Omalur Taluk, 17.02.2016. 12.05.2017 Salem

S/o.S.K.Selvar Collector’s

ajan, No.6/1, Proceeding DEIAA-

Rough Siruthangal Roc.673/ SLM/EC. 11°47'54.27"N Open Cast- 19 Stone-Jelly S.Senthilkumar Kattuvalavu, 2015/ 1.44.0 - - 25.11.2017 Working - No.01/ 2017 to Semi (Rule-19) P.N.Patty, Mines-A/ dated 77°45'46.85"E mechanized

Mettur Taluk, dated 21.09.2017

24.11.2017 23.11.2022 Salem District 05.11.2017

S/o.Sinna kannu, No.4/452, Collector’s SEIAA-TN/

Jalakandapura Proceeding

F.No.2924/ Rough m Main Road, Roc.230/ 11°56'46.42"N Open Cast- Non- EC-1(a)/ 20 Stone-Jelly S.Selvam Papampadi 2013/ 2.32.0 - - 24.11.2017 - and Semi Working EC.No.2827/ (Rule-19) Village, Mines-A/ 78°07'59.00"E mechanized 2015 dated

Chinnappamp dated

24.11.2017 23.11.2022 atti Post, 05.11.2017 08.02.2016. Omalur Taluk, Salem

[District Survey Report, Salem District] Page 40

Period of Period of Status Obtained Mining Mining lease (Working / Environmental Method of Sl Mining Area of Lease (1st /2nd Date of Non- Location of the Address & Captive clearance Mining N Name of Name of Lease Mining (Initial) ….renewal) Commencem Working Mining Lease Contact No. of / Non- (Yes/No), If (Opencast/ o the Mineral the Lessee Grant order Lease ent of Mining /Temp. (Latitude & Lessee Captive yes letter No. Under- No. & Date (Ha.) Operations Working for Longitude) From To From To with date of ground) dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Sinnakannu

No.4/452, Collector’s SEIAA-TN/

Jalakandapuram Proceeding F.No.2923/E Open Cast- Rough Main Road, Roc.231/ 017 C- 11°53'34.97"N 21 Stone-Jelly S.Selvam Papampadi 2013/ 1.06.0 - - 25.11.2017 Working - 1(a)/EC.No.2 and Semi

(Rule-19) Village, Mines-A/ 828/2015 78°05'27.18"E mechanized 23.11.2022 Chinnappampat dated 24.11.2 dated ti Post, Omalur 05.11.2017 08.02.2016. Taluk, Salem S.o, Muthaiya, Prop. Sri Collector’s DEIAA- 11042’55.99’’N

Pachiyamman Proceeding DIA/TN/MIN

to Rough Blue Metal, Roc.484/ /5414/2017- Open Cast- 11043’05.53’’N 22 Stone-Jelly M. Karthe 1469-A. 2015/ 2.01.0 - - 07.01.2018 Working - SLM- Semi 78016’32.05’’E

(Rule-19) Vinayagam Mines-A/ EC.No.02/20 6.1.2023 7.1.2018 mechanized to patty, Kannan dated 17 dated 78016’39.61’’E kurichi Post, 30.11.2017 14.11.2017 Salem - 8. Collector’s DEIAA- S/o.K.P.Govind 11038’21.68’’N

Proceeding DIA/TN/MIN

asamyNo.106, to Rough Roc.11/ /7273/2017- Open Cast- Yercaud Main 11038’25.30’’N 23 Stone-Jelly G.Kannan 2016/ 1.75.5 - - 08.01.2018 Working - SLM- Semi Road, 78012’10.76’’E

(Rule-19) Mines-A/ 6.1.2023 7.1.2018 EC.No.04/20 mechanized Kannankurichi to dated 17 dated Salem-8. 78012’18.98’’E 30.11.2017 13.11.2017

[District Survey Report, Salem District] Page 41

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Sl Mining Area of Lease (1st /2nd Non- Location of the Method of Address & Commence Captive clearance N Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open Contact No. of ment of / Non- (Yes/No), If yes o the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive letter No. with No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DEIAA- W/o.Selvaku Collector’s DIA/TN/MIN/ 11038’45.73’’N

mar, Door

Proceeding 7253/2017- to Rough No.141/56, Open Cast- Roc.521/20 SLM- 11038’48.85’’N 24 Stone-Jelly D.Lavanya V.M.R Ngaar, 0.73.0 - - 04.01.2018 Working - Semi 16/ Mines- EC.No.05/201 78013’37.99’’E

(Rule-19) Meyyanur, 2.1.2023 A/ dated 3.1.2018 to mechanized Salem-636 7 dated 30.11.2017 0 004. 16.11.2017 78 13’43.73’’E

S/o.K.C.Mani,

No.7/3/27-B, Collector’s

Market Street, Proceeding SEIAA- 11052’11’’N to Rough Thanda Main Roc.403/ TN/F.No.3412/ Open Cast- 11052’21’’N 25 Stone-Jelly M.Prabhu Road, 2014/ 3.40.0 - - 14.03.2018 Working - EC/1(a)/2793/2 Semi 77044’13’’E to (Rule-19) Kolathur, Mines-A/ 015 dated

0 mechanized 12.3.2023 13.3.2018 77 44’30’’E Mettur Taluk, dated 21.01.2015 Salem-636 23.2.2018 303. W/o.P.Rajendr DEIAA-

an, Door Collector’s 11039’18.32’’N

DIA/TN/MIN/ No.76, Proceeding to Rough 11961/2017- Open Cast- Thiyagi Roc.135/20 11039’22.32’’N 26 Stone-Jelly R.Vijaya 0.66.5 - - 27.05.2018 Working - SLM- Semi Natesan 17/ Mines- 78016’01.40’’E

(Rule-19) EC.No.12/201 mechanized 25.5.2023 Street, No.3, A/ dated 26.5.2018 to 7 dated Ammapet, 14.4.2018 78016’05.10’’E Slaem-636 00. 3103.2018 S/o.Krishnan, DEIAA- 0

51/83, Collector’s 11 39’16.18’’N

DIA/TN/MIN/ Proceeding to Rough Manickavasagar 11192/2017- Open Cast- K.Sasi Street, Roc.469/20 Non- 11039’19.80’’N 27 Stone-Jelly 0.68.5 - - 28.05.2018 - SLM- Semi kumar Soundamman 17/ Mines- Working 78018’10.68’’E

(Rule-19) Kovil Backside, EC.No.11/201 mechanized 26.5.2023 A/ dated 27.5.2018 to 7 dated Ammapet, 14.4.2018 78018’14.26’’E Salem-636 003. 31.03.2018

[District Survey Report, Salem District] Page 42

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive al clearance Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open No Contact No. of ment of / Non- (Yes/No), If the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. No. & Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o Chinnanna gounder,4/6A, SEIAA-TN/

New No.2/4- Collector’s

F.No. 92 Vanicham Proceeding 11050’57’’N Rough 3419/ Open Cast- patty , Roc.444/20 Non- 11051’56’’N to 28 Stone-Jelly A.C.Manian 3.34.5 - - 21.05.2018 - 1(a)/Ec.No.2 Semi Chinnappamp 13/ Mines- Working 77043’34’’E to

(Rule-19) 794 /2015 mechanized 18.5.2023 atty Post, A/ dated 19.5.2018 77043’37’’E dated Omalur Taluk, 5.4.2018 23.01.2016. Salem District. S/o Kuppiru DEIAA-

sagounder, Collector’s DIA/TN/

Kallapalayam, Proceeding MIN/6940/ 11035’43’’N to Rough Open Cast- Vellirivelli Roc.316/20 Non- 2017-SLM- 11035’48’’N 29 Stone-Jelly K.Subramani 0,64,5 - - 20.05.2018 - Semi Village, 15/ Mines- Working EC.No.03/2 77046’28’’E to

(Rule-19) mechanized 18.5.2023 Edappady A/ dated 19.5.2018 017 dated 77046’30’’E Taluk, Salem 14.4.2018 31.03.2018 District S/o Shanmu DEIAA-

ganathi, Door Collector’s DIA/TN/

No.3/85, Proceeding MIN/19151 N11034’42.84 Rough Open Cast- Mariamman Roc.594/20 /2018-SLM- to11034’50.03 30 Stone-Jelly S.Saravanan 0.80.5 - - 25.06.2018 Working - Semi Koil Street , 17/ Mines- EC.No.75/2 E78008’02.04

(Rule-19) mechanized 23.6.2023 Parapatty A/ dated 24.6.2018 018 dated: to78008’05.32 Post, Salem 24.6.2018 07.12.2018 District

[District Survey Report, Salem District] Page 43

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive clearance Mining(Ope Name of Lease Mining ….renewal) Working Mining Lease No the Contact No. of ment of / Non- (Yes/No), If ncast/ the Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive yes letter No. Under- No. & Date (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Thiru P.Baskaran Collector’s DEIAA- S/o.Palani 11038’24.46’’N

Sri Proceeding DIA/TN/MIN

Rough appan, to Parasakthi Roc. /12403/ Open Cast- Stone- Varagampadi 11038’28.34’’N 31 Crusher 480/2017/ 1.37.0 - - 16.07.2018 Working - 2018-SLM- Semi Jelly Village, 78013’21.48’’E Private Mines-A/ EC.No.02/20 mechanized

(Rule-19) Masinaickenp to 14.7.2023 Limited dated 15.7.2018 18 dated atty Post, 0 14.04.2018. 78 13’28.89’’E Valapady 31.03.2018 Taluk, Salem

S/o.Arthanari, Thesavilakku Collector’s DEIAA-

North Village, Proceeding DIA/TN/MIN 0

Rough N11 51’59.68 Thuttampatty Roc. /14035/ Open Cast- Stone- to 11052’04.97 32 A.Kumar Post, 568/2017/ 0.90.5 - - 30.07.2018 Working - 2018-SLM- Semi Jelly 2018 E77059’04.18 Tharamangala Mines-A/ EC.No.06/ mechanized

(Rule-19) to 77059’08.05 28.7.2023 m, Omalur dated 29.7. 2018 dated Taluk, Salem- 29.7.2018 27.05.2018 306.

Collector’s DEIAA-

S/o.Thangavel Proceeding DIA/TN/MIN 0

Rough N11 51’43.23 , 245, Roc. /13921/ Open Cast- Stone- Non- to 11051’47.63 33 T.Balu Meyyannur, 233/2017/ 1.09.0 - - 29.07.2018 - 2018-SLM- Semi Jelly Working E78009’01.75 Salem- Mines-A/ EC.No.04/20 mechanized

(Rule-19) to 78009’06.27 28.7.2023 636 004. dated 29.7.2018 18 dated 29.7.2018 27.05.2018

[District Survey Report, Salem District] Page 44

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive / clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease No the Contact No. of ment of Non- (Yes/No), If yes (Opencast/ Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Sithaiyan, Collector’s DEIAA- N11044’40.52”

No.4/327, Proceeding DIA/TN/MIN/

Rough to Kattuvalavu, Roc.105/ 15454/2018- Open Cast- Stone- S.Panneer Non- 11044’43.54” 34 Kottamettupat 2012/ 0.83.5 - - 09.08.2018 - SLM- Semi Jelly selvam Working E78003’44.25”

ty, Omalur Mines-A/ EC.No.30/2018 mechanized 8.8.2023 (Rule-19) 9.8.2018 to Taluk, Salem- dated dated 78003’48.65” 636 455. 09.08.2018 10.06.2018 S/o.Tamilaras Collector’s DEIAA-

N11057’41.42”

u, No.458, Proceeding DIA/TN/MIN/ Rough to National Roc. 305/ 15436/2018- Open Cast- Stone- T.Saran 11057’46.89” 35 Nagar, 2017/ 1.67.0 - - 27.08.2018 Working - SLM- Semi Jelly kumar E78011’24.88”

Kottamettupat Mines-A/ EC.No.31/2018 mechanized 25.8.2023 (Rule-19) 26.8.2018 to ty, Omalur dated dated 78011’31.00” Taluk, Salem. 26.08.2018 10.06.2018 W/o.G.Selvak Collector’s DEIAA-

umaran, Proceeding DIA/TN/MIN/

Rough N11053’49.15 No.333/21, Roc. 13775/2018- Open Cast- Stone- to 11053’57.32 36 R.Jayanthi Rajaganapathy 69/2017/ 1.93.0 - - 09.08.2018 Working - SLM- Semi Jelly E78005’26.23

Nagar, Mines-A/ mechanized 8.8.2023 9.8.2018 EC.No.03/2018 (Rule-19) to 78004’32.81 Chinnakollapa dated dated 17 tty, Salem-8. 09.08.2018 .05.2018 S/o.Pacha Collector’s DEIAA- muthu,

Proceeding DIA/TN/MIN/1

Rough 1.6/142, Roc. 5433/2018- Open Cast- Stone- Kannakupillai N11031’42.81” 37 P.Pachiyannan 495/2016/ 1.01.5 - - 10.08.2018 Working - SLM- Semi Jelly kadu, E77051’33.40”

Mines-A/ EC.No.29/2018 mechanized 8.8.2023 (Rule-19) Manjakkal 9.8.2018 dated dated patti, Sankari 09.08.2018 Taluk, Salem 10.06.2018

[District Survey Report, Salem District] Page 45

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Mining Area of Lease (1st /2nd Non- Location of the Sl Address & Commence Captive / clearance Mining Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease No Contact No. of ment of Non- (Yes/No), If (Opencast/ the Mineral Lessee Grant order Lease /Temp. (Latitude & Lessee Mining Captive yes letter No. Under- No. & Date (Ha.) Working for Longitude) From To From To Operations with date of ground) dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Sengoda DEIAA- Collector’s

gounder, DIA/TN/MIN N11053’08.60

Roc. Rough Thinnapatti /14182/ to 11053’15.72 Open Cast- 495/2016/ 38 Stone-Jelly T.P.S.Sadasivam Post, 1.54.0 - - 03.10.2018 Working - 2018-SLM- Semi Mines-A/ (Rule-19) Kadayampatty EC.No.08/20 0 mechanized dated E78 04’43.35

0 30.9.2023 Taluk, Salem- 1.10.2018 09.08.2018 18 dated to 78 04’48.53 636 305 17.05.2018

S/o.Palani, Collector’s Arasan Saw Proceeding SEIAA- N11048’11 to

Mil, Yercaud Rough sRoc. TN/F.No.3414 11048’06 Open Cast- Main Road, 39 Stone-Jelly P.Tamilarasan 72/2014/ 1.67.5 - - 11.02.2019 Working - /EC/1(a)/2159 Semi Kondappanaic (Rule-19) Mines-A/ /2014 dated 0 mechanized

kenapatty, E77 58’06 to 9.2.2024

dated 10.2.2019 01.04.2015 0 Salem-636 77 58’12 10.02.2019 008

S/o.Ashok Collector’s DEIAA- kumar, Proceeding DIA/TN/MIN 0 No.999/1A, N11 53’45.75 Rough sRoc. /16529/201 Open Cast- Bharathi to11053’58.94 40 Stone-Jelly A.Harishkumar 197/2018/ 3.23.0 - - 11.02.2019 Working - 8-SLM- Semi nagar, Jagir E78005’32.68 (Rule-19) Mines-A/ EC.No.41/20 mechanized

Ammapalaya to78005’44.32 9.2.2024

dated 10.2.2019 m, Salem-636 18 dated 10.02.2019 302. 05.12.2018

[District Survey Report, Salem District] Page 46

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commencem Captive clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease No the Contact No. of ent of / Non- (Yes/No), If yes (Opencast/ Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.A.Nagarajan. Collector’s DEIAA- D.No. 494/1,

Proceeding DIA/TN/MIN/ N11052’23.49

Rough Anna Nagar Roc.220/ 18538/2018- to 11052’29.72 Open Cast- Stone- West, 41 N.Sankar 2016/ 1.28.5 - - 29.02.2019 Working - SLM- E78002’15.40 Semi Jelly Kottamettupatty Mines-A EC.No.47/201 to mechanized (Rule-19) Village, Omalur

0 27.2.2024 dated 28.2.2019 Taluk, Salem- 8 dated 78 02’119.69 28.02.2019. 636 455. 05.12.2018

S/o. (late) Venkata DEIAA- chalagounder, Proceeding DIA/TN/MIN/

Rough D.No.44,Therkat Roc.64/ N11035’19.82

19244/2018- Open Cast- Stone- hiyankadu, 2018/ Non- to11035’19.67 42 V.Palaniappan 0.87.5 - - 10.03.2019 - SLM- Semi Jelly Adikarai, Mines-A Working E78012’54.62

3.2024 EC.No.76/201 mechanized

(Rule-19) Panamarathu dated to78012’59.48

8.3.2019 7. patty Village, 08.03.2019. 8 dated: and 07.12.2018 District.

DEIAA- Proceeding S/o.Gopalan, DIA/TN/MIN/

Rough Roc.479/ N11044’38.65

No.52E, Railway 18632/2018- Open Cast- Stone- 2017 Non- to11044’41.30 43 G.Nagarajan station road, 0.81.0 - - 09.03.2019 - SLM- Semi Jelly Mines-A Working E78003’43.86 Omalur Taluk, EC.No.53/201 mechanized

(Rule-19) dated to78003’48.74 7.3.2024 Salem-636 455. 8.3.2019 8 dated: 08.03.2019. 07.12.2018

[District Survey Report, Salem District] Page 47

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive al clearance Name of Name of the Lease Grant Mining (Initial) ….renewal) Working Mining Lease Mining(Open No Contact No. of ment of / Non- (Yes/No), If the Mineral Lessee order No. & Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Collector's S/o.Chinn

Proceedings

annan, Rough Roc.68 Open Cast- 2/89, Valluvar Non- 44 Stone-Jelly C.Jayapal /2009/ 0.40.0 - - 07.07.2009 - No - Semi Nagar, Eruma Working

(Rule-8) Mines-A/ mechanized 5.7.2019 palayam Post, 6.7.2009 dated Salem-15. 19.5.2009. Collector's

S/o.

Proceedings Govindan, Rough Roc.67/ Open Cast- G.Ashok Paraikadu, Non- 11°37'58"N 45 Stone-Jelly 2009/ 0.40.0 - - 23.07.2009 - No Semi kumar Sanniya Working to78°11'00"E

(Rule-8) Mines-A/ mechanized 20.7.2019 sikundu, 21.7.2009 dated Salem-15. 19.5.2009. S/o. Alagu Collector's

muthu,

Proceedings Rough 5/144,Kaliam Open Cast- A.Chandran Roc.62/ Non- 11°37'01.40"N 46 Stone-Jelly man Street, 0.60.0 - - 07.07.2009 - No Semi . 2009/ Mines- Working to78°10'03.15"E

(Rule-8) Nilavarapatty, mechanized 5.7.2019 A/ dated 6.7.2009 Salem Tk and 2.3.2009. Dt S/o.

