{r. 1 c 'l'&tlt S OF THE MEETING OF CABINET COMMITTEE ON INFRASTRUCTURE (CCI) ao o- ,ii.-,r:l HELD ON 1gth DECEMBER, 2019 ri IN THE CONFERENCE HALL OF HON'BLE CHIEF MINISTER

A meeting of the Cabinet Committee on lnfrastructure (CCl) was held in the Conference Hall of the Hon'ble Chief Minister on lgthDecember, 201 9 to discuss various issues as per agenda circulated vide No. PD(SPD)-21lccll2019-2012214 dated 16th December, 2019.

The meeting was chaired by Hon'ble Chief Minister and attended by Hon'ble Deputy Chief Minister, Chief Secretary, Commissioner (FPl), Secretary to CM, Secretary (PIanning) and officials of concerned Department

Concerned departments gave power point presentations on the respective proposa ls/issues for appraisal /consideration of the Committee. The proposa ls/issues were discussed in detail and after threadbare discussion, the following decisions were taken:-

LDecisions on Policv related issues:-

Decision No-1 :

It was pointed out that performance of the State under CSS schemes is not up to the mark due to non-submission of Utilisation Certificates on time to the concerned Ministry. The matter was viewed seriously by the CCI and it was decided that all efforts should be made to ensure that Utilisation Certificates are submitted to the Government of lndia on time and there is no delay at any level. The Committee directed the Planning & lnvestment Division to issue necessary notification in this regard immediately

Decision No-2: The issue of delay in floating tenders against sanctioned various projects/schemes under various Centrally Sponsored Schemes was also raised in the meeting. lt was proposed by the implementing departments that once a projecUscheme is sanctioned by the Govt. of lndia, the department may be allowed to float necessary tender without waiting for concurrence from Finance Department. The Committee, in principle, agreed to the proposal and it was decided that necessary instructions may be issued to this effect by the competent authority

Decision No-3:

The need for timely release of fund/LOC was discussed in the meeting. lt was decided that Planning DePartment shall issue allocations for all schemes by 1st April every year. As far as carry fonrard funds are concerned, Planning departrnent shall give part allocation in the month of April every year pending AG reconciliation based upon department's expendit ure statement. Once a projecUscheme is sanctioned by the competent authoritY and necessary documents are submitted by the concerned ment, Finance Department shall issue LOC/ authorisation regularlv every month from the beginning of the financial year as are done in cases of "Revenue expenditure" by the departments 2 \- :)

$?sul ,X8, DepartmenUProjects I Decisions/Remarks -4( 2 3 I Health & Family Welfare 1 Strengthening of 100 bedded Department to submit a comprehensive and General Hospital at and detailed DPR for all the Zonal Hospitals in the . State incorporating both residential and non- residential components along with requirements for critical medical equipments. lMajor equipments may be procured and installed on Annuity tVodel for better operation and maintenance. A separate block for AYUSH may be proposed which will be taken up with the ttlinistry for funding. PWD will be the executing agency for this project. CE (D&p), PWD will depute one senior SE for necessary coordination with the department. The project shall be executed under the direct supervision of Deputy Commissioner. Department was directed to finalise the DPR as early as possible so that necessary fund provision can be kept in Revised Estimates 2O1g-20 and tenders can be floated within this financial t! PWD 1 C/o . Common Directorate Departmen t was instructed to identify lands (in Complex and office Complex more than one location, if necessary) in for SHRC/LokayuktaAiVomen consultation with the District Administration and Commission etc. UD & Housing Department and submit the same to the Govt for further consideration 2 Building lnfrastructure plan, t WAS decided that i n the first p hase only 2019-24 for both residential h ig h er secon d a ry/secondary sch oo I bu ld ngs and non-residential buildings S hall be taken up PWD sh a do S u rvey to including replacement of identify S PT H rg h er Seco n da ry/Secondary buildings constructed during school b u it d ngs wh ich shal be reco nstru cted NEFA da to CC buildin stn hase wise manner 3 Development of Ganga Lake Approved i n principle as proposed by the department. Department to submit Detailed ect rt for further consideration 4 Proposa I for change of Approved as proposed by the Department nomenclature from "C/o Steel Bridge over Senki River in between Police Colony and Chimpu" to "Clo Steel composite Bridge over Senki River in between police Colony and Senki View Complex (Span 100m)" 3

{1 sh! i ... o. t. rtm e nUP rojects Ns: .. .k ,liDeRa Decisions/Remarks >3:. !;V 2 3 w 4to Uign Court Building Law Department to expedite accord of AA & ES and PWD may initiate tender for the work at the earliest. 6 Arogya Bhawan at Shillong The project was originally sanctioned for Rs 26.00 Crore which has been revised and the revised project cost with revision in scope of work of Rs. 8.50 Crore is approved. ilt RWD 1 Miao-Vijoynagar Road Approved in principle as proposed by the department. Department to submit DPR indicating requirement of year-wise fund requirement from State Plan for further consideration.

IV Agriculture and Textile Handicrafts (Sericulture)

1 Development of Apicultu re Concerned departments will take up activities separately in the western and eastern sectors in appropriate locations based on feasibility. Allocation of Rs. 36.00 lakh approved @ Rs. 18.00 lakh to each department. V Agriculture and Horticulture 1 C/o Green House Nurseries All the KVKs and Govt. farms are to be covered under this scheme in a phased manner. 20 units to be covered during CFY. Allocation of Rs. 2.00 Crore approved @ Rs. 10.00 lakhs each. Department to adjust the amount in RE within their budgetary allocatior vil Sports 1 Open Gyms in 36 towns Department to keep necessary provision in RE within their budgetary allocation 2 SPA Projects The proposal for allocation of fund against the ongoing projects sanctioned under SPA was also discussed and it was decided to allocate the fund against the project as under including unspent amount of SPA released by the Gol : in lakh SI Name of the On-going Project Amount No sanctioned under SPA recommended for release during 2019- 20 2495.00 1 Clo Outdoor Stadium at Chimpu under Papumpare District. 2 C/o Outdoor Stadium at Aalo, 497.50 West . 3. C/o Outdoor Stadium at Tezu 497.50 under . @ Total 3490.00 4

sl. DepartmenUProjects No Decisions/Remarks 1 2 3

The Committee also directed the Planning Department to pursue with Niti Aayog for release of balance fund for completron of major ongoing projects sanctioned under SPA vilt Miscellaneous 1 The CCI also accorded in principle approval for allocation of Rs. 32577.11 lakh only for implementation of 456 projects / schemes for which proposals have been received from various sources.

The meeting then ended with vote of thanks form the Secretary (Planning) This is issued with the approval of Hon'ble Chief lt/inister. sd/- (Naresh Kumar), IAS Chief Secretary

[/emo No. PD(sPD)-21lccll2019-20 Dated, the 23rd January, 2020.

