ENERGY PLANT

Project Start Completion Location Client Generation Capacity Contents

Simple A conversion project from the single cycle power plant that generated 561MW Chilca, Kallpa cycle(560MW) into a combined cycle power plant of 830MW using Natural Gas. POSCO E&C Nov. 2009 Aug. 2012 Kallpa Combined Cycle Power Plant Peru Generacion S.A. Combined took a fist step into Peru’s Energy market among Korea construction cycle(830MW) companies through this project.

Simple An EPC turn-key project for the design and construction of a power station Chilca, cycle(530MW) Jun. 2010 Nov. 2012 Enersur.S.A add-on project from Simple Cycle (530MW) to Combined Cycle (810MW) using ChilcaUno Power Station Add-on Project Peru Combined Natural Gas. cycle(810MW)

This is an EPC Turn-key project which composes two set of eco-friendly gas turbine combined cycle power plants of 142MW capacity by using by-product POSCO POWER Combined Cycle Apr. 2009 Jun. 2011 POSCO POWER 284MW gases (BFG,COG) as recycled fuel, after collecting surplus by-product gas Steel works Power Plant No.1&2 which is generated accordomg to increased production of crude steel at Gwang-yang Steel Works.

This is an EPC Turn-key project which composes two set of gas turbine POSCO POWER Combined Cycle combined cycle power plants of 500MW capacity using LNG as main fuel in Aug. 2008 Jun. 2011 POSCO POWER 1000MW Power Plant No.5&6 reclaimed area order to produce power for selling. And this is also IPP business for POSCO Power.

Hwasung Combined Cycle Hwasung, Korea District A construction project for combined cycle power plant using LNG with heating Jul. 2008 Dec. 2008 500MW Power Plant Kyunggido Heating Corp. system to supply community energy(heat) in Dongtan residential area.

A construction project for combined cycle power plant using LNG with heating , Korea District Jun. 2007 Jun. 2010 500MW system to supply community energy(heat) in Kyoha residential area and Paju Combined Cycle Power Plant Kyunggido Heating Corp. Unjeong new city. ENERGY PLANT

A project to construct an environment-friendly gas turbine combined cycle power plant with a capacity of 146MW using by-product gas (FOG) generated Steel from a FINEX plant at Pohang Steelworks. The plant is Korea’s first gas Jun. 2005 Jul. 2007 POSCO 146MW FINEX Combined Cycle Power Plant works turbine combined cycle power plant to utilize Low BTU by-product gas of the Steelworks, and a single-shaft plant equipped with both the gas turbine and the steam turbine connected to a single shaft.

An EPC turn-key project for the design and construction of a gas turbine Pohang Steel combined cycle power plant with a capacity of 345MW using LNG as the main Oct. 1997 Jan. 2001 POSCO 345MW LNG Combined Cycle Power Plant works fuel for the stable supply of power and steam to plants involved in iron production at Pohang Steelworks.

An EPC turn-key project for the design and construction of a gas turbine Gwangyang combined cycle power plant with a capacity of 500MW using LNG as the main Feb. 1996 Aug. 1999 POSCO 500MW LNG Combined Cycle Power Plant Steel works fuel for the stable supply of power and steam to plants involved in iron production at Gwangyang Steelworks.

Uijeongbu, Daeryun A heating system installation business is for the supply of LNG heat energy Sep. 2008 Mar. 2013 Gyeonggi-do, 103.2Gcal/h Group Energy Energy heat heating population Uijeongbu Millak2 District. Korea

Yangju-si, A heating system installation business is alienation heat for combined heat and Daeryun Jul. 2011 Dec. 2013 Gyeonggi-do, 555MW power generation combined cycle for the supply of LNG Group Energy for Combined Heat & Power plant Power Korea heating and heat for Yangju Okjeong & Hoecheon district

An EPC Turn-Key business is complex gas turbine power plant of 834MW -si, capacity of the main LNG as fuel for the production of electricity for sale. It is Jul. 2012 Oct. 2014 Gyeonggi-do, S-Power 834MW Ansan Combined Cycle Power Plant the IPP business of the S-Power which is a special purpose company Korea Samchully, Korea South-East Power, POSCO E&C was established. ENERGY PLANT

Project Start Completion Location Client Generation Capacity

Scope: EPC Turn-Key Antofagasta, Main facilities Oct. 2007 Aug. 2011 AES Gener 260MW x 2 Angamos coal fired power plant Chile - Steam Turbines(Ansaldo Energia) - Boiler(Doosan Heavy Industry and Construction)

Scope: EPC Turn-Key Nueva Ventanas, Main facilities Sep. 2006 Dec. 2009 AES Gener 270MW Nueva Ventanas coal fired power plant Chile - Steam Turbines(Ansaldo Energia) - Boiler(Doosan Heavy Industry and Construction)

Scope: EPC Turn-Key Nueva Ventanas, Main facilities Oct. 2007 Mar. 2013 AES Gener 270MW Campiche coal fired power plant Chile - Steam Turbines(Ansaldo Energia) - Boiler(Doosan Heavy Industry and Construction)

Scope: EPC Turn-Key PT. Merak Banten, Main facilities May 2010 Feb. 2014 Energi 60MW x 2 Merak CFBC coal fired power plant Indonesia - Steam Turbines(Fuji) Indonesia - Boiler(Foster Wheeler)

Scope: EPC Turn-Key Antofagasta, Main facilities May 2013 Sep. 2017 AES Gener 270MW x 2 Cochrane coal fired power plant Chile - Steam Turbines(Ansaldo Energia) - Boiler(IHI) ENERGY PLANT

Project Start Completion Location Client Generation Capacity

Sep. 2006 KOSPO (No.3) (Korea This is the power plant using heavy oil as main fuel and it was designed to Seoguipo, 100MW Jul. 2004 Southern cope with increased power demand and furnish stable and reliable power to South Jeju Thermal Power Plant No.3&4 Jeju Island x 2units Mar. 2007 Power Co., JEJU Island. (No.4) Ltd.)

By using surplus by-product gas(BFG, COG, LDG) as reusable fuel after collection from the steel works, generated by the increased production of No. 9 Cogeneration Thermal Gwangyang Nov. 2004 Aug. 2006 POSCO 100MW crude steel at Gwangyang Steelworks, this cogeneration thermal power plant Steel works Power Plant contributes to the environment protection and also generates and supplies 100MW power and 45ton/hr steam.