Collector's

Kathirvel,77, Proceedings Rough Bharathiar Open Cast- Kathir Roc.64/ 2009 Non- 47 Stone-Jelly Street, 0.60.0 - - 27.09.2009 - No - Semi Rajarathinam /Mines-A/ Working

(Rule-8) Peramanur mechanized 25.9.2019 dated 26.9.2009 Main Road, 19.5.2009 Salem - 7

[District Survey Report, Salem District] Page 48

Period of Period of Status Obtained Mining Mining lease (Working / Environment Date of Method of Area of Lease (1st /2nd Non- al clearance Location of the Sl. Name of Address & Mining Lease Commencem Captive Mining Name of the Mining (Initial) ….renewal) Working (Yes/No), If Mining Lease No the Contact No. of Grant order ent of / Non- (Opencast/ Lessee Lease /Temp. yes letter (Latitude & Mineral Lessee No. & Date Mining Captive Under- (Ha.) Working for No. with Longitude) From To From To Operations ground) dispatch date of grant etc.,) of EC. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Sengodan, SEIAA-

Collector's

438/1,Makalia TN/F.No. Rough Proceedings mman Koil 4383/ 1(a)/ Open Cast- Stone- Roc.61/2009/ 11°37'02"N to 48 S.Dhanapal Street, 1.00.0 - - 22.07.2009 Working - Ec. No. Semi Jelly Mines-A/ 78°10'18"E

Ambalyeri 5th 3653 /2016 mechanized 20.7.2019 (Rule-8) dated 21.7.2009 Cross, dated 18.5.2009. Salem-6 08.08.2016. S/o.Karuppiah 11°37'27.00"N Collector's

No.1, to Rough Proceedings Pappammal 11°37'32.21"N Open Cast- Stone- K.Lakshmana Roc.63/2009/ Non- 49 Illam, M.D.S. 1.10.0 - - 07.07.2009 - No and Semi Jelly perumal Mines-A/ Working

Backside, 78°10'08.85"E mechanized 6.7.2009 (Rule-8) dated 5.7.20019 Hasthampatty, to 19.5.2009. Salem-7. 78°10'13.35"E S/o,M.Palani samy, Collector's

2/48,Mettu Rough Proceedings kadu, Open Cast- Stone- Roc.69/2009 Non- 11°34'42"N to 50 P.Thirugnanam Santhiyur, 1.14.0 - - 11.08.2009 - No Semi Jelly /Mines-A/ Working 78°08'05"E

S.Attayam mechanized 9.8.2019 (Rule-8) dated 10.8.2009 patty Post, 19.5.2009. Mallur Salem and District

[District Survey Report, Salem District] Page 49

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Method of Sl Area of Lease (1st /2nd Non- Location of the Name of Address & Mining Lease Commence Captive al clearance Mining N Name of the Mining (Initial) ….renewal) Working Mining Lease the Contact No. of Grant order ment of / Non- (Yes/No), If (Opencast/ o Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Dura

Collector's

isamy Rough Proceedings Padayachi,Mett Open Cast- Stone- Roc.78/2009 Non- 11°38'49"N 51 D.Rajendran upatty, 1.50.0 - - 09.11.2009 - No Semi Jelly /Mines-A/ Working to78°17'49"E

Sesanchavadi, mechanized 8.11.2019 (Rule-8) dated 9.11.2009 Valapadi Taluk, 20.5.2009. Salem District.

S/o. Collector's SEIAA-

Rough Muniappan, Proceedings TN/F.No. Open Cast- Stone- Pullagoundamp Roc.172/2010 5180/ 1(a)/ 11°28'27"N to 52 M. Sakthivel 0.70.0 2020 - - 29.04.2010 Working - Semi Jelly atty Post, /Mines-B/ Ec.No.3580 77°42'59"E

mechanized 28.4. (Rule-8) Sankari Taluk, dated 29.4.2010 /2016 dated Salem District 16.4.2010. 19.08.2016. S/o.Nallathamb Collector's

i gounder,

Rough Proceedings Peramachipalay Open Cast- Stone- Roc.173/2010 Non- 11°28.'35.67"N 53 N.Venkatesan am Village, 1.00.0 - - 02.06.2010 - No Semi Jelly /Mines-B/ Working to77°42'57.10"E

Thevur Post, mechanized 1.6.2020 (Rule-8) dated 2.6.2010 Sankari Taluk, 16.4.2010. Salem District. DEIAA- S/o.M.Kuppu Collector’s

DIA/TN/MI

Rough samy Proceedings N/5810/20 Open Cast- Stone- 631, Alamara Roc.171/2010 Non- 11°41'54.50"N 54 K.Senthilnathan 1.20.0 - - 03.06.2010 - 17-SLM- Semi Jelly street, / Mines-A/ Working to78°17'37.85"E

mechanized 1.6.2020 2.6.2010 EC.No.10/2 (Rule-8) Kottavadi, dated Attur 16.04.2010 017 dated 31.03.2018

[District Survey Report, Salem District] Page 50

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive / clearance Mining Name of the Mining ….renewal) Working Mining Lease No the Contact No. of Grant order ment of Non- (Yes/No), If (Opencast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Munusam

y gounder, Collector's

Rough 270/1, Nehru Proceedings 11°48'23.19"N Open Cast- Stone- Nagar,Karuma Roc.75/ 2009 Non- 55 M.Dhanraj 2.00.0 - - 14.09.2009 - No to Semi Jelly laikoodal /Mines-A/ Working 77°46'04.30"E mechanized

(Rule-8) Mettur dated 13.9.2019 Dam - 2, 19.5.2009. 14.9.2009 Salem

W/o. S.G. Collector's

SEIAA-

Rough Thangavel, Proceedings TN/F.No. 11°53'35"N Open Cast- Stone- 22, Arthanari Roc.72/ 2009 Non- 56 T.Jayasudha 2.00.0 019 - - 13.7.2009 - 3984/EC/1(a)/2 and Semi Jelly Street, /Mines-A/ Working 845/2015 dated 78°06'43"E to mechanized

(Rule-8) Arisipalayam, dated 12.7.2 13.7.2009 15.2.2016 Salem-9. 18.5.2009.

S/o. Thangavel Collector's

11°38'36"N to

Rough Udaiyar, Kasi Proceedings 11°38'42"N Open Cast- Stone- T.Kasiviswa Nagar, Roc.76/ 2009 Non- 57 2.00.0 - - 19.06.2009 - No and Semi Jelly nathan Masinaickenp /Mines-A/ Working 78°13'48"E to mechanized

(Rule-8) atty, Valapadi dated 17.6.2019 18.6.2009 78°13'56"E Taluk, 19.5.2009. Salem

[District Survey Report, Salem District] Page 51

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environment Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commencem Captive al clearance Mining Name of the Mining ….renewal) Working Mining Lease No the Contact No. of Grant order ent of / Non- (Yes/No), If (Opencast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Subramani

Ramakrishna Collector's

Rough Colony, Proceedings Open Cast- Stone- Pannavadi Roc.74/2009 Non- 11°47'17"N to 58 S.Sakthivel 2.00.0 - - 23.07.2009 - No Semi Jelly Road,Kolathur /Mines-A/ Working 77°45'35"E

mechanized 20.7.2019 (Rule-8) Road, Mettur dated 21.7.2009 Taluk, 19.5.2009. Salem S/o.N.Manick avel,

Collector's

3/54,F-1, Rough Proceedings 11°34'44"N to Poosari Open Cast- Stone- M.Senthil Roc.91/2009 Non- 11°34'50"N and 59 Thottam, 2.02.5 - - 07.10.2009 - No Semi Jelly kumar /Mines-A/ 0.2009 Working 78°09'57"E to

Jagir Amma mechanized 5.10.2019 (Rule-8) dated 6.1 78°10'06"E palayam, 19.05.2009 Salem Taluk, Salem District S/o. Thanda gounder,

91-A, Collector's

Rough Thuttampatty Proceedings Open Cast- Stone- Village & Roc.604/2006 11°52'56.8"N 60 T.Srinivasan 3.00.0 - - 26.05.2009 Working - Yes Semi Jelly Post, Taraman / Mines-A/ to78°06'13.3"E

mechanized 24.5.2019 (Rule-8) galam (Via) dated 25.5.2009 Omalur Taluk, 24.7.2006. Salem District.

[District Survey Report, Salem District] Page 52

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmenta Location of Method of Area of (1st /2nd Non- Sl. Name of Address & Mining Lease (Initial) Commence Captive / l clearance the Mining Mining Name of the Mining ….renewal) Working No the Contact No. of Grant order ment of Non- (Yes/No), If Lease (Opencast/ Lessee Lease /Temp. Mineral Lessee No. & Date Mining Captive yes letter No. (Latitude & Under- (Ha.) Working From To From To Operations with date of Longitude) ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o. K.Sengottaiyan,

Managing Collector's

Rough Partner, Proceedings 11°41'27"N Open Cast- Stone- Suriya Blue Roc.77/2009/ Non- 61 S.Palanivel 3.04.0 - - 24.06.2009 - No and Semi Jelly Metal, 1-52-59, Mines-A/ Working 78°16'32"E mechanized

(Rule-8) Attur Main dated 22.6.2019 Road,Karipatty 19.5.2009. 23.6.2009 Village, Valapadi Taluk

Collector's SEIAA-

Rough S/o. Thangavel, Proceedings TN/F.No.

11°53'46"N Open Cast- Stone- Pagalpatty, Roc.118/2011 3983/EC/1(a)/ 62 T.Gnanavelu 1.00.0 - - 04.05.2011 Working - to Semi Jelly Omalur Taluk, Mines - A/ 2843/2015 78°05'47"E mechanized

(Rule-8) Salem District. dated dated

2.5.2011 1.5.2021 01.3.2011. 15.02.2016.

Collector's

Rough S/o.Murugesan, Proceedings

11°38'30"N Open Cast- Stone- 4/68, Roc.111/2011 Non- 63 M.Ramachandran 0.40.0 - - 03.05.2011 - No to Semi Jelly Sanniyasikundu Mines-A/ Working 78°11'21"E mechanized

(Rule-8) (PO), Salem-15 dated

2.5.2011 1.5.2021 01.3.2011.

[District Survey Report, Salem District] Page 53

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive / clearance Mining Name of the Mining ….renewal) Working Mining Lease No the Contact No. of Grant order ment of Non- (Yes/No), If yes (Opencast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/o. Collector's G.Vadi vel,

Rough Proceedings

168, Open Cast- Stone- Roc.123/2011 11°39'20.11"N to 64 V.Hemaladha E.B.Colony, 0.34.0 - - 03.05.2011 Working - Yes Semi Jelly Mines-A/ 78°16'01.32'21"E Ayothiapattina mechanized

(Rule-8) dated 1.5.2021 m, 2.5.2011 01.3.2011. Salem-106.

Collector's

S/o.Panneer SEIAA-

Rough Proceedings Selvam, 70/16 TN/F.No.4234/ Open Cast- Stone- Roc.214/2012 11°34'31"N to 65 P.Sivakumar 1st Avenue, 0.81.0 - - 15.04.2012 Working - 1(a)/Ec.No.336 Semi Jelly Mines-A/ 78°09'54"E Ashok Nagar, 9/2016 dated mechanized

(Rule-8) dated 13.4.2022 Chennai-83 14.4.2012 19.07.2016. 05.4.2012.

S/o.Chinnusa Collector's

Rough my, 6/14, Proceedings Open Cast- Stone- Cuddalore Roc.210/2012 Non- 66 C.Kumar 0.40.0 - - 24.04.2012 - No - Semi Jelly Main Road, Mines-A/ Working mechanized

(Rule-8) Ammapet, dated 22.4.2022 Salem-3. 05.4.2012. 23.4.2012

S/o.A.Kandas Collector's

Rough amy, Proceedings Open Cast- Stone- Mettupatty, Roc.220/2012 Non- 11°51'51"N and 67 K.Ravikumar 0.40.5 - - 25.04.2012 - Yes Semi Jelly Kullmanaicke Mines-A/ Working 77°59'07"E mechanized

(Rule-8) npatty, dated 22.4.2022 Omalur 05.4.2012. 23.4.2012

[District Survey Report, Salem District] Page 54

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Area of Lease (1st /2nd Non- Location of the Method of Sl. Name of Address & Mining Lease Commence Captive / clearance Name of the Mining (Initial) ….renewal) Working Mining Lease Mining(Open No the Contact No. of Grant order ment of Non- (Yes/No), If yes Lessee Lease /Temp. (Latitude & cast/ Under- Mineral Lessee No. & Date Mining Captive letter No. with (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.A.Kandas SEIAA-

Collector's

Rough amy, TN/F.No.4652/ Proceedings Open Cast- Stone- K.Vijaya Mettupatty, 1(a)/Ec.No. 11°51'47"N and 67 Roc.220/2012 0.40.5 - - 24.04.2012 Working - Jelly kumar Kullmanaicke 3592 /2016 77°59'04"E Semi Mines-A/ dated

(Rule-8) npatty, dated mechanized 22.4.2022 05.4.2012. 23.4.2012 Omalur 19.08.2016.

DEIAA-

S/o.Ramasam Collector's DIA/TN/MIN/

Rough y gounder, Proceedings 61539/2017- Open Cast- Stone- 11°48'21"N 69 R.Yogaraj 1/12, Andavar Roc.219/2012 1.50.0 - - 23.04.2012 Working - SLM- Jelly to77°46'04"E Semi Illam,Koilpala Mines-A/ dated EC.No.79/

(Rule-8) mechanized 22.4.2022 yam, Mettur 05.4.2012. 23.4.2012 2018 dated: 07.12.2018

S/o.A.Chandra N11037’03.45

Collector's 0

Rough n, 5/144, to 11 37’05.60 Proceedings Open Cast- Stone- C.Saravana Kalaiamman Non- and 70 Roc.208/2012 0.50.0 - - 15.05.2012 - No Jelly kumar Koil Street, Working Semi Mines-A/ dated

(Rule-8) Nilavarapatty, E 78010’00.03 mechanized 12.5.2022 05.4.2012. 13.5.2012 Salem to 78010’02.92

S/o.Palaniapp Collector's SEIAA-

Rough an, 3/63, Proceedings TN/F.No.4589/ 11°37’31.76”N Open Cast- Stone- P.Kanda Varadanadar 71 Roc.207/2012 0.40.5 - - 14.05.2012 Working - 1(a)/Ec.No.360 and Semi Jelly samy Thottam, Mines-A/ dated 5 /2016 dated 78°10’14.50”E

(Rule-8) Erumapalaya mechanized 12.5.200

05.4.2012. 13.5.2012 24.08.2016. m, Salem

[District Survey Report, Salem District] Page 55

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive clearance Mining Name of the Mining ….renewal) Working Mining Lease No the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Pacha Collector’s

muthu 5/144, Rough Proceedings Irusayee Open Cast- Stone- Roc.209/2012 72 P.Sasthiri Ammankoil 0.50.0 - - 03.06.2012 Non- - No - Semi Jelly Mines-A/

street, Working mechanized 1.6.2012 (Rule-8) dated 31.5.2022 Nilavarapatty, 05.4.2012. Salem S/o.Chandrase DEIAA-

karan, No.2/1 Collector’s DIA/TN/MIN

Rough Chinna Proceedings /8470/2017- 0 11 39’23.13’’ Open Cast- Stone- goundapuram, Roc.367/2017 73 C.Vijayakumar 1.50.0 - - 08.01.2018 Working - SLM- Semi Jelly Ramalingapur Mines-A/ N

EC.No.07/201 0 mechanized 6.1.2023 7.1.2018 78 16’15.96’’E (Rule-8) am Post, dated 7 dated Valapady 07.12.2017 13.11.2017 Taluk, Salem S/o.Balan, Sri Rajaganapathy Blue Metal, Collector’s DEIAA-

No.31-1/24A, Proceedings DIA/TN/MIN 0

Rough N11 37’50.32 VPR Roc.65/2018 /14162/2018- 0 Open Cast- Stone- to 11 37’57.01 74 B.Pandidurai Apartments, Mines-A/ 2.00.0 - - 09.01.2018 Working - Semi Jelly SLM- 0

5th cross, dated E78 10’56.85 mechanized 6.1.2028 7.1.2018 EC.No.07/201 (Rule-8) to 78011’04.02 Narayana 19.5.2009 and 8 dated 19 Nagar, 1.7.2018 .05.2018 Kitchipalayam Salem-15

[District Survey Report, Salem District] Page 56

Period of Period of Status Mining Mining lease (Working Obtained Lease (1st /2nd Date of / Non- Environmental Method of Sl Area of Location of the Name of Address & Mining Lease (Initial) ….renewal) Commence Working Captive clearance Mining N Name of the Mining Mining Lease the Contact No. of Grant order ment of /Temp. / Non- (Yes/No), If yes (Opencast/ o Lessee Lease (Latitude & Mineral Lessee No. & Date Mining Working Captive letter No. with Under- (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/o. DEIAA- 0

Collector’s N11 53’49.15

Karthikeyan, DIA/TN/MIN/ Rough Proceedings to No.2/69, 13775/2018- Open Cast- Stone- Roc.78/ 11053’57.32 75 K.Jayalakshmi Thottiyankadu 1.00.0 - - 17.07.2018 Working - SLM- Semi Jelly 2008/Mines- E78005’26.23

Parapatty EC.No.03/2018 mechanized 14.7.2028 (Rule-8) A dated 15.7.2018 to Post, Mallur, dated 15.07.2018. 78004’32.81 Salem-203. 17 .05.2018 S/o.Palanisam DEIAA- 0

y, No.2/48, Collector’s N11 34’46.07

DIA/TN/MIN/ Rough Mettukadu, Proceedings ” to 14922/2018- Open Cast- Stone- Santhiyur, Roc.77/ 11034’41.63” 76 P.Sivanandham 1.00.0 - - 16.07.2018 Working - SLM- Semi Jelly S.Attaiyampat 2008/Mines- E78008’09.97

EC.No.20/2018 mechanized 14.7.2028 (Rule-8) ty Post, A dated 15.7.2018 ” to dated Salem-636 15.07.2018 78008’06.22” 203 10.06.2018 DEIAA- S/o.M.Parama 0

Collector’s DIA/TN/MIN/ N11 35’00.30

sivam, Rough Proceedings 14921/2018- to No.83/1, Open Cast- Stone- Roc.76/ SLM- 11035’06.52 77 P.Vimalan Ramakrishna 2.16.0 - - 17.07.2018 Working - Semi Jelly 2008/Mines- 0

Road, EC.No.14/2018 E78 09’20.34 mechanized 15.7.2023 (Rule-8) A dated 16.7.2018 Salem-636 dated to 16.07.2018 0 007 10.06.2018 78 09’24.87

[District Survey Report, Salem District] Page 57

Period of Status Period of Mining lease (Working Obtained Mining Lease (1st /2nd Date of / Non- Environmental Method of Area of (Initial) Location of the Sl. Name of Address & Mining Lease ….renewal) Commence Working Captive clearance Mining Name of the Mining Mining Lease No the Contact No. of Grant order ment of /Temp. / Non- (Yes/No), If yes (Opencast/ Lessee Lease (Latitude & Mineral Lessee No. & Date Mining Working Captive letter No. with Under- (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Kuppusam y, No.315, 0 Collector’s DEIAA- N11 35’16.49

Vallalar

Rough Proceedings DIA/TN/MIN/1 ” to Nagar, Open Cast- Stone- K.Mani Roc.75/ 5225/2018- 11035’11.90” 78 Ayyanthiruma 1.50.0 - - 11.08.2018 Working - Semi Jelly vannan 2008/Mines- 0

ligai, SLM- E78 09’20.79 mechanized 8.8.2023 (Rule-8) A dated 9.8.2018 Kannankurichi EC.No.24/2018 ” to 09.08.2018 0 Post, Salem- dated10.06.2018 78 09’15.40” 636 008. S/o.Selvam, No.51/1- DEIAA- 0 Collector’s N11 37’48.37

154D, DIA/TN/MIN/1

Rough Proceedings ” to Erumapalaya 4973/2018- 0 Open Cast- Stone- S.Satheesh Roc.73/ 11 37’49.75” 79 m Main Road, 1.00.0 - - 10.08.2010 Working - SLM- Semi Jelly kumar 2008/Mines- 0

Seelanickenpa E78 10’40.35 mechanized 8.8.2023 9.8.2018 EC.No.17/2018 (Rule-8) A dated ” to ttti, Uthukadu, dated 09.08.2018 78010’48.60” Salem-636 10.06.2018 201 DEIAA- 0

