2018 Draft -DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

SR 821/HEFT SR 874 I-75 Underway - Widen, Add Managed Lanes (1)

Underway- Widen from 4 lanes to 6 lanes, improve signal NW 12th Street NW 107th Ave SR 826 (1) coordination SR 997/Krome Avenue South of Flagler Ave SW 296th Street (Truck Route) Underway - Widen (12)

I-75 at Miami Gardens Drive Underway - Modify Interchange (17) Underway - New SR 836 Eastbound Auxiliary Lane from NW 57th Avenue to Le Jeune Road; SR 836 Eastbound additional lane from Le Jeune Road to NW 27th Avenue; SR SR 836 Operational, Capacity and Interchange NW 57th Avenue NW 17th Avenue 836 Westbound additional lane from 17th Avenue to 57th (14) Improvements Avenue and improvements to the interchanges at NW 57th Avenue, Le Jeune Road, NW 27th Avenue and NW 17th Avenue. Underway - Reconstruction of the NW 87th Avenue SR 836 West of 82nd SR 836 Interchange Modifications at 87th Avenue NW 97th Avenue Interchange and SR 836 Mainline to 500 feet West of NW (14) Avenue 82nd Avenue.

SR 826/Palmetto Expressway I-75 SR 836 Underway - Add managed lanes Interchange Improvements (1)

SR 826/Palmetto Expressway (NB) Okeechobee Rd NW 103rd St Underway- Add 1 NB auxiliary lane (1)

SR 836/I-95 Interchange Ramps NW 17th Avenue I-95 Modify Interchange (12)

SR 826/Palmetto Expressway SR 826 Eastbound Ramp SR 9A/I-95 Northbound Modify Interchange (12)

SR 826/Palmetto Expressway I-75 I-95 Managed Lanes (12)

I-75 S. of NW 170th Street MiamI-Dade County Line Managed Lanes (12)

NW 20th St NW 27th Ave I-95 Roadway infrastructure improvements (1)

Widen 25th Street to include reversible lanes. Provide adequate left-turn bay lengths, incldue access management NW 25th St NW 117th Ave Viaduct (1) median opening closures within 1,000 feet of the intersection and provide adequate turning ratio Increase operational capacity, improve safety, address roadway and structural deficiencies, and enhance overall SR 821/HEFT Interchange Improvements Hainlin Mill Drive traffic operations on the Turnpike / SR 821 at Hainlin Mill (7) Drive Interchange. Also includes improvements along the Turnpike / SR 821 and surface streets. From MP 0 to MP 5.1, and ramps from Work includes milling and resurfacing, guardrail installation,

Freight to Highway Current Related 2025 Projects Resurface Turnpike / SR 821 MP 9.2 (7) Freight to Highway Current Related 2025 Projects MP 5.1 and signing and pavement marking improvements.

SR 25/Okeechobee Rd/US 27 E. of NW 117th Avenue E. of NW 107 Avenue Modify Interchange (12)

SR 112/I-195 Frontage Road & Ramp Realignment Miami Design District New Road (12)

Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

SR 9A/I-95 Southbound Ramp to Westbound SR 836 SR 9a/I-95 Southbound Ramp Westbound SR 836 Modify Interchange (12) Golden Glades Interchange Improvements (Mainline SR 91/Turnpike Southbound Modify Interchange (12) Spur MP 0x) Golden Glades Interchange Improvements N/B Direct SR 91/Turnpike Southbound Bridge (12) Connect Bridge Golden Glades Interchange SB Turnpike SB I-95 @ NW 135th St Modify Interchange (17)

Golden Glades Interchange: SR-826/Palmetto Expy NW 17th Avenue@ SR-826 NB I-95 @ NW 183rd St Modify Interchange (17)

SR 9336/Palm Drive SR 997/Krome Ave SR 5/US 1 (Truck Bypass) Widen/Resurface (12) Operational improvements from Golden Glades interchange SR 91/'s Turnpike I-95 / Golden Glades (7) to Turnpike / SR 91 SB to I-95 SB. SR 836/I-395 West of I-95 MacArthur Cswy Bridge Bridge (12)

SR 25/Okeechobee Rd/US 27 E. of NW 107 Avenue E. of NW 116th Way Grade Separation (12)

Golden Glades Interchange @ I-95, SR 826 and Florida's Turnpike Modify Interchange (12)