Copy to: 1) The Secretary to Hon'ble Chief Minister, Govt. of , . 2) PS to Hon'ble Deputy Chief N/inister, Govt. of Arunachal Pradesh, ltanagar. 3) US to Chief Secretary, Govt. of Arunachal Pradesh, ltanagar. 4) All Principal Secretaries/ Commissioners i Secretaries, Govt. of Arunachal Pradesh, ltanagar. 5) The PS to Principal Secretary (Finance, Planning & lnvestment), Govt. of Arunachal Pradesh, ltanagar. 6) The Joint secretary (cabinet), Govt. of Arunachal pradesh, ltanagar. 7) Concerned Chief Engineers and Directors, Govt. of Arunachal pradesh, Itanagar/ Naharlagun/ N irjuli. 8) The Secretary (Finance), Govt. of Arunachal pradesh, ltanagar 9) PA to Secretary (Planning), Govt. of Arunachal p , ltanagar 10)Office Copy

(Himanshu Gupta), IAS Secretary (Planning & lnvestment) Page L

Annexure-l \ List of the projects approved by the Cabinet Committee on lnfrastructure (CCl) in principle for im plementation du ring 2019-20. st. NAME OF WORK AMOUNT EXECUTING No (in lakhs) AGENCY 1 2 3 4 Agriculture I C/o Market Shed at Lumla 50.00 Agriculture Sub-Total (Agriculture) 50.00 APEDA 2 lnstallation of Solar lrght at Sibe/Ditten/Tanqo/Gengi/Siberite 190 00 APEDA 3 Solar Power light system at Karo village and Ruku village under PlDl and 25.00 APEDA Moniqonq circle. A lnstallation of 500 KWp Solar PV Power Plant with battery backup at 100.00 APEDA in Arunachal Pradesh Sub-Total (APEDA) 315.00 Environment & Forest A lmprovement of SVR Forest Road at Simong 150.00 Env & Forest 6 lmprovement and Maintenance of Yamne Tarak Forest Road - 150.00 Env & Forest Sub-Total (Env & Forest) 300.00 Hydropower 7 Survey and investigation over Tirap river for 10MW near Thamjang 50.00 Hydropower village and 25MW near Chanqlanq HQ. 8 Reconstruction of Abhapani MHS at Aliaye and Rupapani MHS at Punli 150.00 Hydropower

Sub-Total (Hydropower) 200.00 PHE & WSD I Strengthening of distribution network of water supply to 250.00 PHE &WSD Township. 10 Marntenance of water supply in Tawanq Township 80.00 PHE&WSD 11 Development Play Ground cum community Festival Ground at Tanio 100.00 PHE&WSD under Nari Camp Vill.Sawa Circle. 12 lmprovement works of water supply system from Sille to Urban Areas 50.00 PHE&WSD

'13 lmprovement of water supply system from Sippi & Bosing Source to 50.00 PHE&WSD Urban Areas t4 lmprovement of water supply system from Sippi Source to Rural Areas. 50.00 PHE&WSD

15 lmprovement works of Water Supply System from Bosing Source to 50.00 PHE&WSD Rural Areas 16 lmprovement of Water Supply in Lekang Circle, Namsai Dis!!. 200.00 PHE&WSD 17 C/o Land protection wall at PD residential colony near old butcher point to 50.00 PHE&WSD new Macha Bridqe. 18 Providinq water supply at Saljipam village 50.00 PHE&WSD Sub-Totq![PHE & WSD) 930.00 Power 19 Renovation & System lmprovement of HT/LT District line at TaliADC Hq 100.00 Power l/C providinq street Light at Tali ADC Hq )a lmprovement of Assest under Electrical Division (Urban Area) 50.00 Power

21 lmprovement of Assest under Pasighat Electrical Division (Rural Area) 50.00 Power

22 Augmentation of 33 KV & 11 KV Line l/c switchyard of Khimiyang feeder 100.00 Power under Khimiyang Electrical Sub- Divlsion 23 Providrng of Distribution Transformers at Olington and Tichahat 50.00 Power Lonqnakshe, 24 C/o Augmentation of HT/LT Line l/C lnstallation of DT under Longding 60.00 Power Circle 25 Connection of 33 Kv line at Deko-Degom ME schoolto Badi and Yama 50.00 Power Banqqo Tea Estate. Page 2 sl. NAME OF WORK AMOU NT EXECUTING AGENCY No. (in lakhs) 3 4 1 2 Power zo Shifting of 11 Kv line transformers at Galu village from Rise PaddY Field 50.00

Power 27 lllumination of Malinitthan Archaeol ical Site and Tem le 50.00 Sub-Total (Power) 560.00 Pubic Works De artment 70.00 PWD 28 C/o T uarters- 2 Nos. in Lumla 30 00 PWD 29 C/o Boundary wall and maintenance of road from Main Road to Sports Com ex Lumla PWD JU C/o Amphi-Theatre craft Shop (Huts), Souvenir Shop, Cafeteria (coffee 300.00 sh Public Toilet welcome Gate and Parkin at Lumla 30.00 PWD 31 C/o A road at Dam nin villa e T District PWD 32 C/o Cultural Centre at Yusum Vill e Tawan District 30.00 33 Acoustic of Pacific S orts Club, Tawan District 20 00 PWD PWD 34 C/o zomkhan Hall at circuit house Tawa 50.00 PWD 35 C/o School Building and Staff Quarter at Govt. Middle School Kharsa 150 00 Jan Jt) C/o lvlani Hall with Kitchen at Bon len 50 00 PWD 37 C/o Drainage system with cross Drain-3 Nos and storm water drainage at 50.00 PWD Bon khar office com lex PWD JO C/o Residence Buildin for EAC staff at Thin bu 90.00 39 C/o Double storied type-ll, 4 Nos staff quarter at Govt. Middle School 75.00 PWD Jan 40 C/o Traditional Gate and a shelter house at Muka near lV bridge at 40.00 PWD Sh aro 41 C/o l\4ultipurpose hall for community shopping place a nd fair price shops 200 00 PWD at the existi co-o erative house at Lhou 42 C/o Boys Hostel Warden Quarters at Govt Higher Secondary School 20 00 PWD Kalaktan West Kamen District. 43 C/o Girls Hostel Warden Quartersat Govt. Higher Secon dary School 20.00 PWD Kalaktan West Kamen District 44 C/o Boundary Wall for Boys and Girls Hostel at Govt. Hr. Sec Schoo I 121 00 PWD Kalaktan both alo ith Internal Wall 45 Renovation of Boys Hostel at Govt Higher Secondary School Kalaktang, 10.00 PWD West Kam District 46 Renovation of Girls Hostel at Govt. Higher Secondary School Kalaktang 10 00 PWD West Kamen District 47 Renovation of 23 Nos of Teachers quarters at Govt. Hr. Sec. School, 69 00 PWD Kalaktanq (3 Lakhs each 48 Maintenance / Renovation of roads and bridges under Bhalukpong & 200.00 PWD Tenga sub-Division: 1. Road from Kamegbari to Doimara (CH: 23.00 KM to 50.00 KM) 2. Road from Foothill to Tenga (CH: 20.50 KM to 40.50 KM)- Rs. 120.00 lakh 3. Road from Magopam to Bichum (CH: 0.00 KNI to 15.00 KM)- Rs. 55.00 lakh 4. Protection work at Lower Bhalukpon near Bazaar line- Rs. 50 00 lakh