W/o.Rajkumar Collector’s DIA/TN/MIN/1 N11 37’43.77

Rough , No.89A, Proceedings 4970/2018- to Open Cast- Stone- Kollapatty, Roc.72/ SLM- 11037’50.25 80 A.Sivagami 1.50.0 - - 24.07.2018 Working - Semi Jelly Karuppur 2008/Mines- 0

EC.No.16/2018 E78 10’37.61 mechanized 22.7.2023 (Rule-8) Post, Omalur A dated 23.7.2018 dated to Taluk, Salem. 09.08.2018 05.06.2018 78010’44.11

[District Survey Report, Salem District] Page 58

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Sl Area of (1st /2nd Non- Location of the Name of Address & Mining Lease (Initial) Commence Captive clearance Mining N Name of the Mining ….renewal) Working Mining Lease the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ o Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/o. DEIAA-

Collector’s

Mahadevan, DIA/TN/MIN/1 Rough Proceedings N11033’27.53 D.No.348-9, 8523/2018- Open Cast- Stone- M.Gowri Roc.79/ to 11033’30.05 81 South street, 3 1.00.0 - - 23.10.2018 Working - SLM-EC.No. Semi Jelly puni thavathy 2008/Mines- E78005’54.46

Roads, 46/2018 0 mechanized 18.10.2023 (Rule-8) A dated 19.10.2018 to 78 05’59.16 Salem -636 dated 19.10.2018 009. 05.12.2018 DEIAA-

Collector’s DIA/TN/MIN/

S/o.Shan Rough Proceedings 15286/2018- N11030’39.03” mugam, No.1, Open Cast- Stone- S.Mohan Roc.88/ SLM- to 11030’43.36” 82 1st street, 1.50.0 - - 20.10.2018 Working - Semi Jelly kumar 2008/Mines- EC.No.28/2018 E78036’14.56”

A.S.Pettai, 0 mechanized 18.10.2028 (Rule-8) A dated 19.10.2018 dated to 78 36’19.10” Namakkal-1. 19.10.2018 10.06.2018

S/o.Kuppusam y, No.11, Ponnga Nagar, DEIAA-

rd Collector’s

3 East Street, DIA/TN/MIN/ Rough Proceedings N11041’33.18” Sothupakkam, 15255/2018- Open Cast- Stone- Roc.70/ to 11041’40.25” 83 K.Arjunan Melmaru 4.90.0 - - 22.10.2018 Working - SLM- Semi Jelly 2008/Mines- E78016’37.61”

vathur post, EC.No.26/2018 0 mechanized 20.10.2028 (Rule-8) A dated 21.10.2018 to 78 16’42.21” dated 21.10.2018 Taluk, 10.06.2018 - 603 319

[District Survey Report, Salem District] Page 59

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Area of Lease (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease Commence Captive clearance Mining Name of the Mining (Initial) ….renewal) Working Mining Lease No the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Kaligound er, No.8/416- Collector’s

DEIAA- 0

Rough 5, Thillai Proceedings N11 34’25.09 DIA/TN/MIN/151 Open Cast- Stone- nagar, Trichy Roc.71/ 2008/ to 11034’29.24 84 K.Prakash 1.00.0 - - 22.10.2018 Working - 90/2018-SLM- Semi Jelly main road, Mines-A E78009’47.85 EC.No.15/2018 mechanized (Rule-8) Vasanthapura dated to 78009’51.10

dated 10.06.2018 18.10.2028 m Post, 19.10.2018 19.10.2018 Namakkal-1.

S/o.Nallagoun der, Collector’s

DEIAA- 0

Rough No.5/41A, Proceedings N11 33’05.06” DIA/TN/MIN/152 Open Cast- Stone- Elayappa Roc.86/ to 11033’10.85” 85 N.Sellamuthu 1.50.0 - - 20.10.2018 Working - 08/2018-SLM- Semi Jelly Nagar, 2008/Mines- E78028’38.14” EC.No.25/2018 mechanized (Rule-8) Suramangala A dated to 78028’43.45”

dated 10,06.2018 18.10.2023 m Post, 19.10.2018 19.10.2018 Salem-5

S/o.Pachiappa gounder, DEIAA- st Collector’s

No.252,1 DIA/TN/MIN/154 0

Rough Proceedings N11 31’09.49” cross street, 40/2018-SLM- Open Cast- Stone- Roc.90/ to 11031’14.61” 86 P.Jayaraj Periyasamy 1.00.0 - - 27.11.2018 Working - EC.No.32/2018 Semi Jelly 2018/Mines- E77054’22.66”

Nagar, 11.2018 dated 10.06.2018 mechanized (Rule-8) A dated to 77054’25.87”

Alagapuram 24.11.2028 25.11.2018 25. pudhur, Salem-16.

[District Survey Report, Salem District] Page 60

Period of Period of Status Mining Mining lease (Working Obtained Lease (1st /2nd Date of / Non- Environmental Method of Sl Mining Area of Location of the Name of Address & (Initial) ….renewal) Commencem Working Captive clearance Mining(Ope N Name of the Lease Grant Mining Mining Lease the Contact No. of ent of /Temp. / Non- (Yes/No), If yes ncast/ o Lessee order No. & Lease (Latitude & Mineral Lessee Mining Working Captive letter No. with Under- Date (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.M.Selladu rai, Door DEIAA-

Collector’s

No.4/287, DIA/TN/MIN/1 0

Rough Proceedings 18 N11 33’02.30” Merkukadu, 5189/2018- Open Cast- Stone- Roc.87/ to 11032’09.49” 87 S.Suresh Kanda 2.00.0 - - 27.11.2018 Working - SLM- Semi Jelly 2018/Mines- E78028’32.72”

samypudur, EC.No.19/2018 0 mechanized 24.11.2023 (Rule-8) A dated 25.11.20 to 78 28’38.39 Arasanatham, dated 25.11.2018 Attur Taluk, 10.06.2018 Salem-107 DEIAA- S/o.Jagadee Collector’s

DIA/TN/MIN/1

Rough san, No.101B, Proceedings N11041’33.18” 5223/2018- Open Cast- Stone- Kasipadaiya Roc.82/ to 11041’40.25” 88 J.J.Srinivasan 1.50.0 - - 08.01.2019 Working - SLM-EC.No. Semi Jelly chi Street, 2018/Mines- E78016’37.61”

23/2018 dated mechanized 5.1.2029 (Rule-8) Valapady, A dated 6.1.2019 to 78016’42.21” 10.06.2018 Salem-115. 06.01.2019

A.Arun Aravind, S/o.M.A.Aras DEIAA-

endran, Collector’s DIA/TN/MIN/1

Rough No.426/3, Proceedings 5207/2018- N11038’19.57” Open Cast- Stone- Vaas Ziegal Thengalkadu, Roc.74/ SLM- to 11038’13.88” 89 1.00.0 - - 12.02.2019 Working - Semi Jelly Blocks Erumapalaya 2018/Mines- EC.No.18/2018 E78011’56.57” mechanized

9.1.2029 0 (Rule-8) m Village, A dated 10.2.2019 dated to 78 11’54.22” Kandashram 10.02.2019 10.06.2018 Backside, Udayapatti, Salem-140

[District Survey Report, Salem District] Page 61

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Location of Method of Mining Area of (1st /2nd Non- Sl. Name of Address & (Initial) Commence Captive clearance the Mining Mining Name of the Lease Grant Mining ….renewal) Working No the Contact No. of ment of / Non- (Yes/No), If yes Lease (Opencast/ Lessee order No. & Lease /Temp. Mineral Lessee Mining Captive letter No. with (Latitude & Under- Date (Ha.) Working From To From To Operations date of grant of Longitude) ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.G.Muthus DEIAA- Collector’s

amy, Tvl.SRC DIA/TN/MIN/1 Rough Proceedings N11035’04.96 Projects Pvt. 8386/2018- Open Cast- Stone- M.Parama Roc.563/ to 11035’12.20 90 Ltd, NO.4-B, 3.00.0 - - 12.05.2019 Working - SLM- Semi Jelly sivam 2018/Mines- E78009’19.08 Lakshmi EC.No.44/2018 mechanized

9.1.2024 0 (Rule-8) A dated 10.5.2019 to 78 09’25.09 puram, Gandhi dated 10.02.2019 road, Salem-7 05.12.2018 S/o.Muthuling DEIAA- am, No.6/57,

Collector’s DIA/TN/MIN/1

Mottur Road, Rough Proceedings 5301/2018- N11030’35.86 Sommampatti, Open Cast- Stone- M.Koteeshwara Roc.89/ SLM- to11030’39.87 91 Vilarippalaya 1.00.0 - - 18.02.2019 Working - Semi Jelly muthu 2018/Mines- EC.No.35/2018 E78036’19.00

m Post, 0 mechanized 16.2.2029 (Rule-8) A dated 17.2.2019 dated to78 36’23.40 Valapady 17.02.2019 05.12.2018 Post, Salem-

15 DEIAA-

Collector’s

S/o.Sivakumar DIA/TN/MIN/1 Rough Proceedings N11032’58.43 , No.1/2/19-1, 9048/2018- Open Cast- Stone- S.Sri Balaji Roc.558/ to11033’01.59 92 Parapatti, 1.50.0 - - 27.02.2019 Working - SLM- Semi Jelly Sugumar 2018/Mines- E78009’51.87

Salem Taluk, EC.No.69/2018 0 mechanized 24.2.2029 (Rule-8) A dated 25.2.2019 to78 09’57.82 Salem-203. dated 25.02.2019 05.12.2018 DEIAA-

W/o.Palaniappan Collector’s

DIA/TN/MIN/1 Rough , No.34/9-53B, Proceedings N11034’35.70 19 8836/2018- Open Cast- Stone- Kanchinagar, Roc.561/ to11034’41.13 93 P.Lakshmi Dhasanaikkanpa 1.00.0 28.02.2019 Working - SLM- 0 Semi

Jelly 2018/Mines- .2.2024 E78 08’22.50

tti, Seelanai EC.No.62/2018 0 mechanized 25 (Rule-8) A dated 26.2.20 to78 08’25.45 kanpatti, Salem- dated: 26.02.2019 201. 07.12.2018

[District Survey Report, Salem District] Page 62

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Sl Mining Area of Lease (1st /2nd Non- Location of the Name of Address & Commence Captive / clearance Mining N Name of the Lease Mining (Initial) ….renewal) Working Mining Lease the Contact No. ment of Non- (Yes/No), If yes (Opencast/ o Lessee Grant order Lease /Temp. (Latitude & Mineral of Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Kanda samy, 4- Collector’s

207/4-69A, DEIAA- 0

Rough Proceeding N11 37’18.38 Perumal DIA/TN/MIN/188 Open Cast- Stone- s Roc.559/ to11037’23.96 94 O.K.Kumar kovil karadu, 1.35.0 - - 28.02.2019 Working - 24/2018-SLM- Semi Jelly 2018/Mines E78010’12.34 Ettimara EC.No.55/2018 mechanized

(Rule-8) -A dated to78010’15.95 25.2.2029 kkadu 26.2.2019 dated 05.12.2018 26.02.2019 Erumapalaya m, Salem-6.

S/o.Ayyamp DEIAA- erumal, Proceeding DIA/TN/MIN/187

Rough No.4/4, N11054’54.45

s Roc.578/ 54/2018-SLM- Open Cast- Stone- Chinneri to11054’58.18 95 A.Manickam 2018/Mines 1.00.0 - - 09.03.2019 Working - EC.No.54/2018 Semi Jelly vayalkadu, E78006’38.61 -A dated dated 05.12.2018 mechanized

(Rule-8) Pallapatti, to78006’44.47 7.3.2029 08.03.2019. 8.3.2019 Leebazar,

Salem-9.

S/o.Rajaraja n, No.270/1, Proceeding DEIAA-

Rough Ammasigoun N11050’45.61

s Roc.587/ DIA/TN/MIN/186 Open Cast- Stone- der street, to11050’50.15 96 R.Rajesh 2018/Mines 1.00.0 - - 09.03.2019 Working - 59/2018-SLM- Semi Jelly Chinnapudur E78002’36.45 -A dated EC.No.50/2018 mechanized

(Rule-8) Hasthampatti to78002’41.32 7.3.2029 08.03.2019. 8.3.2019 dated 05.12.2018 Salem-636 007.

[District Survey Report, Salem District] Page 63

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease No the Contact No. of ment of / Non- (Yes/No), If yes (Opencast/ Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Arthanari,

No.316-195A, Proceeding DEIAA-

Rough N11052’03.05 Mariyamman s Roc.571/ DIA/TN/MIN/191 Open Cast- Stone- to11052’08.13 97 A.Sellamuthu kovil street, 2018/Mines 0.92.0 - - 09.03.2019 Working - 37/2018-SLM- Semi Jelly E77059’06.69

Omalur Taluk, -A dated EC.No.71/2018 mechanized 7.3.2029 (Rule-8) 8.3.2019 to77059’10.77 Salem-636 08.03.2019. dated: 07.12.2018 306. S/o.Sengodag ounder, No.2/150, DEIAA-

Proceeding

Rough Thinnapatti DIA/TN/MIN/190 N11053’05.11 s Roc.583/ Open Cast- Stone- S.Sekar kattuvalavu, 14/2018-SLM- to11053’12.87 98 2018/Mines 2.85.5 - - 08.03.2019 Working - Semi Jelly Ku.Kuttapatti, EC.No.64/2018 E78004’49.64

-A dated mechanized 6.3.2029 (Rule-8) Thinnapatti, 7.3.2019 dated 05.12.2018 to78004’57.30 07.03.2019. Kadayampatti, Salem-636 305 W/o.R.Gopal, B-1,

Brindhavan Proceeding DEIAA-

Rough N11051’17.15 Apartment, s Roc.582/ DIA/TN/MIN/ 0 Open Cast-

Stone- 029 to11 51’25.20 99 G.Samarasam Southeast 2018/Mines 3.93.5 - - 03.03.2019 Working - 19073/2018-SLM- Semi Jelly E78005’27.05

Layout, -A dated EC.No.66/2018 mechanized 1.3.2 (Rule-8) 2.3.2019 to78005’36.67 Brindhavan 02.03.2019. dated 05.12.2018 Road, Salem- 636 004.

[District Survey Report, Salem District] Page 64

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commencem Captive clearance Mining(Op Name of the Mining ….renewal) Working Mining Lease No the Contact No. of Grant order ent of / Non- (Yes/No), If yes encast/ Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Thangavel u, S2, Green house DEIAA- apartments,

Proceedings DIA/TN/MIN/1

Rough Thiruvalluvar N11053’45.36 Roc.577/ 8967/2018- Open Cast- Stone- T.Muruga Street, to 11053’52.13 100 2018/Mines- 1.50.0 - - Working - SLM- Semi Jelly manickam Subramniya 06.03.2019 E78005’43.57

A dated EC.No.63/2018 0 mechanized 4.3.2029 (Rule-8) Nagar, 5.3.2019 to 78 05’49.119 05.03.2019. dated Suramangala 05.12.2018 m Post, Salem-636 005.

S/o.Umasanka DEIAA-

r, No.1/2- Proceedings DIA/TN/MIN/1 Rough N11034’19.32 112/10, Roc.565/ 8692/2018- Open Cast- Stone- to11034’24.48 101 U.Karikalan Solaigounderk 2018/Mines- 1.00.0 - - 09.03.2019 Working - SLM- Semi Jelly E78006’56.65

adu, Parapatti, A dated EC.No.56/2018 mechanized 7.3.2024 (Rule-8) 8.3.2019 to78007’00.16 Salem-636 08.03.2019. dated 203 05.12.2018 W/o.Mathava DEIAA- kannan, DIA/TN/MIN/1

Proceedings

Rough No.62-D-30, 8952/2018- N11037’43.28 Roc.560/ Open Cast- Stone- Thandan SLM- to11037’48.31 102 S.Jothi 2018/Mines- 1.00.0 - - 09.03.2019 Working - Semi Jelly street, EC.No.59/2018 E78010’47.84

A dated mechanized 7.3.2024 (Rule-8) Shevapet, 8.3.2019 dated: to78010’50.04 08.03.2019. Salem-636 07.12.2018 006.

[District Survey Report, Salem District] Page 65

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Location of Sl. Mining Area of (1st /2nd Non- Method of Name of Address & (Initial) Commence Captive clearance the Mining No Name of the Lease Grant Mining ….renewal) Working Mining the Contact No. of ment of / Non- (Yes/No), If yes Lease Lessee order No. & Lease /Temp. (Opencast/Un Mineral Lessee Mining Captive letter No. with (Latitude Date (Ha.) Working derground) From To From To Operations date of grant of &Longitude) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Raju,

D.No.4/593, Proceedings DEIAA- N11052’23.49

Rough Anna Nagar, Roc.588/ DIA/TN/MIN/185 to 11052’29.72 Open Cast- Stone- 103 R.Sankar Panakattur, 2018/Mines- 1.00.0 - - 11.03.20199 Working - 38/2018-SLM- E78002’15.40 Semi Jelly

Panjukalipatty, A dated EC.No.47/2018 to mechanized 8.3.2024 (Rule-8) 9.3.2019 Omalur Taluk, 09.03.2019. dated 05.12.2018 78002’119.69 Salem-636 455.

S/o.Andiyappan Proceedings DEIAA-

Rough N11051’51.71 No.3/68, Roc.569/ DIA/TN/MIN/186 Open Cast- Stone- to11051’55.35 104 A.Kandasamy Mettupatti, 2018/Mines- 0.45.0 - - 12.03.2019 Working - 63/2018-SLM- Semi Jelly E77059’09.40

Kottamettupatti A dated EC.No.51/2018 0 mechanized 8.3.2029 (Rule-8) 9.3.2019 to77 59’11.45 Salem-636 455. 09.03.2019. dated 05.12.2018

S/o.Andiyappan Proceedings DEIAA-

Rough N11051’44.16 No.3/68, Roc.570/ DIA/TN/MIN/186 Open Cast- Stone- to11051’50.40 105 A.Kandasamy Mettupatti, 2018/Mines- 1.00.0 - - 10.03.2019 Working - 57/2018-SLM- Semi Jelly E78059’08.64

Kottamettupatti A dated EC.No.52/2018 0 mechanized 8.3.2029 (Rule-8) 9.3.2019 to77 59’13.02 Salem-636 455. 09.03.2019. dated 05.12.2018 S/o.Venkatacha

llam, No.6/251, Proceedings DEIAA-

Rough N11051’43.61 Deevattipatti Roc.581/ DIA/TN/MIN/191 Open Cast- Stone- to11051’48.73 106 V.Vadivelu Post, 2018/Mines- 1.00.0 - - 08.03.2019 Working - 06/2018-SLM- Semi Jelly E78005’22.26

Kadayampatti A dated EC.No. 70/ 2018 mechanized 6.3.2029 (Rule-8) 7.3.2019 to78005’26.33 Taluk, Salem- 07.03.2019. dated: 07.12.2018 636 351.

