Prepared By Environmental Section

TAISEI CORPORATION, JAPAN (Main Contractor) Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Table of Contents

Chapter 1 Introduction…………………………………………………………………………………… 1 1.1 Environmental Organization Chart……………………………………………………………. 2 1.2 Environmental Responsibilities……………………………………………………………….. 3 1.2.1 Engineer (Oriental Consultants Company Limited)…………………………………………………... 3 1.2.2 Main Contractor(Taisei Corporation)…………………………………………………………. 3 1.2.3 Environmental Manager and Deputy Environment Manager ………………………………… 3 1.2.4 Sub contractors………………………………………………………………………………… 4 1.3 Major Construction Activities…………………………………………………………………. 6 1.4 Locations of Construction Activities…………………………………………………………... 7 Chapter 2 EMAP Implementation …………………………………………………………………… 12 2.1 Introduction ……………………………………………………………………………………. 12 2.2 Pre Construction Stage………………………………………………………………………… 12 2.3 Construction Phase…………………………………………………………………………….. 13 2.3.1 Controlling of Social impacts due to the influx of construction workers to local areas……….. 14 2.3.2 Controlling of Hydrological impacts…………………………………………………………... 14 2.3.3 Controlling of Impact on water quality/quantity………………………………………………. 16 2.3.4 Controlling of Impact on air quality /dust……………………………………………………... 16 2.3.5 Controlling of Noise/ Vibration………………………………………………………………... 17 2.3.6 Controlling of Soil erosion or surface run-off ………………………………………………… 18 2.3.7 Safe Handling and storage of hazardous material……………………………………………... 19 2.3.8 Spoil and construction waste disposal methods………………………………………………... 20 2.3.9 Operation of work camps and provision of sanitary facilities for the workers………………... 21 2.3.10 Controlling of Loss of vegetation covers of the areas for temporary yard…………………….. 22 2.3.11 Controlling of Impacts on wetlands……………………………………………………………. 22 2.3.12 Controlling of Visual and aesthetic impact…………………………………………………..... 23 2.3.13 Controlling of Impacts from traffic……………………………………………………………. 23 2.3.14 Controlling of Social impacts………………………………………………………………….. 24 2.3.15 Safety and precaution measures taken for the workers and public…………………………….. 31 2.3.16 Controlling of impacts on transportation of haulage material…………………………………. 32 2.4 Implementation of EMAP on Prescribed activities carried out Beyond Project Area………... 33 2.4.1 Batching Plants………………………………………………………………………………… 33 2.4.2 Asphalt Plants………………………………………………………………………………….. 35 2.4.3 Gravel Barrow Pits…………………………………………………………………………….. 35 2.4.4 Disposal Dumping Yards………………………………………………………………………. 36 2.4.5 Crusher Plants………………………………………………………………………………….. 36 Chapter 3 Environmental Management Monitoring…………………………………………………… 37 3.1 Monitoring Requirements as per the contract………………………………………………….. 37 3.1.1 Water Quality…………………………………………………………………………………... 37

ii

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3.1.2 Air Quality……………………………………………………………………………………... 37 3.1.3 Noise………………………………………………………………………………………….... 38 3.1.4 Vibration……………………………………………………………………………………….. 39 3.1.5 Well water monitoring…………………………………………………………………………. 39 3.1.6 Rainfall………………………………………………………………………………………… 40 3.1.7 Flood / Water level……………………………………………………………………………. 40 3.2 Routine Inspections……………………………………………………………………………. 41 3.3 Joint Inspections……………………………………………………………………………….. 41 Chapter 4 Reporting Mechanism for Environmental Management and Monitoring Activities...... 42

iii

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

LIST OF ANNEXTURES

A. Public complain register B. License and clearances obtained for project activities C. Details of compensation for house damages D. List of affected parties who temporary evacuated E. List of affected parties who compensated for well water depletion F. Details of flood damage compensation G. List of miscellaneous compensation H. Final status of disposal sites I. SLLRDC clearance for removing pilot road J. Noise and vibration analysis K. Public road rehabilitation, Frontage/access road provision

iv

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

ABBREVIATIONS

CEA Central Environmental Authority EIA Environment Impact Assessment EMAP Environment Management Action Plan EMMP Environment Management Monitoring Plan EMP Environment Management Plan GSMB TS Geological Survey & Mines Bureau Technical Services OCH Outer Circular Highway ROW Right of Way RDA Road Development Authority SLLRDC Land Reclamation and Development Corporation SIEI Special Internal Environmental Inspection ESD Environment and safety division

v

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Chapter 1 Introduction

Outer Circular Highway (OCH) was originally planned by Road Development Authority (RDA) with the objectives to cater for the growing need in the transport sector in Sri Lanka. This was proposed as a connecting ring road to the existing trunk roads and other proposed highways. In addition to easing the traffic congestion in Colombo by reducing through traffic, OCH was expected to promote regional development leading to a balanced urban economy.

The Phase II of the Outer Circular Highway Project (Phase II – OCHP) extending a total of 8.9 km from Kadawatha (Ch 8 + 648) to Kaduwela (Ch 17 + 500), funded by Japan International Corporation Agency (JICA) was to be completed in 36 months. Phase II – OCHP was constructed by Taisei Corporation, Japan – the contractor. The project construction was commenced on the 9th January 2012 and it was open for public on 5th August 2015. Proposed ROW is given in Fig.1.

Environment Management Plan (EMP) was developed by Road Development Authority considering the anticipated impacts of the construction project. EMP gave a strong base for EMAP preparation. According to the contract agreement, it was essential to fulfill the requirements of EMP. Since it was a contractual agreement with the employer and the contractor, the engineer instructed to prepare a mechanism for implementation of the EMP. EMAP was prepared by Contractor in order to implement the EMP of Phase II – OCHP.

The Environment Management Action Plan was the document which describes possible environmental and social impact and proposal to avoid and minimize those impacts during the construction of Greater Colombo Urban Transport Development Project Outer Circular Highway to the City of Colombo (OCH) Northern Section from Kadawatha to Kaduwela in Sri lanka. The EMAP based on the Environmental Management Plan, Environmental Management Monitoring Plan and the Technical Specifications which was provided by the employer according to the EIA studies. Taisei Corporation implemented counter measures in order to prevent Environmental and social impacts under Engineer’s supervision.

1

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

1.1 Environmental Organization Chart The following officers were responsible for the implementation of EMAP during the construction period.

Project Manager Mr Akira Tanabe

Env Manager Mr. W.A.I.A. Rodrigo

Deputy Env Manager Ms.K.H.Jayasinghe

Env Specialist Env Specialist Mr.D.Meegaswatta Mr. S.N.Rajapaksha

ENV & Social Technical Team 1 Technical Team 2 Officer GSMB Mr Rohan Liyanage ITI

Env. Assistant (Documentation) Ms.K.L.D.K.Maduwanthi Env Assistant Mr Pallegedara

Data Controller Ms.F.G.Abewickrame Supervisor Mr.John Antony

2

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

1.2 Environmental Responsibilities

1.2.1 Engineer (Oriental Consultants Company Limited) Engineer on behalf of the employer was overseeing the monitoring of environmental issues of the project during the construction period in accordance with the contract.

1.2.2 Main Contractor(Taisei Corporation) The management of Taisei Corporation got the leadership to address the possible environmental issues and to control/minimize the adverse impacts, which arise due to particular anticipated environmental issues. Necessary management approaches were implemented by the Contractor in order to,

 Ensure that the correct mitigation measures were understood and fully accepted at each level of management, supervisory staff and all other employees.

 Ensure that the correct mitigation measures were implemented at each project activity as planned.

 Ensure that all subcontractors of the project follow the given instructions regarding the mitigation of adverse environmental impacts.

1.2.3 Environmental Manager and Deputy Environmental Manager Environment manager and Deputy Environment manager equally contributed for the implementation of EMAP throughout the project with fulfilling following responsibilities, in collaboration with the project manager.

 Identified possible Environment and Social impacts arising due to construction activities.  Arranged the specific impact monitoring procedure (Air/Water/Noise/Vibration impacts) and obtain reports from recognized laboratory or by independent monitoring agency approved by the Engineer.  Took necessary actions to rectify the impact as described in the EMAP  Obtained license, clearances and approvals from relevant authorities  Arranged site monitoring daily, weekly, monthly basis.  Attended and investigate public complaints and other public related issues  Prepared and submit monthly environmental report to Engineer.  Attended to Environment related meetings The Environment Specialist also participated above duties in addition to the duties that assigned by Environment Manager.

3

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

1.2.4 Sub contractors

 All subcontractors of the project were strictly made aware of the requirements for environmental impact mitigation of the project.

 All subcontractors of the project were strictly following the instruction given for the mitigation of environmental pollution.

In case of failure to comply with Taisei Corporation’s requirements on the control of environmental pollution, penalties were imposed to the respective sub Contractor

4

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Fig 02 – Location map of the OCH -Phase II

5

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

1.3 Major construction activities The major construction activities of the outer circular highway to the city of Colombo, Project Phase 11 (NS- 1) Kadawatha to Kaduwela.

Table. 01 Major construction activities

# Major Activities Sub Activities 1. Preliminary works. I. Clearing and grubbing, removing and disposing of vegetation and debris within designated road limits. 2. Removing of existing structures within designated road limits. 3. Constructing pilot road. 2. Earth Works. 1. Excavation (cutting of high elevation areas to designated road levels). 2. Construction of embankments. (filling low lands to designated road levels) 3. Soft ground treatment by using Gravel Compaction Piling (GCP) technique. (For wetlands, paddy fields, water logging areas etc, for construction) 4. Removal of original material and replacement of rocks. (Applies at locations of structures where the soft materials were existed.) 5. Excavation of rocks and boulders within ROW using explosives or chemicals to designed road level. 6. Mining of rocks outside the ROW to obtain materials. 7. Concrete production for construction of structures. 8. Aggregate production for cement concrete and asphalt concrete and for road base construction works. 9. Asphalt concrete production for final road finishing works. 10. Disposal of vegetative materials, debris and other unsuitable materials such as top soil, peat etc. 11. Operation of borrow pits. 12. Stabilizing the cut slopes and embankments slopes by turfing. 3. Construction of Drainage Construction of pipe and box culverts cut off drains, vertical Structures. drains, toe drains and sub surface drains. 4. Construction of other Construction of river bridges, viaducts, underpass bridges, structures. overpasses bridges and vehicular box culverts. 5. Road works. Layering of Aggregate Base Course (ABC), prime coating and asphalting. Repairing and servicing of vehicles and other machinery deployed in construction activities. 6. Operating crusher plants, Quarries, Borrow pits, Disposal sites, Accommodations.

6

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

1.4 Locations of construction activities.

Table No. 2 Locations of Rock and Boulder Excavation within ROW # Chainage 1. 08+865 (V1-P7) 2. 11+200 – 11+260 3. 12+490 – 12+510 4. 15+500 – 15+400 5. 15+585 6. 15+620 – 15+720 7. 15+675 – 15+750 8. 15+800 – 15+850 9. 17+358

Table No.3 Excavation (cut) Areas within ROW. # Chainage 1. 9+000 – 9+140 2. 9+420 – 9+640 3. 9+940 – 10+360 4. 11+140 – 11+520 5. 12+080-12+220 6. 12+420-12+540 7. 14+520-14+580 8. 14+700-14+945

Table No. 4 Filling Areas (Earth/Rock Embankment Construction Areas) within ROW. # Chainage 1. 8+960-9+000 2. 9+140-9+420 3. 9+640-9+710 4. 9+900-9+940 5. 9+360-9+400 6. 11+520-12+080 7. 12+220-12+420 8. 12+540-12+900 9. 14+400-14+520 10. 14+580-14+700 11. 14+945+15+100 12. 15+520-15+860

Table No.5 Viaduct Areas within ROW. # Chainage 1. 8+540-8+960 2. 9+710-9+900

7

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3. 9+460-11+140 4. 12+900-14+400 5. 15+100-15+520 6. 15+860-17+500

Table No.6 Soft Ground Treatment Areas within ROW. # Chainage 1. 8+500-8+550 2. 9+300 3. 9+700-9+880 4. 10+180 5. 11+240 6. 11+740 7. 11+840-11860 8. 12+020-12+080 9. 12+240-12+420 10. 12+500 11. 12+640-12+800 12. 14+600-14+650 13. 15+040-15+100 14. 15+500-15+600

Table No.7 Locations of Drainage Box Culverts within ROW. # Chainage 1. 9+340 2. 11+740 3. 11+940 4. 12+250 5. 12+340 6. 12+390 7. 12+780 8. 14+619 9. 15+585

Table No.8 Locations of Over Pass Bridges within ROW. # Chainage 1. 9+420 2. 10+200 3. 11+245 4. 12+520 5. 14+846

Table No.9 Locations of River Bridges within ROW. # Chainage 1. 16+260-16+525

8

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Table No. 10 Locations of Vehicular Box Culverts within ROW. # Chainage 1. 14+619 2. 8+860

Table No.11 Details of Main Water sources in OCH Ph-11, NS-1

# Location Name of the channel DS division Channel Authority 01 16+945 Ramahara Ela Kaduwela Provincial Irrigation 02 16+300 Kalani river Kaduwela Dep: of Irrigation 03 15+900 Rakgahawatta Canal Biyagama Dep: of Irrigation

Table No.12 Paddy field Areas.

# Chainage Status of the paddy field 1 17+500 – 17+300 (LHS) Cultivated 2 17+100 – 16+650(RHS) None cultivated and water logged in clay pits during dry season. No proper drainage system of water. 3 15+500 – 15+080 (RHS) None cultivated and water logged in clay pits during dry season. No proper drainage system of water. 4 15+800 – 15+080 (LHS) None cultivated and water logged in clay pits during dry season. No proper drainage system of water. 5 14+500 – 12+900(LHS) None cultivated and water logged in clay pits during dry season. No proper drainage system of water. 6 14+500 – 12+750(RHS) None cultivated and water logged in clay pits during dry season. No proper drainage system of water. 7 12+400 – 12+250 (RHS)/(RHS) Cultivated 8 12+400 – 11+700 (LHS) Cultivated 9 10+500 – 10+850 (RHS/LHS) None Cultivated 10 9+880 – 9+700 (RHS/LHS) Cultivated 11 9+000 – 8+648 (RHS/LHS) Cultivated

9

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Table No. 13 Temporary Cross Drainage for Pilot road

Capacity of Drainage Chainage provided

12+250 1/600mmφ pipe 12+350 1/600mmφ pipe

12+400 1/600mmφ pipe 13+100 1/1200mmφ pipe 13+510 3/1200mmφ pipe 13+300 4/1200mmφ pipe Side canal LHS Outside ROW 2/1200mmφ pipe Side canal RHS 13+890 1/1600mmφ pipe 14+070 1/1200mmφ pipe

14+260 1/1600mmφ pipe

14+340 1/1600mmφ pipe 15+150 2/1200mmφ pipe 15+860 Rakgahawatta Ela

16+640 1/900mmφ pipe

16+900 2/900mmφ pipe 16+960 1/900mmφ pipe 17+200 2/1200mmφ pipe

10

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Table No.14 Prescribed Activities Relevant to the OCH project p-11, NS -1(Kadawatha to Kaduwela).

# Prescribed Location Obtained Approval Activity 01 Mechanical 12+200 at Makola Borrow pit 1. CEA clearance Yards/Garages area 2.Building Approval 3.UDA approval 02 Metal Crusher Hanwella 1.CEA clearance Plant 2.UDA clearance 3. EPL. 03 Accommodations Siyambalape 1.EPL

04 Asphalt plant Galpothugoda, Dompe 1.CEA clearance 2. EPL. 05 Tokyo cement Keangnam land Batching Plant 1 Biyagama(16+100) Taisei Batching Makola 1.CEA clearance Plant 12+000-12+200 2. EPL Tokyo cement Mawaramandiya 3.UDA clearance Batching Plant 2 Access Mabima,Biyagama Batching plant 06 Metal Quarry Meepe (Taisei did not maintain quarries, only purchasing boulders from CEA permitted Quarries) 07 Borrow pit - 1 Makola 1.GSMB clearance 2.CEA clearance Borrow pit - 2 Meepe 1.GSMB clearance 2.UDA clearance 3.CEA clearance

Borrow pit - 3 Ambepussa, Mahena 1.GSMB clearance 2.CEA clearance Borrow pit - 4 Meerigama I ,Danowita 1.GSMB clearance 2.CEA clearance Borrow pit - 5 Meerigama II 1.GSMB clearance Weweldeniya 2.CEA clearance 3. NBRO clearance Borrow pit - 5 Warakapola, 1.GSMB clearance Thulhiriya 2.CEA clearance

11

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Chapter 02 Implementation of EMAP 2.1 Introduction

The basic Environmental impacts of the Outer Circular Highway Project were identified and findings have been described in the Environmental Impact Assessments Report of Central Environmental Authority.

Environmental Management Plan and Environmental Monitoring plan was prepared considering the finding of the EIA report. Details of implementation of environmental protection measures and mechanism were described in the Environmental Management Action Plan which was prepared by the Contractor base on EMP. Employer, Engineer and Contractor obligated for planning, coordinating, Implementation, supervision and monitoring of all recommended environmental protection measures stipulated in the EIA, EMP and EMAP.

 EMAP Mainly divided in to two sections. 1. Pre – Construction Stage. 2. Construction Stage.

2.2 Pre – Construction Stage.

In the pre-construction stage, all possible social and other impacts were identified and following actions were taken in order to mitigate them.

 Existing condition of public roads that cross the proposed main highway trace identified and recorded.  All valuable Plants throughout main highway trace identified and recorded.  All existing structures, which located within 50 meters offset either side of the proposed road trace identified and existing condition was recorded.  All existing Canals, water paths, Irrigation Canals and other drainage paths located cross the proposed main highway trace were identified and recorded.  Ground water levels, water quality of Dug wells and Domestic wells located either side of the proposed main highway trace were recorded.  Identified and recorded the sensitive locations such as Temples/Sacred places, Hospitals, Schools and nursery schools and Elderly Homes.  Recorded the highest and lowest flood levels of the flood prone locations within the proposed construction area.  Identified the Underground and overhead utility paths located across the proposed main highway trace.  Recorded Existing topography condition of either side of the road trace.  Prepared the Environmental Management Action Plan and submitted it to Engineer for approval.  Flood Assessment Report prepared by qualified drainage Engineer and submitted it to SLLRDC for Pilot Road approval.

12

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

 Property Condition survey was carried out by the GSMB Technical for the Structures located within 50 meters from proposed Highway trace boundary Services and reports submitted to Engineer, CEA and RDA.  Baseline data for the noise and air quality were obtained from employer and arranged further monitoring during construction.

2.3 Construction Stage

EMAP was implemented at site to control and minimize the negative environmental effects, which caused by construction activities. Following environmental and social impacts were anticipated during construction stage.

1. Social impacts due to the influx of construction workers to local areas 2. Hydrological impacts 3. Impact on water quality 4. Impact on air quality /dust 5. Noise/ Vibration 6. Soil erosion or surface run-off 7. Handling and storage of hazardous material 8. Spoil and construction waste disposal 9. Operation of work camps and provision of sanitary facilities for the workers 10. Loss of vegetation cover of the areas for temporary yard 11. Impacts on wetlands 12. Visual and aesthetic impact 13. Impacts from traffic 14. Social impacts 15. Safety and precaution for the workers and public 16. Impacts on transportation of haulage material

In order to mitigate these addressed impacts, Contractor implemented following mitigation actions in accordance with EMAP.

13

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

2.3.1 Controlling of Social impacts due to the influx of construction workers to local areas Contractor conducted Environment awareness programs for supervisory and labour staff in their toolbox meeting. Environmental committee meeting was held every month for Sub contractors and advised them how to protect environment during construction without violating rules and regulations. Impacts identified during the daily monitoring were discussed in the committee meeting and mitigation actions were taken accordingly. Minuets of meeting was reported in the Monthly Report and submitted to Engineer, RDA and CEA. A special awareness program was conducted on HIV AIDS for the local and foreign staff by specialized expertise.

2.3.2 Controlling of Hydrological impacts Possible hydrological impacts that may occur due to construction activities were identified prior commence construction activities. Following mitigation measures were taken in order to overcome those impacts.  A qualified Hydrologist of GSMBTS carried out flood level assessment and prepared a report for proposed pilot road and working platforms in via duct areas.  SLLRDC gave their approval for the pilot road after carefully studying previously mentioned report.  Cross drainages were provided with proposed capacities for pilot road in accordance with SLLRDC approval at prescribed locations.  Each pilot road breaching points were indicated by displaying signboards at site.  Emergency Action Plan for flash flood situations were prepared and submitted to Engineer.

Mechanism described in the EMAP was implemented during construction activities were in progress; in addition to that, contractor, deployed Environmental staff to monitor impact arose due to ongoing activities in the construction sites. All hydrological impact related public complaints resolved by the Contractor and reported to Engineer, RDA, and CEA with monthly Environmental report. However, Contractor had to face following unavoidable circumstances during construction period.

14

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

 In 2013 and 2014 during heavy rain, some areas located adjacent to Viaduct 14 and A1 bypass area subjected to flood.  Kelani river bank erosion due to cofferdam construction in 2012 and 2014. (Massive erosion reported in 2014 at Kelani river south bank).  Well water depletion incidents at Viaduct 11, Viaduct 14 and Viaduct 1 areas in 2013 and in first quarter of 2014.

It was decided to expedite the construction of permanent drainage system in order to overcome the flood occurrence at site.

Flood affected location at A1 Bypass area Flood affected location at Viaduct 14 area

In month of June 2014 south bank of Kelani river was eroded severely. Approximately 100m of river bank was affected by this incident. However Contractor proposed a rectification method for this issue in assistance with a hydrology specialist at University of Peradeniya and it was submitted to Irrigation Department for review. Eventually Contractor proposed boulder-packing method was accepted and implemented at site. Some parts of the North Riverbank were also affected during south cofferdam. Since it was not significant erosion, riverbank was protected with earth bund. Tendency of Kelani river water current shows towards south river bank at particular area. The earth bund provided for north bank was able to stand still even during rainy season of 2015 because of that phenomenon and removing of cofferdams.

Water depletion incidents were reported during pile cap excavations. Some cases were reported more than 100m away from site. This matter was referred to University of Moratuwa for justification. Technical team of the university carried out an investigation. Based on all information, which was gathered during their site inspection and after carefully studying available data they concluded that it was a temporary issue and all depleted wells would recover within two or three months.

15

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

South River Bank Protection North River Bank Protection

2.3.3 Controlling of Impact on water quality/quantity Scheduled surface and groundwater quality monitoring was carried out by university of Moratuwa at prescribed baseline locations throughout the construction period. All public complains related water quality/quantity were resolved and the Contractor was able to provide reasonable solutions for those issues. Most of the complaints recorded during construction stage regarding.  Degradation or contamination of well water  Well water depletion

Public complains which arose due to water quality degradation/ contamination were resolved in acceptable manner i.e. all incidents were referred to Environment Lab, University of Moratuwa in order to examine whether there was a contamination/ degradation of water quality. Accordingly, suitable solutions were provided for affected parties.

2.3.4 Controlling of Impact on air quality /dust Industrial Technology institute was arranged in order to continue scheduled air quality monitoring at baseline locations until end of the project. Dust generation was one of the significant environmental issue arose during construction stage. Three filling stations and five no. of water bowsers were deployed in order to minimize dust emission of pilot road. Contractor established three no. of water pumping stations at site in order to carry out an efficient dust control mechanism Additional dust control mechanism was introduced during dry season to control dust emission more effectively. In addition to that, Dust Barriers were provided for houses locate adjacent to the site. Also public roads, which cross the site, had to be washed in order to minimize dust emission.

Several public complaints received regarding dust emission in Hanwella crusher plant premises. As mitigation action for dust generation  Dust barriers were erected around the plant  Sprinklers were installed at locations where heavy dust emission causing activities carried out.(Such as boulder unloading point, Crusher jaw etc.)

16

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

 A water bowser was deployed to wet access road in order to minimize emission while moving vehicles within the premises.  Air quality monitoring was carried out once in six month and its report forwarded to CEA for evaluation.

Water filling Station Pilot Road Damping

Providing of dust barriers

2.3.5 Controlling of Noise/ Vibration During construction period, significant no. of noise and vibration related complaints were received. Contractor deployed a separate technical team from Industrial Technical Institute to monitor noise and vibration while construction activities were ongoing. Contractor was able to minimize unnecessary public obstructions by implementing this mechanism. Noise and vibration monitoring was carried out randomly and based on the complaints. Whenever noise/vibration related complain received the technical team and contractor’s environment staff member visited and monitored noise/vibration. Whenever permissible noise/vibration level exceeded, immediately particular construction activity was discontinued. In such circumstances, mitigation actions were taken such as.

17

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

 Rearranging of working area  Replacing with low capacity machineries  Reducing of no. of machines  Discontinue of particular construction activity in the night time and restart in the daytime. Construction works had to be continued even during nighttime in order to expedite project progress. Contractor obtained an approval from CEA before commence works beyond daytime. Since this is, a national project CEA described daytime as 0600hr to 2100hr. Although prescribed nighttime commenced after 2100hr, activities, which generated heavy noise/vibration, were limited after 1800hr. The status of action taken for complaints received during construction period, reported to Engineer, RDA, and CEA with our monthly Environmental report. At the end of the project Contractor carried out a comprehensive Noise and Vibration analysis in order to figure out the diffusion of Noise and Vibration effect (Refer to Annexure J).

Noise Monitoring

2.3.6 Controlling of Soil erosion or surface run-off During daily inspection and based on the complaints received, affected locations were identified. Contractor’s environmental labour team was assigned for issues that can be rectified by manually and machines were allocated for the issues that cannot be rectified by manually. Especially as the aftermath of heavy rains/floods irrigation canals, paddy lands, private lands that located adjacent to the site were subjected to heavy siltation frequently. Erosion prone steep locations were secured with gabion structures. However all complaints related soil erosion or surface run-off were resolved up to the satisfaction of the complainants. The status of action taken for complains received during construction period, reported to Engineer, RDA, and CEA with monthly Environmental report.

18

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Erosion control by using sand bags

Controlling of surface run-off

2.3.7 Safe Handling and storage of hazardous material A hazardous material is defined as any substance or material could adversely affect the safety of the public, handlers or carriers during transportation/handling. During construction period several kind of hazardous materials were used such as  Fuel  Lubricants  Explosives  Gaseous materials (Acetylene etc.)  Insecticides (mosquito breeding control) A special attention was given to prevent impacts arise due to Hazardous Materials. Fuel was stocked in underground tanks in safe and environmental friendly manner. There were separate storage facilities for Lubricants, Gaseous products etc. Explosives had to be handled since there were several minor scale blasting activities throughout the trace. However, instead of maintaining a magazine by Contractor, explosive supplier transported explosives from their magazine daily basis.

19

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Insecticides had to be used since there were water logging locations at site that could become mosquito breeding grounds. A representative of chemical supplier visited the site and conducted a brief demonstration for the people who handle the insecticide. The chemical and apparatus were stored separately in safe manner in accordance with manufactures manual.

Lubricant storage Filling Station

Handling of insecticide

2.3.8 Spoil and construction waste disposal methods Vast amount and different varieties of disposal materials were generated during construction operations, such as  Clearing and grubbing  Excavation  Yard/plant operations  Demolishing (such as temporary structures)  Removal of Pilot road and working platforms. All these materials were disposed in selected disposal sites, which had been approved by relevant government authorities such as CEA, SLLRDC, Agrarian services etc.

20

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

During operation stage of a Disposal site

After reinstate

2.3.9 Operation of work camps and provision of sanitary facilities for the workers Contractor maintained a work camp during project construction period. Environment Protection License was obtained from CEA as an obligation of the Contractor during operation period of labour camp. Temporary sanitary facilities were installed at selected locations by concerning density of workers/nature of the location. Effluent of septic tanks that had been installed for those temporary sanitary facilities was removed regular basis in order to prevent social/environmental impacts.

21

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Provided Sanitary Facilities

2.3.10 Controlling of Loss of vegetation covers of the areas for temporary yard Contractor ensured not to perform unnecessary removal of vegetation during construction of temporary yards. Further removal of large trees and vegetation cover were minimized largely as only few numbers of yards operated outside the project trace. Tokyo cement batching plant and girder fabrication yard were constructed in a backfilled land, thus a significant vegetation cover was not removed.

2.3.11 Controlling of Impacts on wetlands After carefully studying the topography of the area, which OCH NS-1 lies, several sections of the highway were designed as viaducts. These viaducts run through marsh/swamps, saturated lands/paddy lands etc. One of the main purposes of these viaducts is minimizing the interruption on hydrology of particular sensitive areas from the project. These areas play significant role during heavy rainy season/flash floods i.e. as a result of rising Kelani River water level during heavy rain, excessive water flows towards inland areas and retains in these areas until water level of the river comes back to normal. This phenomenon protects residential areas from flood. During construction period, these areas were filled with soil to form pilot road and working platforms. As described in “Hydrological Impact” cross drainages & diversion canals were provided and maintained at prescribed locations during construction period in order to improve the drainage and to minimize impact on water retention. Due to scheduled water quality monitoring, Contractor was able to make sure that there was no any contamination take place in these areas as a result of Kottunna Area construction activities. However, at the end of the project all viaducts areas were brought back to original ground condition. Previous and post 22

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela elevation differences of viaduct areas were obtained and submitted to SLLRDC in order to determine whether soil removal has taken place in an acceptable manner. At the end of visual inspection which was held with SLLRDC, Employer, Engineer and Contractor several further rectifications were proposed by SLLRDC. Subsequently approval was granted by SLLRDC after the completion of rectified work. (Refer to Annexure I).

Removal of Pilot Road After removing Pilot road and working platforms

2.3.12 Controlling of Visual and aesthetic impact Alteration of existing natural environment is an obvious phenomenon that happens during construction projects. However, during this construction period, activities which could degrade visual and aesthetic value were minimized as much as possible. All embankment areas were secured by turfing and planting recommended flora in order to enhance the visual and aesthetic value. Other than embankment areas, recommended flora was planted underneath selected viaduct areas.

Greenery Works

2.3.13 Controlling of Impacts from traffic OCH NS-1 crosses several public roads such as AB10, B214, B632, B262, B169, Nagahamulla Road, Shramadana Mawatha. These roads had to be crossed for mobilization of project vehicles and machineries during construction period. Road damages which occurred such as pot holes, edge

23

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela corrections were immediately rectified before it would affect traffic. Temporary diversion roads were provided with same good condition in order to divert traffic flow of particular public roads while working on overpass bridges. In viaduct areas especially at AB10 and B214 roads were diverted only during working hours. Therefore, the provided diversion roads were not asphalted or macadamized which leaded to dust generation at B214 road. As the control measure of this issue, dust barriers were provided for houses located on either side of the road and extra bowser was allocated for public road damping.

Diversion Roads provided

2.3.14 Controlling of Social impacts The OCH NS-1 was constructed through urban and suburb areas. However more than thousand houses were identified on either side of the ROW up to 50m. One of the main social impacts was the fear over lack of transparent mechanism for property damages/losses valuation and uncertainty of timely payments of compensations. In order to overcome this issue, a government approved method was followed i.e. pre-condition survey was carried out through an independent third party (GSMB Technical Services Pvt. Ltd.) prior to commence construction activities. After completion of all construction activities, same property condition survey was conducted by aforesaid third party in order to evaluate the extent of property damages on behalf of the contractor. Thereafter a qualified chartered civil engineer carried out field inspections for each house. Final cost estimate was prepared based on the previously mentioned condition survey reports and information gathered during inspection. These final cost estimates were forwarded to particular house owners for their assent. The payment was proceeded after they agreed with their estimates (Refer to Annexure C).

24

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Following diagram demonstrates entire compensation procedure which was implemented for the structures located within 50m corridor.

Demarcation of 50m corridor

Pre condition survey

Construction diagnostic vibration monitoring

Low vibration Excessive vibration beyond below the permissible limit the permissible limit

Select a low vibration mode Stabilization and shoring of Temporary evacuation of and continue the activity weak structures and continue affected parties and continues the activity the activity

After completion of the construction, post crack survey was carried out and prepared estimates for house damages

APs produce their own cost Affected parties agree with Affected parties do not agree estimate through a chartered the estimate with the estimate civil engineer

Accept the compensation Negotiation is held between APs payment by the AP Engineer and GSMB Engineer to consider whether there is a possibility for Revised estimate revision

25

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Property Condition Survey Damage Valuation

During construction period several public complaints received from people who lived beyond 50m boundary regarding property damages occurred due to construction activities. As the preliminary action, this matter was forwarded to an expert team of University of Moratuwa in order to investigate whether there was a relationship between damages of house situated beyond 50m and construction activities of the project. At the end of the investigation it was concluded that property damages of some houses occurred not due to construction activities but due to other reasons such as poor ground condition, construction failures, etc. However they suggested continuous monitoring on crack development for selected houses before the final decision was made.

Accordingly, Contractor arranged GSMB technical service Pvt. Ltd to carry out initial crack survey for particular houses and occasionally the Contractor monitored crack development of each house during construction period. Monitoring data were forwarded to the technical team of the University of Moratuwa for evaluation after a certain period. In order to enhance the accuracy of the final decision, expert team requested Contractor to obtain a report regarding structural stability for each house as a supplementary requirement.

A qualified Chartered Structural Engineer conducted a structural stability inspection for particular houses and its report was forwarded to University of Moratuwa. Finally considering all available data expert team of University of Moratuwa concluded that construction activities of the project were responsible for only seven no. of house damage cases. House damages of other complainants, had been occurred due to thermal/ shrinkage effect or poor construction manner. Based on that conclusion, those affected parties (07 Houses) were included in the final compensation procedure.

26

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Resolution mechanism for the public complaints received from beyond 50m boundary

Receiving a Complaint

Site Inspection

Construction diagnostic vibration monitoring

Preliminary investigation

Weak structures with Sound structures with previous cracks previous cracks

Implementation of the recommendation of the Report

Monitoring on crack No effect from development construction activities

Evaluation of results and recommendation accordingly

Structural stability No effect from survey construction activities

Evaluation of results and recommendation accordingly

Compensation for No effect from house damages construction activities

27

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

University Team inspecting complainants.

Most of the construction activities used in this project generated noise and vibration. Therefore, noise and vibration was the prominent public complain category during construction period. As described in “Noise/Vibration” section in the EAMP, Contractor implemented an admissible procedure in order to mitigate excessive noise and vibration. However, there were few cases, which Contractor could not control noise/vibration within the permissible limit. Thus, Contractor decided to evacuate the particular affected families on temporary basis for a certain period and a compensation payment was made as the rental for the new house (Refer Annexure D). In some locations, Contractor could not complete the construction activity within predetermined period; hence, the evacuation period had to be extended.

Dust generation was another critical environment and social issue. However, Contractor was able to successfully control and mitigate this matter by implementing strategies that described in “Impact on air quality /dust”. None was evacuated due to dust problem during construction period.

Several locations which were adjacent to the site, were affected from flood twice during construction period. Major incident reported in 2014. Approximately 40 no. of families were affected. As immediate action, some parts of the pilot road had to be breached. At that instant relevant officers of the project visited the affected locations in order to investigate the damage occurred. First of all basic requirement such as food and drinking water were provided for the affected parties for three days. Simultaneously the damaged household items were identified with the assistance of relevant Officers of Divisional Secretaries. Afterwards a recognized electric good repairing company was hired by the Contractor and all defected electric appliances were forwarded to them. The Contractor explained their damage valuation procedure to Divisional secretary and prepared reasonable estimates for damages of each affected party. Finally, all affected parties were compensated under Divisional Secretary’s supervision. (Refer to Annexure F).

28

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Flood affected areas

A flood affected house Gathering information regarding damages.

As the initial approach for well water depletion, public water supply connections were provided for more than 20 affected parties. Eventually as the no. of affected parties increased, providing of public water supply connection became not feasible. Therefore, drinking water was provided for affected parties on daily basis until their wells became normal. (Refer to Annexure E).

Providing of Drinking water 29

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Next prominent social impact was agrarian problems, OCH NS-1 project crosses agricultural lands /irrigation canals/ water paths which are more sensitive than other areas. During construction period, some existing irrigation canals had to be diverted on a temporary basis. However all precautionary actions described in EMAP were taken in order to ensure uninterrupted cultivation. Whenever Contractor received complaints from farmers, Contractor’s environment staff attended to solve the matter with immediate effect. Some matters were brought to Contractor’s attention through relevant divisional secretary/ divisional officer of Agrarian Services centre. In such circumstances, Contractor inspected particular matters jointly with government bodies and provided acceptable remedial solution.

A joint inspection held regarding agrarian issues A meeting held with farmers association

Desilting a paddy land Irrigation canal cleaning

After implementation of permanent drainage plan, some lead away canals were improved since those canals did not endure for the large volume of water that comes from project area.

30

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

An Improved Lead away Canal

A public complaints register was maintained by the Contractor as mentioned in EMAP. All complaints received throughout the construction period were recorded and it was categorized in accordance with its nature. Summary of public complaints of each month was submitted to Engineer, Employer and CEA with the Monthly Environment Report. Contractor was able to resolve all public complaints received up to the satisfaction of complainants (Refer to Annexure A).

2.3.15 Safety and precaution measures taken for the workers and public Safety of the workers and public was one of the most important factors of this project. Contractor took every possible action in order to ensure safety. Special attention was given while working at locations such as public roads/ footpaths etc. In such locations Contractor provided separate walkways for pedestrians considering their safety. During rainy period, pedestrians could not use some footpaths due to muddy condition. Contractor improved the condition of those walkways with Aggregate Base Course. Public roads were washed on regular basis in order to overcome slippery conditions occurred in rainy days due to mud deposition.

Improving the condition of walkways Separate walkways

31

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

2.3.16 Controlling of impacts on transportation of haulage material Dust generation and mud deposition on public roads was the critical environmental/social issue, which arose due to transportation of haulage material. In addition, road damages, drainage congestions were reported during construction period. Following actions were taken as mitigation measures for these addressed impacts.  Road condition surveys were conducted jointly with relevant Municipal council/ Pradeshiya Sabha prior to commencing the project construction activities in order to justify the road damage at end of the project.  All Public roads, which cross the highway trace, were damped on daily basis.  Especially in rainy season Contractor’s Environmental labour team was deployed to wash/clean public roads on regular basis.  Awareness programs were conducted for drivers of dump trucks/ concrete mixer trucks in order to prevent environmental hazards, which arise during transportation of haulage material.

Removing of deposited mud

Public road washing

32

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

2.4 Implementation of EMAP Plan on Prescribed activities carried out Beyond Project Area.

 Batching Plants  Asphalt Plants  Gravel Barrow Pits  Disposal Dumping Yards  Crusher Plants

2.4.1 Batching Plants.

In total Four (04) numbers of Batching plants were operated for the Outer circular Highway Project Kadawatha to Kaduwela section. Batching plants were maintained at following locations.

 Keangnam yard Biyagama. (Operated by Tokyo Cement)  Makola Yard Makola. (Operated by Taisei)  Mankada Road, Kadawatha. (Operated by Tokyo Cement)  Mabima Wathurapatha. (Operated by Access)

Central Environmental Authority had granted approval and issued EPL for all above mentioned Batching Plants. The Contractors Environmental monitoring staff monitored the operations throughout project period and the identified impacts were controlled. All complaints received from the general public were investigated and appropriate actions were taken immediately. Special Monitoring program was implemented to settle public complaints from people around Kadawatha Batching Plant. Following mitigation actions were implemented in order to overcome environmental impacts, which arose due to operations of Kadawatha Batching plant.

Noise Barrier for Washing bay Noise Barrier for Silo area

However, Contractor had taken action to operate the plant by complying conditions stipulated in the EPL. At the end of the project, all batching plants were removed from the places where they were operated and it was informed to the Central Environmental Authority.

33

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Washing bay Baffle Screening

Regular cleaning of water treatment facilities

After removal of temporary structures

34

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

2.4.2 Asphalt Plants.

Central Environmental Authority has granted approvals and issued EPL for asphalt plants operated at Galpothugoda,Pugoda. The entire operation system was handled by a nominated sub Contractor. The operations were monitored by the Contractors Environmental monitoring staff throughout operation period. Since this asphalt plant located at an isolated area, no public complaints were received during operation period.

Asphalt plant located at Galpothugoda,Pugoda

2.4.3 Gravel Barrow Pits.

Geological Survey and Mines Bureau and Central Environmental Authority had granted approvals for gravel excavation outside project area. The gravel barrow pits were operated by the nominated sub contractors. The main contractor’s Environmental monitoring staff monitored the conditions stipulated in the approvals during the operations period. No major incidents or conditions violations were reported during operation period.

Borrow pit operations

35

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

2.4.4 Disposal Dumping Yards.

All disposal yards, which were operated for dumping of unsuitable materials, were approved by relevant authorities such as the CEA, SLLRDC, Agrarian Development Department and UDA. Engineer and Contractor’s Environmental monitoring staff monitored the conditions stipulated in the approvals during the operational period. All disposal sites were reinstated in accordance with the conditions stipulated in approvals. (Refer to Annexure H).

2.4.5 Crusher Plants.

Contractor operated a crusher plant at Pahala Hanwella under sub contractor's Environmental Protection License (EPL). Contractor's Environmental monitoring staff monitored the conditions stipulated in the EPL issued by the CEA, during the operational period. All public complaints reported were resolved up to the satisfaction of complainants. Impact Monitoring and complains resolving reports were submitted to Engineer, RDA and CEA with Monthly Environmental Report.

Sprinkler System Dust barrier provided for crusher

Periodical Air quality monitoring Complain basis Noise monitoring

36

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Chapter 3 Environmental Management Monitoring

3.1 Monitoring Requirements as per the contract The following monitoring mechanism was implemented in order to monitor Water Quality/Level, Air Quality/Dust, Noise and Vibration in accordance with EMAP. All scheduled monitoring activities were carried out in accordance with Environmental Monitoring Schedule throughout the year. Monthly updated Environmental Monitoring Schedule for designated baseline locations was submitted to Engineer/ Employer and CEA with Monthly Environmental Report.

3.1.1 Water Quality Surface water quality, Ground water level and Quality was monitored throughout the construction period as per the monitoring locations and frequencies given in the EMP. The parameters were checked by Environmental laboratory of University of Moratuwa. Monitoring data were analyzed with the baseline data mentioned in EMP. Analyzed data were submitted to Engineer, RDA and CEA with the Environmental Quarterly Report.

3.1.2 Air Quality Scheduled air quality and dust monitoring was carried out by the Industrial Technology Institute (ITI) at baseline location as per the frequency and Parameters given in the EMP. The monitoring data were submitted to Engineer, Employer and CEA with the Environmental Quarterly Report.

37

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3.1.3 Noise

Scheduled 24hr and 3hr Noise monitoring was carried out by the Industrial Technology Institute (ITI) at baseline location as per the frequency given in the EMP. The monitoring data were submitted to Engineer, RDA and CEA with the Environmental quarterly report. In addition complain/ daily basis noise monitoring was carried out by a special team of ITI. Contractor’s environmental staff and ITI carried out nighttime noise monitoring as a requirement of CEA nighttime work approval. The monitoring data were submitted to Engineer, Employer and CEA with the Environmental monthly report.

38

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3.1.4 Vibration

On regular and complain basis vibration monitoring was carried out by ITI technical team. The monitoring data were submitted to Engineer, Employer and CEA with the Environmental monthly report.

3.1.5 Well water monitoring Water levels of the selected existing wells adjacent to proposed road trace were monitored on monthly basis and resulting data were submitted to Engineer, Employer and CEA with the Environmental Monthly Report.

39

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3.1.6 Rainfall Rainfall was measured on daily basis at Ch 16+300 – Kaduwela and A1 interchange area. Monitoring data was submitted with Environmental Monthly Report.

3.1.7 Flood / Water level Water level was measured daily at Kelani river and flood level was monitored at identified locations during rainy weather and data were submitted to the Engineer/ Employer and CEA with Monthly Report and it was analyzed quarterly.

40

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3.2 Routine Inspections

Two Environmental Specialists carried out environment monitoring at site on daily basis. They monitored the environmental and social impacts on daily basis and reported through the format. Site conditions were reported to the Environmental Manager and Deputy Manager through the Environmental Specialists. Special Internal Environmental Inspection was carried out monthly by a team consisting with Deputy Environmental Manager or Environmental Specialists. Site was selected for this SIEI based on the facts revealed by the previous week monitoring reports.

3.3 Joint Inspections

Joint inspection with engineer and other relevant parties was carried out on monthly basis. Engineer informed in advance for these joint inspections. Environmental Manager or Deputy Manager or Environmental Specialists participated in the joint inspections on behalf of the Contractor. Occasionally these were carried out with relevant government institutes for matters that could not be resolved by Contractor/Engineer or Employer.

41

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Chapter 4 Reporting Mechanism for Environmental Management and Monitoring Activities

The Environmental Staff of the Contractor conducted regular and frequent (daily-weekly) environmental inspections to check whether the mitigation specified in the EMAP were being implemented properly and timely.

Contractor implemented the monitoring action plan described in the EMAP based on the guidelines of the EMP. Field level monitoring was carried out with assistance of monitoring service providers such as GSMBTS, ITI, and University of Moratuwa.

The monitoring results were included in the Monthly Environmental Report (MER) prepared and submitted on the 5th of each month by the contractor. Progress of controlling of negative environmental impacts during the construction period was also included in the MER.

Monitoring results of every three months were analysed with the Baseline monitoring data, which were given in EMP and it was presented as Quarterly Environment Report (QER). In QER environmental monitoring parameters, which were being measured during construction period, were comparatively discussed with baseline and cumulative data. Fluctuations and deviations of each parameter were graphically presented in order to enhance the comprehension.

In accordance with the Condition of contract and the responsibilities described in the Section 114 of the Technical Specification, Contractor prepared and submitted above- mentioned Reports in a timely manner.

42

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Assist & Approve Development of EMAP

Implementation of EMAP Scheduled Monitoring Engineer frequency stipulated in EMPthe Joint Inspections Daily Daily monitoring

Coordinate based based the on

Preparation of "Monthly Environmental Report"

Submitted the Report at 5th of following

Engineer

Submitted the Monthly progress report in the middle of each

Employer/ESDU

Submitted the

CEA

43

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure A

Public Complain Register

Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

RDA 1 Dust Emission Dust 14+760 RDA Wetting & Provided a dust barrier Solved 27/03/2012

2 Dust Emission Dust 28/03/2012 16+400 Mr.Ekanayaka Wetting Solved

Water quality & Verbal through RDA Godella watte, Well water contamination 12+750 LHS Mr.L.Indika Udayakumara. Controlled mud water entering towards the well Solved Quantity 25/04/2012 Heiyanthuduwa 3 636,Godalawata,Heiyanthuduwa. Verbal through RDA Godella watte, Loss of access Access road 12+750 LHS Mr.L.Indika Udayakumara. Rectified the road elevation Solved 25/04/2012 Heiyanthuduwa

Hanwella Mobile 4 Dust Emission Dust Verbal 9/5/2012 Neighbor of the crusher plant Wetting access road Solved Crusher Plant

5 Dust Emission Dust 14/05/2012 Near Siriketha road 14+000 Technical Officer/ OCC Wetting Pilot road Solved

Verbal (over the phone) Near Bandaranayake 6 Dust Emission Dust 14+560 LHS Mr.U.A.Gajaweera Permanent solution is in progress/no work at site temporary solved Solved 17/05/2012 Mw.

Mr.Rajamanthri Richmond place near 7 Dust Emission Dust (OCC/HE) Over the phone 10+200 LHS Mrs.D.I.Abewikrama 698,Mankada road,Kadawatha. Using pilot road instead of using public road Solved mankada road 21/05/2012

Near Bandaranayake Loss of access Access road Letter 09/06/2012 14+560 LHS Ms.Iresha Manori Jayasingha 355/A,Bandaranayake Mw,Heiyanthuduwa Tempory access provided Solved Mw.

8 Near Bandaranayake Dust Emission Dust Letter 09/06/2012 14+560 LHS Ms.Iresha Manori Jayasingha 355/A,Bandaranayake Mw,Heiyanthuduwa Permanent solution is in progress/no work at site temporary solved Solved Mw.

Mr.Gunarathna OCC (over Heavy vehicle movement near Montessori School Noise Near Mankada Road 10+500 LHS Ms.Shalika Dharshani No.694/1B,Makola North,Makola. Negotiated and solved Solved the phone) 13/06/212 9 Mr.Gunarathna OCC (over Heavy vehicle movement near Montessori School Vibration Near Mankada Road 10+500 LHS Ms.Shalika Dharshani No.694/1B,Makola North,Makola. Negotiated and solved Solved the phone) 13/06/212

RDA No.694,Makola Installing supportive clamps . Paid evacuation fee for two years and 10 Damage of house Property damage 10+500 LHS Mr.G.Linton Fernando. No.694,Makola North,Makola. Solved 12/06/2012 North,Makola. evacuated the AP's from the house on 31.10.2012 Material Mr.Gunarathna OCC Transportation Biyagama main road 11 Mud soil deposition of biyagama road (over the phone) _ Mr.Gunarathna OCC Wash out the mud with using the water bowser Solved and use of public near the Kyngyam yard 18/06/212 roads PHI - Kaduwela Access Yard Hewagama 12 Mosquito Breeding at Access yard Hewagama Danger to public _ Public Health Inspector - Kaduwela Public Health Inspector Office Kaduwela. Remove all stagnation water & clean the yard Solved 19/06/2012 Kaduwela

RDA (over the phone) Godella watte, 13 Loss of access Access road 12+750 LHS Mr.L.Indika Udayakumara. 636,Godalawata,Heiyanthuduwa. Rectified the access road Solved 21/06/2012 Heiyanthuduwa Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Other problem Mr.Gunarathna Land close to Kyangyam 14 Unauthorized filling related to _ Mr.Gunarathna OCC Immediately Stop filling Solved (05/07/2012) Yard construction Mr.Rajamanthri (OCC) 15 Dust Emission Dust Over the phone 12+500 12+500 Mr.Rajamantri OCC Wetting Pilot road Solved 12/07/2012 Material Transportation 16 Mud deposition of biyagama road Security sec. (23/07/2012) Biyagama main road 16+200 Biyagama Police Biyagama Police station,Biyagama. Clean the road & Wash out the mud patches. Solved and use of public roads

Vibration Vibration Vibration measured & level was below the limit convince and negotiated . Solved Mr.Ranjith Thilakasiri Liyanage Mr.Susil Pradeshiya sabha Beyond the Makola Priyantha perera 17 12+200 Makola South,Makola Water quality/ level monitoring was done by University of Moratuwa Chairmen (24/07/2012) barrow pit Ms. Bandu Sudharshi Water quality & jointly with OC/Taisei and regular water level monitoring is being done Well water depletion Mr. Victor Liyanage Solved Quantity according to the negociations. For the initial issues, informed Finite for the rectifications if any.( Ref No TC-ENV-SUB-336 dated 25.09.2012)

Mr.Rodel - Site Engineer Near Bandaranayake 18 Vibration Vibration 14+500 Mrs.Sumali Dilrukshi Peris, Bandaranayaka Mw,Heiyanthuduwa. Vibration measured & level was below the limit convince and negotiated . Solved (26/07/2012) Mw.

Mr. Janaka-RDA 19 Noise Noise Makola South,Makola 11+600 Mr. Manjula Sooriyaarachchi 478 F,Makola South,Makola Noise measured & level was below the limit convince and negotiated . Solved (27/07/2012)

Over the phone 20 Dust Emission Dust Near Jayanthi Mw 14+870 Mr.E.A.D.Nandasiri 330,Dewamitta Place,Heiyanthuduwa Provided a dust barrier Solved (29/07/2012)

Over the phone Near Bandaranayake 21 Vibration Vibration 14+520 Mr.W.L.D.D.Anura 351/A,Bandaranayaka Mw,Heiyanthuduwa. Vibration measured & level was below the limit convince and negotiated . Solved (30/07/2012) Mw.

Over the phone No activities on going during the inspection.Tobe mesured vibration on Vibration Vibration Close to Access Yard 16+600 Mr. Perera No 8/2,Biyagama pahala Solved (03/08/2012) 09/08/2012 & level was below the limit 22 Over the phone Hewagama Hewagama Noise Noise 16+600 Mr. Perera Negotiated . Solved (03/08/2012) (Access Yard) (Access Yard)

Over the Phone Near Bandaranayake 23 Vibration Vibration 14+500 Mr.Chaminda Nirosh 330/4,Bandaranayake Mw,Heiyanthuduwa. Vibration measured & level was below the limit convince and negotiated . Solved (06/08/2012) Mw.

Safty sec. Over the 24 Dust Emission Dust Eldeniya road Mr.Premarathne Eldeniya road,Kadawatha Damping affected area Solved Phone (08/08/2012)

Over the Phone Rectified the house to the satisfaction of the house owner and this was 25 Property Damage Property damage Eldeniya road Mrs. I.Z.G.Jayamanne, No.576,Eldeniya, Kadawatha. Solved (08/08/2012 informed to OC. (Ref. TC-ENV-GEN-0126-1190 dated 28.08.2012)

26 Vibration Vibration Verbal (09/08/2012) Galwala Junction 11+570 Mr.Anura Samarasekara 478/3 B,Makol, Galwala Junction Vibration measured & level was below the limit convince and negotiated . Solved

Over the phone 27 Siltation Soil Erosion Makola South,Makola 9+900 Udula Ranasingha 705/1B,Mankada rd,Makola North,Kadawatha Clean the affected area & make sand bag barier. Solved (16/08/2012)

Over the phone Near Bandaranayake No activities carried out during the inspection ITI explained the situation 28 Formation of cracks due to compaction Property damage 14+480 Mr Nimal Wjesiri 349/D,Bandaranayake Mw,Heiyanthuduwa Solved (22/08/2012) Mw. bassed on the mesurement taken & negotiated in some days before. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Over the phone 29 Siltation of paddy land & vegetable cultivation Soil Erosion Makola South,Makola 9+900 Udula Ranasingha 705/1B,Mankada rd,Makola North,Kadawatha Clean the affected area & make sand bag barier.Make small dike. Solved (27/08/2012)

Other problem Ihalabiyanwila, L.W.P.U.N.Weerasooriya (Agrarian Joint inspection carried oug with OC/SLLRDC/GSMB & the hydrology 30 Disturbing the exsisting drainage system related to In writing (29/08/2012) Agrarian Service Center, Delgoda Solved Kadawatha Development Officer) consultant. Agrarian officer was made aware accordingly. construction

Ihalabiyanwila, 31 Inundation of homegarden Flooding Verbal (01/09/2012) 9+700-9+900 L.K.Sumanawathi 658/4,Ihala Biyanwila, Kadawatha Prepared a small causeway in order diverted the flow of water Solved Kadawatha

Biyagama Pahala, 32 Nuisance due to construction noise Noise in writing (04/09/2012) 16+210 S.A.S.D.Samaraweera 2/8,Biyagama Pahala,Biyagama Permenently evacuated with the family for 02 years period Solved Biyagama

Material Mud deposition of Kaduwela-Colombo Main Rd due to haulage of Transportation Over the Phone Mr. Gunarathne OCC 33 AB 10 Road 16+500 Wash out the mudy road & Damping dusty areas Solved soil. and use of public (06/09/2012) Mrs.K.D.Priyadarshani Hewagama,Kaduwela roads Over the phone Near Bandaranayake 34 Vibration Vibration 14+520 Mr.Prasad 355 B/1,Bandaranayaka MW,Heiyanthuduwa Vibration measured & level was below the limit convince and negotiated . Solved (12/09/2012) Mw.

Agreed to erect a dust barrier. Since pilot rd shifting is ongoing at the 35 Dust Emission Dust Verbal (13/09/2012) 14+610 Mr.U.A.Gajaweera 355/D,Bandaranayaka Solved location, negociated to erect the dust barior as sson as finished it

Other problem 36 Block of drainage related to Verbal (13/09/2012) 12+300 (LHS) Mr.Sugath Prepared canal in ordar to divered block of water Solved construction

Mr.Piyal Weerasingha Provided materials to the AP to erect dust barior without causing any 37 Dust Emission Dust In writing (13/09/2012) 14+800 (LHS) Jayanthi Mw,Heiyanthuduwa. Solved Mr.Pradeep Samarasingha hindrance to their small shop as negociated.