49 Road from Foothill to Tenqa 70.00 PWD 50 Road from Magopam to Bichum 55.00 PWD 51 Beautification & Completion of Entrance Gate at Bhalukpong 25.00 PWD 52 C/o Boundary wall around Medical Officers resident at CHC Nafra, West 24.00 PWD kameng Distt. C/o FSB in between old Bulu village to New Bulu village (Spain 35 20 00 PWD Meters) 54 C/o Boundary Wall around Govt. Primary School at Lower Dzong Nafra 25.00 PWD (t-225m) 55 C/o protection wall at various colony of Nafra Township 100.00 PWD (Sh: C/o protection wall near Co-operative building - Rs. 70.00 lakh and Nafra Gate Colony- Rs. 30.00 lakh) 6,e9arti, .)/,,0n, \ !J Page 3 st. NAME OF WORK AMOUNT EXECUTING No. (in lakhs) AGENCY 1 2 ., 4 56 C/o two roomed stagino hut at Mathow Village, under Nafra circle 25 00 PWD C/o Drainage system from back side of PWD subs- Division office to Shiv 20.00 PWD Ivlandir at Khellonq colony at Nafra. 58 C/o Playground for residential [/iddle School at Dibbin village under 36.00 PWD Nafra circle 59 C/o Land Development with approach road from Seppa ChayangTaJo 50.00 PWD Road to Govt Primary School Pao Nallah 60 C/o Road from Domdila to Laching Bagang PI\4GSY road to ME School, 50.00 PWD Lachinq Baqanq 2 Km (ph-1). ot C/o approach road from Kakukao village to Tower point Tanyek Letik 250.00 PWD area under 10- Seppa (E) AJC East Kameng 62 Repair and renovation of community health centre at Seijosa, Pakke- 150.00 PWD Kessang Distt. 63 Repair and renovation of Govt. Higher Secondary School at Seijosa, 150 00 PWD Pakke-Kessanq Distt 64 C/o CC Road at Konkra Putu-|, Nlg 50.00 PWD 65 C/o CC Road at Konkra Putu-ll, Nlq 50.00 PWD 66 C/o Lrnk Road from Model village to Damesite Nlg (Via Forest Colony) 100.00 PWD

67 C/o ADC office bualdinq. Baliian 200.00 PWD 68 C/o storm water drainaqe and RCC Wall at ESS-Sector at ltanaqar 250.00 PWD 69 C/o CC Permanent road from Yachuli College road to Toon village, Lower 50.00 PWD Subansiri Distrlct C/o Football around at Lichlit, 20.00 PWD 71 C/o C rcle Office building and quarters at Loth. Lower Subansiri District 50 00 PWD

72 C/o Road from Lempy-Akang to Lyokpo (SH: FC, CULVERT, R/WALL 250.00 PWD SOLLING, I\iIETALLING AND CARPETING, LENGTH 1,5 KIiIS),

73 C/o R/Wall, CC Foot path of various sectors at Hapoli. (Sh: Police 50.00 PWD Colonv Hill Top) 74 Renovation of Main Administrative Block District Hospital at Palin 50 00 PWD 75 Renovation of 50 Bedded lndoor Patient Hall at District Hospital, Palin 50 00 PWD

76 C/o Quarter for Crrcle Officer, Phassang circle 50.00 PWD 77 C/o Crrcuit House, Lungsa, Phassang crrcle 50.00 PWD 78 C/o Approach road to Pokrianq SDO HQ Sangram, Kurung Kumey 100.00 PWD 79 C/o Approach road at Pagba village, Kurung Kumey 50.00 PWD 80 C/o Protection and Retaining wall at Langrh circle HQ Nyobia, Kurung 50.00 PWD Kumey 81 Maintenance of infrastructure under ADC Office Tali 150.00 PWD (SH:1 . Repair & maintenance of Tali ADC Office building - Rs.20.00 lakh 2 Repair & N4aintenance of Staff quarters- Rs. 40 00 lakh 3. C/o SPT Generator shed cum store room & public toilet - Rs. 20 00 lakh 4. lnternal Pipe fitting- Rs. 20.00 lakh 5. lmprovement of General Ground at Loa under TaliADC Headquarter Rs. 50.00 lakh)

82 C/o welcome Gate at lvlen under Taliha Constitue 40.00 PWD dJ C/o Land Development for Community Hall at Tabom Jobe under Taliha 30 00 PWD Circle HQ 84 Re Constructron of Rest House al l\4enga l\,4andir under Janng Circle 25.00 PWD

PWD 85 lnf rastructure development of Residential School Putung Dui under 45.00 Jarin Circle HQ PWD B6 C/o Namlo ate at Raden 20.00 87 C/o Multipurpose Community Hall at Rigia village under Taliha Circle 100.00 PWD \ ?r"'t Page 4

si st. t NAME OF WORK AMOUNT EXECUTING I No (in lakhs) AGENCY 1 2 3 4 88 C/o Boundary wall around secondary school at Taliha 40.00 PWD 89 C/o Road from BRTF road to Merring Jobe under Jaring Clrcle 50.00 PWD 90 lmprovement of road Rigia to Bifnpe!( 050 km Widening) 50 00 PWD 91 C/o road from Soki village to Maachu village 6 km. [Sh: Formation cutting 300.00 PWD (0-6 km) Ph-l) 92 C/o CC a roach/ internal road to Mosivill e. 40.00 PWD 93 C/o CC approach /internal road at Soki village 40.00 PWD 94 C/o CC approach road to Dunivillage 20.00 PWD 95 Repair and maintenance of various Road under Baririjo PWD Sub- 70.00 PWD Division 96 Annual Repair and maintenance OF VARIOUS ROADS UNDER 90 00 PWD Dumooriio PWD Sub-Division-|, Dumporito (AP) 97 Repair maintenance, Extension Additional and Modification etc Existing 50.00 PWD Non-residential Building under Dumportjo PWp Division 98 Annual Repair and maintenance of residential buildings under Dumporijo 40.00 PWD PWD Sub-Division-l oo Annual Repair and maintenance of residential building under Sub- 31.00 PWD Division-ll (Gusar) of PWD Dumporiio Division. 100 Annual Repair and maintenance of non-residential buildings under Sub- 25.00 PWD Division -ll (Gusar) of PWD Dumporiio Division 101 Annual Repair and maintenance of non-residential buildings under Sub- 20.00 PWD Division-lll (Maro) of PWD Dumporiii Division 102 Annual Repair and maintenance of various roads under Sub-Drvision-ll 74.00 PWD (Gusar) of PWD Dumporiio Division. 103 Maintenance work of lB at Liromoba and Yomcha 20.00 PWD 104 C/o Modern Toilet and Bathroom with Geyser for Boys and Girls hostel 25.00 PWD alonqwith security fencing at VKV, Liromoba. 105 C/O Link Road at Darak to Boru Raksap 20.00 PWD 106 C/o New Rostrum at Keak villaqe, Kamba 20.00 PWD 107 Land Protection work at Kato area, Essi-Abevillageunder Liromoba '125.00 PWD Circle. 108 [\/aintenance works of various Govt. HS Schools under 27 25.00 PWD LiromobaAssembly Constituency. 109 C/o Helipad and approach road at Molom under Rumgong circle, Siang 100.00 PWD Distt. 110 C/o Tourism Square in Mechukha '1s0.00 PWD 111 C/o Road from Yibuk to Liqinq 300 meters hard rock 150.00 PWD 112 q& 8@d [9q $imang bridge to Kaying wet Paddy field 80 00 PWD 113 Maintenance of PLTK road from 40 km to 60Kms (SH Widenrng 300 00 PWD Kachcha Drain and Geometrics). 114 Conversion of 3 numbers of excess classrooms into staff quarter, 35.00 PWD furnishing of Library and Auditorium at secondary school Motum. 115 C/o Cattle trap, additional incomplete RCC boundary wall and parking 30.00 PWD provision at secondary school Kiyit. 116 lmprovement of road geometric at Mebo-Dholla road at Chainage (0.00 to 25.00 PWD 5.90 km). 117 lmprovement of road geometric at Mebo Dholla road at Chainage (6.00 to 25 00 PWD 12.00). 118 lmprovement of road geometric at Motum-Mebo road at Chainage (0.00 25 00 PWD toS.90 km) 119 Renovation of staff uarters for and HDO at Mebo. 25.00 PWD 120 C/o of additional gallery and MS gate at Motum field 25.00 PWD 121 Furnishing of Mebo lB 40.00 PWD Page 5