I-95 NB Biscayne River Canal SR 860/Miami Gardens Drive Add 2 Auxiliary Lanes (12) New connections from SR 836 to the Homestead Extension of the Florida's Turnpike (HEFT) including eastbound SR 836 Homestead Extension of SR 836 New HEFT Ramp Connections SR 836 to northbound HEFT general purpose lanes, and (14) Florida's Turnpike southbound HEFT general purpose lanes to westbound SR 836. SR 924/Gratigny Expressway Partial Interchange at New westbound on and off ramp from NW 67th Avenue and SR 924 NW 67th Avenue (14) NW 67th Avenue new eastbound on-ramp from NW 67th Avenue. New partial interchange at SR 112 and NW 37th Avenue. New movements SR 112 include eastbound on-ramp at NW SR 112 Ramp Improvements at NW 37th Avenue SR 112 NW 37th Avenue (14) 37th Avenue as well as a westbound off-ramp at NW 37th Avenue. New southbound exit ramp to SW 72nd Street and new SR 874/Don Shula Expressway SW 72nd Street SR 874 (14) northbound entrance ramp to SR 874 from SW 72nd Street. New public-use access ramp from West of NW 107th SR 836 Extension - Westbound Access Ramp SR 836 Extension Westbound NW 107th Avenue (14) Avenue to SR 836 westbound extension. Modification of toll plaza, installation of gantries and system SR 836 Infrastructure Modifications for Open Road NW 137th Avenue NW 62nd Avenue signage, and modification to SR 836 and ramps near existing (14) Tolling (West SECTION) toll plaza. SR 997/Krome Avenue SW 312th Street/Campbell Drive SW 136 Street Add 2 Lanes to 4 Lane Divided (12)

SR 826/Palmetto Expressway Connector At Golden Glades Modify Interchange (12)

Freight to Highway Current Related 2025 Projects SR 25/Okeechobee Rd/US 27 Broward County Line West of HEFT Add 2 Auxiliary Lanes (12) Widening and operational improvements to SR 836 EB from

Freight cont'd to Highway Current Related 2025 Projects NW 17th Ave to I-95, widening of the SR 836 bridges over SR 836 / I-95 Interchange Improvements NW 17th Avenue I-95 the Miami River and improvements to the SR 836 WB (14) mainline and new connector serving SB I-95 traffic destined WB on SR 836 and to the Civic Center. Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

SR 821/HEFT US 1 Campbell Drive Add 2 Lanes to 6 Lane Expressway (7)

SR 826/Palmetto Expressway I-75 NW 17th Avenue Managed Lanes (16)

SR 25/Okeechobee Road/US 27 East of NW 87th Avenue NW 79th Ave Add 2 to Build 8 Lanes (12)

SR 25/Okeechobee Road/US 27 East of NW 116th way East of NW 87th Ave Grade Separation (12)

SR 25/Okeechobee Road/US 27 at SR 826/Palmetto Expressway Various Ramps (12)

Expressway extension from SR 924 West to the Homestead Extension of the Florida's Turnpike (HEFT). Segment 1 - 107th Avenue to HEFT including feasibility analysis for a SR 924/Gratigny Expressway Extension West to the potential ramp at 87th Avenue, Segment 2 - 97th Avenue to HEFT Existing SR 924 (14) HEFT 107th Avenue, and Segment 3 - 97th Avenue to SR 826. This work program includes funding for Design-Build of Segment 1 WB and Segment 2, and Final Design for Segments 1 EB and 3 EB.

Projects 2026 to 2030 2026 Projects

Freight Highway Related SR 924/Gratigny Expressway Extension East to I-95 Existing SR 924 at NW 32nd Avenue I-95 Expressway Extension (14)

SR 826/Palmetto Expressway NW 103rd St NW 154th St Ultimate Improvement, Modify Interchange (17)

NW 21st Street/NW 32nd Ave NW 37th Ave NW 28th St Construct high level bridge (1)