38 Loss of access Access road In writing (14/09/2012) 14+600 (LHS) Mrs.R.M.L.Nisansala No. 255/C, Dewamiththa Place, Heiyanthuduwa Prepared an access road Solved

Over the Phone Damping affected portion of pilot road. And provided a dust barrier on 39 Dust Emission Dust 9+300 Mr.S.A.Kumara Chandrasiri Solved (14/09/2012) 24.01.2013 to solve the matter

40 Loss of access Access road In written (18/09/2012) Makola North 9+960 Mrs.Udula Ranasingha 705/B,Mankada road,Makola North,Makola. Access was provided Solved

Vehicles are not moving nearby due to shifting of pilot road. Already 41 Dust Emission Dust In writing (15/09/12) Heiyanthuduwa 12+600 L.V.Karunarathne 627/7,Temple Rd, Heiyanthuduwa provided a dust barrier. (Referred to OC by letter No. 195-2469 dated Solved 08.02.2013)

Inspection held on13.09.2012 with OC & RDA during the inspection no any activities onging when will start activity will meassur noise level & 42 Noise Noise In Written (11/09/2012) Makola North Mrs.G.Sureka Darshani Makola North Solved will take necessary action regardin g this matter.(Informed - Ref. No - TC- ENV-GEN-0138-1350 on 19.09.2012)

Material Transportation Over the phone 43 Mud deposition of Kaduwela - Colombo road 16+400 Mr.Aravinda (OC) Removed the mud and washed the road. Solved and use of public (18/09/2012) roads

Over the phone Vibration measured & level was below the limit , explained the matter 44 Vibration due to pile driving Vibration Near Jayanthi Mw 15+300 Mr.Sunil Shantha Jayanthi Mw,Heiyanthuduwa. Solved (19/09/2012) and negociated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

45 Noise Genaration Noise Verbal (22/09/2012) Near Jayanthi Mw 14+930 (LHS) Mr.M.A.D.Chaminda Niroshan No.330/4,Dewamiththa Place, Heiyanthuduwa. Noise measured & level was below the limit convince and negotiated . Solved

Verbal Near Bandaranayake 46 Loss of access Access road 14+600(RHS) Mr Upul Gajaweera 355D, Bandaaranayake Mw,Heiyanthuduwa Permenent access was provided through Vehicular Culvert at 14+600 Solved (22/09/2012) Mw

Other problem A survey session will be scheduled by the EMPLOYER. Survey result 47 Boundry Problem related to in writing Dewamitta Place 14+600 Mr.E.A.D. Edmond 330A,Dewamitta Place,Heiyanthuduwa Solved revealed that there was no any encroachment construction

Verbal Ihalabiyanwila, Damping affected portion of pilot road. And provided a dust barrier on 48 Dust generation due to pilot road construction Dust 09+140 Mr. Sameera Perera 287/4, Ihalabiyanwila, Kadawatha Solved 04/10/2012 Kadawatha 02.01.2013 to solve the matter

Verbal 49 Dust generation due to pilot road construction Dust Eldeniya, Kadawatha 01+000 (RHS) Mr. K.S. Tusharasiri 369/3/1, Koswatta, Eldeniya, Kadawatha Damping affected portion of pilot road Solved 04/10/2012

Mr. K.A.Lorance Perera Mr. K.A. Dharmadasa Perera Provided the Access road to the Veenagahawela yaya and informed to OC 50 Loss of access due to construction activities Access road 10.06.2012 Heiyanthuduwa 12+400 Veenagahawela yaya, Heiyanthuduwa Solved and on 12.10.2012 by letter Ref. No. TC-ENV-GEN-147-1572. Farmers Assosiation

Verbal A drain was prepared in order to divert the water flow and contaminated 51 Inundation of homegarden and well water contamination with silt Flooding Richmond Place 10+410 Mr Senaka Bowathdeniya 698/4,Richmond Place,Mankada Rd,Kadawatha Solved (10/10/2012) well water removed

Verbal Ihalabiyanwila, No. 698/9, Richmond place, Mankada road, 52 Inundation of homegarden Flooding 8+800 M. Constructed a drain system to aviod this problem Solved (10/10/2012) Kadawatha Kadawatha

Inundation of homegarden Flooding Verbal (10/10/2012) Richmond Place 10+450 Mr S.M.Sisira Kantha 698/9,Richmond place,Mankada Rd,Kadawatha Deposited silt was scraped and removed Solved

53

Inconvenience due to dust Dust Verbal (10/10/2012) Richmond Place 10+450 Mr S.M.Sisira Kantha 698/9,Richmond place,Mankada Rd,Kadawatha Damping affected portion of pilot road Solved

Other problem Obstructions to the paddy cultivation due to diverting of a canal In Writing Maladolawatta, No. 186, Waladolawatta, 54 related to Mr. Ajith Pushpakumara Inspected and rectified to the satisfaction of the Aps. Solved which provided water to the paddy fields. 13.10.2012 Kadawatha Kadawatha construction

No. 330/A, Ihala Biyanwala, Provided the Access road to them and informed to OC on 55 Loss of access due to construction activities Access road 13.10.2012 9+200 Ms. Sujatha C. Liyanage Ihala Biyanwala, Solved Kadawatha 22.10.2012 by letter Ref. No. TC-ENV-GEN-154-1649. Kadawatha

Over the Phone Permanent dust barrior errected for the affected area and damping of pilot 56 Inconvenience due to dust Dust Makola North 10+500 LHS Ms.G. Shalika Dharshani No.694/1B,Makola North,Makola. Solved (13/10/2012) road is continued.

Other problem Over the Phone Ihala Biyanwala, Secretary, Central Agricultural Organization, 57 Inadequate drainage facility related to A1 By pass Mr. M.A. Podiappuhami Provided Drainage facility Solved (15/10/2012) Kadawatha Ihala Biyanwala construction

Over the Phone 58 Siltation of cultivated land Soil Erosion Galwala Junction 11+600 Mr. Jagath Galwala Junction Deposited silt was scraped and removed Solved (15/10/2012) Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Other problem Over the Phone 59 Blockage of road side culvert due to eroded material of the ROW related to Richmond place 10+400 Mr. Prasanna Richmond place Blocked silt was removed & Clean the culvert Solved (15/10/2012) construction

(1) Inconvenience due to noise and vibration due to heavy RDA Noise Makola North 11+500 Mr. B.Sooriyaarachchi No. 478/F, Makola South, Makola Measured the Noise & vibration levels were below the permisible limit. Solved equipments 15.10.2012

(2) Dust emission due to the construction works / movement of RDA Dust Makola North 11+500 Mr. B.Sooriyaarachchi No. 478/F, Makola South, Makola Provide dust barrier & damping affected portion Solved construction vehicles 15.10.2012

60 (3) Damaged to retaining wall in the back yard of the house caused RDA Soil Erosion Makola North 11+500 Mr. B.Sooriyaarachchi No. 478/F, Makola South, Makola Provided a Sand bag barrier to control the erosion condition Solved by erosion 15.10.2012

RDA Our inspection reveals that they are expecting a new road parallel to the (4) Access problem to the house Access road Makola North 11+500 Mr. B.Sooriyaarachchi No. 478/F, Makola South, Makola Solved 15.10.2012 pilot road. Access they expected was provided

According to the highway engineer, permenent road will be provided by 61 Access problem Access road 17.10.2012 Eldeniya, Kadawatha 1+200 (LHS) Mr. M.J.M. Rangana Sudharshana No. 513, Eldeniya, Kadawatha Solved RDA. Existed road was improved

Water quality & 62 Well water contamination 20.10.2012 Heiyanthuduwa 14+800 Mr. H.C. Gunasekara No. 325/1, Dewamiththa place, Heiyanthuduwa Pump out affected well & deposited silt was scraped & removed Solved Quantity

63 Mud deposition in the road Soil erosion 23.10.2012 Richmond place 10+400 Mrs. Amunugama Richmond place Deposited silt was scraped and removed & provided drainage Solved

Mankada road, 64 Siltation problem Soil erosion 26.10.2012 10+200 Mr. Sudesh Mankada road, Kadawatha Deposited silt was scraped and removed & provided drainage Solved Kadawatha

Mankada road, 65 Siltation problem Soil erosion 26.10.2012 10+200 (RHS) Mr. S.K.Vidanage No. 704 A, Mankada Road, Kadawatha Deposited silt was scraped and removed & provided drainage Solved Kadawatha

Makola South,Makola (1) Vibration problem due to the construction works / movement of Mr. Liyanage Victor Perera Vibration 26.10.2012 (Batugewatta) Vibration monitored by ITI team. Parameters were within limits. Solved construction vehicles Ms. Liyanage Vineetha Piyaseele Borrow pit area Mr. L.R. Thilakasiri Mr. L.E. Sugath Pushpa Kumara Makola South,Makola Mr. Liyanage Wicrama (2) Dust emission due to the construction works / movement of Arranged water bouzer to damping and the damping process will be Dust 26.10.2012 (Batugewatta) Ms. Liyanage Indrani Solved construction vehicles Mr. Liyanage Susil Priyantha Perera continued regulerly Borrow pit area Makola South,Makola (Batugewatta) 66 Ms. Maithree Bandusudharshi Perera Mr.P.B. Sarath Ms. D. Thilaka Nandani Mr. H.K. Wijesiri Makola South,Makola Checked the water levels and compared with baseline data. Checked the Water quality & Mr. I. Gunasiri (3) Decrease of water level of drinking water wells 26.10.2012 (Batugewatta) bottom level of the well and our slope cut levels. Investigation reviews no Solved Quantity Mr. I. Romiyel Singhno Borrow pit area Mr. Wasantha Kumara such effect due to our construction activities. Mr. W.Sunil Shantha Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Farmers Assosiation - Ihalabiyanwila (Mr. M.A. Podiappuhami Mr. W.A. Albert Drainage design implemented without providing a proper leadaways and a Mr. Ajith Pushpakumara joint inspection was carried out on 15.11.2012 at site and RDA will Mr.K. Piyasena suggest a solution in consultation with Agrarian Department. W e have Other problem Mr. H.G. Kiriukku referred the matter to the Engineer by the letter No. TC-ENV-GEN-166- Ihala Biyanwala, 67 Inadequate drainage facility related to 06.11.2012 A1 By pass Mr.J.M.Wijerathna Ihalabiyanwaila, Kadawatha 1914 dated 21.11.2012 and TC-ENV-GEN-173-2080 dated 18.12.2012. Solved Kadawatha construction Mr. L.A. Perera On 11.02.2013 a joint inspection had with SLLRDC officials to provide Mr. L.S. Premarathna leadaway drain. it was decided to expedite the construction of permanant Mr. S.A.Y. Yasawardana drainage facilty. permenant drainage system has already been Mr. H.A.Dharshana Prabath implemented. Mr. Sameera Indika)

We have carried out a joint inspection on 29.11.2012 with the Irrigation Biyagama Pahala, department officials to investigate the issue. At this stage as a temporary 68 Erosion of river bank due to recent flood at the private land Soil Erosion 08.11.2012 16+200 Mr. A.A.D.Abeysingha Weerarathna 8/1, Biyagama Pahala, Biyagama Solved Biyagama solution the eroded portion have been backfilled with protecting sand bags. After the final constructions, a permanent solution will be provided.

Checked the house comparing with the pre survey report and observed 08.11.2012 minor cracks have been improved and existing cracks been developed. By OC letter No. As this is not a dangerous situation, after the completion of our 69 Cracks on walls due to construction activities Property damage Heiyanthuduwa 11+560 (LHS) Ms. Anurajika Niroshani Liyanage 479/E, Galadeniya Road, Heiyanthuduwa Solved OC/TC/NS1/1242 dated construction activities we will compare the pre survey and the post survey 08.11.2012 and will take suitable action. (Informed to OC by letter No. TC-ENV- GEN-173-2080 dated 18.12.2012)

08.11.2012 Inspected and temporary access provided to the paddy land and referred By OC letter No. Meegahawatta, 81/1, Dikwela Handiya, Meegahawaththe, 70 Existing access to their paddy lands have been damaged Access road 12+600 Mr.G.A.Danushaka Sampath this to RDA for further action. (Informed to OC by letter No. TC-ENV- Solved OC/TC/NS1/1242 dated Siyabalape Siyabalape GEN-173-2080 dated 18.12.2012). Access was provided. 08.11.2012

08.11.2012 There is no house in this location and observed there is well in this land Water quality & By OC letter No. Galadeniya Road, but water level is not decreased and desided to monitor this well monthly 71 Reduction of water level in the well due to construction activities 11+580 Mr. Liyanage Wailet Peris 497/E, Galadeniya road, Heiyanthuduwa Solved Quantity OC/TC/NS1/1242 dated Heiyanthuduwa basis. (Informed to OC by letter No. TC-ENV-GEN-173-2080 dated 08.11.2012 18.12.2012) Inspected the location by measured the vibration by ITI team and levels are within the permissible limits. (Informed to OC by letter No. TC-ENV- Vibration problem Vibration Solved GEN-173-2080 dated 18.12.2012 / TC-ENV-GEN-247-4416 dated 27.08.2013) 08.11.2012 Damping pilot road daily as 04 times per day. (Informed to OC by letter By OC letter No. Galadeniya Road, Ms.R.A.Sumudu Nadeeshani Rathnaweera 72 Emission of dust Dust 11+620 479/D,Galadeniya road, Heiyanthuduwa No. TC-ENV-GEN-173-2080 dated 18.12.2012 / TC-ENV-GEN-247- Solved OC/TC/NS1/1242 dated Heiyanthuduwa (Mr. Keerthisingha) 4416 dated 27.08.2013) 08.11.2012 Checked the water level of this well but there is no any significant Water quality & depletion of the water level. (Informed to OC by letter No. TC-ENV-GEN- Depletion of water level in the well Solved Quantity 173-2080 dated 18.12.2012 / TC-ENV-GEN-247-4416 dated 27.08.2013) 08.11.2012 Other problem Provided causeway for the pilot road. Improved drainage and canals. Existing paddy lands have been flooded during rain due to lack of By OC letter No. 73 related to Makola North Mr. S.H.S.S. Samanthika 270, Makola North (Informed to OC by letter No. TC-ENV-GEN-173-2080 dated Solved drainage across the pilot road OC/TC/NS1/1242 dated construction 18.12.2012) 08.11.2012 Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Vibration measured several times during activities on going, since one measurement was detected at the margin, control measures adapted. Vibration problem Vibration Solved (Informed to OC by letter No. TC-ENV-GEN-173-2080 dated 18.12.2012) Water damping of this area has been improved. (Informed to OC by letter Emission of dust Dust 08.11.2012 Solved No. TC-ENV-GEN-173-2080 dated 18.12.2012) By OC letter No. Galadeniya Road, 74 11+560 Ms. M.A. Thanuja Shirmili 475/3-C, Galadeniya, Heiyanthuduwa OC/TC/NS1/1242 dated Heiyanthuduwa No any dangerous condition created, explained the compensation Cracks on walls due to construction activities Property damage 08.11.2012 procedure and negotiated (Informed to OC by letter No. TC-ENV-GEN- Solved 173-2080 dated 18.12.2012)

Checked the water levels and compared with the baseline data and no any Water quality & Reduction of water level in the well difference observed (Informed to OC by letter No. TC-ENV-GEN-173- Solved Quantity 2080 dated 18.12.2012) Checked the complain comparing pre survey report of the house and 08.11.2012 identified minor cracks in the walls after completion of the construction By OC letter No. Galadeniya Road, 75 Vibration at home due to construction activities Vibration 11+620 Mr. N.C.P. Liyanage 479/C, Galadeniya road, Heiyanthuduwa activities we will take necessary actions by conducting a post survey. Solved OC/TC/NS1/1242 dated Heiyanthuduwa (Informed to OC by letter No. TC-ENV-GEN-173-2080 dated 08.11.2012 18.12.2012)

Other problem De-silted the eroded soil, diverted the storm water paths within the ROW 76 Inundation problem related to 08.11.2012 Heiyanthuduwa 11+600 (LHS) Mr. R.A. Keerthisingha 479/D, Galadeniya, Heiyanthuduwa and protected the eroded embankment using sand bags up to the Solved construction satisfaction of the complainant

Residents around Samurdhi Mw. ( H.Asini Kimara 08.11.2012 H. Kamalawathi Perera Provided a causeway to avoid unnecessary flooding (Informed to OC by By OC letter No. Ihala Biyanwala, 77 House premises have been flooded during rain due to filling Flooding 9+700-900 H.Derik Wimalarathna Samurdhi Mw, Ihalabiyanwila, Kadawatha letter No. TC-ENV-GEN-173-2080 dated 18.12.2012) Solved OC/TC/NS1/1242 dated Kadawatha G.V. Kusumawathi 08.11.2012 H.A. Somalatha W.A. Indrani Perera) Well has not been affected by any of the project activity. And the AP is Water quality & Godallawatta, seeking to obtain an extra pipe line (New public water supply) after (i) Reduction of water level in their well 12+750 (LHS) Mr. Indika UdayaKumara 636, Godallawatta, Heiyanthuduwa Solved Quantity Heiyanthuduwa providing the permanent access. (Informed to OC by letter No. TC-ENV- GEN-173-2080 dated 18.12.2012)

08.11.2012 Godallawatta, Repaired the pilot road and scraped and removed the mud soil (Informed (ii) Temporary access has been washed out by the rain Soil Erosion 12+750 (LHS) Mr. Indika UdayaKumara 636, Godallawatta, Heiyanthuduwa Solved By OC letter No. Heiyanthuduwa to OC by letter No. TC-ENV-GEN-173-2080 dated 18.12.2012) 78 OC/TC/NS1/1242 dated 08.11.2012 Presently the area is patrolled 24hrs. By the out sourced security Other problem company. Further Sapugaskanda police too carries out, patrolling (iii) Security problem to the residents due to use of pilot road by Godallawatta, related to 12+750 (LHS) Mr. Indika UdayaKumara 636, Godallawatta, Heiyanthuduwa especially during the night on the request of the Taisei Security Manager Solved public at night Heiyanthuduwa construction and public are highly satisfied. (Informed to OC by letter No. TC-ENV- GEN-173-2080 dated 18.12.2012)

Other problem Placed 2 PVC pipes from the nearby cannal and allow them to to control 79 Blockage of water paths and damages to the cannal bank related to 08.11.2012 Gonahena, Kadawatha 8+800 (RHS) Mr. W.A. Albert 461, Gonahena, Kadawatha Solved as there water requirement to paddy land and provided a gabion wall too. construction

80 Damages to the Kandakale road due to erosion Soil Erosion 08.11.2012 Heiyanthuduwa 14+860 Mr. Rathnasiri Gunathilaka 330/B, Dewamiththa place, Heiyanthuduwa Rectified the road Solved

No temporary backfill done since no significant erosion occurred. Further 81 Erosion of river bank due to recent flood at the private land Soil Erosion 09.11.2012 Biyagama 16+200 Mr. D.Dayarathna No. 3 A, Biyagama south, Biyagama Solved observations will be carried out if necessary action will be taken Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Biyagama south, No temporary backfill done since no significant erosion occurred. Further 82 Erosion of river bank due to recent flood at the private land Soil Erosion 09.11.2012 16+200 Mr. W.L.I. UdayaKumara No. 1/5, Biyagama south, Biyagama Solved Biyagama observations will be carried out if necessary action will be taken

Conducted an intermediate survey and it reveals that the several cracks have been improved. Since the SGT has to be started the stability of the 83 Vibration problem Vibration 10.11.2012 Eldeniya, Kadawatha 01+000 (RHS) Mr. K. Thusharasiri 369/3/1, Koswatta, Eldeniya, Kadawatha Solved house was checked by the GSMB Engineer and action will be taken according to the report. (Repeated in No. 148)

Other problem Ihala Biyanwala, 84 Requesting to level the existing bund and to repaire related to 13.11.2012 Mr. Dayarathna Wijesooriya No. 297/12/B, Ihala Biyanwila, Kadawatha Rectified the existing bund Solved Kadawatha construction

85 Inundation due to improper drainage system Flooding 14.11.2012 Hewagama, Kaduwela 17+500 Ms. Renuka Wickramasingha 238 B, Kekirideniya road, Hewagama, Kaduwela Installed 2 RC pipes and cleaned the drainage path. Solved

ITI measured the vibration and noise. It is within limit. Informed to Sub (i) Vibration problem Vibration 19.11.2012 Hewagama, Kaduwela 16+400 Mr. L. Pubudu Prasanna 133/8B, Hewagama, Kaduwela Solved contractor to take necessary action. 86 ITI measured the vibration and noise. It is within limit. Informed to Sub (ii) Noise problem Noise 19.11.2012 Hewagama, Kaduwela 16+400 Mr. L. Pubudu Prasanna 133/8B, Hewagama, Kaduwela Solved contractor to take necessary action.

We have done the intermediate crack survey under the name Mrs. T.D. 87 Cracks on walls due to construction activities Property damage 19.11.2012 Makola South, Makola 11+300 Mr. Mohan Ranaweera 392/2, Makola South, Makola Sriyani Dhammika. There are no any considerable development of the Solved cracks.

Vibration level measured by the ITI and it has been exceeded the level but there is no such a dangerous situation and before the activities we have 88 Vibration Problem Vibration 29.11.2012 Hewagama, Kaduwela 16+500 Mr. W.Ariyawansha 132, Hewagama, Kaduwela Solved done the pre condition survey . Explained the compensation procedure and Negotiated.

Water quality & Well water was tested by Moratuwa University, since there was high 89 Water contamination of the well 03.12.2012 Heiyanthuduwa 14+650 Mr. Prasanna Kaminda Gajaweera 355/ A, Bandaranayaka Mw; Heiyanthuduwa Solved Quantity turbidity, the well was cleaned and dewatered.

We have provided a dust barrier and solved the problem up to the 90 Dust problem Dust 03.12.2012 Mabima, Heiyanthuduwa 15+700 Ms. H.G. Roopawathi 480, Wathurapatha, Mabima Solved satisfaction of the complainant

Vibration level measured by the ITI on 11.10.2012 and the level within Intolerable vibration Vibration 07.12.2012 Heiyanthuduwa Ms. R.M.S. Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa the limit. No operation ongoing recently. Since the pre condition survey Solved has been done, explained the compensation procedure and negotiated.

Noise level measured by the ITI on 11.10.2012 and the level within the 91 Noise problem Noise 07.12.2012 Heiyanthuduwa Ms. R.M.S. Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa limit. No operation ongoing recently. Since the pre condition survey has Solved been done, explained the compensation procedure and negotiated. Heavy dust generation due to transportation of trucks in the pilot road. But it has been already shifted the pilot road to the other side of the ROW and Dust emission Dust 07.12.2012 Heiyanthuduwa Ms. R.M.S. Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa Solved now this house 200-250m away from the pilot road. Now there is no such dust generation. 07.12.2012 (Ref. No operation ongoing recently and since the pre condition survey has Vibration Vibration No.RDA/OCHP2/PBBCO Heiyanthuduwa 12+600 Mr. L.V.Karunarathne 627/7, Temple Rd, Heiyanthuduwa been done, explained the compensation procedure and negotiated Solved M (Referred to OC by letter No. 195-2469 dated 08.02.2013) dated 31.12.2012) 92 07.12.2012 Inspected the well. According to the initial data no depletion of water (Ref. Water quality & identified. Keep on monitoring to check whether any possibility for Depletion of water level in the well No.RDA/OCHP2/PBBCO Heiyanthuduwa 12+600 Mr. L.V.Karunarathne 627/7, Temple Rd, Heiyanthuduwa Solved Quantity depletion of water. (Referred to OC by letter No. 195-2469 dated M 08.02.2013) dated 31.12.2012) Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Informed (letter Ref No. TC-ENV-SUB-513)to ACCESS Engineering 222/1/B, Vihara Mawatha, Hewagama, Ltd to take necessary action to avoid obstructions from General public. 93 Inconvenience due to Night Works Noise 10.12.2012 Hewagama, Kaduwela Mr. R.Wijesingha Solved Kaduwela They redused the noise by utilizing one machine except two and negotiated. Vibration measured by ITI and it is within the limit. Since this is located beyond 50 m we haven't done the pre condition survey. However will be 94 Vibration problem Vibration 17.12.2012 Hewagama, Kaduwela 17+500 Mr. H.P.L. Wijethissa 302/C 5, Rajasinghpura, Hewagama, Kaduwela Solved monitored the vibration regularly and further action will be taken based on the results.

26.12.2012 95 Access problem Access road Makola North, Makola Mr. A.A.D.M.P. Alahakoon No. 69, Makola north, Makola Access provided according to the engineer's instructions Solved Through RDA

26.12.2012 96 Access problem Access road Makola South, Makola Mr. T.L.K.P. Gunathilaka No. 398, Makola South, Makola Access provided according to the engineer's instructions Solved Through RDA

26.12.2012 97 Access problem Access road Kandy Road, Kadawatha A1 By pass Mr. K.M. Katulanda No. 145/A, Kandy Road, Kadawatha Access was provided. Solved Through RDA

26.12.2012 Explained that a permenent access will be provided at the end of the 98 Access problem Access road Kottunna, Biyagama Mr. S.A. Welun Perera No. 440/C, Kottunna, Biyagama Solved Through RDA project. Negotiated and Solved

26.12.2012 Galadeniya Road, 99 Access problem Access road Mr.Vivian Jayalatha No. 481/D/2, Galadeniya Road, Heiyanthuduwa Tempory access provided Solved Through RDA Heiyanthuduwa Ms. S.K. Nandawathi 26.12.2012 100 Access problem Access road Aldeniya, Kadawatha & No. 518/1, Aldeniya, Kadawatha Inspected the location and temporary access provided Solved Through RDA Mr. S.K. Dayananda 26.12.2012 101 Access problem Access road Heiyanthuduwa Mr. E.A.D. Edmond No.330/A, Dewamiththa Pedesa, Heiyanthuduwa Temporary access provided Solved Through RDA 26.12.2012 102 Access problem Access road Heiyanthuduwa Mr. E.A.D. Premasiri No. 329/1,Dewamiththa Pedesa, Heiyanthuduwa Temporary access provided Solved Through RDA 26.12.2012 103 Access problem Access road Heiyanthuduwa Mr. G.A.D. Sirisena No. 524/A, Dalukgala, Heiyanthuduwa Temporary access provided Solved Through RDA 26.12.2012 104 Access problem Access road Makola South, Makola Mrs. K.K.Hemalatha No.401/2, South Makola, Makola Temporary access provided Solved Through RDA

26.12.2012 449//C22, 2nd Lane, Vihara Mawatha, Waliwita, 105 Access problem Access road Waliwita, Kaduwela Mr. S.A. Serasingha Access was provided. Solved Through RDA Kaduwela

26.12.2012 106 Access problem Access road Mr. M.P.A.D.Peris No.7, Kristhuraja Mawatha, Mahabage, Ragama Send letter to get aware the exact location and so far no reply Solved Through RDA

Other problem Ihala Biyanwala, Requested to OC to recheck the boundary with their surveyors. They have 107 Boundry Problem related to 26.12.2012 09+380 Mrs. J.M.D. Nirosha Jayamanna 335/I A, Ihalabiyanwila, Kadawatha Solved Kadawatha rechecked and settled the matter construction

Ihala Biyanwala, 108 Dust problem Dust 26.12.2012 A1 By pass Mr. D.M.A. Sumedha Tharanga 171/1/A, Ihala Biyanwila, Kadawatha Provided a dust barrier and settle the matter Solved Kadawatha Vibration measured and within limit. As per the observations it reveals Shramadana Mawatha, 109 Collapsed of boundary wall due to vibration Vibration 26.12.2012 Mr. Nimal Ariyarathna No. 174/3, Sramadana Mawatha, Kadawatha that this has happened not due to the construction activities. Explained Solved Kadawatha and Negotiated. Provided the temporary access on 18.01.2013 will be provided a 110 Access problem Access road 27.12.2012 Kadawatha Udswatta Villagers Kadawatha permenent access road at the end of the construction activities and the Solved electricity facility is continues same as before Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Inspected the situation by the University of Moratuwa and according to Water quality & No. 224/1/B, Vihara Mawatha, Hewagma, 111 Depletion of water level in the well 27.12.2012 Kaduwela 17+200 Ms. P.L. Vineetha the report it will take atleast 6 months to recover the condition and taken Solved Quantity Kaduwela action to fulfill the domestic water requirement

Inspected the situation by the University of Moratuwa and according to Water quality & 27.12.2012 112 Depletion of water level in the well Kaduwela 17+200 Mr. N.A.B. Aruna Kumari No. 224/J,Vihara Mawatha, Hewagma, Kaduwela the report it will take atleast 6 months to recover the condition and no Solved Quantity Verbal issue since they consume the public water supply.

Water quality & 27.12.2012 113 Depletion of water level in the well Kaduwela Mr. P. Sirisena 224/B, Vihara Mawatha, Hewagama, Kaduwela Inspected. Well has been backfilled. Solved Quantity Verbal

Since the pre-condition survey has been done and the noise level is 114 Noise Nuisance Noise 28.12.2012 Kaduwela 17+200 Mr.L.A.Jinadasa 224/D/1, Vihara Mw; Hewagama, Kaduwela beyond the limit at the boundary, precausions taken to reduce noise at the Solved area beyond the ROW.

Measured the vibration and the level is within the limit. Explained the 115 Vibration problem Vibration 28.12.2012 Kadawatha A1 By pass Mr. R.S. Somadasa No. 174/5, Ihala Biyanwila, Kadawatha compensation proceedure which we will implement in the end of the Solved construction and negotiated

As per the complainant these cracks have been occurred mainly by gravel compaction piling but there is a significant distance to this perticular house from the GCP activity location. Jointly inspected with RDA/OC on 31.01.2013 and this house is located approximetly 500m away from highway construction area. The complainant requested to monitor the 116 Cracks on walls due to vibration Vibration 02.01.2013 Kaduwela 16+000 Mr. Gimhana Gallage 187/B/2, Sethsiri Mw; Vihara Mw; Kaduwela Solved vibration for longer period.Vibration monitored on 31.01.2013 by ITI special team by using sensitive equipments and no effect was reported. On 06.02.2013 we have monitored the vibration in night time as requested by the complainant and no effect was reported. Therefore we consider this as unbeleivable. We have no further complaints received.

16+800 90 G, Ramahara rd; 1st lane, Hewagama, 117 Dust problem Dust 03.01.2013 Kaduwela Mr. S.W. Muthukumara Provided a dust barrier on 14.02.2013 Solved (RHS) Kaduwela Other problem Ihala Biyanwala, 118 Boundary Problem related to 04.01.2013 1+600 Ms. I.L.G.Jayamanna No. 576, Eladeniya, Kadawatha Rechecked and settled Solved Kadawatha construction This house is located about 300 m away from our work site. Measured 09.01.2013 Chna Habour No. 257/D, 2nd Lane, Rajasingha Mw; the noise level and it does not exceed permissible level. Negotiated. 119 Noise Nuisance Noise Kaduwela Ms. K.B. Princi Ranjani Solved (Through CEA) section Kothalawala, Kaduwela (Referred this to OC by the letter No. TC-ENV-GEN-202-2548 dated 18.02.2013)

120 Vibration problem and cracks on walls Vibration 08.01.2013 Heiyanthuduwa 12+600 Mr.L.D.Perera No. 822 A, Pansala rd; Heiyanthuduwa Mesured and vibraiton level is below the limit. Explained and Negotiated Solved

121 Vibration problem and cracks on walls Vibration 09.01.2013 Heiyanthuduwa Mr. Manage Gunasena No. 326/4,Dewamiththa Pedesa, Heiyanthuduwa Mesured and vibraiton level is below the limit. Explained and Negotiated Solved

Well has damaged due to wash off of silt from construction area Gunathilakaramaya, Dewamiththa pedesa, 122 Property damage 09.01.2013 Heiyanthuduwa Rev. Pathegama Gunathilaka Provided a new well and solved the matter Solved into the well Heiyanthuduwa

16+200 Mr. S.A.G. Perera No. 8/2, Biyagama Pahala, 123 Nuisance due to dust Dust 09.01.2013 Biyagama Permenently evacuated with the family for 02 years period Solved (LHS) Mr. S.A.S.D.Samaraweera Biyagama

Currently there is no borad pilling work in this location. The well has 124 Damages to the well due to board pilling works Property damage 14.01.2013 Biyagama 16+200 Ms. Amara Nandaseeli "Siri Mahal", Pahala Biyagama, Biyagama Solved been repaired Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

9+250 No. 328, Ihala Biyanwila, Inspected. We have offered them a dust barrier and they agreed. A dust 125 Dust problem Dust 16.01.2013 Kadawatha Mr. S.A.K. Udaya Kumara Solved (LHS) Kadawatha barrier have been erected

17.01.2013 126 Vibration problem Vibration Heiyanthuduwa 12+800 (RHS) Mr.Lalani Ramyalatha No. 625 F, Godallawaththa, Heiyanthuduwa Mesured and vibraiton level is below the limit. Explained and Negotiated Solved Verbal

Pre condition survey has been carried out and explained the 127 Vibration problem Vibration 20.01.2013 Kaduwela 16+500 Mr. S.H.M. Rizvi No. 82, Hewagama, Kaduwela compensation proceedure for the damages if any crack development in Solved their house at the end of the construction activities.

Water quality & No. 288, Ihala Biyanwila, 128 Water contamination of the well 21.01.2013 Kadawatha Mr. Upul Inspected the affeced well and there is no any contamination. Negotiated Solved Quantity Kadawatha

No. 288, Ihala Biyanwila, 129 Dust problem Dust 21.01.2013 Kadawatha Mr. Upul Aruna Shantha Dust barrier provided and settled the matter Solved Kadawatha

Mr. B.G.Anura Bandara 354/1 , 355/4, Nagahamula rd; Ihala Biyanwila, No operation ongoing recently . When operation strated we will monitor Noise Nuisance Noise 21.01.2013 Kadawatha Solved Mr. H.A.Ajith Priyantha Kadawatha the noise levels. Negotiated 130 Mr. B.G.Anura Bandara 354/1 , 355/4, Nagahamula rd; Ihala Biyanwila, Dust problem Dust 21.01.2013 Kadawatha Provided a dust barrier Solved Mr. H.A.Ajith Priyantha Kadawatha

131 Dust emission Dust 22.01.2013 Heiyanthuduwa 11+500 (LHS) Mr. A.M. Liyanage Wetting Pilot road Solved

16+440 No. 133/ 8 B, We have taken action to evacuate the AP and his family from this location Dust emission Dust 22.01.2013 Kaduwela Mr. L. Pubudu Prasanna Solved (RHS) Rakgahawaththa, Hewagama, Kaduwela for 01 year period

16+440 No. 133/ 8 B, We have taken action to evacuate the AP and his family from this location Noise problem Noise 22.01.2013 Kaduwela Mr. L. Pubudu Prasanna Solved 132 (RHS) Rakgahawaththa, Hewagama, Kaduwela for 01 year period

16+440 No. 133/ 8 B, Measured the vibraion. It was exceeded the limit. We have taken action to Vibration problem Vibration 22.01.2013 Kaduwela Mr. L. Pubudu Prasanna Solved (RHS) Rakgahawaththa, Hewagama, Kaduwela evacuate the AP and his family from this location for 01 year period

Deposited soil layer which was the main cause for the dust emission was 133 Dust problem Dust 22.01.2013 Kadawatha 16+500 People who resides beside the AB 10 road Kadawatha Solved removed and daily damping process is carried out

Other problem Jointly inspected the problem and since the paddy cultivation has been 134 Lack of water for the paddy land related to 22.01.2013 Kadawatha Gamunu Farmers Association Kadawatha Solved matuared. Agreed to construct the canal and provide water construction

135 Dust problem Dust 28.01.2013 Kadawatha 09+200 Mr. S.A. Leelarathna 329/4, Ihala Biyanwila, Kadawatha Provided a dust barrier and settle the matter Solved

136 Dust problem Dust 28.01.2013 Heiyanthuduwa 14+650 Mr. Prasanna Kaminda Gajaweera 355/ A, Bandaranayaka Mw; Heiyanthuduwa Provided a dust barrier Solved

Vihara Mawatha, Sub contractor agreed to arrange the site by carrying out noisy activities 137 Noise problem Noise 28.01.2013 Kaduwela 16+800 Residents around Vihara mawatha Hewagama, at day time instead of night time. Solved Kaduwela Negotiated

Other problem 478/3, Wathurapatha, 138 Electricity line have been damaged and request to level the land related to 28.01.2013 Heiyanthuduwa Mr. B.A.C.K. Perera Repared the damage through CEB and the leveling completed Solved Heiyanthuduwa construction Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

No. 330/A, 139 Dust problem Dust 28.01.2013 Kadawatha Mr. M.K. Liyanage Ihala Biyanwala, Errected a dust barrier Solved Kadawatha

140 Dust problem Dust 28.01.2013 Heiyanthuduwa Mr. G.Mery Margrete 627/39, Temples Road, Heiyanthuduwa Provided a dust barrier Solved

Measured the vibration by ITI and the level is within the limit. Pre survey 141 Vibration problem Vibration 29.01.2013 Kadawatha 09+000 Mr. Sameera Perera 287/4, Ihalabiyanwila, Kadawatha have been done for this house. Explained the compensation proceedure Solved which we will implement in the end of the construction and negotiated

Measured the level and it is within the limit. Pre survey have been done 30.01.2013 for this house. Explained the compensation proceedure which we will 81, Biyagama Pahala, Noise problem Noise (OC/TC/NS1/1894 dated Biyagama Mr. I.P.G.B. Ilangakoon implement in the end of the construction and negotiated Solved Biyagama 23.2.2013) (Informed to OC By letter No. TC/ENV/GEN-215-2993 dated 05.04.2013)

Measured the level and it is within the limit. Pre survey have been done 142 30.01.2013 for this house. Explained the compensation proceedure which we will 81, Biyagama Pahala, Vibration problem Vibration (OC/TC/NS1/1894 dated Biyagama Mr. I.P.G.B. Ilangakoon implement in the end of the construction and negotiated Solved Biyagama 23.2.2013) (Informed to OC By letter No. TC/ENV/GEN-215-2993 dated 05.04.2013)

30.01.2013 Damping the public road and pilot road continuously 81, Biyagama Pahala, Dust problem Dust (OC/TC/NS1/1894 dated Biyagama Mr. I.P.G.B. Ilangakoon (Informed to OC By letter No. TC/ENV/GEN-215-2993 dated Solved Biyagama 23.2.2013) 05.04.2013)

Water quality & 143 Water level depletion 30.01.2013 Heiyanthuduwa Ms. K.A.D. Wimalawathi 627/3, Pansala rd; Heiyanthuduwa No depletion identified. Negotiated Solved Quantity

Mr. Upali Dahanayaka (Verbal) 144 Dust problem Dust 31.01.2013 Kadawatha 10+250 698/2, Mankada road, Kadawatha Provided a dust barrier Solved Ms. P.Lalani

145 Dust problem Dust 31.01.2013 Makola Ms. A.W. Ariyalatha 478 C/1, Makola south, Makola Wetting process is continuously on going Solved

01.02.2013 Dust problem Dust (Received 06.02.2013 thro' Kaduwela Mr. D.N. Wijesundara No. 131, Disawatta, Hewagama, Kaduwela Provided a dust barrier Solved OC) 146 01.02.2013 Measured the level and it is within the limit. Pre survey have been done Vibration problem Vibration (Received 06.02.2013 thro' Kaduwela Mr. D.N. Wijesundara No. 131, Disawatta, Hewagama, Kaduwela for this house. Explained the compensation proceedure which we will Solved OC) implement in the end of the construction and negotiated

Pre condition survey has been carried out and explained the 224/G/1, Vihara Mawatha, 147 Cracks on walls due to vibration Vibration 06.02.2013 Kaduwela 17+250 Mr. K.A.A. Perera compensation proceedure for the damages if any crack development in Solved Kaduwela their house at the end of the construction activities. Negotiated

Dust Emission Dust 06.02.2013 Eldeniya, Kadawatha 01+000 (RHS) Mr. K. Thusharasiri 369/3/1, Koswatta, Eldeniya, Kadawatha Solved Vibration and noise measured on 30.01.2012 were beyond the Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

permissible levels. With considering the house condition report submitted 148 Intolerable vibration Vibration 06.02.2013 Eldeniya, Kadawatha 01+000 (RHS) Mr. K. Thusharasiri 369/3/1, Koswatta, Eldeniya, Kadawatha by GSMB it was decided to evacuate the residents and on 11.02.2013 Solved during joint inspection the house owner agreed to evacuate with effect from 01.04.2013 Noise problem Noise 06.02.2013 Eldeniya, Kadawatha 01+000 (RHS) Mr. K. Thusharasiri 369/3/1, Koswatta, Eldeniya, Kadawatha Solved

Visited jointly with OC in several times but cannot identify the location. 149 Intolerable vibration due to pilling Vibration 06.02.2013 Kaduwela Mr. G.G.S. Bandula 229/2/D, Hewagama, Kaduwela Solved Thereafter no complaints received and consider that this can be resolved.

150 Siltation Soil Erosion 07.02.2013 Ihala Biyanwala 10+200 Mr. Ganepola 643/14, Mankada rd; Ihala Biyanwila Cleared the area and Negotiated Solved

Ihla Biyanwila, 151 Vibration problem Vibration 08.02.2013 09+380 Ms. S.M.M.S. Mayadunne 355/B, Ihala Biyanwila, Kadawatha No activity is on going Solved Kadawatha

Water quality & No considerable depletion. Negotiated. (Informed to OC by letter No. TC- Well water depletion 12.02.2013 Heiyanthuduwa 11+600 (LHS) Mr. R.A. Keerthisingha 479/D, Galadeniya, Heiyanthuduwa Solved Quantity ENV-GEN-247-4416 dated 27.08.2013.)

152 Toilet drainage system functions to current order. Embankment filling of OCH is ongoing at the adjacent area beyond 15 m away from the house. Damage of toilet drainage system due to construction activities Property damage 12.02.2013 Heiyanthuduwa 11+600 (LHS) Mr. R.A. Keerthisingha 479/D, Galadeniya, Heiyanthuduwa Continuous monitoring of the well water level will be carried out monthly Solved basis. (Informed to OC by letter No. TC-ENV-GEN-247-4416 dated 27.08.2013.)

Sub contractor agreed to arrange the site by carrying out noisy activities 153 Noise problem in night time Noise 12.02.2013 Heiyanthuduwa 13+300 Mr. R.A. Rathnaweera 718, Mahakubura watta, Heiyanthuduwa at day time instead of night time. Solved Negotiated

154 Dust problem Dust 12.02.2013 Kadawatha Mr. C.S.D. Jayasingha 170/4 A, Ihala Biyawila, Kadawatha Provided a dust barrier Solved

155 Dust problem Dust 12.02.2013 Kadawatha Mr. M.J.M. Rangana Sudharshana 513, Eladeniya, Kadawatha Provided a dust barrier Solved

12.02.2013 (Thro' OC/TC/NS1/1760 Pre condition survey has been carried out and explained the dated 12.2.2013 compensation proceedure. Negotiated 156 Cracks on walls due to vibration Vibration Kaduwela Ms. Leela Liyanage No. 77/7, Ranmal Pedesa, Hewagama, Kaduwela Solved & (Informed to OC By letter No. TC/ENV/GEN-215-2993 dated OC/TC/NS1/1894 dated 05.04.2013) 23.2.2013)

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa and report handed over to the AP. In accordance with the report a crack 14.02.2013 No. 129/5, Ramahara road, Hewagama, survey was carried out and monitoring should be continued for 3 months 157 Cracks on walls due to construction activites Property damage (OC/TC/NS1/1894 dated Kaduwela Mr. R.B.D. Randana Solved Kaduwela to do the assessment. A structural engineer inspected this house and its 23.2.2013) report and crack survey data forwarded to University for final recomendation. University concluded that all cracks are thermal shrinage cracks and those cracks ocurred not due to project activity. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Pre condition survey has been carried out and explained the 158 Cracks on walls due to vibration Vibration 14.02.2013 Makola Mr.Victor Perera Makola South, Makola Solved compensation proceedure. Negotiated

159 Dust problem Dust 15.02.2013 Kaduwela Mr. U.I.R.P. Perera 90/3 E, Ramahara road, Hewagama, Kaduwela Covered the ventilation areas directed to the site Solved

160 Vibration problem Vibration 16.02.2013 Kaduwela 16+350 (RHS) Mr. Charith Perera 77/7, Ranmal place, Hewagama, Kaduwela GCP activities are completed Solved

Hewagama, Noise problem Noise 20.02.2013 Kaduwela Villagers, Hewagama Sri Saralankara Mawatha, Noise generating activities are completed in this location Solved Kaduwela Hewagama, Vibration problem Vibration 20.02.2013 Kaduwela Villagers, Hewagama Sri Saralankara Mawatha, Vibration generating activitiees are completed in this location Solved Kaduwela Hewagama, 161 Dust problem Dust 20.02.2013 Kaduwela Villagers, Hewagama Sri Saralankara Mawatha, Damping procedure in the pilot road is continuously on going Solved Kaduwela Hewagama, Decided to inspect the house through a civil engineer and we will take Formation of cracks Property damage 20.02.2013 Kaduwela Villagers, Hewagama Sri Saralankara Mawatha, Solved action on his report Kaduwela Other problem Hewagama, Mud deposition in the access road related to 20.02.2013 Kaduwela Villagers, Hewagama Sri Saralankara Mawatha, Repared and cleared the access road Solved construction Kaduwela

162 Dust problem Dust 26.02.2013 Ihala Biyanwala 10+100 (RHS) Mr. G.A.M.T. Ganepola 643/14, Mankada rd; Ihala Biyanwila Provided a dust barrier Solved

163 Dust problem Dust 26.02.2013 Ihala Biyanwala 09+090 (RHS) Mr. S.P. Liyanage 330/A, Ihala Biyanwila, Kadawatha Provided a dust barrier Solved

164 Loss of access Access road 26.02.2013 Heiyanthuduwa 12+500 - 12+950 Ms. K.A.Piyawathi 637/1, Kajuhena road, Heiyanthuduwa Temporary access provided Solved

This is Bare land. Not requested any temporary access. Explained that a 165 Access problem Access road 26.02.2013 Heiyanthuduwa Ms. T.M. Asoka Amarawathi Jayanthi Mw,Heiyanthuduwa. permenent access will be provided at the final stage of the project. Solved Negotiated This is Bare land. Not requested any temporary access. Explained that a 166 Access problem Access road 26.02.2013 Heiyanthuduwa Mr. T.M. Anura Chandralal Jayanthi Mw,Heiyanthuduwa. permenent access will be provided at the final stage of the project. Solved Negotiated This is Bare land. Not requested any temporary access. Explained that a 167 Access problem Access road 26.02.2013 Heiyanthuduwa Ms. Indrani Jayanthi Mw,Heiyanthuduwa. permenent access will be provided at the final stage of the project. Solved Negotiated This is Bare land. Not requested any temporary access. Explained that a 168 Access problem Access road 26.02.2013 Heiyanthuduwa Mr. T.M. Ariyasiri Chandralal Jayanthi Mw,Heiyanthuduwa. permenent access will be provided at the final stage of the project. Solved Negotiated This is Bare land. Not requested any temporary access. Explained that a 169 Access problem Access road 26.02.2013 Heiyanthuduwa Mr. T.M. Anil Kumara Jayanthi Mw,Heiyanthuduwa. permenent access will be provided at the final stage of the project. Solved Negotiated This is Bare land. Not requested any temporary access. Explained that a 220/11, Jaya Mawatha, Ihala Biyanwila, 170 Loss of access Access road 26.02.2013 Kadawatha 9+200 (RHS) Mr. J.M.D. Siripala permenent access will be provided at the final stage of the project. Solved Kadawatha Negotiated

297/15,Shramadana Mw; Ihala Biyanwila, 171 Formation of cracks Vibration 26.02.2013 Kadawatha Mr. H.G. Dayarathna Measured the vibration level and it is within the limit. Negotiated Solved Kadawatha

172 Dust problem Dust 26.02.2013 Heiyanthuduwa 14+090 (RHS) Mr. K.Sarath Priyantha 357/1, Dewamiththa pedesa, Heiyanthuduwa Provided a dust barrier Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

173 Dust problem Dust 26.02.2013 Kadawatha 8+800 Mr. M. Ajith Kumara 287/1 C, Ihalabiyanwila, Kadawatha Provided a dust barrier Solved

28.02.2013 174 Vibration issue due to operation of machinery Vibration thro' OC/TC/NS 1/ 1893 Kaduwela 16+450 (RHS) Mr. K. Senevirathna No. 77/6, Ranmal Pedesa, Hewagama, Kaduwela GCP activities are completed Solved dated 27.2.2013

175 Dust problem Dust 28.02.2013 Kaduwela 0+400 (LHS) Mr. A.D.S. Amarasingha 167/2, Sunethrarama road, Kadawatha Provided a dust barrier Solved

28.02.2013 Temporary drainage path constructed with barricading the land to avoid Other problem thro' flowing of waste water in to the land 176 Issues with storm water drainage through their land related to Kadawatha 9+005 (LHS) Ms. A.D. Premawathi 292, Ihala Biyanwila, Kadawatha Solved RDA/OCHP2/PBCOM (Informed to OC By letter No. TC/ENV/GEN-215-2993 dated construction dated 21.2.2013 05.04.2013) Mesured and vibraiton level and it is below the limit. Explained and 177 Vibration problem Vibration 28.02.2013 Kadawatha 9+300 Ms. Emalin Rajapaksha 349/2, Ihala Biyanwila,Kadawatha Solved Negotiated

Informed (letter Ref No. TC-ENV-SUB-634 dated 28.02.2013)to ACCESS Engineering Ltd to take necessary action to avoid obstructions Noise problem Noise 28.02.2013 Kaduwela 16+500 - 17+000 Villagers Kaduwela Solved from General public. They have negotiated the matter and presently the vibration generating activities are completed in this location. 178 Informed (letter Ref No. TC-ENV-SUB-634 dated 28.02.2013)to ACCESS Engineering Ltd to take necessary action to avoid obstructions Vibration problem Vibration 28.02.2013 Kaduwela 16+500 - 17+000 Villagers Kaduwela Solved from General public. They have negotiated the matter and presently the vibration generating activities are completed in this location. Mr. Neil Wasantha Mr.H.A. Indika Prashan Vibration problem Vibration 28.02.2013 Heiyanthuduwa 11+800 Dalukgala, Heiyanthuduwa Measured the vibration and within limit. Negotiated Solved Mr.Ranjith Suranimala 179 Mr.Kolambage Indrani Mr. Neil Wasantha Mr.H.A. Indika Prashan Dust problem Dust 28.02.2013 Heiyanthuduwa 11+800 Dalukgala, Heiyanthuduwa Wetting the pilot road properly Solved Mr.Ranjith Suranimala Mr.Kolambage Indrani

Water quality & 180 Depletion of water level in the well 02.03.2013 Kaduwela 16+610 (LHS) Mr. T.S.G.S. Saman Kumara 187/1 C, Godalla road, Hewagama, Kaduwela This house has the public water supply connection Solved Quantity

344/4, Ihala Biyanwila, Nagahamula road, 181 Dust problem Dust 03.03.2013 Kadawatha Mr. H.A. Anil Priyantha Provided the dust barrier Solved Kadawatha

182 Dust problem Dust 03.03.2013 Kadawatha Mr. H.W. Piyadasa 327/1, Ihala Biyanwila,Kadawatha Provided the dust barrier Solved

Measured the vibration level and it is within the permissible level. Pre 183 Vibration problem Vibration 04.03.2013 Kadawatha A1 By pass Mr. D. Sunil 297/10,Ihala Bianwila, Kadawatha condition survey was not done for this house since it is situated beyond the Solved 50 m. Negotiated

Water quality & Additional payment made for the damage well and as per the continuous 184 Depletion of water level in the well 04.03.2013 Kaduwela 16+600 (RHS) Mr. S.W. Gunadasa 79 F, Hewagama, Kaduwela Solved Quantity measurements the water level is recovered up to the normal level.

Dust problem Dust 07.03.2013 Kadawatha 8+800 (LHS) Ms. Thilaka Padmini 290/ B, Ihala Biyanwila, Kadawatha Provided the dust barrier Solved

185 No mud contamination observed. Well water was clear when we inspecte Water quality & Contaminatin of well water 07.03.2013 Kadawatha 8+800 (LHS) Ms. Thilaka Padmini 290/ B, Ihala Biyanwila, Kadawatha the matter. Also the excavation (SGT) is going on above 150 m away Solved Quantity from the land. Negotiated. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Measured the vibration level and it is within the permissible level. Pre No. 297/8, Sramadana Mw; Ihala Biyanwila, condition survey was not done for this house since it is situated beyond the 186 Vibration issue Vibration 08.03.2013 Kadawatha A1 By pass Mr. R.R.M. Jayasekara Solved Kadawatha 50 m. Presently vibration generating activities are completed in this location. Negotiated.

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Mr. M.B. Samarakoon 188 D, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Ms. W.Somawathi 187 C, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Mr. W.Sarath Premakumara 187 A, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Ms. W. Gunawathi Botheju 187 D, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Mr. K.G. Wijebandara 187 E, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Mr. W.Lasantha Kumara 187, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & 191/2, Vihara mw; Godalla road, Hewagama, As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Ms. W. Asawathi Solved Quantity Kaduwela the normal level. 187 Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Ms. U. Nilmini 193, Godalla road, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & Depletion of water level in the well 08.03.2013 Kaduwela Ms. W. Pushpika Gayani 187, Godalla road, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & 185 D, Vihara mw; Godalla road, Hewagama, As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Ms. H.M. Pubuduni Solved Quantity Kaduwela the normal level.

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Mr. W. Albin Singno 187, Godalla road, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Mr. G. Thomas 188, Godalla road, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Mr. Wimon Singno 187, Godalla road, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 08.03.2013 Kaduwela Mr. Roy Kumara 188 A, Godalla road, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & Mr. Jayarathna As per the continuous measurements the water level is recovered up to Depletion of water level in the well 12.03.2013 Kaduwela 185/ D, Vihara mw; Hewagama, Kaduwela Solved Quantity (H.M.J.Bandara) the normal level. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 12.03.2013 Kaduwela Mr. Sarath Priyashantha Botheju 185/ C, Vihara mw; Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & As per the continuous measurements the water level is recovered up to 188 Depletion of water level in the well 12.03.2013 Kaduwela Ms. Siriyawathi 185/ C 2, Vihara mw; Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & Mr. Janaka As per the continuous measurements the water level is recovered up to Depletion of water level in the well 12.03.2013 Kaduwela 185/ C 1, Vihara mw; Hewagama, Kaduwela Solved Quantity (Mr.K.T.P.Wasantha Kumara) the normal level.

Water quality & As per the continuous measurements the water level is recovered up to Depletion of water level in the well 12.03.2013 Kaduwela Ms. Senehelatha 185/ B, Vihara mw; Hewagama, Kaduwela Solved Quantity the normal level.

189 Dust problem Dust 18.03.2013 Kadawatha Mr. S.D. Vimal Rathnasiri 290 / D, Ihala biyanwila, Kadawatha Provided the dust barrier Solved

344/5, Ihala biyanwila, Nagahamula rd; 190 Dust problem Dust 19.03.2013 Kadawatha 9+400 (RHS) Ms. Nilma Anojika Provided the dust barrier Solved Kadawatha

191 Dust problem Dust 19.03.2013 Kadawatha Mr. Pubudu Wijewardana 164/1, Sunethrarama rd; Kadawatha Already finished dust generating activity Solved

Received the Agrarian letter by confirming that the Agrarian officer has no evidence of such cultivation or any damage occurred due to project 192 Damage to paddy land due to water stagnation Crop Damage 21.03.2013 Makola Mrs.P.Kamala Perera 391/14, Makola South , Makola Solved activities. Informed the matter by latter to Ms. Kamala and convinced accordingly.

193 Dust problem Dust 21.03.2013 Heyiyanthuduwa Mr.Sumana MalDeniya 617/5,Temple Road, Heyiynathuduwa Provided the dust barrier Solved

Dust problem Dust 22.03.2013 Kadawatha Ms.A.D.Premawathi 292,Ihala Biyanwila, Kadawatha Continuous waterering on going. Solved

194 Other problem Drainage problem related to 22.03.2013 Kadawatha Ms.A.D.Premawathi 292,Ihala Biyanwila, Kadawatha Desilted the drainage path and repaired Solved construction

Water quality & 195 Depletion of water level in the well 22.03.2013 Kaduwela Mr.Sisira Suranga Rajapaksha 189/2, Vihara Mawatha, Hewagama, Kaduwela Water connection provided Solved Quantity

Pre survey have been carried out for this house but now it could observed that there is a development of the cracks. Therefore we have conducted a 196 Cracks on walls due to construction activites Vibration 22.03.2012 Kaduwela 17+200 Mr.L.A.Jinadasa 224/D1, Vihara Mawatha, Hewagama, Kaduwela stability test through a chartered engineer. As per the chartered civil eng. Solved Intermidiate condition survey was done. According to the report there is no significant development of cracks. Negotiated

Water quality & As per the continuous measurements the water level is recovered up to 197 Depletion of water level in the well 22.03.2013 Kaduwela 16+750 Mr.P.K.C.I.Perera 186/1,Vihara Mawatha, Hewagama, Kaduwela Solved Quantity the normal level.

198 Dust problem Dust 22.03.2013 Kadawatha Mrs. S.Harichandani 143/3,Sharmadana Mawatha, Kadawatha. Proper damping implemented Solved

Monitored the vibration and it is below the limit. And this house is 199 Vibration issue Vibration 22.03.2013 Kadawatha Mr.Gamini Gunathilaka 170,Ihala Biyanwila, Kadawatha. situated beyond 50m. Explained the situation and negotiated. And further Solved monitoring will be carried out on activity base.

Monitored the vibration and it is within the limit. Explained the situation 200 Vibration issue Vibration 22.03.2013 Kadawatha Mr.H.K.I.Gnanasinghe 143/2, Kandy Road, Kadawatha Solved and negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

201 Damege to roof due to fly rock Blasting 22.03.2012 Heiyanthuduwa 15+700 Mr.U.U.K.Nihal Anthani 480,Wathurapatha, Mabima, Heyiyanthuduwa . Replaced the roofing sheet and repaired the damage Solved

202 Dust problem Dust 22.03.2012 Kadawatha Mr.S.Lalitha Nandani 143/D,Sharmadana Mawatha, Kadawatha. Proper damping implemented Solved

203 Dust problem Dust 22.03.2012 Kadawatha Mr.S.Jayathilaka 143/1,Sharmadana Mawatha, Kadawatha. Provided a dust barrier and proper damping implemented Solved

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa and report handed over to the AP. In accordance with the report a crack survey was carried out and monitoring should be continued for 3 months 204 Cracks on walls due to construction activites Vibration 22.03.2012 Kaduwela Dr.L.G.R.L.Prabath 225/4, Vihara Mawatha, Hewagama, Kaduwela Solved to do the assessment. A structural engineer inspected this house and its report and crack survey data forwarded to University for final recomendation. University concluded that all cracks are thermal shrinage cracks and those cracks ocurred not due to project activity.

Pre survey have been carried out. Monitored the vibration and it is within Vibration issue Vibration 25.03.2013 Kadawatha Mr.Neal Jayawardhana 582/1,Aldeniya, Kadawatha, Solved the limit. Explained the situation and applied safety precausions. 205 Monitored the vibration and it is within the limit. Explained the situation Noise problem Noise 25.03.2013 Kadawatha Mr.Neal Jayawardhana 582/1,Aldeniya, Kadawatha, Solved and negotiated

Vibration measured by ITI and it is within the limit. Since this is located beyond 50 m we haven't done the pre condition survey. However will be 206 Vibration issue Vibration 26.03.2013 Kadawatha Ms. Chithra Ganasingha 143/2, Kandy Road, Kadawatha Solved monitored the vibration regularly and further action will be taken based on the results.