st. NAME OF WORK AMOUNT EXECUTING No. (in lakhs) AGENCY I 2 3 4 122 Construction of Cluster of roads under Geku-Mariyang area [Sh: 250.00 PWD 1 Constructron of road from Jamkong to Kongkung Area, Geku (Rs. 160 00 lakh) 2. Construction of Cement Concret Pavement road at Christian Prayer Centre, Geku (Rs. 25.00 lakh) 3. Construction bikable suspension bridge over Yamne river, Pongging village (Rs. 20.00 lakh) 4 Construction of CC pavement at Karing, Mariyang (Rs. 25.00 lakh) 5. Construction of road from Lower Sumsing to Upper Sumsing village (Rs. 20.00 lakh)l

tlJ C/o Mini Stadium at 400.00 PWD 124 C/o RLR at Meka 30.00 PWD 125 Up gradation of road from Chidu to New Chidu, Lower Dibang Valley 250.00 PWD District. 126 lmprovement of road from BRTF Road to Tellulianq Village, Tezu 100.00 PWD 127 Up-qradation and Maintenance of Amik Rinqva Hall, Tezu 150.00 PWD 128 Extension of community hall at Yasonq & Yatong 30.00 PWD 129 C/o CC footpath & steps from FSB point to Manchal villaqe 20.00 PWD 130 C/o CC Footpath & steps from Manchal villaqe to Manchal CO Hq 20.00 PWD 131 C/o Community Hall at Tapang under Hawai Circle. 25.00 PWD 132 C/o Community Hall at Loiliang under Manchal circle. 30.00 PWD 133 C/o Protection & Retaininq wallfor CHC Chaqlaqam 20.00 PWD 134 C/o Link Road to Walla village- 400 metres (SH:CC Pavement, S/Drain 35.00 PWD and R/wallat Hawai 135 C/o lnfrastruutures in the Community Complex at Emphong Village, 200.00 PWD Chonkham. 136 lmprovement of Roads under Namsai circle 200.00 PWD 137 C/o Auditorium at GSS Manmow 25.00 PWD 138 C/o Auditorium at GSS Manhobai 25.00 PWD 139 C/o Auditorium at GSS, Jaipur 25.00 PWD 140 C/o Auditorium at GSS,Namsai 25.00 PWD 141 C/o Children Park at Lathao. 25.00 PWD 142 C/o Children Park at Piyog 25.00 PWD 143 lnfrastructure development at Namsai Dairy Plant. 30.00 PWD 144 lnfrastructure development of Rostrum, gallery & play ground at Piyog 20.00 PWD Circle HQ. 145 lmprovement of roads under Leka4glQ{sle. Namsai Distt 200.00 PWD 146 C/o Road from Golu to Kherem Mura village (3.00) 210.00 PWD 147 C/o Link road from NH 315 at MT check gate to Jini Road TAH-215 (SH- 150.00 PWD embankment & GSBC, renovation of steel bridge) 148 C/o Road 'ftom 2.5 KM point road to Kengkhu village. (SH. RCC Slab 200.00 PWD Culvert, WBM and slide clearance works) 149 C/o Namtok township and adjacent villages roads (SH. Laying of CC 100.00 PWD Paver Block 150 C/o Paang (Traditional Community Hall) at Natun Kheti village. 25.00 PWD 151 C/o Class room H her School 100.00 PWD 152 C/o Strengthening of Link Road from Namsang to Wasathong at different 30.00 PWD Chainaqe. PWD 153 C/o Multipuroose CommunitY hall at Khonsa village 40.00 PWD 154 lmprovement of internal Village Road with CC Drain and WBM in New 50.00

PWD 155 C/o General Ground with at Ko Vi 50.00 PWD 156 C/o Protection wall below Bari- General Ground 70.00 PWD 157 C/o School Buildi for Govt. Prim School at Old 30.00 158 C/o Bounda wall l/C Protection work atK nsa 125.00 PWD PWD 159 C/o Protection work at Club at Khonsa 100.00 160 C/o Breast wall on Baazar drain near Thana Road Khonsa 25.00 PWD Page 6 sl. Yrkl NAME OF WORK AMOUNT EXECUTING No (in lakhs) AGENCY

1 2 3 4 161 C/o General Ground with drainage and retaining wall at circle HQ 80.00 PWD Borduria. 162 Up-gradation of HasheRusa-Kamkuh Rusa Road, Longding District 50.00 PWD

'163 C/O Play ground at Government Higher Secondary School, Ranglua, 30 00 PWD Lonqdinq District 164 C/o Wanu-Nqamdinq Road, Londing District 50 00 PWt] 165 Widening & maintenance of road from Khanu to upto Chithing rrver point. 150.00 PWD

166 C/o of Retaining wall at multi -purpose general at Pongchau township 50.00 PWD

167 Renovation, Repairing & maintenance of BDO office, Pongchau HQ 20.00 PWD

168 C/o Drainaqe system at naku villaqe at Nafra. 20.00 PWD 169 lnstallation of supply outdoor fitness equipment at lG Park, lta. And Polo 20.00 PWD park Naharlagun. 170 Repairing work of the internal street road at Ward no 16, lMC, P sector, 20.00 PWD CC pavement, RCC wall , CC Drainage and CC Culverts. 171 C/o Wine Rope suspension bridge at Pate river connect to Langdang 20.00 PWD villaoe. Saqalee. 172 C/o Retaining wall at Joram VKV under yachulicircle, Lower subansiri 20.00 PWD

173 C/o Volleyball ground at Sekh Jarak, under Yachuli circle, Lower 20.00 PWD Subansiri. 174 C/o Compound wall at old Fire station 20 00 PWD 175 C/o lnter circle road from Paksok to village of Gite Ripa circle to Bulo 20.00 PWD villaqe, Gusar circle. 176 C/o Rostrum at General qround Gensi. 20.00 PWD 177 Repairing of Boys and Girls school hostel building at Basar 20.00 PWD 178 C/o RIA suspension bridge at Poyum village under Darak circle 20.00 PWD 179 C/o formation cutting at Doji village general ground to Hami Sik bridge 20.00 PWD

180 C/o Approach road work length 500 mtrs (SH: retaining wall, drainage, 150 00 PWD culverts and CC pavement) at Lalu- lVlorang Nibu Pani 181 C/o Cultural Centre at Chillipam under Rupa Circle West Kameng Distt. 150.00 PWD