This is a project to replace the low pressure boiler at Pohang steel works due to deteriaration of plant. And it decreases high pressure and temperature Boiler steam to low pressure and temperature steam of No.2 power plant on Boiler remodeling of No.2 Cogeneration Pohang Aug. 2002 Oct. 2003 POSCO 125 Ton/h operation. Then with this operation, the supply of low poressure and Steel works Thermal Power Plant Steam temperature steam could improve the power plant. Also this project is aimed at preparation in produce and obtaining of the capability of stable supply so that it seeks for stable operation of the plant. ENERGY PLANT

Project Start Completion Location Client Generation Capacity Scope: EPC Turn-Key Cilegon, Krakatau Main facilities Aug. 2011 Dec. 2013 100MW x 2 Krakatau By-product Gas Power Plant Indonesia POSCO Power - Steam Turbines(Fuji) - Boiler(Bumwoo Heavy Industry) PH No.15 Oxygen Plant GW No.15 Oxygen Plant

Project Summary Project Summary

- Project: PH No.15 Oxygen Plant Cryogenic Tank - Project: GW No.15 Oxygen Plant Cryogenic Tank - Client: POSCO - Client: POSCO - Location: Pohang, Korea - Location: Gwangyang, Korea - Capacity: 10,000 ton x 1 tank (Nitrogen Liquid) - Capacity: 7,000 ton x 1 tank (Oxygen Liquid) 910 ton x 1 tank (Oxygen Liquid) 2,000 ton x 1 tank (Nitrogen Liquid) 200 ton x 1 tank (Argon Liquid) 300 ton x 1 tank (Argon Liquid) 80 ton x 2 tank (Oxygen, Nitrogen Liquid) - Scope: EPC Turnkey - Scope: EPC Turnkey - Period: 2008 ~ 2010 - Period: 2007 ~ 2010

0 PH No.16 Oxygen Plant

Project Summary

- Project: PH No.16 Oxygen Plant Cryogenic Tank - Client: POSCO - Location: Pohang, Korea - Capacity 100,000Nm3/h (Oxygen Gas) 100,000Nm3/h (Nitrogen Gas) 4,000 ton x 1 tank (Oxygen Liquid) 6,000 ton x 1 tank (Nitrogen Liquid) 80 ton x 1 tank (HP Oxygen Liquid) 100 ton x 1 tank (HP Nitrogen Liquid) - Scope: EPC Turnkey - Period: 2011. 6 ~ 2013. 12 (30 months)

1 GW No.16 Oxygen Plant

Project Summary

- Project: GW No.16 Oxygen Plant Cryogenic Tank - Client: POSCO - Location: Gwangyang, Korea - Capacity 100,000Nm3/h (Oxygen Gas) 100,000Nm3/h (Nitrogen Gas) 7,000 ton x 1 tank (Oxygen Liquid) 1,000 ton x 1 tank (Nitrogen Liquid) 2,000 ton x 1 tank (Argon Liquid) - Scope: EPC Turnkey - Period: 2011. 6 ~ 2013. 12 (30 months)

2 Project Client/Location Period Capacity Scope

Pohang #15 Oxygen Plant POSCO, Korea 2007 ~ 2010 3,429 ton/day EPC

Gwangyang #15 Oxygen Plant POSCO, Korea 2007 ~ 2010 3,429 ton/day EPC

Pohang #14 Oxygen Plant POSCO, Korea 2004 ~ 2006 1,886 ton/day EPC

Gwangyang #14 Oxygen Plant POSCO, Korea 2004 ~ 2008 1,886 ton/day EPC

Pohang #13 Oxygen Plant POSCO, Korea 2004 ~ 2006 1,886 ton/day EPC

3 Project Client/Location Period Capacity Scope

Gwangyang #13 Oxygen Plant POSCO, Korea 2003 ~ 2005 1,371 ton/day EPC

Pohang #12 Oxygen Plant POSCO, Korea 2003 ~ 2005 1,029 ton/day EPC

Gwangyang #12 Oxygen Plant POSCO, Korea 1997 ~ 2000 1,371 ton/day EPC

Pohang #11 Oxygen Plant POSCO, Korea 1995 ~ 1997 860 ton/day EPC

Gwangyang #11 Oxygen Plant POSCO, Korea 1997 ~ 2000 1,371 ton/day EPC

Pohang #10 Oxygen Plant POSCO, Korea 1991 ~ 1993 860 ton/day P.C

Gwangyang #10 Oxygen Plant POSCO, Korea 1994 ~ 1995 720 ton/day EPC

Pohang #9 Oxygen Plant POSCO, Korea 1991 ~ 1993 860 ton/day P.C

Gwangyang #9 Oxygen Plant POSCO, Korea 1990 ~ 1992 538 ton/day P.C

Pohang #8 Oxygen Plant POSCO, Korea 1982 ~ 1984 686 ton/day P.C

4 Project Client/Location Period Capacity Scope

Gwangyang #8 Oxygen Plant POSCO, Korea 1990 ~ 1992 538 ton/day P.C

Pohang #7 Oxygen Plant POSCO, Korea 1979 ~ 1981 1,029 ton/day P.C

Pohang #6 Oxygen Plant POSCO, Korea 1976 ~ 1978 860 ton/day P.C

Pohang #5 Oxygen Plant POSCO, Korea 1976 ~ 1978 860 ton/day P.C

Pohang #3 Oxygen Plant POSCO, Korea 1974 ~ 1976 343 ton/day P.C

Pohang #2 Oxygen Plant POSCO, Korea 1972 ~ 1973 154 ton/day P.C

Pohang #1 Oxygen Plant POSCO, Korea 1972 ~ 1973 154 ton/day P.C

Pohang #3 Hydrogen Plant POSCO, Korea 1995 ~ 1996 700 Nm³/hr EPC

Gwangyang #5 Hydrogen Plant POSCO, Korea 2004 ~ 2006 350 Nm³/hr EPC

Pohang #4 Hydrogen Plant POSCO, Korea 2005 ~ 2006 1,200 Nm³/hr EPC

5 Description Scope Project Name Location Client (Capacity) of Work Period BRU: 2,500 BPSD Bangchak Petroleum Publi RSU: 17,900 BPSD Product Quality Improvement Project Bangkok, Thailand c Co., Ltd. HPU: 40 MMSCD EPC 2010- 2011 NSU: 7,200 BPSD

UAE RUWAIS Refinery Expansion Project RUWAIS, UAE TAKREER / SKEC 400,000 BPSD DE, PS 2009-2014

PRU 974 MTD PRU/GDS Unit , Korea SK Energy GDS 30,000 BPSD DE, PS 2006-2008 Selective Hydrogenation Unit Ulsan, Korea S-Oil Corp. 30,000 BPSD DE,PS.CS 2006-2007

Formosa Petrochemical Kerosene Hydrotreating Unit Mailiao, Taiwan Corp. 42,000 BPSD DE,PS 2005-2007

Formosa Petrochemical HDS 26,500 BPSD Gasoline Hydrotreating Unit Taiwan Corp. ISO 11,100 BPSD DE 2003-2005

6 Description Scope Project Name Location Client (Capacity) of Work Period

YEP-V Project , Korea Kumho Polychem Co., Ltd. EPM/EPDM 60,000MTA EPC 2013-2015

PTT Phenol Company Phenol 250,000 MTA, PTT Phenol Project Rayong, Thailand EPC 2013-2015 Limited Acetone 123,000 MTA Cumene 900,000 MTA, KPA IV Project Yeosoo, Korea Kumho P&B Chemical EPC 2013-2015 Phenol 300,000 MTA Needle Coke 63,000 MTA Needle Coke Project Gwangyang PMC Tech EPC 2012-2014 Pitch Coke 28,000 MTA TONGSHU Petrochemical Aceto Plant Project Ulsan, Korea Acetonitrile 11,000 MTA EPC 2012-2013 CO., Ltd

Para-Xylene1,341.2 KMTA SK Innovation V-Project Inchon, Korea SK E&C Co., Ltd. EPC 2012-2014 Benzene 410 KMTA

Ethylene 800,000 MTA Maptaphut Olefins → 1,000,000 MTA MOC Process Improvement Project Rayong, Thailand EPC 2012-2013 Co., Ltd. Propylene 400,000 MTA → 480,000 MTA Gulf Advanced Cable Insul XLPE 20,000 MTA Wire & Cable Compounding(WCC) Plant Jubail, Saudi Arabia EPC 2011-2013 ation Company(GACIC) SC 5,000 MTA PT Tank 15,000 MT x1, Rayong Terminal Company PG Tank Project Rayong, Thailand 5,000 MT X 2, EPC 2011-2012 Limited PE Tank 3,700MT x 1

SBPA Project , Korea Samyang Inochem 150,000 MTA EPC 2010- 2012

Samsung Total Petrochem. PX 700 kTA Expansion Project Daesan, Korea 700,000 MTA DE, P 2010- 2012 Co., Ltd. 7 Description Scope Project Name Location Client (Capacity) of Work Period

GOC(TC) LAB Project China Great Orient Chemical Ltd. LAB 100,000 MTA BD 2010- 2010

LDPE : 115,000 à 155,000 MTA Samsung Total Petrochem. PP-3 : 320,000 à 400,000 MTA LDPE, PP-3 & PP-B Extension Project Daesan, Korea DE, PS 2010- 2011 Co., Ltd. PP-B : 130,000 à 147,000 MT A TDI 100,000MTA TDI Extension Project Yeosu, Korea KPX Fine Chemical EPC 2009-2012 To 150,000MTA Rayong Terminal Company Propylene Oxide Tank *3 RTC Project Rayong, Thailand EPC 2009-2011 Limited Spherical Propylene Tank *2 Woongjin Poly Silicon Wongjin Poly Silicon Plant Project , Korea 5,000 MTA EPC 2008-2010 Co., Ltd. Sodiff Advanced Materials Silan Plant YoungJu, Korea EPC 2008-2009 Co., Ltd. Bangkok Polyethylene BPEX HDPE Project Rayong, Thailand 250,000 MTA EPC 2007-2010 Public Company Ltd. Isobutene Plant Ulsan, Korea Songwon Industry Co., Ltd. 30,000 MTPA EPC 2007-2009 Kumho Mitsui Chemical In MDI 142,000 MTPA Plant Extension Project Yeosu, Korea 142,000 MTPA EPC 2007-2009 c.

BPA(lll) Plant Project Yeosu, Korea Kumho P&B Chemical 355,000 TPA DE,P 2007-2008

Bio Diesel Plant(II) Sabah, Malaysia Global Bio-Diesel Sdn Bhd 300,000 MTA DE,PS 2007-2008

Isopropyl Alcohol Plant Yeosu, Korea Isu Chemical Co., Ltd 30,000 MTA DE,PS 2007

8 Description Scope Project Name Location Client (Capacity) of Work Period

Green Soft Chem(Mitsui K GDC Project Daesan, Korea 25,740 MTA EPC 2007-2008 asei Process) Mexico Carbon Manuf. S.A Carbon Black Plant Altamira, Mexico 45,000 MTA EPC 2006-2008 de C.V Lotte Daesan Petrochemic SM Revamping Project Daesan, Korea 420,000 MTPA DE, P 2006-2008 al Corp.

Bio Diesel Plant Sabah, Malaysia Global Bio-Diesel Sdn Bhd 200,000 MTA DE,PS.CS 2006-2007

Polyonsan Project Ulsan, Korea Rhodia Polyamide Co., Ltd. 36,000 TPA EPC 2006-2007

LN2 : 30,000 MTA Air Separation Plant Ulsan, Korea Korea Airtech Inc LAr : 2,700 MTA EPC 2006-2007 LO2 : 57,000 MTA

400,000 MTA to PTA Plant Revamping Ulsan, Korea Taekwang Industry Co.Ltd. DE,PS,CS 2006-2007 900,000 MTA

Standby Stabilizer Unit Rayong, Thailand PTT Public Co., Ltd. 15,000 BPSD EPC 2005-2007

Ethylene 510,000 to 875,000 M Yeochun NCC Naphtha Cracking Center Extension Yeosu, Korea TA DE,PS,CS 2005-2007 CO., Ltd. BD 170,000 to 220,000 MTA

Butandiol Plant Mailiao, Taiwan Nanya Plastics Corp. 80,000 MTA DE,PS 2005-2006

LN2 55,000 MTA Air Separation Plant Giheung, Korea BOC Gases Korea Inc LAr 15,000 MTA DE, C 2005-2006 LO2 3,000 MTA 9 Description Scope Project Name Location Client (Capacity) of Work Period

GLS Pattern Embossing Project Ulsan, Korea DuPont (Korea) EPC 2005-2006

350,000 MTA To PTA Plant Debottlenecking Ulsan, Korea Hyosung Corp. DE 2005-2006 410,000 MTA

CSC Ammonia Still Project Kaohsiung, Taiwan China Steel Corp. DE,PS 2005-2006

G-ABS SM Stripper Ulsan, Korea Cheil Industry Inc 205 kg/h DE,P 2005-2006

Formosa Petrochemical Co SRU#4/ARU#5/SWS#3 Unit Mailiao, Taiwan 800 MTPD DE 2004-2006 rp.