Pre survey have been carried out. Monitored the vibration and it is within 207 Vibration issue Vibration 26.03.2013 Kadawatha Mr. H.A. Jude Roshan Perera 608/1/A, Eldeniya, Kadawatha Solved the limit. Explained the compensation proceedure and negotiated

Pre survey have been carried out. Monitored the vibration and it is within 208 Vibration issue Vibration 26.03.2013 Makola 11+470 (RHS) Mr. B.Sooriyaarachchi 478 F,Makola South,Makola Solved the limit. Explained the compensation proceedure and negotiated

Water quality & As per the continuous monitoring the water level recovered up to the 209 Depletion of water level in the well 29.03.2013 Kaduwela 16+980 Mrs.Nilmini Damayanthi 90/7, 1st Lane Ramahara, Hewagama, Kaduwela Solved Quantity normal level

Nature's View Society (M.D.Gamini Kantha Located beyond 50 m. Measured the vibration and it is within the limit. D.N.Disanayaka Investigated the house by a specialized team of University of Moratuwa D.M.N.R.P.Dissanayaka and report submitted to the AP.In accordance with the report a crack L.G.R.L.Prabath survey was carried out and monitoring should be continued for 3 months Gamini Hewa Pathirana to do the assessment for some houses and some of them are decided as no R.S.Harshani Piries effect from the construction.Rest of the houses were inspected by a No,225/1, Vihara mawatha, Hewagama, 210 Cracks on walls due to construction activites Vibration 29.03.2013 Kaduwela A. Jayasooriya structural engineer and its report and crack survey data forwarded to Solved Kaduwela. Sharly Ananda University for final recomendation. University concluded that all cracks Banard Jemis are thermal shrinage cracks and those cracks ocurred not due to project A.Lewwanduwa activity. Chandana Silva But for Mr. M.G. Bandula's house - We have already done the pre survey D.M.Champa Sandyani as it is in the 50m range. And at the end will do a post survey and payment M.G.Bandula will be made accordingly if their any damages. L.G.Pathirana) Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

394/1/B, Sri Parakum Mw; Makola South, Pre survey have been carried out. Monitored the vibration and it is within 211 Vibration issue Vibration 30.03.2013 Makola 11+280 (RHS) G.A.M. Perera Solved Makola the limit. Explained the compensation proceedure and negotiated

Pre survey have been carried out. Monitored the vibration and it is within 212 Vibration issue Vibration 02.04.2013 Kadawatha 01+590 (RHS) M.J.M. Lucus Jayawardana 528/277, Kandy road, Eldeniya Solved the limit. Explained the compensation proceedure and negotiated

Pre survey has been done for this house. Measured the vibration level and No.330 A/1, Dewamiththa 213 Cracks on walls due to construction activites Vibration 02.04.2013 Heyiyanthuduwa Mr.E.A.D.Edmond it is within the limit. Explained the compensation proceedure and Solved Pedasa,Heyinathuduwa Negotiated

214 Dust problem Dust 02.04.2013 Kadawatha Ms. Premawathi 290/3, Ihala Biyanwila, Kadawatha Proper damping implemented Solved

Since the vibration levels were beyond the limits and the structure is Vibration problem Vibration 03.04.2013 Kadawatha Mr. R.P. Jayaweera Peris 187, Ihalabiyanwila, Kadawatha weak, the people who live in the house were temporary evacuated by Solved providing them a temporary shed after discussing with them 215 Other problem Inundation due to over flow of the nearby canal in rainy days related 03.04.2013 Kadawatha Mr. R.P. Jayaweera Peris 187, Ihalabiyanwila, Kadawatha Constructed a storm water drainage path and cleared the land Solved to construction

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa 216 Vibration problem Vibration 03.04.2013 Kadawatha 00+245 (RHS) Mr. R.D. Nimal Karunathilaka 185/B, Ihala Biyanwila, Biyanwila, Kadawatha and report submitted to the AP action will be taken according to the Solved recommendation of the report. As per the report there is no any relationship between crack formation and project activity.

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa 217 Vibration problem Vibration 03.04.2013 Kadawatha 00+246 (RHS) Mr. R.D.S. Jayalath 185/C, Ihala Biyanwila, Biyanwila, Kadawatha and report submitted to the AP action will be taken according to the Solved recommendation of the repor. As per university there are lack of possibilities to occur cracks due to project activities

This house situated beyond 50m from ROW. Vibration monitored by ITI 218 Vibration problem Vibration 03.04.2013 Kadawatha 00+245 (RHS) Mr. P.M.D. Chandradasa 185/D, Ihala Biyanwila, Biyanwila, Kadawatha and level is below the limit. Continuous monitoring will be carried out Solved based on the activities. Negotiated

186/2/A, Shramadana Mw; Ihala Biyanwila, Pre survey have been carried out. Monitored the vibration and it is within 219 Vibration problem Vibration 04.04.2013 Kadawatha 00+200 Mr. U.A. Vijitha Solved Kadawatha the limit. Explained the compensation proceedure and negotiated

No,290/02, Shamadhana Mawatha, 220 Dust problem Dust 04.04.2013 Kadawatha Mr. B.L.Madhurani Continuous damping is ongoing Solved Ihalabiyanwila, Kadawatha

Water quality No,131 Contamination of well water 06.04.2013 Kaduwela Mr.D.N.Wijesundara As per observations water of the well became to the normal condition Solved & Quantity Disawatte Hewagama, Kaduwela

221 Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA 221

No,131 Pre survey done for this house. Explained the payment proceedure and Crack on parapet wall due to Vibration Vibration 06.04.2013 Kaduwela Mr.D.N.Wijesindara Solved Disawatte Hewagama, Kaduwela Negotiated

Measured the vibration level and it was below the limit. Pre survey done 222 Vibration problem Vibration 06.04.2013 Kadawatha 00+930 (RHS) Mr. J.M. Ariyawathi 641/3/B, Koswatta, Eldeniya, Kadawatha Solved for this house. Explained the compensation procedure and Negotiated

No,645/2 223 Dust problem Dust 08.04.2013 Kadawatha Mrs. K.A.Pemawathi Provided the dust barrier Solved Ihalabiyanwila, Kadawatha

No. 335/1 A, Ihala Biyanwila, 224 Dust problem Dust 09.04.2013 Kadawatha Ms. J.M.D. Nirosha Jayamanna Already finished dust generating activity Solved Kadawatha

Measured the vibration level and it was below the limit. Pre survey done 225 Vibration problem Vibration Verbal (22/09/2012) Near Jayanthi Mw 14+980 Mr.Chaminda Niroshan No.330/4,Dewamiththa Place, Heiyanthuduwa. Solved for this house. Explained the compensation procedure and Negotiated

Other problem No.391/14,Makola South, 226 Damage to water line related 10.04.2013 Makola Mrs. P.Kamala Perera Paid for the damages Solved Makola to construction

647/2, Dharmashoka road, Dust problem and requesting a transparent dust barrier Dust 10.04.2013 Kadawatha Mr. H. Sunil Shantha Ihala Biyanwila, Proper damping implemented Solved Kadawatha 227 Other problem 647/2, Dharmashoka road, Inundation problem related 10.04.2013 Kadawatha Mr. H. Sunil Shantha Ihala Biyanwila, Diverted the storm water flow by providing a hump Solved to construction Kadawatha

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa and report handed over to the AP. In accordance with the report a crack Sumito Trading Company 228 Vibration problem Vibration 18.04.2013 Kadawatha 144/1 A, Kandy Road, Kadawatha survey was carried out and monitoring should be continued for 3 months Solved (Mr. W.D. Jayarathna) to do the assessment. The structure was renovated by the owner. therefore relationship between crack formation and construction activities can not be identified.

Water quality & 90/3, 1st Lane, Ramahara Mawatha, Hewagama, As per the continuous monitoring the water level recovered up to the 229 Depletion of water level in the well 18.04.2013 Kaduwela Mr. K.T.G. De Silva Solved Quantity Kaduwela normal level

Water quality & As per the continuous monitoring the water level recovered up to the 230 Depletion of water level in the well 18.04.2013 Kaduwela Mr. Kolambage Jayasena 89, Ramahara road, Hewagama, Kaduwela Solved Quantity normal level

Water quality & As per the continuous monitoring the water level recovered up to the 231 Depletion of water level in the well 18.04.2013 Kaduwela Mrs. R.A.G.C. Pushpa 90/4, Ramahara road, Hewagama, Kaduwela Solved Quantity normal level

Water quality & As per the continuous monitoring the water level recovered up to the 232 Depletion of water level in the well 18.04.2013 Kaduwela Mr. P.A.K. Sirinimala 94/2, Ramahara road, Hewagama, Kaduwela Solved Quantity normal level

Construction not yet started at that location and when it is started we will 233 Dust problem Dust 19.04.2013 Kadawatha Mr. A. Samaraweera 334, Ihala Biyanwila, Kadawatha Solved provide the dust barrier Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

234 Dust problem Dust 19.04.2013 Kadawatha Mr. W.A.D.Lional Weerasingha 704, Mankada road, Kadawatha Provided a dust barrier Continuously damping Solved

Noise level measured and it is within the permissible level. No effect. Noise problem Noise 20.04.2013 Kadawatha Mr. A.G. Chandrarathna Nandasara 179/01, Mahagedara waththa, Kadawatha Solved Negotiated

Located beyond 50 m. Measured the vibration and it is within the limit. 20.04.2013 Investigated the house by a specialized team of University of Moratuwa & 235 and report submitted to the AP. In accordance with the report a crack 08.07.2013 survey was carried out and monitoring should be continuued for 3 months Crack Developments due to machine operations Vibration through RDA letter Kadawatha Mr. A.G. Chandrarathna Nandasara 179/01, Mahagedara waththa, Kadawatha Solved to do the assessment. A structural engineer inspected this house and its No. report and crack survey data forwarded to University for final RDA/OCHP2/PBCOM recomendation. University concluded that cracks have formed due to dated 05.06.2013 material deterioration of the building and vibration effect is insignificant.

Vibration measured and it was beyond the limit. Since our investigations A1 By pass 22.04.2013 157/3, Ihala Biyanwila, revealed that excessive vibration due to operation of 02 GCP mechine 236 Vibration problem Vibration Close to SGT 23 Mr. Roy Wasantha Coorey Solved (Through the phone) Sunethra rama road, Kadawatha activities, one machine was stopped and reduced the vibration to the limit location and at this moment GCP activities - SGT-21A have been completed.

179/2 A, Shramadana Mawatha, Measured the vibration level and it was below the limit. Pre survey done Vibration problem Vibration 22.04.2013 A1 By pass Dr. Hemachandra Ihalabiyanwila, Solved for this house. Explained the compensation procedure and Negotiated Kadawatha 237 179/2 A, Shramadana Mawatha, Measured the noise and level was below the permisible limit. No effect Noise problem Noise 22.04.2013 A1 By pass Dr. Hemachandra Ihalabiyanwila, Solved and Negotiated Kadawatha 23.04.2013 (By RDA through the phone) Dust problem Dust & Kadawatha Mr. Nilantha Kumara 174/2 A, Ihala Biyanwila, Kadawatha Proper damping implemented Solved OC ref. No. OC/TC/NS1/2380 dated 26.04.2013 238 23.04.2013 (By RDA through the phone) Vibration measured and it is exceeded the permissible level. Evacuated Vibration problem Vibration & Kadawatha Mr. Nilantha Kumara 174/2 A, Ihala Biyanwila, Kadawatha Solved from the house. OC ref. No. OC/TC/NS1/2380 dated 26.04.2013

Water quality & As per the continuous monitoring the water level recovered up to the 239 Depletion of water level in the well 26.04.2013 Kaduwela Mr. R.A.B. Nevil 81/2, Hewagama, Kaduwela Solved Quantity normal level

Other problem We have requested the relavent clearances and permissions from the 240 Distubance to the life style due to the concrete mixing plant related 27.04.2013 Kadawatha Mr. M. Piyadasa 614, Mankada road, Ihalabiyanwila, Kadawatha Tokyo cement obtained from the relevant authorities and we have not yet Solved to construction started to purchase any product from them.

House within the 50 m from ROW. Pre-condition survey done for this 179/2, Shramadana mw; Ihalabiyanwila, 241 Vibration problem Vibration 29.04.2013 Kadawatha Mr. P.G. Jayasooriya house. And measured the vibration and it is within the limit. Explained the Solved Kadawatha compensation proceedure and negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Located within 50 m. Measured the vibration and it is beyond the limit. 242 Vibration problem Vibration 29.04.2013 Kadawatha Mr. S.M. Gunathilaka 352, Ihalabiyanwila, Kadawatha Rectified the matter by replacing a low gier roller machine by increasing Solved of time period. Intermediate condition survey to be done

179/A/1, Ihala Biyanwila, Mahagedarawatta, This house located beyond the 50 m from ROW. Measured the vibration 243 Vibration problem Vibration 29.04.2013 Kadawatha Mr. A.N.Wijewardana Solved Kadawatha and it is with in the limit. Negotiated

Located within 50 m. Measured the vibration and it is within the limit. 244 Vibration problem Vibration 29.04.2013 Heiyanthuduwa Mr. K.A.D.L. Titus No. 345/D, Bandaranayaka Mw; Heiyanthuduwa Solved Explained the compensation proceedure and Negotiated

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa and report handed over to the AP. In accordance with the report a crack survey was carried out and monitoring should be continued for 3 months Mr. Shriwantha Perera to do the assessment. A structural engineer inspected this house and its 245 Vibration problem Vibration 29.04.2013 Kadawatha 639/2, Koswatta, Aldeniya, Kadawatha Solved (Mr. Hector Perera) report and crack survey data forwarded to University for final recomendation. University concluded that project construction may contribute crack formation at some parts of the house. therefore a compensation payment will be provided for damage rectification. Final payment for house damages was made.

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa 157/4, Sunethrarama rd; Ihalabiyanwila, and report submitted to the AP action will be taken according to the 246 Vibration problem Vibration 30.04.2013 Kadawatha Dr. R.D.K.S.Gunarathna Solved Kadawatha recommendation of the report. As per the report only one crack has been formed and complaint was about vibration during the piling activity.negotiated and solved

247 Dust problem Dust 02.05.2013 Kadawatha Mr. K.A.Piyasena 645/1, Ihalabiyanwila, Mankada rd; Kadawatha Continuous damping is ongoing Solved

248 Inundation of the well due to flood Flooding 04.05.2013 Kaduwela Mr. N.C.P. Hewagama 198/4, Vihara Mw; Hewagama, Kaduwela Well was dewatered and adjacent diversion canal was desilted. Solved

The RC pipe installed across the existed road was too small and Other problem interupted the water flow of the particular drain which comes from Ch 90 G, Ramahara rd; 1st lane, Hewagama, 249 Land is near to inundate due to poor flow rate of the near by drain. related 04.05.2013 Kaduwela 16+800 Mr. S.W. Muthukumara 16+600 towards the Ramahara ela. Due to that the upstream water Solved Kaduwela to construction stagnated. To resolve the matter road was cut and existed RC pipe was removed.

600/5/1, 250 Damages to domestic items due to flood Flooding 06.05.2013 Kadawatha Mr. H.E. Ajith Piyasiri Perera Compensated for the damages Solved Bandaranayaka Mw; Eldeniya, Kadawatha

06.05.2013 & 251 Damages to the well and domestic items due to flood Flooding Kadawatha Mr. G.V.Kusumawathi 358/4, Samurdhi Mw; Ihalabiyanwila, Kadawatha Compensated for the damages Solved 30.05.2013 from DS-Biyagama

252 Crop damage due to inundation Crop Damage 06.05.2013 Kadawatha Mr. Fedric Perera 511, Eldeniya, Kadawatha Compensated for the damages Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

06.05.2013 & 253 Damages to domestic items due to flood Flooding Kadawatha Mr. H. Derik Wimalarathna 358, Samurdhi mw; Ihalabiyanwila, Kadawatha Compensated for the damages Solved 30.05.2013 from DS-Biyagama 06.05.2013 & 356/D, Samurdhi Mw; Ihalabiyanwila, Electrical goods were checked by the electrician, no damages identified. 254 Damages to domestic items due to flood Flooding Kadawatha Mrs. W.A. Indrani Solved 30.05.2013 from Kadawatha Cleaned and widen the canals to avoid drainage congesions and solved. DS-Biyagama

255 Crop damage due to inundation Crop Damage 06.05.2013 Kadawatha Mr. M.J.M. Jayasena Jayawardana 510, Eldeniya, Kadawatha Compensated for the damages Solved

Erosion in the public access due to flood damaged to domestic 256 Flooding 06.05.2013 Kadawatha Mr. Philip Jayawardana Eldeniya, Kadawatha Compensated for the damages Solved items

257 Damages due to Flood Flooding 07.05.2013 Kadawatha Mr. N.L.S. Indrani 600/5, Bandaranayaka Mw; Eldeniya, Kadawatha Compensated for the damages Solved

258 Damages due to Flood Flooding 07.05.2013 Kadawatha Mrs. J.P.Prema Ranjani 513/2/B, Eldeniya, Kadawatha Compensated for the damages Solved

259 Damages due to Flood Flooding 07.05.2013 Kadawatha Mr. M.J.M.R. Sudharshana Jayawardana 513, Eladeniya, Kadawatha Compensated for the damages Solved

260 Damages due to Flood Flooding 07.05.2014 Kadawatha Mr. S.K. Dayananda 518, Eldeniya, Kadawatha Compensated for the damages Solved

Mr. K.W.Rathnapala 261 Damages to factory items and to house due to Flood Flooding 07.05.2013 Kadawatha 518/1, Eldeniya, Kadawatha Compensated for the damages Solved Ms. S.K.Nandawathi

262 Damages to the access road due to flood Access road 07.05.2013 Kadawatha Mr. D.P. Chandana Kumarasiri 512/D, Eldeniya, Kadawatha Drainage s improved for free water flow Solved

263 Crop damage and wastage of fertilizer due to inundation Crop Damage 07.05.2013 Kadawatha Mr. A.A.L. Siriwardana 600/1/B, Eldeniya, Kadawatha Compensated for the damages Solved

Damages to domestic items and the bakery items and the three- Mr. W.D. Saliya Ajith Kumara No evidence of damage items and not satisfied with our estimation. And 264 Flooding 07.05.2013 Kadawatha 513/2/A/1, Eldeniya, Kadawatha Solved wheeler due to Flood (Pathma Jayawardana) this was informed to the Divisional Secretary.

Located beyond 50 m. Measured the vibration and it is within the limit. 265 Vibration due to excavation Vibration 07.05.2013 Kadawatha Mr. K.D.P. Dayananda 182,Ihalabiyanwila, Kadawatha Vibration generating activites are completed in this location and Solved negotiated the matter.

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa Mr. G.D.P. Samaranayaka and report handed over to the AP. In accordance with the report a crack 266 Cracks on walls Property damage 07.05.2013 Kadawatha Secretary - Committee of Sunethrarama 179/21, Mahagedarawatta, Kadawatha Solved survey was carried out and monitoring should be continued for 3 months Temple to do the assessment. As per university there are lack of possibilities to occur cracks due to project activities

674/4, Wediwatte road, Ihala Biyalawila, 267 Inundation of house and wash off of land Flooding 07.05.2013 Kadawatha Ms. Liyanage Margret Explained that without access we cannot supply soil. Negotiated. Solved Kadawatha

663/C, Wediwatte road, Ihala Biyalawila, 268 Inundation of house Flooding 07.05.2013 Kadawatha Mr.Sunil Thilak Compensated for the damages Solved Kadawatha

To be provided a separate foot path. 269 Damage of access road Access road 07.05.2013 9+100 (LHS) Villagers of Uswatta road Solved Clean the drainage path and provided a cause way

270 Inundation of house Flooding 08.05.2013 Kadawatha Mr. M.A.K. Banda 522/2/1, Eldeniya, Kadawatha Damages of the canal have not been improved & Cleaned canals Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Ms. M.H. Shamalee Kumuduni 306/3, Samagi Mw; Hewagama, Kaduwela 271 Inundation of house Flooding 09.05.2013 Kaduwela Cleaned the canal Solved Mr. K.D. Steven 224/C1, Vihara Mw; Hewagama, Kaduwela

House situated within 50 m and checked the vibration levels and it is Crack formations due to vibration Vibration 10.05.2013 Kadawatha Mr. D.L.W. Rajitha Maduranga 292/04, Ihalabiyanwila, Kadawatha within the limit. Continuous monitoring will be carried out when work is Solved in progress in this area 272

Inundation of the well due to flood Flooding 10.05.2013 Kadawatha Mr. D.L.W. Rajitha Maduranga 292/04, Ihalabiyanwila, Kadawatha Dewatered & Cleaned the well Solved

10.05.2013 & 273 Inundation of house and the domestic items Flooding Kadawatha Mr. D.P.G.P.K. Peiris 357, Samurdhi Mw; Ihala Biyanwila , Kadawatha Compensated for the damages Solved 30.05.2013 from DS-Biyagama House located beyond 50 m. Measured the vibration and level was with in 274 Vibration problem Vibration 10.05.2013 Kaduwela Mr. B.G.S. Gamini 129/3, Ramahara rd; Hewagama, Kaduwela Solved the limit. Negotiated 513/2, Eldeniya Damages to house and domestic items due to inundation Flooding 10.05.2013 Kadawatha Mr. M.P.J. Perera 286/B, Eldeniya West, Compensated for the damages Solved 275 Kadawatha 513/2, Eldeniya Crop damage due to inundation Crop Damage 10.05.2013 Kadawatha Mr. M.P.J. Perera 286/B, Eldeniya West, Compensated for the damages Solved Kadawatha House within the 50 m from ROW. Pre-condition survey done for this 276 Vibration problem Vibration 11.05.2013 Kadawatha Mr. S.D. Podimahaththaya 294,Ihalabiyanwila, Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved compensation proceedure and negotiated House within the 50 m from ROW. Pre-condition survey done for this 277 Vibration problem Vibration 11.05.2013 Kadawatha Mr. 294/1C,Ihalabiyanwila, Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved compensation proceedure and negotiated House within the 50 m from ROW. Pre-condition survey done for this 278 Vibration problem Vibration 11.05.2013 Kadawatha Mr. Sujith Palitha Samanweera 294/1/A, Ihalabiyanwila,Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved compensation proceedure and negotiated Situated within the 50 m from ROW. Vibration checked and it is beyond 279 Vibration problem Vibration 12.05.2013 Kadawatha Mr. H.M.A.S. Bandara Eladeniya, Kadawatha the limit. Work have been completed at this location. (SGT 25) Solved Explained the compensation proceedure and Negotiated.

Other problem Villagers of Ihalabiyanwila 280 Blockage of Drainage related 12.05.2013 Ihalabiyanwila Ihalabiyanwila Cleaned the Canal and settled the matter Solved Mr. Pradeep - OC to construction

House within the 50 m from ROW. Pre-condition survey done for this 281 Cracks on wall and pavement Property damage 14.05.2013 Ihalabiyanwila Mr. H.W. Piyadasa 327/1, Ihala Biyanwila,Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved compensation proceedure and negotiated

House situated within 50 m . At the time of inspection of the University of 282 Cracks on walls due to excavation Property damage 15.05.2013 Kadawatha Mr. W.D. Kumarasiri Premalal 171/1D, Ihalabiyanwila, Kadawatha Solved Moratuwa it was desided that there is no effect by the construction

Located beyond 50 m. Measured the vibration and it is within the limit. 283 Crack formation due to vibration Vibration 15.05.2013 Kadawatha Mr. M. Kumarathunga 340,Nagahamula rd; Ihalabiyanwila, Kadawatha Solved Negotiated

House within the 50 m from ROW. Pre-condition survey done for this Mr. G.N. Weerasingha 340/1, Nagahamula road, Ihalabiyanwila, 284 Vibration due to pilling Vibration 15.05.2013 Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved Ms. Indrani Kusumalatha Kadawatha compensation proceedure and negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Located beyond 50 m. Measured the vibration and it is within the limit. 285 Vibration problem Vibration 16.05.2013 Kadawatha Mr. Wasantha Kumara 336/16, Ihalabiyanwila, Kadawatha Solved Negotiated

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa Mr. Akila Harshana 286 Vibration problem Vibration 16.05.2013 Kadawatha 9+300 336/5, Ihalabiyanwila, Kadawatha and report submitted to the AP action will be taken according to the Solved Mr.K.A. Nimal recommendation of the report. As per the report poor construction contributes crack formation

House within the 50 m from ROW. Pre-condition survey done for this 287 Cracks due to excavation activities Property damage 21.05.2013 Kadawatha A1 By pass Ms. Leela Liyanaarachchi 327, Ihalabiyanwila, Kadawatha house. And measured the vibration and it is within the limit. Explained the Solved compensation proceedure and negotiated

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa and report submitted to the AP.A crack survey was carried out and monitoring should be continued for 3 months to do the assessment.A 288 Formation of cracks and Inconvenience due to vibration Vibration 21.05.2013 Kaduwela Mr. K.A.D.Suraweera Sampath 126/C 2 , Hewagama, Kaduwela structural engineer inspected this house and its report and crack survey Solved data forwarded to University for final recomendation. University concluded that differential settlements had been accelerated due to course of vibrations during construction activities. therefore this AP was included into compensation procedure.

House located within the 50m limit and pre condition survey Measured 289 Damage of the slab Property damage 23.05.2013 Kadawatha A1 By pass Ms. Padmini Ariyarathna 174/3, Ihalabiyanwila, Kadawatha the vibration and level is within the limit. Explained the compensation Solved procedure and Negotiated

House situated within 50 m and checked the vibration levels and it is 290 Vibration problem Vibration 22.05.2013 Kadawatha Ms. R.D. Gunawathi 175, Ihalabioyanwila, Kadawatha within the limit. Continuous monitoring will be carried out when work is Solved in progress in this area

Damages to the temporary house at the time of sheet piling inorder Situated beyond the 50 m from ROW. Taken precausionary actions to 291 Property damage 23.05.2013 Kadawatha GCP - 28-29 area Mrs. Gunawathi 295, Ihalabiyanwila, Kadawatha Solved to avoid the obstructed mango tree settle the matter

House situated beyond 50 m and checked the vibration levels and it is 292 Vibration problem Vibration 26.05.2013 Kadawatha 00+280 (RHS) Mr. Nalin Suranga Perera 179/12 B, Mahagedarawatta, Kadawatha Solved within the limit. Negotiated

House situated beyond 50 m and checked the vibration levels and it is 293 Vibration problem Vibration 26.05.2013 Kadawatha 09+350 (RHS) Ms. W.G. Karunawathi 336/2, Ihala Biyanwila, Kadawatha Solved within the limit. Negotiated

Located beyond 50 m. Measured the vibration and it is within the limit. Investigated the house by a specialized team of University of Moratuwa 294 Vibration problem Vibration 26.05.2013 Kadawatha 09+600 (RHS) Mr. R.S.P.U. Luxman Rajapaksha 344, Nagahamula rd; Ihalabiyanwila, Kadawatha and report submitted to the AP action will be taken according to the Solved recommendation of the report as per the report poor construction,poor maintainance and old age of the house contributes crack formation

House situated beyond 50 m and checked the vibration levels and it is 295 Vibration problem Vibration 26.05.2013 Kadawatha 09+310 (RHS) Mr. Chamika Lakshan 336/10, Ihala Biyanwila, Kadawatha Solved within the limit. Negotiated

House situated beyond 50 m and checked the vibration levels and it is 296 Vibration problem Vibration 26.05.2013 Kadawatha 09+360 (RHS) Ms. Madhuri Deleepa Kumari 336/2/B, Ihalabiyanwila, Kadawatha Solved within the limit. Negotiated

297 Erosion of the land boundary Soil Erosion 26.05.2013 Kaduwela 16+700 Mr. U.I.R.P. Perera 90/3 E, Ramahara road, Hewagama, Kaduwela Land boundary of the complainant was protected with concrete Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Mr. H.W. Piyadasa 298 Erosion of the land boundary Soil Erosion 27.05.2013 Kadawatha 327/1, Ihala Biyanwila,Kadawatha Inspected. Currenly no issue. Solved Ms. L.A. Prema Habaraduwa

Inspected. Currently no issue. To be measured vibration during activity 299 Vibration problem Vibration 27.05.2013 Heiyanthuduwa Mr. P.O. Perera 253, Sudharshana, Udaya Mw; Heiyanthuduwa Solved ongoing. Action will be taken accordingly.

House within 50m. Pre condition done. Recently no any construction 300 Damage of toilet pit Property damage 30.05.2013 Heiyanthuduwa Ms. Mery Margrete 627/3 A, Temple road, Heiyanthuduwa Solved activities was carried out.

Divisional Secretary - Biyagama Divisional Secratariate, Provided soil for washed off land is approved by RDA, but still the trucks 301 Wash off of the land Flooding 30.05.2013 Biyagama Solved (Liyanadurage Jayasena) Biyagama cannot enter to the land. Agreed to give soil after the access provided

Water quality and Water checked by the University of Moratuwa. According to the report no 302 Well water contamination 30.05.2013 Kadawatha Mr. Samaraweera 334, Ihala Biyanwila, Kadawatha Solved quentity contamination due to our construction activities.

Water quality and Water checked by the University of Moratuwa. According to the report no 303 Well watre contamination 30.05.2013 Kadawatha Ms. Mery Wilfred Jayamanna 574, Eldeniya, Kadawatha Solved quentity contamination due to our construction activities. 513/3, Eldeniya, 304 Noise problem Noise 03.06.2013 Kadawatha Mr. W.M. Wickramasingha Activities completed at the location. Negotiated Solved Kadawatha House located within 50m. Measured the vibration and it is within the Vibration problem Vibration 04.06.2013 Kadawatha Mr. W.K.S.P. Jayasooriya 513/3/A, Eldeniya, Kadawatha Solved limit. Negotiated 305 House located within 50m. Measured the Noise level and it is beyond the Noise problem Noise 04.06.2013 Kadawatha Mr. W.K.S.P. Jayasooriya 513/3/A, Eldeniya, Kadawatha Solved limit. But activities completed within 03 days. Negotiated

Other problem 306 Inconvenience due to stock pile which locates to the land related 07.06.2013 Kaduwela Mr. P. Sirisena 224/B, Vihara Mawatha, Hewagama, Kaduwela Stock pile was barricaded by placing sand bags Solved to construction

307 Access problem Access road 07.06.2013 Kadawatha Ms. S.A. Indralatha 481, Ihala Biyanwila, Kadawatha Temporary access provided Solved

287/1 B, Sramadana Mw; Ihalabiyanwila, 308 Dust problem Dust 08.06.2013 Kadawatha Ms. Anusha Geethanjali Damping the pilot road Solved Kadawatha House located within the 50m limit and pre condition survey Measured Damages to roof tile and toilet pit due to vehicle movement of the the vibration and level is within the limit. According to the measurements 309 Property damage 08.06.2013 Makola Mr. A.A.D.A. Pushpakumara 625/1, Makola North, Makola Solved project it was considered that the damges was not occurred by our construction activities. Explained and negotiated

310 Dust problem Dust 08.06.2013 Kadawatha Ms. H.H. Piyaseeli 294/1, Ihala Biyanwila, Kadawatha Provided the dust barrier Solved

311 Inundation by flood due to filling activities Flooding 08.06.2013 Kadawatha Mr. M. Somapala Silva 639/3/2/B, Koswatta, Kadawatha Cleaned the drainage paths and improved. Solved

House within the 50 m from ROW. Pre-condition survey done for this 312 Vibration problem Vibration 08.06.2013 Kadawatha Mr. P. Joseph 639/6, Koswatta road, Eldeniya Kadawatha Solved house. Explained the compensation proceedure and negotiated

House located beyond 50 meters and the constructin activities are Vibration problem Vibration 08.06.2013 Kadawatha 00+300 (LHS) Mr. G. D. Dharmasena 169, Ihalabiyanwila, Kadawatha Solved completed at this location. Negotiated and solved 313 House located beyond 50 meters and the constructin activities are Noise problem Noise 08.06.2013 Kadawatha 00+300 (LHS) Mr. G. D. Dharmasena 169, Ihalabiyanwila, Kadawatha Solved completed at this location. Negotiated and solved

314 Access problem Access road 08.06.2013 Kadawatha Ms. B.A.Lalitha 287/4, Ihalabiyanwila, Kadawatha Temporary access provided Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House within the 50 meters from ROW. Pre condition survey (H-55) was 315 Property damage due to vibration Vibration 10.06.2013 Heiyanthuduwa Mr. R.M.D. Podimanike 706/C, Siriketha road, Heiyanthuduwa Solved done for this house. Explained the compensation procedure. Negotiated

This house located beyond 50 m. Vibration measured and it is within the 316 Vibration problem Vibration 10.06.2013 Kadawatha 9+300 (RHS) Ms. W.N.K.Senanayaka 336/6, Ihalabiyanwila, Kadawatha Solved limit. Negotiated

Other problem 317 Inundation due to storm water related 10.06.2013 Kadawatha 9+000 (RHS) Mr. Roy Dissanayaka 286/2, Uswatta rd, Kadawatha Rectified the issue Solved to construction

318 Dust problem Dust 12.06.2013 Kadawatha Ms. J.K. Gunawathi 295/C, Ihalabiyanwila, Kadawatha Provided a dust barrier Solved

319 Dust problem Dust 12.06.2013 Kadawatha Ms. G. Leelawathi 295/A, Ihalabiyanwila, Kadawatha Provided a dust barrier Solved

Other problem 320 Inundation due to storm water related 12.06.2013 Kadawatha 1+030 (LHS) Ms. Ranjani Silva 639/3/1 A, Koswatta rd, Eldeniya, Kadawatha Drainage s cleaned and improved Solved to construction

This house located beyond 50 m. Vibration measured and it is within the Vibration problem Vibration 14.06.2013 Hanwella Mr. S.G. Shashika Ransara 146/A, Shilo Niwasa, lower Hanwella, Hanwella Solved limit. Negotiated 321

Dust problem Dust 14.06.2013 Hanwella Mr. S.G. Shashika Ransara 146/A, Shilo Niwasa, Pahala Hanwella, Hanwella Continuous waterering using sprinklers and repaired dust barrier Solved

127/1, Jayaweeragoda rd, Pahala Hanwella, This house located beyond 50 m. Vibration measured and it is within the Vibration problem Vibration 14.06.2013 Hanwella Ms. H.T. Nelanka Jeewani Perera Solved Hanwella limit. Negotiated

127/1, Jayaweeragoda rd, Pahala Hanwella, This house located beyond 50 m. Noise measured and it is within the 322 Noise problem Noise 14.06.2013 Hanwella Ms. H.T. Nelanka Jeewani Perera Solved Hanwella limit. Negotiated

127/1, Jayaweeragoda rd, Pahala Hanwella, Dust problem Dust 14.06.2013 Hanwella Ms. H.T. Nelanka Jeewani Perera Continuous waterering using sprinklers and repaired dust barrier Solved Hanwella

House located within 50m and done presurvye. Vibration measured and it 323 Damaged to toilet pit due to vibration Vibration 19.06.2013 Heiyanthuduwa 13+200 (RHS) Mr. A.G. Fernando 362/E, Siriketha rd, Heiyanthuduwa Solved was with in the limit. Negotiated

157/2, Sunethrarama rd; Ihalabiyanwila, Inspected. Currenly no issue. To be measured vibration during activity 324 Vibration problem Vibration 19.06.2013 Kadawatha 00+370 (LHS) Mr. H.D. Victor Solved Kadawatha ongoing. Action will be taken accordingly.

Flood occurs near to the house due to embankment filling Flooding21.06.2013 Kadawatha Mr. A.V.S.D. Nimalrathna 178/2-A, Ihalabiyanwila, Kadawatha Cleaned and improved the canal Solved through RDA letter 325 No. RDA/OCHP2/PBCOM Other problem Difficult to getting water connection to the house due to dated 17.06.2013 Currently no issue. Water line will be provided in future during the related Kadawatha Mr. A.V.S.D. Nimalrathna 178/2-A, Ihalabiyanwila, Kadawatha Solved construction activities construction period. to construction House within 50m. Pre condition survey done. Mesured the vibration and 25.06.2013 326 Vibration problem Vibration Kadawatha Mr. Ajantha Samaraweera 332/1, Ihala Biyanwila, Kadawatha it is within the limit. Continuous monitoring will be carrried out and GCP Solved Through the phone activities are completed. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Inspected. Currenly no issue. To be measured vibration during activity 327 Vibration problem Vibration 26.06.2013 Kaduwela 17+100(LHS) Mr. M.K. Sumith Priyantha 222/2/A, Vihara Mw, Hewagama, Kaduwela Solved ongoing. Action will be taken accordingly

27.06.2013 Joint site inspection was carried out on 01.07.2013 through RDA letter 698/9, Richmond Place, Mankada Road, ITI reports on 27.07.2013 & 01.07.2013 revealed that the vibration levels 328 Intolerable vibration due to construction activities Vibration No. Kadawatha 10+410 (RHS) Ms. S.W.T. Niroshani Solved Kadawatha are very much below than the permissible level. we explained, negotiated RDA/OCHP2/PBCOM and solved dated 25.06.2013

27.06.2013 through RDA letter This complain is not related to NS-1 section and the location is 329 Toilet pit has been damaged due to bored piling work Property damage No. Kaduwela Ms. Renuka Wickramasinghe 238/B, Kakirideniya Rd, Hewagama, Kaduwela Solved completely away from our construction area. RDA/OCHP2/PBCOM dated 25.06.2013

27.06.2013 & 08.07.2013 330 Damages to their crops due to siltation Crop Damage through RDA letter Kadawatha 09+300 (RHS) Mr. R.P. Amith Eranga 332/1, Ihala Biyanwila, Kadawatha Land filling was completed Solved No. RDA/OCHP2/PBCOM dated 25.06.2013

331 Noise problem Noise 01.07.2013 Kadawatha 10+630 (LHS) Ms. G. Shalika Dharshani 694/1/B, Makola North, Makola Evacuated for 11 months period Solved

Instruction was given to the water bowser operator for continuous 332 Dust problem Dust 02.07.2013 Kaduwela 16+460 (LHS) Mr. D.M.D. Nilantha 138/2, Hewagama, Kaduwela Solved damping

Dust problem Dust 03.07.2013 Kadawatha 10+200 (RHS) Mr. B.V. De Alwis 705/1, Mankada Rd, Kadawatha Dust & mud of the road were cleaned & washed Solved

333 Material Transportation Project vehicles movement through mankada road 03.07.2013 Kadawatha 10+200 (RHS) Mr. B.V. De Alwis 705/1, Mankada Rd, Kadawatha Project vehicles movement through mankada road were stoped Solved and use of public roads

Dust & mud of the road were cleaned & washed & Project vehicles 334 Dust problem Dust 03.07.2013 Kadawatha 10+200 (RHS) Mr. K.P.A.K. Pathirana 670, Ihala Biyanvila, Kadawatha Solved movement through mankada road were stopped

New drainage paths were prepared & Sand bag barriers were used to 335 Silt problem Soil Erosion 03.07.2013 Kadawatha 10+300 (RHS) Mr. D.A.U. Abewickrama 698, Mankada Rd, Kadawatha Solved control siltation

With in 50 m. Measured the vibration levels which were within the limit 336 Vibration problem Vibration 04.07.2013 Kadawatha 01+010 (RHS) Mr. M.J.M. Philip Jayawardhne 513/1, Aldeniya, Kadawatha Solved and explained the compensation procedure and negotiated

With in 50 m. Measured the vibration levels which were within the limit 337 Vibration problem Vibration 04.07.2013 Kadawatha 01+010 (RHS) Mr. M.J.M. Rangana Sudarshana 513, Aldeniya, Kadawatha Solved and explained the compensation procedure and negotiated

Other problem After jointly inspected tha area with OC and RDA and Taisei on 338 Boundary problem related 05.07.2013 Kaduwela 16+800 (LHS) Mr. Devasiri Dayananda 195/3, Vihara Mawatha, Hewagama, Kaduwela Solved 10.07.2013, AP agreed with RDA solution. to construction

339 Dust problem Dust 08.07.2013 Kadawatha 10+090 (LHS) Mr. S.M.S.P. Senevirathne 650/1, Ihala Biyanvila, Kadawatha Provided a dust barrier Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House situated within 50 m . At the time of inspection of the University of 340 Cracks on walls due to excavation Property damage 09.07.2013 Kaduwela 16+980 (RHS) Mr. B.D.G. Amarasekara 129/C, Ramahara Rd; Hewagama, Kaduwela Solved Moratuwa it was desided that there is no effect by the construction

Inspected. Referred to GSMB for crack survey and the survey is Cracks on walls due to excavation Property damage 11.07.2013 Kadawatha 01+000 (RHS) Mr. H.P.J. Perera 534/1, Aldeniya, Kadawatha Solved completed 341 Crop damage due to inundation Crop Damage 11.07.2013 Kadawatha 01+000 (RHS) Mr. H.P.J. Perera 534/1, Aldeniya, Kadawatha Compensated for the damages Solved

Water quality 342 Odorous condition of well water & 16.07.2013 Kadawatha 00+360 (LHS) Mr. W.M. Jayantha Wijekoon 164/1/D, Sunethrarama Rd, Kadawatha Dewatered & Cleaned the well to remove adorous condition of well water Solved quantity House within the 50 meters from ROW. Pre condition survey was done 343 Vibration problem Vibration 16.07.2013 Kadawatha 09+300 (RHS) Mr. N.J.L. Thilakasiri 332/2, Ihala Biyanvila, Kadawatha for this house. Explained the compensation procedure and Negotiated & Solved solved

Water quality Well was dewatered & Cleaned 344 Contamination of well water 20.07.2013 Heyanthuduwa 12+800 (RHS) Mr. L. Premasiri Perera 624/1, Godellawattha, Heyanthuduwa Solved & Storm water paths were diverted quantity

356/C, Nagahamula Rd, Ihala Biyanvila, 345 Access Problem Access road 23.07.2013 Kadawatha 09+700 (LHS) Mr. Sudath Peris Temporary access provided. Construction of permanent access is on going Solved Kadawatha

With in 50 m. Measured the vibration levels which were within the limit 346 Vibration problem Vibration 30.07.2013 Kadawatha 1+200 (RHS) Mr. K.W.Rathnapala 518, Eldeniya, Kadawatha Solved and explained the compensation procedure and negotiated

House located within 50m. Joint inspection carried out on 16/08/2013,ITI 347 Intolerable vibration Vibration 03.08.2013 Heiyanthuduwa 16+600 Ms. R.M.S. Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa report on 16/08/2013 revealed the vibration level below the permisible Solved level.We explained and negotiated.

House located beyond the 50m. Inspected. Further monitoring will be 348 Damages of the house Property damage 09.08.2013 Heiyanthuduwa Ms. W.D. Geethika 254/3, Udaya Mw; Heiyanthuduwa carried out, If there are development of cracks condition survey will be Solved carried out.Negotiated the problem.

643/1, Ihalabiyanwila, Dharmashoka Mw; 349 Dust problem Dust 10.08.2013 Kadawatha Mr. M.W.M. Gunawardana Provided a suitable dust barrier Solved Kadawatha

650, Dharmashoka Mw; Ihalabiyanwila, 350 Dust problem Dust 12.08.2013 Kadawatha Mr. Upul Susila Kulathunga Provided a suitable dust barrier. Solved Kadawatha

351 Dust problem Dust 13.08.2013 Makola 10+330 (LHS) Mr. B.M.S.P. Silva 698/3, Mankada road, Makola Provided a suitable dust barrier. Solved

Vibration measured by ITI and it is within the limit. We introduced less heavy vibration roller and compaction mode and controlled the vibration. Villagers of Jambugahawatta Referred to University of Moratuwa to obtain a stability report. As per the (Ms. Janaki Damayanthi, report crack survey was carried out and monitoring should be continued 352 Damages of the house Property damage 15.08.2013 Kadawatha 9+400 Mr. K.A.Nimal, Jambugahawatta, Kadawatha Solved for 3 months to do the assessment for those houses. Crack survey data Mr. H.V. Siripala, forwarded to the University and final recommendation was lack of Mr.S.A.G. Nimal Sirikumara,) possibilities could be identified to occur cracks due to road construction activities Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Inspected. Currently no activities on going in the area. To be measured vibration when started the activities. Referred to University of Moratuwa to obtain a stability report. As per the report crack survey was carried out 324/H, Ihala Biyanwila, and monitoring should be continued for 3 months to do the assessment. A 353 Damages of the house Property damage 15.08.2013 Kadawatha Suraweera Gamage Pradeep Nishantha Solved Kadawatha structural engineer inspected this house and its report and crack survey data forwarded to University for final recomendation. University concluded that Settlement of the wash room area can be accelarated due to piling activity. therefore 30% of damage repair cost is recommended

Joint inspection carried out on 16/08/2013,ITI report on 16/08/2013 354 Vibration problem Vibration 17.08.2013 Heiyanthuduwa Mr. K.A.D.L. Titus No. 345/D, Bandaranayaka Mw; Heiyanthuduwa revealed the vibration level below the permisible level.We explained and Solved negotiated.

Other problem Cleaned the canal and provided the sand bag barrier to avoid further 11+600 355 Block of drainage related 20.08.2013 Heiyanthuduwa Mr. R.A. Keerthisingha 479/C, Galadeniya road, Heiyanthuduwa siltation (Informed to OC by letter No. TC-ENV-GEN-247-4416 dated Solved (LHS) to construction 27.08.2013.)

8+800 Inconvenience due to vibration Vibration 21.08.2013 Kadawatha Mr. H.D. Nimalsiri 293/5, Ihalabiyanwila, Kadawatha Temporarily evacuated the AP and his family for one year period Solved (LHS) 356 8+800 Dust problem Dust 21.08.2013 Kadawatha Mr. H.D. Nimalsiri 293/5, Ihalabiyanwila, Kadawatha Temporarily evacuated the AP and his family for one year period Solved (LHS)

Water quality & 357 Depletion of water level in the well 22.08.2013 Kaduwela 16+750 Ms. Chathurani Indunil Perera 186/1,Vihara Mawatha, Hewagama, Kaduwela Provided the water supply connection Solved Quantity

Water quality & 358 Depletion of water level in the well 23.08.2013 Kaduwela 16+800 Mr. W.S. P. Botheju 185/C,Vihara Mw; Hewagama, Kaduwela Provided the water supply connection Solved Quantity

No activities on going during the inspection. When activities started 359 Vibration problem Vibration 23.08.2013 Kadawatha 00+930 (LHS) Mr. E.S.L. Suresh Pradeep Kumara 641/3/B, Koswatta, Eldeniya, Kadawatha Solved vibration will be monitored. Negotiated

1000 L Capacity Plastic tank and adequate water provided. Further as per the request of the AP we have taken a water quality report from Water quality & University of Moratuwa and it revealed that the well has contaminated 360 Depletion of water level in the well 23.08.2013 Kaduwela 16+610 (LHS) Mr. T.S.G.S. Saman Kumara 187/1 C, Godalla road, Hewagama, Kaduwela Solved Quantity with fecal matter. There was a temporary toilet adjacent to the particular well which belongs to our sub contractor. Informed to the subcontractor regarding this matter and it has been removed.

Mr. Sony Samantha Kumara With in 50 m. Measured the vibration levels which were within the limit 361 Vibration problem Vibration 23.08.2013 Heiyanthuduwa 12+900 Kajugahahena road, Heiyanthuduwa Solved (Mr. Sunil Shantha) and explained the compensation procedure and negotiated

Water quality & 23.08.2013 Mr. L.A. Samith Hasitha 362 Depletion of water level in the well Kaduwela 92/A, Ramahara Rd; Hewagama, Kaduwela Provided permanent water connection Solved Quantity (Mr.Gunarathna - OC) (Mr. Wasantha Hemasiri) Water quality & 363 Depletion of water level in the well 24.08.2013 Kaduwela 16+850 Ms. M.A.D. Siriyawathi 185/C 2, Vihara Mw; Hewagama, Kaduwela Provided permanent water connection Solved Quantity Water quality & 364 Depletion of water level in the well 24.08.2013 Kaduwela 16+850 Mr. K.T.C.W.Kumara 185/C 1, Vihara Mw; Hewagama, Kaduwela Provided the Public water supply connection Solved Quantity

Other problem Informed to RDA. Jointly inspected during the progress review Leadaway problem related 26.08.2013 Kadawatha 9+300 (RHS) Mr. A.K.Liyanage No. 240 A, Ihalabiyanwila, Kadawatha Solved monitoring. Leadaway was provided to construction Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA 26.08.2013 365 & (On 09.09.20113 Through Soil erosion of the land Soil Erosion RDA Kadawatha 9+300 (RHS) Mr. A.K.Liyanage No. 240 A, Ihalabiyanwila, Kadawatha Provided adiquate soil and properly established Solved RDA/OCHP2/PBCOM dated 02.09.2013)

366 Dust problem Dust 26.08.2013 Makola Villagers Makola Proper damping implemented Solved

No. 349/7/2, Sri Dewamiththa Place, House located beyond 50m. Controlled the vibration levels by using a 367 Cracks on walls Property damage 26.08.2013 Heiyanthuduwa Mr. W.G.Somapala Solved Bandaranayaka Mw; Heiyanthuduwa roller with low vibration mode.

Water quality & 368 Depletion of water level in the well 27.08.2013 Kaduwela 16+720 (RHS) Anura Weerasingha 90/5, Ramahara Road, Hewagama, Kaduwela Provided permanent water connection Solved Quantity

Water quality & 369 Depletion of water level in the well 27.08.2013 Kaduwela 16+940 (LHS) Ms. P.Seelawathi Dabare 195/9, Vihara Mw; Hewagama, Kaduwela Recharged the well and recovered. Solved Quantity

Water quality & 370 Depletion of water level in the well 27.08.2013 Kaduwela Ms. L.A. Deepika Rani 186, Vihara Mw; Hewagama, Kaduwela Provided the Public water supply connection Solved Quantity

House located beyond 50m. Referred to University of Moratuwa to obtain a stability report. As per the report crack survey was carried out and monitoring should be continued for 3 months to do the assessment. A structural engineer inspected this house and its report and crack survey 371 Property damage due to construction Property damage 27.08.2013 Kadawatha Mr. W.Gamini Gunasekara 324/1, Ihalabiyanwila, Kadawatha Solved data forwarded to University for final recomendation. University concluded that cracks on rear side of the washroom area can be accelarated due to piling activity. therefore 30% of damage repair cost is recommended House located within the 50 m and checked the vibration. Since the limits 372 Vibration problem Vibration 27.08.2013 Kadawatha 09+000 (LHS) Mr. P.D. Dayarathna 304/31, Ihalabiyanwila, Kadawatha exceeded taken action to control the vibration levels by using a roller with Solved low vibration mode.

Mr. W.G. Sunil Shantha 304/30 A, Ihalabiyanwila, Kadawatha House located beyond 50m. Vibration checked & limits not exceeded. 373 Vibration problem Vibration 27.08.2013 Kadawatha 09+000 (LHS) Solved Ms. Lilinona 304/30, Ihalabiyanwila, Kadawatha Continued the activities by using a roller with low vibration mode.

House located beyond 50m. Vibration checked & limits not exceeded. 374 Vibration problem Vibration 27.08.2013 Kadawatha 09+000 (LHS) Ms. T.Niroshika Priyanthi 287/4 B, Ihalabiyanwila, Kadawatha Solved Continued the activities by using a roller with low vibration mode.

House located within the 50 m and checked the vibration. Vibration limits 375 Vibration problem Vibration 27.08.2013 Kadawatha 09+000 (LHS) Ms. J.A. Rohini 304/5, Ihalabiyanwila, Kadawatha not exceeded taken action to control the vibration levels by using a roller solved with low vibration mode.

Water qulaity & 376 Depletion of water level in the well 27.08.2013 Kaduwela Ms. W.A. Senehelatha 185/B, Vihara Mw; Hewagama, Kaduwela Provided the Public water supply connection Solved quantity

Water quality & 377 Depletion of water level in the well 27.08.2013 Kaduwela 16+750 Mr.P.K.C.I.Perera 186/1,Vihara Mawatha, Hewagama, Kaduwela Provided the Public water supply connection Solved Quantity

Water quality & 378 Depletion of water level in the well 27.08.2013 Hewagama 16+420 (RHS) Mr. P. Ranasingha 90/4, Ramahara road, Hewagama Provided the Publicwater supply connection Solved Quantity

Water quality & 379 Depletion of water level in the well 27.08.2013 Hewagama 16+620 (RHS) Mr. K. Jayasena 89, Ramahara road, Hewagama Provided the Publicwater supply connection Solved Quantity

Water quality & As per the continuous measurements the water level is recovered up to 380 Depletion of water level in the well 27.08.2013 Kaduwela 16+500 Mr. L.A.D. Wimalawansha 115, Vihara Mw; Hewagama, Kaduwela Solved Quantity the normal level. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located beyond 50m. Vibration checked & limits not exceeded. Continued the activities by using a roller with low vibration mode. However referred the matter to University of Moratuwa to obtain a stability report (Informed to OC by letter No. TC-ENV-GEN-278-5577 28.08.2013 dated 13.12.2013) As per the report crack survey was carried out and & 351/C, Dewamiththa Place, Bandaranayaka Mw; 381 Cracks on walls Property damage Heiyanthuduwa Mr. M.G. Lional monitoring should be continued for 3 months to do the assessment. A Solved By RDA/OCHP2/PBCOM Heiyanthuduwa structural engineer inspected this house and its report and crack survey dated 07.10.2013 data forwarded to University for final recomendation. University concluded that project construction may contribute crack formation at some parts of the house. therefore 50% of damage repair cost is recommended

382 Inconvenience due to dust Dust 28.08.2013 Makola Mr. J.M. Kithsiri Bandara 589/5, Makola North, Makola Provided a dust barrier Solved

Water quality & 383 Depletion of water level in the well 28.08.2013 Kaduwela Mr. Hemantha Siriwimala 94/2 A, Ramahara road, Hewagama, Kaduwela Provided the Public water supply connection Solved Quantity

Water quality & 1000 L Capacity Plastic tank and adiquate water provided. Well have 384 Depletion of water level in the well 28.08.2013 Kaduwela Mr. P.A.K. Sirinimala 94/2, Ramahara road, Hewagama, Kaduwela Solved Quantity been recovered after the dry condition.

Water quality & 90/3, 1st Lane, Ramahara Mawatha, Hewagama, 385 Depletion of water level in the well 28.08.2013 Kaduwela Mr. K.T.G. De Silva Provided the Publicwater supply connection Solved Quantity Kaduwela

Other problem Inspected jointly with Agrarian officer, Farmers, Taisei Site Engineer. Mr. D.M. Somapala 390 A, Gunasekara road, Heiyanthuduwa 386 Inundation due to drainage congestion related 29.08.2013 Heiyanthuduwa Identified issues (Drainage Conjetions) of cross drainage culverts were Solved Mr. R.M.D. Siriwardana 701, Kottunna road, Heiyanthuduwa to construction rectified. Monitoring of drainage functioning status is continuing.

Water quality & 387 Depletion of water level in the well 29.08.2013 Kaduwela Mr. K.Rohitha Dharmasiri Perera 195/6, Vihara Mw; Hewagama, Kaduwela Provided the Publicwater supply connection Solved Quantity

Water quality & 388 Depletion of water level in the well 29.08.2013 Kaduwela Mr. Thissa Weerapperuma 179/1, Vihara Mw; Hewagama, Kaduwela Provided the Public water supply connection Solved Quantity

Water quality & As per the continuous measurements the water level is recovered up to 389 Depletion of water level in the well 30.08.2013 Kaduwela 16+980 Mrs.D. Nilmini Damayanthi 90/7, 1st Lane Ramahara, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & 390 Depletion of water level in the well 30.08.2013 Hewagama Mr. Anil Karunarathna 89/2, 1st Lane, Ramahara, Hewagama Recharged the well and recovered. Solved Quantity

Discussed and negociated. House located beyond 50m. Continouse 391 Cracks on walls Property damage 31.08.2013 Heiyanthuduwa Mr. J.A.Pulle 623/B, Godallawatta, Heiyanthuduwa monitoring will be carried out when the construction work start. Solved Negotiated.

Other problem Though the RDA given the approval to fill the land but the neighbors 392 Inundation problem and requesting to fill the land related 31.08.2013 Kadawatha Ms. S.A. Indralatha 481, Ihala Biyanwila, Kadawatha disturbed. So the RDA agreed to give an alternative solution. As the Solved to construction alternative solution storm water flow was diverted into Toa drain

393 Noise problem due to rock breaking Noise 31.08.2013 Kadawatha Mr. G.A.M.T. Ganepola 643/14, Ihalabiyanwila, Kadawatha Activities completed at the location. Negotiated Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located beyond 50m. Investigation done to monitor the cracks . 394 Cracks on walls Property damage 02.09.2013 Kaduwela Mr. R. M.D. Rathnayaka 95/B2, Ramahara road, Hewagama, Kaduwela Initial crack survey was done to investigate the status of the house. Final Solved crack survey will be done after completion of the construction.

Water quality & 395 Depletion of water level in the well 02.09.2013 Hewagama 16+380 (RHS) Ms. K.B. Mallika Damayanthi 94/6, Ramahara road, Hewagama Recharged the well and recovered. Solved Quantity

396 Dust problem Dust 03.09.2013 Kadawatha Mr. R. Karunanayaka 701, Mankada road, Kadawatha Proper damping implemented Solved

Water quality & 397 Depletion of water level in the well 03.09.2013 Kaduwela Mr. Saman Jayawardana 94/1/1, Ramahara road, Hewagama, Kaduwela Provided permanent water connection Solved Quantity

398 Dust problem Dust 03.09.2013 Kadawatha Ms. Padmini Liyanaarachchi 335/G, Ihalabiyanwila, Kadawatha Proper damping implemented for nearby pilot road Solved

Water quality & 399 Depletion of water level in the well 04.09.2013 Hewagama 16+300 Ms. P.D. Roopawathi 94/1/B1, Ramahara road, Hewagama Provided permanent water connection Solved Quantity

Water quality & As per the continuous measurements the water level is recovered up to 400 Depletion of water level in the well 05.09.2013 Kaduwela Mr. R.A.B. Nevil 81/2, Hewagama, Kaduwela Solved Quantity the normal level.

Water quality & 90/3/1, Ramahara road, 1st Lane, Hewagama, 401 Depletion of water level in the well 06.09.2013 Kaduwela Mr. M.L. Prabath Gunasekara Negotiated since this house is not a residential house. Solved Quantity Kaduwela Pilot road already been diverted to the other side as well as the damping is 402 Dust problem Dust 06.09.2013 Makola 10+250 Ms. P. Lalani Padmakanthi 698/2,Richmond place, Makola North, Makola on going continuously. Dust barrier provided and also covered the Solved ventilation areas. And evacuated the house.

Other problem Cleaned all the canals and de- silted the paddy land. Informed to the 403 Inundation and mud deposition in the paddy lands related 09.09.2013 Heiyanthuduwa 10+400 Mr. K.A. Lorance Perera 669/2, Kottunna road, Heiyanthuduwa Agrarian Service Department - Delgoda by the letter No. TAI-ENV-GOV- Solved to construction 1108 dated 07.11.2013

404 Dust problem Dust 09.09.2013 Kadawatha 9+000 Ms. Madurani 290/2, Ihalabiyanwila, Kadawatha Proper damping implemented Solved

81/1, Dikwela Handiya, Meegahawaththe, 405 Mud deposition in the paddy land due to soil erosion Soil Erosion 09.09.2013 Siyabalape 10+500 Mr.P.A.Danusha Sampath De-Silted and solved the matter Solved Siyabalape

House located within 50m. Vibration checked and not exceeded. As this 406 Displacement of roof tiles due to vibration Property damage 09.09.2013 Makola Mr. R.K.A.D. Yothan 615/3, Makola North, Makola Solved was not due to the vibration and he agreed to rectify this by his own.

House located within 50m. Measured the vibration levels and not 407 Inconvenience due to vibration Vibration 10.09.2013 Makola Ms. Chithra Malkanthi Waduge 615/3A, Makola North, Makola exceeded. And further to reduse the vibration relocate the machinaries Solved and continued the activities.