182 C/o RCC Protection Wallat Niriuli (Karma Jullv) 75.00 PWD 183 C/o Rcc wallat SenkiView Panchali Road 75.00 PWD 184 C/o WRSB over Huma river at Richik 100.00 PWD 185 C/o WRSB over Sulu river in Between Sartam to Tunqmar villaqe 50.00 PWD 186 C/o Boundary wall at Silluk villaqe Gravevard 50.00 PWD 187 C/o Rural link road from Mebo Dholla road to Agam village 0 to 2 Km 100 00 PWD (SH: EmLankment culverts & GSB) 188 C/o Drainage system and solling metalling of Holor Bine approach road in 150.00 PWD Jomo village-4 Kms by PWD 189 Clo Hall at Jamyang Choikorling Cultural centre . 170.00 PWD 190 C/o Approach road to Agri. Fields under Kalaktang Administrative Sub- 50.00 PWD Division 191 lmprovement and construction wall and Security gates around High 100.00 PWD Altitude Sport complex at Tawang. 192 C/o Approach road to Kunzang Choikorling lnstitute, Bomdila 130.00 PWD 193 C/o School Building for Zangdo Peri at Jang. 100.00 PWD 194 Additional fund for construction of Fathamba lnstitute of learning at Lhou. 1 00.00 PWD

195 C/o of Viewing gallery at Nurananq water fall, Janq 100 00 PWD 196 Acoustic of lndoor Badminton Club at Tawa ng 50.00 PWD 197 C/o security fencing around play ground (Statiium) at Kheti village in 40.00 PWD Ti Distt. Page 7

st. NAME OF WORK AMOUNT EXECUTING No, (in lakhs) AGENCY 1 2 3 4 198 C/o Headmasters Office building cum Conference hall at Govt. Sec 100.00 PWD School Thinsa in Tirap Distt. 199 lmprovement of lnternal Road in NIMAS Complex, Dirang 60.00 PWD 200 C/o Cutural centre at Takseng village under Lumla Sub-Division, Tawang 300.00 PWD Distt 201 C/o of RCC Protection Wallwith Compound Wall & MS Gate at Pray 184.00 PWD Tower/Town Baptist Church, Nirjuli. 202 C/o land protection work to protect Youth Hostel Road, Naharlagun 100.00 PWD 203 RCC Hostelfor 100 Boarders, for Gontse Gaden Rabgye Ling lnstitute, 328.00 PWD Bomdila West Kamenq Distt. 204 C/o protection wall at Pedung Village, Bomdila West kameng Distt '100.00 PWD 205 C/o Land Protection at Polo Colony near State Transport colony 150.00 PWD Naharlagun. 206 C/o Approach road from NH415 to Lekhi Putu at LekhiVillage, 100.00 PWD Naharlaqun. 207 lmprovement of Road from Police Check Point to Mowb-ll (SH BM, 100.00 PWD BC,S/Drarn clearance and pot holes), ltanaqar 208 Maintenance of roads from Papu Nallahto ltanagar via Jollang, 100.00 PWD Itanagar(Chainage:0.00 Km to 7.00 Kms) 209 Maintenance of roads from Papu Nallah to ltanagar via Jollang 100.00 PWD (Chainaqe.T 00 KLms to 14.00 Kms) 210 C/o Community Hall at 50.00 PWD 211 C/o New road (Extension)at ModelVillage, Naharlagun 43.00 PWD 212 PWD Construction of Box Culverts and protection wall at Lor Potung, ltanagar 80 00 213 C/o RCC retaininq wall and retaininq wall at Julanq villaqe 200.00 PWD 214 PWD C/o protection wall at Upper Medical Colony Seppa Kakukao village 150.00 215 Rectification of Bvoass Rinq Road under CD-B ltanaqar 150.00 PWD 216 PWD Re-carpeting of existing road from NH 299 to VKV School new Vessang 200.00 217 PWD Construction of approach road, car parking with CC interlocking including 350 00 drarnage culverts around Multipurpose Cultural Hall Namsai 218 Renovation of road from Kingko village to Wingko village under Namsai PWD 25.00 Circle 219 C/o road from Forest Check Gate to Koseng Village at Namsai (0.800 PWD 50.00 km) 220 lmprovement of road from Rajbhawan Gate No.1 to Children Park at B- 28.50 PWD Sector r/c development of parking place near Gate No.2 at Ra1 Bhawan Complex, ltangar (Sh C/o RR mosonary retaining wall, widening, WBM, caroetinq of road and parkinq area) 221 Replacement of wooden flooring with vitrifred tiles flooring including 5.80 PWD paintrng of lounge and Papumpare room of VIP Guest House at Raibhawan. ltanaoar 222 C/o com Pit-2 nos at bhawan 1.85 PWD 223 Replacement of damaged tiles flooring of Hon'ble Governor suit (Morning 3.30 PWD Dinin Room hawan r 224 Furnishing of residence of ADC's (ARMY) to Governor of AP at 6.60 PWD bhawan 225 Protection work around Hornbil Cottage repair and PU coat ing of Exterior 18.00 PWD Pannel Wall, roofing base replacement of roofing and wall cladding by tim n of new bathroom 226 Repair, remodeling of Governor's Secretariat office bu ilding and 23.75 PWD construction of new office chamber with attached Toilet for Joint or at 227 Wall ni with aesthetic art inin at hawan 9.25 PWD 228 Errection of Metal/ MS square tubular arches frame behi nd the flag post 2.35 PWD for crefer plant/ flqyver growth Page 8

I EXECUTING sl. NAME OF WORK AMOUNT in lakhs AGENCY No. 3 4 1 :-.' 2 21.00 PWD 229 C/o gardener shed for store, pots, manure & T&P items at Rajbhawan, Ita g ilc 56.00 PWD 230 Clo a pp roach road, fenc ng constructio n of ga rage & C G roofin shed q ua rter enternal water S upply RR maso na ry protectio n wal for res idential at Ita '18.60 PWD 231 Repair remodel ing of eecu rity persona ls rest room to convert AS a g uest r' nce SU it ilc pat nti ng and fu rnish tng at Commi ron er to Govern resid e Itan 17.50 PWD 232 Furnishing & furniture of ADC's Qtr (D/S) T-lV-2 Nos. Near IAS colony i/c carpet, water storage tank & pump etc. at Rajbhawan Comlex,

PWD 233 Maintenance, repair, painting and furnishing of Darbar Hall at Rajbhawan, 30 20 Itanaoar 4 PWD 234 Levelin of Main Lawn fit ti with earth at hawan PWD 235 C/o 50 boarders b hostel for Govt. Bomdila 63. PWD 236 Clo RCC slab cu lvert and storm water d ra at Likabali 100.00 PWD 237 Procurement of 1 No. Fully Robotic Total Station in the office of Chief 20.00 neer SI PWD 238 Procurement of on license of oPen road design software including training 15.00

PWD 239 Providing and fixing of Advertisement, scrolling flex panel around Civil 39.66 Secretari Itan ar Arunachal Pradesh 240 Supply, installation, testing and commissioning of Bubbler Stream Jet 38. PWD Fountaion and Volcano Jet Fountain with LED lights at Japanese ZEN n CivilSecreta Itan ar 241 Repair / maintenance of office building of D FC , Parvatinagar, TezPur 4. PWD

242 Extension of 1 room for ARC at Parvatin al Tez I 21.40 PWD 243 air and renovation of Govt. Quarters at T r 30.00 PWD 244 Construction of uarter for ARC UT 26 50 PWD 245 lnsatallation of a Gate at the entrance of Arunac hal Pradesh Govt Land 25.00 PWD T 246 C/o Assembly Hall at R.K. Sarada lVission School, Khaso, Wesl Kameng 100.00 PWD district 247 C/o link road from ltanagar - Hollongi 4 lane road to Langde Koto village 200. PWD via M/s N riT Garden 248 Constructi on of General G round with stadiu m at Sala ri vil I 200 PWD 249 C/o Storm water drainage System at lane-l (boda Colony) Nirjuli-l village 50.00 PWD