Create separate barriered truck lane with manageable SR 826/Palmetto Expressway Golden Glades (1) entry/exit Expressway Conversion-Construct Grade Separated Overpasses at Major Intersections. New Interchange at NW SR 25/Okeechobee Rd/US 27 Krome Ave NW 79th Ave (1) 79th Avenue, Krome Ave/SR 997, NW 103 St/NW 87th Avenue SR 25/Okeechobee Rd/US 27 Krome Ave SR 826 Conversion to limited access toll facility (1) Widen North River Drive to include shoulders and improved NW North River Dr NW 107th Ave NW 74th Ave (1) access management Widen bridges and intersections between Okeechobee NW South River Dr & Medley Bridges connecting to Medley's NW South River Drive Bridges US 27/Okeechobee Rd Roadand NW South River Dr. Address inadequate geometry (10) Okeechobee Rd/US 27 and improve freight and truck movements Widen North River Drive to include shoulders and improved NW North River Dr NW 107th Ave NW 74th Ave (1)

Projects 2031 to 2045 2031 Projects access management

HighwayFreight Related Improve the connections between Okeechobee Roadand NW 121Street Way, NW 116th Medley Bridge/Canal Improvement Program Medley through a combination of bridge widening and canal (1)

Freight to Highway Current Related 2025 Projects Way,NW 105th Way, NW 79th Ave improvements

Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source New expressway connecting SR 836, SR 112 and SR 924. Includes system interchanges with SR 112 and SR 924 and Connect 4 Express SR 836 SR 924 potential service interchanges with NW 54th Street, NW 79th (18) Street and NW 103RoadStreet with connectors to NW 37th Avenue.

I-95 at NW 20th Street NW 20th Street New Interchange (18)

New expressway connecting SR 836, SR 112 and SR 924. Includes system interchanges with SR 112 and SR 924 and SR 836 SW Extension (MDX) NW 137th Avenue SW Kendall potential service interchanges with NW 54th Street, NW 79th (18) Street and NW 103RoadStreet with connectors to NW 37th Avenue. SR 836 Managed Lanes NW 87th Ave HEFT Managed Lanes (18)

SR 836 Managed Lanes East of SR 826 West of SW 27 Ave Managed Lanes (18)

NW 25th Street Viaduct NW 82nd Avenue NW 107th Ave Grade Seaparated Viaduct (18)

SR 826/Palmetto Expressway SR 836 US 1 Managed Lanes (18)

SR 826/Palmetto Expressway/ Okeechobee RoadInt. SR 826 US 27/Okeechobee Road Modify Interchange (18)

SR 25/Okeechobee Rd SR 826 Krome Ave Ultimate Improvement (17)

I-75 SR-826 NW 170th St Ultimate Improvement (17)

I-75 at NW 138th St Modify Interchange (18)

I-75 / SR 826 Int. I-75 SR 826 Modify Interchange (18)

I-75 CorridorImprovements NW 138th St SR 826 Ultimate Improvement (18)

I-75 / Miami Gardens Dr. Interchange HEFT NW 170th St. Ultimate Improvement (18)

I-75 / HEFT Interchange Collector Distributor Road Miami Gardens Dr Modify Interchange (18)

SR 90 at I-95 Modify Interchange (18)

I-95 US 1 Broward County line Managed Lanes and Transitway Ultimate Improvement (18)

Highway Freight Related Projects 2031 toHighway 2045 2031 Freight Projects Related I-195 Terminus of I-195 I-95 Ultimate Improvement (18)

Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Freight to Highway Current Related Plan 2025 Projects FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

Le Jeune Road NW 28th Street North of NW 31Street St Corridor Traffic Ops. Improvements (1/15)

Le Jeune Road NW 28th Street Intersection Traffic Ops. Improvements (1/15)

NW 58th Street NW 74th Avenue Intersection Traffic Ops. Improvements (1/15)

NW 72nd Avenue NW 74th Avenue SR 836 Corridor Traffic Ops. Improvements (1/15)

NW 74th Street NW 84th Avenue NW 74th Ave Corridor Traffic Ops. Improvements (1/15)

NW 107th Avenue NW 74th Ave Arterial Capacity Improvements (1) NW South River Drive Milam Dairy Road NW 58th Street NW 74th Street Corridor Traffic Ops. Improvements (1)

Medley freight hub streetlight improvements Corridor Traffic Ops. Improvements (1)

NW 25th St NW 87th Ave MIA Cargo Area Signal Timing Improvement (9)

NW 36th St NW 7100 Block NW 79th Ave Signal Timing Improvement (9)

NW 72nd Ave Corporate Way NW 25th St Signal Timing Improvement (9)

NW 72nd Ave NW 74th St NW 74th Street Connector Signal Timing Improvement (9)

NW 74th Street NW 74th Avenue SR 826 Signal Timing Improvement (9)

NW 117th Avenue NW 12th Street NW 41st Street +2 Lanes to 4 Lane Divided Arterial (9)

NW 117th Avenue NW 25th Street NW 41st Street +2 Lanes to 4 Lane Divided Arterial (9)

US 27/Okeechobee Road W 8th Avenue NW 74th Street Signal Timing Improvement (9)

PORTMiami Access I-395 PORTMiami Via 2nd Avenueand 5th St Signal Timing Improvement (9) PORTMiami Via 1Street Avenueand 6th PORTMiami Access I-395 Signal Timing Improvement (9) St Evaluate the need for rail grade separations at affected At-Grade Railroad Crossings (10) locations

At-Grade Railroad Crossings Countywide Monitor rail movements for future grade spearations (10)

Extend left turn lane storage to 1,000 feet on Curtiss Street Curtiss St at NW 42nd Avenue (11) at WB approach to NW 42nd Ave; close median at Musick St

Freight Direct Highway Projects 2019 to 2025 Freight Highway 2019 Direct Projects NW 135th Street Signals in Opa-locka Improve signal coordination along NW 135th St (11) Change EB approach to 1 shared through right + 2 through +

Freight to Highway Current Related 2025 Projects 2 left; sign to indicate EB trucks making LT to NB 27th EB 135th Street at NW 27th Avenue Avenueuse outer lane only; pull back SBLT stop line, add (11) pavement marking to align new EB through and left turn traffic pattern Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

NW 27th Avenue Signals in Opa-locka Improve signal coordination along NW 27th Ave (11)

NW 22nd Avenue Signals NW 22nd Avenuein Opa-locka Improve signal coordination along NW 22nd Ave (11) Add additional SB through lane and exclusive SB right turn NW 42nd Ave at 135th Street (11) lane at NW 42nd Avenueand 135th St Improve signal coordination along NW 42nd Ave/Le Jeune

cont'd NW 42nd Avenue Signals NW 42nd Avenue in Opa-locka (11)

Freight to 2025 to 2025 Rd

Direct Direct 2019 Truck Parking Faciltiy at Golden Glades Interchange (12)

SR 25/Okeechobee Road/US 27 NW 138th Avenue NW 79th Avenue Corridor Traffic Ops. Improvements (1/15)

NW South River Drive NW 36th Street Intersection Traffic Ops. Improvements (1/15)

NW North River Drive SR 112 NW 27th Avenue Corridor Traffic Ops. Improvements (1/15)

NW 82nd Avenue NW 41Street Street NW 25th Street Arterial Capacity Improvements (1/15)

W 16th Avenue S Okeechobee Rd NW South River Dr Corridor Traffic Ops. Improvements (1/15)

NW 12th Street NW 107th Avenue SR 826 Arterial Capacity Improvements (1)

NW 12th Street NW 87th Avenue Intersection Traffic Ops. Improvements (1)

NW 25th Street NW 89th Court SR 826 Arterial Capacity Improvements (1)

NW 36th St/NW 41Street St HEFT Le Jeune Road Corridor Traffic Ops. Improvements (1)

SR 826/Palmetto Expressway Golden Glades Dadeland Freeway Capacity Improvements (Unfunded) (1)

SR 836/I-395/MacArthur Causeway NW 137th Avenue Miami Beach Freeway Capacity Improvements (Unfunded) (1)

NW 107th Ave Okeechobee Road 1000 ft north of NW 122nd Street Arterial Capacity Improvements (1)

NW 87th Avenue Extension Okeechobee Rd NW 58th Street Arterial Capacity Improvements (1) Golden Glades Interchange Multimodal Truck Parking Improvement Truck Parking (1) facility NW 12th Street NW 127th Ave TURNPIKE +2 Lanes to 6 Lane Divided Arterial with TSM&O (9)

NW 25th Street Fl-825/SW 137th Ave NW 127th Ave New Road (9)

NW 25th Street NW 127th Ave TURNPIKE +2 Lanes to 6 Lane Divided Arterial with TSM&O (9)

NW 25th Street and NW 67th Ave Intersection Modification (9)

NW 36th St and NW 79th Ave Intersection Modification (9)

NW 36th St and NW 72nd Ave Intersection Modification (9)

Freight to Highway Current Related 2025 Projects NW 36th St and NW 7100 Block Intersection Modification (9)