[District Survey Report, Salem District] Page 66

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Location of Area of (1st /2nd Non- Method of Sl. Name of Address & Mining Lease (Initial) Commence Captive clearance the Mining Name of the Mining ….renewal) Working Mining(Open No the Contact No. of Grant order ment of / Non- (Yes/No), If yes Lease Lessee Lease /Temp. cast/ Under- Mineral Lessee No. & Date Mining Captive letter No. with (Latitude & (Ha.) Working ground) From To From To Operations date of grant of Longitude) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S/o.Sellappag DEIAA- ounder,

Proceedings DIA/TN/MIN/1

Rough 8-1-10, N11047’22.08 Roc.572/ 8991/2018- Open Cast- Stone- Ramakrishna to11047’27.22 107 S.Subramani 2018/Mines- 1.00.0 - - 10.03.2019 Working - SLM- Semi Jelly colony, E78045’36.17

A dated EC.No.68/2018 mechanized 7.3.2029 (Rule-8) Kolathur Post, 8.3.2019 to77045’40.53 08.03.2019. dated: Mettur Taluk, 07.12.2018 Salem- 303. S/o.Venkatach DEIAA- allam, No.69,

Proceedings DIA/TN/MIN/1

Rough Vedappankatt N11053’30.19 Roc.586/ 9055/2018- Open Cast- Stone- V.Ramesh uvalasu, to11053’35.39 108 2018/Mines- 1.00.0 - - 07.03.2019 Working - SLM- Semi Jelly kumar. Deevattipatti, E78005’33.66

A dated EC.No.67/2018 mechanized 5.3.2024 (Rule-8) Kadayampatti 6.3.2019 to78005’38.09 06.03.2019. dated Taluk, Salem- 05.12.2018 636 351 W/o.Elan govan, DEIAA- No.3/4-33,

Proceedings DIA/TN/MIN/1

Rough Seperumal N11054’40.53 Roc.579/ 8642/2018- Open Cast- Stone- kottai to 11054’45.05 109 E.Devi 2018/Mines- 1.00.0 - - 10.03.2019 Working - SLM- Semi Jelly Kanjanaicken E78006’34.49

A dated EC.No.49/2018 mechanized 8.3.2029 (Rule-8) patti, 9.3.2019 to 78006’39.21 09.03.2019 dated : Kadayampatti 05.12.2018 Taluk, Salem- 636 305.

[District Survey Report, Salem District] Page 67

10. Details of Revenue received in last three years 2016-17 to 2018-19 (Roughstone) (in Rs.)

SL.

NO

SEP BID

JAN FEB

OCT DEC

AUG NOV

MAY

JUNE JULY

YEAR

APRIL

LEASE

TOTAL

MARCH

AMOUNT

AMOUNT /

17

415 335 755 325 150 075 650 950 130 350 630 255 000

-

, , , , , , , , , , , , ,

1

28 34 09 37 53 24 55 58 30 73 61 23 50

, , , , , , , , , , , , ,

2016

24 25 35 26 22 38 25 34 21 28 30 44 27

3,84,40,020

000

18

,

615 250 125 625 500 525 525 275 655 040 160

-

, , , , , , , , , , ,

375

,

2

33

,

89 82 66 39 29 17 74 54 11 35 64

, , , , , , , , , , ,

49

,

71

2017

7

,

18 27 34 29 37 26 31 31 36 44 45

8

12,42,46,670

000

,

19

730 700 240 915 890 251 040 660 025 655 675 300

-

, , , , , , , , , , , ,

25

3

,

10 38 68 45 68 55 70 57 68 11 39 27

, , , , , , , , , , , ,

10

,

2018

22 18 19 25 26 21 28 27 22 30 29 32

13 16,14,87,081

771

,

73

,

Total

41

,

,22,14,715

53,88,520 65,62,650 82,60,245 86,49,365 78,61,655 97,08,826 80,43,215 93,91,135 75,52,430 94,96,660

10,436,345

1

22,09,08,000 32

[District Survey Report, Salem District] Page 68

11. Details of Production of Minor Minerals in the last three years (2016-17 to 2018-19) (Roughstone) (in Cubic Meter)

SL. YEAR APRIL MAY JUNE JULY AUG SEP OCT NOV DEC JAN FEB MARCH TOTAL NO

1. 2016-17 53,965 56,319 77,995 19,536 44,895 64,320 61,500 72,090 69,822 51,865 52,155 79,140 7,03,872

2. 2017-18 48,379 50,667 65,100 68,295 71,925 71,400 73,095 70,845 70,395 61,214 69,395 75,963 7,96,673

3. 2018-19 39,045 33,150 33,510 42,285 43,843 36,120 45,360 46,740 39,600 50,595 49,521 54,996 5,14,764

Total 1,41,389 1,40,136 1,76,605 1,30,116 1,60,663 1,71,840 1,79,955 1,89,675 1,79,817 1,63,674 1,71,071 2,10,099 20,15,309

[District Survey Report, Salem District] Page 69

12. Mineral Map of the District

[District Survey Report, Salem District] Page 70

13. List of Letter of Intent (LOI) holders in Salem District along with its validity as per the following format

Area of Use mining Location of the Sl. Name of the Address & contact No. of letter Letter of Intent Grant Validity of (Captive/ Name of the lessee lease to be Mining lease (Latitude No Mineral of Intent holder order No. & date LOI Non- allotted & Longitude) captive) (Ha) 1 2 3 4 5 6 7 8 9 S/o.K.Chandra mohan, No.23/12, Sri Krishna 0 Rc.No.589/2018/ N11 30’45.45 o kudil Apartment, Non- 11030’49.97 1. Roughstone Thiru. C.Adharsh Mines-A dated 2.51.5 - 0 Highways Colony, Salem- captive E77 50’34.38 to 27.01.2019 0 636 005 77 50’44.01 Cell No:94432-52403

S/o.Rajigounder, 0 Rc.No.337/2017/ N11 51’33.90 o Gopinathapuram Village, Non- 11051’39.27 2. Roughstone ThiruR.Sadasivam Mines-A dated 1.00.0 - 0 Sakkarachettipatty Post, captive E78 02’20.50 to 05.12.2018 0 Omalur Taluk, Salem 78 02’25.18

S/o Chinnayagounder, 3/39, Kanakkupillai Rc.No.145/2018/ Non- N 11056’53.84 to 3. Roughstone Thiru.C.Rathinam Street, Alagapuram, Mines-A dated 1.21.0 - 0 captive E 78 7’46.18 Salem 15.11.2018 Cell No.99949-55327

[District Survey Report, Salem District] Page 71

Area of Use Location of the mining Sl. Name of the Address & contact no. of Letter of Intent Grant Validity (Captive/ Mining lease Name of the lessee lease to be No Mineral letter of Intent holder order No. & date of LOI Non- (Latitude & allotted captive) Longitude) (Ha) 1 2 3 4 5 6 7 8 9 W/o Rathinam, 1/42 A, 0 Mukkanur Post, Rc.No.369/2018/ N11 52’16.51 o Roughstone/ Non- 11052’21.43 4. Tmt. Thilagavathy Kadayampatty Taluk, Mines-A dated 1.67.5 - 0 Gravel captive E78 02’58.04 to Salem. 05.12.2018 78003’04.98 Cell No:93600-59703

S/o Manimohan, Mel Rc.No.03/2018/ Roughstone/ veethi, Nadupatty Post, Non- 5. Thiru. M. Raghuram Mines-A dated 1.21.5 - - earth Kadayampatty taluk, captive 26.05.2018 Salem District

[District Survey Report, Salem District] Page 72

14. Total Reserve available in the district: (Roughstone)

Period of Period of Obtained Status Mining Mining lease Date of Environmental Method of Mining Area of (Working / Location of the Sl. Name of Address & Lease (1st /2nd Commence Captive clearance Mining Name of the Lease Mining Non-Working Mining Lease No the Contact No. of (Initial) ….renewal) ment of / Non- (Yes/No), If (Opencast/ Resources in Lessee Grant order Lease /Temp. (Latitude & Cubic Meter Mineral Lessee Mining Captive yes letter No. Under- No. & Date (Ha.) Working for Longitude) From To From To Operations with date of ground) dispatch etc.,) grant of EC. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Collector’s S/o.Andiappa SEIAA-

Proceeding

Rough gounder, TN/F.No. Roc.310/ 11°48'54.78"N Open Cast- Stone- D.No.12/46, 1923/EC- 1 A.Manickam 2013/ 0.50.0 - - 15.07.2014 Working - to Semi Jelly Desai Nagar, 1(a)/1265/ Mines-A/ 78°49'25.89"E

(Rule-19) P.N.Patty, 2013 dated mechanized

59,848 14.7.2019 dated 15.7.2014 Mettur Dam, 15.07.2014 12.05.2014.

S/o.Anaigaou

nder, Collector’s SEIAA-

Rough Anaigounder Proceeding TN/F.No.1906 Open Cast- Stone- valavu, New Roc.216/20 /EC-1(a)/ 11°45'49"N to 2 A.Selvakumar 0.82.0 - - 16.07.2014 Working - Semi Jelly 5th, 13/ Mines- 1264/ 2013 77°58'25"E

(Rule-19) Tharamangala A/ dated dated mechanized

29,438 14.7.2019 m, Omalur, 15.07.2014 15.7.2014 13.05.2014. Salem

10°27'23.74"N

Collector’s SEIAA-

S/o.Thangavel to

Rough Proceeding TN/F.No.2135 Open Cast- , Pagalpatty 10°27'23.76"N and Stone- Roc.214/20 / EC-1(a)/ 3 T.Gnanvelu Village, 3.68.5 - - 17.07.2014 Non-Working - and Semi Jelly 13/ Mines- 1288/2014 Omalur Taluk, 78°45'.11.05"E

(Rule-19) A/ dated dated mechanized 14.7.2019 Salem 15.7.2014 to

15.07.2014 20.05.2014. Roughstone

78°45'.15.04"E 1,24,129 Gravel 21,676

[District Survey Report, Salem District] Page 73

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Sl Mining Area of (1st /2nd Non- Location of the Method of Name of Address & (Initial) Commence Captive clearance N Name of the Lease Mining ….renewal) Working Mining Lease Mining(Open Resources the Contact No. of ment of / Non- (Yes/No), If yes in Cubic o Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Mineral Lessee Mining Captive letter No. with Meter No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Gopal, Collector’s

23/7, Proceeding SEIAA-

Rough Duraisamy Roc.152/ TN/F.No.2110/E Open Cast- Stone- Non- 11°53'36.05"N 4 S.G.Thangavel Nagar Main 2013/ 1.00.0 - - 04.08.2014 - C-1(a)/ Jelly Working and 78°50'50.2"E Semi

Road, Mines-A/ 1252/2013 dated

12,554 1.8.2019 (Rule-19) 2.8.2014 mechanized Pallapatty, dated 12.05.2014. Salem-9. 02.08.2014 Collector’s S/o.Chinnusa

Proceeding SEIAA-

Rough my Roc.31/ TN/F.No.1556/E Open Cast- Stone- Velluvankadu, 11°56.987"N to 5 C.Nallaian 2013/ 2.80.0 - - 03.09.2014 Working - C-1(a)/ Jelly Kollapatty, 78°07.883"E Semi

Mines-A/ 1292/2013 dated

48,691 1.9.2019 (Rule-19) Karuppur 2.9.2014 mechanized dated 23.05.2014. Post, Salem 02.09.2014 SEIAA-TN/ S/o.Rama Collector’s F.No.2043/EC/1(

samy, B1,

Proceeding a)/1560/2014 Rough Brindhavan N11051’11.28 to Roc.240/ dated 14.08.2014 Open Cast- Stone- Apartment,So 11051’23.02 6 R.Gopal 2013/ 2.65.5 - - 22.11.2014 Working - and DEIAA- Jelly uth East E78005’20.79 to Semi

Mines-A/ DIA/TN/MIN/14 0 mechanized

3,37,632 19.11.2019 (Rule-19) layout, 20.11.2014 78 05’27.28 dated 460/2018-SLM- Brindavan 20.11.2014 EC.No.12/2018 Road, Salem-4 dated 17.05.2018

Collector’s

W/o.Palani SEIAA- Rough Proceeding samy, Thevur TN/F.No.1990/E Open Cast-

Stone- Roc.198/20 2019 11°30'04.00"N 7 P.Kavitha Post, Sankari 1..97.5 - - 16.07.2014 Working - C/1(a)/1250/ Jelly 13/ Mines- to77°45'05.58"E Semi

Taluk, Salem 2013 dated mechanized

15.7.2014 1,58,400

(Rule-19) A/ dated 14.7.2 District 12.05.2014 15.07.2014

[District Survey Report, Salem District] Page 74

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Sl Mining Area of Lease (1st /2nd Non- Location of the Method of Address & Commence Captive clearance N Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open Resources Contact No. of ment of / Non- (Yes/No), If yes in Cubic o the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive letter No. with Meter No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 W/o.P.Rajendr Collector’s

an, Veppillai Proceeding SEIAA-

Rough Village, Roc.536/ TN/F.No.2625 11°57'23.03"N to Open Cast- 8 Stone-Jelly R.Thillaikkarasi K. Morur 2013/ 1.34.5 - - 28.04.2015 Working - 11°57'29.37"N and /EC/1(a)/170 78°11'19.58"E to Semi -

(Rule-19) Post, Omalur Mines-A/ 6/ 2014 dated 78°11'25.16"E mechanized 26.4.2020 Taluk, dated 27.4.2015 04.03.2015 Salem District 27.04.2015

Collector’s 3/6A/69-A, -

Proceeding SEIAA- -

Tvl.Mettur Rajaganapathy Rough Roc.501/ TN/F.No.2587 Open Cast- S.P.R.Blue Metal Nagar, West 11°48'23.14"N 9 Stone-Jelly 2012/ 2.20.5 - - 26.06.2015 Working - /EC/1(a)/203 & Construction Main Road, to77°46'06.97"E Semi (Rule-19) Mines-A/ 8/ 2014 dated

Pvt. Ltd., Mettur Dam- mechanized

18,842 24.6.2020 dated 25.6.2015 01.04.2015 636 401

25.06.2015 Roughstone 160846 Gravel Collector’s SEIAA- Proceeding

TN/F.No.1952

Rough S/o.K.Sekaran Roc. Open Cast- /EC-1(a)/ 11°31'5.7N 10 Stone-Jelly S.Aruldas No.7, Kottai 192/2013/ 1.05.5 - - 06.08.2014 Working - Semi 1297/2013 to77°53.21.6"E - (Rule-19) Street, Sankair Mines-A/

dated mechanized 4.8.2019 dated 5.8.2014 05.08.2014 20.05.2014.

[District Survey Report, Salem District] Page 75

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Sl Mining Area of Lease (1st /2nd Non- Location of the Name of Address & Commence Captive clearance Mining(Ope N Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Resources the Contact No. of ment of / Non- (Yes/No), If yes ncast/ in Cubic o Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- Meter No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Collector’s

SEIAA-

S/o. Raji, Proceeding Rough TN/F.No.3524 Ku.Kuttapatty, Roc.624/ Open Cast- Stone- /EC-1(a)/ 11°56'29.59"N 11 R.Chinnathampi Thinnapatty 2014/ 2.07.0 - - 24.02.2016 Working - Semi Jelly 2496/2015 to78°07'39.83"E

Post, Omalur Mines-A/ mechanized

3,65,139 21.2.2021 (Rule-19) 22.2.2016 dated Taluk, dated 22.02.2016 14.12.2015. S/o.Shanmu Collector’s

SEIAA-

ganathi, Proceeding

Rough TN/F.No.3623 0 Parappatti Roc.239/ Open Cast- Stone- /EC/1(a)/ 11°34'26"N to 12 S.Somasundaram Post, Mallur 2015/ 1.61.0 - - 03.08.2016 Working - Semi Jelly 2839/ 2015 78°08'01"E Via., Salem Mines-A/

1.8.2016 mechanized 6,44,00 (Rule-19) 30.7.2021 dated Taluk and dated District. 29.07.2016 15.02.2016

W/o.V.Vadivelu Collector’s

1/99,thirumthika Proceeding SEIAA-TN/ Rough 11°56'49.71"N to ttuvalu, Roc.639/ F.No.5594/EC- Open Cast- Stone- 11°51'44.53"N and 13 V.Kalaiselvi Deevattipatti 2015/ 0.95.5 - - 04.12.2016 Working - 1(a)/EC.No.37 Jelly 78°05'24.93"E to Semi Post, Omalur Mines-A/ 09/2016 dated mechanized

78°05'17.95"E 3,55,820 2.12.2021 (Rule-19) 3.12.2016 Taluk, dated 06.09.2016. Salem-351 24.11.2016 Collector’s

W/o.Parama SEIAA-

Proceeding Rough sivam, Thinda TN/F.No. Roc.225/ 11°56'31.23"N to Open Cast- Stone- P.Dhana mangalam, 2620/EC/1(a) 11°56'39.73"N and 14 2013/ 2.90.5 - - 15.12.2016 Working - Semi - Jelly bakkiyam Panakattur /2470/ 2015 78°08'15.34"E to

Mines-A/ 78°08'20.93"E mechanized 13.12.2021 (Rule-19) Post, Omalur, 14.12.2016 dated dated Salem-455 14.12.2016 15.09.2016

[District Survey Report, Salem District] Page 76

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Sl Mining Area of Lease (1st /2nd Non- Location of the Name of Address & Commencem Captive clearance Mining N Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Resources the Contact No. of ent of / Non- (Yes/No), If yes (Opencast/ in Cubic o Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- Meter No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 D/o.M.Rathin avelu, Collector’s

SEIAA-TN/

Rough Sakthivinayak Proceeding 11°46'58"N to F.No.4742/EC- Open Cast- Stone- ar Blue Metal, Roc.664/20 11°47'06"N and 15 R.Mogana, 2.22.0 - - 14.12.2016 Working - 1(a)/EC.No.34 Semi Jelly 178-83- 14/ Mines- 77°45'32" E to 39/2016 dated

(Rule-19) A,Hospital A/ dated 77°45'38" E mechanized

3,20,775 13.12.2021 colony, Mettur 30.11.2016 14.12.2016 29.07.2016. Dam, Salem

S/o.K.Nachim Collector’s SEIAA-

Rough uthu, No.4, Proceeding TN/F.No.3368 Open Cast- Stone- Kalaimagal Roc.619/20 Non- /EC-1(a)/ 11°29'45"N to 16 N.Harishkumar 3.95.5 - - 20.07.2016 - Semi - Jelly kalvi nilaiyam 14/ Mines- Working 2639/2015 77°45'56" E mechanized

(Rule-19) Street, Erode- A/ dated ehŸ 18.7.2021 638 001 19.07.2016 19.7.2016 05.01.2016.

S/o.K.C.S.Kan nan, 286/51, Collector’s

Nainampatty SEIAA-TN/

Rough Proceeding 11°35'44"N to Road Street, F.No.4253/1(a Open Cast- Stone- Roc.321/20 11°35'41"N and 17 K.Ravisuthan, Gandhi Nagar, 0.81.0 - - 14.03.2017 Working - )/EC.No.3467/ Semi Jelly 15/ Mines- 77°46'28" E to Vellandivalas 2016 dated

(Rule-19) A/ dated 77°46'25" E mechanized

14.3.2017 13.3.2022

u, Edappadi 1,57,020 08.02.2017 29.07.2016. Taluk, Salem District

[District Survey Report, Salem District] Page 77

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive clearance Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open Resources No Contact No. of ment of / Non- (Yes/No), If in Cubic the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. Meter No. & Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o. Periya Collector’s thampi, SEIAA-

Proceeding

Thuttampatty TN/F.No.3288 Rough Roc.241/ 11°52'47.74"N Open Cast- Post, / 1(a)/ 18 Stone-Jelly P.Krishnan 2013/ 4.92.5 - - 22.05.2017 Working - to77°59'01.97" Semi Chinnappam Ec.No.2912/2 - (Rule-19) Mines-A/ E mechanized

patty Via., 015 dated 20.5.2022 dated 21.5.2017 Omalur Taluk, 17.02.2016. 12.05.2017 Salem

S/o.S.K.Selvar Collector’s

ajan, No.6/1, Proceeding DEIAA-

Rough Siruthangal Roc.673/ SLM/EC. 11°47'54.27"N Open Cast- 19 Stone-Jelly S.Senthilkumar Kattuvalavu, 2015/ 1.44.0 - - 25.11.2017 Working - No.01/ 2017 to Semi (Rule-19) P.N.Patty, Mines-A/ dated 77°45'46.85"E mechanized

Mettur Taluk, dated 21.09.2017 3,55,015

24.11.2017 23.11.2022 Salem District 05.11.2017

S/o.Sinna kannu, No.4/452, Collector’s SEIAA-TN/

Jalakandapura Proceeding

F.No.2924/ Rough m Main Road, Roc.230/ 11°56'46.42"N Open Cast- Non- EC-1(a)/ 20 Stone-Jelly S.Selvam Papampadi 2013/ 2.32.0 - - 24.11.2017 - and Semi Working EC.No.2827/ (Rule-19) Village, Mines-A/ 78°07'59.00"E mechanized 2015 dated

Chinnappamp dated 1,36,668

24.11.2017 23.11.2022 atti Post, 05.11.2017 08.02.2016. Omalur Taluk, Salem

[District Survey Report, Salem District] Page 78

Period of Period of Status Obtained Mining Mining lease (Working / Environmental Method of Sl Mining Area of Lease (1st /2nd Date of Non- Location of the Address & Captive clearance Mining N Name of Name of Lease Mining (Initial) ….renewal) Commencem Working Mining Lease Resources Contact No. of / Non- (Yes/No), If (Opencast/ in Cubic o the Mineral the Lessee Grant order Lease ent of Mining /Temp. (Latitude & Lessee Captive yes letter No. Under- Meter No. & Date (Ha.) Operations Working for Longitude) From To From To with date of ground) dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Sinnakannu

No.4/452, Collector’s SEIAA-TN/

Jalakandapuram Proceeding F.No.2923/E Rough Main Road, Roc.231/ C- 11°53'34.97"N Open Cast- 21 Stone-Jelly S.Selvam Papampadi 2013/ 1.06.0 - - 25.11.2017 Working - 1(a)/EC.No.2 and Semi -

(Rule-19) Village, Mines-A/ 828/2015 78°05'27.18"E mechanized 23.11.2022 Chinnappampat dated 24.11.2017 dated ti Post, Omalur 05.11.2017 08.02.2016. Taluk, Salem S.o, Muthaiya, Prop. Sri Collector’s DEIAA- 11042’55.99’’N

Pachiyamman Proceeding DIA/TN/MIN

to Rough Blue Metal, Roc.484/ /5414/2017- Open Cast- 11043’05.53’’N 22 Stone-Jelly M. Karthe 1469-A. 2015/ 2.01.0 - - 07.01.2018 Working - SLM- Semi 78016’32.05’’E

(Rule-19) Vinayagam Mines-A/ EC.No.02/20 6.1.2023 7.1.2018 mechanized

to 1,43,205 patty, Kannan dated 17 dated 78016’39.61’’E kurichi Post, 30.11.2017 14.11.2017 Salem - 8. Collector’s DEIAA- S/o.K.P.Govind 11038’21.68’’N

Proceeding DIA/TN/MIN

asamyNo.106, to Rough Roc.11/ /7273/2017- Open Cast- Yercaud Main 11038’25.30’’N 23 Stone-Jelly G.Kannan 2016/ 1.75.5 - - 08.01.2018 Working - SLM- Semi Road, 78012’10.76’’E

(Rule-19) Mines-A/ 6.1.2023 7.1.2018 EC.No.04/20 mechanized

Kannankurichi to 7,63,020 dated 17 dated Salem-8. 78012’18.98’’E 30.11.2017 13.11.2017

[District Survey Report, Salem District] Page 79

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Sl Mining Area of Lease (1st /2nd Non- Location of the Method of Address & Commence Captive clearance N Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open Contact No. of ment of / Non- (Yes/No), If yes Resources in o the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Cubic Meter Lessee Mining Captive letter No. with No. & Date (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 DEIAA- W/o.Selvaku Collector’s DIA/TN/MIN/ 11038’45.73’’N

mar, Door

Proceeding 7253/2017- to Rough No.141/56, Open Cast- Roc.521/20 SLM- 11038’48.85’’N 24 Stone-Jelly D.Lavanya V.M.R Ngaar, 0.73.0 - - 04.01.2018 Working - Semi 16/ Mines- EC.No.05/201 78013’37.99’’E

(Rule-19) Meyyanur, 2.1.2023 3.1.2018 mechanized

A/ dated to 2,19,000 Salem-636 7 dated 30.11.2017 0 004. 16.11.2017 78 13’43.73’’E

S/o.K.C.Mani, Collector’s

No.7/3/27-B,

Proceeding SEIAA- Market Street, 11052’11’’N to Rough Roc.403/ TN/F.No.3412/ Open Cast- Thanda Main 11052’21’’N 25 Stone-Jelly M.Prabhu 2014/ 3.40.0 - - 14.03.2018 Working - EC/1(a)/2793/2 Semi - Road, 77044’13’’E to

(Rule-19) Mines-A/ 015 dated mechanized 12.3.2023 Kolathur, 13.3.2018 0 dated 21.01.2015 77 44’30’’E Mettur Taluk, 23.2.2018 Salem- 303.

W/o.P.Rajendr

DEIAA- 0

an, Door Collector’s 11 39’18.32’’N

DIA/TN/MIN/ No.76, Proceeding to Rough 11961/2017- Open Cast- Thiyagi Roc.135/20 11039’22.32’’N 14284 26 Stone-Jelly R.Vijaya 0.66.5 - - 27.05.2018 Working - SLM- Semi - Natesan 17/ Mines- 78016’01.40’’E

(Rule-19) EC.No.12/201 mechanized 25.5.2023 26.5.2018

Street, No.3, A/ dated to 1,61,650 7 dated Ammapet, 14.4.2018 0 Roughstone

78 16’05.10’’E Gravel Slaem-636 00. 3103.2018

S/o.Krishnan, DEIAA- Collector’s 11039’16.18’’N -

51/83,

DIA/TN/MIN/

Proceeding to - Rough Manickavasagar 11192/2017- Open Cast- K.Sasi Street, Roc.469/20 Non- 11039’19.80’’N 27 Stone-Jelly 0.68.5 - - 28.05.2018 - SLM- Semi vel kumar Soundamman 17/ Mines- Working 78018’10.68’’E (Rule-19) EC.No.11/201 mechanized 22,032

Kovil Backside, Gra 27.5.2018 26.5.2023

A/ dated to 1,98,912 Ammapet, 7 dated 0 14.4.2018 78 18’14.26’’E Roughstone Salem-636 003. 31.03.2018

[District Survey Report, Salem District] Page 80

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive al clearance Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Mining(Open Resources No Contact No. of ment of / Non- (Yes/No), If in Cubic the Mineral Lessee Grant order Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. Meter No. & Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o Chinnanna gounder,4/6A, SEIAA-TN/

New No.2/4- Collector’s

F.No. 92 Vanicham Proceeding 11050’57’’N Rough 3419/ Open Cast- patty , Roc.444/20 Non- 11051’56’’N to 28 Stone-Jelly A.C.Manian 3.34.5 - - 21.05.2018 - 1(a)/Ec.No.2 Semi Chinnappamp 13/ Mines- Working 77043’34’’E to

(Rule-19) 794 /2015 mechanized 18.5.2023 19.5.2018 0

atty Post, A/ dated 77 43’37’’E 1,79,209 dated Omalur Taluk, 5.4.2018 23.01.2016. Salem District. S/o Kuppiru DEIAA- Collector’s

sagounder, DIA/TN/

Proceeding Kallapalayam, MIN/6940/ 11035’43’’N to Rough Roc.316/ Open Cast- Vellirivelli Non- 2017-SLM- 11035’48’’N 29 Stone-Jelly K.Subramani 2015/ 0,64,5 - - 20.05.2018 - Semi Village, Working EC.No.03/2 77046’28’’E to (Rule-19) Mines-A/ mechanized

91,065 18.5.2023 Edappady 19.5.2018 0 dated 017 dated 77 46’30’’E Taluk, Salem 14.4.2018 31.03.2018 District S/o Shanmu DEIAA-

ganathi, Door Collector’s DIA/TN/

No.3/85, Proceeding MIN/19151 N11034’42.84 Rough Open Cast- Mariamman Roc.594/20 /2018-SLM- to11034’50.03 30 Stone-Jelly S.Saravanan 0.80.5 - - 25.06.2018 Working - Semi Koil Street , 17/ Mines- EC.No.75/2 E78008’02.04

(Rule-19) mechanized 23.6.2023 24.6.2018 0

Parapatty A/ dated 018 dated: to78 08’05.32 1,61,000 Post, Salem 24.6.2018 07.12.2018 District

[District Survey Report, Salem District] Page 81

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive clearance Mining(Ope Name of Lease Mining ….renewal) Working Mining Lease Resources No the Contact No. of ment of / Non- (Yes/No), If ncast/ in Cubic the Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive yes letter No. Under- Meter No. & Date (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Thiru P.Baskaran Collector’s DEIAA- S/o.Palani 11038’24.46’’N

Sri Proceeding DIA/TN/MIN

Rough appan, to Parasakthi Roc. /12403/ Open Cast- Stone- Varagampadi 11038’28.34’’N 31 Crusher 480/2017/ 1.37.0 - - 16.07.2018 Working - 2018-SLM- Semi Jelly Village, 78013’21.48’’E Private Mines-A/ EC.No.02/20 mechanized

(Rule-19) Masinaickenp to

15.7.2018 14.7.2023

Limited dated 18 dated 4,09,500 atty Post, 0 14.04.2018. 78 13’28.89’’E Valapady 31.03.2018 Taluk, Salem

S/o.Arthanari, Thesavilakku Collector’s DEIAA- North Village, Proceeding DIA/TN/MIN

0

Rough N11 51’59.68 Thuttampatty Roc. /14035/ Open Cast- Stone- to 11052’04.97 32 A.Kumar Post, 568/2017/ 0.90.5 - - 30.07.2018 Working - 2018-SLM- Semi Jelly E77059’04.18 Tharamangala Mines-A/ EC.No.06/ mechanized

(Rule-19) to 77059’08.05

29.7.2018 28.7.2023

m, Omalur dated 2018 dated 3,14,688 Taluk, Salem- 29.7.2018 27.05.2018 306.

Collector’s DEIAA- S/o.Thangavel Proceeding DIA/TN/MIN

0

Rough N11 51’43.23 , 245, Roc. /13921/ Open Cast- Stone- Non- to 11051’47.63 33 T.Balu Meyyannur, 233/2017/ 1.09.0 - - 29.07.2018 - 2018-SLM- Semi Jelly Working E78009’01.75 Salem- Mines-A/ EC.No.04/20 0 mechanized

(Rule-19) to 78 09’06.27 ,68,725

29.7.2018 28.7.2023

636 004. dated 18 dated 5 29.7.2018 27.05.2018

[District Survey Report, Salem District] Page 82

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive / clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease No the Contact No. of ment of Non- (Yes/No), If yes (Opencast/ Resources in Lessee Grant order Lease /Temp. (Latitude & Cubic Meter Mineral Lessee Mining Captive letter No. with Under- No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Sithaiyan, Collector’s DEIAA- N11044’40.52”

No.4/327, Proceeding DIA/TN/MIN/

Rough to Kattuvalavu, Roc.105/ 15454/2018- Open Cast- Stone- S.Panneer Non- 11044’43.54” 34 Kottamettupat 2012/ 0.83.5 - - 09.08.2018 - SLM- Semi Jelly selvam Working E78003’44.25”

ty, Omalur Mines-A/ EC.No.30/2018 mechanized

9.8.2018 8.8.2023

(Rule-19) to 4,28,715 Taluk, Salem- dated dated 78003’48.65” 636 455. 09.08.2018 10.06.2018 S/o.Tamilaras Collector’s DEIAA-

N11057’41.42”

u, No.458, Proceeding DIA/TN/MIN/ Rough to National Roc. 305/ 15436/2018- Open Cast- Stone- T.Saran 11057’46.89” 35 Nagar, 2017/ 1.67.0 - - 27.08.2018 Working - SLM- Semi Jelly kumar E78011’24.88”

Kottamettupat Mines-A/ EC.No.31/2018 mechanized

26.8.2018 25.8.2023

(Rule-19) to 7,16,035 ty, Omalur dated dated 78011’31.00” Taluk, Salem. 26.08.2018 10.06.2018 W/o.G.Selvak Collector’s DEIAA-

umaran, Proceeding DIA/TN/MIN/

Rough N11053’49.15 No.333/21, Roc. 13775/2018- Open Cast- Stone- to 11053’57.32 36 R.Jayanthi Rajaganapathy 69/2017/ 1.93.0 - - 09.08.2018 Working - SLM- Semi Jelly E78005’26.23 Nagar, Mines-A/ mechanized

40,528 8.8.2023 9.8.2018 EC.No.03/2018 0

(Rule-19) to 78 04’32.81 8,09,530

Chinnakollapa dated dated 17 and Gravel Roughstone tty, Salem-8. 09.08.2018 .05.2018 S/o.Pacha Collector’s DEIAA- muthu,

Proceeding DIA/TN/MIN/1

Rough 1.6/142, Roc. 5433/2018- Open Cast- Stone- Kannakupillai N11031’42.81” 37 P.Pachiyannan 495/2016/ 1.01.5 - - 10.08.2018 Working - SLM- Semi Jelly kadu, E77051’33.40”

Mines-A/ EC.No.29/2018 mechanized

9.8.2018 8.8.2023

(Rule-19) Manjakkal 2,51,100 dated dated patti, Sankari 09.08.2018 Taluk, Salem 10.06.2018

[District Survey Report, Salem District] Page 83

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Sl Mining Area of Lease (1st /2nd Non- Location of the Address & Commence Captive / clearance Mining N Name of Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Contact No. of ment of Non- (Yes/No), If (Opencast/ Resources in o the Mineral Lessee Grant order Lease /Temp. (Latitude & Cubic Meter Lessee Mining Captive yes letter No. Under- No. & Date (Ha.) Working for Longitude) From To From To Operations with date of ground) dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Sengoda DEIAA- Collector’s

gounder, DIA/TN/MIN N11053’08.60

Roc. Rough Thinnapatti /14182/ to 11053’15.72 Open Cast- 495/2016/ 38 Stone-Jelly T.P.S.Sadasivam Post, 1.54.0 - - 03.10.2018 Working - 2018-SLM- Semi Mines-A/ (Rule-19) Kadayampatty EC.No.08/ 0 mechanized dated E78 04’43.35

0

1.10.2018 30.9.2023

Taluk, Salem- 7,51,795 09.08.2018 2018 dated to 78 04’48.53 636 305 17.05.2018

S/o.Palani, Collector’s Arasan Saw Proceeding SEIAA- N11048’11 to

Mil, Yercaud

Rough sRoc. TN/F.No.3414 11048’06 Open Cast- Main Road, 39 Stone-Jelly P.Tamilarasan 72/2014/ 1.67.5 - - 11.02.2019 Working - /EC/1(a)/2159 Semi Kondappanaic (Rule-19) Mines-A/ /2014 dated 0 mechanized

kenapatty, E77 58’06 to

78,335 9.2.2024

dated 10.2.2019 01.04.2015 0 Salem-636 77 58’12 10.02.2019 008

S/o.Ashok

Collector’s DEIAA- kumar, Proceeding DIA/TN/MIN 0

No.999/1A, N11 53’45.75

Rough sRoc. /16529/201 Open Cast- and Bharathi to11053’58.94 40 Stone-Jelly A.Harishkumar 197/2018/ 3.23.0 - - 11.02.2019 Working - 8-SLM- Semi nagar, Jagir E78005’32.68 (Rule-19) Mines-A/ EC.No.41/ mechanized

Ammapalaya to78005’44.32 9.2.2024

dated 10.2.2019

m, Salem-636 2018 dated Roughstone

10.02.2019 05.12.2018 9,79,903 302. Gravel 66,404

[District Survey Report, Salem District] Page 84

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commencem Captive clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease Resources No the Contact No. of ent of / Non- (Yes/No), If yes (Opencast/ in Cubic Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- Meter No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.A.Nagarajan. Collector’s DEIAA- D.No. 494/1,

Proceeding DIA/TN/MIN/ N11052’23.49

Rough Anna Nagar Roc.220/ 18538/2018- to 11052’29.72 Open Cast- Stone- West, 41 N.Sankar 2016/ 1.28.5 - - 29.02.2019 Working - SLM- E78002’15.40 Semi Jelly Kottamettupatty Mines-A EC.No.47/ to mechanized (Rule-19) Village, Omalur

0 7,02,190 27.2.2024 dated 28.2.2019 Taluk, Salem- 2018 dated 78 02’119.69 28.02.2019. 636 455. 05.12.2018

S/o. (late) Venkata DEIAA- chalagounder, Proceeding DIA/TN/MIN/ 0

Rough D.No.44,Therkat Roc.64/ N11 35’19.82

19244/2018- Open Cast- Stone- hiyankadu, 2018/ Non- to11035’19.67 42 V.Palaniappan 0.87.5 - - 10.03.2019 - SLM- Semi Jelly Adikarai, Mines-A Working E78012’54.62 EC.No.76/ mechanized

(Rule-19) Panamarathu dated to78012’59.48

8.3.2019 7.3.2024 patty Village, 08.03.2019. 2018 dated: 3,26,161 Salem Taluk and 07.12.2018 District.

DEIAA- Proceeding S/o.Gopalan, DIA/TN/MIN/ 0

Rough Roc.479/ N11 44’38.65

No.52E, Railway 18632/2018- Open Cast- Stone- 2017 Non- to11044’41.30 43 G.Nagarajan station road, 0.81.0 - - 09.03.2019 - SLM- Semi Jelly Mines-A Working E78003’43.86 Omalur Taluk, EC.No.53/ mechanized

(Rule-19) dated to78003’48.74

8.3.2019 7.3.2024 Salem-636 455. 2018 dated: 2,80,980 08.03.2019. 07.12.2018

[District Survey Report, Salem District] Page 85

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Mining Area of Lease (1st /2nd Non- Location of the Method of Sl. Address & Commence Captive al clearance Name of Name of the Lease Grant Mining (Initial) ….renewal) Working Mining Lease Mining(Open Resources No Contact No. of ment of / Non- (Yes/No), If in Cubic the Mineral Lessee order No. & Lease /Temp. (Latitude & cast/ Under- Lessee Mining Captive yes letter No. Meter Date (Ha.) Working Longitude) ground) From To From To Operations with date of for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Collector's S/o.Chinn

Proceedings

annan, Rough Roc.68 Open Cast- 2/89, Valluvar Non- 44 Stone-Jelly C.Jayapal /2009/ 0.40.0 - - 07.07.2009 - No - Semi Nagar, Eruma Working -

(Rule-8) Mines-A/ mechanized 5.7.2019 palayam Post, 6.7.2009 dated Salem-15. 19.5.2009. Collector's

S/o.

Proceedings Govindan, Rough Roc.67/ Open Cast- G.Ashok Paraikadu, Non- 11°37'58"N 45 Stone-Jelly 2009/ 0.40.0 - - 23.07.2009 - No Semi kumar Sanniya Working to78°11'00"E

(Rule-8) Mines-A/ mechanized

21.7.2009 20.7.2019

sikundu, 10,7,016 dated Salem-15. 19.5.2009. S/o. Alagu Collector's

muthu,

Proceedings Rough 5/144,Kaliam Open Cast- A.Chandran Roc.62/ Non- 11°37'01.40"N 46 Stone-Jelly man Street, 0.60.0 - - 07.07.2009 - No Semi . 2009/ Mines- Working to78°10'03.15"E (Rule-8) Nilavarapatty, mechanized

34,562 5.7.2019 A/ dated 6.7.2009 Salem Tk and 2.3.2009. Dt S/o.

Collector's

Kathirvel,77, Proceedings Rough Bharathiar Open Cast- Kathir Roc.64/ 2009 Non- 47 Stone-Jelly Street, 0.60.0 - - 27.09.2009 - No - Semi Rajarathinam /Mines-A/ Working -

(Rule-8) Peramanur mechanized 25.9.2019 dated 26.9.2009 Main Road, 19.5.2009 Salem - 7

[District Survey Report, Salem District] Page 86

Period of Period of Status Obtained Mining Mining lease (Working / Environment Date of Method of Area of Lease (1st /2nd Non- al clearance Location of the Sl. Name of Address & Mining Lease Commencem Captive Mining Name of the Mining (Initial) ….renewal) Working (Yes/No), If Mining Lease Resources No the Contact No. of Grant order ent of / Non- (Opencast/ in Cubic Lessee Lease /Temp. yes letter (Latitude & Mineral Lessee No. & Date Mining Captive Under- Meter (Ha.) Working for No. with Longitude) From To From To Operations ground) dispatch date of grant etc.,) of EC. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Sengodan, SEIAA-

Collector's

438/1,Makalia TN/F.No. Rough Proceedings mman Koil 4383/ 1(a)/ Open Cast- Stone- Roc.61/2009/ 11°37'02"N to 48 S.Dhanapal Street, 1.00.0 - - 22.07.2009 Working - Ec. No. Semi Jelly Mines-A/ 78°10'18"E

Ambalyeri 5th 3653 /2016 mechanized

21.7.2009 20.7.2019

(Rule-8) dated 3,61,550 Cross, dated 18.5.2009. Salem-6 08.08.2016. S/o.Karuppiah 11°37'27.00"N

Collector's

No.1, to Rough Proceedings Pappammal 11°37'32.21"N Open Cast- Stone- K.Lakshmana Roc.63/2009/ Non- 49 Illam, M.D.S. 1.10.0 - - 07.07.2009 - No and Semi Jelly perumal Mines-A/ Working

Backside, 78°10'08.85"E mechanized

6.7.2009 5.7.20019

(Rule-8) dated 4,80,095 Hasthampatty, to 19.5.2009. Salem-7. 78°10'13.35"E S/o,M.Palani samy,

Collector's

2/48,Mettu Rough Proceedings kadu, Open Cast- Stone- Roc.69/2009 Non- 11°34'42"N to 50 P.Thirugnanam Santhiyur, 1.14.0 - - 11.08.2009 - No Semi Jelly /Mines-A/ Working 78°08'05"E

S.Attayam mechanized

9.8.2019 10.8.2009

(Rule-8) dated 2,33,050 patty Post, 19.5.2009. Mallur Salem and District

[District Survey Report, Salem District] Page 87

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environment Method of Sl Area of Lease (1st /2nd Non- Location of the Name of Address & Mining Lease Commence Captive al clearance Mining N Name of the Mining (Initial) ….renewal) Working Mining Lease Resources the Contact No. of Grant order ment of / Non- (Yes/No), If (Opencast/ in Cubic o Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- Meter (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Dura

Collector's

isamy Rough Proceedings Padayachi,Mett Open Cast- Stone- Roc.78/2009 Non- 11°38'49"N 51 D.Rajendran upatty, 1.50.0 - - 09.11.2009 - No Semi Jelly /Mines-A/ Working to78°17'49"E

Sesanchavadi, mechanized

9.11.2009 8.11.2019

(Rule-8) dated 3,79,950 Valapadi Taluk, 20.5.2009. Salem District.

S/o. Collector's SEIAA-

Rough Muniappan, Proceedings TN/F.No. Open Cast- Stone- Pullagoundamp Roc.172/2010 5180/ 1(a)/ 11°28'27"N to 52 M. Sakthivel 0.70.0 - - 29.04.2010 Working - Semi Jelly atty Post, /Mines-B/ Ec.No.3580 77°42'59"E

mechanized

29.4.2010 28.4.2020

(Rule-8) Sankari Taluk, dated /2016 dated 1,67,500 Salem District 16.4.2010. 19.08.2016. S/o.Nallathamb Collector's

i gounder,

Rough Proceedings Peramachipalay Open Cast- Stone- Roc.173/2010 Non- 11°28.'35.67"N 53 N.Venkatesan am Village, 1.00.0 - - 02.06.2010 - No Semi Jelly /Mines-B/ Working to77°42'57.10"E Thevur Post, mechanized

80,543 1.6.2020 (Rule-8) dated 2.6.2010 Sankari Taluk, 16.4.2010. Salem District. DEIAA- S/o.M.Kuppu Collector’s

DIA/TN/

Rough samy Proceedings MIN/5810/ Open Cast- Stone- 631, Alamara Roc.171/2010 Non- 11°41'54.50"N 54 K.Senthilnathan 1.20.0 - - 03.06.2010 - 2017-SLM- Semi Jelly street, / Mines-A/ Working to78°17'37.85"E

mechanized 1.6.2020 2.6.2010 EC.No.10/2

(Rule-8) Kottavadi, dated 2,44,200 Attur 16.04.2010 017 dated 31.03.2018

[District Survey Report, Salem District] Page 88

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive / clearance Mining Name of the Mining ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ment of Non- (Yes/No), If (Opencast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- Meter (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Munusam

y gounder, Collector's

Rough 270/1, Nehru Proceedings 11°48'23.19"N Open Cast- Stone- Nagar,Karuma Roc.75/ 2009 Non-

55 M.Dhanraj 2.00.0 - - 14.09.2009 - No to Semi

Jelly laikoodal /Mines-A/ Working - 77°46'04.30"E mechanized

(Rule-8) Mettur dated 13.9.2019 Dam - 2, 19.5.2009. 14.9.2009 Salem

W/o. S.G. Collector's

SEIAA-

Rough Thangavel, Proceedings TN/F.No. 11°53'35"N Open Cast- Stone- 22, Arthanari Roc.72/ 2009 Non- 56 T.Jayasudha 2.00.0 - - 13.7.2009 - 3984/EC/1(a)/2 and Semi Jelly Street, /Mines-A/ Working 845/2015 dated 78°06'43"E to mechanized

(Rule-8) Arisipalayam, dated 12.7.2019 13.7.2009 15.2.2016 Salem-9. 18.5.2009. 12,50,990

S/o. Thangavel Collector's

11°38'36"N to

Rough Udaiyar, Kasi Proceedings 11°38'42"N Open Cast- Stone- T.Kasiviswa Nagar, Roc.76/ 2009 Non- 57 2.00.0 - - 19.06.2009 - No and Semi Jelly nathan Masinaickenp /Mines-A/ Working 78°13'48"E to mechanized

(Rule-8) atty, Valapadi dated

18.6.2009 17.6.2019

78°13'56"E 1,63,497 Taluk, 19.5 .2009. Salem

[District Survey Report, Salem District] Page 89

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environment Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commencem Captive al clearance Mining Name of the Mining ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ent of / Non- (Yes/No), If (Opencast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive yes letter No. Under- Meter (Ha.) Working Longitude) From To From To Operations with date of ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Subramani

Ramakrishna Collector's

Rough Colony, Proceedings Open Cast- Stone- Pannavadi Roc.74/2009 Non- 11°47'17"N to 58 S.Sakthivel 2.00.0 - - 23.07.2009 - No Semi Jelly Road,Kolathur /Mines-A/ Working 77°45'35"E

mechanized

21.7.2009 20.7.2019

(Rule-8) Road, Mettur dated 5,98,080 Taluk, 19.5. 2009. Salem S/o.N.Manick avel,

Collector's

3/54,F-1, Rough Proceedings 11°34'44"N to Poosari Open Cast- Stone- M.Senthil Roc.91/2009 Non- 11°34'50"N and 59 Thottam, 2.02.5 - - 07.10.2009 - No Semi Jelly kumar /Mines-A/ Working 78°09'57"E to

Jagir Amma mechanized

6.10.2009 5.10.2019

(Rule-8) dated 78°10'06"E 6,48,980 palayam, 19.05.2009 Salem Taluk, Salem District S/o. Thanda gounder,

91-A, Collector's

Rough Thuttampatty Proceedings Open Cast- Stone- Village & Roc.604/2006 11°52'56.8"N 60 T.Srinivasan 3.00.0 - - 26.05.2009 Working - Yes Semi Jelly Post, Taraman / Mines-A/ to78°06'13.3"E

mechanized

25.5.2009 24.5.2019

(Rule-8) galam (Via) dated 3,17,334 Omalur Taluk, 24.7.2006. Salem District.

[District Survey Report, Salem District] Page 90

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmenta Location of Method of Area of (1st /2nd Non- Sl. Name of Address & Mining Lease (Initial) Commence Captive / l clearance the Mining Mining Name of the Mining ….renewal) Working Resources No the Contact No. of Grant order ment of Non- (Yes/No), If Lease (Opencast/ in Cubic Lessee Lease /Temp. Mineral Lessee No. & Date Mining Captive yes letter No. (Latitude & Under- Meter (Ha.) Working From To From To Operations with date of Longitude) ground) for dispatch grant of EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o. K.Sengottaiyan,

Managing Collector's

Rough Partner, Proceedings 11°41'27"N Open Cast- Stone- Suriya Blue Roc.77/2009/ Non- 61 S.Palanivel 3.04.0 - - 24.06.2009 - No and Semi Jelly Metal, 1-52-59, Mines-A/ Working 78°16'32"E mechanized

(Rule-8) Attur Main dated

23.6.2009 22.6.2019 Road,Karipatty 19.5.2009. 3,49,450 Village, Valapadi Taluk

Collector's SEIAA-

Rough S/o. Thangavel, Proceedings TN/F.No.

11°53'46"N Open Cast- Stone- Pagalpatty, Roc.118/2011 3983/EC/1(a)/ 62 T.Gnanavelu 1.00.0 - - 04.05.2011 Working - to Semi Jelly Omalur Taluk, Mines - A/ 2843/2015 78°05'47"E mechanized

(Rule-8) Salem District. dated dated

2.5.2011 1.5.2021 01.3.2011. 15.02.2016. 8,49,150

Collector's

Rough S/o.Murugesan, Proceedi ngs

11°38'30"N Open Cast- Stone- 4/68, Roc.111/2011 Non- 63 M.Ramachandran 0.40.0 - - 03.05.2011 - No to Semi Jelly Sanniyasikundu Mines-A/ Working 78°11'21"E mechanized

(Rule-8) (PO), Salem-15 dated

2.5.2011 1.5.2021 01.3.2011. 1,40,000

[District Survey Report, Salem District] Page 91

Period of Status Period of Obtained Mining lease (Working / Mining Lease st nd Date of Environmental Method of Area of (1 /2 Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive / clearance Mining Name of the Mining ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ment of Non- (Yes/No), If yes (Opencast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- Meter (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 W/o. Collector's G.Vadi vel,

Rough Proceedings

168, Open Cast- Stone- Roc.123/2011 11°39'20.11"N to 64 V.Hemaladha E.B.Colony, 0.34.0 - - 03.05.2011 Working - Yes Semi Jelly Mines-A/ 78°16'01.32'21"E Ayothiapattina mechanized

(Rule-8) dated .5.2021

87,297 1 m, 2.5.2011 01.3.2011. Salem-106.

Collector's

S/o.Panneer SEIAA-

Rough Proceedings Selvam, 70/16 TN/F.No.4234/ Open Cast- Stone- Roc.214/2012 11°34'31"N to 65 P.Sivakumar 1st Avenue, 0.81.0 - - 15.04.2012 Working - 1(a)/Ec.No.336 Semi Jelly Mines-A/ 78°09'54"E Ashok Nagar, 9/2016 dated mechanized

(Rule-8) dated

14.4.2012 13.4.2022

Chennai-83 19.07.2016. 3,24,000 05.4.2012.

S/o.Chinnusa Collector's

Rough my, 6/14, Proceedings Open Cast- Stone- Cuddalore Roc.210/2012 Non-

66 C.Kumar 0.40.0 - - 24.04.2012 - No - Semi

Jelly Main Road, Mines-A/ Working - mechanized

(Rule-8) Ammapet, dated 22.4.2022 Salem-3. 05.4.2012. 23.4.2012

S/o.A.Kandas Collector's

Rough amy, Proceedings Open Cast- Stone- Mettupatty, Roc.220/2012 Non- 11°51'51"N and 67 K.Ravikumar 0.40.5 - - 25.04.2012 - Yes Semi Jelly Kullmanaicke Mines-A/ Working 77°59'07"E mechanized

(Rule-8) npatty, dated

23.4.2012 22.4.2022 Omalur 05.4.2012. 1,62,000

[District Survey Report, Salem District] Page 92

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Area of Lease (1st /2nd Non- Location of the Method of Sl. Name of Address & Mining Lease Commence Captive / clearance Name of the Mining (Initial) ….renewal) Working Mining Lease Mining(Open Resources No the Contact No. of Grant order ment of Non- (Yes/No), If yes in Cubic Lessee Lease /Temp. (Latitude & cast/ Under- Mineral Lessee No. & Date Mining Captive letter No. with Meter (Ha.) Working Longitude) ground) From To From To Operations date of grant of for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.A.Kandas SEIAA-

Collector's

Rough amy, TN/F.No.4652/ Proceedings Open Cast- Stone- K.Vijaya Mettupatty, 1(a)/Ec.No. 11°51'47"N and 67 Roc.220/2012 0.40.5 - - 24.04.2012 Working - Jelly kumar Kullmanaicke 3592 /2016 77°59'04"E Semi Mines-A/ dated

(Rule-8) npatty, dated mechanized

23.4.2012 22.4.2022

05.4.2012. 1,62,000 Omalur 19.08.2016.

DEIAA-

S/o.Ramasam Collector's DIA/TN/MIN/

Rough y gounder, Proceedings 61539/2017- Open Cast- Stone- 11°48'21"N 69 R.Yogaraj 1/12, Andavar Roc.219/2012 1.50.0 - - 23.04.2012 Working - SLM- Jelly to77°46'04"E Semi Illam,Koilpala Mines-A/ dated EC.No.79/

(Rule-8) mechanized

23.4.2012 22.4.2022

yam, Mettur 05.4.2012. 2018 dated: 4,99,265 07.12.2018

S/o.A.Chandra N11037’03.45

Collector's 0

Rough n, 5/144, to 11 37’05.60 Proceedings Open Cast- Stone- C.Saravana Kalaiamman Non- and 70 Roc.208/2012 0.50.0 - - 15.05.2012 - No Jelly kumar Koil Street, Working Semi - Mines-A/ dated

(Rule-8) Nilavarapatty, E 78010’00.03 mechanized 12.5.2022 05.4.2012. 13.5.2012 Salem to 78010’02.92

S/o.Palaniapp Collector's SEIAA-

Rough an, 3/63,

Proceedings TN/F.No.4589/ 11°37’31.76”N Open Cast- Stone- P.Kanda Varadanadar 71 Roc.207/2012 0.40.5 - - 14.05.2012 Working - 1(a)/Ec.No.360 and Semi Jelly samy Thottam, Mines-A/ dated 5 /2016 dated 78°10’14.50”E

(Rule-8) Erumapalaya mechanized

60,900 12.5.200

05.4.2012. 13.5.2012 24.08.2016. m, Salem

[District Survey Report, Salem District] Page 93

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commence Captive clearance Mining Name of the Mining ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- Meter (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 16 S/o.Pacha Collector’s

muthu 5/144, Rough Proceedings Irusayee Open Cast- Stone- Roc.209/2012 72 P.Sasthiri Ammankoil 0.50.0 - - 03.06.2012 Non- - No - Semi Jelly Mines-A/ -

street, Working mechanized 1.6.2012 (Rule-8) dated 31.5.2022 Nilavarapatty, 05.4.2012. Salem S/o.Chandrase DEIAA-

karan, No.2/1 Collector’s DIA/TN/MIN

Rough Chinna Proceedings /8470/2017- 0 11 39’23.13’’ Open Cast- Stone- goundapuram, Roc.367/2017 73 C.Vijayakumar 1.50.0 - - 08.01.2018 Working - SLM- Semi Jelly Ramalingapur Mines-A/ N

EC.No.07/201 0 mechanized 6.1.2023 7.1.2018 78 16’15.96’’E (Rule-8) am Post, dated 7 dated 2,93,020 Valapady 07.12.2017 13.11.2017 Taluk, Salem S/o.Balan, Sri Rajaganapathy Blue Metal, Collector’s DEIAA-

No.31-1/24A, Proceedings DIA/TN/MIN 0

Rough N11 37’50.32 VPR Roc.65/2008 /14162/2018- 0 Open Cast- Stone- to 11 37’57.01 74 B.Pandidurai Apartments, Mines-A/ 2.00.0 - - 09.01.2018 Working - Semi Jelly SLM- 0

5th cross, dated E78 10’56.85 mechanized 6.1.2028 (Rule-8) 7.1.2018 EC.No.07/201 0

to 78 11’04.02 10,06,110 Narayana 19.5.2009 and 8 dated 19 Nagar, 1.7.2018 .05.2018 Kitchipalayam Salem-15

[District Survey Report, Salem District] Page 94

Period of Period of Status Mining Mining lease (Working Obtained Lease (1st /2nd Date of / Non- Environmental Method of Sl Area of Location of the Name of Address & Mining Lease (Initial) ….renewal) Commence Working Captive clearance Mining N Name of the Mining Mining Lease Resources the Contact No. of Grant order ment of /Temp. / Non- (Yes/No), If yes (Opencast/ in Cubic o Lessee Lease (Latitude & Mineral Lessee No. & Date Mining Working Captive letter No. with Under- Meter (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 W/o.

Collector’s DEIAA-

Karthikeyan, Rough Proceedings DIA/TN/MIN/13 N11053’49.15 No.2/69, Open Cast- Stone- Roc.78/ 775/2018-SLM- to 11053’57.32 75 K.Jayalakshmi Thottiyankadu 1.00.0 - - 17.07.2018 Working - Semi Jelly 2018/Mines- EC.No.03/2018 E78005’26.23

Parapatty 0 mechanized

15.7.2018 14.7.2028

(Rule-8) A dated dated to 78 04’32.81 4,39,380 Post, Mallur, 15.07.2018. 17 .05.2018 Salem-203. S/o.Palanisam

y, No.2/48, Collector’s

DEIAA- Rough Mettukadu, Proceedings N11034’46.07” DIA/TN/MIN/14 Open Cast- Stone- Santhiyur, Roc.77/ to 11034’41.63” 76 P.Sivanandham 1.00.0 - - 16.07.2018 Working - 922/2018-SLM- Semi Jelly S.Attaiyampat 2018/Mines- E78008’09.97”

EC.No.20/2018 0 mechanized

15.7.2018 14.7.2028

(Rule-8) ty Post, A dated to 78 08’06.22” 5,42,047 dated 10.06.2018 Salem-636 15.07.2018 203 S/o.M.Parama

Collector’s DEIAA-

sivam, Rough Proceedings DIA/TN/MIN/14 N11035’00.30 No.83/1, Open Cast- Stone- Roc.76/ 921/2018-SLM- to 11035’06.52 77 P.Vimalan Ramakrishna 2.16.0 - - 17.07.2018 Working - Semi Jelly 2018/Mines- EC.No.14/2018 E78009’20.34 Road, mechanized

15.7.228 0 (Rule-8) A dated 16.7.2018 dated 10.06.2018 to 78 09’24.87 Salem-636 20,27,328 16.07.2018 007

[District Survey Report, Salem District] Page 95

Period of Status Period of Mining lease (Working Obtained Mining Lease (1st /2nd Date of / Non- Environmental Method of Area of (Initial) Location of the Sl. Name of Address & Mining Lease ….renewal) Commence Working Captive clearance Mining Name of Mining Mining Lease Resources No the Contact No. of Grant order ment of /Temp. / Non- (Yes/No), If yes (Opencast/ in Cubic the Lessee Lease (Latitude & Mineral Lessee No. & Date Mining Working Captive letter No. with Under- Meter (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Kuppusam y, No.315, 0 Collector’s DEIAA- N11 35’16.49

Vallalar

Rough Proceedings DIA/TN/MIN/1 ” to Nagar, Open Cast- Stone- K.Mani Roc.75/ 5225/2018- 11035’11.90” 78 Ayyanthiruma 1.50.0 - - 11.08.2018 Working - Semi Jelly vannan 2018/Mines- 0

ligai, SLM- E78 09’20.79 mechanized

9.8.2018 8.8.2023

(Rule-8) A dated 6,90,140 Kannankurichi EC.No.24/2018 ” to 09.08.2018 0 Post, Salem- dated10.06.2018 78 09’15.40” 636 008. S/o.Selvam, No.51/1- DEIAA- 0 Collector’s N11 37’48.37

154D, DIA/TN/MIN/1

Rough Proceedings ” to Erumapalaya 4973/2018- 0 Open Cast- Stone- S.Satheesh Roc.73/ 11 37’49.75” 79 m Main Road, 1.00.0 - - 10.08.2010 Working - SLM- Semi Jelly kumar 2018/Mines- 0

Seelanickenpa E78 10’40.35 mechanized 8.8.2023 9.8.2018 EC.No.17/2018 (Rule-8) A dated ” to 3,75,140 ttti, Uthukadu, dated 09.08.2018 78010’48.60” Salem-636 10.06.2018 201 DEIAA- 0

W/o.Rajkumar Collector’s DIA/TN/MIN/1 N11 37’43.77

Rough , No.89A, Proceedings 4970/2018- to Open Cast- Stone- Kollapatty, Roc.72/ SLM- 11037’50.25 80 A.Sivagami 1.50.0 - - 24.07.2018 Working - Semi Jelly Karuppur 2018/Mines- 0

EC.No.16/2018 E78 10’37.61 mechanized

23.7.2018 22.7.2023 (Rule-8) Post, Omalur A dated dated to 5,17,326 Taluk, Salem. 09.08.2018 05.06.2018 78010’44.11

[District Survey Report, Salem District] Page 96

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Sl Area of (1st /2nd Non- Location of the Name of Address & Mining Lease (Initial) Commence Captive clearance Mining N Name of the Mining ….renewal) Working Mining Lease Resources the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ in Cubic o Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- Meter (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 W/o. DEIAA-

Collector’s

Mahadevan, DIA/TN/MIN/1 Rough Proceedings N11033’27.53 D.No.348-9, 8523/2018- Open Cast- Stone- M.Gowri Roc.79/ to 11033’30.05 81 South street, 3 1.00.0 - - 23.10.2018 Working - SLM-EC.No. Semi Jelly punithavathy 2018/Mines- E78005’54.46

Roads, 46/2018 0 mechanized

3,42,109 18.10.2023 (Rule-8) A dated 19.10.2018 to 78 05’59.16 Salem -636 dated 19.10.2018 009. 05.12.2018 DEIAA-

Collector’s DIA/TN/MIN/

S/o.Shan Rough Proceedings 15286/2018- N11030’39.03” mugam, No.1, Open Cast- Stone- S.Mohan Roc.88/ SLM- to 11030’43.36” 82 1st street, 1.50.0 - - 20.10.2018 Working - Semi Jelly kumar 2018/Mines- EC.No.28/2018 E78036’14.56”

A.S.Pettai, 0 mechanized

5,02,570 18.10.2028 (Rule-8) A dated 19.10.2018 dated to 78 36’19.10” Namakkal-1. 19.10.2018 10.06.2018

S/o.Kuppusam y, No.11, Ponnga Nagar, DEIAA-

rd Collector’s

3 East Street, DIA/TN/MIN/ Rough Proceedings N11041’33.18” Sothupakkam, 15255/2018- Open Cast- Stone- Roc.70/ to 11041’40.25” 83 K.Arjunan Melmaru 4.90.0 - - 22.10.2018 Working - SLM- Semi Jelly 2018/Mines- E78016’37.61”

vathur post, EC.No.26/2018 0 mechanized 20.10.2028 (Rule-8) A dated 21.10.2018 to 78 16’42.21” Cheyyar dated 40,23,945 21.10.2018 Taluk, 10.06.2018 Kanchipuram- 603 319

[District Survey Report, Salem District] Page 97

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Method of Area of Lease (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease Commence Captive clearance Mining Name of the Mining (Initial) ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ment of / Non- (Yes/No), If yes (Opencast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- Meter (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Kaligound er, No.8/416- Collector’s

DEIAA- 0

Rough 5, Thillai Proceedings N11 34’25.09 DIA/TN/MIN/151 Open Cast- Stone- nagar, Trichy Roc.71/ 2018/ to 11034’29.24 84 K.Prakash 1.00.0 - - 22.10.2018 Working - 90/2018-SLM- Semi Jelly main road, Mines-A E78009’47.85 EC.No.15/2018 mechanized (Rule-8) Vasanthapura dated to 78009’51.10

dated 10.06.2018 7,53,600 18.10.2028 m Post, 19.10.2018 19.10.2018 Namakkal-1.

S/o.Nallagoun der, Collector’s

DEIAA- 0

Rough No.5/41A, Proceedings N11 33’05.06” DIA/TN/MIN/152 Open Cast- Stone- Elayappa Roc.86/ to 11033’10.85” 85 N.Sellamuthu 1.50.0 - - 20.10.2018 Working - 08/2018-SLM- Semi Jelly Nagar, 2018/Mines- E78028’38.14” EC.No.25/2018 mechanized (Rule-8) Suramangala A dated to 78028’43.45”

dated 10,06.2018 8,43,660 18.10.2023 m Post, 19.10.2018 19.10.2018 Salem-5

S/o.Pachiappa gounder, DEIAA- st Collector’s

No.252,1 DIA/TN/MIN/154 0

Rough Proceedings N11 31’09.49” cross street, 40/2018-SLM- Open Cast- Stone- Roc.90/ to 11031’14.61” 86 P.Jayaraj Periyasamy 1.00.0 - - 27.11.2018 Working - EC.No.32/2018 Semi Jelly 2018/Mines- E77054’22.66” Nagar, dated 10.06.2018 mechanized (Rule-8) A dated to 77054’25.87”

Alagapuram 1,37,107 24.11.2023 25.11.2018 25.11.2018 pudhur, Salem-16.

[District Survey Report, Salem District] Page 98

Period of Period of Status Mining Mining lease (Working Obtained Lease (1st /2nd Date of / Non- Environmental Method of Sl Mining Area of Location of the Name of Address & (Initial) ….renewal) Commencem Working Captive clearance Mining(Ope N Name of the Lease Grant Mining Mining Lease Resources the Contact No. of ent of /Temp. / Non- (Yes/No), If yes ncast/ in Cubic o Lessee order No. & Lease (Latitude & Mineral Lessee Mining Working Captive letter No. with Under- Meter Date (Ha.) Longitude) From To From To Operations for date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.M.Selladu rai, Door DEIAA-

Collector’s

No.4/287, DIA/TN/MIN/1 Rough Proceedings N11033’02.30” Merkukadu, 5189/2018- Open Cast- Stone- Roc.87/ to 11032’09.49” 87 S.Suresh Kanda 2.00.0 - - 27.11.2018 Working - SLM- Semi Jelly 2018/Mines- E78028’32.72”

samypudur, EC.No.19/2018 0 mechanized

6,46,610 24.11.2023 (Rule-8) A dated 25.11.2018 to 78 28’38.39 Arasanatham, dated 25.11.2018 Attur Taluk, 10.06.2018 Salem-107 DEIAA-

S/o.Jagadee Collector’s

DIA/TN/MIN/1

Rough san, No.101B, Proceedings N11041’33.18” 5223/2018- 0 Open Cast- Stone- Kasipadaiya Roc.82/ to 11 41’40.25” ,655 88 J.J.Srinivasan 1.50.0 - - 08.01.2019 Working - SLM-EC.No. Semi Jelly chi Street, 2018/Mines- E78016’37.61”

23/2018 dated mechanized 5.1.2024 (Rule-8) Valapady, A dated 6.1.2019 to 78016’42.21” 10.06.2018 12,43 Salem-115. 06.01.2019

A.Arun Aravind, S/o.M.A.Aras DEIAA-

endran, Collector’s DIA/TN/MIN/1

Rough No.426/3, Proceedings 5207/2018- N11038’19.57” Open Cast- Stone- Vaas Ziegal Thengalkadu, Roc.74/ SLM- to 11038’13.88” 89 1.00.0 - - 12.02.2019 Working - Semi Jelly Blocks Erumapalaya 2018/Mines- EC.No.18/2018 E78011’56.57” mechanized

9.1.2029 0 10.2.2019

(Rule-8) m Village, A dated dated to 78 11’54.22” 2,90,016 Kandashram 10.02.2019 10.06.2018 Backside, Udayapatti, Salem-140

[District Survey Report, Salem District] Page 99

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Location of Method of Mining Area of (1st /2nd Non- Sl. Name of Address & (Initial) Commence Captive clearance the Mining Mining Name of the Lease Grant Mining ….renewal) Working Resources No the Contact No. of ment of / Non- (Yes/No), If yes Lease (Opencast/ in Cubic Lessee order No. & Lease /Temp. Mineral Lessee Mining Captive letter No. with (Latitude & Under- Meter Date (Ha.) Working From To From To Operations date of grant of Longitude) ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.G.Muthus DEIAA-

Collector’s

amy, Tvl.SRC DIA/TN/MIN/1 Rough Proceedings N11035’04.96 Projects Pvt. 8386/2018- Open Cast- Stone- M.Parama Roc.563/ to 11035’12.20 90 Ltd, NO.4-B, 3.00.0 - - 12.05.2019 Working - SLM- Semi Jelly sivam 2018/Mines- E78009’19.08 Lakshmi EC.No.44/2018 mechanized

9.1.2024 0 (Rule-8) A dated 10.5.2019 to 78 09’25.09 puram, Gandhi dated 30,42,108 10.02.2019 road, Salem-7 05.12.2018 S/o.Muthuling DEIAA- am, No.6/57,

Collector’s DIA/TN/MIN/1

Mottur Road, Rough Proceedings 5301/2018- N11030’35.86 Sommampatti, Open Cast- Stone- M.Koteeshwara Roc.89/ SLM- to11030’39.87 91 Vilarippalaya 1.00.0 - - 18.02.2019 Working - Semi Jelly muthu 2018/Mines- EC.No.35/2018 E78036’19.00

m Post, 0 mechanized

17.2.2019 16.2.2029

(Rule-8) A dated dated to78 36’23.40 5,16,685 Valapady 17.02.2019 05.12.2018 Post, Salem-

15 DEIAA-

Collector’s

S/o.Sivakumar DIA/TN/MIN/1 Rough Proceedings N11032’58.43 , No.1/2/19-1, 9048/2018- Open Cast- Stone- S.Sri Balaji Roc.558/ to11033’01.59 92 Parapatti, 1.50.0 - - 27.02.2019 Working - SLM- Semi Jelly Sugumar 2018/Mines- E78009’51.87

Salem Taluk, EC.No.69/2018 0 mechanized

25.2.2019 24.2.2029

(Rule-8) A dated to78 09’57.82 8,64,680 Salem-203. dated 25.02.2019 05.12.2018 DEIAA-

W/o.Palaniappan Collector’s

DIA/TN/MIN/1 Rough , No.34/9-53B, Proceedings N11034’35.70 Kanchinagar, 8836/2018- 0 Open Cast- Stone- Roc.561/ 019 to11 34’41.13 93 P.Lakshmi Dhasanaikkanpa 1.00.0 28.02.2019 Working - SLM- Semi Jelly 2018/Mines- E78008’22.50

tti, Seelanai EC.No.62/2018 0 mechanized

26.2.2 25.2.2029

(Rule-8) A dated to78 08’25.45 5,75,430 kanpatti, Salem- dated: 26.02.2019 201. 07.12.2018

[District Survey Report, Salem District] Page 100

Period of Period of Status Obtained Mining Mining lease (Working / st nd Date of Environmental Method of Sl Mining Area of Lease (1 /2 Non- Location of the Name of Address & Commence Captive / clearance Mining N Name of the Lease Mining (Initial) ….renewal) Working Mining Lease Resources the Contact No. ment of Non- (Yes/No), If yes (Opencast/ in Cubic o Lessee Grant order Lease /Temp. (Latitude & Mineral of Lessee Mining Captive letter No. with Under- Meter No. & Date (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Kanda samy, 4- Collector’s

207/4-69A, DEIAA- 0

Rough Proceeding N11 37’18.38 Perumal DIA/TN/MIN/188 Open Cast- Stone- s Roc.559/ to11037’23.96 94 O.K.Kumar kovil karadu, 1.35.0 - - 28.02.2019 Working - 24/2018-SLM- Semi Jelly 2018/Mines E78010’12.34 Ettimara EC.No.55/2018 mechanized

(Rule-8) -A dated to78010’15.95

26.2.2019 25.2.2029

kkadu dated 05.12.2018 7,65,550 26.02.2019 Erumapalaya m, Salem-6.

S/o.Ayyamp DEIAA- erumal, Proceeding DIA/TN/MIN/187 0

Rough No.4/4, N11 54’54.45

s Roc.578/ 54/2018-SLM- Open Cast- Stone- Chinneri to11054’58.18 95 A.Manickam 2018/Mines 1.00.0 - - 09.03.2019 Working - EC.No.54/2018 Semi Jelly vayalkadu, E78006’38.61 -A dated dated 05.12.2018 mechanized

(Rule-8) Pallapatti, to78006’44.47

8.3.2019 7.3.2029

08.03.2019. 7,55,600 Leebazar,

Salem-9.

S/o.Rajaraja n, No.270/1, Proceeding DEIAA- 0

Rough Ammasigoun N11 50’45.61

s Roc.587/ DIA/TN/MIN/186 Open Cast- Stone- der street, to11050’50.15 96 R.Rajesh 2018/Mines 1.00.0 - - 09.03.2019 Working - 59/2018-SLM- Semi Jelly Chinnapudur E78002’36.45 -A dated EC.No.50/2018 mechanized

(Rule-8) Hasthampatti to78002’41.32

8.3.2019 7.3.2029

08.03.2019. dated 05.12.2018 7,55,200 Salem-636 007.

[District Survey Report, Salem District] Page 101

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Mining Area of (1st /2nd Non- Location of the Sl. Name of Address & (Initial) Commence Captive clearance Mining Name of the Lease Mining ….renewal) Working Mining Lease Resources No the Contact No. of ment of / Non- (Yes/No), If yes (Opencast/ in Cubic Lessee Grant order Lease /Temp. (Latitude & Mineral Lessee Mining Captive letter No. with Under- Meter No. & Date (Ha.) Working for Longitude) From To From To Operations date of grant of ground) dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Arthanari,

No.316-195A, Proceeding DEIAA-

Rough N11052’03.05 Mariyamman Roc.571/ DIA/TN/MIN/191 Open Cast- Stone- to11052’08.13 97 A.Sellamuthu kovil street, 2018/Mines 0.92.0 - - 09.03.2019 Working - 37/2018-SLM- Semi Jelly E77059’06.69

Omalur Taluk, -A dated EC.No.71/2018 mechanized 7.3.2029 8.3.2019 0

(Rule-8) to77 59’10.77 1,80,992 Salem-636 08.03.2019. dated: 07.12.2018 306. S/o.Sengodag ounder,

No.2/150, DEIAA-

Proceeding

Rough Thinnapatti DIA/TN/MIN/190 N11053’05.11 s Roc.583/ Open Cast- Stone- S.Sekar kattuvalavu, 14/2018-SLM- to11053’12.87 98 2018/Mines 2.85.5 - - 08.03.2019 Working - Semi Jelly Ku.Kuttapatti, EC.No.64/2018 E78004’49.64

-A dated mechanized 6.3.2029 (Rule-8) Thinnapatti, 7.3.2019 dated 05.12.2018 to78004’57.30 07.03.2019. 18,35,000 Kadayampatti, Salem-636 305 W/o.R.Gopal, B-1,

Brindhavan Proceeding DEIAA-

Rough N11051’17.15 Apartment, s Roc.582/ DIA/TN/MIN/ Open Cast- Stone- to11051’25.20 99 G.Samarasam Southeast 2018/Mines 3.93.5 - - 03.03.2019 Working - 19073/2018-SLM- Semi Jelly E78005’27.05

Layout, -A dated EC.No.66/2018 mechanized 1.3.2029 (Rule-8) 2.3.2019 to78005’36.67 Brindhavan 02.03.2019. dated 05.12.2018 27,71,220 Road, Salem- 636 004.

[District Survey Report, Salem District] Page 102

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Method of Area of (1st /2nd Non- Location of the Sl. Name of Address & Mining Lease (Initial) Commencem Captive clearance Mining(Op Name of the Mining ….renewal) Working Mining Lease Resources No the Contact No. of Grant order ent of / Non- (Yes/No), If yes encast/ in Cubic Lessee Lease /Temp. (Latitude & Mineral Lessee No. & Date Mining Captive letter No. with Under- Meter (Ha.) Working Longitude) From To From To Operations date of grant of ground) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Thangavel u, S2, Green house DEIAA- apartments,

Proceedings DIA/TN/MIN/1

Rough Thiruvalluvar N11053’45.36 Roc.577/ 8967/2018- Open Cast- Stone- T.Muruga Street, to 11053’52.13 100 2018/Mines- 1.50.0 - - Working - SLM- Semi Jelly manickam Subramniya 06.03.2019 E78005’43.57

A dated EC.No.63/2018 0 mechanized

5.3.2019 4.3.2029

(Rule-8) Nagar, to 78 05’49.119 8,53,005 05.03.2019. dated Suramangala 05.12.2018 m Post, Salem-636 005.

S/o.Umasanka DEIAA-

r, No.1/2- Proceedings DIA/TN/MIN/1 Rough N11034’19.32 112/10, Roc.565/ 8692/2018- Open Cast- Stone- to11034’24.48 101 U.Karikalan Solaigounderk 2018/Mines- 1.00.0 - - 09.03.2019 Working - SLM- Semi Jelly E78006’56.65

adu, Parapatti, A dated EC.No.56/2018 mechanized 7.3.2024 8.3.2019 0

(Rule-8) to78 07’00.16 5,03,550 Salem-636 08.03.2019. dated 203 05.12.2018 W/o.Mathava DEIAA- kannan, DIA/TN/MIN/1

Proceedings

Rough No.62-D-30, 8952/2018- N11037’43.28 Roc.560/ Open Cast- Stone- Thandan SLM- to11037’48.31 102 S.Jothi 2018/Mines- 1.00.0 - - 09.03.2019 Working - Semi Jelly street, EC.No.59/2018 E78010’47.84

A dated mechanized 7.3.2024 8.3.2019 0

(Rule-8) Shevapet, dated: to78 10’50.04 4,71,875 08.03.2019. Salem-636 07.12.2018 006.