Inspected the matter. House located beyond 50m. Minor cracks obsreved. Continuing the monitoring of formation cracks while maintaining vibration. However referred to University of Moratuwa to obtain a 408 Cracks due to vibration Property damage 10.09.2013 Kadawatha Mr. H.A. Upali Karunasiri 304/27 A, Ihalabiyanwila, Kadawatha stability report. As per the report crack survey was carried out and Solved monitoring should be continued for 3 months to do the assessment. crack survey data were forwarded to university and university concluded that lack of possibilities to occur cracks due to road construction activities.

House located beyond 50m. Measured the vibration levels and not 409 Vibration problem Vibration 10.09.2013 Kadawatha Mr. Douglas Perera 284/1 A, Ihalabiyanwila, Kadawatha exceeded. Controlled the vibration levels by using a roller with low Solved vibration mode. House located beyond 50m. Measured the vibration levels and not 410 Vibration problem Vibration 10.09.2013 Kadawatha Mr. L.R. Nihal 284/10, Ihalabiyanwila, Kadawatha exceeded. Controlled the vibration levels by using a roller with low Solved vibration mode. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located beyond 50m. Measured the vibration levels and not 411 Vibration problem Vibration 10.09.2013 Kadawatha Mr. S.A. Wimaladasa 284/7, Ihalabiyanwila. Kadawatha exceeded. Controlled the vibration levels by using a roller with low Solved vibration mode.

House within the 50m. Inspected. Explained the crack survey proceedure 412 Cracks on walls Property damage 12.09.2013 Kadawatha Ms. Prabhawathi Withanawasam 284/9, Ihalabiyanwila, Kadawatha Solved which we will be implemented at the end of the project and negotiated.

413 Cracks on walls Property damage 12.09.2013 Kaduwela Mr. Mahinda Senarathna 95/E, Ramahara road, Hewagama, Kaduwela House located beyond 50m. No activities on going. Solved

House located beyond 50m. Measured the vibration levels and not 414 Vibration problem Vibration 13.09.2013 Kadawatha Ms.A.D.Premawathi 292,Ihala Biyanwila, Kadawatha exceeded. Controlled the vibration levels by using a roller with low Solved vibration mode. 652/3, Dharmashoka Mw; Ihalabiyanwila, 415 Dust problem Dust 15.09.2013 Kadawatha Mr. T.H. Somarathna Provided dust barrier Solved Kadawatha

House located beyond 50m. Measured the vibration levels and not 416 Cracks on walls due to vibration Vibration 16.09.2013 Makola Mr. R.A.K. Weerasekara 610/13 B, Araliya Garden, Makola North Solved exceeded. Negotiated

House located with in 50 m. We will rectify the issue at the end of the Damage to the the toilet due to construction activities Property damage 16.09.2013 Heiyanthuduwa Ch 11+620 Ms. R.A.S.N.Rathnaweera 479/D, Galadeniya, Heiyanthuduwa Solved project after the post crack survey. 417 Water quality & The toilet constructed adjecent to the existing well and this is beyond our Well water contamination 16.09.2013 Heiyanthuduwa Ch 11+620 Ms. R.A.S.N.Rathnaweera 479/D, Galadeniya, Heiyanthuduwa Solved Quantity control.

No any noise generating activities in this location when the ITI officers 418 Noise problem Noise 16.09.2013 Makola Ms. Sureka 691/4, Makola North, Makola Solved visited this location.

House located beyond 50m. Measured the vibration levels and not 419 Vibration problem Vibration 17.09.2013 Kadawatha Mr. H.V. Siripala 335/C, Ihalabiyanwila, Kadawatha exceeded. Controlled the vibration levels by using a roller with low Solved vibration mode.

170/2, Sunethrarama Mw; Ihalabiyanwila, House located within 50m. Pre survey done. Estimated the damages and 420 Damages of the kitchen due to vibration Vibration 20.09.2013 Kadawatha Mr. M.A. Sandya Priyadharshani Solved Kadawatha it will be considered at the end of the project. Negotiated

Mr. A. House within the 50m. Measured the noise and it was exceeded the levels. 421 Inconvenience due to noise to the pregnant lady Noise 20.09.2013 Makola 638/11, Makola North, Makola Solved (Ms. Nirosha Udayangani Liyanage) Negotiated and evacuated the family for one month period

House located within 50m. Vibration mesured and below the level. 422 Cracks due to vibration Vibration 20.09.2013 Kadawatha Mr. S.M.M.S. Mayadunna 335/B, Ihalabiyanwila, Kadawatha Further, controlled the vibration levels by using a roller with low vibration Solved mode.

615/1B, Galwala Junction, Makola North, House located within 50m. Measured the vibratino and below thre limit. 423 Vibration problem Vibration 20.09.2013 Makola Mr. W.K. Thilakarathna Solved Makola Explained the compensation proceedure and negotiated.

House located within 50m. Measured the vibratino and below thre limit. 424 Vibration problem Vibration 24.09.2013 Heiyanthuduwa Mr. K. S. Priyantha 357/1, Dewamiththa pedesa, Heiyanthuduwa Solved Explained the compensation proceedure and negotiated.

House located within 50m. Measured the vibratino and below thre limit. 425 Vibration problem Vibration 24.09.2013 Heiyanthuduwa Ms. S,K. Chandralatha 361/B/2, Dewamiththa place, Heiyanthuduwa Solved Explained the compensation proceedure and negotiated.

Water quality & As per the continuous measurements the water level is recovered up to 426 Depletion of water level in the well 26.09.2013 Kaduwela 16+800 Mr. S.W. Muthukumarana 90 G, Hewagama, Kaduwela Solved Quantity the normal level. Recharged the well and recovered. Referred to the University of Water quality & Moratuwa to obtain a report on water quality. Report received and all 427 Contamination & Depletion of water level in the well 27.09.2013 Kaduwela Mr. P.W.S. Kumara 79/A/1, Hewagama, Kaduwela Solved Quantity measured parameters meet standards for portable water which prescribed by NWS&DB. Report was sumitted to the AP Recharged the well and recovered. Referred to the University of Water quality & Moratuwa to obtain a report on water quality. Report received and all 428 Contamination & Depletion of water level in the well 27.09.2013 Kaduwela Mr. W.M. Pradeepa Thushani 79/1, Hewagama, Kaduwela Solved Quantity measured parameters meet standards for portable water which prescribed by NWS&DB. Report was sumitted to the AP Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Recharged the well and recovered. Referred to the University of Water quality & Moratuwa to obtain a report on water quality. Report received and all 429 Contamination & Depletion of water level in the well 27.09.2013 Kaduwela Mr. R.S.D. Nihal 79/A/2, Awissawella rd; Hewagama, Kaduwela Solved Quantity measured parameters meet standards for portable water which prescribed by NWS&DB. Report was sumitted to the AP House located within 50m. Measured the vibration and below the limit. 430 Vibration problem Vibration 27.09.2013 Kadawatha Ms. L.K. Sumanawathi 658/4, Ihalabiyanwila, Kadawatha Solved Explained the compensation proceedure and negotiated.

643/14, Dharmashoka rd; Ihalabiyanwila, House located within 50m. Measured the vibration and below the limit. 431 Vibration problem Vibration 27.09.2013 Kadawatha Mr. G.M.A.T.Ganepola Solved Kadawatha Explained the compensation proceedure and negotiated.

Water quality & As per the continuous measurements the water level is recovered up to 432 Depletion of water level in the well 01.10.2013 Kaduwela 16+600 (RHS) Mr. S.W. Gunadasa 79 F, Hewagama, Kaduwela Solved Quantity the normal level.

House located beyond 50m. Vibration levels are within limit. Further 433 Cracks on walls due to construction Property damage 01.10.2013 Kadawatha 09+150 Mr. S.A. Gunadasa 343/B 1, Ihalabiyanwila, Kadawatha Solved monitoring will be carried out as per the request of AP No activities on going in the location. Will monitor the vibration when Vibration problem Vibration 01.10.2013 Kadawatha Mr. K.A.N. Jayathilaka 641/3 A, Koswatta, Bandarawatta, Kadawatha Solved ever the activities starts. Negotiated 434 No activities on going in the location. Will monitor the vibration when Noise problem Noise 01.10.2013 Kadawatha Mr. K.A.N. Jayathilaka 641/3 A, Koswatta, Bandarawatta, Kadawatha Solved ever the activities starts. Negotiated

Water quality & "Jeewani" Despensary, 435 Depletion of water level in the well 03.10.2013 Kaduwela Mr. S.R. Jayawickrama Recharged the well and recovered. Solved Quantity 94/1, Ramahara Mw; Kaduwela

House located within 50m and done presurvye. Vibration measured and it 436 Property damage due to vibration Property damage 03.10.2013 Heiyanthuduwa 14+860 Mr. A.L.Shantha Lal Kumara 330/B, Dewamiththa place, Heiyanthuduwa was with in the limit. Explained the compensation proceedure and Solved Negotiated.

Other problem 313/2 B, Sremadana Mw; Ihalabiyanwila, Inundation due to construction activities related 04.10.2013 Kadawatha Central Farmers Association Cleaned the canal and improved the water flow Solved Kadawatha to construction

437 Other problem 313/2 B, Sremadana Mw; Ihalabiyanwila, Inadequate drainage facility related 04.10.2013 Kadawatha Central Farmers Association Cleaned the drainages and developed the causeway Solved Kadawatha to construction

313/2 B, Samurdhi Mw; Ihalabiyanwila, Loss of access to the paddy land Access road 04.10.2013 Kadawatha Central Farmers Association Provided a temporary access to the paddy land Solved Kadawatha

Compensated for the damages. (Informed OC by Ref. TC-ENV-GEN-286- 438 Collapse of Well Wall and Damage Occurred to Well Property damage 05.10.2013 Makola Mr. Lalith Liyanage 648/2, Makola North, Makola Solved 5872 dated 11.01.2014)

House situated within 50 m . At the time of inspection of the University of 439 Damages to the house due to compaction Vibration 05.10.2013 Heiyanthuduwa Mr. G. Rathnasiri Premajeewa 349/7, Bandaranayaka Mw; Heiyanthuduwa Solved Moratuwa it was desided that there is no effect by the construction

House located within 50m. Measured the vibration and below the limit. 440 Developing of crack in the walls Property damage 07.10.2013 Heiyanthuduwa Mr. H.B. Ramani 361/ B 4, Devamiththa pedesa, Heiyanthuduwa Solved Explained the compensation proceedure and negotiated.

House located within 50m. Measured the vibration and below the limit. 441 Cracks on walls due to construction activities Property damage 09.10.2013 Kaduwela Mr. G. Sirimal Perera 195/1 A, Vihara Mw; Hewagama, Kaduwela Solved Explained the compensation proceedure and negotiated.

House located within 50m. Measured the vibration and below the limit. 442 Vibration problem Vibration 09.10.2013 Kadawatha 1+200 (RHS) Mr. K.W.Rathnapala 518, Eldeniya, Kadawatha Solved Explained the compensation proceedure and negotiated.

House located within 50m. Measured the vibration and below the limit. 443 Cracks on wall and roof tile displacement due to vibration Vibration 09.10.2013 Makola Ms. G. Sureka Dharshani 694/1, Makola North, Makola Solved Explained the compensation proceedure and negotiated. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within 50m. Measured the vibration and below the limit. 09.10.2013 Repaired the damaged roof tiles up to his satisfation. Further explained 444 Intolareble vibration due to construction activities Vibration By RDA/OCHP2/PBCOM Makola Mr. A.A.D.A. Pushpakumara 625, Makola North, Makola Solved the compensation proceedure and negotiated. (Informed OC by the letter dated 07.10.2013 Ref. TC-ENV-GEN-278-5577 dated 13.12.2013)

House located within 50m. Measured vibration and levels are within limit. 445 Vibration problem Vibration 09.10.2013 Mankada Mr. S.M.S.P. Senevirathne 650/1, Dharmashoka Road, Mankada Solved Controlled the vibration levels by using a roller with low vibration mode. House located within 50m. Vibration measured and below the level. 652/8, Dharmashoka road, Ihalabiyanwila, 446 Cracks on walls due to vibration Vibration 11.10.2013 Kadawatha Mr. Himal Anusha Jayawardana Further, controlled the vibration levels by using a roller with low vibration Solved Kadawatha mode. House located within 50m. Vibration measured and below the level. 652/3, Dharmashoka Mw; Ihalabiyanwila, 447 Vibration problem Vibration 11.10.2013 Kadawatha Ms. Mangalika Liyanage Further, controlled the vibration levels by using a roller with low vibration Solved Kadawatha mode. House located within 50m. Vibration measured and below the level. 448 Cracks on walls due to vibration Vibration 14.10.2013 Makola Mr. L.G. Jayasingha 624/1, Makola North, Makola Further, controlled the vibration levels by using a roller with low vibration Solved mode. House located within 50m. Vibration measured and below the level. 652/7, Dharmashoka road, Ihalabiyanwila, 449 Cracks on walls due to vibration Vibration 14.10.2013 Kadawatha Mr. Ajith Priyantha Further, controlled the vibration levels by using a roller with low vibration Solved Kadawatha mode. 450 Dust problem Dust 15.10.2013 Heiyanthuduwa Mr. L.A.T. Sunil Shantha 330/21, Dewamiththa place, Heiyanthuduwa Provided the dust barrier Solved Ms. Prema Egodawaththa, Ms. Subodha Nadeeshani Gurusingha, 353, 353/1 A, 345/A, Bandaranayaka Mw; House located beyond 50m. Vibration checked & limits not exceeded. 451 Vibration problem Vibration 15.10.2013 Heiyanthuduwa 14+620 Solved Ms. M. Sumali Dilrukshi Peiris Heiyanthuduwa Continued the activities by using a roller with low vibration mode.

626, Temple Road, Godallawaththa, House located beyond 50m. Vibration levels are within limit. Further 452 Cracks on walls due to vibration Vibration 16.10.2013 Heiyanthuduwa Ms. D.A. Chandralatha Solved Heiyanthuduwa monitoring will be carried out as per the request of AP

House located beyond 50m. Vibration levels are within limit. Further 453 Vibration problem and cracks on walls Vibration 22.10.2013 Heiyanthuduwa 12+600 Mr.L.D.Perera No. 622 A, Pansala rd; Heiyanthuduwa Solved monitoring will be carried out as per the request of AP

House located within 50m. Vibration levels within limit. Further, 454 Crack developments Property damage 24.10.2013 Makola Mr. I.A. Wimalachandra 638/12, Asiri Mw; Makola North, Makola Solved Explained the compensation proceedure and Negociated.

Mr. Prasanna Kaminda Gajaweera 355/ A & 355/B/2, Bandaranayaka Mw; House located within 50m. Vibration levels within limit. Further, 455 Vibration problem Vibration 26.10.2013 Heiyanthuduwa 14+600 Solved Mr.Gayan Madusanka Rajapaksha Heiyanthuduwa Explained the compensation proceedure and Negociated.

House located above 50m. Vibration level measured by the ITI was 456 Vibration problem Vibration 27.10.2013 Heiyanthuduwa 14+600 (RHS) Mr. M.G.Lional 351 C Bandaranayaka Mw; Heiyanthuduwa Solved within the permissible level. Negotiated.

House located beyond 50m. Vibration level measured by the ITI was within the permissible level. Referred to Moratuwa University to obtain a stability report. As per the report crack survey was carried out and monitoring should be continued for 3 months to do the assessment. A No. 349/7/2, Sri Dewamiththa Place, 457 Cracks on walls Property damage 29.10.2013 Heiyanthuduwa 14+600 (RHS) Mr. W.G.Somapala structural engineer inspected this house and its report and crack survey On going Bandaranayaka Mw; Heiyanthuduwa data forwarded to University for final recomendation. University concluded that project construction may contribute crack formation at some parts of the house. Therefore a compensation payment will be provided for damage rectification. Damage assessment in progress.

House located within 50m. Vibration levels within limit. Further, 458 Damages to the toilet Property damage 30.10.2013 Makola 10+600 Ms. Monika Irangani 638/5, Makola North, Makola Solved Explained the compensation proceedure and Negociated. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within 50m. Vibration levels within limit. Further, 459 Cracks on walls Property damage 30.10.2013 Makola 10+550 Ms. B.V. Karunawathi 638/2, Asiri Mw; Makola North, Makola Solved Explained the compensation proceedure and Negociated.

460 Inadequate access to the land Access road 30.10.2013 Makola 11+260 Mr. T.L.K.P. Gunathilaka No. 398, Makola South, Makola Permenent access provided. Solved

Water quality & Ms. M.D. Lalitha Algama 461 Depletion of water level in the well 31.10.2013 Heiyanthuduwa 15+900 356/8/8, Dewamiththa Place, Heiyanthuduwa Provided permanent water connection Solved Quantity Mr. Sangeeth Algama Water quality & 462 Depletion of water level in the well 01.11.2013 Heiyanthuduwa 15+900 Mr. Sarath Pemasiri 361/B/3, Dewamiththa Place, Heiyanthuduwa Provided permanent water connection Solved Quantity

463 Damage to the paddy cultivation Crop damage 02.11.2013 Ihalabiyanwila Mr. H.A.Darshana Prabath Ihalabiyanwila De-Silted , Cleaned the canals and rectified the area. Solved

Water quality & Jointly inspected. Removed the aricunut tree which was the reason for the 464 Contamination of well water 04.11.2013 Kadawatha Ms. G.W.Kusumawathi 358/4, Samurdhi Mw; Ihalabiyanwila, Kadawatha Solved Quantity contamination and dewatered the well Mr. Gamini Gunawardana Mr. C.M. Waduge Temporarily evacuated the AP and there families during the activities and 465 Vibration problem Vibration 07.11.2013 Makola 11+100-10+900 Mr. W.K. Thilakarathna Makola North, Makola Solved continued the work. Mr. R.K.A.D. Yothan Mr. M. Mahesh Anuruddha Ms. Nilka Rajapaksha, House located within 50m. Controlled the vibration by changing the Ms. Asoka Liyanage, 466 Vibration problem Vibration 07.11.2013 Makola 10+100 Makola North, Makola position of the sheet pilling Further, Explained the compensation Solved Mr. D.H.S. Perera, proceedure and Negociated. Mr. E.A.Jothipala

Water checked by the University of Moratuwa. As per the report the Water quality & 467 Contamination of well water 07.11.2013 Kaduwela 16+550 Mr. D.N. Wijesundara 131, Disawatta, Hewagama, Kaduwela measured parameters meet standards for portable water except turbidity. Solved Quantity Further we have provided the permenent water connection

638/4, Asiri Mw; Galwalahandiya, Makola Resently there are no activities on going in this location. We will monitor 468 Cracks on walls Property damage 08.11.2013 Makola 10+200 Mr. K.A.H.J.Kariapperuma Solved North, Makola the vibration when the activities on going. Negotiated

House located within 50m. Vibration levels within limit. Further, 469 Cracks on walls Property damage 08.11.2013 Heiyanthuduwa 14+600 Mr. K.D.J.Thilakarathna 527/2, Daluggala road, Heiyanthuduwa Solved Explained the compensation proceedure and Negociated.

House located beyond 50m. Vibration level measured by the ITI was within the permissible level. Referred to Moratuwa University to obtain a stability report. As per the report crack survey was carried out and 470 Cracks on walls due to vibration Vibration 08.11.2013 Heiyanthuduwa 14+300 Mr. W.D. Geethika 254/B, Udaya Mw; Heiyanthuduwa Solved monitoring should be continued for 3 months to do the assessment. crack survey data were forwarded to university and university concluded that lack of possibilities to occur cracks due to road construction activities.

Water quality & Mr. Deepal Lakshitha De Silva 290, Dewaiththa pedesa, Heiyanthuduwa 471 Depletion of water level in the well 09.11.2013 Heiyanthuduwa 14+600 Provided the permenent water connection Solved Quantity (Mr. S.A.P.S. Senevirathna) (357/E, Dewamiththa place, Heiyanthuduwa)

Ms. Mangalika Liyanage 652/3, & 652/4,Dharmashoka Road, House located within 50m. Vibration levels within limit. Further, 472 Vibration problem Vibration 10.11.2013 Kadawatha 10+300 Solved Mr. Udaya Shantha Liyanage Ihalabiyanwila, Kadawatha Explained the compensation proceedure and Negociated.

473 Toilet pit damaged due to vibration Vibration 11.11.2013 Makola 10+600 Mr. L.Sunil 693/A, Makola North, Makola Rectified the damages Solved

Other problem Cleared the adjacent water path in order to improve the drainages and 474 Inundation around the well due to improper drainages related 12.11.2013 Heiyanthuduwa 12+850 Ms. E.A.D. Magilinnona 639, Kajuhena road, Heiyanthuduwa Solved solved the matter to construction Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within 50m. Vibration levels within limit. Further, 475 Cracks on walla due to vibration Vibration 12.11.2013 Heiyanthuduwa 14+800 Mr. H.M.Kamalasiri Jayasingha 330/1, Dewamiththa place, Heiyanthuduwa Solved Explained the compensation proceedure and Negociated.

House located within 50m. Vibration levels within limit. Further, 476 Vibration problem Vibration 15.11.2013 Heiyanthuduwa 14+700 Mr. A.D. Rangana Perera 361 B/7, Dewamiththa Place, Heiyanthuduwa Solved Explained the compensation proceedure and Negociated. House located bayond 50m. Vibration level measured by the ITI was within the permissible level. Referred to Moratuwa University to obtain a stability report. As per report crack survey was carried out and monitoring 15.11.2013 should be continued for 3 months to do the assessment. (Informed OC by 477 Vibration problem Vibration Heiyanthuduwa 14+300 Mr. P.O. Perera 253, Sudharshana, Udaya Mw; Heiyanthuduwa Solved By RDA/OCHP2/PBCOM TC-ENV-GEN-296-6148 dated 06.01.2014). A stuctural engineer inspected. Its report and crack survey data were forwarded to university and university concluded that lack of possibilities to occur cracks due to road construction activities Recharged the well and recovered. Referred to the University of Water quality & Moratuwa to obtain a report on water quality. Report received and all 478 Water quality issue 18.11.2013 Heiyanthuduwa 14+800 Mrs. R.M.S.Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa Solved Quantity measured parameters meet standards for portable water which discribed by NWS&DB. Further the report submitted to the AP. 352, Nagahamula road, Ihalabiyanwila, House located within 50m. Vibration levels within limit. Further, 479 Vibration problem Vibration 20.11.2013 Kadawatha 9+400 Mr. S.M. Gunathilaka Solved Kadawatha Explained the compensation proceedure and Negociated.

House located within 50m. Vibration levels within limit. Further, 480 Vibration problem Vibration 21.11.2013 Kadawatha 9+200 Mr. S.A. Leelarathna 329/4, Ihala Biyanwila, Kadawatha Solved Explained the compensation proceedure and Negociated.

House located within 50m. Vibration levels within limit. Further, 481 Vibration problem Vibration 21.11.2013 Kadawatha 9+200 Ms. S.V. Liyanage 330/A, Ihala Biyanwila, Kadawatha Solved Explained the compensation proceedure and Negociated. House located within 50m. Pre survey done. Evacuated the full family for 482 Vibration problem Vibration 21.11.2013 Kadawatha 9+200 Mr. M.K. Liyanage 330, Ihalabiyanwila, Kadawatha 09 months period due to the inconvenience occurred by soil compaction Solved activities. Water quality & 483 Depletion of water level in the well 22.11.2013 Heiyanthuduwa Mr. L.Jayawardana Perera 361/B/10, Dewamiththa place, Heiyanthuduwa Recharged and recovered the well Solved Quantity Other problem 157/3, Sunethrarama Road, Ihalabiyanwila, Inspected the matter. Negotiated with the land owner. Cleaned the area 484 Drainage problem related 26.11.2013 Kadawatha Mr. D.Sunanda Perera Solved Kadawatha and rectified. to construction

House locate beyond 50 m. No activties on going. continue the monitoring 485 Cracks on walls Property damage 28.11.2013 Kaduwela Mr. W.A. Stanley Dias 184/2, Godalla Mw; Hewagama, Kaduwela Solved when the activities are going on. Negotiated

House locate beyond 50 m. No activties on going. continue the monitoring 486 Cracks on walls Property damage 28.11.2013 Kaduwela Mr. W. Dharmasiri 187/B/1, Godalla Mw; Hewagama, Kaduwela Solved when the activities are going on. Negotiated

347/B, Nagahamula road, Ihalabiyanwila, 487 Improper access to the land Access road 28.11.2013 Kadawatha Ms. U. Sepalika Perera Provided access and solved the matter Solved Kadawatha

Dust problem Dust 29.11.2013 Biyagama Mr. I.P.G.B. Ilangakoon 8/1, Biyagama Down, Biyagama Provided the dust barrier Solved 488 House located with in 50 m. Noise measured & levels are within limit. Noise problem Noise 29.11.2013 Biyagama Mr. I.P.G.B. Ilangakoon 8/1, Biyagama Down, Biyagama Solved Explained and Negotiated

Water quality & 489 Contamination of the well water 02.12.2013 Kadawatha Ms. S.Lalitha Nandani 143/4, Sramadana Mw; Kandy road, Kadawatha Cleaned & Dewatered the well Solved Quantity Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House locate beyond 50 m. (More than 100m) No activties on going. 490 Cracks due to vibration Vibration 03.12.2013 Makola Mr. K.W. Nadee Prasadika 613/A, Makola North, Makola Solved continue the monitoring when the activities are going on. Negotiated

698/9, Richmond Place, Mankada Road, 491 Dust problem Dust 03.12.2013 Kadawatha Mr. S.M. Sisira Kantha Provided the dust barrier Solved Kadawatha

349/4, Gonahena road, Ihalabiyanwila, House located within 50m. Vibration monitored and within limit. 492 Cracks on walls Property damage 11.12.2013 Kadawatha Mrs. P.Asilin Perera Solved Kadawatha Explained the compensation proceedure and Negotiated

This house beyond 50m. Vibration was monitored by GSMB during the 493 Cracks on walls due to blasting Blasting 11.12.2013 Heiyanthuduwa Mr. K.V. Jayawardana No. 484, Wathurapatha, Heiyanthuduwa Solved blasting and levels are within the limit. Convinced the AP and Negotiated

Water quality & 77 A, Diswaththa, Awissawella road, As per the continuous measurements the water level is recovered up to 494 Depletion of water level in the well 13.12.2013 Kaduwela Mrs. S.I.H.N. De Silva Solved Quantity Rakgahawaththa, Hewagama, Kaduwela the normal level.

House located within 50m. Controlled the vibration levels by using a 495 Vibration problem Vibration 17.12.2013 Kadawatha Mr. P.K.A.Perera 351, Ihalabiyanwila, Kadawatha Solved roller with low vibration mode.

344/1, Nagahamula road, Ihalabiyanwila, House located within 50m. Controlled the vibration levels by using a 496 Vibration problem Vibration 17.12.2013 Kadawatha Mr. Sumithra Rajapaksha Solved Kadawatha roller with low vibration mode.

House located within 50m. Controlled the vibration levels by using a 497 Vibration due to compaction Vibration 17.12.2013 Kadawatha Mr. Ranjith Weerasingha 355/3, Ihalabiyanwila, Kadawatha Solved roller with low vibration mode.

498 Dust problem Dust 18.12.2013 Kadawatha Mr. K.A.C. Kasthurisingha 702, Mankada road, Kadawatha Dust barrier provided and settled the matter Solved

349/8, Sri Dewamiththa Place, Bandaranayaka House located beyond 50m. Vibration measured and levels area within the 499 Crack on walls due to vibration Vibration 18.12.2013 Heiyanthuduwa Mr. K.T. Dixon Perera Solved Mw; Heiyanthuduwa limits. Negotiated 663/A, Ihalabiyanwila, Wediwaththa road, House located within 50m. Explained the compensation procedure. 500 Damaged to toilet pit due to vibration Vibration 18.12.2013 Kadawatha Mr. P.A. Sunil Premarathna Solved Kadawatha Negotiated and Solved Other problem We have already checked and there are no any blockage due to our 501 Blockage of Rakgahawaththa Ela due to construction activities related 18.12.2013 Rakgahawaththa RDA Udumulla road, Battaramulla construction activities and already replied to OC/ RDA/CEA and Solved to construction Biyagama Pradeshiya Sabha Other problem Muddy condition in the diversion road during rainy days related 18.12.2013 Heiyanthuduwa Biyagama Pradeshiya Sabha Biyagama Pradeshiya Sabha, Delgoda Rectified the situation Solved to construction Other problem 502 Lack of street lights at night time related 18.12.2013 Heiyanthuduwa Biyagama Pradeshiya Sabha Biyagama Pradeshiya Sabha, Delgoda Lighting already provided Solved to construction Other problem The speed control humps were removed by RDA on the day of Hon. No proper speed control measures adopted related 18.12.2013 Heiyanthuduwa Biyagama Pradeshiya Sabha Biyagama Pradeshiya Sabha, Delgoda Solved President's visit of the area. This beyond our control to construction House located within 50m. Controlled the vibration levels by using a 503 Crack damages due to vibration Property damage 20.12.2013 Biyagama Ms. Ajantha Samaraweera 332/1, Ihalabiyanwila, Kadawatha Solved roller with low vibration mode. Ms. Inoka Samaraweera 292/D, Sramadana Mw; Ihalabiyanwila, House located within 50m.Vibration monitored and within limit. Inconvenience due to vibration Vibration 21.12.2013 Kadawatha Solved (Mr. Indika Thushara) Kadawatha Negotiated. 504 Ms. Inoka Samaraweera 292/D, Sramadana Mw; Ihalabiyanwila, Inconvenience due to dust Dust 21.12.2013 Kadawatha Continuously damping the adjecent pilot road Solved (Mr. Indika Thushara) Kadawatha

505 Paddy damage Crop damage 26.12.2013 Makola Mr. D.M. Karunadasa Daluggalayaya, Heiyanthuduwa, Makola Discharging of mud water into the paddy land was stopped Solved

Water quality & 90/3/1, Ramahara road, 1st Lane, Hewagama, As per the continuous measurements the water level is recovered up to 506 Depletion of water level in the well 26.12.2013 Kaduwela Mr Prabhath Gunasekare Solved Quantity Kaduwela the normal level. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

507 Dust problem Dust 26.12.2013 Kaduwela Ms. W.Somawathi 187/C, Hewagama, Kaduwela Provided a dust barrier. Further it has been elongated Solved

House located beyond 50 m. Measured the vibration and level was with in 508 Floor cracks & damages occurred to the walls Property damages 28.12.2013 Kadawatha 9+300 Mr. C.Dissanayaka 324/4, Ihalabiyanwila, Kadawatha Solved the limit. Negotiated Water quality & As per the continuous measurements the water level is recovered up to 509 Depletion of water level in the well 28.12.2013 Kaduwela Mr. P.A.K. Sirinimala 94/2, Ramahara road, Hewagama, Kaduwela Solved Quantity the normal level. Water quality & 663/A, Ihalabiyanwila, Wediwaththa road, As per the continuous measurements the water level is recovered up to 510 Depletion of water level in the well 30.12.2013 Kadawatha Mr. P.A. Sunil Premarathna Solved Quantity Kadawatha the normal level.

511 Dust problem Dust 30.12.2013 Kadawatha Mr. K.A.N. Jayathilaka 641/3 A, Koswatta, Bandarawatta, Kadawatha Continuous damping is ongoing Solved

512 Dust problem Dust 02.01.2014 Mabima 14+450 Mr. K.Namal Krishantha 361/B/2, Dewamiththa place, Heiyanthuduwa Provided the dust barrier Solved

House located within 50m.Vibration monitored and within limit. Cracks on walls Property damages 04.01.2014 Kadawatha Ms. R.M. Sawithri Karunanayaka 701, Ihalabiyanwila, Kadawatha Solved Explained the compensation proceedure. Negotiated and Solved 513 Dust problem Dust 04.01.2014 Kadawatha Ms. R.M. Sawithri Karunanayaka 701, Ihalabiyanwila, Kadawatha Provided the dust barrier Solved Beyond 50m. No activities on going at the location. Will monitor the 514 Cracks on walls Property damages 04.01.2014 Kadawatha Mr. J.M.L. Luxman 180, Mahagedarawaththa, Kadawatha Solved vibration when the activities on going and Negotiated Water quality & As per the continuous measurements the water level is recovered up to 515 Depletion of water level in the well 05.01.2014 Heiyanthuduwa Mr. Felix Kostha 361/B,6, Dewamiththa pedesa, Heiyanthuduwa Solved Quantity the normal level.

516 Dust problem Dust 05.01.2014 Heiyanthuduwa 14+120 (RHS) Ms. H.B. Ramani 361/B,4, Dewamiththa pedesa, Heiyanthuduwa Damping on going Solved Water quality & As per the continuous measurements the water level is recovered up to 517 Depletion of water level in the well 05.01.2014 Heiyanthuduwa 14+120 (RHS) Ms. H.B. Ramani 361/B,4, Dewamiththa pedesa, Heiyanthuduwa Solved Quantity the normal level. House located within 50m. Explained the compensation procedure. 518 Cracks on walls due to vibration Vibration 08.01.2014 Kaduwela Mr. Wimon Singno 187, Hewagama, Kaduwela Solved Negotiated and Solved 08.01.2014 Ms. P.G.S.Perera Jointly inspected with OC. House located beyond the 50 m. Vibration 519 Cracks on walls Property damages Kadawatha 00+900 657/1, Bandarawatta, Kadawatha Solved (Through RDA) Mr. S.M.N.T. Senevirathna measured and levels are within the permissible level. Negotiated.

House locates beyond 50m. Currently no any vibration creating activities 520 Cracks on walls due to vibration Vibration 08.01.2014 Kaduwela 16+850(LHS) Mr W.Karathelis Silva 187/B,Hewagama,Kaduwela are carried out. Whenever construction activities would be carried out, Solved vibration will be monitored. Negotiated. Joint monitoring was carried out with the Agrarian officer and DO of the area. Cultivation was not matured enough to identify the damages and the Mr W.Y.M. Sudubanda 709 A, Mankada Rd, Kadawatha agrarian officer agreed us to confirm the damages after matuaring the 521 Paddy damage Crop damage 11.01.2014 Makola 10+500 (RHS) Solved Mr W.A.Sirisena 574/ 4, Makola North, Makola cultivation. Further, the paddy field was harvested and no damage complains received yet. House locates beyond 50m. (More than 100 m) Currently no any on 522 Crack formation Property damages 12.01.2014 Kaduwela Ms. Madurika 94/1/1, Ramahara road, Hewagama, Kaduwela going activities. Whenever construction activities would be carried out, Solved vibration will be monitored. Negotiated

Water quality & As per the continuous measurements the water level is recovered up to 523 Depletion of water level in the well 16.01.2014 Makola 10+800 Mr. A.A. Ajith Pushpakumara 625, Makola North, Makola Solved Quantity the normal level.

330/A,/1 Ihala Biyanwila, 524 Dust problem Dust 17.01.2014 Kadawatha 9+300 (RHS) S.P.Liyanage Provided the dust barrier Solved Kadawatha 588/1, Palathuru Watte, House locates within 50m.Pre-condition survey was carried out. 525 Cracks on walls due to vibration Vibration 18.01.2014 Makola 10+400 (RHS) D.V.Abenayake Solved Sanghabo Mw,Makola Explained the compensation proceedure and Negotiated. House locates within 50m. Vibration checked and levels are within limit. 526 Cracks on walls due to vibration Vibration 18.01.2014 Makola 10+600( RHS) K.A.P.Saman Wickramarathne 610/A, Makola North, Makola Solved Explained the compensation proceedure and Negotiated. House locates beyond 50m. Vibration checked and levels are within limit. 527 Cracks on walls due to vibration Vibration 18.01.2014 Makola S.T.W.Gunawardane 610/09, Makola North, Makola Solved Continuous monitoring on going. Negotiated House locates beyond 50m. Whenever construction activities would be 528 Cracks on walls due to vibration Vibration 18.01.2014 Kaduwela Mr. A.G.R.Wijayabandara 185 E, Hewagama, Kaduwela Solved carried out, vibration will be monitored. Negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Beyond 50m. During the inspection it was observed many cracks. After 529 Cracks on walls due to vibration Vibration 18.01.2014 Kaduwela Mr. N.L.N.P. Nanayakkara 124/6/1, Ramahara road. Hewagama. Kaduwela that crack survey done by GSMB. Based on the GSMB report will Solved monitor the crack development if any. Negotiated

Water quality & As per the continuous measurements the water level is recovered up to 530 Depletion of water level in the well 19.01.2014 Kaduwela 17+800 Mr. Wasantha Samankumara 79/A/1, Hewagama, Kaduwela Solved Quantity the normal level. Water quality & As per the continuous measurements the water level is recovered up to 531 Depletion of water level in the well 19.01.2014 Kaduwela 17+800 Ms. Janitha Lalani Kumari 79/A/2, Hewagama, Kaduwela Solved Quantity the normal level. 532 Cracks on walls Property damages 19.01.2014 Kadawatha 9+200 Ms. Sujeewa Nandasiri 324/5 A, Ihalabiyanwila, Kadawatha Beyond 50m. Vibration checked and levels are within imit. Negotiated Solved

533 Dust problem Dust 20.01.2014 Kadawatha 8+800 (LHS) Ms. H.G. Disna ayomi 292/2, Ihalabiyanwila, Kadawatha Provided the dust barrier Solved Water quality & As per the continuous measurements the water level is recovered up to 534 Depletion of water level in the well 26.01.2014 Makola Mr. J.M. Kithsiri Bandara 589/5, Makola North, Makola Solved Quantity the normal level. No activities on going. Will monitor the location when the activities 535 Vibration problem Vibration 26.01.2014 Kadawatha Mr. J.A. Nimal Jayakody 658/B, Bandarawatta, Kadawatha Solved started. Negotiated No activities on going. Will monitor the location when the activities 536 Property damage Property damages 26.01.2014 Kaduwela Ms. H.K. Chamini Dharshana 226/3, Vihara Mw; Hewagama, Kaduwela Solved started. Negotiated House within 50m. No activities on going. Explained the compensation Cracks on walls Vibration 27.01.2014 Makola North Mr. Wimalachandra 638/12, Asiri Mw; Makola North, Makola Solved proceedure and Negotiated 537 Dust problem Dust 27.01.2014 Makola North Mr. Wimalachandra 638/12, Asiri Mw; Makola North, Makola Continous damping on going Solved

The proposed drain is to be constructed as a covered drain and a frontage 538 Loss of access due to drain construction Access road 27.01.2014 Heiyanthuduwa Mr. K.A.Piyawathi 637, Kajuhena Road, Heiyanthuduwa Solved road will be provided after the construction House within 50m. No activities on going. Explained the compensation 539 Wall damages due to vibration Vibration 27.01.2014 Kadawatha Mr. H.A. Patric Perera 628/1 A, Eldeniya, Kadawatha Solved proceedure and Negotiated House within 50m. Vibration measured and levels are within limit. 540 Crack formation due to vibration Vibration 27.01.2014 Kadawatha Mr. D.L.W.Rajitha Maduranga 292/4, Ihalabiyanwila, Kadawatha Solved Strenthned the damaged wall by using hard wood boards. 541 Cracks on walls Vibration 27.01.2014 Kaduwela Mr. S.Liyanage 94/4, Ramahara road, Hewagama, Kaduwela Beyond 50 m. No activities on going. Negotiated Solved House within 50m. Vibration measured and below the limit. Explained 542 Vibration effect Vibration 28.01.2014 Makola Ms. Monika Irangani 638/5, Asiri Mawatha, Makola North, Makola Solved the compensation proceedure and Negotiated 543 Dust problem Dust 30.01.2014 Kadawatha Ms.A.D.Premawathi 292,Ihala Biyanwila, Kadawatha Damping the area continuously Solved 182, Ihalabiyanwila, Shramadana Mw; House located within 50m. No activities on going. Explained the 544 Crack developments due to vibration Vibration 31.01.2014 Kadawatha Mr. K.D.P. Dayananda Solved Kadawatha compensation proceedure and negotiated 545 Dust problem Dust 01.02.2014 Heiyanthuduwa Mr. B.A. Dayarathna 486, Wathurapatha, Heiyanthuduwa Provided a dust barrier Solved Water quality & 356/1, Nagahamula road, Ihalabiyanwila, 546 Contamination of well water 02.02.2014 Kadawatha Mr. R.H.P.D. Nimal Dewatered & checked the pH level and it is within limit. Solved Quantity Kadawatha House within 50m. Vibration measured and below the limit. Explained Vibration problem Vibration 03.02.2014 Mabima Mr. Sanjeewa Priyashantha 486/1, Wathurapatha, Mabima Solved the compensation proceedure and Negotiated 547 Dust problem Dust 03.02.2014 Mabima Mr. Sanjeewa Priyashantha 486/1, Wathurapatha, Mabima Provided a dust barrier Solved

548 Damages to the toilet due to vibration Vibration 04.02.2014 Heiyanthuduwa 15+100 Mr. L.A.T. Sunil Shantha 330/21, Dewamiththa place, Heiyanthuduwa Compensation was made for the damaged structure Solved

House within 50m. Noise measured and below the limit. Explained the 549 Noise problem Noise 07.02.2014 Kaduwela 16+400 (LHS) Mrs. W.Somawathi 187/C,Vihara Mw; Hewagama, Kaduwela Solved compensation proceedure and Negotiated

550 Dust problem Dust 07.02.2014 Heiyanthuduwa Mrs. K.A.Piyaseeli 625/1/G, Godallwaththa, Heiyanthuduwa Damping the area continuously Solved

Water quality & As per the continuous measurements the water level is recovered up to 551 Depletion of water level in the well 08.02.2014 Kadawatha 8+800 (LHS) Mr. K.D.Alponso Somapala 289/1, Ihalabiyanwila, Kadawatha Solved Quantity the normal level. 552 Cracks on walls due to vibration Vibration 10.02.2014 Makola 10+400 (LHS) Mr. Weerasena Kumarappeli 638/7,Makola North, Makola Beyond 50 m. No activities on going. Negotiated Solved

553 Dust problem Dust 10.02.2014 Kadawatha Ms. Tharanga 164/1/E, Ihalabiyanwila,Kadawatha Erected the dust barrier Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Water quality & 554 Contamination of well water 11.02.2014 Kadawatha Mr.A.G.Chandrarathna Nandasara 179/1, Mahagedarawaththa, Kadawatha Well recharged after the rainy season Solved Quantity House within 50m. Vibration measured and below the limit. Explained 555 Vibration problem Vibration 11.02.2014 Heiyanthuduwa Mr. H.D. Saman Priyantha 330/6, Dewamiththa place, Heiyanthuduwa Solved the compensation proceedure and Negotiated Water quality & 556 Depletion of water level in the well 11.02.2014 Heiyanthuduwa Mr. L.V. Karunarathna 627/7, Temple Rd, Heiyanthuduwa No any significant water depletion could be identified. Solved Quantity Mr. Kiriporuwage Sarath Priyantha Evacuated for 06 working days for 1st time 557 Inconvenience due to vibration Vibration 17.02.2014 Heiyanthuduwa 357/A, Dewamiththa Place, Heiyanthuduwa Solved (Mrs. N.G.Mallika) Again evacuated for 05 working days for 2nd time

558 Dust problem Dust 17.02.2014 Kaduwela Mr.Liyanage Premasiri Perera 221/2, Vihara Mw; Hewagama, Kaduwela Erected the dust barrier Solved

559 Inconvenience due to vibration Vibration 18.02.2014 Heiyanthuduwa Mr. Priyantha Sreenath Senevirathna 357/E, Dewamiththa Place, Heiyanthuduwa Evacuated for 06 working days and negotiated Solved

Water quality & As per the continuous measurements the water level is recovered up to 560 Depletion of water level in the well 20.02.2014 Kadawatha Mr. W.D.Upul Arunashantha 288, Ihalabiyanwila, Kadawatha Solved Quantity the normal level.

As this is beyond our control it was referred to RDA by the letter No. TC- 561 Access Problem Access road 22.02.2014 Heiyanthuduwa Mr. Prasanna Kaminda Gajaweera 355/A, Bandaranayaka Mw; Heiyanthuduwa Solved ENV-GEN-300-6322. As the solution frontage road was elevated

Water quality & 674/3/1, Wediwatta road, Ihalabiyanwila, No depletion of water quantity but there is contamination of the water. We 562 Depletion of water level in the well 22.02.2014 Kadawatha Mr. Roland Wijesekara Solved Quantity Kadawatha have dewatered the well. Other problem After a joint inspection technical instructions were given to taisei senior 563 Boundary problem related 22.02.2014 Heiyanthuduwa Mr. P.V.Jayalatha 481/D/2,Galadeniya road, Heiyanthuduwa Solved site engineer accordingly to construction

564 Dust problem Dust 23.02.2014 Kaduwela Mr. A.D.Siriwardhana 191/1, Hewagama, Kaduwela Provided a dust barrier Solved

Water quality & 565 Odorous condition of well water 26.02.2014 Kadawatha 0+300 Mr.W.M.J.Wijekoon 164/1/D, Sunethrarama Rd, Kadawatha Provided the water supply connection Solved Quantity

566 Vibration problem Vibration 27.02.2014 Heiyanthuduwa 14+220 Mrs. S.K.Chandralatha 361/B, Dewamiththa Place, Heiyanthuduwa Evacuated for 06 working days and negotiated Solved

Mr. A.D.Rangana Perera 361/B/7, 361/B/3, House locaed beyond 50 m. Mesured vibration and levels are within limit. 567 Vibration problem Vibration 27.02.2014 Heiyanthuduwa 14+200-14+300 Solved Mr. K. Premanath Dewamiththa Place, Heiyanthuduwa Negotiated

Other problem 568 Dumping of garbage in front of the house by the workers of the site related 28.02.2014 Kaduwela 17+200 Mr. P. Sirisena 224/B, Vihara Mawatha, Hewagama, Kaduwela Garbage pile was removed Solved to construction

348/3, Nagahamulla road, Ihalabiyanwila, House located within 50 m. Mesured vibration and levels are within limit. 569 Vibration problem Vibration 28.02.2014 Kadawatha 9+500 (LHS) Mr. Mahesh Malimboda Solved Kadawatha Controlled the vibration by applying lower vibration mode. Negotiated.

House locaed beyond 50 m. No activities are on going. Will monitor the 570 Damages to the house due to construction Property damages 28.02.2014 Kadawatha 9+300 Mrs. Wialat Samaraweera 334/2, Ihalabiyanwila, Kadawatha Solved vibration when the activities started. Negotiated

Water quality & 571 Contamination of well 28.02.2014 Kadawatha 9+380 Ms. Priyanka Rukshini 326/5, Ihalabiyanwila, Kadawatha Dewatered & cleaned the well Solved Quantity

House located within 50 m. Mesured vibration and levels are within limit. 572 Cracks on walls due to vibration Vibration 03.03.2014 Kadawatha 9+600 Mr. Arunasiri Perera 351, Ihalabiyanwila, Kadawatha Solved Explained the compensation proceedure and Negotiated.

House locaed beyond 50 m. No activities are on going. Will monitor the 573 Vibration problem Vibration 04.03.2014 Kaduwela Beyond 50m Mr. S.Liyanage 92/4, Ramahara road, Hewagama, Kaduwela Solved vibration when the activities started. Negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Water quality & 574 Depletion of water level in the well 04.03.2014 Kadawatha 9+050 Mr. H.D. Wimalarathna 283/01, Ihalabianwila, Kadawatha Recharged and recovered the well Solved Quantity

575 Dust problem Dust 04.03.2014 Kadawatha 0+500 Mrs. Padmini Swarnalatha 176/A, Ihalabiyanwila, Kadawatha Provided dust barrier Solved

576 Dust problem Dust 04.03.2014 Kadawatha 0+500 Mr. Sunil Mayadunne 170/4 B, Ihalabiyanwila, Kadawatha Continuously damping the area Solved

663/C, Wediwatte road, Ihala Biyalawila, 577 Dust problem Dust 05.03.2014 Kadawatha 9+900 Mr. P.D. Sunil Thilak Provided du st barrier Solved Kadawatha Water quality & 578 Contamination of well water 06.03.2014 Kadawatha 9+610 Mr. W. Roland Wijesekara 674/3/1, Ihalabiyanwila, Kadawatha Dewatered & Cleaned the well Solved Quantity 349/4, Gonahena road, Ihalabiyanwila, 579 Dust problem Dust 10.03.2014 Kadawatha 9+400 Mrs. P.Asilin Perera Damping the area continuously Solved Kadawatha

580 Dust problem Dust 11.03.2014 Kadawatha 10+220 Mr. K.A.Wasantha Padmakumara 702/1C, Mankada road, Kadawatha Provided a dust barrier Continuously damping Solved

581 Dust problem Dust 11.03.2014 Kadawatha 8+800 Ms.A.D.Premawathi 292,Ihala Biyanwila, Kadawatha Provided dust barrier Solved Water quality & 582 Contamination of well water 11.03.2014 Kadawatha 9+380 Mr. R.A. Sudath Kumara 326/1, Ihalabiyanwila, Kadawatha Dewatered the and checked the pH and level are within limit. Solved Quantity Mr. W.D.D.Rodrigo, Mr. M.G.Lional, Mr. T. Gayan , Mr. K. Dharmadasa Mr.K.T.Dixon Perera Monitored the vibration and levels are within limit. But it was exceeded Mrs. Lalitha Kumara Dewamiththa place & Bandaranayaka Mw; the level near Mr. W.D.D. Rodrigo's house. Since the house was under 583 Cracks due to vibration Vibration 14.03.2014 Heiyanthuduwa 14+500 Solved Mr. Sisira Kumara Heiyanthuduwa construction and no person to evacuate. After agreeing with Mr. W.D.D. Mr. Chamith Gayan Rodrigo measurements were recorded for future actions. Negotiated. (Mr.G.Wikramasekara) Mr. K.Dharmadasa Mr. M.D.Rajinda Priyadharshani Mr. A.S.Shantha

House located within 50m. Vibration measured and below the level. 584 Vibration problem Vibration 14.03.2014 Ihalabiyanwila 9+600 Mr. Nimal Rajapaksha 356/1 A, Nagahamulla road, Ihalabiyanwila Solved Explained the compensation proceedure and Negotiated.

House located within 50m. Vibration measured and below the level. 585 Vibration problem Vibration 14.03.2014 Kadawatha 9+980 Mrs. L.K. Sumanawathi 658/4, Ihalabiyanwila, Kadawatha Solved Explained the compensation proceedure and Negotiated.

586 Dust problem Dust 17.03.2014 Kadawatha 0+150 Mrs, K.M. Katulanda 142/C, Sramadana Mw; Kadawatha Provided a dust barrier Solved 663/A, Wediwaththa road, Ihalabiyanwila, 587 Dust problem Dust 17.03.2014 Kadawatha 9+660 Mr. P.A. Sunil Premarathna Continuously damping the area Solved Kadawatha Water quality & 588 Contamination of well water 27.03.2014 Heiyanthuduwa 14+787 Ms. Lalitha 349/E, Bandaranayaka Mw; Heiyanthuduwa De-watered and cleaned the well. Solved Quantity

Water quality & 351/C, Dewamiththa Place, Bandaranayaka Mw; 589 Contamination of well water 27.03.2014 Heiyanthuduwa 14+480 Mr. M.G. Lional De-watered the well Solved Quantity Heiyanthuduwa

590 Cracks damages due to construction activities Vibration 27.03.2014 Makola Beyond 50m Mr. W.G.Bandumathi 587, Makola North, Makola House located beyond 50m. No activities on going. Negotiated Solved

Water quality & 591 Depletion of water level in the well 28.03.2014 Kadawatha 0+920 Mr. Siripala Jayawardana 512/C, Eldeniya, Kadawatha Well recharged after the rainy season Solved Quantity Other problem A portion of the land was Inundated due to improper drainage 592 related 28.03.2014 Kadawatha 0+250 Mr. Kolika Gunawardana 169/1, Ihalabiyanwila, Kadawatha Cleaned the existing drainage path & made the bund Solved system to construction House located within the 50m. Pre survey done. Measured vibration and 593 Vibration problem Vibration 01.04.2014 Kadawatha 09+000 (LHS) Ms. T.Niroshika Priyanthi 287/4 B, Ihalabiyanwila, Kadawatha levels are with in limit. Explained the compensation proceedure and Solved negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within the 50m. Pre survey done. Measured vibration and 594 Vibration problem Vibration 01.04.2014 Kadawatha 9+000 (RHS) Ms. A.D. Premawathi 292, Ihala Biyanwila, Kadawatha levels were exceeded in one occasion. Controlled the vibration by Solved changing the roller and negotiated House located within the 50m. Pre survey done. Explained the 595 Damages to the well due to construction activities Vibration 03.04.2014 Heiyanthuduwa 14+480 Mr. M.D. Nimal Wijesiri 349/B, Bandaranayaka Mw; Heiyanthuduwa Solved compensation proceedure and Negotiated House located beyond 50m. Vibration measured and levels are within the 596 Cracks due to vibration Vibration 01.04.2014 Kadawatha Beyond 50m Mr. K.Athula 658, Bandarawatta, Kadawatha Solved permissible level. Negotiated. House located beyond 50m. Vibration measured and levels area within the 597 Cracks due to vibration Vibration 03.04.2014 Heiyanthuduwa Beyond 50m Mr. K.Dharmadasa 349/11, Bandaranayaka Mw; Heiyanthuduwa Solved limits. Negotiated

Other problem 598 Inundation due to inadequate drainage facilities related 04.04.2014 Kadawatha 0+250 Mr. R.P.Jayaweera Peris 187, Ihalabiyanwila, Kadawatha Provided the permenent drainage Solved to construction

House located beyond 50m. Vibration measured and levels are within the permissible level. Pre crack investigation done. Further monitoring will 04.04.2014 be carried out. A stuctural engineer was inspected. Its report and crack & survey data were forwarded to university and university concluded that 26.01.2015 Upper floor major cracks were propagated due to differential settlement 599 Cracks due to vibration Vibration Kadawatha Beyond 50m Mr. J.M.Hettiarachchi 639/4, Koswatta road, Eldeniya, Kadawatha Solved & effect of residual soils. Possibilities are due to different bearing capacity of Through OC/TC/NS1 soil under the foundation. However rest of the damages have been dated 02.03.2015 occured due to vibration. Therefore a compensation payment will be provided for particular damages. Damage assessment in progress. Compensation payment was paid

Water quality & As per the continuous measurements the water level is recovered up to 600 Depletion of water level in the well 08.04.2014 Galabodawatta 15+880 Mr. Ranjith Athukorala 380/6, Mabima, Galabodawatta Solved Quantity the normal level. House located within the 50m. Pre survey done. Vibration measured and 601 Vibration problem Vibration 08.04.2014 Kadawatha 8+830 Mr. R.D. Gunawathi 175, Ihalabiyanwila, Kadawatha levels are within limit. Explained the compensation proceedure and Solved Negotiated Confirmed the quality of the well water by checking the pH levels. No Water quality & 602 Contamination of well water 08.04.2014 Kadawatha Beyond 50m Mr. Roshan Padmakumara 664/1, Wediwatta rd; Ihalabiyanwila, Kadawatha issue. House located beyond 200m from the work sites. No any Solved Quantity considerable effect. 11.04.2014 Damaged to the fence due to use of the access road by project Property damages Throu' RDA letter No. Kadawatha 0+150 Mrs. K.M. Katulanda 142/C, Sramadana Mw; Kadawatha Re-installed the fence and erected the dust barrier along the fence Solved vehicles RDA/OCHP2/PBCOM 603 11.04.2014 Other problem The issue was rectified by forwarding to the safety & security sections Night gangs enter to the land with illegal drugs and liquor causing Throu' RDA letter No. related Kadawatha 0+150 Mrs. K.M. Katulanda 142/C, Sramadana Mw; Kadawatha and their involvement to erect a fence and by frequent security night Solved intolerable noises RDA/OCHP2/PBCOM to construction patrols. dated 17.04.2014

604 Dust problem Dust 21.04.2014 Makola 11+150 Mr. D.K.Nayana Chandimali 626/6, Makola North , Makola Provided the dust barrier Solved House located within 50m . Vibration measured and levels are within the 605 Damaged to the fish tank due to vibration Vibration 22.04.2014 Heiyanthuduwa 14+550 Mr. R.M.G.M. Rajapaksha 355/B/2, Bandaranayaka Mw; Heiyanthuduwa limit. Explained the compensation proceedure and the damages will Solved consider in the final evaluation.Negotiated Confirmed the quality of the well water by checking the pH levels. No Water quality & 606 Contamination of well water 23.04.2014 Kadawatha Beyond 50m Mr. G. Samarathunga 574, Eldeniya, Kadawatha issue. Referred to University of Moratuwa to check the water quality. Solved Quantity Levels are within limit. Explained and Negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within the 50m. Pre survey done. Vibration measured and 607 Vibration issue Vibration 24.04.2014 Kadawatha 1+090 Mr. H.A. Jude Roshan Perera 608/1/A, Eldeniya, Kadawatha levels are within limit. Explained the compensation proceedure and Solved Negotiated House located within 50m. Explained the compensation procedure. 608 Cracks on walls Property damages 26.04.2014 Kaduwela 16+500 Mr. Wijesundara 131, Disawatta, Hewagama, Kaduwela Solved Negotiated. Water quality & Checked the pH level and levels are within the limit. Explained and 609 Contamination of well water 03.05.2014 Heiyanthuduwa 14+620 Ms. Sumali Peiris 345/E, Bandaranayaka Mw; Heiyanthuduwa Solved Quantity Negotiated

House located within 50m. Evaluated the damage and it will included with 610 Damage to wall due to vibration Property damages 07.05.2014 Kadawatha 00+470 Mr. Deemon Athula 174/1, Ihalabiyanwila, Kadawatha Solved the final compensation at the final stage. Negotiated.