Sub-Total(PWD) 16826.65 Rural Devel 250 C/o Approach Road with Site Development at Tamakso (Damin) for 75.00 RD Establishment of various residential schools of Govt./Semi Govt./ Missionaries for Border Area of Damin and Paniasang circle. (Ph-l)

251 C/o Approach Road with Site Development and Boulder wall protection at 75.00 RD Damin near old Dropping zone for construction of all Govt. department residential and non reside al 252 C/o lmprovement of various WRSBs over rivers Pania Paha Joku under 50 00 RD Paniasa circles 253 C/o lmprovement of outdated Wire Rope Suspension Bridges (WRSBs) 75.00 RD over Kumeyand Thapa river in between Huri ITBP out post to China international border route. 254 C/o lmprovement of outdated (WRSB) over Kudey, Kumey and Pabin 75.00 RD rivers in Lower Damin area. 255 C/o lnter Village Foot track/Log ladder/log bridges under Damin circle in 50.00 RD Kuru Kum District 256 C/o RLR at Rukmo vil 30 00 RD 257 C/o commu fenci al Bizari 20.00 RD Page 9

st. NAME OF WORK AMOUNT EXECUTING No (in lakhs) AGENCY 1 2 3 4 258 C/o Public utilities at Baane Giddii notka, savinq 25.00 RD 259 C/o RLR at Poblunq 35.00 RD 260 C/o RCC culvert at Namlenq 20.00 RD 261 C/o 2RCC culvert at Bizari 20.00 RD 262 C/o RLR at Anpum 20.00 RD 263 C/o Approach road to Kapu Secondary School 20.00 RD 264 C/o Drainage retaining wall and extension of Khela village general 20.00 RD qround zo5 C/o General Ground at Tissa Town. 50.00 RD to6 C/o Approach road, Public gallery and VIP Rustom at General ground 50.00 RD Tissa 267 C/o Buildinq for Medical Sub centre Tissa 20.00 RD 268 C/o drainage system and parking place Mipi Pene Cultural Museum, 400.00 RD Ezenqo 269 C/o Rain Water Drainage at Yibuk village, (Near Distt. Veterinary office) 150.00 RD Roinq. Sub-Total(RD) 1280.00 RuralWorks Department 270 Protection Wall at Khromten Guest House,Tawanq District 20.00 RWD 271 C/o Cultural Centre at Thonqmin Gonpa, Tawanq District. 70.00 RWD 272 Maintenance of Kitpi PMGSY road, Tawanq District 100.00 RWD 273 C/o Boundary wallfor Govt. M.E School at Gyamdong 40.00 RWD 274 C/o Rest House and Assembly qround at Omlham, Lhou 50.00 RWD 275 C/o Rostrum at Bamenq General Ground, ADC HQ 100.00 RWD 276 Land Development Work at Khenewa Township, CO HQ 100.00 RWD 277 C/o Approach of Medical Colony at Khenewa CO HQ 100.00 RWD 278 Carpeting at Approach road at Pagya Tara near Art of Living 100.00 RWD 279 C/o Approach road fromNH-229 to lTl centre, Bana and internal Ring 100.00 RWD Road. 280 C/o Ato Rinqso Convention Hall at Lumdunq in East Kameng Distt 200.00 RWD 281 Maintenance of PMGSY road from Yarptn to Seba 100.00 RWD 282 C/o Approach road from Dheehapa to Pepihapa, Yoizat, Lower 25.00 RWD Subansisri District. 283 C/o link road from Pistana-Mengio Road to Pakha- Happa (2 Km) 20.00 RWD 284 C/o protection wall at Billo village 100.00 RWD 285 Maintenance of RWD road under RWD Division, Ziro. 50.00 RWD 286 C/o Yorlusubu road to Nenchanlanlya ( SH:CC Surfacinq Km) 30.00 RWD 287 C/o Retaining Wall and drainage at Govt. HSS Hiza and Govt HSS Hiza 20.00 RWD F nd 288 C/o Approach road to VKV School, Dobi including concreting of AssemblY 50 00 RWD area.(SH. Honq-aori villaqe road to VKV School) 289 C/o OPD Buildi at PH RaiBalo 200.00 RWD 290 C/o MO Para Medical Staff Qua etc. At PH Rai Balo 100.00 RWD 291 C/o Commun Hall at Nacho 40.00 RWD RWD 292 C/o Foot S ion at Limeki circle 45.00 293 C/o Approach road from BRTF road to Loke Modelvillage 50.00 RWD RWD 294 C/o Approach road from Bridge point (Keolorrng) to MultipurPose Hall at 100 00 Keoiorino. RWD 295 C/o Veterina D at mHQ 30.00 40.00 RWD 296 Clo Foot S sion brid at J ul over S uban S ri R iver RWD 297 Clo nd at Charu and Ri vill e 35.00 RWD 298 Land Development for agricu Iture at Paro in Dollungmukh SDO HQ in 200.00 50.00 RWD 299 Land Development and BoundarY wallat Madokoto area in Baosimla, Kamle District 25.00 RWD 300 C/o of Two unit of Toilets for Dl ET, Kam ki and renovation work for Girls and Bovs Hoste.l.a\DGPC, Kamkl Page 10 /, st. NAME OF WORK AMOUNT EXECUTING AGENCY No. "ll (in lakhs) 3 4 1 2 100 00 RWD 301 Maintenance of various Road under Kamba Circle (Sh: Karbak to Yomcha, Karbak Moku to Himak andn Karbak Hipin to Karbak Moku) ln West Sian District P RWD 302 cto toach R oad from P D road at Tak SO NI oha n tvl a n 20.00 RWD 303 C/o RLR from IGO PWD Point to lBU-DEBU confluence, West Siang 400.00 District 40.00 RWD 304 C/o Link road to H i area at N4o U 1Km U e 30 00 RWD 305 CIo Com m U n it ha I D ere at D amda D ek a RWD 306 C/o Commun Hall Dere at Yosin v ill e 30 00 RWD 307 C/o Link road from Patum to Borak at Lorging Ralung village (1 2 Km) 30.00

308 C/o Commun Hall Dere at Jomlo lvlobuk Vill 20.00 RWD 309 Clo roach road for N eko toH el side lvlabun ,Ri a 150.00 RWD 310 C/o Road from Siman Brid to Lilen vill 20.00 RWD 31 '1 C/o Hanging bridge over Singen Stream, Hinu area at Rina under Koyu 30.00 RWD Circle 312 C/o Link Road at Potte and Rina 25 00 RWD 313 lm rovement of road from Bilat to Mikon 20.00 RWD 314 Road from l\4irem to Ro on 20.00 RWD 315 Road from Sille to Ya rU 20.00 RWD 316 Road from Remi river to sille 20.00 RWD 317 Furnishin of RWD Guest House at Ruksin 20.00 RWD 00 RWD 318 C/o RLR from NH-52 to 12th Mile villa e, East Sian 30 319 RLR Nqorlung to Rombo Primarv School 20 00 RWD 320 Link road from Bilat -bamin to PLT road to Galling WRC field area in east 20.00 RWD Sia District 321 Road fromNH-52 to Govt.Middle School Rani via Govt. Primary School 20 00 RWD Siyinq 322 RLR from Debi to UPS at Debin 20 00 RWD 20.00 RWD C/o RLR from 12rh Mile to Mangnang 324 RLR from Mirem (Mikonq) to lvlangnang 20 00 RWD C/o FSB over Roi Nallah to connect Gomin village under Metengliang 20 00 RWD Circle. JZO Renovation of FSB over Dalai River to connect Chakka vlllage under 20.00 RWD Circle C/o CC steps with 2 units CC culvert at Palang under Manchal Circle 20 00 RWD