Formosa Petrochemical Co SM3 Plant Mailiao, Taiwan 600,000 MTA DE 2004-2006 rp.

Sodiff Advanced Materials Silan Plant Yeongju, Korea 300 MTA EPC 2004-2005 Co., Ltd.

PT. Unggul Indah Cahaya Linear Alkyl Benzene Plant Revamping Merak, Indonesia 180,000 MTA EPC 2004-2005 Tbk

Bridgestone Carbon Black Carbon Black Plant Extension Rayong, Thailand 18,200 MTA EPC 2004-2005 (Thailand) Co., Ltd.

Modacryl Resin Plant Ulsan, Korea Bibaco Co. Ltd. 2,500 MTA DE,PS 2004-2005

Flexible Copper Clading Laminate Plant Gumi, Korea SD Flex Co., Ltd. 100,000 m2/min DE, PS, C 2004-2005

10 Description Scope Project Name Location Client (Capacity) of Work Period

Rotary Dryer Niigata, Japan Asahi Carbon Co., Ltd 2.7m(d)x18.4m(l) P 2004

DP Conversion & C/A Extension Yeosu, Korea Hanwha Chemical 280,000 MTA DE 2003

Formosa Chemicals & Fibr Styrene Monomer Plant Taiwan 720,000MTA DE 2003-2004 e Corp.

2.6 DMN & NDA Pilot Plant Ulsan, Korea Hyosung Corp. 1,000 MTA EPC 2003-2004

Co-Extrusion System Shadeband Project Ulsan, Korea DuPont(Korea) Inc. 359hg/hr EPC 2003-2004

Phenol Tank Modification & Unloading Faci Odfjell Terminals (Korea) C 3,300㎥×1 Ulsan, Korea EPC 2003 lity o., Ltd. Unloading Arm

Pet Plant Wloclawek, Poland SK Eurochem Co. 120,000MTA DE,PS,PM 2003

LAB Plant Revamping Ulsan, Korea Isu Chemical Co.,Ltd. EPC 2003-2004

Polyol Plant Capa-up Project Yeosu, Korea Hanwha Chemical 55,000 MTA DE,PS 2002-2004

Bridgestone Carbon Black Plant Rayong, Thailand Carbon Black (Thailand) C 45,000MTA EPC 2002-2004 o., Ltd.

SKL Plant Upgrade Project Yeosu, Korea Schenectady Korea 12,000 ton EPC 2002-2003

11 Description Scope Project Name Location Client (Capacity) of Work Period

Energy Saving System for EP Plant Yeosu , Korea Kumho Polychem Co., Ltd. EPC 2002

CA3 Capa-Up Project Yeosu, Korea Hanwha Chemical 615 DMT/day DE,PS 2001-2003

Onsan Tank Terminal Storage Tank 39 Sets & Tank Terminal Ulsan, Korea DE,PS 2001-2002 Co., Ltd Unloading Facility

Adipic Acid Extension OSBL Facility Ulsan, Korea Rhodia Polyamide Co., Ltd. 130,000 MTA BD,DE,PS 2001-2002

12 Description Scope Project Name Location Client (Capacity) of Work Period

Li Pilot Plant Pohang, Korea RIST Li 1kg/day EPC 2012 Woongjin Poly Silicon Wongjin Poly Silicon Plant Project Sangju, Korea 5,000 MTA EPC 2008-2010 Co., Ltd. Sodiff Advanced Materials Silan Plant YoungJu, Korea EPC 2008-2009 Co., Ltd. Mexico Carbon Manuf. Carbon Black Plant Altamira, Mexico 45,000 MTA EPC 2006-2008 S.A de C.V LN2 : 30,000 MTA Air Separation Plant Ulsan, Korea Korea Airtech Inc LAr : 2,700 MTA EPC 2006-2007 LO2 : 57,000 MTA LN2 55,000 MTA Air Separation Plant Giheung, Korea BOC Gases Korea Inc LAr 15,000 MTA DE, C 2005-2006 LO2 3,000 MTA

GLS Pattern Embossing Project Ulsan, Korea DuPont (Korea) EPC 2005-2006

CSC Ammonia Still Project Kaohsiung, Taiwan China Steel Corp. DE,PS 2005-2006

Sodiff Advanced Materials Silan Plant Yeongju, Korea 300 MTA EPC 2004-2005 Co., Ltd. Bridgestone Carbon Black Carbon Black Plant Extension Rayong, Thailand 18,200 MTA EPC 2004-2005 (Thailand) Co., Ltd.

Flexible Copper Clading Laminate Plant Gumi, Korea SD Flex Co., Ltd. 100,000 m2/min DE, PS, C 2004-2005

Co-Extrusion System Shadeband Project Ulsan, Korea DuPont(Korea) Inc. 359hg/hr EPC 2003-2004

Polyol Plant Capa-up Project Yeosu, Korea Hanwha Chemical 55,000 MTA DE,PS 2002-2004 13 Description Scope Project Name Location Client (Capacity) of Work Period

PTT Global Heavy Gas to Olefins Feedstock Project Rayong, Thailand Chemical Public Ethan + Propane 33,288 kg/hr EPC 2012-2015 Company Limited 30" x 38.9km, ~ Gyoha Trunk Pipeline Project Pocheon, Korea KOGAS CN 2012-2015 2 Stations 100,000m3, PVGAS LNG Fast Track LNG Terminal FEED Vung Tau, Vietnam TOKYO GAS ENG Co., Ltd. FEED, BD 2012 150,000m3

No.3 Tank Barburetor Gwangyang, Korea POSCO LNG 200T/hr EPC 2012-2014

200,000 m3 LNG Tank x 3 LNG FEED Project , Korea GS Energy FEED, BD 2012 45,000 T/hr LPG Tank x 1

Korea Institute of Energy T Boryeong 10MW Carbon Capture Storage Boryeong, Korea echnology Evaluation and CO2 250T/day EPC 2010-2014 Project Planning

Petrovietnam Gas Corp. 30,000 Ton x 2 sets LPG Refrigerated Storage Project Vung Tau, Vietnam EPC 2010-2012 (PVGAS) 2,000 Ton x 2 sets