House located beyond 50 m. No activities on going. Peremeter vibration 611 Cracks on walls Property damages 07.05.2014 Kaduwela Beyond 50m Mr. Asela Pushpakumara 126/E, Ramahara road, Hewagama, Kaduwela Solved was not exceeded. Negotiated House located beyond 50 m. No activities on going. Peremeter vibration 612 Cracks on walls & floor Property damages 07.05.2014 Kaduwela Beyond 50m Ms. Dilani Nayana Kanthi 126/E 1, Ramahara road, Hewagama, Kaduwela Solved was not exceeded. Negotiated Water quality & Checked the pH level and levels are within the limit. Matter is beyond our 613 Contamination of well water 09.05.2014 Kaduwela 16+765 Mr. K.D. Dasan Priyakumara 193, Hewagama, Kaduwela Solved Quantity control and referred to the PHI for further action 142/2A, Shramadana Mw; Biyanwila road, 614 Dust problem Dust 10.05.2014 Kadawatha Beyond 50m Mr. N.A.A.Premalal Continuous damping is ongoing Solved Kadawatha Other problem Provided temporary drains and removed all stagnated water. Referred 615 Drainage congestion problem related 12.05.2014 Kadawatha Beyond 50m Mr. S.D. Viraj Anuruddha 174/1/C, Ihalabiyanwila,Kadawatha Solved RDA. to construction

Water quality & Borrow pit- Depletion of water level in the well 13.05.2014 Batugewatta Mr. L. Victor Perera 457/1 A, Makola South, Makola, Batugewatta Recharged & recovered the well Solved Quantity Makola 616 House located within the 20m from batching plant. Pre survey done. Borrow pit- Vibration on walls and floor Vibration 13.05.2014 Batugewatta Mr. L. Victor Perera 457/1 A, Makola South, Makola, Batugewatta Vibration measured and levels are within limit. Explained the Solved Makola compensation proceedure and Negotiated

House located within 50m. Evaluated the damage and it will included with 617 Damage to the toilet pit Property damages 16.05.2014 Kadawatha 1+000 Ms. Chandra Kalansooriya 639, Eldeniya, Koswatta, Kadawatha Solved the final compensation at the final stage. Negotiated.

House located within the 50m. Pre survey done. Vibration measured and Development of cracks on walls Property damages 19.05.2014 Kaduwela 16+510 Mr.K.K.Chandradasa 79 E 1, Hewagama, Kaduwela levels are within limit. Explained the compensation proceedure and Solved 618 Negotiated Water quality & Contamination of well water 19.05.2014 Kaduwela 16+510 Mr.K.K.Chandradasa 79 E 1, Hewagama, Kaduwela De-watered and checked the pH. Levels are within limit. Solved Quantity Water quality & 619 Depletion of water level in the well 19.05.2014 Kadawatha 9+950 Mr. K.G.Jayantha Chandrasiri 660/3, Ihalabiyanwila, Kadawatha Well recharged after the rainy season Solved Quantity Houses located in 50m. Explained the compensation proceedure and 620 Cracks on walls & roof Property damages 23.05.2014 Heiyanthuduwa 12+600 Ms. G.Mary Margrette 627/3A, Pansala road, Heiyanthuduwa Solved Negotiated

Other problem Removed the unnecessary soil rectified the area. De- silt & cleaned the 621 Drainage congestion and unauthorized filling of a paddy area related 23.05.2014 Eldeniya west A1 By pass Agrarian Research Officer Eldeniya west Solved drainages to construction

26.05.2014 Jointly inspected. Surveyed the existing boundary, No damages to the Other problem & actual boundary and no issue according to the survey data. Eroded portion 622 Kelani River North bank erosion related 28.07.2014 through OC Biyagama Mr. Sanjaya de Serum 3/2/A, Biyagama pahala, Biyagama rectified by using soil. However the affected parties are expecting boulder Solved to construction OC/TC/NS1/6022 dated packing instead of provided solution. As the final solution of this matter 25.7.14' eroded river bank was rectified by using soil

House located within the 50m. Vibration measured. Levels are within 623 Damage to the house & well Property damages 26.05.2014 Makola Ms. Seetha Amarasingha 478, Makola South, Makola Solved limit. Explained the compensation method and Negotiated. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within the 50m. Explained the compensatin proceedure and 624 Damage to the front part of the house Property damages 26.05.2014 Kadawatha Mr. S.D.Wasantha Manel 12/A, Eldeniya, Kadawatha Solved Negotiated

House located within the 50m. Pre survey done. Vibration measured and 625 Damaged to the walls of the house due to vibration Property damages 26.05.2014 Kadawatha Ms. M. Pathmakanthi Gunawardana 656/1A, Ihalabiyanwila, Kadawatha levels are within limit. Explained the compensation proceedure and Solved Negotiated

Villagers Jointly inspected with OC & RDA. Adviced AP's to forward the matter to & RDA for a proper river bank protection to control the issue by written 626 Wash off due to flood Flooding 03.06.2014 Rakgahawaththa Rakgahawaththa Solved through OC ref. No OC/TC/NS1/5673 request. (Referred to OC by letter Ref. NO. TC-ENV-GEN-349-7548 dated 10.06.2014 dated 08.07.2014). River bank was protected with suitable methods.

04.06.2014 & Inspected the matter. Damage calculation completed and paid the 18.06.2014 627 Damages to house and domestic items due to flood Flooding Kadawatha Ms. Upeshika Dehideniya 282/1, Ihalabiyanwila, Kadawatha damages. Informed OC by letter ref. No. TC-ENV-GEN-339-7375 dated Solved through OC 23.06.2014 Ref. OC/TC/NS1/5710 dated 16.06.2014 356/D, Samurdhi Mw; Ihalabiyanwila, Inspected the matter. Damage calculation completed and paid the 628 Damages to house and domestic items due to flood Flooding 04.06.2014 Kadawatha Ms. Indrani Solved Kadawatha damages. Inconvenience and damage to house and domestic items due to Inspected the matter. Damage calculation completed and paid the 629 Flooding 04.06.2014 Kadawatha Mr. N.J.L. Thilakasiri 332/2, Ihala Biyanvila, Kadawatha Solved flood damages. 05.06.2014 Inspected the matter. Damage calculation completed and paid the 630 Damages to the domestic items due to flood Flooding Kadawatha 04 Nos. of Villagers Eldeniya, Kadawatha Solved (Verbal) damages. Agrarian Research Officer Eldeniya (West), Inspected the matter. Damage calculation completed and paid the 631 Damages to the crop land Crop damage 05.06.2014 Eldeniya (West) Solved (Mr. H.P. Perera) Udupila damages. Inspected the matter. Damage calculation completed and paid the 632 Damages to the domestic items due to flood Flooding 05.06.2014 Kadawatha Mr. M.J. M.P. Jayawardana 513/1, Eldeniya, Kadawatha Solved damages. Inspected the matter. Damage calculation completed and paid the 633 Damages to the domestic items due to flood Flooding 05.06.2014 Kadawatha Mr. W.D. Saliya Ajith Kumara 513/1/A/1, Eldeniya, Kadawatha Solved damages. Inspected the matter. Damage calculation completed and paid the 634 Damages to the domestic items due to flood Flooding 05.06.2014 Kadawatha Mr. S.M.S.Manike 513/A1, Eldeniya, Kadawatha Solved damages. Inspected the matter. Damage calculation completed and paid the 635 Damages to the domestic items due to flood Flooding 05.06.2014 Kadawatha Ms. J.P.Prema Ranjani 513/2 B, Eldeniya, Kadawatha Solved damages. Inspected the matter. Damage calculation completed and paid the 636 Damages to the domestic items due to flood Flooding 05.06.2014 Kadawatha Ms. H.P.I. Lasanthi 513, Eladeniya, Kadawatha Solved damages.

Ms.Manori Gajaweera, Inspected the site jointly with OC & RDA. RDA Agreed to check the Mr.R.M.C.A.Rajapaksha, 355/A, 355/B/1, 355/B2, 637 Loss of access during flood Access road 06.06.2014 Heiyanthuduwa possibility of providing suitable walkway to use even during flood without Solved Mr.R.M.G.M. Rajapaksha, 355/D/1,Bandaranayaka Mw; Heiyanthuduwa, any disturbance. Frontage road was elevated. Mr. M.A.D.T.Chinthaka Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

07.06.2014 Jointly inspected. Surveyed the existing boundary, No damages to the Other problem & actual boundary and no issue according to the survey data. Eroded portion 638 Kelani River North bank erosion related 28.07.2014 through OC Biyagama Mr.D.N.D. Dayarathna No. 3A, Biyagama Pahala, Biyagama rectified by using soil. However the affected parties are expecting boulder Solved to construction OC/TC/NS1/6022 dated packing instead of provided solution. As the final solution of this matter 25.7.14' eroded river bank was rectified by using soil

Other problem 639 Kelani River South bank erosion related 09.06.2014 Kaduwela Mr. Ravijith Ariyawansha 77/1A, Ranmal Place, Hewagama, Kaduwela Bank protection is ongoing Solved to construction

Other problem 640 Kelani River South bank erosion related 09.06.2014 Kaduwela Mr. 78, Ranmal Place, Hewagama, Kaduwela Bank protection is ongoing Solved to construction

Other problem 641 Kelani River South bank erosion related 09.06.2014 Kaduwela Mr. Ojith Weerasingha 78 A, Ranmal place, Hewagama, Kaduwela Bank protection is ongoing Solved to construction

Gamunu Farmers Association Inspected the matter. Damage calculation completed and paid the 642 Crop damage due to inundation Crop damage 10.06.2014 Kadawatha Eldeniya - West Solved (Mr. A.A.L. Siriwardana) damages. Ms. N.L.S.Indrani Inspected the matter. Damage calculation completed and paid the 643 Damages to the domestic items due to flood Flooding 10.06.2014 Kadawatha 600/5, Bandaranayaka Mw; Eldeniya, Kadawatha Solved Mr. D.M.P.Jayantha damages. Inspected the matter. Damage calculation completed and paid the 644 Inundation of the business place due to flood Flooding 10.06.2014 Kadawatha Mr. G.R. Hapuarachchi 293/1, Ihalabiyanwila, Kadawatha Solved damages. 10.06.2013 Inspected the matter. Damage calculation completed and paid the 645 Damages to the domestic items due to flood Flooding Kadawatha 27 No. of Villagers Ihalabiyanwila, Kadawatha Solved (Verbal) damages. Inspected the matter. Damage calculation completed and paid the 646 Inundation of the house due to flood Flooding 13.06.2014 Kadawatha Mr. H.E. Ajith Piyasiri Perera 600/5, Bandaranayaka Mw; Eldeniya, Kadawatha Solved damages. Mr. R.A.Wimalachandra, Other problem Mr. B.A. Upali Perera, 477/2, 478/4, 478/3, 477, 478/2, Wathurapatha, Temporary drainage was provided up to Mudungoda. Permenent solution 647 Water stagnation due to blockage of the canal related 16.06.2014 Heiyanthuduwa Mr. B.A. Chamli Kumarasiri, Solved Heiyanthuduwa will be provided afetr we get the design fro the Engineer. to construction Mr. B.A. Nimalrathna Perera, Mr. B.A. Shirly Rohana Perera

648 Wash off of the boundary wall Property damages 17.06.2014 Heiyanthuduwa Mr. L.Premasiri Perera 624/1, Godellawattha, Heyanthuduwa A boundary wall has been established by land owner Solved

House located within the 50m. Vibration and noise measured. Levels are 649 Damages of the roof due to vibration Vibration 18.06.2014 Makola Ms. G. Sureka Dharshani 694/1, Makola North, Makola Solved within limit. Explained the compensation method and Negotiated.

House located beyond 50m . Measured the vibration and levels are below 650 Damages to the house and to the well Vibration 19.06.2014 Kadawatha Mr. Helapitiyage Dona Ebrham Perera 664, Wediwatta rd; Ihalabiyanwila, Kadawatha Solved the limit. Negotiated.

House located beyond 50m.Vibration measured and levels are within 651 Vibration problem Vibration 19.06.2014 Makola Mr. W.A.Gunathilaka 616, Makola North, Makola Solved limit. Explained and Negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Complain resolved within the responcibility of the contractor and non Reducing the width of the existing access road alongside the RDA resolved portion of the complain regarding the access road referred to irrigation canal starting from Bandaranayaka Mw; due to the Access road 26.06.2014 Kadawatha 513/1, Aldeniya, Kadawatha Solved (Mr. M.J.M. Philip Jayawardhne) RDA (Informed OC by TC-ENV-GEN-350-7549 dated 08.07.2014). construction of New canal Permenant drain was constructed as not affect the accesss.

Reducing the existing width of the Shramadhana mawatha due to RDA Access road 26.06.2014 Kadawatha Divisional Secretary - Biyagama Permanent access provided. Solved the execution of A1 by pass (Divisional Secretary - Biyagama) RDA Water quality & Divisional Secretary - Biyagama Water level recovered and back to normal level. Informed to OC by TC- (i) Dropping the water level of their well 26.06.2014 Biyagama (Divisional Secretary - Biyagama - Mr. Solved Quantity (330, Dewamiththa pedesa, Heiyanthuduwa) ENV-GEN-350-7549 dated 08.07.2014 E.A.D.Nandasiri) House located 175m away from the ROW. Not observed any vibration RDA Divisional Secretary - Biyagama effect in this area when our ativities are in progress. Therefore we (ii) Formation of cracks Vibration 26.06.2014 Biyagama (Divisional Secretary - Biyagama - Mr. Solved (334/1, Ihalabiyanwila) consider these cracks not due to construction activities of the highway Charlet Samaraweera) 652 project. RDA Divisional Secretary - Biyagama (iii) Loss of Access Access road 26.06.2014 Biyagama (Divisional Secretary - Biyagama - Ms. This is not relevant to OCH-NS-1 section Solved (Eldeniya, Kadawatha) Irin Somawathi Dias) Inspected the location and found house is located about 250m away from RDA Divisional Secretary - Biyagama the ROW. Again inspected jointly with the engineer and confirmed that is (iv) Vibration problem Vibration 26.06.2014 Biyagama (Divisional Secretary - Biyagama - Mr. Solved (154/1, Kandy road, Kadawatha) is not with in the project area. Informed to OC by TC-ENV-GEN-350- Mahinda Devalegama) 7549 dated 08.07.2014 RDA Divisional Secretary - Biyagama Inconvenience due to diversion of Samurdhi Mawatha Access road 26.06.2014 Biyagama (Divisional Secretary - Biyagama - Mr. Flash lights provided and action taken to rectify the road condition Solved (627/7,Temple road, Heiyanthuduwa) L.V.Karunarathna) Other problem RDA Rectification of the damaged canal due to construction activities related 26.06.2014 Kadawatha 169/1, Ihalabiyanwila, Kadawatha Silt removed and properly rectified the area Solved (Mr. T.T. Gunawardhana) to construction

Inspected jointly and explained that the complaint received after Environmental Predicaments due to the construction activities implementation of MUDUN ELA RE-ROUTE PLAN in this location and Soil Erosion 26.06.2014 Rakgahawaththa RDA Rakgahawaththa RDA matter near Rakgahawaththa canal this incident completely outside the ROW and contractor cannot take any action

Other problem Ms. S.K. Nandawathi 518/1 , 518 & 600/5 , Bandaranayaka Mw; 653 Drainage problem related 01.07.2014 Kadawatha 1+200 Mr. S.K. Dayananda Provided a additional drain in order to reduce the load. Solved Eldeniya, Kadawatha to construction Ms. N.L.S. Indrani

Other problem 654 Kelani River South bank erosion related 02.07.2014 Kaduwela Mr. Manjula Palihena 60, Hewagama, Kaduwela Bank protection is ongoing Solved to construction

Inspected the matter. Damage calculation completed and paid the 655 Crop damage due to inundation Crop damage 10.07.2014 Heiyanthuduwa Ms. R.M.D. Chithra Ranjani 492/2, Daluggala road, Heiyanthuduwa Solved damages. Ms. S.D. Gunawathi Mr. W.D.Anura Rampal Kulakumaru, Mr. H.A.Dulip Perera, All the houses located within the 50 m range. 295/C, 294/1, 294/2, 294/1A, 295/A, 297/12/B, 656 Vibration problem Vibration 19.07.2014 Kadawatha Mr. Sujith Palitha Samanweera, Vibration effects only at the point of starting (05 seconds) Solved Ihalabiyanwila, Kadawatha Ms. G. Leelawathi Explained the situation, negotiated by implementing safe guard measures. Mr. Dayarathna Wijesooriya

Water quality & Water level is gradually increased and discontinued the dewatering 657 Depletion of water level in the well 30.07.2014 Kadawatha Mr. W.M.Wickramasingha 513/3, Bandaranayaka Mw; Eldeniya, Kadawatha Solved Quantity process Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Jointly inspected. Surveyed the existing boundary, No damages to the 28.07.2014 Other problem actual boundary and no issue according to the survey data. Eroded portion through 658 Kelani River North bank erosion related Biyagama Mr. W.L.I. UdayaKumara 1/5 B, Biyagama South, Biyagama rectified by using soil. However the affected parties are expecting boulder Solved OC/TC/NS1/6022 dated to construction packing instead of provided solution. As the final solution of this matter 25.07.2014 eroded river bank was rectified by using soil

Jointly inspected. Surveyed the existing boundary, No damages to the 28.07.2014 Other problem actual boundary and no issue according to the survey data. Eroded portion through 659 Kelani River North bank erosion related Biyagama Ms. K.D.P.Madubhashini 05, Biyagama road, Biyagama rectified by using soil. However the affected parties are expecting boulder Solved OC/TC/NS1/6022 dated to construction packing instead of provided solution. As the final solution of this matter 25.07.2014 eroded river bank was rectified by using soil

Other problem Agrarian officer 16+900 660 Drainage congesion at ramahara area related 18.08.2014 Kaduwela & Ramahara The portion of drains which locates inside the ROW was cleared Solved (RHS) to construction Farmers House located beyond 50m. Vibration measured and levels area within the 661 Cracks due to vibration Vibration 19.08.2014 Kadawatha Mr. L.R.Nihal 284/10, Ihalabiyanwila, Kadawatha Solved limits and controlled further. Negotiated

Other problem Temporary dam wahich was established inorder to barricade water flow 662 Inundation problem related 22.08.2014 Biyagama Villagers 120/2, Yatawatta road, Biyagama Solved was breached and facilitated drain out water through Mudun Ela to construction House located within 50m. Vibration measured and levels exceeded. 641/3A, Koswaththa road, Bandarawaththa, 663 Vibration due to compaction Vibration 25.08.2014 Kadawatha Mr. K. Nihal Jayathilaka Controlled vibration by redusing the VPM of the compaction machine. Solved Kadawatha Explained the compensation proceedure and Negotiated House located within 50m. Vibration measured and levels exceeded. 664 Vibration problem Vibration 26.08.2014 Kadawatha Mr.E.S.A. Pramila 641/3, Koswatta, Eldeniya, Kadawatha Informed to the relevant authorities to take necessary action to control the Solved vibration. Recently activities are stopped.

House located within 50m. Vibration measured and levels exceeded. 665 Vibration problem due to compaction Vibration 26.08.2014 Heiyanthuduwa Ms. P.V. Jayalatha 482/2, Galadeniya, Heiyanthuduwa Controlled the vibration by redusing VPM level of the vibration roller and Solved solved the matter

Other problem Two openings were provided for the Rakgahawatta canal and solved the 666 Drainage problem related 02.09.2014 Heiyanthuduwa Mr. U.A.Gajaweera 355/D, Dewamiththa place, Heiyanthuduwa Solved matter to construction

Other problem 667 Boundary problem related 02.09.2014 Kaduwela Ms. P. Seelawathi Dabare 199, Vihara Mw; Hewagama, Kaduwela Fence will be erected by avoiding particular well Solved to construction

Cross drainage at Ch 15+100 was cleaned and rectified the congestion. Other problem Submited a recommendation letter from Agrarian Service Department and 668 Inundation of cultivated paddy field related 05.09.2014 Heiyanthuduwa Mr. K.A.D. Sujeewa Premalal 172/6, Mabima, Heiyanthuduwa Solved Divisional secretary. And compensation payment was made for the to construction estimated damage. Cross drainage at Ch 15+100 was cleaned and rectified the congestion. Estate Farmers Assosition Submited a recommendation letter from Agrarian Service Department and 669 Damages to the paddy field Crop damage 06.09.2014 Heiyanthuduwa 15+100 Mabima Solved Mabima Divisional secretary. And compensation payment was made for the estimated damage.

11+500 House located within the 50m. Measured the vibration. Controlled the 670 Vibration problem Vibration 09.09.2014 Makola Mr. Abdul Kafoor 478/B/7, Makola South, Makola Solved (RHS) exceeded levels by redusing VPM level of the vibration roller.

01+100 House located within the 50m. Measured the vibration and levels are 671 Vibration problem Vibration 09.09.2014 Kadawatha Mr. Philip Jayawardana 513/1, Eldeniya, Kadawatha Solved (RHS) below the limit Other problem Mr. Lal Jayarathna Cleaned the drainage path temporarily and permanent drainage will be 672 Contamination of the well due to blockage of nearby drainage related 10.09.2014 Kadawatha 163/14, Sunethrarama Road, Kadawatha Solved (Asilin) connected to construction Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

House located within the 50m. Measured the vibration and levels are 673 Vibration problem Vibration 23.09.2014 Kadawatha Mr. W.D.G.Pathmakumara 11, Kandy road, Eldeniya, Kadawatha Solved below the limit House located within the 50m. Measured the vibration and levels are 674 Vibration problem Vibration 23.09.2014 Kadawatha Ms. W. Dayawathi Weerasingha 13, Eldeniya, Kadawatha Solved below the limit

14+700 House located beyond 50m. Vibration checked and levels are below the 675 Vibration problem Vibration 27.09.2014 Heiyanthuduwa Mr. A. Sunil Shantha 379/K, Bandaranayaka Mw; Heiyanthuduwa Solved (RHS) limit. Negotiated

Damages to the bamboo trees Property damages 29.09.2014 Heiyanthuduwa Mr. G. Sumanadasa 635, Kadjuhena road, Heiyanthuduwa Compensated for the property damage. Solved 676 Additional Boundary Problem 29.09.2014 Heiyanthuduwa Mr. G. Sumanadasa 635, Kadjuhena road, Heiyanthuduwa The land lease payment for 14 months already paid. Solved Acquisition 14+700 House located beyond 50m. Vibration checked and levels are below the 677 Cracks on walls due to compaction Vibration 29.09.2014 Heiyanthuduwa Mr. R.P.K. Roshan Chinthaka 349/Q, Dewamiththa Pedesa, Heiyanthuduwa Solved (RHS) limit. Negotiated House located beyond 50m. Vibration checked and levels are below the 678 Damages to house due to vibration Vibration 02.10.2014 Heiyanthuduwa Mr. R.M. Kalum Pushpakumara 349/M, Dewamiththa Pedesa, Heiyanthuduwa Solved limit. Negotiated

Other problem Jointly inspected the location with RDA, OC and Agrarian. Problem Mr. P. Kulathunga Perera 679 Water stagnation due to insufficient drainages related 06.10.2014 Kadawatha 3/3/213 , Ihalabiyanwila, Samurdhi Mw; Kadawathaidentified as insufficient drainage facility (Design Problem) Matter Solved (Chairman) to construction referred to OC for necessary instructions. A Drain provided

680 Damages due to flood Flooding 09.10.2014 Kaduwela Mr. K.D. Steawen 224/C1, Vihara Mawatha, Hewagama, Kaduwela Observed and estimated the damages and provided the compensation Solved

681 Damages due to flood Flooding 09.10.2014 Kaduwela Ms. M.H. Shamalee Kumuduni 306/ 3A, Samagi Mw; Hewagama, Kaduwela Compensation payment was made for the AP Solved

Other problem 13.10.2014 RDA 682 Blockage of feeding canal related Kadawatha 1+600 Kadawatha Cleaned the box culvert and provided water to the paddy cultivation Solved (Through the phone) to construction

Other problem 683 Drainage congesion related 14.10.2014 Kaduwela Villagers Hewagama, Kaduwela Drainage system from 1+500 to 16+900 was cleaned and cleared Solved to construction

Inspected. Impact location is beyond 150m from the ROW. Well water Water quality & contamination is due to stagnated water of the adjecent irrigation canal. 684 Contamination of well water 15.10.2014 Kaduwela Mr. B.D. Lal Nishantha 95 A, Ramahara road, Hewagama, Kaduwela Solved Quantity Explained and aware them to inform to relevant authority (Agrarian Service Center)

House located beyond 50m. No activities on going. Vibration measured 685 Damages to the house Vibration 25.10.2014 Kadawatha Mr. A. Wickramasingha 294/2, Ihalabiyanwila, Kadawatha when removing the sheet pilies and levels were below the limit. Solved Negotiated

House located within 50m. Vibration measurd and levels below the limit. 686 Vibration problem Vibration 28.10.2014 Heiyanthuduwa 14+700 Mr. W.G. Nandapala 625/A, Godallwatta, Heiyanthuduwa Nearby embankment filled by the complainer in an improper manner. He Solved agreed to bare the damage after explaing the situation. Negotiated.

House located within 50 . Meaured the vibration of the area levels area 8+800 687 Cracks on the nearby embankment Vibration 01.11.2014 Kadawatha Ms. R.P. Siriyalatha 284/4, Ihala biyanwila, Kadawatha within the limit. Embankment damaged due to neighbors earth cutting Solved (RHS) activities. Provided adequate soil to filled the toilet pit and temporary toilet installed 688 Collapse of toilet pit Property damages 03.11.2014 Makola - North Ms. H.L.Monika Irangani 638/5, Asiri Mw, Makola North by the owner and cost will be recovered through the final estimate. Solved Negotiated Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

61/3/5, Katukurundawaththa, Mawaramandiya, Drainage path diverted towards the site. Permanent drainage will be 689 Soil erosion of the land due to improper drainages Soil Erosion 05.11.2014 Kadawatha 10+000 Mr. Sarath Athapaththu Solved Kadawatha constructed. Negotiated. Constructed the main canal and connected to middle canal and cleaned 690 Inconvenience due to flood Flooding 05.11.2014 Kadawatha Mr. H.D. Nimalsiri 293/5, Ihalabiyanwila, Kadawatha Solved other blockages. Other problem 691 Boundary problem related 05.11.2014 Ihalabiyanwila 10+400 Mr. K.C.R. Jayarathna 31/6, 1st lane, Kirulapone, Colombo 05 Confirmed the land boundary and drainage was provided within ROW. Solved to construction

10+400 Final crack survey done as per the instruction of the OC. Allowed him to 692 Cracks on walls and requesting for final estimate Vibration 17.11.2014 Makola Mr. I.A. Wimalachandra 638/12, Asiri Mw; Makola North, Makola Solved (LHS) do the renovations of his house. Damage estimation is on going

House located within 50 . Meaured the vibration levels exceeded. 693 Vibration problem Vibration 21.11.2014 Heiyanthuduwa 14+700 Mr. H.D. Piyal Weerasingha 330/C. Dewamiththa Pedesa, Heiyanthuduwa Controlled the vibration by VPM value and changing the roller. Solved Negotiated. House located beyond 300 m away from the taisei construction site. But 694 Vibration problem Vibration 24.11.2014 Kadawatha Mr. W.A.P.D. Weththasingha 163/3, "Sansasiri", Mawathawaththa, Kadawatha this area belongs to section 03 package. Informed the complainant to Solved contact relevant person.

House located within 50m. Measured the vibration of the area and levels 695 Vibration problem Vibration 24.11.2014 Makola Ms. Priiyanga Sanjeewani 457/A, Makola South, Makola Solved within the level. Explained and Negotiated.

03.12.2014 Located beyond 50m. Peremeter vibration below the limit. No activities 696 Cracks due to vibration Vibration Kadawatha Beyond 50m Mr. Ranasingha Bandara 163/10 B, Ihalabiyanwila, Kadawatha Solved Through Fax from RDA on going. This area belongs to NS - 2.. Negotiated

03.12.2014 697 Damages to the paddy land Crop damage Kadawatha Mr. W.A.Seemon 461/1, Gonahena, Kadawatha Estimate received from the Agrarian officer. Paid compensation. Solved Through Fax from RDA

House located within 50m. Pre condition survey has already been done. Mr. K.A. Sarath Currently no activities on going in the area. Inspected the structure and it 698 Cracks due to vibration Vibration 04.12.2014 Heiyanthuduwa 637/3, Kajuhena road, Heiyanthuduwa Solved (K.A. Nadeeka Nilangani) was not in a danger. Explained the compensation proceedure and Negotiated.

699 Inconvenience due to dust Dust 16.01.2015 Biyagama Mr. A.A.D.Sarath Padmasiri 3/4, Biyagama Dust barrier provided Solved

16+900 Final crack survey done and observed damages. Estimated the damages 700 Damages to the floor tiles due to vibration Vibration 26.01.2015 Kaduwela Mr. D.N. Wijesundara No. 131 , Disawatta, Hewagama, Kaduwela Solved (RHS) and final compensation will be done. Final crack survey done and observed damages. Estimated the damages 701 Damage to the house & well Property damages 05.02.2015 Makola Ms. E.A.D.S.A. Amarasingha 478 E, Makola South, Makola Solved and final compensation will be done.

Other problem 702 Inundation due to heavy rain related 10.02.2015 Kaduwela Ms. M.H. Shamalee Kumuduni 306/3 A, Samagi Mw; Hewagama, Kaduwela Particular canal was cleaned Solved to construction

Beyond our control. The particular complain location locates LHS of 703 Cracks due to vibration Vibration 20.02.2015 Kaduwela Mr. M.P. Hewagama 302/C/6/1, Rajasinghapura, Hewagama, Kaduwela Solved china harbour section

26.02.2015 Mr. W.Y.M. Sudubanda (Through Mr. K.A. Lowrence & K.A.Dharmadasa Paid compensation and solved 704 Damages to paddy cultivation due to flood Crop damage Kadawatha Kadawatha Solved RDA/OCHP2/DRAIN/CO Mr. W.A. Seemon (Refer TC-ENV-GEN-408-9557 dated 27.03.2015) NST. dated 16.02.2015 W.K.Nimal Kularathna

705 Damages for paddy cultivation Crop damage 03.03.2015 Kadawatha Mr. P. Thilakaratne 337, Ihala Biyanwila, Kadawatha Paid Compensation Solved Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Other problem Ms. W.G. Chandawathi This is beyond Contractor's control. Referred to RDA.Retaining wall 706 Soil erosion due to drain construction related 10.03.2015 Kadawatha 329/3 & 329/4, Ihala biyanwila, Kadawatha Solved Ms. P. Ariyawathi provided to construction

Other problem Ms. L.A. Prema Habaraduwa This is beyond Contractor's control. Referred to RDA. Damages of the 707 Request to repair the Gonahena road related 17.03.2015 Kadawatha & 327/1. Ihalabiyanwila, Kadawatha Solved road was rectified to construction Villagers

Other problem Mudun ela was opened considering water level of upstream area. 708 Inundation due to drainage congestion related 18.03.2015 Biyagama Mr. P. Anurasiri Premalal 86/3, Yatawatta road, Biyagama Solved Therefore stagnated water drained out. to construction

Water quality & 709 Contamination of well water 23.03.2015 Kadawatha Ms. I.D. Priyanka Rukshani 326/5, Ihalabiyanwila, Kadawatha Dewatered and cleaned the well Solved Quantity

Water quality & 710 Depletion of water level in the well 26.03.2015 Kadawatha Mr. W.M.Wickramasingha 513/3, Eldeniya, Kadawatha Recharged & recovered the well Solved Quantity

26.03.2015 Rehabilitation of Nagahamula road and extension of approch road Jointly inspected the area.. Identified this is beyond our control. Referred 711 Access road Thro' OC/TC/NS1/7643 Kadawatha Mr. Sarath Nelum Liyanage Nagahamula Road, Ihala Biyanwila, Kadawatha Solved from Nagahamula road to Mankada road to RDA. The road was rehabilitated dated 23.03.2015

Other problem 26.03.2015 Damages to the land and bathing well due to unclean water from Jointly inspected the area.. Identified this is beyond Contractor's control. 712 related Thro' OC/TC/NS1/7643 Kadawatha Mr. P. Thilakaratne Iroshan Chamathkara Mw; Ihalabiyanwila, Kadawath Solved lead away drain at 9+100 Referred to RDA. Lead away drain provided to construction dated 23.03.2015

Other problem 26.03.2015 Erosion of lands and damages for cultivation due to water from Jointly inspected the area.Identified this is beyond Contractor's control. 713 related Thro' OC/TC/NS1/7643 Kadawatha Mr.J.M.D. Sumith Nandasiri 337/1, Ihalabiyanwila, Kadawatha Solved lead away drain at 09+100 Referred to RDA. . Lead away drain provided to construction dated 23.03.2015

Other problem 26.03.2015 Erosion of lands and damages for cultivation due to water from Jointly inspected the area.. Identified this is beyond Contractor's control. 714 related Thro' OC/TC/NS1/7643 Kottukachchiya Mr. J.M.D. Sangadasa Kandayaya, Galkulama, Kottukachchiya Solved lead away drain at 09+100 Referred to RDA.. Lead away drain provided to construction dated 23.03.2015

Other problem 26.03.2015 Land become erode and unclean water from the drain flows to Jointly inspected the area.. Identified this is beyond our control. Referred 715 related Thro' OC/TC/NS1/7643 Kadawatha Mr. Wimalasiri Dahanayaka 340/2, Nagahamula road, Kadawatha Solved their well to RDA.Lead away drain provided to construction dated 23.03.2015

Other problem 26.03.2015 Land become erode and unclean water from the drain flows to Jointly inspected the area.. Identified this is beyond Contractor's control. 716 related Thro' OC/TC/NS1/7643 Kadawatha Mr. Dhammika S. Wijayawickrama 345/B, Ihalabiyanwila, Kadawatha Solved their well Referred to RDA. Lead away drain provided to construction dated 23.03.2015 Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

Other problem 26.03.2015 Land become erode and unclean water from the drain flows to Jointly inspected the area.. Identified this is beyond Contractor's control. 717 related Thro' OC/TC/NS1/7643 Kadawatha Mr. R.P. Winson 345, Ihalabiyanwila, Kadawatha Solved their well Referred to RDA. Lead away drain provided to construction dated 23.03.2015

Water quality & 718 Contamination of the well due to improper storm water drainages 08.04.2015 Heiyanthuduwa Mr. H.C. Gunasekara 325/1, Dewamiththa Place, Heiyanthuduwa Inspected. Proper drainage facility has to be suggested by the engineer RDA matter Quantity

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since Mr. W.A.Ariyadasa 639/10 and 639/10/A, 719 Cracks on walls Property damages 21.04.2015 Kadawatha the complain was received after completion of project activities. Solved Ms. W.A. Ashika Nayomi Koswatta, Eldeniya, Kadawatha Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received 22.04.2015 during construction was on going. Adequate data are not available since Thro' RDA letter ref. 720 Cracks on walls Property damage Kaduwela Mr. W.A. Stanley Dias 184/2, Godalla Mw; Hewagama, Kaduwela the complain was received after completion of project activities. Solved RDA/OCHP2/ENV/GEN Therefore no evidance to confirm that there is a relasionship between and dated 31.03.2015 crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received 22.04.2015 during construction was on going. Adequate data are not available since Thro' RDA letter ref. 721 Cracks on walls Property damage Kaduwela Mr. Weligamage Dharmasiri 187/B/1, Hewagama, Kaduwela the complain was received after completion of project activities. Solved RDA/OCHP2/ENV/GEN Therefore no evidance to confirm that there is a relasionship between and dated 31.03.2015 crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since 722 Cracks on walls Property damage 22.04.2015 Kaduwela Ms. Sumudu Kodikara 34/B, Hewagama, Kaduwela the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities 22.04.2015 Thro' RDA letter ref. Post survey will be conducted and final payment will be provided when 723 Cracks on walls Property damage Biyagama Mr. D.N.D. Dayarathna 3A, Biyagama Pahala, Biyagama Solved RDA/OCHP2/ENV/GEN receive the valuation from the chartered engineer dated 31.03.2015 22.04.2015 Thro' RDA letter ref. 142/2C, Shramadana Mw; Ihalabiyanwila, Crack survey conducted and final payment will be provided when receive 724 Cracks on walls Property damage Kadawatha Mrs. K.M. Katulanda Solved RDA/OCHP2/ENV/GEN Kadawatha the valuation from the chartered engineer dated 31.03.2015 AP located beyond the 50m coridor. No previous complaints received 22.04.2015 during construction was on going. Adequate data are not available since Thro' RDA letter ref. 725 Cracks on walls Property damage Kaduwela Mr. A.G.R.Wijayabandara 185/E, Hewagama, Kaduwela the complain was received after completion of project activities. Solved RDA/OCHP2/ENV/GEN Therefore no evidance to confirm that there is a relasionship between and dated 31.03.2015 crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received 22.04.2015 during construction was on going. Adequate data are not available since Thro' RDA letter ref. 726 Cracks on walls Property damage Kaduwela Mr. Weligamage Karolis Silva 187/B,Hewagama,Kaduwela the complain was received after completion of project activities. Solved RDA/OCHP2/ENV/GEN Therefore no evidance to confirm that there is a relasionship between and dated 31.03.2015 crack formation and road construction activities 22.04.2015 Crack survey conducted and final payment will be provided when receive 727 Cracks on walls Property damage Thro' RDA letter ref. Kaduwela Mr. Wimon Singno 187/A, Hewagama, Kaduwela Solved the valuation from the chartered engineer RDA/OCHP2/ENV/GEN Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

07.05.2015 The paddy land located in the downstream of the project and there is no Thro' project activities are involved in this claim. 728 Damages to the paddy cultivation Crop damage Kadawatha Mr.G.A. Upali 273/2, Ihalabiyanwila, Kadawatha Solved RDA/OCHP2/ENV/GEN (Referred to RDA by letter No. TC-ENV-GEN-428-9998 dated dated 29.04.2015 30.05.2015)

Other problem The existing canal was blocked by us. Once the obstruction was removed 729 Inundation due to drainage congestion related 11.05.2015 Hewagama Villagers Hewagama Solved stagneted water drained out. to construction

Other problem Inspected jointly with OC . No evidance that the purticular erosion was 730 River bank erosion and damages to bamboo bushes related 18.05.2015 Rakgahawaththa Dr. Amara Nandaseely "Sirimahal", Rakgahawatta, Pahala Biyagama Solved occurred due to project activities. to construction

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since Property damages due to construction activities Property damage 20.05.2015 Kadawatha Mr. R.P. Winson 345, Ihalabiyanwila, Kadawatha the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

Inspected and the AP located beyond the 50m coridor. Refer Com. No. Property damages due to construction activities Property damage 20.05.2015 Kadawatha Mr. R.S.P.U. Luxman Rajapaksha 344, Nagahamula rd; Ihalabiyanwila, Kadawatha Solved 294.

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since Property damages due to construction activities Property damage 20.05.2015 Kadawatha Mr. P.D.C. Thilakarathna 351, Nagahamula rd; Ihalabiyanwila, Kadawatha the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and 731 crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since Property damages due to construction activities Property damage 20.05.2015 Kadawatha Mr. S.L. Liyanage 342, Nagahamula rd; Ihalabiyanwila, Kadawatha the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since Property damages due to construction activities Property damage 20.05.2015 Kadawatha Mr. P.D. Dayasena 351/03, Nagahamula rd; Ihalabiyanwila, Kadawathathe complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

Inspected the location. It was evident that the damage is due to our 732 Damages to the boundary wall Property damage 03.06.2015 Kaduwela Dr. L.P.R.L. Prabath 225/4, Vihara Mawatha, Hewagama, Kaduwela activities and desided to rectify the damage. Damaged boundary wall was Solved repaired

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since 733 Property damages due to construction activities Property damage 03.06.2015 Kadawatha Mr. Chaminda Wickramarachchi 642/A, Ihala Biyanwila, Mankada road, Kadawathathe complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since 734 Property damages due to construction activities Property damage 16.06.2015 Heiyanthuduwa Ms. S.M.D. Thilini Shashika Suraweera 706/1 C, Siriketha Road, Heiyanthuduwa the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

We have already conducted the post suevey and valuation of the damages. 735 Property damages due to construction activities Property damage 19.06.2015 Kadawatha Mr. C.B.D.Jayasingha 170/4/A, Ihlabiyanwila, Kadawatha Solved Payments will be made accordingly. Taisei Corporation OUTER CIRCULAR HIGHWAY TO THE CITY OF COLOMBO PROJECT NS-1

Legend Flooding ( Due to pilot road and due to main Highway) Blasting ( Noise , Vibration ,Evacuation , etc) Dust (Nuisance, loss of crops) Danger to public Access road Additional Acquisition Material Transportation and use of public roads Water quality & quantity Noise Vibration Property damages Crop damages Soil erosion Other problems related to constructions

Status Chain age Reg.No. Nature of the Complaint Category Complaint received on Impact Location Name of the Complaint Address Action taken Reference Solved On going Pending RDA

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since 736 Property damages due to construction activities Property damage 25.06.2015 Heiyanthuduwa Ms. M.A. Seelinnona 634/1, Kajugahahena road, Heiyanthuduwa the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

AP located beyond the 50m coridor. No previous complaints received during construction was on going. Adequate data are not available since 737 Property damages due to construction activities Property damage 25.06.2015 Heiyanthuduwa Ms. P. Neil Priyantha 634/2, Kajugahahena road, Heiyanthuduwa the complain was received after completion of project activities. Solved Therefore no evidance to confirm that there is a relasionship between and crack formation and road construction activities

Other problem 738 Debris in the land related 06.07.2015 Gonawala Ms. T.M. Asoka Amarawathi 117/2, Pamunuwila road,Gonawala Removed all the debris and solved the matter Solved to construction

Referred to RDA for action through letter ref. No. TC-ENV-GEN-446- Access road completely changed from the existing condition Access road 22.07.2015 Kadawatha Mr. H.D. Nimalsiri 293/5, Ihalabiyanwila, Kadawatha RDA matter 10389 dated 29.07.2015.

739 Compensation proceedure is ongoing, he will be paid after the evaluation Damages occurred to his boundary wall / roof and the and also to mitigate the environmental impacts they faced during the environmental impacts faced during the construction (Dust and Property damages 22.07.2015 Kadawatha Mr. H.D. Nimalsiri 293/5, Ihalabiyanwila, Kadawatha construction, we have evacuated them for 12 months period till Solved Noise) construction completed (Informed to the engineer by letter ref. No. TC- ENV-GEN-446-10389 dated 29.07.2015)

23.07.2015 355/4, Nagahamulla road, Ihalabiyanwila, At the initial stage when they complained we have rectified the impact and (Through OC letter Ref. Mr. H.A.Ajith Priyantha Kadawatha they have satisfied. Thereafter they didn't make any complaints. But for 740 Health issues due to dust during construction Dust Kadawatha Solved No. OC/TC/NS1/8394 Mr. B.G. Anura Bandara 354/1, Nagahamulla road, Ihalabiyanwila, this complaint, which is making in the end we cannot accept. This is will dated 21.07.2015) Kadawatha be informed to the engineer.

Other problem 741 Inundation due to improper drainages related 24.07.2015 Kadawatha K.P.R. Karunanayaka 701, Mankada road, Kadawatha Permanent drainage provided Solved to construction

742 Lost of access to the paddy land Access road 30.07.2015 Heiyanthuduwa Ms. W.A.Ramani Pushpalatha 636 A, Nayagala, Heiyanthuduwa Beyond Contractor's control and referred to RDA RDA matter Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure B

License and Clearances Obtained for Project Activities

No. Purpose Chainage/Location Type of License /Approval Issuing Authority Date of receive Validation Periods

Environmental Clearance CEA - 1 Borrow Pit(Makola) 12+100 Mining Licence GSMB 22/06/2012 22/06/2012-21/07/2012 Environmental Clearance CEA 03.12.2012 03/06/2012-02/09/2012 2 Borrow Pit (Meepe) Meepe Mining Licence GSMB 25/01/2012 25/01/2012-24/07/2012 Mining Licence GSMB 22/08/2012-24/01/2013 Environmental Clearance CEA 26/03/2012 26/03/2012-25/03/2013 3 Laboratory Building 16+080 UDA Clearance UDA 18/04/2012 18/04/2012-17/04/2012

4 Vehicle Yard,Portable Office,Fuel Point 16+420 - 16+620 Environmental Clearance CEA 19/03/2012 19/03/2012 - 18/03/2013

Mechanical Work Shop & Meterial Storage 16+080 - 16+180 Environmental Clearance CEA 25/04/2012 25/04/2012- 24/04/2012 Pahala Hanwella Environmental Clearance CEA 14/02/2012 14/02/2012 - 13/02/2013 5 Metal Crusher 1 Pahala Hanwella Environmental protection licence CEA 13/08/2012 13/08/2012 - 12/08/2013

Metal Crusher 1 Pahala Hanwella Environmental protection licence CEA 09.04.2013 13/08/2013 - 12/08/2014

Environmental protection licence CEA 28.10.2014 13.08.2014 - 12.08.2015 6 Metal Crusher 1 Pahala Hanwella NBRO Clearance NBRO 22.03.2012 For ever

7 Metal Crusher 11 Hanwella Environmental protection licence CEA 31/07/2013 28/03/2011 - 27/03/2014

Pahala Bomiriya Environmental Clearance CEA 20/04/2012 20/04/2012 - 19/04/2013 8 Disposal yard Pahala Bomiriya Environmental Clearance CEA 31.07.2013 29/07/2013 - 28/07/2014

9 Disposal yard Yaboraluwa Environmental Clearance CEA Rejected Environment clearance CEA Not required 10 Minor scale Blasting 15+860 Mining Licence GSMB 30/04/2012 30/04/2012 -29/05/2012 Rakgahawatta SLLRDC Clearance SLLRDC 06.08.2012 For ever Dept. of Agrarian Keangnam yard Rakgahawatta Agrarian Approval 30/08/2012 For ever Development Rakgahawatta Pradeshiyasabha Approval Biyagama P/ S 07.02.2012 For ever Keangnam yard- Batching plant (Tokyo Rakgahawatta Environmental Recommendation CEA 13/06/2012 13/06/2012 - 12/6/2013 Cement) 11 Keangnam yard- Batching plant (Tokyo Rakgahawatta Environmental Protection Licence CEA 15/07/2013 03/07/2013 - 02/07/2014 Cement)

Keangnam yard- Batching plant (Tokyo Rakgahawatta Environmental Protection Licence CEA 16/09/2014 03/07/2014 - 02/07/2015 Cement)

31/05/2011 31/05/2011 - 30/05/2012 Keangnam yard- Ware House Rakgahawatta Environmental Clearance CEA 13/06/2012 13/06/2012 - 12/6/2013

12 Workers Accommodation Siyambalape Environmental Protection Licence CEA 22/01/2013 22/01/2013 - 21/01/2016

13 Civil/Mechanical facility yard Makola Environmental Clearance CEA 08.06.2012 6/8/2012 - 5/8/2013

Environmental Protection Licence CEA 31/12/2012 30/01/2012-29/01/2013 Kaduwela 14 Quarry 1 (Nawagamuwa-South) Mining Licence GSMB 07/09/2011-06/09/2012

Environmental Protection Licence CEA 19/05/2011 - 18/05/2014 Kaduwela 15 Quarry 11 (Korathota) Mining Licence GSMB 27/06/2012-26/06/2013

16 Disposal yard Wathurapatha - 1 Environmental Clearance CEA 31/10/2012 31/10/2012 - 30/10/2013

15+700 Mining Licence GSMB 28/09/2012 25/09/2012 - 24/12/2012 15+675-15+750 Mining Licence GSMB 28/11/2012 28/11/2012 - 27/01/2013 15+675-15+750 Mining Licence GSMB 28.01.2013 28.01.2013 - 27.03.2013 17 Minor scale Blasting 15+675-15+750 Mining Licence GSMB 27.03.2013 28.03.2013 - 27.06.2013

15+675-15+750 Mining Licence GSMB 15.07.2013 16.07.2013 - 15.08.2013

17 Minor scale Blasting 15+600-15+750 Mining Licence GSMB 03.10.2013 01.10.2013 - 31.12.2013

SLLRDC Clearance SLLRDC 28/08/2012

18 Disposal yard (Yoshida) Sapugaskanda DS Approval Biyagama DS 28/08/2012 Dept. of Agrarian Agrarian Approval 30/08/2012 Development Disposal yard Wathurapatha - 2 Environmental Clearance CEA 13/09/2012 13/09/2012 - 12/09/2013 19 Disposal yard Wathurapatha - 2 Environmental Clearance CEA 17/09/2013 13/09/2013 - 12/09/2014

20 Disposal yard Siyambalape Environmental Clearance CEA - -

21 Pilot road Approval 12+200 - 16+400 SLLRDC Clearance SLLRDC 17/09/2012 For ever

22 Pilot road Approval 16+370 - 17+500 SLLRDC Clearance SLLRDC 28/09/2012 For ever No. Purpose Chainage/Location Type of License /Approval Issuing Authority Date of receive Validation Periods

14+000 - 17+500 CEA Approval CEA 09.11.2012 11/09/2012-10/12/2012 CEA Approval - 14+000 - 17+500 Approval for bored pilling works at 16+200- CEA 20/12/2012 20/12/2012-19/03/2013 17+500 received on 14.02.2013 CEA Approval 14+000 - 17+500 Approval for enhanced working time for bored CEA 22/03/2013 20/03/2013-19/06/2013 pilling works at 16+200-17+500 received on 16.04.2013

14+000 - 17+500 CEA Approval CEA 19/06/2013 20/06/2013 - 19/09/2013

23 Night time Approval 14+000 - 17+500 CEA Approval CEA 07.10.2013 07.10.2013 - 06.01.2014

14+000 - 17+500 CEA Approval CEA 10.01.2014 07.01.2014 - 06.04.2014

14+000 - 17+500 CEA Approval CEA 23.04.2014 07.04.2014 - 06.07.2014

14+000 - 17+500 CEA Approval CEA 08.08.2014 08.08.2014 - 07.11.2014

14+000 - 17+500 CEA Approval CEA 20.11.2014 19.11.2014 - 18.02.2015

23 Night time Approval 14+000 - 17+500 CEA Approval CEA 09.03.2015 19.02.2015 - 18.05.2015

24 Batching Plant (Taisei Corporation) Makola CEA Approval CEA 28/11/2012 28/11/2012 - 27/11/2013

24 Batching Plant (Taisei Corporation) Makola CEA Approval CEA 22.09.2014 04.09.2014 - 03.09.2015

25 Disposal yard (Access Engineering) Pahala Bomiriya CEA Approval CEA 27/06/2012 27/06/2012-26/06/2013 26 Minor scale Blasting 15+600 - 15+650 Mining Licence GSMB 01.03.2013 04/01.2013 - 03/04/2013

Environmental Recommendation CEA 24.12.2012 24.12.2012 - 23.12.2013 Pra sabha 27 Disposal yard Mahara Pradeshiya Sabha Approval 07.01.2013 - Mahara Approval from UDA UDA 03.01.2013 -

14+000 - 10+000 CEA Approval CEA 17.01.2013 11.01.2013 - 10.04.2013

14+000 - 10+000 CEA Approval CEA 16.04.2013 11.04.2013 - 10.07.2013

14+000 - 10+000 CEA Approval CEA 09.07.2013 11.07.2013 - 10.10.2013

14+000 - 10+000 CEA Approval CEA 14.10.2013 11.10.2013 - 10.01.2014

28 Night time Approval 14+000 - 10+000 CEA Approval CEA 10.01.2014 11.01.2014 - 10.04.2014

14+000 - 10+000 CEA Approval CEA 23.04.2014 11.04.2014 - 10.07.2014

14+000 - 10+000 CEA Approval CEA 08.08.2014 08.08.2014 - 07.11.2014

14+000 - 10+000 CEA Approval CEA 20.11.2014 19.11.2014 - 18.02.2015

28 Night time Approval 14+000 - 10+000 CEA Approval CEA 09.03.2015 19.02.2015 - 18.05.2015

8+600 - 10+000 & A1- CEA Approval CEA 17.01.2013 11.01.2013 - 10.04.2013 By pass 8+600 - 10+000 & A1- CEA Approval CEA 16.04.2013 09.04.2013 - 08.07.2013 By pass 8+600 - 10+000 & A1- CEA Approval CEA 09.07.2013 09.07.2013 - 08.10.2013 By pass 8+600 - 10+000 & A1- CEA Approval CEA 14.10.2013 11.10.2013 - 10.01.2014 By pass 29 Night time Approval 8+600 - 10+000 & A1- CEA Approval CEA 10.01.2014 11.01.2014 - 10.04.2014 By pass 8+600 - 10+000 & A1- CEA Approval CEA 23.04.2014 11.04.2014 - 10.07.2014 By pass 8+600 - 10+000 & A1- CEA Approval CEA 08.08.2014 08.08.2014 - 07.11.2014 By pass

8+600 - 10+000 & A1- CEA Approval CEA 20.11.2014 19.11.2014 - 18.02.2015 By pass

8+600 - 10+000 & A1- 29 Night time Approval CEA Approval CEA 09.03.2015 19.02.2015 - 18.05.2015 By pass

30 Minor scale Blasting 15+400 - 15+500 Mining Licence GSMB 01.02.2013 01.02.2013 - 31.03.2013

8+400 - 12+200 31 Pilot road Approval SLLRDC Clearance SLLRDC 03.04.2013 For ever including A1 By pass

Environmental Protection Licence Quarry III Meepe I 32 Mining Licence GSMB 22/2/2012 - 21/02/2013

Quarry III Meepe I Mining Licence GSMB 31.07.2013 04.07.2013 -03.07.2014

Pitumpe-Padukka Quarry IV Environmental Protection Licence CEA 01/01/2013 - 31/12/2013 (Nurani Estate) 33 Mining Licence GSMB 29/11/2012 - 28/11/2013 No. Purpose Chainage/Location Type of License /Approval Issuing Authority Date of receive Validation Periods

Environmental Protection Licence CEA 29.05.2014 26.01.2014 - 25.01.2015 Pitumpe-Padukka 33 Quarry IV (Nurani Estate) Mining Licence GSMB 29.05.2014 30.11.2013 - 29.11.2014 Mahara Environmental Recommendation CEA 20/03/2013 14/03/2013 - 13/03/2014 (Naligama) 34 Disposal yard Mahara Environmental Recommendation CEA 14.08.2014 08.08.2014 - 07.08.2015 (Naligama)

Mining Licence GSMB 02.04.2013 03.04.2013 - 02.07.2013 35 Minor scale Blasting 11+200 - 11+260 Mining Licence GSMB 15.07.2013 16.07.2013 - 15.10.2013

Environmental Protection Licence CEA 27.04.2013 21.10.2012 - 20.10.2013 Thunnana 36 Quarry V Mahakanda Mining Licence GSMB 27.04.2013 15.06.2012 - 14.06.2013

Environmental Protection Licence CEA 27.04.2013 14.07.2010 - 13.07.2013

Mining Licence GSMB 27.04.2013 21.08.2012 - 20.11.2012

Environmental Protection Licence CEA 29.05.2014 12.08.2013 - 11.08.2014 Kahahena - Hanwella 37 Quarry VI (Morakale Estate) Environmental Protection Licence CEA 25.08.2014 12.08.2014 - 11.08.2015

Mining Licence GSMB 29.05.2014 20.09.2013 - 19.12.2013

Mining Licence GSMB 29.05.2014 20.12.2013 - 19.09.2014

Environmental Clearance CEA 28.05.2013 21.05.2013 - 20.05.2014

Mining Licence GSMB 01.04.2013 01.04.2013 - 30.09.2013

38 Borrow Pit Ambepussa - Mahena Mining Licence GSMB 21.01.2014 02.12.2013 - 01.03.2014

Mining Licence GSMB 21.01.2014 02.12.2013 - 01.04.2014

NBRO Clearance NBRO 01.04.2013 15.03.2013 - 14.03.2014

Meerigama, Environmental Clearance CEA Exp 39 Borrow pit Gonnagahawatta - I Danowita Mining Licence GSMB 01.02.2013 01.02.2013 - 30.04.2013

Meerigama - II Environmental Clearance CEA Exp Weweldeniya Meerigama - II Mining Licence GSMB 23.05.2013 20.04.2013 - 19.09.2013 40 Borrow pit Weweldeniya Meerigama, Gonnagahawatta - II NBRO Clearance NBRO 23.05.2013 Weweldeniya

CEA approval CEA 27.06.2013 26.06.2013 - 25.06.2014 41 Disposal Yard Mabima (Rakgahawatta) SLLRDC Clearance SLLRDC 25.03.2013 -

12+490 - 12+510 GSMB 12.06.2013 13.06.2013 - 12.09.2013

12+490 - 12+510 - 42 Minor scale Blasting Mining Licence GSMB 30.08.2013 30.08.2013 - 29.10.2013 Enhancement 12+490 - 12+510 - Mining Licence GSMB 30.10.2013 30.10.2013 - 06.11.2013 Renewal

CEA approval CEA 27.02.2013 27.02.2013 - 26.02.2014 43 Disposal Yard Wathurapatha - 3 SLLRDC Clearance SLLRDC 01.02.2013 -

44 Quarry VII Padukka - II Mining Licence GSMB 31.07.2013 05.07.2013 - 04.07.2014

45 Minor scale Blasting 17+358 Mining Licence GSMB 21.08.2013 22.08.2013 - 04.09.2013

46 Minor scale Blasting 15+840 - 15+880 Mining Licence GSMB 21.08.2013 22.08.2013 - 21.11.2013

47 Minor scale Blasting 00+061 Mining Licence GSMB 30.08.2013 30.08.2013 - 29.11.2013

Batching Plant (Tokyo Cement) Mawaramandiya CEA Recommendation CEA 30.08.2013 11.03.2013 - 10.03.2014 48 Batching Plant (Tokyo Cement) Mawaramandiya Environmental Protection Licence CEA 25.07.2014 26.07.2014 - 25.07.2015

17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 14.10.2013 11.10.2013 - 09.01.2014 By pass

17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 17.01.2013 10.01.2014 - 09.04.2014 By pass

17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 23.04.2014 10.04.2014 - 09.07.2014 By pass 49 17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 08.08.2014 10.07.2014 - 09.10.2014 By pass

17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 14.10.2014 10.10.2014 - 09.01.2015 By pass

17+500 to 8+600 & A1 Night time Approval - Beyond 9.00 pm CEA Approval CEA 22.01.2015 10.01.2015 - 09.04.2015 By pass No. Purpose Chainage/Location Type of License /Approval Issuing Authority Date of receive Validation Periods

50 Minor scale Blasting 08+865 Mining Licence GSMB 30.10.2013 30.10.2013 - 29.01.2014

51 Disposal Yard Wathurapatha - 4 CEA Recommendation CEA 20.12.2013 13.12.2013 - 12.12.2014

52 Disposal Yard Malwana CEA Recommendation CEA 08.03.2014 12.11.2013 - 11.11.2014

CEA Recommendation CEA 28.04.2014 05.12.2013 - 04.12.2014 53 Borrow pit Warakapola - Thulhiriya Mining Licence GSMB 28.04.2014 31.01.2014 - 30.01.2015

54 Disposal Yard Bambaragahawatta CEA Recommendation CEA 07.05.2014 06.05.2014 - 05.05.2015

55 Disposal Yard Godaparagahawatta CEA Recommendation CEA 28.05.2014 28.05.2014 - 27.05.2015

56 Asphalt plant Galpothugoda Environmental Protection Licence CEA 22.07.2014 14.07.2014 - 13.07.2015

Environmental Clearance CEA - 57 Disposal Yard (Yoshida 2) Sapugaskanda Dept. of Agrarian Agrarian Approval - Development