328 Renovation of Tai Khamti-Singpho Museum-Cum-Research Centre at 100 00 RWD Chonqkham. Restoration work of PMGSY road in Chakma Basti, Chongkham. 1s0 00 RWD 330 lmprovement of Road from Golu village to Gidding Baltlan Point of 40.00 RWD Buddhrst Temple (500 ntr) 331 Renovation and re- carpeting of PIVIGSY road from Namphai Baazar to 400.00 RWD Balinong, Changlang Distt.(1gkms ) PH-l 0 to 1okms JJZ C/o Link Road for development of WRC fields and Horticulture garden at 100 00 RWD New Kamlao. 333 C/o CC road from TAH 215 to Kovin Viilaqe 50.00 RWD 334 C/o CC Pavement road at Chimsu village l/c 1 No. Culvert (300 00 mtrs) 30.00 RWD

335 C/o Road from New Sallana to Old Sal anq (3 00 Km) 80.00 RWD JJO C/o Road from Changra PMGSY road to Datkan village 91.00 mtrs) 30.00 RWD C/o CC Slab Culvert (4.00 m span) at Phenbiro-l 25.00 RWD 338 Cio CC Pavement of road from Sangkhuhavi road to Panlom (300 00 35 00 RWD mtrs 339 C/o Road from township SIB colony to Yan Forest colony 50.00 RWD 340 C/o Boundary wall and Renovation of Class-room at Mapoya village 20.00 RWD Primary School (Deomali) 341 C/o Traditional Nam-Hum with Boundary Wall at Namsang village 40.00 RWD h- Page 1L {\*lt I st. NAME OF WORK AMOUNT EXECUTING No. (in lakhs) AGENCY 1 2 3 4 342 C/o Under- Ground Rain Water Drainage system at Deomali General 40.00 RWD Ground 343 C/o Lrnk road between Turet to Phunpong Village 20 00 RWD 344 Strengthening of RLR at changthrng vrllaqe 40 00 RWD 345 C/o General Play ground with Approach Road at Lower Kolam. 20.00 RWD 346 C/o Approach road at Noksa villaqe 20.00 RWD 347 C/o Approach road at Longo village upto Water Treatment Plant(WTP) 20.00 RWD

348 C/o Approach road at Old Paaniduria 20.00 RWD 349 Maintenance of PMGSY road to Waisho, Longding District. 20.00 RWD 350 C/o Wire rope suspension bridqeat Ranqlua, Lonqdinq district 40.00 RWD 351 C/o Approach road to qeneral qround at Ranqlua, Lonqdinq district 30.00 RWD .1Ea C/o Extension and Up-gradation of Helipad at Pumao C O HQ 100.00 RWD 353 C/o 2 Nos slab culvert at Chop villaqe under Wakka circle 20.00 RWD 354 C/o Protection work at Nainvuian area, ponqchau villaqe 25.00 RWD 355 C/o Protection work at Wakka villaqe. 20.00 RWD 356 C/o Protection work at lndustries building area, Pongchau town 25.00 RWD 357 C/o 2 Nos Slab Culvert on Guli Nalla at Khasa villaqe. 20.00 RWD 358 C/o 2 Nos Slab Culvert on Medical road and Thomas school at Pongchau 25.00 RWD Townshop. 359 C/o Land protection work on medical road at Pongchau Townshop 25.00 RWD JbU C/o Community hall at Holongi (new creation of Gumsing Masang vrllage. 20.00 RWD

361 C/o Boundary wall for Animal Hushbandry & veterinary office at Siro 20.00 RWD (Honq) villase. 362 C/o Community Playground at Ekke village under Siyum circle, Upper 25.00 RWD Subansiri 363 C/o Boundary wall, Teachers Qtr at Govt. Primary school Singdak village, 20.00 RWD under Sivum circle. 364 C/o Playqround at labin at Marqria, under Nilling circle 20.00 RWD 365 C/o Villaqe Football Playqround at Tasidonu village 20.00 RWD 366 C/o Protection wall cum water strom channel at Malini road, Near power 20.00 RWD office, Likabali. 367 Formation cutting , PWD road to Tarrikko Upper Nyodu village 3.5 km 20.00 RWD lenqth includinq 2 nos CD Gote and Payir. 368 C/o Suspension Bridge at Rime River (Connecting two village Sarilikar to 20.00 RWD Belo villaqe) under Liromoba Constituency 369 C/o Cultural hall at Tato villaqe. 20.00 RWD 370 Construction of Road from BRTF road to Kungkung area 150.00 RWD 371 C/o Link road from DPT to Jampani NLCPR road at Sika Bamin (4Kms) 50.00 RWD

372 C/o Link road from Ngorlung to Leku village via Birem WRC area (4kms) 50.00 RWD

373 Procurement of furniture for new guest house at Tawang 20.00 RWD 374 lnfrastructure development and creation of Tourism asset including a 50.00 RWD traditional qate at Melongkhar, Mangnam at Lumlq 375 C/o CC Drain and retaining wall and Breast Wall from BRTF Road to 40 00 RWD Balemronq road, Tawanq 376 C/o road from Goya village to Cheha Hapa under Toru Circle, 80.00 RWD (1KM) 377 Restoration and Strengthening of Rural Link Road from Pech to Pech 50.00 RWD Hoi Villaqe, under Saqalee Sub-Division 378 Restoration and Strengthening of Rura I Link Road from Pech to Khemlee 50.00 RWD Villaqe, under Sagalee Sub-Division. 379 C/o Double Court indoor Badminton Stadium at Aalo. 150.00 RWD 380 C/o Farm Link Road from Sigya, Pabu to Pyara Pabu at Loyako village, 200.00 RWD Hiia 381 Construction of road from C.K. Road to Juthung in Old Lainwang village 100.00 RWD Page 12 t a sl. NAME OF WORK AMOUNT EXECUTING (in No v"# Iakhs) AGENCY 4 1 2 3 Sub-Total 6370.00 Tourism 382 Provision for three signature bike rallies namely, 1. Eastern Arunachal, 2 200 00 Tourism Western Arunachal 3.Trans Arunachal 383 Procurement of furniture items and tiles fitting at Tourist Lodge at Geku 95.46 Tourism

Sub-Tolql{fguI!Ern) 295.46 Urban Development & Housing 384 C/o Flood protection work at the back side of Transition CamP, TYPe-ll 50.00 UD Colon 385 C/o Library cum cultural Hall at Circle HQ Borduria 70.00 UD 386 C/o CC Pavement road from Ponla road to Army Entry Point Road, 40.00 UD di 387 C/o RCC Strom water at Dedir Nallah adjacent to Kipa Marbie, Lekhi, 20.00 UD Papum Pare. 388 C/o RCC retaining wall at OTC forest colony below youth hostel 30.00 UD Naharlagun 389 Cio Cultural centre at Pasighat East Sta ng Distt. 150.00 UD 390 C/o Protection Wall near Vendor Market , Yinkiong, 100.00 UD