NW 41 Street NW 127th Ave TURNPIKE +2 Lanes to a 4 Lane Divided Arterial (9)

Freight Direct Highway Projects 2026 to 2030 Freight Highway 2026 Direct Projects NW 58th St FL-826 Milam Dairy Rd +2 Lanes to a 4 Lane Divided Arterial (9)

NW 74th St NW 87th Avenue FL-826 TSM&O (9) Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

NW 74th St FL-826 Okeechobee Rd +2 Lanes to a 8 Lane Divided Arterial (9)

NW 74th St and NW 77th Ct Intersection Modification (9)

NW 74th St and NW 72nd Avenue Intersection Modification (9)

NW 74th St and NW 69th Ave Intersection Modification (9)

NW 90th St NW 117th Avenue NW 84 Avenue New Road and Add Lanes to 4 Lane Divided Arterial (9)

NW 90th St NW 84th Street NW 79th Avenue New Construction 2 Lane Divided Roadway (9)

SW 137th Ave NW 12th St NW 41Street St New 2 Lane Divided Roadway (9)

NW 127th Ave NW 12th St NW 41Street St New 4 Lane Divided Arterial (9)

NW 122nd Ave NW 12th St NW 41Street St New 4 Lane Divided Arterial (9)

NW 122nd Ave NW 41Street St NW 58th St New 4 Lane Divided Arterial (9)

NW 117th Avenue NW 41Street St NW 58th St +2 Lanes to a 4 Lane Divided Arterial (9)

PORTMiami Access I-395 PORT Miami Via 2nd Avenueand 5th St Geometric Modifications (9)

NW 106th Street South River Drive to NW 116th Way +2 Lanes to a 4 Lane Divided Arterial (10) Resurfacing to fix flood retention issues during raining NW 138th Street At NW 115th Avenue (10) conditions Use of Traffic Adaptive Signal System throughout the SR 25 / Okeechobee Road HEFT to NW 74th Street (10) corridor Implement Active Arterial Management Techniques, SR 25 / Okeechobee Road including dynamic message sign system, CCTV coverage (10) and detection systems that can collect traffic data Palmetto Intermodal Terminal to Golden Implement express bus service on managed lanes between Palmetto Express Bus (East) (10) Glades Interchange Terminal terminals Palmetto Intermodal Terminal to NW Palmetto Express Bus (North) Express commuter transit service (10) 138th Street / I-75 Interchange Freight Direct Highway Projects 2026 to 2030 Freight Highway 2026 Direct Projects Implementation of a Virtual Freight Network (VFN) that identifies operational strategies using intelligent Medley Townwide (10) transportation technology to improve freight mobility within the area

Sources: (1) 2014Freight to Highway Current Related 2025 Projects Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

Medley Twonwide Dynamic routing of freight vehicles (10) NW 42nd Avenue and NW 135th Street Reduce access/close driveways along intersection legs of NW 42nd Ave/NW 135th Street Access (11) within 1000 feet of intersection NW 42nd Ave/NW 135th St

Improve Le Jeune Rd/Douglas Roadaccess to/from Gratigny Douglas Rd/Gratigny Expressway Douglas Rd/Gratigny Access (11)

cont'd interchange

Freight

to 2030 to 2030

Direct Direct 2026 NW 74th St Palmetto Expy FEC Intermodal Yard Modify Connector (17)

NW 116th Way Okeechobee Road South River Drive Corridor Traffic Ops. Improvements (1/15)

Way-Finding Sign Improvement Program Corridor Traffic Ops. Improvements (1/15)

NW 25th Street HEFT NW 89th Court Corridor Traffic Ops. Improvements (1)

SR 997/Krome Truck By-Pass Along Flagler Ave/Civic Court NW 6th Street Arterial Capacity Improvements (1)

NW 107th Avenue NW 25th Street NW 41Street Street Arterial Capacity Improvements (1)

NW 117th Ave NW 12th St NW 58th St Corridor Traffic Ops. Improvements (1) NW 121Street Way, NW 116th Way, Medley Bridge/Canal Improvement Program Corridor Traffic Ops. Improvements (1) NW 105th Way, NW 79th Ave Integration of Truck Route System & Regional ITS ITS Improvements (1) Network improvements SR 836 Fl-825/SW 137th Ave NW 127th Ave +2 Managed Lanes (9)

SR 836 NW 127th Ave TURNPIKE +2 Expressway Lanes (9)