CEA Recommendation CEA 26.10.2014 24.10.2014 - 23.10.2015 Kuruduwatta 58 Disposal Yard (Gonawala) SLLRDC Clearance SLLRDC 10.11.2014 -

UDA Clearance UDA 10.11.2014 -

59 Minor scale Blasting 12+490 - 12+510 - II Mining Licence GSMB 24.12.2014 26.12.2014 - 25.03.2015

60 Minor scale Blasting 11+270 - 11+310 Mining Licence GSMB 05.02.2015 06.02.2015 - 11.02.2015

SLLRDC Clearance SLLRDC 25.03.2015 - Kaduwela 61 Disposal Yard (Ramahara road) Dept. of Agrarian Agrarian Approval 25.03.2015 - Development

Environmental Clearance CEA 06.08.2014 06.08.2014 - 05.08.2015

62 Disposal Yard Siyambalape SLLRDC Clearance SLLRDC 18.02.2015 - Dept. of Agrarian Agrarian Approval 11.03.2015 - Development

63 Disposal Yard Manelwatta CEA Recommendation CEA 24.04.2015 22.04.2015 - 21.04.2016

SLLRDC Clearance SLLRDC - 64 Disposal Yard Rakgahawatta Dept. of Agrarian Agrarian Approval - Development Environmental Recommendation CEA - 65 Disposal Yard Kaduwela - II Irrigation Approval Irrigation Department - SLLRDC Clearance SLLRDC -

66 Disposal Yard Siyambalape - II Environmental Recommendation CEA 22.04.2015 - 21.04.2016

Environmental Recommendation CEA 23.07.2015 - 22.07.2016 67 Disposal Yard Mabima - II SLLRDC Clearance SLLRDC -

Dept. of Agrarian 68 Disposal Yard Kothalawala Agrarian Approval 12.05.2014 - 11.05.2015 Development Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure C

Details of Compensation for House Damages

Property Condition Survey & Payment Estimation completed Location No. of House Demolished Foundation only other Null Damaged Agreed & Paid Balance Damage Section -01 241 224 9 6 0 2 223 1 (00+000-08+800) Section -02 246 240 0 5 1 0 240 0 (08+800-10+500) Section -03 241 236 2 1 0 2 235 1 (10+500-12+000) Section -04 22 20 0 0 1 1 20 0 (13+000-14+000) Section -05 99 94 3 1 1 0 94 0 (14+000-15+000) Section -06 178 168 0 3 1 6 166 2 (15+500-17+700)

COMPLAIN 3 3 0 0 0 0 3 0

Beyond 50m 7 7 0 0 0 0 6 1

Total 1037 992 14 16 4 11 987 *5

. * Note - Balance five no. of Affected Parties are under negotiation Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

1 1 P. Pemawathi Perera 224 E, Wihara mawatha, Hewagama, Kaduwela 17+260 LHS 60,000.00 Agreed 2 2 K. D. Stephen 224/C-1, Wihara mawatha, Hewagama, Kaduwela 17+255 LHS 90,000.00 Agreed 3 3 P. L. Vineetha 224/1B, Wihara mawatha, Hewagama, Kaduwela 17+220 LHS 55,000.00 Agreed 4 4 N. A. B. Arunakumari 224/J, Wihara mawatha, Hewagama, Kaduwela 17+220 LHS 100,000.00 Agreed 5 5 P. Sirisena 224/B, Wihara mawatha, Hewagama, Kaduwela 17+200 LHS 117,000.00 Agreed 6 6 Ramanilatha hettiarachchi 222/2C-1, Wihara mawatha, Hewagama, Kaduwela 17+160 LHS Foundation Only 7 7 K. D. C. Renuka 218/5, Wihara mawatha, Hewagama, Kaduwela 17+120 LHS 69,000.00 Agreed 8 8 M.H.S.Kumuduni 306/3A, Samagi mawatha, Hewagama, Kaduwela 17+270 LHS 122,000.00 Agreed 9 9 H.A.H.P.Perera 226/2, Wihara mawatha, Hewagama, Kaduwela 17+260 RHS 75,000.00 Agreed 10 10 H. K. C.Darshana 226/3, Wihara mawatha, Hewagama, Kaduwela 17+290 RHS 70,000.00 Agreed 11 11 W.L.Shiranthi 199/A, Wihara mawatha, Hewagama, Kaduwela 16+980 LHS 82,000.00 Agreed 12 12 T. A. P. Chandralatha 199/8, Wihara mawatha, Hewagama, Kaduwela 16+950 LHS 50,000.00 Agreed 13 13 J. A. Siriyani 195/8, Hewagama, Kaduwela 16+900 LHS 65,000.00 Agreed 14 14 L.Premasiri Perera 222/2D, Wihara mawatha, Hewagama, Kaduwela 17+190 LHS 81,000.00 Agreed 15 15 K. B. W. Perera 195/B, Godelle road, Hewagama, Kaduwela 16+870 LHS 50,000.00 Agreed 16 16 K.L.K.Manel 195/7C,Hewagama, Kaduwela 16+880 LHS 30,000.00 Agreed 17 17 H.P.G.C. Weerasinghe 133/5, Hewagama, Kaduwela 16+420 RHS 192,000.00 Agreed 18 18 (1) L.Pubudu Prasanna 133/8/B, Hewagama, Kaduwela 16+440 RHS 240,000.00 Agreed 19 19 D. N. Wejesundara 131, Disawatta, Hewagama, Kaduwela 16+600 RHS 355,000.00 Agreed 20 20 B. B. Chandika 133/24,Avissawella road, Kaduwela 16+520 RHS 40,000.00 Agreed 21 21 N.C.P.Hewagama 198/4, Wihara mawatha, Hewagama, Kaduwela 16+965 LHS 72,000.00 Agreed 22 22 Weligamage Ariyawansha 132, Hewagama, Kaduwela 16+520 LHS 95,000.00 Agreed 23 23 S.S.Rajapaksha 138/1, Hewagama, Kaduwela 16+440 LHS 40,000.00 Agreed 24 24 S A Gunapala Perera 8/2, Biyagama pahala, Biyagama 16+210 LHS Already compensated 25 25 U.I.R. P. Perera 90/3E, Ramahara, 1st lane, Hewagama, Kaduwela 16+740 RHS 310,000.00 Agreed 26 26 T. S. G. S. Samankumara 187/1-C, Godelle road, Hewagama, Kaduwela 16+610 LHS 105,000.00 Agreed 27 27 W. Gunawathi Botheju 187/C 2, Vihara Mw; Hewagama, Kaduwela 16+660 LHS 65,000.00 Agreed 28 28 W.N.Botheju 187/C, Hewagama, Kaduwela 16+680 LHS 65,000.00 Agreed 29 29 W. Amarawathie Botheju 187/C-1/1, Hewagama, Kaduwela 16+650 LHS 150,000.00 Agreed 30 30 S.M.S.Wijerathne 188/D-1, Vihara Mw; Hewagama, Kaduwela 16+700 LHS 80,000.00 Agreed 31 31 W.U.Jayashantha 187/D-2, Hewagama, Kaduwela 16+680 LHS 95,000.00 Agreed 32 32 Y.P. Karunathunga 188/D, Hewagama, Kaduwela 16+710 LHS 90,000.00 Agreed 33 33 A.D.C.Saman Siriwardhana 191/1, Wihara mawatha, Hewagama, Kaduwela. 16+720 LHS 50,000.00 Agreed 34 34 P. G. Dilhani 191/2A, Wihara mawatha, Hewagama, Kaduwela 16+750 LHS 40,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

35 35 K.D.I.Malani 191, Wihara mawatha, Hewagama, Kaduwela 16+780 LHS 20,000.00 Agreed 36 36 W. Asawathie 191/2, Wihara mawatha, Hewagama, Kaduwela 16+740 LHS 35,000.00 Agreed 37 37 Athula Mahagamage 188/1C, Wihara mawatha, Hewagama, Kaduwela 16+710 LHS Already compensated 38 38 T.L.S. Padmaseeli 195/2, Wihara mawatha, Hewagama, Kaduwela 16+790 LHS 30,000.00 Agreed 39 39 T L Kusuma Chandraseeli 195/4, Hewagama, Kaduwela 16+790 LHS 55,000.00 Agreed 40 40 T L Kusuma Chandraseeli 195/4 A, Hewagama, Kaduwela 16+788 LHS 55,000.00 Agreed 41 41 T. L. D. Dayananda 195/3, Wihara mawatha, Hewagama, Kaduwela 16+870 LHS 40,000.00 Agreed 42 42 T. L. D. Dayananda 395/3-1, Wihara mawatha, Hewagama, Kaduwela 16+840 LHS 66,000.00 Agreed 43 43 T. L. D. Dayananda 195/3, Hewagama, Kaduwela 16+820 LHS 20,000.00 Agreed 44 44 W.M.K.Clement Fernando 480, Heiyanthuduwa, Mabima 15+740 RHS 50,000.00 Agreed 45 45 L A T Sunil Shantha 488/1, wathura patha, Mabima 15+700 LHS Demolished 46 46 A. A. D. Abesingha Weerarathna 08, biyagama pahala, biyagama 16+220 RHS 150,000.00 Agreed 47 47 A. A. D. Abesingha Weerarathna 10, biyagama pahala, biyagama 16+220 RHS 15,000.00 Agreed 48 48 Eksath Samaja Sewa Subasadaka Sangamaya No.90/70,Ramhara road, Hewagama, Kaduwela 16+760 RHS 30,000.00 Agreed 49 49 K. V. Jayasena 224/A-1, Wihara mawatha, Hewagama, Kaduwela 17+240 LHS 144,000.00 Agreed 50 50 S. W. Muthukumara 90/G, Ramhara para, Hewagama, Kaduwela 16+720 RHS 152,000.00 Agreed 51 51 S. W. Muthukumara 90/G, Ramhara para, Hewagama, Kaduwela 16+720 RHS 60,000.00 Agreed 52 52 R.I.S.Jayarathne Ilukwatta, Biyagama Pahala, Biyagama 16+100 LHS 40,000.00 Agreed 53 53 A. A. D. Abesingha Weerarathna 8/1, biyagama pahala, biyagama 16+180 RHS 86,000.00 Agreed 54 54 R. M. D. Podimanike 706/C, Siriketha Road, Heiyanthuduwa. 13+380 LHS 90,000.00 Agreed 55 55 R. M. D. Podimanike 706/C/1, Siriketha Road, Heiyanthuduwa. 13+380 LHS 60,000.00 Agreed 56 56 R. M. D. Podimanike 706/C/2 , Siriketha Road, Heiyanthuduwa. 13+380 LHS 30,000.00 Agreed 57 57 P. G. Pemawansha 705/A/4 Siriketha Road, Heiyanthuduwa. 13+310 LHS 70,000.00 Agreed 58 58 U.D.B. Silva 292/9, Makola North,Makola 13+310 LHS 31,000.00 Agreed 59 59 L.D.P.Perera 294, Heiyanthuduwa, Sapugaskanda 12+500 LHS 65,000.00 Agreed Sri Gnanathilaka Meditation Center, Dewamiththa place, 60 60 Ven. Pathegama Gnanathilake 15+020 RHS 102,000.00 Agreed Heiyanthuduwa Sri Gnanathilaka meditation center, Dewamiththa place, 61 61 Ven. Pathegama Gnanathilake 15+020 RHS 71,000.00 Agreed Heiyanthuduwa Sri Gnanathilaka meditation center, Dewamiththa place, 62 62 Ven. Pathegama Gnanathilake 15+020 RHS 80,000.00 Agreed Heiyanthuduwa 63 63 S. Thilakawardhana 628/G/1,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 50,000.00 Agreed 64 64 S. Thilakawardhana 628/G/2,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 50,000.00 Agreed 65 65 S. Thilakawardhana 628/G/3,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 62,000.00 Agreed 66 66 S. Thilakawardhana 628/F/6,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 46,000.00 Agreed 67 67 S. Thilakawardhana 628/G/4,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 70,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

68 68 S. Thilakawardhana 628/F/5,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 75,000.00 Agreed 69 69 S. Thilakawardhana 628/G/5,Jayanthi Mw; Heiyanthuduwa. 14+960 RHS 60,000.00 Agreed 70 70 S. Thilakawardhana 628/G/6,Jayanthi Mw; Heiyanthuduwa. 14 + 960 RHS 75,000.00 Agreed 71 71 S. Thilakawardhana 628/F/1,Jayanthi Mw; Heiyanthuduwa. 14 + 960 RHS 60,000.00 Agreed 72 72 S. Thilakawardhana 628/F/2,Jayanthi Mw; Heiyanthuduwa. 14 + 960 RHS 80,000.00 Agreed 73 73 S. Thilakawardhana 628/F/3,Jayanthi Mw; Heiyanthuduwa. 14 + 960 RHS 100,000.00 Agreed 74 74 S. Thilakawardhana 628/F/4,Jayanthi Mw; Heiyanthuduwa. 14 + 960 RHS 60,000.00 Agreed 75 75 D. Sheela Kumuduni 328/1-B, Dewamiththa place, Heiyanthuduwa 14 + 920 RHS 63,000.00 Agreed 76 76 R.Piyasena 328/A, Dewamiththa place, Heiyanthuduwa 14 + 860 RHS 41,000.00 Agreed 77 77 T. H. Nalaka 329/B, Dewamiththa place, Heiyanthuduwa 14 + 450 RHS 62,000.00 Agreed 78 78 R.Piyasena 328/1 A, Dewamiththa place, Heiyanthuduwa 14 + 860 RHS 18,000.00 Agreed 79 79 M. A. D. Chaminda Niroshana 330/4, Dewamiththa place, Heiyanthuduwa 14 + 930 LHS 40,000.00 Agreed 80 80 E. A. D. Pemasiri 329/1, Dewamiththa place, Heiyanthuduwa 14 + 870 RHS 75,000.00 Agreed 81 81 N. P. Gnanathilaka 328/1, Dewamiththa place, Heiyanthuduwa 14 + 870 RHS 50,000.00 Agreed 82 82 L. D. Perera 354/A, Dewamiththa place, Heiyanthuduwa 14 + 960 LHS 50,000.00 Agreed 83 83 H. D. Saman Priyantha 330/6, Dewamiththa place, Heiyanthuduwa 14 + 980 LHS 70,000.00 Agreed 84 84 Pathma Abeywickrama 330/G, Dewamiththa place, Heiyanthuduwa 14 + 860 LHS 75,000.00 Agreed 85 85 E.A.D. Nandasiri 330, Dewamiththa place, Heiyanthuduwa 14 + 850 LHS 95,000.00 Agreed 86 86 K Gayan Dinesh Perera 138/2, Hewagama, Kaduwela 16+400 LHS Court case 87 87 A. L. Shantha Lal Kumara 330/B, Dewamiththa place, Heiyanthuduwa 14 + 540 LHS 85,000.00 Agreed 88 88 R. M. S. Damayanthi 355/D, Dewamiththa place, Heiyanthuduwa 14 + 620 RHS 175,000.00 Agreed 89 89 R. M. Lakmali Nisansala 355/C, Dewamiththa place, Heiyanthuduwa 14 + 570 LHS 66,000.00 Agreed 90 90 G.A.P.Kaminda 355/A, Bandaranayaka road, Heiyanthuduwa 14 + 560 LHS 90,000.00 Agreed 91 91 R. M. C. Amali Rajapaksha 355/B/1, Bandaranayaka road, Heiyanthuduwa 14 + 530 LHS 75,000.00 Agreed 92 92 R. M. G. Madushanka 355/B-1, Dewamiththa place, Heiyanthuduwa 14 + 550 LHS 145,000.00 Agreed 93 93 H.D.Piyal Weerasinghe 330/C, Dewamiththa place, Heiyanthuduwa 14 + 760 LHS 80,000.00 Agreed 94 94 N. P. S. Samarasinghe 330/D, Dewamiththa place, Heiyanthuduwa 14 + 780 LHS 95,000.00 Agreed 95 95 E. A.Prema Egodawatta 353, Bandaranayaka road, Heiyanthuduwa 14 + 530 RHS 75,000.00 Agreed 96 96 G. A.S.N. Gurusinghe 353/1-A, Bandaranayaka road, Heiyanthuduwa 14 + 550 RHS 165,000.00 Agreed 97 97 G. A. K. Nirosha 353/1, Bandaranayaka road, Heiyanthuduwa 14 + 580 RHS 52,000.00 Agreed 98 98 S.K.Chandralatha 361/B/2, Dewamiththa place, Heiyanthuduwa 14 + 220 RHS 75,000.00 Agreed 99 99 W. D. D. Rodrigo 349/14/A, Dewamiththa place, Heiyanthuduwa 14 + 370 RHS 70,000.00 Agreed 100 100 W. D. D. Rodrigo 349/14/A, Bandaranayaka Mw; Heiyanthuduwa 14 + 400 RHS 270,000.00 Agreed 101 101 N.G. Mallika 357, Dewamiththa place, Heiyanthuduwa 14 + 200 RHS 62,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

102 102 H. B. Ramani 361/B-4, Dewamiththa place, Heiyanthuduwa 14 + 150 RHS 65,000.00 Agreed 103 103 L.A.W.A.S.V. Madusanka 361/B-9, Dewamiththa place, Heiyanthuduwa 14 + 150 RHS 60,000.00 Agreed 104 104 T.M.N.A.T. Banda 304/6, Samagi mawatha, Hewagama, Kaduwela 17+320 LHS 143,000.00 Agreed 105 105 R. A. Sunil Shantha 306/6/B, Samagi mawatha, Hewagama, Kaduwela 17+300 LHS 60,000.00 Agreed 106 106 K.A.A.Perera 224/B/1, Wihara mawatha, Hewagama, Kaduwela 17+260 LHS 80,000.00 Agreed 107 107 D. M.W. K. Dissanayaka 224/C/2, Wihara mawatha, Hewagama, Kaduwela 17+255 LHS 50,000.00 Agreed 108 108 S. L. Mangalika 224/G/2, Wihara mawatha, Hewagama, Kaduwela 17+220 LHS 85,000.00 Agreed 109 109 L.A.Jinadasa 224/D/1, Wihara mawatha, Hewagama, Kaduwela 17+200 LHS 123,000.00 Agreed 110 110 L A Jinadasa 224/D/1, Wihara mawatha, Hewagama, Kaduwela 17+200 LHS 75,000.00 Agreed 111 111 Premalatha Jayawardhana 224/D/2, Wihara mawatha, Hewagama, Kaduwela 17+200 LHS 110,000.00 Agreed 112 112 J.A.D.R.Lasanthi 306/5, 7th lane, Samagi mawatha, Hewagama, Kaduwela 17+310 LHS 96,000.00 Agreed 113 113 M. H.S. Kumuduni 306/3 A, Samagi mawatha, Kaduwela 17+290 LHS 130,000.00 Agreed 114 114 K.G.S.Pieris 224/4, Hewagama, Kaduwela 17+200 LHS 54,000.00 Agreed 115 115 L. C.S. Karunasekara Vihara mawatha, Hewagama, Kaduwela 17+190 LHS 151,000.00 Agreed 116 116 N. P. Edinsiri 222/2/B, Wihara mawatha, Hewagama, Kaduwela 17+170 LHS 95,000.00 Agreed 117 117 N. P. Edinsiri 222/B, Wihara mawatha, Hewagama, Kaduwela 17+170 LHS 21,000.00 Agreed 118 118 H.A.N. Ranjith Perera 169/3, Wihara mawatha, Hewagama, Kaduwela 17+160 LHS 80,000.00 Agreed 119 119 H. A. Nimalasiri 226/1, Wihara mawatha, Hewagama, Kaduwela 17+270 RHS 90,000.00 Agreed 120 120 Ramanilatha Hettiarachchi 222/2C, Wihara mawatha, Hewagama, Kaduwela 17+160 LHS 115,000.00 Agreed 121 121 H. A. R. Hapuarachchi 226, Wihara mawatha, Hewagama, Kaduwela 17+300 RHS 110,000.00 Agreed 122 122 H. A. R. Hapuarachchi 226, Wihara mawatha, Hewagama, Kaduwela 17+300 RHS 20,000.00 Agreed 123 123 N P Amara Piyasili 228/1/2, Wihara mawatha, Hewagama, Kaduwela 17+330 RHS 273,000.00 Under Negotiation 124 124 D.P.L.C.K. Doolwala 218/A, Wihara mawatha, Hewagama, Kaduwela 17+110 LHS 205,000.00 Agreed 125 125 B.G. Yasawathie 199, Wihara mawatha, Hewagama, Kaduwela 16+980 LHS 40,000.00 Agreed 126 126 B.G. Ariyawathi Prera 199/1, Wihara mawatha, Hewagama, Kaduwela 16+970 LHS 47,000.00 Agreed 127 127 K. K. S. Gunawardhane 199/1, Wihara mawatha, Hewagama, Kaduwela 16+965 LHS 58,000.00 Agreed 128 128 K. D. Sarath Anandasiri 218/B, Wihara mawatha, Hewagama, Kaduwela 17+120 LHS 130,000.00 Agreed 129 129 G. Buddhika Sampath 198/2/A, Wihara mawatha, Hewagama, Kaduwela 16+965 LHS 60,000.00 Agreed 130 130 L.C.Perera 196/2, Wihara mawatha, Hewagama, Kaduwela 16+940 LHS 65,000.00 Agreed 131 131 W.B.Samantha 199/9, Wihara mawatha, Hewagama, Kaduwela 16+950 LHS 61,000.00 Agreed 132 132 L. R. Liyanage 205, Wihara mawatha, Hewagama, Kaduwela 16+965 LHS 60,000.00 Agreed 133 133 H. M. C. Malani Herath 182,Sirisevena, Hewagama, Kaduwela 16+940 LHS 30,000.00 Agreed 134 134 Liyanage Somawathi 196/A, Wihara mawatha, Kaduwela 16+910 LHS 22,000.00 Agreed 135 135 K. K. Lalitha Kumari 195/7/A, Wihara mawatha, Hewagama, Kaduwela 16+820 LHS 40,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

136 136 L .K.Perera 196/1, Wihara mawatha, Hewagama, Kaduwela 16+950 LHS 57,000.00 Agreed 137 137 K.H.Namali 195/7, Wihara mawatha, Hewagama, Kaduwela 16+810 LHS 50,000.00 Agreed 138 138 Gamage Sirimal Perera 195/1/A, Wihara mawatha, Hewagama, Kaduwela 16+800 LHS 70,000.00 Agreed 139 139 A. Nandawathi Perera 195/1, Wihara mawatha, Hewagama, Kaduwela 16+790 LHS 70,000.00 Agreed 140 140 K.R.Dharmasiri Perera 195/6, Wihara mawatha, Hewagama, Kaduwela 16+980 LHS 75,000.00 Agreed 141 141 A. K. W. Kumara Perera 195, Wihara mawatha, Hewagama, Kaduwela 16+770 LHS 66,000.00 Agreed 142 142 K.T.D.Dasanpriya Kumara 193, Hewagama, Kaduwela 16+765 LHS 60,000.00 Agreed 143 143 W. Karalainnona 189/1/A, Ramahara road, Hewagama 16+730 LHS 80,000.00 Agreed 144 144 G. D. Vijitha Rupika 188/1, Wihara mawatha, Hewagama, Kaduwela 16+730 LHS 55,000.00 Agreed 145 145 M. G. Bandula 225/18, Wihara mawatha, Hewagama, Kaduwela 17+230 RHS 113,000.00 Agreed 146 146 H. G.Pieris 225/11, Wihara mawatha, Kothalawala, Kaduwela 17+240 RHS 76,000.00 Agreed 147 147 D. N. Dissanayaka 225/22, Wihara mawatha, Hewagama, Kaduwela 17+250 RHS 155,000.00 Agreed 148 148 D. N. Dissanayaka 225/21, Wihara mawatha, Hewagama, Kaduwela 17+250 RHS 40,000.00 Agreed 149 149 H.W.D.Karunarathne 90/B/3, Hewagama, Kaduwela 16+690 RHS 67,000.00 Agreed 150 150 W. W. Singho 187/A, Hewagama, Kaduwela 16+670 LHS 50,000.00 Agreed 151 151 W. Wimon Singho 187, Hewagama, Kaduwela 16+670 LHS 48,000.00 Agreed 152 152 Y. P. Karunathunga 188/D, Vihara Mw; Hewagama, Kaduwela 16+710 LHS 21,000.00 Agreed 153 153 W. A. R. Kumara 188/A, hewagama, Kaduwela 16+710 LHS 70,000.00 Agreed 154 154 Mihindu Kumara Liyanagamage 155/1, Hewagama, Kaduwela. 16+520 LHS 30,000.00 Agreed 155 155 Mihindu Kumara Liyanagamage 155/1, Hewagama, Kaduwela 16+520 LHS 48,000.00 Agreed 156 156 K D Nimalsiri 205/1, Awisawella road, hewagama, Kaduwela 16+520 LHS Demolished 157 157 K.D.Nimalsiri 205/207, Awisawella road, hewagama, Kaduwela 16+520 LHS 67,000.00 Agreed 158 158 S. W. Gunadasa 79/F, hewagama, Kaduwela 16+640 RHS 107,000.00 Agreed 159 159 P.W.J.Kumar 79/D/1, Hewagama, Kaduwela 16+630 LHS 109,000.00 Agreed 160 160 M. S. M. Perera 79/G/1, hewagama, Kaduwela 16+620 LHS 96,000.00 Agreed 161 161 K. D. Seelawathie 79/B, Hewagama, Kaduwela 16+610 RHS 93,000.00 Agreed 162 162 C. S. Rampathirana 79/C, hewagama, Kaduwela 16+590 RHS 115,000.00 Agreed 163 163 D. N. Wijesundara 131, Disawatta, Hewagama, Kaduwela 16+600 RHS 16,000.00 Agreed 164 164 D. N. Wijesundara 131/1, Disawatta, Hewagama, Kaduwela 16+600 RHS 80,000.00 Agreed 165 165 D. C. J. Katugampala 82, Hewagama, Kaduwela 16+550 RHS 56,000.00 Agreed 166 166 D. M. G. N. Dissanayaka 133/2, Hewagama, Kaduwela 16+420 RHS 220,000.00 Agreed 167 167 A. A. D. Pathma Abeyasiri 7, Biyagama pahala, Biyagama 16+220 RHS 95,000.00 Agreed 168 168 W.L.I. Udaya Kumara 5/1/B, Biyagama pahala, Biyagama 16+240 RHS 75,000.00 Agreed 169 169 G.Ranjani Perera 6, Biyagama pahala, Biyagama 16+200 RHS 70,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

170 170 G.Ranjani Perera 6/A, Biyagama pahala, Biyagama 16+200 RHS 45,000.00 Agreed 171 171 A. A. D. Malini Sirimathi 8/1, Biyagama pahala, Biyagama 16+220 RHS 109,000.00 Agreed 172 172 A. A. D. Abesingha Weerarathna 10, Biyagama pahala, Biyagama 16+250 RHS 30,000.00 Agreed 173 173 A.A.D. Vinnie Amarasuriya 8/4, Biyagama pahala, Biyagama 16+180 RHS 75,000.00 Agreed 174 174 A.A.D. Vinnie Amarasuriya 8/4, Biyagama pahala, Biyagama 16+170 RHS 80,000.00 Agreed 175 175 K. D. Wijesiri 380/5, Galabada watta, Mabima,Heiyanthuduwa 15+950 RHS 95,000.00 Agreed 176 176 P.K.Priyalatha 380/1/A, Galabada watta, Mabima,Heiyanthuduwa 15+950 RHS 43,000.00 Agreed 177 177 W.D. Emalinnona 380, Galabada watta, Mabima,Heiyanthuduwa 15+900 RHS 80,000.00 Agreed 178 178 K. A. Meththasena 88/A, Wathurapatha, Mabima, Heiyanthuduwa 15+500 LHS 40,000.00 Agreed 179 179 K. A. Ranjith Athukorala 380/6, Mabima, Heiyanthuduwa 15+880 RHS 67,000.00 Agreed 180 180 P.T. Kumara 381, Galabada watta, Mabima,Heiyanthuduwa 15+910 RHS 30,000.00 Agreed 181 181 H. Nimal Karunarathna 376, Galabada watta, Mabima,Heiyanthuduwa 15+910 RHS 43,000.00 Agreed 182 182 P. L. Jayasundara 380/1, Galabada watta, Mabima,Heiyanthuduwa 15+940 RHS 83,000.00 Agreed 183 183 K. S. P. Kumara 380/4, Galabada watta, Mabima,Heiyanthuduwa 15+960 RHS 57,000.00 Agreed 184 184 K G D Perera 138/2/1, Hewagama, Kaduwela 16+400 LHS Court case 185 185 B. A. D. Perera 486, Wathurapatha, Heiyanthuduwa 15+520 RHS 130,000.00 Agreed 186 186 H. R. S. Priyashantha 486/1, Wathurapatha, Mabima, Heiyanthuduwa 15+510 LHS 105,000.00 Agreed Sri Gnanathilaka meditation center, Dewamiththa place, 187 187 Ven.Pathegama Gnanathilaka 15+020 RHS 62,000.00 Agreed Heiyanthuduwa 188 188 U.D.A.Nanayakkara 326/3,Devamitta Place,Heiyanthuduwa 15+020 RHS 60,000.00 Agreed Sri Gnanathilaka meditation center, Dewamiththa place, 189 189 Rev:Pathegama Gnanathilaka Thero 15+020 RHS Null Damage Heiyanthuduwa 190 190 E.A.D.Alpinona 326,Devamitta Place,Heiyanthuduwa 14+960 RHS 50,000.00 Agreed 191 191 M.L.Sriyani 328/4 Devamitta Place,Heiyanthuduwa 14+920 RHS 50,000.00 Agreed 192 192 N. P. Chandani 328/2,Devamitta Place,Heiyanthuduwa 14+890 RHS Demolished 193 193 N.P.P. Chandrani 328, Devamitta Place,Heiyanthuduwa 14+870 RHS 50,000.00 Agreed 194 194 N.P.P. Chandrani 328/7, Devamitta Place,Heiyanthuduwa 14+860 RHS 60,000.00 Agreed 195 195 E.K.Premawathi 328/3/B, Devamitta Place,Heiyanthuduwa 14+850 RHS 40,000.00 Agreed 196 196 H.C.Gunasekara 325/1 Devamitta Place,Heiyanthuduwa 14+840 RHS 65,000.00 Agreed 197 197 H.C.Gunasekara 325/1 Devamitta Place,Heiyanthuduwa 14+840 RHS 60,000.00 Agreed 198 198 H.L.Gunasekara 325 F, Devamitta Place,Heiyanthuduwa 14+830 RHS 50,000.00 Agreed 199 199 H.M.K.Jayasinghe 330/1 Devamitta Place,Heiyanthuduwa 14+770 LHS 50,000.00 Agreed 200 200 H.M.K.Jayasinghe 330/1 Devamitta Place,Heiyanthuduwa 14+785 LHS 96,000.00 Agreed 201 201 K. A.W. Pathmini 486/4, Wathurapatha, Heiyanthuduwa 15+500 RHS 71,000.00 Agreed 202 202 W.M.K.Clement Fernando 480, Wathurapatha, Mabima, Heiyanthuduwa 15+740 RHS 50,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

203 203 A.L.Shantha Lal Kumara 330/B Devamitta Place,Heiyanthuduwa 14 + 540 LHS 125,000.00 Agreed 204 204 E.A.D. Pathmasiri 330/2 Devamitta Place,Heiyanthuduwa 14+790 LHS 80,000.00 Agreed 205 205 M.S.D.Peiris 345/E Bandaranayake Mw , Heiyanthuduwa 14+620 RHS 150,000.00 Agreed 206 206 K.A.D.Lorence Titus 345/D Bandaranayake Mw , Heiyanthuduwa 14+620 RHS 118,000.00 Agreed 207 207 K.A.D.Prabath Sanjeewa 345/C Bandaranayake Mw, Heiyanthuduwa 14+620 RHS 90,000.00 Agreed 208 208 W.D.D.Anura Shantha 351/1, Bandaranayake Mw ,Heiyanthuduwa 14+520 RHS 85,000.00 Agreed 209 209 W.L.D.N. Dilruk 351/A, Bandaranayake Mw ,Heiyanthuduwa 14+520 RHS 70,000.00 Agreed 210 210 H.M.Wimaladasa 351/B Bandaranayake Mw ,Heiyanthuduwa 14+500 RHS 75,000.00 Agreed 211 211 T.J.D.H. Perera 352/C Bandaranayake Mw ,Heiyanthuduwa 14+580 RHS 32,000.00 Agreed 212 212 R.P.Rathnaweera Rajapaksha 352/B Bandaranayake Mw ,Heiyanthuduwa 14+580 RHS Null Damage 213 213 M.A.D.T. Chinthaka 355/D/1 Bandaranayake Mw ,Heiyanthuduwa 14+560 LHS 60,000.00 Agreed 214 214 R. M. S. Damayanthi 355/D 3, Bandaranayake Mw ,Heiyanthuduwa 14+570 LHS 75,000.00 Agreed 215 215 W.L.D.Siriwardhana 351, Bandaranayake Mw ,Heiyanthuduwa 14+500 RHS 90,000.00 Agreed 216 216 H.D.Indrawathie 349/C Bandaranayake Mw ,Heiyanthuduwa 14+490 RHS 70,000.00 Agreed 217 217 R.M.S.S.Rathnayaka 349/E Bandaranayake Mw, Heiyanthuduwa 14+785 RHS 67,000.00 Agreed 218 218 M.Nimal Wijesiri 349/D Bandaranayake Mw, Heiyanthuduwa 14+480 RHS 60,000.00 Agreed 219 219 H.A.Thilakarathna 281, Dewamitta place, Heiyanthuduwa 14+400 RHS 35,000.00 Agreed 220 220 U.V.Samali 349/9 Bandaranayake Mw, Heiyanthuduwa 14+390 95,000.00 Agreed 221 221 T.G.N.Perera 349/F Bandaranayake Mw, Heiyanthuduwa 14+380 RHS 80,000.00 Agreed 222 222 Chamith Gayan Kannangara 349/13 Bandaranayake Mw, Heiyanthuduwa 14+370 70,000.00 Agreed 223 223 K.Sarath Premasiri 361/B/3 Devamitta Place,Heiyanthuduwa 14+220 RHS 40,000.00 Agreed 224 224 K.Sarath Premasiri 361/B/7 Devamitta Place,Heiyanthuduwa 14+200 RHS 55,000.00 Agreed 225 225 L.J. Perera 361.B/10 Devamitta Place,Heiyanthuduwa 14+150 RHS 50,000.00 Agreed 226 226 N.G.Susila Chandanie 357 , Devamitta Place,Heiyanthuduwa 14+200 RHS 65,000.00 Agreed 227 227 H.D.Sudath Kumara 339/1 ,Dewamitta place, ,Heiyanthuduwa 14+780 RHS 70,000.00 Agreed 228 228 H.D.Pemel 339,Dewamitta place,Heiyanthuduwa 14+780 RHS 62,000.00 Agreed 229 229 Felix Coster 361/B/6, Devamitta Place, Heiyanthuduwa 14+100 RHS Unable to contact House Owner 230 230 A.A.D.S. Algama 361/8/8 Devamitta Place,Heiyanthuduwa 14+250 RHS 45,000.00 Agreed 231 231 L.D.L.De Silva 290 , Devamitta Place,Heiyanthuduwa 14+170 RHS 58,000.00 Agreed 232 232 E.A.D.Nirmala Chandani 704/C Mahakumbura watta,Heiyanthuduwa 13+395 LHS 40,000.00 Agreed 233 233 N.D.K.Sumanasekara 233, Siriketha rd,Heiyanthuduwa 13+400 LHS 67,000.00 Agreed 234 234 S.A.N.R.K. Perera 714/B,Siriketha road,Heiyanthuduwa 13+410 LHS 40,000.00 Agreed 235 235 A.Somarathna 714/A Mahakumbura watta,Heiyanthuduwa 13+420 LHS 71,000.00 Agreed 236 236 K.G.M.D.Chandrabandu 339/2, Jayanthi Mw ,Heiyanthuduwa 14+770 RHS 65,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

237 237 R.M.Sumanadasa 663/E/1, Kajugahahena rd;Heiyanthuduwa 13+140 LHS 65,000.00 Agreed 238 238 H.A.Somadasa 663 C, Kajuhena rd; Heiyanthuduwa 13+130 LHS 40,000.00 Agreed 239 239 Deepika Jayakody 663, Kajuhena rd; Heiyanthuduwa 13+120 LHS 40,000.00 Agreed 240 240 W.Nisansala Lakmali 663/K, Kajuhena road,Heiyanthuduwa 13+140 LHS 25,000.00 Agreed 241 241 W.A.Namal Prasanna 663/G, Mahakumbura watta,Heiyanthuduwa 13+145 LHS Foundation Only 242 242 E.A.D.Magilin 639,kajuhena Road,Heiyanthuduwa 12+940 LHS 20,000.00 Agreed 243 243 E.A.D.Magilin 639,kajuhena Road,Heiyanthuduwa 12+930 LHS 35,000.00 Agreed 244 244 E.A.D.Magilin 639,kajuhena Road,Heiyanthuduwa 12+820 LHS 46,000.00 Agreed 245 245 K.A.Siriyawathie 637/C,kajuhena Road,Heiyanthuduwa 12+920 LHS 40,000.00 Agreed 246 246 K.A.D.Sarath 637/3, kajuhena Road,Heiyanthuduwa 12+900 LHS 45,000.00 Agreed 247 247 K.A.Leelawathie 637,Kajuhena Road,Heiyanthuduwa 12+880 LHS 40,000.00 Agreed 248 248 K.A.Indrawansha 641, kajuhena Road,Heiyanthuduwa 12+820 LHS 40,000.00 Agreed 249 249 K.A.Indrawansha 641, kajuhena Road,Heiyanthuduwa 12+810 LHS 40,000.00 Agreed 250 250 L.Indika Udayakumara 636, Godella watta, Heiyanthuduwa 12+720 LHS 84,000.00 Agreed 251 251 G.Sumanadasa Perera 635, Kajuhena Road,Heiyanthuduwa 12+740 LHS 65,000.00 Agreed 252 252 G.Sumanadasa Perera 635, Kajuhena Road,Heiyanthuduwa 12+740 LHS 20,000.00 Agreed 253 253 L.S. Perera 630, Nayagala, Heiyanthuduwa 12+680 LHS 50,000.00 Agreed 254 254 L.W. Perera 630/1, Heiyanthuduwa 12+660 LHS 22,000.00 Agreed 255 255 L.G.D. Pushpakumara 630/C, Heiyanthuduwa 12+650 LHS 127,000.00 Agreed 256 256 M.Sumanawathie 627/1, Heiyanthuduwa 12+680 LHS 40,000.00 Agreed 257 257 P.M.Sunil Shantha 639/1/A, kajuhena Road,Heiyanthuduwa 12+980 LHS 70,000.00 Agreed 258 258 A.M.Padmawathie 630/C/2, Nayagala, Heiyanthuduwa 12+660 LHS 35,000.00 Agreed 259 259 W.A.Ramani Pushpalatha 636/A, Nayagala , Heiyanthuduwa 12+680 LHS 65,000.00 Agreed 260 260 T.M.J.P. Gunathilaka 626, Makola North Makola 11+190 RHS 130,000.00 Agreed 261 261 T.M.J.P. Gunathilaka 626, Makola North Makola 11+170 RHS 21,000.00 Agreed 262 262 T.M.J.P. Gunathilaka 626, Makola North Makola 11+150 RHS 42,000.00 Agreed 263 263 A.T.S.Alahapperuma 295/A, Makola North, Makola 11+280 LHS 104,000.00 Agreed 264 264 A.T.S.Alahapperuma 295, Makola North, Makola 11+280 LHS 28,000.00 Agreed 265 265 T.L.K.P. Gunathilaka 398,Makola South, Makola 11+060 LHS 170,000.00 Agreed 266 266 K.K.Hemalatha 401/2, Makola South,Makola 11+340 LHS 45,000.00 Agreed 267 267 K.K.Hemalatha 401/2, Makola South,Makola 11+320 LHS 90,000.00 Agreed 268 268 K.K.Hemalatha 401/2, Makola South,Makola 11+310 LHS Null Damage 269 269 A.D.K.A.Priyantha 397, Makola South, Makola 11+280 LHS 35,000.00 Agreed 270 270 Bentharage Seeson 397/A, Makola South, Makola 11+280 LHS 40,000.00 Agreed 271 271 D.S.Wickramarachchi 398/1, Makola South, Makola 11+290 LHS 30,000.00 Agreed 272 272 D.S.Wickramarachchi 398, Makola South, Makola 11+290 LHS 50,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

273 273 A.A.D.D.Sandya Alahakoon 422 C, Makola South, Makola 11+280 LHS 30,000.00 Agreed 274 274 A.A.D.D.Sandya Alahakoon 422 B, Makola South, Makola 11+280 LHS 60,000.00 Agreed 275 275 A.A.D.D.Sandya Alahakoon 422 A, Makola South, Makola 11+280 LHS 30,000.00 Agreed 276 276 A.A.D.S.M. Alahakoon 422/F, Makola South, Makola 11+280 LHS 42,000.00 Agreed 277 277 A.A.D.S.M. Alahakoon 422/F, Makola South, Makola 11+280 LHS 40,000.00 Agreed 278 278 A.A.D.S.M. Alahakoon 422/F, Makola South, Makola 11+280 LHS 87,000.00 Agreed 279 279 A.A.D.S.M. Alahakoon 423, Makola South, Makola 11+280 LHS 55,000.00 Agreed 280 280 A.A.D.S.M. Alahakoon 423/1, Makola South, Makola 11+280 LHS 35,000.00 Agreed 281 281 P.I.J. Dissanayake 401/2/A,Makola south,Makola 11+325 LHS 140,000.00 Agreed 282 282 G.Linton Fernando 694, Makola North, Makola, 10+620 LHS 220,000.00 Under Negotiation 283 283 K.Lalitha Perera 615/4, Makola North, Makola 11+020 RHS 71,000.00 Agreed 284 284 P.D.Wimalarathna 615/6, Makola North ,Makola 11+020 RHS 80,000.00 Agreed 285 285 R.K.A.D.Yothan 615/3, Makola North ,Makola 11+060 RHS 90,000.00 Agreed 286 286 U.P.Kamalawathie 615/5, Makola North ,Makola 11+020 RHS 40,000.00 Agreed 287 287 T.L.K.P. Gunathilaka 629/1,Makola North, Makola 11+020 RHS 35,000.00 Agreed 288 288 A.G.A.Premadasa 615/1, Makola North, Makola 11+060 RHS 55,000.00 Agreed 289 289 R.A.Chamani 615/B/1, Galwala road, Makola South, Makola 11+090 RHS 85,000.00 Agreed 290 290 K.A.G.Gunawardhana 29, Galawala rd; Makola North 11+100 RHS 51,000.00 Agreed 291 291 W.Kusumalatha 623/1, Makola North, Makola 11+140 RHS 45,000.00 Agreed 292 292 W.Kusumalatha 623/1, Makola North, Makola 11+140 RHS 70,000.00 Agreed 293 293 G.Shalika Dharshani 694/1/B, Makola North, Makola 10+630 LHS 116,000.00 Agreed 294 294 G.S.D. Fernando 694/1,Makola North, Makola 10+640 LHS 60,000.00 Agreed 295 295 G.S.D. Fernando 694/1,Makola North, Makola 10+640 LHS 65,000.00 Agreed 296 296 L.H.S. Fernando 693/A Makola North, Makola 10+690 LHS 68,000.00 Agreed 297 297 Wickramamunige Kanthi 695, Makola North, Makola 10+610 LHS 50,000.00 Agreed 298 298 J.S.S.S.Sithumina 696,Makola North,Makola 10+590 LHS 125,000.00 Agreed 299 299 H.G.E.P.Fonseka 696/2, Makola North, Makola 10+570 LHS 73,000.00 Agreed 300 300 J.S.Malani 692/1,Makola North, Makola 10+590 LHS 75,000.00 Agreed 301 301 K.S.R.Kumarasinghe 692/1/B ,Makola North, Makola 10+610 LHS 40,000.00 Agreed 302 302 K.P.Kumarasinghe 692/1/A, Makola North, Makola 10+615 LHS 52,000.00 Agreed 303 303 Hewage Susil 692/3, Makola North, Makola 10+670 LHS 75,000.00 Agreed 304 304 Sampath Hewage 692/A/1, Makola North, Makola 10+690 LHS 40,000.00 Agreed 305 305 Hewage Suneth 692/A Makola North, Makola 10+690 LHS 46,000.00 Agreed 306 306 J.S.P. Renuka 691, Makola South, Makola 10+720 LHS 78,000.00 Agreed 307 307 J.S.Sarath Sepala 691/3, Makola North, Makola 10+730 LHS 68,000.00 Agreed 308 308 J.S.Sarath Sepala 691/C, Makola South, Makola 10+730 LHS Null Damage Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

309 309 J.S.Sarath Sepala 691/3, Makola North, Makola 10+730 LHS 15,000.00 Agreed 310 310 J.S.C. Sepala 691/A1, Makola North, Makola 10+730 LHS 55,000.00 Agreed 311 311 J.S.Thushari Renuka 691, Makola North, Makola 10+720 LHS Demolished 312 312 J.S.Saman Sepala 691, Makola North, Makola 10+740 LHS 30,000.00 Agreed 313 313 G.S. Fernando 687/1, Makola North, Makola 10+740 LHS 43,000.00 Agreed 314 314 G.S. Fernando 687, Makola North,Makola 10+750 LHS 55,000.00 Agreed 315 315 J.P.M. P. Kumara 689/1, Makola North, Makola 10+750 LHS 50,000.00 Agreed 316 316 D. Sirisena Fernando 689,Makola North, Makola 10+740 LHS 78,000.00 Agreed 317 317 J.P.R.Jaya Kumara 689/1, Makola North, Makola 10+750 LHS 30,000.00 Agreed 318 318 G.A.Rohitha Fernando 690,Makola North, Makola 10+760 LHS 53,000.00 Agreed 319 319 D.M.Fernando 690/1,Makola North, Makola 10+755 LHS 40,000.00 Agreed 320 320 D.K.K.N.Wasantha 690/1/A,Makola North, Makola 10+755 LHS 60,000.00 Agreed 321 321 G.R.D.Ranasinghe 688/1, Makola North, Makola 10+755 LHS 40,000.00 Agreed 322 322 (I) G.Gunapala 685, Makola North, Makola 10+750 LHS 20,000.00 Agreed 323 323 R.A.M.Perera 687/2, Makola North, Makola 10+770 LHS 82,000.00 Agreed 324 324 S.K.N. Edward 686/4 Makola North, Makola 10+850 LHS 50,000.00 Agreed 325 325 K.Ranjani 638/9, Makola North, Makola 10+940 LHS 100,000.00 Agreed 326 326 K.Ranjani 638/9 A, Makola North, Makola 10+930 LHS 60,000.00 Agreed 327 327 M.A.P.P. Perera 638/8 , Makola North, Makola 10+955 LHS 80,000.00 Agreed 328 328 M.A.P.P. Perera 638/8 , Makola North, Makola 10+955 LHS 45,000.00 Agreed 329 329 I.A.Wimalachandra 638/12, Asiri Mw, Makola North, Makola 10+950 LHS 124,000.00 Agreed 330 330 D.W.G.Priyantha Pushpakumara 638/10, Makola North,Makola, 10+970 LHS 40,000.00 Agreed 331 331 A.M.S.P.Jayawardhana 638/6, Asiri Mawatha, Makola North, Makola 10+980 LHS 65,000.00 Agreed 332 332 N.U. Liyanage 637/11, Makola north, Makola 10+990 LHS 50,000.00 Agreed 333 333 H.L.M.Irangani 638/5, Makola North, Makola 10+970 LHS 85,000.00 Agreed 334 334 D.L.S. Wickramasinghe 638/4, Asiri Mawatha, Makola North, Makola 10+970 LHS 95,000.00 Agreed 335 335 B.P.Karunawathie 638/2, Asiri Mawatha, Makola North, Makola 10+970 LHS 127,000.00 Agreed 336 336 Ranjani Abeyrathna 638, Makola North, Makola 11+010 LHS 45,000.00 Agreed 337 337 A.A.D.C.L. Alahakoon 628/4,A, Makola North,Makola 11+220 LHS 70,000.00 Agreed 338 338 A.A.D.C.L. Alahakoon 628/4, Makola North,Makola 11+220 LHS 15,000.00 Agreed 339 339 A.A.D.C.L. Alahakoon 628/4,Makola North,Makola 11+230 LHS 30,000.00 Agreed 340 340 A.A.D.C.L. Alahakoon 628/4 ,Makola North,Makola 11+240 LHS 20,000.00 Agreed 341 341 A.A.D.C.L. Alahakoon 628/4,A, Makola North,Makola 11+240 LHS 40,000.00 Agreed 342 342 A.A.D.A.S. Alahakoon 628/4,Makola North, Makola 11+250 LHS 65,000.00 Agreed 343 343 P.V.Jayalatha 481/D/2, Galadeniya rd; Heiyanthuduwa 11+460 LHS 90,000.00 Agreed 344 344 Y.M.A.N. Perera 472/1, Galadeniya, Heiyanthuduwa 11+490 LHS 45,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

345 345 M.A.Thanuja Sharmili 475/3, Galadeniya, Heiyanthuduwa 11+560 LHS 80,000.00 Agreed 346 346 R.A.S.N. Rathnaweera 479/D, Galadeniya, Heiyanthuduwa 11+620 LHS 120,000.00 Agreed 347 347 N.C.P.Liyanage 479/C, Galadeniya, Heiyanthuduwa 11+620 LHS 45,000.00 Agreed 348 348 A.A.S. Rodrigo 479/B, Galadeniya Road, Heiyanthuduwa 11+600 LHS 35,000.00 Agreed 349 349 L.Hiranga Subhashini 705/A/2/1, Siriketha Road,Heiyanthuduwa 13+250 LHS 43,000.00 Agreed 350 350 H.D.Indrani Rupalatha 363, Siriketha Road,Heiyanthuduwa 13+250 RHS 80,000.00 Agreed 351 351 H.D.Indrani Rupalatha 363/1, Siriketha Road,Heiyanthuduwa 13+250 RHS 67,000.00 Agreed 352 352 A.Gunapala 362/E, Siriketha Road,Heiyanthuduwa 13+200 RHS 60,000.00 Agreed 353 353 R.P. Boyagama 705/2, Siriketha Road,Heiyanthuduwa 13+260 LHS 70,000.00 Agreed 354 354 U.V.Wimalarathne 624/A, Godella watta, Heiyanthuduwa 12+850 RHS 50,000.00 Agreed 355 355 U.V.Wimalarathne 624/A, Godella watta, Heiyanthuduwa 12+850 RHS 52,000.00 Agreed 356 356 U.W.D.Premalatha 624/B, Godellawatta, Heiyanthuduwa 12+840 RHS 60,000.00 Agreed 357 357 L.S. Perera 625/B, Godella watta, Heiyanthuduwa 12+720 RHS 36,000.00 Agreed 358 358 K.K.D. Piyaseeli 625/G,Godella watta, Heiyanthuduwa 12+700 RHS 35,000.00 Agreed 359 359 K.K.D. Piyaseeli 625/C,Godella watta, Heiyanthuduwa 12+690 RHS 35,000.00 Agreed 360 360 L.N.R.Madhusanka Perera 625/D, Godella watta, Heiyanthuduwa 12+680 RHS 50,000.00 Agreed 361 361 W.G.Nandapala 625, Godella watta, Heiyanthuduwa 12+740 RHS 57,000.00 Agreed 362 362 L.J. Perera 625, Godella Watta Heiyanthuduwa 12+700 RHS 90,000.00 Agreed 363 363 M.A. Somarathna 627, Heiyanthuduwa 12+740 RHS 61,000.00 Agreed 364 364 P.Karunasena 627/6A, Heiyanthuduwa 12+660 RHS 40,000.00 Agreed 365 365 L.V. Karunarathna 627/7, Temple Road ,Heiyanthuduwa 12+620 RHS 100,000.00 Agreed 366 366 L.V. Karunarathna 627/7, Temple Road ,Heiyanthuduwa 12+610 RHS 30,000.00 Agreed 367 367 J.Mary Margret 627/3A,Temple Road , Heiyanthuduwa 12+600 RHS 163,000.00 Agreed 368 368 J.Mary Margret 627/3A,Temple Road ,Heiyanthuduwa 12+600 RHS 45,000.00 Agreed 369 369 L.S.Indika Perera 627/3, Heiyanthuduwa 12+600 RHS 68,000.00 Agreed 370 370 L.S.P.P. Perera 627/4, Heiyanthuduwa 12+640 RHS 30,000.00 Agreed 371 371 L.S.P.P. Perera 624/C, Heiyanthuduwa 12+650 RHS 40,000.00 Agreed 372 372 L.S.P.P.Perera 627/4, Heiyanthuduwa 12+660 RHS 50,000.00 Agreed 373 373 L.S.P.P. Perera 624, Heiyanthuduwa 12+660 RHS 35,000.00 Agreed 374 374 L.A.P. Nishantha Perera 624/A,Heiyanthuduwa 12+600 RHS 76,000.00 Agreed 375 375 M.Sumanawathie 627,Temple road, Heiyanthuduwa 12+600 LHS 52,000.00 Agreed 376 376 U.V.D.Gunarathne 624/C, Godella watta, Heiyanthuduwa 12+850 RHS 50,000.00 Agreed 377 377 Agalawattage Ariyalatha 478/C/1, Makola South, Makola 11+600 RHS 30,000.00 Agreed 378 378 N.Wilbert Cooray 478/D 1, Makola South, Makola 11+590 RHS 30,000.00 Agreed 379 379 N.Wilbert Cooray 478/ 1 D, Makola South, Makola 11+580 RHS 40,000.00 Agreed 380 380 N. Karunaratne 478/D/4, Makola South, Makola 11+580 RHS 65,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

381 381 L.K.Perera 478/B,Makola South,Makola 11+560 RHS 30,000.00 Agreed 382 382 M.A.A.Kapoor 478/B/7, Makola South, Makola 11+560 RHS 90,000.00 Agreed 383 383 L. A. Perera 478/B/5, Makola South, Makola 11+560 RHS 36,000.00 Agreed 384 384 A.S.Sumanasekara 478/3/B, Makola South, Makola 11+570 RHS 50,000.00 Agreed 385 385 M.K.Sumanasekara 478/3/B, Makola South, Makola 11+540 RHS 60,000.00 Agreed 386 386 A.S.S.Perera 478/A/2, Makola south, Makola 11+490 RHS 64,000.00 Agreed 387 387 A.M.G.K. Atapattu 478/A/3, Makola south, Makola 11+490 RHS 75,000.00 Agreed 388 388 B.Sooriarachchi 478/F, Makola south, Makola 11+470 RHS 95,000.00 Agreed 389 389 P.K. Perera 391/14, Makola South, Makola. 11+340 RHS 115,000.00 Agreed 390 390 P.K. Perera 391/14, Makola South, Makola. 11+320 RHS 42,000.00 Agreed 391 391 M.A.W.Jayathilaka 396,Makola south, Makola 11+340 RHS 75,000.00 Agreed 392 392 M.A.W.Jayathilaka 396 / A,Makola south, Makola 11+320 RHS 64,000.00 Agreed 393 393 K.A.D.Ebert 396/1,Makola south, Makola 11+290 RHS 55,000.00 Agreed 394 394 C.K.Kaluarachchi 478/N, Makola South, Makola 11+460 RHS 70,000.00 Agreed 395 395 R.A.D.K. Perera 478/G, Makola south, Makola 11+470 RHS 25,000.00 Agreed 396 396 D.M.T.P.Jayasuriya 391/12/A,Parakum mw; Makola south, Makola 11+300 RHS 55,000.00 Agreed 397 397 K.T.D.Jayakamani 391/12, Makola south, Makola 11+320 RHS 55,000.00 Agreed 398 398 T.D. Dharmadasa 391/3/A,Makola south, Makola 11+350 RHS 32,000.00 Agreed 399 399 Thalgasduwage Sriyani Dammika 392/2,Makola south , Makola, 11+370 RHS 50,000.00 Agreed 400 400 T.D.Susil Dharmapriya 391/3, Siri Parakum Mw; Makola south , Makola, 11+350 RHS 50,000.00 Agreed 401 401 B.P.Perera 392, Siriparakumba Mw; Makola south , Makola, 11+370 RHS 75,000.00 Agreed 402 402 T.P. Hettiarachchi 391/6/A, Makola south , Makola, 11+380 RHS 40,000.00 Agreed 403 403 W.A.P. Rodrigo 391/5, Makola south , Makola, 11+390 RHS 26,000.00 Agreed 404 404 W.A.D. Rodrigo 391/6, Makola south , Makola, 11+390 RHS 30,000.00 Agreed 405 405 R.Nilmini Wijewardhana 391/6/1, Makola south , Makola, 11+400 RHS 40,000.00 Agreed 406 406 C.M.Waduge 615/3/A,Makola North , Makola, 11+080 RHS 70,000.00 Agreed 407 407 W.Kusumalatha 623/1,Makola North, Makola 11+140 RHS 90,000.00 Agreed 408 408 W. Siriyalatha 623, Makola North, Makola 11+160 RHS 62,000.00 Agreed 409 409 R.A.Babynona 623/4, Makola North, Makola 11+170 RHS 65,000.00 Agreed 410 410 W.S. L. Perera 623/4/A,Makola North, Makola 11+170 RHS 40,000.00 Agreed 411 411 A.R.S.Hameed 625/2, Makola North, Makola 10+960 RHS 85,000.00 Agreed 412 412 J.H.Chandralatha 625, Makola North, Makola 10+950 RHS 105,000.00 Agreed 413 413 J.H.Chandralatha 625/1, Makola North, Makola 10+940 RHS 90,000.00 Agreed 414 414 R.A.Jayasena Perera 610/5,Makola North, Makola 10+930 RHS 42,000.00 Agreed 415 415 J.M.Kithsiri Bandara 589/5, Makola North, Makola 10+910 RHS 120,000.00 Agreed 416 416 J. S.D.Sooriyaarachchige 620/1, Makola North, Makola 11+200 RHS 140,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