Long An Refrigerated LPG Terminal Project Long An, Vietmnam Vinabenny Energy JSC 84,000 MT EPC 2010-2012

Tank: 1,500,000 M3 Oiltanking KNOC Yeosu Oiltanking KNOC Yeosu, Korea Jetty: 250,000 DWTx2 Berth an BD 2009-2010 Co., Ltd. d Facilities 40,000 ton x 1 set Samsung Total Petrochem. LPG Storage Tank Project , Korea With Loading / Unloading EPC 2009-2010 Co., Ltd. Facilities SNG Project Kwang yang, Korea POSCO SNG 500,000 MTA EPC 2010-2014 14 Description Scope Project Name Location Client (Capacity) of Work Period

Spherical Tanks x 2 Oman Refineries and Additional Storage Tank Project Sohar, Oman Oily Water Tank x 1 EPC 2009- 2011 Petrochemical Company 15,000 m3

Tongyeong LNG Terminal 6th Extension , Korea Korea Gas Corp. 140,000 ㎘ x 1 BD,DE,PS,CS 2009-2012

200,000 ㎘ ×2 Tongyeong LNG Terminal 5th Extension Tongyeong, Korea Korea Gas Corp. 180 T/H BD,DE,PS,CS 2006-2011 270,000 ㎘ ×1 Berth 140,000 ㎘ ×2 Tongyeong LNG Terminal Tongyeong, Korea Korea Gas Corp. 200,000 ㎘ ×2 BD,DE,PS,CS 2005-2010 (3rd & 4th)Extension 360 T/H

Samcheok ~ Youngwol Main Pipeline Proje , Korea Korea Gas Corp. 30” X 56 km EPC 2009- 2014 ct

200,000 kl x 4sets Samcheok LNG Terminal Project Samcheok, Korea Korea Gas Corp. With Loading / Unloading DE,PS,CS 2009- 2014 Facilities LNG Terminal 200,000 ㎘ x 2 Pyeongtaek, Korea Korea Gas Corp. DE,PS,CS 2008-2012 (No. 2 Plant 3rd Extension) 240 t/hr

Pyeongtaek LNG Terminal 200,000 ㎘ x 4 Pyeongtaek, Korea Korea Gas Corp. DE,PS,CS 2007-2011 (No. 2 Plant 2nd Extension) 120 t/hr

Pyeongtaek LNG Terminal 200,000 ㎘ x 3 Pyeongtaek, Korea Korea Gas Corp. DE,PS,CS 2006-2010 (No. 2 Plant 1st Extension) 360 t/hr

140,000 ㎘×4 Pyeongtaek LNG Terminal II Pyeongtaek,Korea Korea Gas Corp. Sendout Capacity DE,PS,CS 2003-2008 540t/hr 15 Description Scope Project Name Location Client (Capacity) of Work Period

SCG Map Ta Phut Tank 70,000 m3 Propane/ MTT Propane/Butane Tank Project Rayong, Thailand EPC 2008-2010 Terminal Co., Ltd. Butane Tank 5MM TPA PTT LNG Terminal EPC Turnkey Project Rayong, Thailand PTT LNG Terminal DE,PS,CS 2008-2011 160,000㎘ ×2

NG Trunk Line Banwol, Korea Korea Gas Corp. 48 " x 1.1 km CN 2007

Ogabinbiri Flowstation Upgrade Ogbainbiri, Nigeria AGIP Oil Company (NAOC) 312 MMSCFD DE 2007-2010

Odfjell Terminal Korea 2nd Extension Projec Odfjell Terminals Korea 25 TANKS Ulsan, Korea EPC 2007-2008 t Co., Ltd. 61,170 kl

Oben-Kaduna, Nigeria NG Pipeline Terminal KEPCO Consortium 36” ×600km FS 2006-2007 Nigeria

200,000 m3/hr x 2 Governor Station Extension Banwol, Korea Korea Gas Corp. CN 2006-2007 100,000 m3/hr x 1

Natural Gas Trunk Lines 24” ×32km Yeosu, Korea GS Caltex Oil Corp. BD,DE,PS 2005-2007 between Yeosu and Yulchon 2 Stations

NG Trunk Lines -Jeocheon, 30” × 24km Korea Gas Corp. DE,PS,CS 2005-2007 between Chungju and Korea 2 Stations

Submarine Pipeline Inpection & Repair Ulsan, Korea Korea National Oil Corp. 42” × 1.8km EPC 2005

Gunsan LNG Terminal Gunsan, Korea GS Caltex Oil Corp. 160,000 ㎘ ×3 BD,GI 2005

16 Description Scope Project Name Location Client (Capacity) of Work Period

Vapor Combustion Unit Yeosu, Korea E1 2,500 Nm3/hr EPC 2005

Jinyeong Governor Station Jinyeong, Korea Korea Gas Corp. 124,000 m3/hr x 3 CN 2004-2005

Intelligent Pig Test Facility Incheon, Korea Korea Gas Corp. 30" x 400 m CN 2004-2005

LNG Satellite Plant , Korea Kyungnam Energy Co. 15,000 N㎥/hr EPC 2004-2005

VOC Treatment Facility , Korea Korea National Oil Corp. 100 N㎥/hr EPC 2004

FS, Basic Pla Proper Location Study for LNG Terminal Gunsan, Korea GS Caltex Oil Corp. 140,000 ㎘×4 2004 nning NG Trunk Lines Tongyeong-, 30〃×165㎞ Korea Gas Corp. BD,DE,CS 2002-2007 between Daegu and Tongyeong Korea 70㎏/㎠·g

Additional No3 LPG Tanks and Butane Tank 100,000㎥×3 Mesaieed, Qatar Qatar Petroleum Co. BD,DE 2002-2005 s 58,000㎥×2

Kwale Gas Injection Upgrading Project Kwale, Nigeria Daewoo E&C 150 MMSCFD DE,CS 2002-2005

Daewoo Ship-Building & LNG Regasfication Plant Geoje, Korea Marine Engineering Co., Lt 600MMS BD,DE 2002-2003 d.