NW 25th Street Viaduct NW 117th Ave NW 107th Ave Transition to At Grade (9)

NW 25th Street Viaduct MIA Cargo Area New Intermodal Center + Viaduct Ext (9)

NW 25th Street Viaduct WB to SB at SR 826 Intersection Improvement (9)

NW 25th St and NW 75th Ave Intersection Modification (9)

NW 36th St and NW 79th Ave Lane Reconfiguration (9) at NW 67th & 66th Avenue & Perimeter NW 36th St Intersection Modifications (9) Rd NW 74th St and NW 72nd Ave Access Management (9)

NW 87th Ave NW 58th St NW 74th St +2 Lanes to a 6 Lane Divided Arterial (9)

NW 107th Ave NW 90th St NW 122th St +2 Lanes to a 4 Lane Divided Arterial (9)

Freight to Highway Current Related 2025 Projects NW 117th Avenue NW 58th St NW 74th St +2 Lanes to 4 Lane Divided Arterial (9)

Highway Freight Direct Projects 2031 to 2045 Highway 2031 Freight Projects Direct NW 117th Avenue NW 74th St NW 90th St New 4 Lane Divided Arterial (9)

Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan 2018 Draft MIAMI-DADE COUNTY FREIGHT PLAN UPDATE Project Type Project From To Description Source

Milam Dairy Rd FL -836 Okeechobee Rd +2 Lanes to 8 Lane Divided Arterial (9)

SR 826/Palmetto Expressway NW 58th St Okeechobee Rd Autonomous Vehicle/Connected Vehicle Technology (9)

HEFT FL -836 NW 106th St Autonomous Vehicle/Connected Vehicle Technology (9)

PORTMiami Access I-395 PORT Miami Reevaluate after I-395 Evaluation (9) FEC Intermodal Facility Access N. of NW 58th Street Capacity (9) and W. of NW 87th Avenue FEC Transloading Facility Access at NW 114th S. of Capacity (9) Homestead Extension NW 22nd Avenuefrom Opa-locka Blvd Add two additional through lanes on NW 232nd Avenuefrom NW 22nd Avenue (11) to SR-9 Opa-locka Blvd to SR-9 NW 22nd Avenuefrom SR-9 to NW Add four additional through lanes on NW 22nd Avenuefrom NW 22nd Avenue (11) 151Street St SR-9 to NW 151Street St Incorporate truck considerations input to SMART NW 27th NW 27th Avenue NW 27th Avenuein Opa-locka (11) Avenueproject NW 27th Avenuefrom Opa-locka Blvd Add two additional through lanes on NW 27th Avenuefrom NW 27th Avenue (11)

Projects 2031 to 2045 2031 Projects to SR-9 Opa-locka Blvd to SR-9

HighwayFreight Direct Reconstruct SR-9/NW 27th Avenue interchange (coordinate SR-9/NW 27th Avenue Interchange SR-9/NW 27th Avenue Interchange (11) with SMART corridor project)

Sources: (1) 2014 Miami-Dade County Freight Plan Update (2) FDOT JACIP application 2/2018 (3) MDAD meeting 10/4/2017 (4) MIA CORE Program Presentation 11/2/2017 (5) PORTMiami Powerpoint at FTAC 1/10/2018 (6) Bob LeDoux, FEC 1/11/2018 MD Freight Plan Update Study Advisory Committee meeting (7) FTE Tentative 5-year Work Program FY19-23 Summary of Projects as of 9/29/2017 (8) Freight Plan Update SAC mtg 3/8/2018 (9) Draft Doral Area Freight Plan FDOT D6 (10) The Town of Medley Freight Mobility Improvement Plan FDOT 6: Final Report (11) City of Opa Locka Freight Implementation Plan FDOT 6: Final Report (12) FDOT SIS First 5-year Plan Fy 18-22 (13) Alissa Penaloza, PORTMiami, email 8/31/2017 (14) MDX FY 18-22 Work Program Board Approved 1/31/2017 (15) Miami-Dade 2040 LRTP 10/23/2014 (16) FDOT SIS Second 5 - year plan FY 23-27 (17) FDOT Strategic Intermodal System Cost Feasible Plan 2024-2040 (18) FDOT Strategic Intermodal System: 2045 Multi-Modal Unfunded Needs Plan Freight to Highway Current Related 2025 Projects