Sub-Total (UD & Housing) 460.00 Water Resources Department 391 C/o Community Hall at Kharung Gemlfq4g 60.00 WRD 392 C/o Protection wall and side drainage at Rho lB, under Thingbhu Circle 25.00 WRD

393 lmprovement of Lake with protection work, CC foothpath with proper 40.00 WRD drainaqe system at Kharung 394 C/o Flood protection work at Tangbo, Dirang, . 400.00 WRD

395 Flood control work at Seijosa Pakke -Paga festival ground, Pakke- 100.00 WRD Kessanq Distt. 396 Flood control Work at Karsingsa to protect Government Piggery Farm 50.00 WRD

397 C/o protection wallto protect Suspension bridge on Pare river in between 150 00 WRD Midpu to Lekha. 398 C/o Protection Wall to protect Pitapooltown from Pit River, Lower 45.00 WRD Subansiri District. 399 C/o lrrigation Channel at at Power House colony, Yazali, Lower Subansiri 20.00 WRD District 400 C/o MIP channelfrom Duud to Tabi stream at Radhpu 20.00 WRD 401 C/o Craft centre, marketing shed/ District information centre at Kirium, 100.00 WRD Kurung Kumey Distt. 402 C/o lVlP at Prrong 20 00 WRD 403 MIP at Rakmi 40 00 WRD 404 C/o Flood protection work at PeriVillage under Kamba Circle 20.00 WRD 405 C/o MIC at WRC field aqainst Kato NamsrVillaqe, Kamba 20.00 WRD 406 C/o Flood controlworks at Jipu Villaqe 20.00 WRD 407 C/o Land Protection at Siker stream, Gensi village 20.00 WRD 408 Maintenance of offices and Staff Quarters of WRD Basar, Leparada Distt. 150.00 WRD [sh: 1) C/o Executive Engineer Office residence Type-lV (Rs. 20.00 lakh) 2) Clo ASW Office Qtr.Type-lll (Rs.20.00 lakh) 3) C/o AE office Qtr Type-lll (Rs.20.00 lakh) 4) 5 nos. Type-ll Quaters (Rs. 20.00 lakh) 5) C/o EE WRD Division office- Rs.50.00lakh 6) Boundary wallfor allthe quaters- Rs. 20.00 lakhl er"/ ! Page 1-3

sl. NAME OF WORK AMOUNT EXECUTING No. n lakhs AGENCY 1 2 3 4 409 Maintenance of irrigation and infrastructure under WRD Basar, Leparada 100.00 WRD Distt. [sh: 1)Renovation and maintenance of MIP at Nyapin- Rs. 10.00lakh 2) Renovation & maintenance of MIP at Kamayarijo MIP at Basar- Rs.10.00lakh 3) Renovation & maintenance of MIP at Pagle MIP at Gori- Rs. 10.00 lakh 4) Maintenance of MIP at Nyodu- Rs.15.00 lakh 5) Maintenance of MIP at Daring- Rs. 15.00 lakh 6) Maintenance of MIP at Daririjo Daring- Rs. 20.00 lakh

410 Maintenance of MlPs under Aalo Division, . 300.00 WRD ect to clearance of P&l Division 411 Maintenance of Flood Control Structure under Aalo, West circle, West 100.00 WRD Siang District. ect to clearance of P&l Division 412 Anti -Erosion works at Gauste to Protect the Lusury Tent Resort, 250.00 WRD Mechukha 413 C/o Flood Protection at Old Deka New D Potte Nari 20.00 WRD 414 C/o Canal Headwork at Pam viil Circle 25.00 WRD 415 lmprovement of Earthen Embankments of Siang River in aroung 21 mile 35.00 WRD at hat 416 Channelization work at Poklek ending to protect WRC field ares of 35.00 WRD Takilal and Sibut vill 417 Extension & lmprovement of M.l schemes at Bosing and Bogong Areas 30.00 WRD under WRSD Pasi hat 418 Flood on at AB Kadan river 20.00 WRD 419 C/o Flood for tr 200.00 WRD 420 C/o Water Storm dra channel at Goil 20.00 WRD 421 C/o Retain & Protection wall at Walon Bazar 12 00 WRD 422 C/o Water Storm drain e channel at Marbo vil 20.00 WRD 423 Water harvesti structSure at Tikhak T 70.00 WRD 424 Land work at Jai r 30.00 WRD 425 Renovation & Extension to enhance capacity of MIP under Khimiyang & 100.00 WRD circle. 426 Flood Protection at Deomali NCI Nallah 20.00 WRD 427 C/o Strom water Drainage within Deomali Township BazarlNotun Basti 20.00 WRD extension area 428 C/o CC at Notun- Kheti Turet Lamlo Vill e 30.00 WRD 429 C/o Public Shed/ Galle at Si iPt round. 30.00 WRD 430 C/o Boundary wall around Traditional Paang and Heritage Structures at 25.00 WRD Namsa viil e 431 C/o Head Work for S Pathar MIP at Jadthu 100.00 WRD 432 Mai ntenance of MIP under Chubam Block n District. 40.00 WRD 433 Protection Wall at Tisa river at Otongkhua bridge point, Londing District. 60.00 WRD

434 Maintenance of WRD section and quarters at Lawnu, Longding District. 30.00 WRD WRD 435 C/o L.P work at Tichang Agrifield on the bank of Tissa river, Longding 50.00 district 436 C/o L P Work at Tizan Agrifield on the bank of Tizan stream, Longding 30.00 WRD District WRD 437 C/o MIP for Paddy Cultivation at Kolong Agri Field at Chongkhow village 20.00 WRD 438 C/o Landslide Mitigation to eroding Paddy field near Block 4 Hill top, Huto 30.00 Panch Hol WRD 439 C/o Community Playground at village Dodo under Yazali circle,Lower 25.00 Subansiri Page 1.4 I a

i, st. NAME OF WORK AMOUNT EXECUTING (in AGENCY No lakhs) 3 4 1 2 WRD 440 C/o Approach road to comPou nd Fish Farm Dodo Nallah, from Swreh 25.00 h under Dodo Yazali circle WRD 441 C/o lrrigation Channel and protection Wallat Jia-Sika Sille and [Vlangnang 150.00 area WRD 442 C/o MIC over Pan o Nallah Chann at Sille vtl e 25 00 WRD 443 C/o MIC over S Koron at Rani vi 25.00 444 C/o Hisi Rijo MIP at Ragi Doke, Tirbin, (SH: Formation cutting and CC 50.00 \ryRD

445 C/o Flood Protection Wall at RigYq Village under Dollumukh Circle. 150.00 WRD 446 C/o Entrance Gate and boundary wall at Malinithan Archaeological site 50 00 WRD

447 C/o RCC Storm Water Drainage in between lVlalini l\Iela Ground and 50 00 WRD Entrance of Malinithan Archaeological S[e- 448 Construction of 2(two) rows of RCC retain ing wall at Malinithan 50.00 WRD ,l ical Site 449 Construction and renovatio n of scattered sand stones plinth including age 50.00 WRD old steps at Malinithan 450 C/o Pedestrian Ramp for Physically disabled and senior citizens at 50.00 WRD Malinithan 451 C/o Protection Wallwith Drainage at Nyari Welly Village Colony Seppa 30 00 WRD 50 Mtr Sub-Total D 3990.00

Grand Total 31577.',|1