[District Survey Report, Salem District] Page 103

Period of Status Period of Obtained Mining lease (Working / Mining Lease Date of Environmental Location of Sl. Mining Area of (1st /2nd Non- Method of Name of Address & (Initial) Commence Captive clearance the Mining No Name of the Lease Grant Mining ….renewal) Working Mining Resources the Contact No. of ment of / Non- (Yes/No), If yes Lease in Cubic Lessee order No. & Lease /Temp. (Opencast/Un Mineral Lessee Mining Captive letter No. with (Latitude Meter Date (Ha.) Working derground) From To From To Operations date of grant of &Longitude) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Raju, DEIAA- 0

D.No.4/593, Proceedings DIA/TN/MIN/ N11 52’23.49

Rough Anna Nagar, Roc.588/ 18538/2018- to 11052’29.72 Open Cast- Stone- 103 R.Sankar Panakattur, 2018/Mines- 1.00.0 - - 11.03.20199 Working - SLM- E78002’15.40 Semi Jelly

Panjukalipatty, A dated EC.No.47/2018 to mechanized

9.3.2019 8.3.2024

(Rule-8) 7,02,190 Omalur Taluk, 09.03.2019. dated 78002’119.69 Salem-636 455. 05.12.2018 DEIAA-

S/o.Andiyappan Proceedings DIA/TN/MIN/

Rough N11051’51.71 No.3/68, Roc.569/ 18663/2018- Open Cast- Stone- to11051’55.35 104 A.Kandasamy Mettupatti, 2018/Mines- 0.45.0 - - 12.03.2019 Working - SLM- Semi Jelly E77059’09.40

Kottamettupatti A dated EC.No.51/2018 mechanized 8.3.2029 9.3.2019 0

(Rule-8) to77 59’11.45 1,21,950 Salem-636 455. 09.03.2019. dated 05.12.2018 DEIAA-

S/o.Andiyappan Proceedings DIA/TN/MIN/

Rough N11051’44.16 No.3/68, Roc.570/ 18657/2018- Open Cast- Stone- to11051’50.40 105 A.Kandasamy Mettupatti, 2018/Mines- 1.00.0 - - 10.03.2019 Working - SLM- Semi Jelly E78059’08.64

Kottamettupatti A dated EC.No.52/2018 mechanized 8.3.2029 9.3.2019 0

(Rule-8) to77 59’13.02 4,21,222 Salem-636 455. 09.03.2019. dated 05.12.2018 S/o.Venkatacha DEIAA-

llam, No.6/251, Proceedings

Rough DIA/TN/MIN/ N11051’43.61 Deevattipatti Roc.581/ Open Cast- Stone- 19106/2018- to11051’48.73 106 V.Vadivelu Post, 2018/Mines- 1.00.0 - - 08.03.2019 Working - Semi Jelly SLM-EC.No. E78005’22.26

Kadayampatti A dated mechanized 6.3.2029 7.3.2019 0

(Rule-8) 70/ 2018 dated: to78 05’26.33 4,82,035 Taluk, Salem- 07.03.2019. 07.12.2018 636 351.

[District Survey Report, Salem District] Page 104

Period of Period of Status Obtained Mining Mining lease (Working / Date of Environmental Location of Area of Lease (1st /2nd Non- Method of Sl. Name of Address & Mining Lease Commence Captive clearance the Mining Name of the Mining (Initial) ….renewal) Working Mining(Open Resources No the Contact No. of Grant order ment of / Non- (Yes/No), If yes Lease in Cubic Lessee Lease /Temp. cast/ Under- Mineral Lessee No. & Date Mining Captive letter No. with (Latitude & Meter (Ha.) Working ground) From To From To Operations date of grant of Longitude) for dispatch EC. etc.,) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S/o.Sellappag DEIAA- ounder,

Proceedings DIA/TN/MIN/1

Rough 8-1-10, N11047’22.08 Roc.572/ 8991/2018- Open Cast- Stone- Ramakrishna to11047’27.22 107 S.Subramani 2018/Mines- 1.00.0 - - 10.03.2019 Working - SLM- Semi Jelly colony, E78045’36.17

A dated EC.No.68/2018 mechanized 7.3.2029 8.3.2019 0

(Rule-8) Kolathur Post, to77 45’40.53 2,99,250 08.03.2019. dated: Mettur Taluk, 07.12.2018 Salem- 303. S/o.Venkatach DEIAA- allam, No.69,

Proceedings DIA/TN/MIN/1

Rough Vedappankatt N11053’30.19 Roc.586/ 9055/2018- Open Cast- Stone- V.Ramesh uvalasu, to11053’35.39 108 2018/Mines- 1.00.0 - - 07.03.2019 Working - SLM- Semi Jelly kumar. Deevattipatti, E78005’33.66

A dated EC.No.67/2018 mechanized 5.3.2024 6.3.2019 0

(Rule-8) Kadayampatti to78 05’38.09 5,62,995 06.03.2019. dated Taluk, Salem- 05.12.2018 636 351 W/o.Elan govan, DEIAA- No.3/4-33,

Proceedings DIA/TN/MIN/1

Rough Seperumal N11054’40.53 Roc.579/ 8642/2018- Open Cast- Stone- kottai to 11054’45.05 109 E.Devi 2018/Mines- 1.00.0 - - 10.03.2019 Working - SLM- Semi Jelly Kanjanaicken E78006’34.49

A dated EC.No.49/2018 mechanized 8.3.2029 9.3.2019 0

(Rule-8) patti, to 78 06’39.21 8,91,335 09.03.2019 dated : Kadayampatti 05.12.2018 Taluk, Salem- 636 305.

[District Survey Report, Salem District] Page 105

Sl. Name of the Lessee/LOI Holder Village Taluk Geological Reserves No. Thiru. C.Adharsh S/o.K.Chandra mohan, 1. No.23/12, Sri Krishna kudil Apartment, Devannagoundanur Sankari Roughstone-3,96,432M3 Highways Colony, Salem-636 005

Thiru.R.Sadasivam S/o.Rajigounder, 2. Gopinathapuram Village, Sakkarachettipatty Mookanur Kadayampatti Roughstone-3,84,720M3 Post, Omalur Taluk, Salem

Thiru.C.Rathinam S/o Chinnayagounder, 3/39, 3. Vepillai Kadayampatti Roughstone-4,09,700M3 Kanakkupillai Street, Alagapuram, Salem

Tmt. Thilagavathy W/o Rathinam, 1/42 A, Roughstone-6,68,000 M3 4. Mukkanur Kadayampatti Mukkanur Post, Kadayampatty Taluk, Salem Gravel - 33,400 M3

Thiru. M. Raghuram S/o Manimohan, Mel 5. veethi, Nadupatty Post, Kadayampatty taluk, Nadupatty Kadayampatty - Salem District

[District Survey Report, Salem District] Page 106

15. Quality / Grade of Mineral available in the District

The Charnockite series includes rocks of many different types, some being felsic and rich in Quartz and microcline, others mafic and full of Pyroxene and olivine, while there are also intermediate varieties corresponding mineralogical to norites, Quartz-norites and diorites. A special feature, recurring in many members of the group, is the presence of a strongly pleochroic, reddish or green orthoPyroxene (formerly known as hypersthene). Chemical Composition Ranges in % SiO2 45 – 46 % Al2O3 1 – 3 % Fe2O3 1.16 FeO 21 – 33% MgO 12 – 20% MnO 0.3 – 0.8 CaO 0.04 – 2.0 Na2O 0.02 – 0.50 K2O 0.02 – 0.30

16. Use of Mineral:

It has been used for construction i.e., building, road and infrastructure development activities. Manufacturing of M-Sand.

17. Demand and supply of the Mineral in the last three years.

There is a huge demand for Rough stone, Gravel in the district due to the sudden increase of Construction activities and highway projects around the district. Environmental Clearance obtained quarry leases are considerably low in the district compare to the other district but the demand and supply of stone is not much more.

Sl. Year Roughstone Production No (in Cubic Meter) 1. 2016-17 7,03,872

2. 2017-18 7,96,673

3. 2018-19 5,14,764

[District Survey Report, Salem District] Page 107

18. Mining lease marked on the map of the District:

Fig 12. Showing the location of Overall Mining and Quarries leases granted in Salem District.

[District Survey Report, Salem District] Page 108

Fig 13. Showing the location Roughstone and Gravel quarries.

[District Survey Report, Salem District] Page 109

19. Details of the area of where there is a cluster of mining viz., number of mining leases, location (latitude and longitude):-

Locatio n of the Letter of Area of Use Mining Name Intent mining Geological S. (Capitive lease of the Grant lease to be Village Taluk District Reserves No. /Non- (Latitu Mineral order No. allotted (Mill.Tons) capitive) de & & date (Ha) Longitu de)

-NIL-

20. Details of Eco-Sensitive Area, if any, in the District.

Name of the Number of Status of the prohibited areas Sl. Quarries / mines Quarries illegal mining existing in the No existing in the /mines existing reported in the district ( Eco Remarks prohibited areas in the prohibited area, sensitive zone, granted with due prohibited if any Wild life clearance areas sanctuaries, etc)

-NIL-

21. Impact on the Environment (Air, Water, Noise, Soil Flora & Fauna, Land use, Agriculture, Forest etc.,) due to Mining Activity:- Generally, the Environmental impacts can be categorized as either primary or secondary. Primary impacts are those, which are attributed directly by the project, secondary impacts are those, which are indirectly induced and typically include the associated investment and changed pattern of social and economic activities by the proposed action.

The impact has been ascertained for the project assuming that the pollution due to mining activity has been completely spelled out under the baseline environmental status for the entire ROM which is proposed to exploit from the mines.

Air Mining Operations are carried out by opencast Semi mechanized/ Mechanized method, dust particles are generated due to various activities like, Excavation, Loading, handling of mineral and transportation. The air quality in the mining area depends upon the nature and concentration of emissions and meteorological conditions.

[District Survey Report, Salem District] Page 110

The major air pollutants due to mining activity includes:-  Particulate Matter (Dust) of various sizes.  Gases, such as, Sulphur Dioxide, Oxides of Nitrogen, Carbon Monoxide etc., from vehicular exhaust.  Dust is the single Air pollutant observed in the Open Cast- mines. Diesel operating drilling

machines, small amount of blasting and movement of machinery/ vehicles produce NOX, SO2 and CO emissions, usually at low levels. Dust can be of significant nuisance surrounding land users and potential health risk in some circumstances.

Water Impact The mining operation leads to intersect the water table cause ground water depletion. Due to the interruption surface water sources like River, Nallah, Odai etc., surface water system, Drainage pattern of the area is altered. Noise Noise pollution is mainly due to operation of Machineries and occasional plying of machineries. These activities will create Noise pollution in the surrounding area. Land Environment The topography of the area will change, due to the Topographical changes the entire Eco system will be altered. Flora and Fauna

The impact on biodiversity is difficult to quantify because of its diverse and dynamic characteristics. Mining activities generally result in the deforestation, land degradation, water, air and noise pollution which directly or indirectly affect the faunal and floral status of the project area.

However, occurrence and magnitude of these impacts are entirely dependent upon the project location, mode of operation and technology involved.

[District Survey Report, Salem District] Page 111

22. Remedial Measure to mitigate the impact of Mining on the Environment

Air Mitigated measures suggested for air pollution controls are based on the baseline ambient air quality of the area

The following measures are proposed to adopted in the mines such as,

 Dust generation shall be reduced by using sharp teeth of shovels.  Wet drilling shall be carried out to contain the dust.  Controlled blasting techniques shall be adopted.  Water spraying on haul roads, service roads and overburden dumps will help in reducing considerable dust pollution.  Proper and regular maintenance of mining equipment’s have to be considered.  Transport of material in trucks covered with tarpaulin.  The mine pit water can be utilized for dust suppression in and around mine areas.  Information on wind direction and meteorology will be considered while planning, so that pollutants, which cannot be fully suppressed by engineering technique, will be prevented from reaching the nearby agriculture area.  Comprehensive green belt around overburden dumps has to be carried out to reduce to fugitive dust emissions in order to create clean and healthy environment. Water

 Construction of garland drains to divert surface run-off into the mining area.  Construction of check dams / gully plugs at strategic places to arrest silt wash off from broken up area.  Retaining walls with weep hole will be constructed around the mine boundariesto arrest silt wash off.  The mined out pits shall be converted into the water reservoir at the end of mine life. This will help in recharging ground water table by acting as a water harvesting structure.  Periodic analysis of mine pit water and ground water quality in nearby villages.  Domestic sewage from site office & urinals/latrines provided in ML is discharged in septic tank followed by soak pits.

[District Survey Report, Salem District] Page 112

Noise Mitigation measures

 Periodic maintenance of machinery, equipment’sshall be ensured to keep the noise generated at minimum.  Development of thick green belt around mining area and haul roads to reduce the noise.  Provision of earplugs to workers exposed to high noise generating activities. Workers and operators at work site will be provided with earmuffs.  Conducting periodical medical checkup of all workers for any noise related health problems.  Proper training to personnel to create awareness about adverse noise level effects.  Periodic noise monitoring at suitable locations in the mining area and nearby habitations to assess efficacy of adopted control measures.  During the blasting, optimum Spacing, Burden and charging of holes will be made under the supervision of competent qualified mines foreman, Mate as approved by Director of Mines safety. Biological Environment MITIGATION MEASURES:  Development of gap filling saplings in the safety barrier left around the quarryarea.  Carrying out thick greenbelt with local flora species predominantly with long canopy leaves on the inactive mined out upperbenches.  Development of dense poly-culture plantation using local flora species in the mining area at conceptual stage.  Adoption of suitable air pollution control measures as suggested above.  Transport of materials in trucks covered with tarpaulin.  Construction of garland drains and settling tank to arrest silt wash off from lease area.  Construction of retention walls around lower boundary of mining area to arrest silt washoff and roll down boulders.  Retaining walls with weep hole will be constructed around the mine boundariesto arrest silt wash off.

[District Survey Report, Salem District] Page 113

23. Reclamation of Mined out area (Best practice already implemented in the District, requirement as per rules and regulation, proposed reclamation plan).

Inrespect of Roughstone quarry the entire mineral is mined out and working will be progressing towards bottom of the pit, reclamation in this mined out areas are not possible at present. However, the quarry pit allowed to collecting the seepage and rainwater for the storage of water will be kept as a reservoir for charging the nearby well and will be used for afforestation purpose. So, reclamation is not possible.

Inrespect of other minerals, the proposed depth of quarrying is depends upon geological formation (strike and dip), persistence of mineral, Anticipated life of the quarry and ultimate pit limit for safe & systematic method of quarrying. The excavated waste materials will be dumped properly terraced systematically be multi level dumping. When the dump becomes non-active it will be further terraced for spread of top soil for plantation of trees. When the quarry reach the ultimate pit limit, quarried out pit will be fenced with barbed wire also safety bund is constructed around the quarry and the quarry pit allowed to collecting the seepage and rainwater for the storage of water will be kept as a reservoir for charging the nearby well and will be used for afforestation purpose. Fish culture will be attempted. Hence, backfilling program has not been commenced.

24. Risk Assessment & Disaster Managment Plan:

The Disaster Management Plan (DMP) is supposed to be a dynamic, changing, document focusing on continual improvement of emergency response planning and arrangements. The disaster management plan is aimed to ensure safety of life, protection of environment, protection of installation, restoration of production and salvage operations in this same order of priorities. For effective implementation of the disaster management plan, it should be widely circulated and personnel training through rehearsals/induction conducted by the respective department from time to time.

[District Survey Report, Salem District] Page 114

General Responsibilities of Employees during an Emergency:

During an emergency, it becomes more enhanced and pronounced when an emergency warning is raised, the workers in-charge, should adopt safe and emergency shut down and attend any prescribed duty as essential employee. If no such responsibility is assigned, he should adopt a safe course to assembly point and await instructions. He should not resort to spread panic. On the other hand, he must assist emergency personnel towards objectives of DMP.

Co-ordination with Local Authorities: The mine manager who is responsible for emergency will always keep a jeep ready at site. Incase any eventualities the victim will be taken to the nearby hospitals after carrying out the first aid at site. A certified first aid certificate holder will be responsible to carryout the first aid at site. The mine manager should collect and have adequate information of the nearby hospitals, fire station, police station, village panchayat heads, taxy stands, medical shop, district revenue authorities etc., and use them efficiently during the case of emergency.

25. Details of the Occupation Health issues in the District. (Last five-year date of number of patients of Silicosis & Tuberculosis is also needs to be submitted):-

As per the guidelines of the Mine Rules 1955, occupational health safety stipulated by the ILO/WHO. The proponent’s will take all necessary precautions. Normal sanitary facilities should be provided within the lease area. The management will carry out periodic health checkup of workers. Occupational hazards involved in mines are related to dust pollution, Noise pollution, blasting and injuries from moving machineries & equipment and fall from high places. DGMS has given necessary guidelines for safety against these occupational hazards. The management will strictly follow these guidelines. All necessary first aid and medical facilities will be provided to the workers. The mine shall be well equipped with Personal Protective Equipment (PPE). Further all the necessary protective equipment’s such as helmets, safety goggles, earplugs, earmuffs, etc. will be provided to persons working in mines as per Mines Rules. Alloperators and mechanics will be trained to handle fire- fighting equipment’s.

[District Survey Report, Salem District] Page 115

26. Plantation and Green Belt development in respect of leases already granted in the District:

Afforestation is carried out along the lease boundary areas (Non-mineral bearing areas) and overburden dump. The rate of survival expected to be 60%. The local species of sapling i.e., Neem, Pongamia, Mango and Pinnata are preferred for plantation.

Field photographs:

Fig 14: Rough stone quarry, Charnockite, mining Fig 15: Horizontal distance from the Quarry to the farm suspended due to the objection from near by farm land is 81.85m land; Loc: P.N.Patti, Mettur Tk; 11º47’35.8”N; 77º49’42.7”E

Fig 16: Quarry/mine in the close vicinity of Fig 17: Dumping of mine waste on patta/ poramboku Dharmapuri highway (>150m); Loc: Thalavaipatti, land outside of the lease area; Loc: Pukkampatty; 11º53’07”N; 78º04’42.2”E 11º51’52”N; 77º59’08.2”E

[District Survey Report, Salem District] Page 116

Fig 18: Quarry on the road side without fencing, name/sign boards and lease area corner pillars; mine waste dumped on the road side; unsafe for the locales using the road; Loc: Parapatti; Salem South; 11º34’50.5”N; 78º08’01.2”E

Fig 19: Systematic and scientific method of mining by bench making, fencing, pitching of pillars, water sprinklers, plantation, safety measures etc carried out by M/s. SRC Proj Pvt Ltd (M.Paramasivam); Gajjelnaickenpatty; 11º35’06.1”N; 78º09’23.9”E

27. Any other information:

 The District Survey Report of the Salem district was prepared based on analysing the mining lease particulars awarded in the district and the field work carried out.

 The minor minerals include dimesion stones (colour Granite, dolerite), dunite, rough stones/ jelly stones (Charnockite), Quartz & Feldspar and gravel.

 The Salem district possessing huge deposit of variety of minerals meets the highest revenue generation through mining operations above the agriculture and other industrial practice.

[District Survey Report, Salem District] Page 117

o Regarding the depth of quarrying for rough stones/ jelly, no specific depth has been prescribed. Studying the average groundwater level of a particular area, the mining depth may be prescribed at lEast more than 5m above groundwater level. Water seepage and stagnation of water in the quarry site is noticed in most of the quarries.

 Also, the construction of buildings, school and other structures may be objected in the radii of 500m from the quarry/mine.

 The permit book and sales tax book is not properly maintained in most of the quarries and mines. It has to be emphasised the necessity of proper maintanace of the records in the mines/ quarries.

 The abanandoned quaries and mines may be developed as groundwater recharge ponds and tanks by increasing the permeability of the massive rocks by hydro fracturing and other techniques.

The socio economy of the Salem district is mainly based on the mining industry that has to be carried out in optimum utilisation of natural resources for the sustainable development of mankind and environment.

[District Survey Report, Salem District] Page 118