Phu-my Gas Distribution Center Vung Tau, Vietnam PetroVietnam Gas Co. 10.48 MM SCMD EPC 2001-2003

Tongyeong LNG Terminal 2nd Extension Tongyeong, Korea Korea Gas Corp. 140,000㎘×3 DE,PS,CS 2001-2006

17 Description Project Name Location Client (Size) Quantity Year

Cameron Solutions Inc. / 100 th x ID 3050 x T.L 8785 Mafumeira Sul Project Angola 4 2013 Chevron (99.6 Tons) Cameron Solutions Inc. / 115 th x ID 3048 x T.L 4877 Mafumeira Sul Project Angola 1 2013 Chevron (73.6 Tons) (178+3) th x ID 3,200 x HDO Lube Base Oil Project Korea Hyundai Eng'g / SK Group 1 2012 TL 13,1965 (285.9 Tons) (171+3)th x ID 3,200 x TL 8,05 HDO Lube Base Oil Project Korea Hyundai Eng'g / SK Group 1 2012 0 L (200.2 Tons) SK Energy / 160 th x ID 5700 x TL 5600 V-Project Korea 1 2012 SK innovation Co.,Ltd ( 243.1 Tons) (132+3) th x ID 4100 x TL 11,2 Ichthys CPF Project Australia SHI / INPEX 3 2012 30 (261.8 Tons)

SECL / (120+3) th x ID 1500 x TL 17,6 Carbon Black & Delayed Coker Project UAE 1 2012 Abu Dhabi Oil Refinery Co., 70 (127.0 Tons)

Wasco Eng'G Services / 167 th x ID 1,220 x TL 3,100 Cernambi FPSO Project Brazil 2 2012 MODEC International Inc. ( 32.9 Tons) Petrofac Eng'g & Co. / (122+3) th x ID 3500 x TL 29,2 South Yoloten Project Turkmenistan 4 2011 Turkmengas 80 (389.2 Tons) Daelim Industrial Co., Ltd / (68/105/106) th x ID( 5182/823 LPG Train 4 Project Kuwait 1 2010 KNPC 0) x TL 53,797 (1151.5 Tons) 109 th x ID 2900 x TL 5360 SP13, 22 /24 Project Iran PKSK 8 2010 (81.4 Tons) POSCO E&C / The Bangcha 115 th x ID 2,100 x TL 4,100 Production Quality Improvement#2 Project Thailand 1 2010 k Petroleum Public Co., Ltd. (46.4 Tons) 18 Description Project Name Location Client (Size) Quantity Year

129 th x ID 5,200 x TL 29,100 LNG Treating Project Iran Nardis 2 2009 (700.5 Tons)

(157+3) th x ID 6,000 x TL 8,00 LNG Treating Project Iran Nardis 1 2009 0 (332.4 Tons) SAIPON SNC / 125 th x ID 3,450 x TL 5,140 OML 58 Upgrade Phase 1 Project Nigeria 1 2009 Total E&P Nigeria Ltd. (101.4 Tons) 121 th x ID 3550 x TL 17580 GNL-3Z Project Algeria Saipem S.p.A / Sonatrach 1 2009 (276.0 Tons) SECL / Saudi Arabian 121 th x I.D 5100 x TL 1170 Ma'aden Ammonia Project Saudi Arabia 1 2008 Mining Company (113.5 Tons) SECL / Saudi Arabian 105 th x ID 5,100 x TL 1,170 Maaden Ammonia Project Saudi Arabia 2 2008 Mining Company ( 89.8 Tons) GSEC / Egypt 226 th x I.D 3900 x TL 5100 ERC Refinery Project Egypt 5 2008 Refining Company (230.0 Tons)

GS E&C / Egyptian (179/199) th x ID (2700/3400) ERC Refinery Project Egypt 1 2008 Refining Co.(ERC) x TL 20,400 (407.3 Tons)

(210+3) th x ID 4200 x TL 710 GS E&C / Egyptian ERC Refinery Project Egypt 0 1 2008 Refining Co.(ERC) (289.8 Tons)

19 Description Project Name Location Client (Size) Quantity Year

GS Construction / 60 th x ID 4800 x TL 46000 IRPC UHV Plant Project Thailand 1 2013 IRPC Public Co., ( 437.7 Tons ) Hyundai Eng'g Co., / (178+3) th x ID 3,200 X TL 13, HDO Lube Base Oil Project Korea 1 2012 SK Group 196 ( 285.9 Tons ) SECL / 62th x ID(4400/5500) x TL 62,0 Carbon Black & Delayed Coker Project UAE 1 2012 Abu Dhabi Oil Refinery Co., 00 ( 743.7 Tons ) SECL / 36 th x ID 8900 x TL 99,400 Carbon Black & Delayed Coker Project UAE 1 2012 Abu Dhabi Oil Refinery Co., ( 1,055 Tons ) Tupras Izmit Refinery Resid Upgrading APS Engineering Co / (22/42+3) th x I.D 6000 Turkey 1 2012 Project Tecnicas Reunidas x TL 37100 ( 300.2 Tons ) Tupras Izmit Refinery Resid Upgrading APS Engineering Co / 48 th x I.D 6900 x TL 52900 Turkey 1 2012 Project Tecnicas Reunidas ( 503.2 Tons ) JGC Corp. / (15/35/45) th x ID 7,800 Barzan Onshore Project Qatar 8 2011 Ras Gas Co., Ltd x TL 22,000 ( 131.9 Tons ) Petrofac Eng'g & Co. / (122+3) th x ID 3500 South Yoloten Project Turkmenistan 4 2011 Turkmengas x TL 29280 ( 389.2 Tons ) Indian Oil Corp. Limited 54 th x ID 9,100 x TL 73,400 Paradip Refinery Project India 1 2010 (IOCL) ( 1,240.8 Tons) Daelim Industrial Co., Ltd / (68/105/106) th x ID( 5182/823 LPG Train 4 Project Kuwait 1 2010 KNPC 0) x TL 53,797 (1,151.5 Tons) Daelim Industrial Co., Ltd / 73 th x ID 7620 x TL 58,522 LPG Train 4 Project Kuwait 1 2010 KNPC (985.4 Tons ) L & T Ltd / ONGC Mangalor (37/43/42/46)th x ID(8,700/9,6 Mangalore Aromatic Complex Unit India 1 2010 e Petrochemicals Ltd 00) x TL 67,200 (930 Tons )

20 Description Project Name Location Client (Size) Quantity Year

Indian Oil Corp. Limited (34+3/37) th x ID (6,000/11,80 Paradip Refinery Project India 1 2010 (IOCL) 0) x TL 49,400 ( 936.9 Tons )

SPT Olefins Project Singapore Shaw / ExxonMobbil 26 th x I.D 9,800 x TL 28,850 1 2009

(28~32) th x I.D (11,500 / 12,5 SPT Olefins Project Singapore Shaw / ExxonMobbil 1 2009 00) x TL 23,730 (22~30) th x I.D 4,900 SPT Olefins Project Singapore Shaw / ExxonMobbil 1 2009 x TL 83,340

(42~72) th x I.D (2,400/4,000) SPT Olefins Project Singapore Shaw / ExxonMobbil 1 2009 x TL 48,550

Cementhai / MOC Project Thailand 26 th x I.D 9,800 x TL 28,850 1 2008 Map Ta Phut Olefins Co. Cementhai / MOC Project Thailand 33 th x I.D 4,200 x TL 89,500 1 2008 Map Ta Phut Olefins Co. Cementhai / MOC Project Thailand 35 th x I.D 5,600 x TL 63,700 1 2008 Map Ta Phut Olefins Co. Technip Italy / Yanbu Nati Yansab-Olefin Project Saudi Arabia 51 th x I.D 7,100 x TL 88,300 1 2006 onal Petrochemical Co Technip Italy / Yanbu Nati Yansab-Olefin Project Saudi Arabia 43 th x I.D 7,800 x TL 86,900 1 2006 onal Petrochemical Co (68~80) th x I.D (4,699 x 3,810) East Area NGL II Project Nigeria ExxonMobil 1 2006 x TL 42,153

21 Description Project Name Location Client (Size) Quantity Year

Cameron Solutions Inc. / 100 th x ID 3050 x T.L 8785 Mafumeira Sul Project Angola 4 2013 Chevron ( 99.6 Tons ) Cameron Solutions Inc. / 115 th x ID 3048 x T.L 4877 Mafumeira Sul Project Angola 1 2013 Chevron ( 73.6 Tons ) Cameron Solutions Inc. / 16th x ID 3658 x T.L 20488 Mafumeira Sul Project Angola 1 2013 Chevron ( 50.5 Tons ) 30th x I.D 720 x TL 2900 Ichthys FPSO Project Australia DSME / INPEX/ TOTAL 2 2012 ( 8.8 Tons ) Wasco Eng'G Services / 167 th x ID 1,220 x TL 3,100 Cernambi FPSO Project Brazil 2 2012 MODEC International Inc. ( 32.9 Tons ) 38th x ID 3800 x TL 8800 Ichthys FPSO Project Australia DSME / INPEX/ TOTAL 1 2012 ( 61.4 Ton s) 32th x ID 5400 x TL 14500 Ichthys FPSO Project Australia DSME / INPEX/ TOTAL 1 2012 ( 108.0 Tons )

(97+3) th x ID 2900 x TL 5200 Ichthys FPSO Project Australia DSME / INPEX/ TOTAL 3 2012 ( 82.7 Tons )

153 th x ID 914 x TL 2133 Domestic Supply Obligation Offshore Pjt Nigeria HHI / Chevron Nigeria 1 2012 ( 36.1 Tons ) 6 th x ID 813 x TL 3700 BARZAN Projec Qatar Nihon Pall Ltd. /RasGas 8 2011 ( 2.3 Tons ) Petrofac Eng'g & Co. / (15+3) th x ID 4300 x TL 3070 South Yoloten Project Turkmenistan 4 2011 Turkmengas 0 ( 83.6 Tons ) (66+3)th x ID 2083 x TL 5200 BARZAN Project Qatar Nihon Pall Ltd. /RasGas 2 2011 ( 43.8 Tons)

22 Description Project Name Location Client (Size) Quantity Year

109 th x ID 2900 x TL 5360 SP 22,23,24 Project Iran PKSK. 4 2010 ( 81.4 Tons ) 107 th x ID 3500 x TL 4500 SP 22,23,24 Project Iran PKSK. 12 2010 ( 100.9 Tons ) (157+3) th x ID 6,000 x TL 8,00 LNG Treating Project Iran NARDIS 1 2009 0 ( 322.4 Tons ) GS E&C / Egypt Refining C (210+3/117+3) th x ID 4200 ERC Refinery Project Egypt 1 2008 o x TL 7100 ( 289.8 Tons ) GS E&C / Egypt Refining C 226 th x ID 3,900 x TL 5,100 ERC Refinery Project Egypt 1 2008 o (230.0 Tons ) (113/63) th x ID 3,048 East Area Project Nigeria ExxonMobil 8 2005 x TL 12,192

Jamnagar Project India Reiiance 100 th x ID 4,000 x TL 7,700 11 2005

HHI / ConocoPhillips (110+3) th x ID 3,350 x TL 6,96 Yadana MCP Project Indonesia 8 2005 Indonesia Inc. Ltd 5

23 Description Project Name Location Client (Size) Quantity Year

Hyundai Eng'g / SK Grou (171+3) th x ID 3,200 HDO Lube Base Oil Project Korea 1 2012 p x TL 8,050 L ( 285.9 Tons ) Hyundai Eng'g / SK Grou (171+3) th x ID 3,200 HDO Lube Base Oil Project Korea 1 2012 p x TL 8,050 L ( 200.2 Tons ) SK Energy / 160 th x ID 5700 x TL 5600 V-Project Korea 1 2012 SK innovation Co., Ltd ( 243.1 Tons ) Petrofac Eng'g & Co. / (122+3) th x ID 3500 South Yoloten Project Turkmenistan 4 2011 Turkmengas x TL 29,280 ( 389.2 Tons ) JGC Corp. / Ras Gas Co., L (15/35/45) th x ID 7,800 Barzan Onshore Project Qatar 8 2011 td x TL 22,000 ( 131.9 Tons ) (19/24) th x ID 6200 x TL 26,00 Plateau Maintenance Project Qatar Technip France / Qatargas 1 2010 0 ( 128.2 Tons ) 89 th x ID 4200 x TL 7600 SP13, 22/24 Project Iran PKSK. 8 2010 ( 130.6 Tons ) SECL / 105 th x ID 5,100 x TL 1,170 Maaden Ammonia Project Saudi Arabia 1 2008 Saudi Arabian Mining Co ( 89.8 Tons ) (179/199/102/126) th GS E&C / ERC Refinery Project Egypt x ID (2700/3400) 1 2008 Egyptian Refining Co.(ERC) x TL 20,400 ( 407.3 Tons )

24 Description Project Name Location Client (Size) Quantity Year

Daewoo International / 60 th x I.D 1800 x 6,000 L Syzran Refinery Project Russia 4 2013 Ran Group (61.3 Tons) 14th x I.D 1829 x TL 7315 LPO Debottleneck BED Project USA KBR / QatarGas 4 2012 (35.6 Tons) 30 th x I.D (1473/2159) LPO Debottleneck BED Project USA KBR / QatarGas 1 2012 x 12192 L (75.8 Tons) 39 th X ID 2500 SNG Product Plant (Coal Gasification) Korea POSCO E&C / POSCO 3 2012 X 12500 L (83.0 Tons) Larsen & Toubro Ltd. / 22 th x ID 1000 Mangalore Aromatic Complex Unit Project India 1 2011 ONGC x TL 5994 (4.4 Tons) Larsen & Toubro Ltd. / 28 th x ID 2600 Mangalore Aromatic Complex Unit Project India 2 2011 ONGC x TL 7157 (42.5 Tons) Worley Parsons / (13+3.5) th x I.D 2108 SAMREF Clean Fuels Project Saudi Arabia 2 2011 ExxonMobil x 6706 L (33.1 Tons) 14 th x ID 1626 Kearl Expansion Project Canada AMEC / Imperial Oil 3 2011 x 9754L (53.8 Tons) Petrofac Eng'g & Co / (13+3) th x I.D (1630/2400) South Yoloten Project Turkmenistan 8 2011 Turkmengas x 7,000 L (32.6 Tons) 18 th x I.D 1680 Syncrude Mining Project Canada Fluor Corp. / Imperial Oil 3 2011 x 9,754 L (52.0 Tons) Worley Parsons / 83 th x I.D 1880 SAMREF Clean Fuels Project Saudi Arabia 3 2010 ExxonMobil x 6096 L (89.9 Tons) 14 th x I.D (1780/2900) Gas Treating Project Iran NARDIS / ILC 4 2010 x 8540 L (55.8 Tons)

25 Description Project Name Location Client (Size) Quantity Year

Essar Const. Ltd / (52+3) th x ID1250 x 4500 (44 Essar Refinery Extension Project India 2 2009 Essar Oil Co.Ltd .1 Tons) Essar Const. Ltd / 82 th x ID 1600 x 4000 L (68.8 Essar Refinery Extension Project India 2 2009 Essar Oil Co.Ltd Tons) 18 th x ID 1067 x 6096 L (15.3 Bandar Abbs Gas Condensate Refinery Iran Tehran Jonoob-Bina Joint 2 2009 Tons) 14th x ID 1626 x 9754 L (51.0 Kearl Oil Sands Project Canada AMEC / Imperial Oil 3 2009 Tons) Fluor Corp/Marathon (70+3) th x ID1016 x 6096 (33 Detroit Heavy Oil Upgrade Project USA 3 2008 Petroleum Company .3 Tons) Essar Const. Ltd / (63+3) th x I.D 1600 x 6000 (1 Essar Refinery Extension Project India 8 2008 Essar Oil Co.Ltd 01 Tons) Foster Wheeler UK / 17 th x I.D 1700 x 8750 L (36. SPT Project Singapore 1 2008 ExxonMobil 9 Tons) World trade / 26 th x ID 2500 x 6000 L (33.2 MDI Project China 1 2008 BASF Chemical Co., Tons)

3rd NGL TRAIN Project UAE Snamprogetti / RUWAIS 35 th x ID 3100 x 18000L 1 2006

Jamnagar India RELIANCE 123 th x ID 1,300 x 5,000 L 1 2006

26 Description Project Name Location Client (Dimension) Quantity Year

Ichthys CPF Project (TEG Pkg) Australia Process group 8 m x 18 m x 14 m 3 2012

Prelude FLNG Project Australia Aker Solutions 12 m x 19 m x 17 m 2 2012

Wheatstone LNG Project Australia Aker Solutions 14 m x 14 m x 9 m 3 2011

APLNG Project Australia Aker Solutions 6 m x 14 m x 3 m 15 2011

Gorgon Project Australia HHI 44m x 82m x 33m 194 2011

Kearl Oil Sands Project Canada AMEC 7.3m x 7.8m x 36.0m 187 2010

Pazflor FPSO Project Angola DSME 28.6m x 19.2m x 29.7m 4 2009

Pascagoula Project (CCR Module) U.S.A UOP 12.0m x 7.0m x 75.0m 1 2008

Tombua-Landana (MSF Module) Angola DSME 14.7m x 15.8m x23.9m 1 2007

Drillship(Topside Module) Gulf of Mexico DSME 8.0m x 7.9m x 21.0m 1 2007

Semi-Rig (Pontoon,Wing Brace,Column) Gulf of Mexico DSME 16.0m x 10.5m x21.0m 3 2007

Kiwinana Project (LNG Module Unit) Australia Linde 4.5m X 9.0m x24.0m 3 2007

27 Description Project Name Location Client (Dimension) Quantity Year

AGBAMI FPSO (GDU-Package) Angola DSME 7.0m x 7.0m x 21.5m 3 2005

CCR. Platform Module China UOP 12.0m x 7.0m x 74.0m 1 2005

P.6040 Benguela Bellize Project Angola DSME 11.3m x 7.3m x 6.7m 1 2004 - Fuel Gas Skid DALIA FPSO Topside Gas Dehydration Angola DSME 13.1m x 5.2m x 9.8m 1 2004 Package DALIA FPSO Topside Gas Dehydration Angola DSME 21.5m x 7.3m x 7.0m 2 2004 Package

CCR. Platform Module Saudi Arabia UOP 75.0m x 12.0m x 8.0m 1 2003

CHUNXIAO TEG Package China KCC 7.5m x 3.5m x 5.1m 2 2003

28 Project Name Location Client Description Quantity Year

Puerto Coronel Chile Bechtel LP FWH, BEU / AEU 8 2009

Trimble County Bechtel LP FWH, BEU 6 2007

Trimble County Bechtel LP FWH, BEU 6 2007

29 Project Name Location Client Description Quantity Year

Oseung CCPP GE Surface Condenser, Horizontal 1 2010

30 Needle Coke Plant  Client : PMC Tech Co., Ltd  Location : Gwangyang, Korea  Plant Capacity : 320,000 MTDY  Construction Area : 226,080 m2  Project Period : 2013.01 ~ 2014. 12 ( 24 months)  Licensor : Mitsubishi Chemical/ Lummus (Delayed Coking)

General Information

Fuel Gas

Coke Drum

Light Oil Pitch

Needle Coke Coke Drum to Heater Storage Coke Pit

31