417 417 N.W. Pasan 394/1, Makola south, Makola 11+260 RHS 230,000.00 Agreed 418 418 N.W. Pasan 394/1 A, Makola south, Makola 11+260 RHS 185,000.00 Agreed 419 419 E.A.D.S. A. Amarasinghe 478/A, Makola south, Makola 11+490 RHS 72,000.00 Agreed 420 420 D.P.A.U. Appuhami 478/C, Makola South, Makola 11+600 RHS 25,000.00 Agreed 421 421 W.A.D. Anuruddha 391/12/B, Makola south, Makola 11+290 RHS 140,000.00 Agreed 422 422 G.A.M.Perera 394/1/B, Sri parakum mw; Makola south, Makola 11+280 RHS 70,000.00 Agreed 423 423 L.Thilakarathna 478 H, Makola South, Makola 11+470 RHS 72,000.00 Agreed 424 424 E.A.L.D. Anura 478/M, Makola south, Makola 11+460 RHS 58,000.00 Agreed 425 425 R.S.Egodawatte 621/3/A, Makola North, Makola 11+190 RHS 90,000.00 Agreed 426 426 Ernest Egodawatta 621/3/A, Makola North, Makola 11+230 RHS 65,000.00 Agreed 427 427 D.M.G. Halangoda 589/5/A, Makola North, Makola 10+910 RHS 65,000.00 Agreed 428 428 D.M.G. Halangoda 589/5/A/1, Makola North, Makola 10+910 RHS 70,000.00 Agreed 429 429 D.M.G. Halangoda 589/5/A, Makola North, Makola 10+910 RHS 75,000.00 Agreed 430 430 J.A.Sugath 589/6, Makola North, Makola 10+900 RHS 60,000.00 Agreed 431 431 J.A.Nihal Jayasinghe 610/2, Makola North, Makola 10+920 RHS 100,000.00 Agreed 432 432 J.A.Saman 610/2/B, Makola North, Makola 10+920 RHS 40,000.00 Agreed 433 433 W.S.Manike 610/A, Makola North, Makola 10+930 RHS 63,000.00 Agreed 434 434 Srimathi Mallika 610/7, Makola North, Makola 10+930 RHS 25,000.00 Agreed 435 435 H.R.A.Padma 583/2, Sangabo Mw, Makola North, Makola 10+590 RHS 50,000.00 Agreed 436 436 H.N.Rohan 588/10/A, Sangabo mw; Makola North, Makola 10+600 RHS 120,000.00 Agreed 437 437 D.D.Deepani 583/7, Sangabo Mw,Makola North, Makola 10+585 RHS 120,000.00 Agreed 438 438 M.G.S.N.B. Galahitiyawa 588/24, Sangabo Mw; Makola North, Makola 10+620 RHS 94,000.00 Agreed 439 439 S.A. Swarnalatha 610/C, Makola North, Makola 10+930 RHS 30,000.00 Agreed 440 440 S.G. Sumanasekara 481/D/1, Galadeniya rd; Heiyanthuduwa 11+450 RHS 45,000.00 Agreed 441 441 K.G.Kumarihami 401/1 A , Makola South, Makola 11+430 RHS 54,000.00 Agreed 442 442 A. Gunapala 401/1/B, Makola South, Makola 11+380 LHS 65,000.00 Agreed 443 443 D.S,Wickramarachchi 401/1/D, Makola South, Makola 11+400 LHS 20,000.00 Agreed 444 444 L. K. Margrat 482/A,Galadeniya, Heiyanthuduwa 11+470 LHS 46,000.00 Agreed 445 445 K.C.S. Perera 481/1 D, Galadeniya, Heiyanthuduwa 11+470 LHS 95,000.00 Agreed 446 446 G.A.D.Ajith Nishantha 472,Galadeniya, Heiyanthuduwa 11+500 LHS 75,000.00 Agreed 447 447 W. A. Premasiri 479/1/B, Galadeniya Heiyanthuduwa 11+520 LHS 105,000.00 Agreed 448 448 W. A. Premasiri 479/1/B, Galadeniya Heiyanthuduwa 11+530 LHS 53,000.00 Agreed 449 449 W.A. Premasiri 479/1/B, Galadeniya Heiyanthuduwa 11+520 LHS 12,000.00 Agreed 450 450 M.A.J.P.Kumara 475/B, Galadeniya Heiyanthuduwa 11+540 LHS 40,000.00 Agreed 451 451 M.A.J.P.Kumara 475/B, Galadeniya Heiyanthuduwa 11+540 LHS 30,000.00 Agreed 452 452 A.N.Liyanage 479/E, Galadeniya, Heiyanthuduwa 11+560 LHS 133,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

453 453 S.A.P.Dissanayaka 524/23, Daluggala Road, Heiyanthuduwa 11+820 LHS 50,000.00 Agreed 454 454 E.A.Ranasinghe 524/15, Daluggala Road, Heiyanthuduwa 11+800 LHS 40,000.00 Agreed 455 455 W.M.R. Suranimala 527/5, Daluggala Road, Heiyantduwa 11+840 LHS 45,000.00 Agreed 456 456 H.A.Gnanadasa 527/3, Daluggala Road, Heiyanthuduwa 11+860 LHS 40,000.00 Agreed 457 457 N.Gunasinghe 524/13/B, Heiyantduwa 11+870 LHS 45,000.00 Agreed 458 458 P.W.Sudath 526/13,Daluggala Road, Wendesiwatta, Heiyantduwa 11+870 LHS 60,000.00 Agreed 459 459 W.A.D.N. Wasantha 525/D,Daluggala Road, Heiyantduwa 11+880 LHS 76,000.00 Agreed 460 460 B.G.T. Wickramasingha 525/E,Daluggala Road, Heiyantduwa 11+890 LHS 55,000.00 Agreed 461 461 H.T.W.A.Manoj Piyasena 588/23, Sangabo Mw, Makola North, Makola 10+660 RHS 60,000.00 Agreed 462 462 Senaka Bowathdeniya 698/4, Mankada Rd, Kadawatha 10+410 RHS 98,000.00 Agreed 463 463 S.W.C. Janaki 698/9, Richmond Place, Mankada , Kadawatha 10+410 RHS 84,000.00 Agreed 464 464 P.L.Pathmakanthi 698/2, Makola North, Makola 10+250 LHS 76,000.00 Agreed 465 465 Kanchana Gayani Abewickrama 698/1, Mankada Road, Mankada 10+300 LHS 135,000.00 Agreed 466 466 D.I.Weragala 698, Mankada Road, Kadawatha 10+300 RHS 221,000.00 Agreed 467 467 A.M.T. Banda 698/3, Mankada Rd, Kadawatha 10+330 LHS 25,000.00 Agreed 468 468 K.A.S.D. Athukorala 589/C, Ihalabiyanwlla, Kadawatha 10+460 RHS 160,000.00 Agreed 469 469 S. Pathiraja 698/8, Richmond Place, Mankada Rd, Kadawatha 10+460 RHS 66,000.00 Agreed 470 470 W.A.D.R.N. Sadeepa 704/A, Mankada Road,Kadawatha 10+260 RHS 55,000.00 Agreed 471 471 K.A.Somapala 704/1, Mankada Road,Kadawatha 10+240 RHS 145,000.00 Agreed 472 472 P.P.Sajeewaka 704/1, Mankada Road,Kadawatha 10+240 RHS 122,000.00 Agreed 473 473 K.G.P.C.Gunadasa 670/1,Ihala Biyanwila Kadawatha 10+230 RHS 142,000.00 Agreed 474 474 K.E.Sumanawathie 660/2, Ihalabiyanwila, Kadawatha 10+080 RHS 45,000.00 Agreed 475 475 K.A.Pemawathie 645/2, Ihalabiyanwila, Kadawatha 10+170 LHS 50,000.00 Agreed 476 476 K.A.Pemawathie 645/2A, Ihalabiyanwila, Kadawatha 10+150 LHS 20,000.00 Agreed 477 477 K.A.Pemawathie 645/6, Ihalabiyanwila, Kadawatha 10+130 LHS 50,000.00 Agreed 478 478 K.A.Piyasena 646/1, Ihalabiyanwila, Kadawatha 10+210 LHS 80,000.00 Agreed 479 479 H.Sunil Shantha 647/2,Ihalabiyanwila, Kadawatha 10+130 LHS 106,000.00 Agreed 480 480 S.M.S.P. Senevirathne 650/1, Ihalabiyanwila, Mankada road, Kadawatha 10+090 LHS 175,000.00 Agreed 481 481 U.S.Kulathunga 650, Ihalabiyanwila, Mankada road, Kadawatha 10+080 LHS 90,000.00 Agreed 482 482 K.A.S.J.Kariyapperuma 642, Mankada Road, Ihalabiyanwila, Kadawatha 10+220 LHS 68,000.00 Agreed 483 483 K.Hemalatha Perera 644,Mankada Road, Ihalabiyanwila ,Kadawatha 10+220 LHS 54,000.00 Agreed 484 484 M.N.Gunawardhana 643, Ihalabiyanwila, Kadawatha 09+900 LHS 40,000.00 Agreed 485 485 L.K.Sumanawathie 658/4, Ihalabiyanwila, Kadawatha 09+980 LHS 45,000.00 Agreed 486 486 L.K.Thilakawathie 658/A, Ihalabiyanwila, Kadawatha 10+000 LHS 40,000.00 Agreed 487 487 M.P. Gunawardhana 656/1/A, Ihalabiyanwila, Kadawatha 10+020 LHS 66,000.00 Agreed 488 488 M.P. Gunawardhana 656/1/A, Ihalabiyanwila, Kadawatha 10+020 LHS 40,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

489 489 R.P.J. Saman Kumara Perera 652/C/1,Dharmasoka Mw, Ihalabiyanwila, Kadawatha 10+020 LHS 50,000.00 Agreed 490 490 L.Weerasena 658.Dharmasoka Mw, Ihalabiyanwila, Kadawatha 10+010 LHS 85,000.00 Agreed 491 491 D. T. Kariyapperuma 642/C, Mankada road,Kadawatha 10+220 LHS 181,000.00 Agreed 492 492 W.A.D.Lionel 704, Mankada Road, Kadawatha 10+240 RHS 200,000.00 Agreed 493 493 W.D.L. Mallika 702, Mankada Road, Kadawatha 10+160 RHS 50,000.00 Agreed 494 494 W.D.L. Mallika 702/A, Mankada Road, Kadawatha 10+160 RHS 20,000.00 Agreed 495 495 W.D.L. Mallika 702/B, Mankada Road, Kadawatha 10+110 RHS 40,000.00 Agreed 496 496 R.M.Savithri 701, Mankada Road, Kadawatha 10+160 RHS 170,000.00 Agreed 497 497 R.M.Savithri 701, Mankada Road, Kadawatha 10+160 RHS 35,000.00 Agreed 498 498 G.A.M.T. Ganepola 643/14, Ihalabiyanwila, Kadawatha 10+080 RHS 150,000.00 Agreed 499 499 M.R.N.G. Ranathunge 645/3, Mankada Road, Kadawatha 10+150 RHS 281,000.00 Agreed 500 500 M.Ajith Priyantha 657, Ihalabiyanwila, Kadawatha 09+920 LHS 10,000.00 Agreed 501 501 M.Ajith Priyantha 657, Ihalabiyanwila, Kadawatha 09+920 LHS 76,000.00 Agreed 502 502 W. Nandawathie 652/5, Ihalabiyanwila, Kadawatha 09+910 LHS 60,000.00 Agreed 503 503 P.G.L.Mangalika 652/3 Dharmasoka Road,, Ihalabiyanwila, Kadawatha 09+900 LHS 89,000.00 Agreed 504 504 P.L.U. Shantha 652/4 Dharmasoka Road,, Ihalabiyanwila, Kadawatha 09+890 LHS 100,000.00 Agreed 505 505 A.V.S.D.Nimalrathne 178/2/A, Ihalabiyanwila Kadawatha 00+520 LHS 72,000.00 Agreed 506 506 M.A.Sunil Mayadunne 170/4/B, Ihalabiyanwila, Kadawatha 00+490 LHS 150,000.00 Agreed 507 507 M.A.Sunil Mayadunne 170/4/B, Ihalabiyanwila, Kadawatha 00+480 LHS 45,000.00 Agreed 508 508 C.B. D. Jayasinghe 170/4/A, Ihalabiyanwila, Kadawatha 00+460 LHS 100,000.00 Agreed 509 509 S.D.Jayarathne 174/3/B, Ihalabiyanwila, Kadawatha 00+450 RHS 70,000.00 Agreed 510 510 W.M.E. Nilantha Kumara 174/2/A, Ihalabiyanwila, Kadawatha 00+450 RHS 120,000.00 Agreed 511 511 W.M.E. Nilantha Kumara 174/2/A, Ihalabiyanwila, Kadawatha 00+450 RHS 24,000.00 Agreed 512 512 S.D.S.P.Gunarathne 179/2/C,Ihalabiyanwila, Kadawatha 00+300 RHS 56,000.00 Agreed 513 513 U.A.Vijitha 186/2/A, Ihalabiyanwila, Kadawatha 00+200 RHS 45,000.00 Agreed 514 514 U.A.Vijitha 186/2/A, Ihalabiyanwila, Kadawatha 00+200 RHS 40,000.00 Agreed 515 515 R.P.Jayaweera Peiris 187, Ihalabiyanwila, Kadawatha 00+250 RHS 40,000.00 Agreed 516 516 N.D.D. Athula Fernando 171/1, Ihalabiyanwila, Kadawatha 00+470 RHS 75,000.00 Agreed 517 517 N.D.L. C. Kumara 174/1/B,Ihalabiyanwila, Kadawatha 00+460 RHS 30,000.00 Agreed 518 518 L.M.W. Perera 174/3/A,Ihalabiyanwila, Kadawatha 00+450 RHS 80,000.00 Agreed 519 519 L.M.W. Perera 174/3/A,Ihalabiyanwila, Kadawatha 00+455 RHS 40,000.00 Agreed 520 520 A.D.K.N.Amarasinghe 167/2,Sunethrarama Rd,Kadawatha 00+380 LHS 320,000.00 Agreed 521 521 A.D.M. P. Amarasinghe 167/2,Sunethrarama Rd,Kadawatha 00+380 LHS 65,000.00 Agreed 522 522 P.S. Wijewardhana 164/2/Sunethrarama Rd,Kadawatha 00+350 LHS 60,000.00 Agreed 523 523 Kulasiri Wijewardhana 164/1/Sunethrarama Rd,Ihalabiyanwila Kadawatha 00+340 LHS 39,000.00 Agreed 524 524 W.M.Jayantha Wijekoon 164/D/1, Sunethrarama Rd,Ihalabiyanwila Kadawatha 00+330 LHS 70,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

525 525 W.D.Nimal Karunathilaka 171/1, Ihala biyanwila, Kadawatha 00+490 RHS 40,000.00 Agreed 526 526 D.M.A.S. Tharanga 171/1/A, Ihala biyanwila Kadawatha 00+495 RHS 75,000.00 Agreed 527 527 W.D.Kumarasiri Premalal 171/B, Ihala biyanwila Kadawatha 00+490 RHS 74,000.00 Agreed Puwakwetiya Sri Sucharithawardena Mutual Benefit 528 528 Sramadana Mawatha , Ihalabiyanwila Kadawatha 00+380 RHS 28,000.00 Agreed Society 529 529 I.M.G. Chamindalal 173, Sramadana Mawatha , Ihalabiyanwila Kadawatha 00+400 RHS 35,000.00 Agreed 530 530 P.G. Jayasooriya 179/2, Sramadana Mw, Kadawatha 00+280 RHS 105,000.00 Agreed 531 531 P.D.Sunil Thilak 663/C, Ihalabiyawila, Kadawatha 09+660 RHS 120,000.00 Agreed 532 532 P.A.Sunil Premarathne 663/A,Ihalabiyanwila , Kadawatha. 09+660 RHS 88,000.00 Agreed 533 533 M.J.M.Lucus 528/2, Kandy Road, Eldeniya, Kadawatha 01+590 RHS 58,000.00 Agreed 534 534 M.J.M.Lucus 528/2, Kandy Road, Eldeniya, Kadawatha 01+580 RHS 5,000.00 Agreed 535 535 D.D.Amitha Kanthi 581/A, Kandy Road, Eldeniya, Kadawatha 01+550 RHS 38,000.00 Agreed 536 536 D.D.Amitha Kanthi 581/A, Kandy Road, Eldeniya, Kadawatha 01+550 RHS 42,000.00 Agreed 537 537 D.D.Amitha Kanthi 581/A, Kandy Road, Eldeniya, Kadawatha 01+550 RHS 51,000.00 Agreed 538 538 D.D.Amitha Kanthi 581/A, Kandy Road, Eldeniya, Kadawatha 01+550 RHS 5,000.00 Agreed 539 539 W.A.D.N.R. Weerakkody 573, Kandy Rd, Eldeniya Kadawatha 01+800 LHS 64,000.00 Agreed 540 540 W.A.D.N.R.Weerakkody 573, Kandy Rd, Eldeniya Kadawatha 01+800 LHS Null Damage 541 541 K.A.D.R.A. Nanayakkara 573, Kandy Rd, Eldeniya Kadawatha 01+720 RHS 50,000.00 Agreed 542 542 K.A.D.R.A.Nanayakkara 573, Eldeniya Kadawatha 01+720 RHS 150,000.00 Agreed 543 543 K.A.D.R.A. Nanayakkara 638/12, Asiri Mw, Makola North, Makola 01+600 LHS 20,000.00 Agreed 544 544 I.Z.G.Jayamanna 638/12, Asiri Mw, Makola North, Makola 01+600 LHS 36,000.00 Agreed 545 545 R.S.P.U. Chandrika 356, Nagahamulla Rd, Ihalabiyanwila, Kadawatha 09+730 LHS 97,000.00 Agreed 546 546 R.S.P.D.Nimal 356/1/A,Nagahamulla Rd, Ihalabiyanwila, Kadawatha 09+600 LHS 83,000.00 Agreed 547 547 H.A.D.K. Perera 355/5, Nagahamulla Rd, Ihalabiyanwila, Kadawatha 09+620 LHS 60,000.00 Agreed 548 548 P.G.Niluka Indika 355/6,Nagahamulla Rd, Kadawatha 09+620 LHS 75,000.00 Agreed 549 549 H.A.D.K. Perera 355, Nagahamulla Rd, Ihalabiyanwila, Kadawatha 09+600 LHS 85,000.00 Agreed 550 550 P.M. R. Kumari 355/1, Ihalabiyanwila, Kadawatha 09+660 LHS 95,000.00 Agreed 551 551 B.G.Anura Bandara 354/1, Nagahamulla Rd, Ihalabiyanwila 09+600 LHS 130,000.00 Agreed 552 552 D.M.Pathmalatha 355/3, Ihalabiyanwila, Kadawatha 09+590 LHS 50,000.00 Agreed 553 553 U. Sepalika Perera 347/B, Nagahamulla Rd, Ihalabiyanwila, Kadawatha 09+580 LHS 60,000.00 Agreed 554 554 S. M. Gunathilaka 352, Ihalabiyanwila, Kadawatha 09+630 RHS 110,000.00 Agreed 555 555 P.K. Arunasiri Perera 351, Ihalabiyanwila, Kadawatha 09+600 RHS 65,000.00 Agreed 556 556 H.A.Anil Priyantha 344/4, Nagahamula Road, Kadawatha 09+600 RHS 60,000.00 Agreed 557 557 R.S.P.Sumithra 344/1 Nagahamula Road, Ihalabiyanwila Kadawatha 09+590 RHS 63,000.00 Agreed 558 558 W.Somawathie 348/6, Nagahamulla Rd, Ihalabiyanwila 09+510 LHS 25,000.00 Agreed 559 559 W.Somawathie 348/5, Nagahamula Rd, Ihalabiyanwila 09+510 LHS 46,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

560 560 Mahesh Chandrasiri Malimbada 348/3, Nagahamula Rd, Ihalabiyanwila 09+470 LHS 96,000.00 Agreed 561 561 P. M. Perera 348/4, Nagahamula Rd, Ihalabiyanwila Kadawatha 09+460 LHS 30,000.00 Agreed 562 562 K.D. Asoka Kahawita 652/8, Dharmasoka Mw, Ihalabiyanwila Kadawatha 09+910 LHS 150,000.00 Agreed 563 563 S.A.T. Disna 349/C, Ihalabiyanwila Kadawatha 09+450 LHS 70,000.00 Agreed 564 564 R.P.Emalin Nona 349/2,Nagahamula Rd, Ihalabiyanwila, Kadawatha 09+450 LHS 65,000.00 Agreed 565 565 G.H.Nayana Samanthi 349/D,Nagahamula Rd, Ihalabiyanwila Kadawatha 09+440 LHS 50,000.00 Agreed 566 566 D.M.S.Dahanayake 349/1, Ihalabiyanwila, Kadawatha 09+430 LHS 52,000.00 Agreed 567 567 M.W.P.G.Abeysena 324/E, Ihalabiyanwila Kadawatha 09+410 LHS 89,000.00 Agreed 568 568 P. M. Perera 325/1/B, Ihalabiyanwila Kadawatha 09+410 LHS 75,000.00 Agreed 569 569 P. T. Perera 325/1, Ihalabiyanwila, Kadawatha 09+420 LHS 80,000.00 Agreed 570 570 M.J.M.Inoka Thushari 304/14/A, Ihalabiyanwila Kadawatha 09+420 LHS 40,000.00 Agreed 571 571 N.N. J.Dissanayaka 326/3 , Ihalabiyanwila Kadawatha 09+380 LHS 65,000.00 Agreed 572 572 I.D.P.R.Sirimanna 326/5, Ihalabiyanwila Kadawatha 09+380 LHS 100,000.00 Agreed 573 573 P.Ariyawathi 329/4, Ihala biyanwila Kadawatha 09+210 LHS 92,000.00 Agreed 574 574 S.A.K. Chandrasiri 329, Ihala biyanwila, Kadawatha 09+170 RHS 120,000.00 Agreed 575 575 S.P.Liyanage 330/A, Ihalabiyanwila, Kadawatha 09+190 RHS 60,000.00 Agreed 576 576 J.M.D.N.Jayamanna 335/1/A, Ihalabiyanwila Kadawatha 09+380 RHS 95,000.00 Agreed 577 577 A.Samaraweera 334,Ihalabiyanwila, Kadawatha 09+380 RHS 52,000.00 Agreed 578 578 P.A.Perera 349/4, IhalaBiyanwila Kadawatha 09+400 LHS 60,000.00 Agreed 579 579 Mahinda Kumara Liyanage 330, IhalaBiyanwila, Kadawatha 09+300 RHS 214,000.00 Agreed 580 580 S.A.K. Udaya Kumara 328, IhalaBiyanwila Kadawatha 09+290 LHS 160,000.00 Agreed 581 581 H.W.Piyadasa 327/1, Ihalabiyanwila Kadawatha 09+280 LHS 97,000.00 Agreed 582 582 B.A.Lalitha 287/1 A, IhalaBiyanwila Kadawatha 09+140 LHS 30,000.00 Agreed 583 583 B.A.Lalitha 287/1 A, IhalaBiyanwila Kadawatha 09+140 LHS 65,000.00 Agreed 584 584 B.A.Lalitha 287/4,IhalaBiyanwila Kadawatha 09+140 LHS 60,000.00 Agreed 585 585 J.M.D. Gayan Thilakasiri 337/1, Ihala Biyanwila , Kadawatha 09+460 RHS 55,000.00 Agreed 586 586 S.D.Sirimathi 287/1-A /F, Ihala Biyanwila, Kadawatha 09+035 LHS 36,000.00 Agreed 587 587 Maha Marakkalage Ajith Kumara Perera 287/1/C, IhalaBiyanwila, Kadawatha 09+030 LHS 62,000.00 Agreed 588 588 K.A.S. Jayarathna 287/1/E, IhalaBiyanwila, Kadawatha 09+035 LHS 61,000.00 Agreed 589 589 S.D.Gunapala 287/2,IhalaBiyanwila, Kadawatha 08+980 LHS 64,000.00 Agreed 590 590 S.D.Gunapala 287/3, IhalaBiyanwila, Kadawatha 08+980 LHS 41,000.00 Agreed 591 591 M.V.N. Deepika 284/6, Sramadana Mw; IhalaBiyanwila, Kadawatha 09+090 RHS 58,000.00 Agreed 592 592 C.Roy Dissanayaka 286/2 Uswatta, IhalaBiyanwila, Kadawatha 09+080 RHS 90,000.00 Agreed 593 593 H.D.Wimalarathna 283/1,IhalaBiyanwila, Kadawatha 09+050 RHS 120,000.00 Agreed 594 594 K.M. Anusha Geethanjali 287/1/B, IhalaBiyanwila, Kadawatha 09+040 LHS 80,000.00 Agreed 595 595 P.D.Dayarathna 304/31, IhalaBiyanwila, Kadawatha 09+035 LHS 60,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

596 596 P.D.Dayarathna 304/3/A, IhalaBiyanwila, Kadawatha 09+035 LHS 40,000.00 Agreed 597 597 W.D.U. Aruna Shantha 288, Uswatta Road , IhalaBiyanwila, Kadawatha 09+010 RHS 65,000.00 Agreed 598 598 K.D.A.Somapala 289/1, IhalaBiyanwila, Kadawatha 08+960 LHS 84,000.00 Agreed 599 599 Sududewage Irangani 290/1, IhalaBiyanwila, Kadawatha 08+910 LHS 92,000.00 Agreed 600 600 S.D.Wimal Rathnasiri 290/D, IhalaBiyanwila, Kadawatha 08+900 LHS 74,000.00 Agreed 601 601 S.D.Thilaka Pathmini 290/B, IhalaBiyanwila, Kadawatha 08+870 LHS 40,000.00 Agreed 602 602 B.L.Madhurani 290/2, Shramadana Mw; IhalaBiyanwila, Kadawatha 08+880 LHS 125,000.00 Agreed 603 603 W.D.C. Padmini 293, Ihala Biyanwila .Kadawatha 08+820 LHS 150,000.00 Agreed 604 604 H.D.Senarath Namal 293/1,Ihala Biyanwila .Kadawatha 08+820 LHS 40,000.00 Agreed 605 605 H.D.Nimalsiri 293/5, Ihala Biyanwila .Kadawatha 08+840 LHS 165,000.00 Agreed 606 606 G.D.N. Sirisoma 292/2, Ihala Biyanwila, Kadawatha 08+850 LHS 45,000.00 Agreed 607 607 G.Chamila Prasadh Dissanayake 176/B, Millagahawatta Ihala Biyanwila Kadawatha 08+870 RHS Null Damage 608 608 W.D.Padmini Swarnalatha 176/A, Ihala Biyanwila, Kadawatha 08+850 RHS 90,000.00 Agreed 609 609 R.D.Sunil Ariyasinghe 175/2, Ihala Biyanwila Kadawatha 08+830 RHS 70,000.00 Agreed 610 610 W.P.Padma Ranjani 176/1B, Ihala Biyanwila, Kadawatha 08+840 RHS 50,000.00 Agreed 611 611 R.D. Ariyawathi Mallika 174/5,Ihala Biyanwila ,Kadawatha 08+820 RHS 115,000.00 Agreed 612 612 R.D.N. Ariyarathne 174/3, Sramadana Mw, Ihalabiyanwila ,Kadawatha 08+800 RHS 80,000.00 Agreed 613 613 R.D.N. Ariyarathne 174/3, Sramadana Mw, Ihalabiyanwila ,Kadawatha 08+800 RHS 45,000.00 Agreed 614 614 N.L.Suneetha Indrani 600/5, Bandaranayake Mw, Eldeniya ,Kadawatha 01+240 RHS 50,000.00 Agreed 615 615 N.L.Suneetha Indrani 600/5, Bandaranayake Mw, Eldeniya ,Kadawatha 01+240 RHS 7,000.00 Agreed 616 616 S.A.K.Dayananda 518, Eldeniya Kadawatha 01+200 RHS 55,000.00 Agreed 617 617 K.W.Ratnapala 518/1, Eldeniya Kadawatha 01+180 RHS 129,000.00 Agreed 618 618 S.D.D.Aris Fonseka Joseph 639/6 , Koswatta Rd, Eldeniya Kadawatha 01+050 RHS Null Damage 619 619 S.D.D.I.F Joseph 639/6 , Koswatta , Eldeniya Kadawatha 01+050 RHS 86,000.00 Agreed 620 620 J.M.Ariyawathie 641/3, Koswatta, Eldeniya Kadawatha 00+930 RHS 70,000.00 Agreed 621 621 J.M.Ariyawathie 641/3/B, Koswatta, Eldeniya Kadawatha 00+930 RHS 25,000.00 Agreed 622 622 K.A.N. Jayathilaka 641/3/A, Koswatta, Bandarawatta, Kadawatha 00+920 RHS 120,000.00 Agreed 623 623 K.S.Thusharasiri 639/3/1,Koswatta,Eldeniya, Kadawatha 01+000 RHS 250,000.00 Agreed 624 624 L.P.Somapala 640, Koswatta, Eldeniya Kadawatha 00+960 RHS 94,000.00 Agreed 625 625 D.L.R.M.Liyanawaduge 292/4, Ihalabiyanwila, Kadawatha 00+880 LHS 84,000.00 Agreed 626 626 D.L.R.M.Liyanawaduge 292/4, Koswatta, Eldeniya Kadawatha 00+880 LHS Null Damage 627 627 M.J.M.Jeremiyes 512/2, Gonahena,Kadawatha 00+910 LHS 23,000.00 Agreed 628 628 M.J.M.Siripala 512/C, Eldeniya Kadawatha 00+920 LHS 35,000.00 Agreed 629 629 W.Shiromi 512/D,Eldeniya Kadawatha 00+930 LHS 30,000.00 Agreed 630 630 M.J.M.Rangana Sudharshana 513, Eldeniya Kadawatha 01+010 LHS 97,000.00 Agreed 631 631 M.J.M.Philip Jayawardhane 513/1, Eldeniya Kadawatha 01+010 LHS 65,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

632 632 M.J.M.Pathma Jayawardhana 513/2/A/1,Eldeniya Kadawatha 01+020 LHS 47,000.00 Agreed 633 633 M.J.M.Pathma Jayawardhana 513/2/A/1,Eldeniya Kadawatha 01+020 LHS 24,000.00 Agreed 634 634 H.M.R. Senarath Bandara 513/3/B/1, Bandaranayaka Mw; Eldeniya, Kadawatha 01+050 LHS 20,000.00 Agreed 635 635 W.K.S.P. Jayasooriya 513/3/A, Eldeniya Kadawatha 01+110 LHS 48,000.00 Agreed 636 636 W.M.Wickramasinghe 513/3, Bandaranayake Mw, Eldeniya Kadawatha 01+150 LHS 46,000.00 Agreed 637 637 M.J.M.Lahiru Chandrasiri 513/4, Eldeniya Kadawatha 01+180 LHS 85,000.00 Agreed 638 638 R.A.Basil Perera 515, Bandaranayake Mw, Eldeniya Kadawatha 01+220 LHS 36,000.00 Agreed 639 639 H.A.Petric Perera 608/1/A, Eldeniya Kadawatha 01+090 RHS 40,000.00 Agreed 640 640 R. D. Gunawathie 175, Sramadana Mw, Ihalabiyanwila Kadawatha 08+830 RHS 82,000.00 Agreed 641 641 R. P. Gunadasa 176/1, Ihalabiyanwila, Kadawatha 08+850 RHS 60,000.00 Agreed 642 642 S. Rathnasena 179/17/1,Guru Niwasa, Mahegedarawatta, Kadawatha 08+910 RHS 115,000.00 Agreed 643 643 W. D. Somaseeli 176,Ihala Biyanwila Kadawatha 08+860 RHS 72,000.00 Agreed 644 644 Ven. Kadawatha Pangha Vimukthi 179/17,Mahagedara watta,Ihalabiyanwila,Kadawatha 08+880 RHS 135,000.00 Agreed

645 645 S.K.K.Premawathi 180, Mahagedara watta,Kadawatha 08+920 RHS 72,000.00 Agreed 646 646 J. M. L. Laxhuman 180, Mahagedara watta,Kadawatha 08+920 RHS 280,000.00 Agreed 647 647 K. G. V. Menike 181/1, Mahagedara watta, Kadawatha 08+920 RHS 110,000.00 Agreed 648 648 W.D.P. Swarnalatha 176/A,Ihalabiyanwila,Kadawatha 08+930 RHS 30,000.00 Agreed 649 649 L. A. Nimal Ravindra 179/6,Mahagedarawatta, Ihalabiyanwila, Kadawatha 08+940 RHS 70,000.00 Agreed 650 650 H.V.Swarna Hapuarachchi 183/A, Sramadana Mw, Ihalabiyanwila, Kadawatha 00+470 RHS 65,000.00 Agreed 651 651 K.D.Thilakarathne 183/C, Sramadana Mw, Ihalabiyanwila, Kadawatha 00+240 RHS 45,000.00 Agreed 652 652 K.D.Wimalawathie 184/B, Sramadana Mw, Ihalabiyanwila, Kadawatha 00+240 RHS 35,000.00 Agreed 653 653 S. D. Weeramunasingha 185/1,Sramadana Mw, Ihalabiyanwila, Kadawatha 00+230 RHS 66,000.00 Agreed 654 654 K. D. Wilfrad 184/C, Sramadana Mw, Ihalabiyanwila, Kadawatha 00+200 RHS 45,000.00 Agreed 655 655 K.A.D.P. Kasthuriarachchi 184/C,Ihalabiyanwila, Kadawatha 00+200 RHS 50,000.00 Agreed 656 656 T.H.D.N. Chandani 180/1C,Maladolawatta, Kadawatha 00+190 RHS 85,000.00 Agreed 657 657 G.A.Jayasinghe 107/2,Ihalabiyanwila, Kadawatha 00+460 RHS 102,000.00 Agreed 658 658 W.G.M.Hemachandra 179/2B,Sramadana Mw, Ihalabiyanwila, Kadawatha 00+280 RHS 150,000.00 Agreed 659 659 H. D. Jayanthi 168/B, Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+290 RHS 40,000.00 Agreed 660 660 Kalubowilage Ramani 168,Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+350 LHS 190,000.00 Agreed 661 661 K.T. U. Kalubowila 168,Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+330 LHS 95,000.00 Agreed 662 662 K.T.U. Kalubowila 169/1, Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+330 LHS 68,000.00 Agreed 663 663 G.D.P.K. Amarasena 184/2,Sramadana Mw, Ihalabiyanwila, Kadawatha 00+300 LHS 100,000.00 Agreed 664 664 L.K.D.S.I. Abeysekara 184/2,Ihalabiyanwila, Kadawatha 00+200 RHS 110,000.00 Agreed 665 665 M.A.Sandya Priyadarshani 170/2,Sunethrarama Mw, Kadawatha 00+350 LHS 75,000.00 Agreed 666 666 M.A.Sandya Priyadarshani 170/2,Sunethrarama Mw, Kadawatha 00+350 LHS 68,000.00 Agreed 667 667 M.A.Sandya Priyadarshani 170/2,Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+350 LHS 82,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

668 668 Nirmala Chandrasekara 171/3, Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+300 LHS 240,000.00 Agreed 669 669 H.A.Kanchana Mendis 167/1,Sunethrarama Mw, Ihalabiyanwila, Kadawatha 00+330 LHS 90,000.00 Agreed 670 670 B.F.R.R. Somathilake 167/1, Sunethrarama Mw; Kadawatha 00+430 LHS 110,000.00 Agreed 671 671 A.V.Thilakarathne 178/2,Ihalabiyanwila, Kadawatha 00+520 LHS 70,000.00 Agreed 672 672 A.D. Ranil Prasad 178/2, Sramadana Mw, Kadawatha 00+520 LHS 60,000.00 Agreed 673 673 Divisional Secretary - Biyagama 170/4/D, Sramadana Mw, Ihalabiyanwila, Kadawatha 00+460 LHS 70,000.00 Agreed 674 674 W.D.Sunil Jayalath 170/4/D, Ihalabiyanwila, Kadawatha 00+480 LHS 60,000.00 Agreed 675 675 W.D.Sunil Jayalath 170/4/D, Ihalabiyanwila, Kadawatha 00+480 LHS 76,000.00 Agreed 676 676 B.G.G.M.C.Perera 608, Gonahena Eldeniya Kadawatha 00+410 LHS 170,000.00 Agreed 677 677 H.A.Petric Perera 608,Gonahena Eldeniya Kadawatha 01+110 RHS 55,000.00 Agreed 678 678 H.A. Perera 606/1 C, Eldeniya, Kadawatha 01+140 RHS 51,000.00 Agreed 679 679 N.L.Suneetha Indrani 600/5, Bandaranayaka Mw; Eldeniya, Kadawatha 01+220 RHS 43,000.00 Agreed School Development Society (Kadawatha Buddhist 00+280- 680 680 Puwakwetiya Sramadana Mw, Ihalabiyanwila Kadawatha RHS 26,000.00 Agreed College) 00+380 School Development Society (Kadawatha Buddhist 00+280- 681 681 Puwakwetiya Sramadana Mw, Ihalabiyanwila Kadawatha RHS 70,000.00 Agreed College) 00+380 School Development Society (Kadawatha Buddhist 00+280- 682 682 Puwakwetiya Sramadana Mw, Ihalabiyanwila Kadawatha RHS 28,000.00 Agreed College) 00+380 School Development Society (Kadawatha Buddhist 00+280- 683 683 Puwakwetiya Sramadana Mw, Ihalabiyanwila Kadawatha RHS 219,000.00 Agreed College) 00+380 684 684 S.S.G.K. Rodrigo 639/9/A, Eldeniya Kadawatha 01+095 RHS 20,000.00 Agreed 685 685 S.S.F.D.Rodrigo 639/9, Eldeniya Kadawatha 01+090 RHS 40,000.00 Agreed 686 686 D. Leelawathie 639/8, Koswatta , Eldeniya Kadawatha 01+070 RHS 75,000.00 Agreed 687 687 M.Ranjanee Silva 639/3/2/B, Koswatta, Eldeniya Kadawatha 01+010 RHS 91,000.00 Agreed 688 688 M.Somapala Silva 639/3/2, Koswatta, Eldeniya Kadawatha 01+000 RHS 85,000.00 Agreed 689 689 K.A.Sampath Kalansooriya 639/3/2, Koswatta, Eldeniya Kadawatha 01+000 RHS 35,000.00 Agreed 690 690 B.A.Chandrawathie 639/3, Koswatta, Eldeniya ,Kadawatha 01+000 RHS 45,000.00 Agreed 691 691 L.P.Somapala 641/2 Koswatta, Eldeniya ,Kadawatha 00+960 RHS 60,000.00 Agreed 692 692 A. I. Palihakkara 641/2, Eldeniya ,Kadawatha 00+910 RHS 40,000.00 Agreed 693 693 A.K.Seelawathee 641/4, Koswatta, Eldeniya ,Kadawatha 00+920 RHS 37,000.00 Agreed 694 694 M.H.Karunarathne 641/5/F, Koswatta, Eldeniya ,Kadawatha 00+910 RHS 70,000.00 Agreed 695 695 D. B. Jayasekara 641/5 F, Bandarawatta ,Kadawatha 00+920 RHS 80,000.00 Agreed 696 696 H.K.Susantha Rohana 641/5, Koswatta, Eldeniya ,Kadawatha 00+910 RHS 114,000.00 Agreed 697 697 H.K.Susantha Rohana 08/01, Kandy Rd, Eldeniya ,Kadawatha 00+900 RHS 40,000.00 Agreed 698 698 H.D.Siriyalatha 11/1, Hansika Frut Shop, Kandy Rd, Kadawatha 01+900 LHS 84,000.00 Agreed 699 699 Upasakayalage Ariyasena 297/12/B, Millagahawatta Ihalabiyanwila, Kadawatha 01+900 RHS Demolished 700 700 H.R.A.N.S. Kumara 703, Mankada rd, Kadawatha 10+230 RHS 57,000.00 Agreed 701 701 H.R.A.N.S. Kumara 703, Mankada rd, Kadawatha 10+230 RHS 14,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

702 702 H.R.A.Dharmasena 703/1, Mankada road,Kadawatha 10+210 RHS 70,000.00 Agreed 703 703 L.D.Asilinnona 702/1/C, Mankada road, Kadawatha 10+220 RHS 50,000.00 Agreed 704 704 L.D.Asilinnona 702/1/C, Mankada road, Kadawatha 10+230 RHS 30,000.00 Agreed 705 705 K.G.Jayantha Chandrasiri 660/3, Ihalabiyanwila, Kadawatha 10+080 RHS 62,000.00 Agreed 706 706 P.P. Perera 663,Wediwatta road, Ihalabiyanwila, Kadawatha 09+960 RHS 85,000.00 Agreed 707 707 P.S. Nilmini Perera 663/B,Ihalabiyanwila, Kadawatha 09+950 RHS 40,000.00 Agreed 708 708 P.L.T. Perera 662/2, Wediwatta road, Ihalabiyanwila, Kadawatha 09+830 RHS 55,000.00 Agreed 709 709 K.A.Jayarathne 674/2, Wediwatta road, Ihalabiyanwila, Kadawatha 09+810 RHS 70,000.00 Agreed 710 710 K.A.Jayarathne 674/1, Wediwatta road, Ihalabiyanwila, Kadawatha 09+810 RHS 76,000.00 Agreed 711 711 L.Margret 674/3, Wediwatta road, Ihalabiyanwila, Kadawatha 09+600 RHS 75,000.00 Agreed 712 712 W.R. Wijesekara 634/6, Wediwatta road, Ihalabiyanwila, Kadawatha 09+610 RHS 100,000.00 Agreed 713 713 H.R.A.Shirani Dhammika 637,Ihalabiyanwila, Kadawatha. 10+230 LHS 80,000.00 Agreed 714 714 K.K.Margretnona 641, Mankada road , Kadawatha 10+230 LHS 50,000.00 Agreed 715 715 K.K.Margretnona 641, Mankada road , Kadawatha 10+230 LHS 25,000.00 Agreed 716 716 G.K.Irangani 642/B, Ihalabiyanwila,Mankada, Kadawatha 10+150 LHS 60,000.00 Agreed 717 717 K.A.Gunasena 645/5, Ihalabiyanwila, Kadwatha 10+100 LHS 30,000.00 Agreed 718 718 A. P.Sedara 512, Millagahawatta Ihalabiyanwila, Kadawatha 10+070 LHS 84,000.00 Agreed 719 719 A. P.Sedara Millagahawatta, Ihalabiyanwila, Kadawatha 10+070 LHS 15,000.00 Agreed 720 720 P.A.Yamuna Indrani 650/4, Dharmashoka Road, Kadawatha 10+060 LHS 55,000.00 Agreed 721 721 H.R.A.Ananda Ranasinghe 650/3, Dharmashoka mw; Ihalabiyanwila, Kadawatha 10+050 LHS 70,000.00 Agreed 722 722 K. G. N. Greru 655/1B, Ihalabiyanwila, Kadawatha 10+020 LHS 42,000.00 Agreed 723 723 W.K. Ranjith 658/3, Ihalabiyanwila, Kadawatha 09+940 LHS 55,000.00 Agreed 724 724 K.A.D.S. Chandra Kumara 653, Ihalabiyanwila, Kadawatha LHS 40,000.00 Agreed 725 725 P.M.M. Mayadunne 652/12, Dharmashoka Mw; Ihalabiyanwila, Kadawatha 09+920 LHS 81,000.00 Agreed 726 726 M. A.Priyantha 652/7,Ihalabiyanwila, kadawatha 09+870 LHS 202,000.00 Agreed 727 727 L.K.Sumanawathie 658/2,Ihalabiyanwila, Kadawatha. 09+970 LHS 45,000.00 Agreed 728 728 M.N. Gunawardhana 656/1, Ihalabiyanwila, Kadawatha 10+030 LHS 80,000.00 Agreed 729 729 W.T.S.Dharmasiri 664/B, Wediwatta, Ihalabiyanwila, Kadawatha 10+020 RHS 66,000.00 Agreed 730 730 W.T.S.Dharmasiri 664/C, Wediwatta, Ihalabiyanwila, Kadawatha 10+020 RHS 40,000.00 Agreed 731 731 H.G.Kiriukku 357, Samurdhi Mw; Ihalabiyanwila, Kadawatha 09+780 LHS 102,000.00 Agreed 732 732 W. A. Indrani 356/D, Samurdhi Mw; Ihalabiyanwila, Kadawatha 09+780 LHS 55,000.00 Agreed 733 733 P. M. Perera 356/B, Nagahamulla road, Ihalabiyanwila, Kadawatha 09+720 LHS 60,000.00 Agreed 734 734 M.M.S.M. Mudannayake 356/B/1, Nagahamulla road, Ihalabiyanwila 09+730 LHS 86,000.00 Agreed 735 735 P.R.Somalatha 356/C, Nagahamulla road, Ihalabiyanwila, Kadawatha 09+590 LHS 86,000.00 Agreed 736 736 P.Lionel Perera 360/4, Ihalabiyanwila, Kadawatha 09+580 LHS 60,000.00 Agreed 737 737 P.Lakmali Perera 360/4/B, Samurdhi Mw; Ihalabiyanwila, Kadawatha 09+590 LHS 75,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

738 738 H.A.Ajith Priyantha 355/4, Ihalabiyanwila,Kadawatha 09+590 LHS 90,000.00 Agreed 739 739 U.P. Perera 347/1/A, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+570 LHS 50,000.00 Agreed 740 740 S.T.B. Amunugama 698/6, Richmond Place, Mankada Rd, Kadawatha 10+450 RHS 164,000.00 Agreed 741 741 U. Anoma 348/A, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+550 LHS 47,000.00 Agreed 742 742 U. Anoma 348/A, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+560 LHS 72,000.00 Agreed 743 743 K.A.Amarasena 361, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+570 LHS 54,000.00 Agreed 744 744 U.A. J. Perera 348/1, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+500 LHS 50,000.00 Agreed 745 745 P.K.Misinona 348/A/2, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+510 LHS 60,000.00 Agreed 746 746 R.A.T. Keerthi 348, Ihalabiyanwila, Kadawatha 09+500 LHS 75,000.00 Agreed 747 747 C.Hirimuthugoda 349,Nagahamulla road,Ihalabiyanwila,Kadawatha 09+450 LHS 70,000.00 Agreed 748 748 C.Hirimuthugoda 349,Nagahamulla road,Ihalabiyanwila,Kadawatha 09+450 LHS 42,000.00 Agreed 749 749 C.Hirimuthugoda 349,Nagahamulla road,Ihalabiyanwila,Kadawatha 09+450 LHS 15,000.00 Agreed 750 750 P. Renuka 325/1/E, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+450 LHS 30,000.00 Agreed 751 751 Bogahagedarage Kusumawathie 348/E, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+470 LHS 45,000.00 Agreed 752 752 B.P.K.Nissanka 348 C, Ihalabiyanwila, Kadawatha 09+460 LHS 90,000.00 Agreed 753 753 R.A.Merlin 348, Ihalabiyanwila, Kadawatha 09+460 LHS 105,000.00 Agreed 754 754 K.E.G.S.Nandasiri 13/A, Kandy Road, Eldeniya Kadawatha 09+450 LHS 40,000.00 Agreed 755 755 P. Siriyawathi Perera 325/A, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+450 LHS 58,000.00 Agreed 756 756 P. Siriyawathi Perera 325/B, Nagahamulla rd; Ihalabiyanwila, Kadawatha 09+450 LHS 30,000.00 Agreed 757 757 Mayuri Malkanthi Devid 11/4, Kandy Road, Eldeniya, Kadawatha 09+460 LHS Foundation Only 758 758 K.K.N.Sandaruwan 325/1B, Ihalabiyanwila, Kadawatha 09+460 LHS 40,000.00 Agreed 759 759 W.A. Pemashantha 325/3, Ihalabiyanwila, Kadawatha 09+420 LHS 70,000.00 Agreed 760 760 H. K. Piyasena 324/G, Ihalabiyanwila,Kadawatha 09+410 LHS 63,000.00 Agreed 761 761 R.P. Anoma Manel 320/1, Ihalabiyanwila, Kadawatha 09+410 LHS 40,000.00 Agreed 762 762 E. M. Sriya 326/7, Ihalabiyanwila, Kadawatha 09+380 LHS 56,000.00 Agreed 763 763 R.P. Madurasinghe 465/1/A, Ranmuthugala, Eldeniya Kadawatha 09+380 LHS 60,000.00 Agreed 764 764 W.M.Wickramanayaka 326/6, Ihalabiyawila, Kadawatha. 09+380 LHS 52,000.00 Agreed 765 765 P.Maragodage 326/4, Ihalabiyawila, Kadawatha. 09+380 LHS 75,000.00 Agreed 766 766 R.A.Sudath Kumara 326/1, Ihalabiyawila, Kadawatha. 09+380 LHS 72,000.00 Agreed 767 767 H.A.S.S.Perera 324/5, Ihalabiyanwila, Kadawatha 09+370 LHS 85,000.00 Agreed 768 768 R.P.Daniel 325/2, Ihalabiyanwila, Kadawatha 09+380 LHS 42,000.00 Agreed 769 769 Padmini Liyanaarachchi 335/G,Ihalabiyanwila, Kadawatha. 09+380 LHS 103,000.00 Agreed 770 770 Padmini Liyanaarachchi 335/G,Ihalabiyanwila, Kadawatha. 09+380 LHS 20,000.00 Agreed 771 771 S.M.M.Sriyani Mayadunna 335/A,Mankada rd,Ihalabiyanwila, Kadawatha. 09+380 LHS 110,000.00 Agreed 772 772 S.A.G. Nimalsiri Kumara 327 /2, Ihalabiyanwila, Kadawatha. 09+380 LHS 140,000.00 Agreed 773 773 B.R. Bandaragoda 327/3, Ihalabiyanwila, Kadawatha 09+350 LHS 58,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

774 774 D.A.Bandaragoda 327, Ihalabiyanwila, Kadawatha 09+280 LHS 155,000.00 Agreed 775 775 B.A.Lalitha 287/1 A, Ihalabiyanwila, Kadawatha 09+100 LHS 80,000.00 Agreed 776 776 A.C.L. Kumara 304/13/A, Ihalabiyanwila, Kadawatha 09+100 LHS 90,000.00 Agreed 777 777 J.A.R. Mangalika 304/5/A, Ihalabiyanwila, Kadawatha 09+020 LHS 42,000.00 Agreed 778 778 J.A.R. Mangalika 304/5, Ihalabiyanwila, Kadawatha 09+020 LHS 53,000.00 Agreed 779 779 Y.A.N.S.Bandara 304/27, Ihalabiyanwila, Kadawatha 09+020 LHS 69,000.00 Agreed 780 780 N.W. S. Shantha 340/31 A, Ihalabiyanwila, Kadawatha 09+020 LHS 44,000.00 Agreed 781 781 N.W. S. Shantha 304/30, Ihalabiyanwila, Kadawatha 09+020 LHS 66,000.00 Agreed 782 782 S. D.Gunasekara 304/29, Ihalabiyanwila, Kadawatha 09+010 LHS 63,000.00 Agreed 783 783 Sudu Devage Gunasekara 304/29, Jambugaswatta, Ihalabiyanwila, Kadawatha 09+010 LHS Demolished 784 784 R.P.Irangani 304/23, Ihalabiyanwila, Kadawatha 09+000 LHS 70,000.00 Agreed 785 785 Senanayakage Hemalatha 291/2, Ihalabiyanwila Kadawatha 09+005 LHS 69,000.00 Agreed 786 786 Senanayakage Hemalatha 291/2, Ihalabiyanwila, Kadawatha 09+005 LHS 40,000.00 Agreed 787 787 A.D.Premawathie 292, Ihalabiyanwila, Kadawatha 09+005 LHS 60,000.00 Agreed 788 788 A.D.Premawathie 292/1, Ihalabiyanwila, Kadawatha 09+005 LHS 62,000.00 Agreed 789 789 W.D. Emalin 284, Ihalabiyanwila, Kadawatha 08+980 LHS 75,000.00 Agreed 790 790 H.D. S. N. Karunarathne 291, Ihalabiyanwila, Kadawatha 08+870 LHS 50,000.00 Agreed 791 791 H. D. Abeyrathna 291/A, Uswatta, Ihalabiyanwila Kadawatha 08+860 LHS 60,000.00 Agreed 792 792 B.G.I.Thushara 292/D, Sramadana Mw; Ihalabiyanwila, Kadawatha 08+870 LHS 60,000.00 Agreed 793 793 N.A.Hettiarachchi 344/5, Ihalabiyanwila, Nagahamula Road, Kadawatha 09+580 RHS 55,000.00 Agreed 794 794 S.A.Indralatha 342/B, Ihalabiyanwila, Kadawatha 09+590 RHS 60,000.00 Agreed 795 795 R.P.I.K. Rajapaksha 340/1, Nagahamula Road, Ihalabiyanwila Kadawatha 09+510 RHS 90,000.00 Agreed 796 796 R.P.I.K. Rajapaksha 340/1, Nagahamula Road, Ihalabiyanwila Kadawatha 09+510 RHS 30,000.00 Agreed 797 797 D. Wimalasiri 340/2, Nagahamula Road, Biyanwila, Kadawatha 09+460 RHS 52,000.00 Agreed 798 798 R.P.G.Sandamali 337/1/A, Ihalabiyanwila, Kadawatha 09+470 RHS 35,000.00 Agreed 799 799 P.T.Perera 337, Ihalabiyanwila Kadawatha 09+480 RHS 25,000.00 Agreed 800 800 E.A.Malini 336/C, Ihalabiyanwila, Kadawatha 09+400 RHS 50,000.00 Agreed 801 801 A.Danthanarayana 336/3, Gonahena Road, Ihalabiyanwila, Kadawatha 09+400 RHS 70,000.00 Agreed 802 802 K.S.Damayanthi Perera 336/12,Gonahena Kadawatha Road, Ihalabiyanwila 09+380 RHS Demolished 803 803 S.A.N. Samaraweera 334/4, Ihalabiyanwila, Kadawatha 09+320 RHS 52,000.00 Agreed 804 804 R.P.A.Eranga 932/1,Ihalabiyanwila, Kadawatha 09+320 RHS 65,000.00 Agreed 805 805 N. J. L. Thilakasiri 332/2, Ihalabiyanwila, Kadawatha 09+330 RHS 80,000.00 Agreed 806 806 D. J. Liyanage 330/B,Ihalabiyanwila, Kadawatha 09+300 RHS 114,000.00 Agreed 807 807 D. J. Liyanage 332,Ihalabiyanwila, Kadawatha 09+300 RHS 66,000.00 Agreed 808 808 P.K.Arunasiri Perera 351, Ihalabiyanwila, Kadawatha 09+630 RHS 65,000.00 Agreed 809 809 R.P.Gunapala 331/1, Ihalabiyanwila Kadawatha 09+290 RHS 40,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

810 810 R.P.Gunapala 331/C, Ihalabiyanwila Kadawatha 09+290 RHS 45,000.00 Agreed 811 811 R.P.Kusumawathi 331, Ihalabiyanwila Kadawatha 09+260 RHS 50,000.00 Agreed 812 812 J.M.N.H. Jayamanna 331,/B. Ihalabiyanwila Kadawatha 09+255 RHS 40,000.00 Agreed 813 813 R.P.Siriyalatha 284/4. Ihalabiyanwila Kadawatha 09+210 RHS 70,000.00 Agreed 814 814 D.P.Withanawasam 284/9 , Ihalabiyanwila Kadawatha 09+180 RHS 90,000.00 Agreed 815 815 S.Wimaladasa 284/7,Ihalabiyanwila Kadawatha 09+190 RHS 87,000.00 Agreed 816 816 R.D.G.S. Thilakasiri 283/5, Uswatta Rd, Ihalabiyanwila Kadawatha 09+080 RHS 40,000.00 Agreed 817 817 G.D.S. Jayaweera 285/A, Ihalabiyanwila, Kadawatha 09+050 RHS 40,000.00 Agreed 818 818 B.T.K.Nissanka 348/D, Ihalabiyanwila Kadawatha 09+460 LHS 90,000.00 Agreed 819 819 A.L.Premachandra 336/1, Ihalabiyanwila , Kadawatha 09+390 RHS 82,000.00 Agreed 820 820 G.D.Venitha Jayaweera 285/1, Ihalabiyanwila Kadawatha 09+050 RHS 80,000.00 Agreed 821 821 W.D.Chandra Padmini 293, Sramadana Mw, Ihalabiyanwila Kadawatha 08+820 LHS Demolished 822 822 W.D.Chandra Padmini 293, Sramadana Mw, Ihalabiyanwila Kadawatha 08+820 LHS Demolished 823 823 H.D.Senarath Namal 293/1, Ihalabiyanwila Kadawatha 08+810 LHS 80,000.00 Agreed 824 824 W.A.P. I. Wijesooriya 297/12D,Ihalabiyanwila,Kadawatha 00+720 LHS 46,000.00 Agreed 825 825 G. Leelawathie 395/A, Ihalabiyanwila, Kadawatha 00+740 LHS 50,000.00 Agreed 826 826 G. Leelawathie 295/A, Ihalabiyanwila, Kadawatha 00+740 LHS 32,000.00 Agreed 827 827 K.Sumith Nandana 296/A, Ihalabiyanwila, Kadawatha 00+720 LHS 50,000.00 Agreed 828 828 M.D.M.Liyanapathirana 297/16/A, Ihalabiyanwila, Kadawatha 00+710 LHS 50,000.00 Agreed 829 829 G.R.Thilakawathie 297/12, Ihalabiyanwila, Kadawatha 00+720 LHS 30,000.00 Agreed 830 830 R.R.Ranathunga 296, Ihalabiyanwila, Kadawatha 00+730 LHS 35,000.00 Agreed 831 831 S.D.Siriwardhana 295/B, Ihalabiyanwila, Kadawatha 00+745 LHS 33,000.00 Agreed 832 832 S.D.Premashantha 295, Ihalabiyanwila, Kadawatha 00+740 LHS 45,000.00 Agreed 833 833 S.D.Gunawathie 295/C, Ihalabiyanwila, Kadawatha 00+750 LHS 50,000.00 Agreed 834 834 S.D.Gunawathie 295/C, Ihalabiyanwila, Kadawatha 00+750 LHS 20,000.00 Agreed 835 835 W.D.A.R. Kulakumaru 294/1, Ihalabiyanwila, Kadawatha 00+770 LHS 35,000.00 Agreed 836 836 W.S.P. Samanweera 294/1/A, Ihalabiyanwila, Kadawatha 00+770 LHS 50,000.00 Agreed 837 837 S.D.Podimahaththaya 294,Ihalabiyanwila, Kadawatha 00+780 LHS 20,000.00 Agreed 838 838 S.D.Podimahaththaya 294, Ihalabiyanwila, Kadawatha 00+770 LHS 36,000.00 Agreed 839 839 W.D.Siriyalatha 294/1/B, Ihalabiyanwila, Kadawatha 00+785 LHS 34,000.00 Agreed 840 840 D.W.V.Jayesinghe 295/4, Ihalabiyanwila, Kadawatha 00+880 LHS 31,000.00 Agreed 841 841 S.D.Leelawathie 294/3, Ihalabiyanwila, Kadawatha 00+900 LHS 25,000.00 Agreed 842 842 S.D.Leelawathie 638/12, Asiri Mw, Makola North, Makola 00+900 LHS Null Damage 843 843 P.K.R. Ajith 512, Janatha Mw; Eldeniya, Kadawatha 00+920 LHS 50,000.00 Agreed 844 844 N.L.K. Gayanu 294/1 C, Puwakwatiya rd; Ihalabiyanwila, Kadawatha 00+720 LHS 15,000.00 Agreed 845 845 A. J. Ranjith 513/2/B,Eldeniya, Kadawatha 01+010 LHS 30,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

846 846 H.M.A.S. Bandara 513/3/B,Bandaranayake Mw, Eldeniya Kadawatha 01+050 LHS 46,000.00 Agreed 847 847 W.A.Chaminda 517/8, Bandaranayaka Mw; Eldeniya, Kadawatha 01+060 LHS 54,000.00 Agreed 848 848 A.L.Nirosha Chandrakanthi 638/12, Asiri Mw, Makola North, Makola 01+220 LHS 8,000.00 Agreed 849 849 R.A.Joseph Antony 515/A, Eldeniya, Kadawatha 01+230 LHS 32,000.00 Agreed 850 850 R.A.Joshep Antony Asiri Mw, Makola North, Makola 01+230 LHS Null Damage 851 851 R.A.M. E. Perera 515/B, Eldeniya, Kadawatha 01+230 LHS 66,000.00 Agreed 852 852 R.A.M. N. Perera 515/A/2, Eldeniya, Kadawatha 01+220 LHS 70,000.00 Agreed 853 853 R.A.D. C. Perera 515/A/1, Eldeniya, Kadawatha 01+210 LHS 28,000.00 Agreed 854 854 M.J.M.Lahiru Chandrasiri 513/5, Eldeniya, Kadawatha 01+200 LHS 41,000.00 Agreed 855 855 S.K.P.S. Sooriarachchi 517/2, Eldeniya, Kadawatha 01+190 LHS 45,000.00 Agreed 856 856 S.K.P.S. Sooriarachchi 517/2, Eldeniya, Kadawatha 01+180 LHS 30,000.00 Agreed 857 857 S. K. Sunil 517/9, Eldeniya, Kadawatha 01+220 LHS 28,000.00 Agreed 858 858 S. K. Sunil 517/1, Eldeniya, Kadawatha 01+240 LHS 55,000.00 Agreed 859 859 H.G.Nandawathie 517, Eldeniya Kadawatha 01+240 LHS 50,000.00 Agreed 860 860 H.G.Nandawathie 517/A, Eldeniya Kadawatha 01+250 LHS 37,000.00 Agreed 861 861 K.G.Theresa Violet 638/12, Asiri Mw, Makola North, Makola 01+310 LHS 45,000.00 Agreed 862 862 M.A.Kudabanda 522/2, Eldeniya, Kadawatha 01+320 LHS 25,000.00 Agreed 863 863 M.J.M.Cresus 638/12, Asiri Mw, Makola North, Makola 01+340 LHS 8,000.00 Agreed 864 864 R.D.J.Priyadarshani 324/K, Ihalabiyanwila ,Kadawatha 09+380 LHS 55,000.00 Agreed 865 865 G.K. Silva 324/I, Ihalabiyanwila ,Kadawatha 09+380 LHS 80,000.00 Agreed 866 866 M.A.N. Munasingha 652/10, Ihalabiyanwila ,Kadawatha 09+930 LHS 75,000.00 Agreed 867 867 W.N. Udayangani 194/B, Vihara Mw; Hewagama, Kaduwela 17+770 LHS 35,000.00 Agreed 868 868 Ven. Pathegama Gnanathilake Sri Gnanathilaka Meditation Center, Dewamiththa place, Heiy 15+020 RHS 86,000.00 Agreed 869 869 E.A.D.Edmond Singho 330/A/1, Dewamitta place, Heiyanthuduwa 14+830 RHS 40,000.00 Agreed 870 870 E.A.D.Edmond Singho 330/A, Dewamitta place, Heiyanthuduwa 14+740 RHS 140,000.00 Agreed 871 871 T.A.M.Malkanthi 361/B/1, Dewamitta place, Heiyanthuduwa 14+100 RHS 21,000.00 Agreed 872 872 K.B.P.Tharanga 361/B/11, Devamitta place, Heiyanthuduwa 14+100 RHS 20,000.00 Agreed 873 873 P.H.I.C. Rangallagedara 289/2, Sramadana Mw, Ihala Biyanwila, Kadawatha 08+940 LHS 160,000.00 Agreed 874 874 H.L. Gunasekara 325/D, Dewamitta place, Heiyanthuduwa 14+830 RHS 30,000.00 Agreed 875 875 A.M.Chularathne 11/1, Eldeniya Hotel, Kandy Road, Kadawatha 01+900 RHS Demolished 876 876 W.D.D. Pathmakumara 11, Kandy Road, Eldeniya Kadawatha 01+900 RHS 35,000.00 Agreed 877 877 W.D.D. Pathmakumara 11, Kandy Road, Eldeniya Kadawatha 01+900 RHS 100,000.00 Agreed 00+830- 878 878 A.A.Sunil Gunawardena 638/12, Asiri Mw, Makola North, Makola RHS 90,000.00 Agreed 00+900 00+830- 879 879 A.A.Sunil Gunawardena 647, Bandarawatta, Kadawatha RHS 90,000.00 Agreed 00+900 Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

00+830- 880 880 A.A.Sunil Gunawardena 638/12, Asiri Mw, Makola North, Makola RHS 25,000.00 Agreed 00+900 00+830- 881 881 A.A.Sunil Gunawardena 638/12, Asiri Mw, Makola North, Makola RHS 70,000.00 Agreed 00+900 00+830- 882 882 A.A.Sunil Gunawardena 638/12, Asiri Mw, Makola North, Makola RHS 64,000.00 Agreed 00+900 00+830- 883 883 A.A.Sunil Gunawardena 638/12, Asiri Mw, Makola North, Makola RHS 86,000.00 Agreed 00+900 884 884 H.D.Wasantha Manel 12/A,Eldeniya, Kadawatha 01+900 RHS 150,000.00 Agreed 885 885 H.D.V.S.Gunarathna 13, Eldeniya, Kadawatha 01+800 RHS 70,000.00 Agreed 886 886 Weerasinghege Dayawathee 13, Kandy Road, Eldeniya Kadawatha (Shop) 01+800 RHS Demolished 887 887 H.D.V.S.Gunarathna 13, Eldeniya, Kadawatha 01+800 RHS 25,000.00 Agreed 888 888 H.D.Vijitha Kumara Gunarathne 13/A, Kandy Road, Eldeniya Kadawatha 01+800 RHS 40,000.00 Agreed 889 889 H.D.Vijitha Kumara Gunarathne 13/A, Kandy Road, Eldeniya Kadawatha 01+800 RHS 25,000.00 Agreed 890 890 H.D.Vijitha Kumara Gunarathne 13/A, Kandy Road, Eldeniya Kadawatha 01+800 RHS 40,000.00 Agreed 891 891 M.T.D.C.Perera 12, Kandy Road, Eldeniya, Kadawatha 01+830 RHS Demolished 892 892 A.G. Jestin 13/C, Kandy Road, Eldeniya, Kadawatha 01+800 RHS 90,000.00 Agreed 893 893 H. S. Cyril 11/4, Kandy Road, Eldeniya, Kadawatha 01+900 RHS 85,000.00 Agreed 894 894 K.A.D.R. A. Nanayakkara 573/1, Eldeniya, Kadawatha 01+720 RHS 65,000.00 Agreed 895 895 S.P.A.Samantha 14/2, Peramuna Mw, Eldeniya, Kadawatha 01+750 RHS 100,000.00 Agreed 896 896 S. R. Sellapperuma 14/1, Peramuna Mw, Eldeniya, Kadawatha 01+750 RHS 166,000.00 Agreed 897 897 S. R. Sellapperuma 14/1, Peramuna Mw,Eldeniya, Kadawatha 01+750 RHS 35,000.00 Agreed 898 898 M.D.Wimalawathee 13/A, Kandy Road, Eldeniya Kadawatha 01+800 RHS Demolished 899 899 T.M.Sarath Thennakoon 304, Kandy road, Kadawatha 01+900 LHS 74,000.00 Agreed 900 900 T.M.A.Thennakoon 572, Eldeniya, Kadawatha 01+560 RHS 10,000.00 Agreed 901 901 I.Z.G.Jayamanna 638/12, Asiri Mw, Makola North, Makola 01+600 RHS Null Damage 902 902 J.M.D.Mary Winifred 574, Eldeniya, Kadawatha 01+590 RHS 40,000.00 Agreed 903 903 J.M.D.Mary Winifred 638/12, Asiri Mw, Makola North, Makola 01+590 RHS Null Damage 904 904 K. Thissa Perera 578, Kandy road, Eldeniya, Kadawatha 01+560 RHS 125,000.00 Agreed 905 905 Kahandage Thissa Perera 638/12, Asiri Mw, Makola North, Makola 01+560 RHS Null Damage 906 906 K.A.D.A.F.Nanayakkara 577, Eldeniya, Kadawatha 01+590 RHS 60,000.00 Agreed 907 907 B.D. Nimaldasa 14/1/C, Eldeniya, Kadawatha 01+750 RHS 40,000.00 Agreed 908 908 G.A.Sugathadasa 580/1, Eldeniya, Kadawatha 01+520 RHS 46,000.00 Agreed 909 909 G.K.Thilakawathie 583, Kandy Road, Kadawatha 01+530 RHS 66,000.00 Agreed 910 910 A.T.Indika De Silva 485, Eldeniya Kadawatha 01+540 RHS 50,000.00 Agreed 911 911 CHILLIES MILLS 578, Kandy road, Eldeniya, Kadawatha 01+570 RHS 80,000.00 Agreed 912 912 L.A.T.Sunil 330/7, Devamitta, Heiyanthuduwa 14+990 LHS 80,000.00 Agreed 913 913 B.H.T. Kulasekara Mankada Rd, Mankada 10+410 RHS 130,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

914 914 S.P.Liyanage 330/A/1, Ihalabiyanwila, Kadawatha 09+190 RHS 100,000.00 Agreed 915 915 M. A.Nandasiri 628/2, Temple Road, Heiyanthuduwa 12+600 LHS 45,000.00 Agreed 916 916 M. A.Nandasiri 628, Temple Road, Heiyanthuduwa 12+600 LHS 50,000.00 Agreed 917 917 L.Y. Perera 628/B.Nayagala, Heiyanthuduwa 12+610 LHS 50,000.00 Agreed 918 918 L.Y. Perera 628/B.Nayagala, Heiyanthuduwa 12+620 LHS 30,000.00 Agreed 919 919 L.Y. Perera 628/B.Nayagala, Heiyanthuduwa 12+610 LHS 90,000.00 Agreed 920 920 L. A. Perera 630/B, Samurdhi mw; Heiyanthuduwa 12+630 LHS 30,000.00 Agreed 921 921 B.P.P.A.P.W.Pathirana 352/D, Bandaranayaka Mw, Heiyanthuduwa 14+530 RHS 40,000.00 Agreed 922 922 T.L.Sumana Pathmaseeli 195/2, Vihara mw; Hewagama Kaduwela 16+940 LHS 25,000.00 Agreed 923 923 A.M. De Cruze 218/B/1, Wihara Mw, Hewagama Kaduwela 17+110 LHS 118,000.00 Agreed 924 924 D.C.J.Katugampala 133/33, Hewagama, Kaduwela 16+550 RHS 54,000.00 Agreed 925 925 Harichandani SuduDevage 143/3, Sramadana Mw, Kandy Rd, Kadawatha 00+190 LHS 67,000.00 Agreed 926 926 S. Jayathilake 143/1, Kandy Road, Kadawatha 00+130 LHS 224,000.00 Agreed 927 927 S. Jayathilake 143/A, Kandy Road, Kadawatha 00+130 LHS 75,000.00 Agreed 928 928 S. Jayathilake 143, Kandy Road, Kadawatha 00+130 LHS 100,000.00 Agreed 929 929 S. Jayathilake 143/B, Kandy Road, Kadawatha 00+130 LHS 140,000.00 Agreed 930 930 S. Jayathilake 143/H, Kandy Road, Kadawatha 00+130 LHS 170,000.00 Agreed 931 931 R. D. Suneetha 146/A, Kandy Rd, Ihala biyanwila Kadawatha 00+100 LHS 60,000.00 Agreed 932 932 R. D. Pathmalatha 146, Ihala biyanwila,Kandy road, Kadawatha 00+100 LHS 70,000.00 Agreed 933 933 K. D. Wimalawathie 441, Kandy Rd, Kadawatha 00+100 LHS 35,000.00 Agreed 934 934 K. D. Wimalawathie 441, Kandy Rd, Kadawatha 00+100 LHS 50,000.00 Agreed 935 935 S. D. Veenat 148/1/A, Kandy Rd, Kadawatha 00+100 LHS 60,000.00 Agreed 936 936 S. D. Veenat 148/1/B, Kandy Rd, Kadawatha 00+100 LHS 25,000.00 Agreed 937 937 J.A.Nimal Jayakody 141, Kandy Road, Kadawatha 00+090 LHS 98,000.00 Agreed 938 938 D.G.K.A.Mayadunne 142/A, Kandy Rd, Kadawatha 00+050 LHS 154,000.00 Agreed 939 939 D.G.K.A.Mayadunne 142/A, Kandy Rd, Kadawatha 00+050 LHS 115,000.00 Agreed 940 940 D.G.K.A.Mayadunne 142/A, Kandy Rd, Kadawatha 00+050 LHS 135,000.00 Agreed 941 941 G.B.Dayani de Silva 139, Kandy Road, Kadawatha 00+030 RHS 104,000.00 Agreed 942 942 G.D.S. Karunanayake 136/12/A, Kandy road, Kadwatha 00+030 RHS 30,000.00 Agreed 943 943 D.S. Manchanayake 136/12 D,Kandy road, Kadawatha 00+000 RHS 33,000.00 Agreed 944 944 Dedigama Jewellers 136/16 /C, Kandy road, Kadawatha 00+020 RHS 41,000.00 Agreed 945 945 R.A.Sumathipala 139, Ihalabiyanwila, Kandy rd; Kadawatha 00+060 RHS 130,000.00 Agreed 946 946 Salinda Holdings (Pvt.) Ltd. 136/12, Kandy road, Kadawatha 00+040 RHS 72,000.00 Agreed 947 947 B. D. Malani 191/1, Kandy Road, Kadawatha 00+100 LHS 65,000.00 Agreed 948 948 C.J.Abeyratne 1040, Kandy Road, Kadawatha 00+010 RHS 21,000.00 Agreed 949 949 A.D.Premawathie 292/B, Ihalabiyanwila Kadawatha 09+010 LHS 41,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

950 950 A.A.D.Kamalawathie 5/1, Biyagama Pahala ,Biyagama 16+200 RHS 95,000.00 Agreed 951 951 Laksiri Hapangama 5,Biyagama Road ,Biyagama 16+240 RHS 40,000.00 Agreed 265,000.00 Agreed 952 952 Degurunnehelage Dayarathne 3,Biyagama Pahala ,Biyagama 16+200 RHS 201,000.00 Under RDA instruction 953 953 Degurunnehelage Dayarathne 1/3,Biyagama Pahala ,Biyagama 16+200 RHS 30,000.00 Agreed 954 954 D.N.D.Dayarathna 3/A,Biyagama Pahala ,Biyagama 16+240 RHS 170,000.00 Agreed 955 955 A.A.D.N.W. Adhikari 3/2, Biyagama Pahala ,Biyagama 16+200 RHS 40,000.00 Agreed 956 956 W.Y.S. Jayawilal 3/3, Biyagama Pahala ,Biyagama 16+240 RHS 110,000.00 Agreed 957 957 A.A.D.Sarath Pathmasiri 3/4, Biyagama 16+200 RHS 57,000.00 Agreed 958 958 E.M.S.C.D. Seram 3/2A, Biyagama road ,Biyagama 16+250 RHS 165,000.00 Agreed 959 959 W.M.Kamal Shanthi Senanayake 2/1. Biyagama Pahala ,Biyagama 16+190 RHS 300,000.00 Under Negotiation 960 960 A.A.D.Chandradasa 4/1, Biyagama Pahala ,Biyagama 16+190 RHS 89,000.00 Agreed 961 961 A.A.D.Chandradasa 4, Biyagama Pahala ,Biyagama 16+190 RHS 40,000.00 Agreed 962 962 A.A.D. Siriyalatha 4/1, Biyagama road ,Biyagama 16+190 RHS 46,000.00 Agreed 963 963 H.A.D. Nandakumara 6/1, Biyagama Pahala ,Biyagama 16+190 RHS 120,000.00 Agreed 964 964 H.A.D. Amara Nandaseeli 10/3, Biyagama Pahala ,Biyagama 16+200 LHS 90,000.00 Agreed 965 965 Liyanage Leela 77//7, Hewagama Kaduwela 16+440 RHS 150,000.00 Agreed 966 966 K.Senevirathne 77/6, Ranmal Place, Hewagama Kaduwela 16+450 RHS 328,000.00 Agreed 967 967 H.Ranjani Perera 77/1, Ranmal Place, Hewagama Kaduwela 16+430 RHS 105,000.00 Agreed 968 968 S.M.Rasika Sampath Dissanayake 77/14, Ranmal Place, Hewagama Kaduwela 16+460 RHS Unable to contact House Owner 969 969 K.K.Chandradasa 79/E/1, Hewagama Kaduwela 16+510 RHS 120,000.00 Agreed 970 970 R.A.Gunawathie 79/A/3, Hewagama, Kaduwela 16+520 RHS 110,000.00 Agreed 971 971 R.A.Gunawathie 79/A, Hewagama, Kaduwela 16+510 RHS 60,000.00 Agreed 972 972 K.O.Virajini 79/B/1, Hewagama Kaduwela 16+510 RHS 108,000.00 Agreed 973 973 D.A.Janaka Kumara 163, Hewagama ,Kaduwela 16+490 RHS 132,000.00 Agreed 974 974 I.W.A.Sugathadasa 180/13, Hewagama , Kaduwela 16+490 RHS 60,000.00 Agreed 975 975 Dr.R.A.Anoma Samarasinghe 638/12, Asiri Mw, Makola North, Makola 00+080 RHS 86,000.00 Under Negotiation 976 976 J.P.Sandya Kumari 142/2 A, Kandy rd; Kadawatha 00+120 RHS 60,000.00 Agreed 977 977 Kamala Malani Katulanda 142/C,Sramadana mw, Ihalabiyanwila,Kadawatha 00+150 RHS Demolished 978 978 R.A.Thilakarathna 643/2/C, Ihalabiyanwila Kadawatha 10+060 RHS 113,000.00 Agreed 979 979 G.A.D.Sirisena 481, Galadeniya, Heiyanthuduwa 11+720 LHS 10,000.00 Agreed 980 980 P.A.Sisira Pradeep Kumara Devamitta place, Heiyanthuduwa 14+900 LHS Foundation Only 981 981 Pathma Abeywickrama 330/29, Devamitta Place, Heiyanthuduwa 14+905 LHS 50,000.00 Agreed 982 982 D. Suneetha Perera 330/H, Devamitta Place, Heiyanthuduwa 14+870 LHS 55,000.00 Agreed 983 983 S.A.Piyawathi 137/A, Hewagama Kaduwela 16+520 LHS 73,000.00 Agreed 984 984 S.A.Piyawathi 137, Hewagama Kaduwela 16+520 LHS 64,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

985 985 A.S.V.Pigera 77/4, Ranmal Place, Hewagama ,Kaduwela 16+500 RHS 77,000.00 Agreed 986 986 W.G.M.M.Ariyawathie Galappaththi 77/5, Ranmal Place, Hewagama ,Kaduwela 16+490 RHS 304,000.00 Agreed 987 987 Manager, Peoples Bank, Kadawatha Peoples Bank , Kadawatha 00+040 RHS 50,000.00 Agreed 988 988 Manel De Silva No,138, Kandy Road, Kadawatha. 00+010 RHS House owner did not allow to do pre survey 989 989 Manel de Silva No,186, Kandy Road,Kadawatha 00+000 LHS House owner did not allow to do pre survey 990 990 K.A.Piyawathie 637/1, Kajuhena road, Heyiyanthuduwa 12+890 LHS 40,000.00 Agreed 991 991 W.A.C.Karunarathna 224/G/3, Vihara Mw,Hewagama, Kaduwela. 17+235 LHS 40,000.00 Agreed 992 992 W.A.R.Nishantha 222/1B, Vihara Mw,Hewagama, Kaduwela. 17+200 LHS 50,000.00 Agreed 993 993 W.L.Chaminda Aruna Kumara 222/2 F, Hewagama, Kaduwela. 17+195 LHS 75,000.00 Agreed 994 994 S.S.Rajapaksha 189/2, Godella road, Hewagama,Kaduwela 16+610 LHS 92,000.00 Agreed 995 995 E.A.D.Prema Egodawatte 353, Bandaranayaka road, Heiyanthuduwa 14+530 RHS Null Damage 996 996 M.Sumanawathie 627,Temple road, Heiyanthuduwa 12+600 LHS 25,000.00 Agreed 997 997 R.P.C.U.K.Rajapakshe 691/A, Makola North, Makola 11+720 LHS 50,000.00 Agreed 998 998 S.M.M.S. Mayadunne 335/B, Ihalabiyanwila, Kadawatha, 09+300 LHS 90,000.00 Agreed 999 999 H. P. J. Perera. 513/2,Eldeniya,Kadawatha 01+190 RHS 60,000.00 Agreed 1000 1000 Ven. Pathegama Gnanathilake Sri Gnanathilaka Meditation Center, Dewamiththa place, Heiy 15+060 RHS 50,000.00 Agreed 1001 1001 N.P.Chandani 328/2, Dewamitta Plase, Heiyanthuduwa, 15+000 RHS 40,000.00 Agreed 1002 1002 L.A.W.A.Shan Sampath Kumara 361/E, Devamitta, Plase,Heyiyanthuduwa, 14+110 RHS 15,000.00 Agreed 1003 1003 H.L.M. Irangani 638/5/1,Makola North,Makola 10+970 LHS 35,000.00 Agreed 1004 1004 I.Z.G.Jayamanne 638/12, Asiri Mw, Makola North, Makola 01+600 LHS 50,000.00 Agreed 1005 1005 C.H. Nilusha Hemanthi 369/2, Makola South, Makola 11+370 RHS Cannot be entered to the premises 1006 1007 H.L.N.P.Nanayakkara 124/6/1, Ramahara road, Hewagama, Kaduwela 16+800 RHS University of moratuwa did not recommend 1007 1014 D.P. Abenayake 588/1, Makola North, Makola. 10+400 RHS 129,000.00 Agreed 1008 1021 W.A.D.C.L.Gunathilaka 650/2/A,Dharmashoka Rd, Kadawatha 10+130 LHS 70,000.00 Agreed 1009 1022 K.A.D.S.Kasthurisinghe 645/5, Ihalabiyanwila, Kadawatha 10+140 LHS 50,000.00 Agreed 1010 1023 P.M.Perera 329,Ihalabiyanwila, Kadwatha 09+300 LHS 80,000.00 Agreed 1011 1024 L.P. Perera 624/1, Godellawatte, Heiyanthuduwa 12+800 RHS 65,000.00 Agreed 1012 H-Comp 01 W.T.Milinona 13/1, Pahala Biyagama Biyagama 16+200 LHS 75,000.00 Agreed

1013 H-Comp 02 L.R.Thilakasiri 457/A,Batuge watta, Makola South, Makola BP RHS 85,000.00 Agreed

1014 H-Comp 03 H.M.K.Herath 457/1A, Makola South, Makola BP RHS 76,000.00 Agreed 1015 BH-03 H.A.Piyarathna 293/3,Ihalabiyanwila,Kadawatha 08+865 LHS 63,000.00 Agreed 1016 BH-04 M.Gunawardhana 293/4,Ihalabiyanwila,Kadawatha 08+865 LHS Demolished 1017 BH-11 A.G.Upali 291/D,Ihalabiyanwila,Kadawatha 08+865 LHS 40,000.00 Agreed 1018 BH-18 Sududewage Irangani 290/1,Ihalabiyanwila,Kadawatha 08+865 LHS 80,000.00 Agreed 1019 BPH-01 L.Indrani 457/E/1,Makola South ,Makola BP LAND RHS 80,000.00 Agreed Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

1020 BPH-02 P.B.Sarath 457, Makola South,Makola BP LAND RHS 58,000.00 Agreed 1021 BPH-03 P.B.Sarath 457/1,Makola South,Makola BP LAND RHS 78,000.00 Agreed 1022 BPH-04 L.V.Piyaseeli 457/D,Makola South,Makola BP LAND RHS 79,000.00 Agreed 1023 BPH-05 H.K.Wijesiri 457/2,Batugewatta,Makola BP LAND RHS 75,000.00 Agreed 1024 BPH-06 I.Gunasiri 459, Badugewatta, Makola South,Makola BP LAND RHS 72,000.00 Agreed 1025 BPH-07 I.Romielsingho 459 /A, Batugewatta, Makola South,Makola BP LAND RHS 116,000.00 Agreed 1026 BPH-08 I.Romielsingho 459 /A, Batugewatta, Makola South,Makola BP LAND RHS 50,000.00 Agreed 1027 BPH-09 W.Sunil Shantha 460 /A, Batugewatta, Makola North,Makola BP LAND RHS 75,000.00 Agreed 1028 BPH-10 G.A.D.R.Padmalal 462 /A, Batugewatta, Makola South,Makola BP LAND RHS 60,000.00 Agreed 1029 BPH-11 D.Nimal Dissanayake, 462/A,Makola South Batugewatta Makola BP LAND RHS Unable to contact House Owner 1030 18 L Pubudu Prasanna 133/8/B, wendesi watta, Hewagama, Kaduwela 16+440 RHS Demolished Affected parties of beyond 50m corridor

Estimated Value # House No Name Address Location Side of the Road Agreed / Not agreed (Rs.)

1 H-comp 04 K.A.S.Sampath 126/C, Hewagama, Kaduwela 16+950 RHS 159,000.00 Agreed 2 H-comp 5 M.G.Lionel 351 C, Dewamiththa Place, Heyiyanthuduwa. 14 + 480 RHS 172,000.00 Agreed 3 H-comp-6 J.M. Hettiarachchi 639/4, Koswatte rd, Eldeniya, Kadawatha. 01+100 LHS 156,000.00 Agreed 4 H-comp-7 Suraweera Gamage Pradeep Nishantha 324/ H, Ihalabiyanwila, Kadawatha. 09+300 LHS 178,000.00 Agreed 5 H-comp-8 W.G.Gunasekara 324/01, Ihalabiyanwila, Kadawatha. 09+300 RHS 220,000.00 Agreed 6 H-comp 9 H.R.H. Mark Perera 639/02, Koswatta , Eldeniya, Kadawatha. 01+100 LHS 180,000.00 Agreed 7 H-comp 10 W.G.Somapala 349/7/2,Bandaranayaka MW, Heyiyanthuduwa 14+480 RHS 115,000.00 Under Negotiation Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure D

List of Affected Parties which were Temporarily Evacuated

Amount # Name & Address of the complainant Location Reason (Rs.)

G.R.T.N. Maduranga Rajapathirana, Evacuated due to property damages (Rental fee for 1 694, Makola North, Makola 10+620 (LHS) 312,000.00 the alternative house) (Two years from 31.10.2012) (G.L. Fernando) Clement Fernando, Blasting evcuation (20 working days from 2 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 21.11.2012) Heiyanthuduwa Clement Fernando, Blasting evcuation (20 working days from 3 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 11.01.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (20 working days from 4 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 16.02.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (20 working days from 5 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 20.03.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (10 working days from 6 480, Wathurapatha, Mabima, 15+740 (RHS) 5,000.00 16.05.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (10 working days from 7 480, Wathurapatha, Mabima, 15+740 (RHS) 5,000.00 14.06.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (10 working days from 8 480, Wathurapatha, Mabima, 15+740 (RHS) 5,000.00 08.08.2013 Heiyanthuduwa Clement Fernando, Blasting evcuation (20 working days from 9 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 24.10.2013) Heiyanthuduwa Clement Fernando, Blasting evcuation (20 working days from 10 480, Wathurapatha, Mabima, 15+740 (RHS) 10,000.00 19.11.2013) Heiyanthuduwa L. Pubudu Prasanna, 133/8 B, Evacuated due to exceeded vibration (One year 11 16+440 (RHS) 600,000.00 Rakgahawatta, period from 24.01.2013) Hewagama,Kaduwela S.A.G. Perera, Evacuated due to exceeded vibration (Until end of 12 S.A.S.D.Samaraweera, 16+210 12,000,000.00 the project) 2/8,Biyagama Pahala,Biyagama K.S. Thusharasiri, Evacuated due to exceeded vibration 13 369/3/1, Koswatta, Eldeniya, 01+000 (RHS) 672,000.00 (From 01.04.2013 - 31.03.2015) Kadawatha W.M.E.Nilantha Kumara, Evacuated due to exceeded vibration 14 No. 174/2 A, Ihalabiyanwila, 00+440 (RHS) 60,000.00 (From 15.05.2013 - 14.11.2013) Kadawatha T.H. Nalaka, Evacuated due to dangerous construciton activities 15 No. 329, Dewamiththa pedesa, 14+880 (RHS) 12,000.00 (From 04.07.2013 - 03.08.2013) Heiyanthuduwa Nimalsiri Hewadewa, Evacuated due to exceeded vibration 16 8+000 (LHS) 300,000.00 293/5, Ihalabiyanwila, Kadawatha (From 02.09.2013 - 01.09.2014) Mr. W.K. Thilakarathna, Evacuated due to exceeded vibration 17 Asiri Mw; Galawala junction, Makola 10+900 - 11+100 (From 01.11.2013 to 08.11.2013 except 03rd & 8th 3,000.00 North, Makola ) Mr. R.K.A.D. Yothan, Evacuated due to exceeded vibration 18 Asiri Mw; Galawala junction, Makola 10+900 - 11+100 (From 01.11.2013 to 08.11.2013 except 03rd & 8th 3,000.00 North, Makola ) Ms. C. M. Waduge, Evacuated due to exceeded vibration 19 Asiri Mw; Galawala junction, Makola 10+900 - 11+100 (From 01.11.2013 to 08.11.2013 except 03rd & 8th 3,000.00 North, Makola ) Mr. Gamini Gunawardana, Evacuated due to exceeded vibration 20 Asiri Mw; Galawala junction, Makola 10+900 - 11+100 (From 01.11.2013 to 08.11.2013 except 03rd & 8th 3,000.00 North, Makola ) Amount # Name & Address of the complainant Location Reason (Rs.) Mr. M. Mahesh Anurudda, Evacuated due to exceeded vibration (Ms. R. S.A.D.M. Priyawardana), 21 10+900 - 11+100 (From 01.11.2013 to 08.11.2013 except 03rd & 8th 3,000.00 Asiri Mw; Galawala junction, Makola ) North, Makola G. Shalika Dharshani, Evacuated due to exceeded Noise 22 V - 15 area 90,000.00 No. 694/1/B, Makola North, Makola (From 16.11.2013 - 15.05.2014) Mahinda Kumara Liyanage, Evacuated due to inconvenience occurred by 23 No. 330, Ihalabiyanwila, 9+300 (RHS) Vibration, Dust & Noise from 10.12.2013 to 30,000.00 Kadawatha 09.02.2014 G.A.M.T.Ganepola, Evacuated due to inconvenience occurred by 24 643/14, Ihalabiyanwila, Dharmashoka 10+100 Vibration, Dust & Noise from 30.12.2013 to 360,000.00 road, Kadawatha 29.12.2014 Kiriporuwage Sarath Priyantha, Evacuated due to exceeded vibration 25 357/A, Dewamiththa pedesa, 14+300 (RHS) 3,000.00 (06 working days from 10.02.2014) Heiyanthuduwa Priyantha Srinath Senevirathne, 14+300 (RHS) Evacuated due to exceeded vibration 26 357/E, Dewamiththa pedesa, 3,000.00 (06 working days from 10.02.2014) Ihalabiyanwila Mahinda Kumara Liyanage, Evacuated due to inconvenience occurred by 27 No. 330, Ihalabiyanwila, 9+300 (RHS) Vibration, Dust & Noise from 10.02.2014 to 45,000.00 Kadawatha 09.05.2014 Kiriporuwage Sarath Priyantha, Evacuated due to exceeded vibration which creates 28 357/A, Dewamiththa pedesa, 14+300 (RHS) by sheet piling activities carried out at P-38 (05 2,500.00 Heiyanthuduwa working days from 27.02.2014) S.K.Chandralatha, Evacuated due to exceeded vibration which creates 29 361/B, Dewamiththa Pedesa, 14+300 (RHS) by sheet piling activities carried out at P-38 (06 3,000.00 Heiyanthuduwa working days from 27.02.2014) Mahinda Kumara Liyanage, Evacuated due to inconvenience occurred by 30 No. 330, Ihalabiyanwila, 9+300 (RHS) Vibration, Dust & Noise from 10.05.2014 to 60,000.00 Kadawatha 09.09.2014 W.M.E.Nilantha Kumara, Evacuated due to exceeded vibration 31 No. 174/2 A, Ihalabiyanwila, 00+440 (RHS) 30,000.00 (From 01.06.2014 - 31.08.2014) Kadawatha G. Shalika Dharshani, Evacuated due to exceeded Noise 32 V - 15 area 75,000.00 No. 694/1/B, Makola North, Makola (From 01.07.2014 - 30.11.2014)

Lalani Padmakanthie, Evacuated due to inconvenience, disturbance by 33 698/2, Richmond Place, Makola South, 10+300 150,000.00 constructrion works (01.07.2014 - 31.12.2014) Makola

G. Shalika Dharshani, Evacuated due to exceeded Noise 34 V - 15 area 30,000.00 No. 694/1/B, Makola North, Makola (From 01.12.2014 - 31.01.2015)

G. Shalika Dharshani, Evacuated due to exceeded Noise 35 V - 15 area 15,000.00 No. 694/1/B, Makola North, Makola (From 01.02.2015 - 28.02.2015)

M.A.Upul Priyashantha, Evacuated due to inconvenience 36 B-214 95,000.00 No. 06, Biyagama South, Biyagama (From 24.02.2015 - 23.08.2015)

D.N.Sanjeewa, Evacuated due to inconvenience 37 B-214 160,000.00 No. 03, Biyagama South,Biyagama (From 24.02.2015 - 23.08.2015)

A.A.D.Siriyalatha, Evacuated due to inconvenience 38 B-214 95,000.00 No. 1/4, Biyagama South, Biyagama (From 24.02.2015 - 23.08.2015)

A.A.D.Chandradasa, Evacuated due to inconvenience 39 B-214 127,500.00 No. 4, Biyagama South, Biyagama (From 24.02.2015 - 23.08.2015)

A.A.D.Kamalawathi, Evacuated due to inconvenience 40 B-214 95,000.00 No. 5/1, Biyagama South, Biyagama (From 24.02.2015 - 23.08.2015) K.S. Thusharasiri, Evacuated due to exceeded vibration 41 369/3/1, Koswatta, Eldeniya, 01+000 (RHS) 84,000.00 (From 01.04.2015 - 30.06.2015) Kadawatha

A.A.D.Vinie Amarasooriya, Evacuated due to inconvenience 42 B-214 127,500.00 8/4, Pahala Biyagama, Biyagama (From 24.03.2015 - 23.09.2015) Amount # Name & Address of the complainant Location Reason (Rs.) W.M.Kamal Shanthi Senanayaka, Evacuated due to inconvenience 43 2/1, Pahala Biyagama, B-214 127,500.00 (From 24.03.2015 - 23.09.2015) Biyagama W.A.L.I. Udaya Kumara, Evacuated due to inconvenience 44 5/1/B, Pahala Biyagama, B-214 95,000.00 (From 24.03.2015 - 23.09.2015) Biyagama

D.N.Sanjeewa, Evacuated due to inconvenience 45 B-214 60,000.00 No. 03, Biyagama South, Biyagama (From 06.05.2015 - 05.11.2015) Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure E

List of Affected Parties which were Compensated for Well Water Depletion

Amount # Name & Address of the complainant Location Reason (Rs.)

Ms. P.L. Vineetha, Temporary water supply for 6 months period from 06.02.2013 due 1 No. 224/1/B, Vihara Mawatha, Hewagma, 17+200 13,000.00 to depletion of the water level of the well Kaduwela Mr. M.B. Samarakoon, Permenent water supply due to depletion of the water level of the 2 16+600 - 16+800 25,620.00 188 D, Godalla road, Hewagama Kaduwela well

Ms. W. Somawathi, Permenent water supply due to depletion of the water level of the 3 16+600 - 16+800 25,620.00 187 C, Godalla road, Hewagama Kaduwela well

Mr. W. S. Prema Kumara, Permenent water supply due to depletion of the water level of the 4 16+600 - 16+800 28,196.00 187 A, Godalla road, Hewagama, Kaduwela well

Mr. W. G. Botheju, Permenent water supply due to depletion of the water level of the 5 16+600 - 16+800 25,620.00 187 D 1, Godalla road, Hewagama, Kaduwela well A.G.R.V.Bandara, Permenent water supply due to depletion of the water level of the 6 185 E, Godalla road, Hewagama, 16+600 - 16+800 54,438.88 well Kaduwela W. L. Kumara, Permenent water supply due to depletion of the water level of the 7 187,Godalla road, Hewagama, 16+600 - 16+800 27,196.00 well Kaduwela Ms. W. P.Gayani Permenent water supply due to depletion of the water level of the 8 16+600 - 16+800 25,648.16 187 , Godalla road, Hewagama Kaduwela well

Permenent water supply due to depletion of the water level of the 9 Mr. H.M.J. Bandara, 16+600 - 16+800 89,154.40 No. 185/D, Godalla Mw, Hewagama, Kaduwela well Mr. S.S.Rajapaksha, Permenent water supply due to depletion of the water level of the 10 16+600 - 16+700 32,540.00 189/2, Vihara Mawatha, Hewagama, Kaduwela well

11 H.A. Amara Nandasilie Peyment for well damage 23,000.00

12 Mr. S.W.Gunadasa Peyment for well damage 13,290.00

Permenent water supply due to depletion of the water level of the 13 Mr. P.K.C.I. Perera, 24,648.16 186/1, Vihara Mw; Hewagama, Kaduwela 16+800 well Permenent water supply due to depletion of the water level of the 14 Mr.K.T.C.W.Kumara 33,314.00 185/C 1, Vihara Mw; Hewagama, Kaduwela 16+750 well Permenent water supply due to depletion of the water level of the 15 Ms. M.A.D.Siriyawathi, 26,552.16 185/C 2, Vihara Mw; Hewagama, Kaduwela 16+750 well Permenent water supply due to depletion of the water level of the 16 Mr.W.S.P.Botheju 24,648.00 185/C, Vihara Mw; Hewagama, Kaduwela 16+750 well Amount # Name & Address of the complainant Location Reason (Rs.)

Ms. L.A.D.W. Rani, Permenent water supply due to depletion of the water level of the 17 16+800 24,620.00 186, Vihara Mw; Hewagama, Kaduwela well Ms.R.A.D.C.Pushpa Permenent water supply due to depletion of the water level of the 18 16+800 25,134.00 90/4, Ramahara road,Kaduwela well Mr.Thissa Weerapperuma Permenent water supply due to depletion of the water level of the 19 16+800 29,274.00 179/1, Vihara Mw; Hewagama, Kaduwela well

Mr.K.R.D. Perera Permenent water supply due to depletion of the water level of the 20 16+600 24,648.00 195/6, Vihara Mw; Hewagama, Kaduwela well Permenent water supply due to depletion of the water level of the 21 Mr. K.T.J.G. Silva, 90/3, Ramahara road,Kaduwela 16+600 27,494.00 well Ms.W.A.Senehelatha, Permenent water supply due to depletion of the water level of the 22 16+800 24,620.00 185/B/1,Vihara Mw;Hewagama,Kaduwela well

Mr. K.Jayasena, Permenent water supply due to depletion of the water level of the 23 16+600 24,620.00 89, 1st Lane, Ramahara road,Kaduwela well Mr. A.L.W.Hemasiri, Permenent water supply due to depletion of the water level of the 24 16+575 25,620.00 92/A, Ramahara road,Kaduwela well Ms. H.M.N.Pushpakumari, Permenent water supply due to depletion of the water level of the 25 16+600 35,288.00 94/1/1,Ramahara road,Kaduwela well Ms. P.D. Roopawathi, Permenent water supply due to depletion of the water level of the 26 16+600 24,520.00 94/1/B/1,Ramahara road,Kaduwela well Mr. P.A.Weerasingha, Permenent water supply due to depletion of the water level of the 27 16+600 24,620.00 5/90, Ramahara road,Kaduwela well Mr. P.A.H. Siriwimal, Permenent water supply due to depletion of the water level of the 28 16+600 23,620.00 94/2/A, Ramahara road,Kaduwela well Mr. K.S.Premasiri, Permenent water supply due to depletion of the water level of the 29 361/B/3, Dewamiththa Place, 14+200 17,520.00 well Heiyanthuduwa Mr. S.A.W. Sangeeth Algama, Permenent water supply due to depletion of the water level of the 30 361/8/8, 14+200 17,520.00 well Dewamiththa Place,Heiyanthuduwa Mr. S.A.P.S. Senevirathne, Permenent water supply due to depletion of the water level of the 31 357/E, 14+200 17,520.00 well Dewamiththa Place,Heiyanthuduwa

Mr. D.N.Wijesundara, Permenent water supply due to depletion of the water level of the 32 17+100 36,056.00 131, Colombo road, Hewagama, Kaduwela well Amount # Name & Address of the complainant Location Reason (Rs.)

Mr. W.M.J.Wijekoon, Permenent for water supply due to depletion of the water level of 33 164/1/D, Ihalabiyanwila, 0+300 19,020.00 the well Kadawatha

G.V. Kusumawathi, Permenent for water supply due to depletion of the water level of 34 9+700 17,520.00 358/4, Samurdhi Mw, Ihalabiyanwila, kadawatha the well Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure F

Details of Flood Damage Compensation

Compensation for damages occurred due to flood at Ch - 9+900 - 9+700 on 03rd of May 2013 Final Name & Address of the Checked Estimated # Location Details of Inspection complainant on Amount (Rs.) Damage to toilet pit(5 cement rings in side the pit) (Rs.43,400.00) Damage to TV Stand (Rs.9,200.00) Surface of the kitchan washoff D.P.G.P.K.Peris, 1Kg milk powder(Rs.800.00) 09.05.2013 1 357, Samurdhe Mw; Ihalabiyanwila, 05 Kg Rice (Rs.350.00) 54,450.00 15.05.2013 Kadawatha 500 g Chilly (Rs.200.00) 250 g Curry powder (Rs.100.00) 100 g Turmaric powder (Rs.40.00) 02 Kg Sugar (Rs.200.00) 01 Kg Dhal (Rs.160.00) G.V. Kusumawathi, Damage to 10 Kg Chilly (Rs.4000.00) 2 358/4, Samurdhe Mw; Ihalabiyanwila, 4,000.00 Well dewatered twice Kadawatha Deric Wimalarathna, Damage to TV stand (Rs.4500.00) 3 358, Samurdhe Mw; Ihalabiyanwila, 9+700 (LHS) Damage to Floor Carpet - 10 X 21 feet (Rs.3000.00) 8,500.00 Kadawatha Cabinet glass (Rs.1000) No cost to 4 L.D. Jayasena, 15.05.2013 9+700 (LHS) Wash off land (Soil cubs 20) provide soil

5 Sunil Thilak 06.05.2013 9+900 (RHS) Wash off of 8 Bathic dye buckets (Rs.9760.00) 9,760.00

No cost to 6 Liyanage Margret 06.05.2013 9+800 (RHS) Wash off land (Soil cubs - 10) provide soil Compensation for damages occurred due to flood at - A1 Bypass on 03rd of May 2013 Grama Final Name & Address Niladhari Estimated # Checked on Location Declaration of the complainant Inspection of TAISEI Joint inspection on 06.06.2013 of the complainant Estimated Amount amount Inspected the house and garden and it was identified the Loss of following items were lost due to flood 100 Coconuts @ Rs. 40/- 100 Coconuts @ Rs. 40/- =Rs 4000/- 1.5 Cub sand @ Rs. 7,000/- 1 Cub sand @ Rs. 7,000/- W.L.S. Indrani, 15 Kg Sugar - Rs. 1,500/- 15 Kg Sugar - Rs. 1,500/- 600/5, Electrical items checked by TAISEI electrician - No damage 2 kg Onion - Rs.150/- 2 kg Onion - Rs.150/- 1 Bandaranayaka Mw, 16.05.2013 1+250 (LHS) Rs.20000/- Dewater the 2 wells 16,100.00 1 Bundle CR/Exercise books - 600/- 1 Bundle CR/Exercise books - 600/- Eldeniya, 2 Kg Curry powder - Rs.800/- 2 Kg Curry powder - Rs.800/- Kadawatha 5 Kg Rice - Rs. 350/- 5 Kg Rice - Rs. 350/- 1 Blanket - Rs. 1,500/- 1 Blanket - Rs. 1,500/- 500g Tea - Rs. 200/- 500g Tea - Rs. 200/- provided sand bags barrier

Ajith Perera, Electrical iron was checked by Taisei Electrician - Not in working _ 2 600/05, Eldeniya, 16.05.2013 1+250 (LHS) Damaged to Electric Iron Rs.10000/- condition and it has to be replaced 1,000.00 Kadawatha Other items are in good condition

Referred the matter to the Agrarian officer and estimate the 1 Cubes of Sand - Rs. 7000/- Loss of valuation of Vegetable plants A.A.L. Siriwardana, 1 1/2 bags of Fertilizer - Rs. 2,500/- 1 1/2 Cubes of Sand 3 601/B, Eldeniya, 14.05.2013 1+300(LHS) Rs.23000/- Wash off of the vegetable plants 14,500.00 1 1/2 bags of Fertilizer Kadawatha Crop Damage - Rs.5000/- (Valuation after submitted Agrarian officer's report & negotiation with Owner on 18.06.2013)

Damaged to Electrical items checked by TAISEI electrician - No damage Food stuff Dewater the well Electrical items Repair the plank bridge (Edanda) Furniture 1 Cube Sand - Rs. 7,000/- S.K.Dayananda, Repaired of house wall (Repaint) 5 Kg of Rice - Rs. 350/- Agreed to repaired the fly wood and repaint the walls at the 4 518,Eldeniya, 16.05.2013 1+210 (LHS) Rs.35000/- 9,350.00 Damages drinking water well 2 sets of CR/ Exercise books - Rs. 1,200/- end of the project Kadawatha Books 10 Coconut - Rs. 400/- Cloths 1 Kg Curry powder - Rs.400/- Edanda (Plank bridge) House wall - Repaint about 1'-1 1/2' from floor level Damaged the bottom of the fly wood door

Wall cupboard bottom - Rs. 12,000/- TAISEI electrician checked all the electric items. Book cupboard repaired - Rs. 3,500/- Refrigerator not in working condition Fly wood almairah - Rs. 7,000/- Electrical leakage of washing machine Refrigerator - Rs. 3,000/- Damaged to Washing machine Bottom of the walls of the house and the door bottoms about 2' will be Washing machine - Rs. 4,600/- Refrigerator rectify at the end of the project. Current damage condition will be Garments items - Rs.80,000/- Sewing machine K.W. Rathnapala, reported to GS. Total - Rs. 110,100/- (Rs. 30,100 + 80,000/-) 16.05.2013 In corporate garments items 5 518/1, Eldeniya, 1+200 (LHS) Rs. 150000/- Damaged to Book cupboard , Almairah 110,100.00 23.05.2013 Bed linen & mattress Kadawatha Estimated all new incomplete garment items and cloths - Valuation- Rs. Cloth Almairah 80,000/- Walls to be painted Except refrigerator, washing machine and sewing machine, all the other Total Estimate - Rs. 600,000/- items are in working condition Dewater the well Grama Final Name & Address Niladhari Estimated # Checked on Location Declaration of the complainant Inspection of TAISEI Joint inspection on 06.06.2013 of the complainant Estimated Amount amount Damaged to :- Electrical items to be checked by TAISEI electrician Three Wheeler 2 bags of flour - (Rs.4,500/- x 2)- Rs . 9000/- Refrigerator (Two door) 3.5 bags of sugar -(Rs. 2700 x 3) - Rs.8100/- DVD 1 Cake label 500 x 3 x 3 - Rs. 1,000/- TV Stand 11 plastic buckets - Rs. 3,500/- Rice cooker 1 phone charger - Rs. 150/- Sofa set DVD SET UP repaired - 7500/- Mobile phone 1 TV stand - Rs. 2000/- Phone charger Shoes - 3 pairs - Rs.3,000/- Shoes - 3 pairs Pathma 16.05.2013 Sleepers - 3 pairs Jayawardana, 18.05.2013 Inspected was carried out 4 days for check electrical items but no Cloths 6 513/2/A/1, 22.05.2013 1+100 (RHS) Rs.35000/- electricity in their house Finally checked electrical items on 18.06.2013 12,500.00 Bed and mattress Eldeniya, 28.05.2013 All are in good condition except DVD SET UP Kadawatha 10.06.2013 Bakery 4 bags of flour 3.5 bags of sugar 1 bag of salt Cake label/ Packing boxes packing materials Microwave Oven Plastic containers Bread trays Damages of Refrigerator, J.P. Prema Ranjani, Mattress TAISEI electrician checked all the electric items. Only refrigerator repair cost - Rs. 3,000/- 7 513/2/B, Eldeniya, 15.05.2013 1+100 (RHS) TV Rs.38000/- 3,000.00 And all are in good condition except refrigerator Others are in acceptable condition Kadawatha Sofa set Almairah

M.J.M.Rangana Checked by the TAISEI Electrician. Not in working condition and it has 8 1+000 (RHS) Damaged to Water pump Rs.20000/- _ 16,000.00 Sudharshana to be replaced

Repaint of walls about 2' - 2.5' Phillip Jayawardana, Damaged to door bottom All electrical items are checked by TAISEI electrician. All are in good 9 513/1, Eldeniya, 15.05.2013 1+000 (RHS) Electrical items Rs.126000/- _ 9,000.00 condition except 1 stand fan and electric iron Kadawatha KUBOTA tractor Furniture

R.P.Pedrik Perera, Loss of : Income loss for a day is Rs. 600/-. Request about Rs. 5000/- to replace 10 511, Eldeniya, 17.05.2013 0+980 (LHS) Kankun, Ladies fingers, Spinach, Bitter Rs.10000/- _ 5,000.00 vegetable. This is for the value equal to seed cost Kadawatha ground and Vegetable

M.J.M. Jayasena, Loss of: Request about Rs. 3000/- to replace vegetable. This is for the value 11 No 510/1, Janatha 07.06.2013 0+970 (LHS) Kankun,Mukunuwenna,Banana Rs.12000/- _ 3,000.00 equal to seed cost Mw,Kadawatha. H.P.J.Perera, Loss of, 534/1, 12 11.07.2013 1+000 (RHS) Banana Plantation,Beetle,Papaya,lima Rs.15000/- Inspection was carried out _ 5,000.00 Eldeniya,Kadawatha beans . Ranjini Silva, 13 639/3/1A, Eldeniya, 07.06.2013 01+010 (LHS) Damages to fridge and house hold items Rs. 38000/- Not detected any damage during the inspection Not detected any damage during the inspection - Kadawatha M. Somapala Silva, Damages to house hold (Kitchan items) 14 139/3/2/B, Eldeniya, 07.06.2013 01+020 (LHS) Rs. 15000/- Not detected any damage during the inspection Not detected any damage during the inspection - items Kadawatha Compensation for damages occurred due to flood at - A1 Bypass on 02nd of June 2014

Estimated cost for Total Completely Estimated cost for Estimated cost for No. Name & address of the affected party Chainage Amount Damaged Items Repairable Items Cleaning purposes (Rs) (Rs) (Rs) (Rs) M.J.M.Rangana Sudharshana 1 1+000RHS 12,700.00 - 5,000.00 17,700.00 513,Eldeniya,Kadawatha A.A.L.Siriwardhana 1+300LHS 14,940.00 - - 14,940.00 2 534/1,Eldeniya,Kadawatha Philip Jyawardhana 1+000RHS 16,945.00 16,500.00 8,000.00 41,445.00 3 513/1,Eldeniya,Kadawatha S.K.Dayananda 1+200LHS 12,545.00 3,500.00 11,500.00 27,545.00 4 518,Eldeniya,Kadawatha K.G.Theresa violet 1+300RHS 13,295.00 - 5,000.00 18,295.00 5 522/1/A,Eldeniya,Kadawatha M.A.Kudabanda 1+300RHS 2,250.00 24,800.00 7,000.00 34,050.00 6 522/2/1,Eldeniya,Kadawatha S.M.S.Menike 7 1+000RHS 16,152.00 7,540.00 7,000.00 30,692.00 513/1/A,Eldeniya,Kadawatha Ajith Piyasiri Perea 8 1+300LHS 13,400.00 - 4,000.00 17,400.00 600/5,Eldeniya,Kadawatha W.D.Saliya Ajith Kumara 9 1+000RHS 25,440.00 - 7,000.00 32,440.00 513/2/1/A,Eldeniya,Kadawatha H.P.J.Perera 10 1+100RHS 37,137.00 - - 37,137.00 513/2,Eldeniya,Kadawatha Prema Ranjani 11 1+000RHS 16,160.00 29,020.00 12,000.00 57,180.00 513/2/B,Eldeniya,Kadawatha Compensation for damages occurred due to flood at - A1 Bypass on 02nd of June 2014

Estimated cost for Total Completely Estimated cost for Estimated cost for No. Name & address of the affected party Chainage Amount Damaged Items Repairable Items Cleaning purposes (Rs) (Rs) (Rs) (Rs) Seelawathi Mayadunna 9+700 LHS 1 358/3,Ihala Biyanwila,Kadawatha 33,200.00 14,387.00 7,000.00 54,587.00 Deric Wimalarathne 9+700 LHS 2 358,Ihala Biyanwila,Kadawatha 43,056.00 17,000.00 7,000.00 67,056.00 Kamala Heyianthuduwa 9+700 LHS 3 358/4,Ihala Biyanwila, Kadawatha 25,750.00 4,200.00 7,000.00 36,950.00 R.K.Namal 9+700 LHS 4 358/5/1,Ihala Biyanwila, Kadawatha 18,700.00 - 8,000.00 26,700.00 P.D.Sunil Thilak 9+900 RHS 5 663/c,Ihala Biyanwila, Kadawatha 34,050.00 - 6,000.00 40,050.00 Margret Liyanage 9+600 RHS 6 674/3,Wediwatte,Ihala Biyanwila, Kadawatha 27,670.00 - 5,000.00 32,670.00 N.J.L.Thilakasiri 9+300 RHS 7 332/2,Ihala Biyanwila, Kadawatha 20,000.00 - 6,000.00 26,000.00 U.A.Vijitha 0+200 RHS 8 186/2A,Ihala Biyanwila, Kadawatha 19,400.00 7,000.00 6,000.00 32,400.00 Nilantha Kumara 0+400 RHS 9 174/2A,Ihala Biyanwila, Kadawatha 3,000.00 2,500.00 7,000.00 12,500.00 A.V.S.D.Nimalarathne 0+500 LHS 10 178/2A,Ihala Biyanwila, Kadawatha 31,680.00 8,650.00 7,000.00 47,330.00 S.D.Thilakarathne 0+500 LHS 11 178/2,Ihala Biyanwila, Kadawatha 14,480.00 2,000.00 7,000.00 23,480.00 T.D.Nimal 0+500 LHS 12 178/2B,Ihala Biyanwila, Kadawatha 6,065.00 - 7,000.00 13,065.00 Estimated cost for Total Completely Estimated cost for Estimated cost for No. Name & address of the affected party Chainage Amount Damaged Items Repairable Items Cleaning purposes (Rs) (Rs) (Rs) (Rs) A.Rosalin Nona 0+500 LHS 13 177/2B,Ihala Biyanwila, Kadawatha 16,930.00 1,500.00 6,000.00 24,430.00 G.Leelawathi 0+740 RHS 14 295/A,Ihala Biyanwila, Kadawatha 4,000.00 4,800.00 4,000.00 12,800.00 S.D.Gunawathi 0+900 RHS 15 295/C,Ihala Biyanwila, Kadawatha 4,800.00 - 6,000.00 10,800.00 Asanka Kumara (Rajitha Maduranga) 0+900 RHS 16 292/4,Ihala Biyanwila, Kadawatha 900.00 - 8,000.00 8,900.00 Rajitha Maduranga 0+900 RHS 17 292/4,Ihala Biyanwila, Kadawatha 10,675.00 4,800.00 6,000.00 21,475.00 Upekshika Dehideniya Downstream 18 282/1,Ihala Biyanwila, Kadawatha 81,775.00 60,875.00 11,000.00 153,650.00 Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure G

List of Miscellaneous Compensation

Name & Address of the Date Amount # Location Reason complainant compensated (Rs.) Payment for toilet damage Mr. L.A.T. Sunil Shantha, ( Concrete slab - Rs. 10,850.00 1 330/21, Dewamiththa Place, 15+150 (RHS) 18.02.2014 19,124.00 Wall repaire - Rs. 2,774.00 heiyanthuduwa. Labour cost - Rs. 5,500.00) Mr. Ajith Perera, Compensation for temporary toilet pit until the damaged No. 78, Ranmal Pedesa, toilet pit rectifications completed which damaged due to 2 16+360 14.06.2014 16,625.00 Hewagama, Kelani river bankerosion occurred due to after heavy rain Kaduwela on 07.06.2014 H.D.Jayasiri, 173/2, Mabima, Compensation for paddy damage due to drainage 3 15+100 RHS 17.12.2014 6,032.00 Heiyanthuduwa congestion H.Karunarathna, Compensation for paddy damage due to drainage 4 15+100 RHS 17.12.2014 19,605.00 221, Mabima, Heiyanthuduwa congestion K.A.D.Sujeewa Premalal, Compensation for paddy damage due to drainage 5 15+100 RHS 17.12.2014 22,621.00 172/1, Mabima, Heiyanthuduwa congestion W.A.Seemon, 6 Compensation for paddy damage due to siltation 24.03.2015 6,032.00 No. 461/1, