RESIDENTIAL CONTRACTOR GUIDELINES Rev. 09/2017 BUILDING INSPECTIONS TABLE OF CONTENTS Code Compliance 2 General Information 3 Inspection Requests / Inspection Cancellations 4 Location of Permit Packet 4 Inspector Office Hours 5 Reinspection Fees 5 Inclement Weather 6 Inspection Requirements 7 T-Pole 7 Plumbing Rough 7 Foundation 8 Flatwork/Approach 9 Sheathing/Nail Pattern 10 Seconds 10 Framing 10 Electrical Rough 12 Plumbing Top-Out 12 Mechanical Rough 13 Fireplace 14 Gas Pressure Test 14 Four (4) Foot Brick 15 Insulation 15 Drywall 15 Gas & Electric Release (Utility Release – Permanent Service) 15 Gas Release 16 Electric Release 16 Temporary Heat 17 Public Works 17 Building Final (Certificate of Occupancy) 18 Plumbing Final 19 Electrical Final 19 Mechanical Final 20 Fence Final 21 Irrigation (DCA/Backflow) Final 21 Energy Final 21 Building Final 21 Summary 22 Attachments Builders Designated Subdivision Wash-Out Pit 23 Building Lot Erosion & Debris Containment Plan 24 Residential Drive Approach Detail 25 Barrier Free Ramp at Intersection 26 Residential Contractor Guidelines – Rev. 9/17 Page 1 of 26 Physical Address: 409 E First Street / Mailing Address: PO Box 307, Prosper, TX 75078 Office: 972-346-3502 / Fax: 972-347-2842 / Email:
[email protected] Code Compliance Construction projects must adhere to the following codes: 2012 International Energy Conservation Code, Ord. #14-47, effective, October 1, 2014 Effective September 1, 2016, State of Texas adopted Phase 1 of the 2015 IECC. 2011 National Electrical Code, Ord. #14-50, effective, October 1, 2014 2012 International Residential Code, Ord. #14-45, effective, October 1, 2014 2012 International Mechanical Code, Ord.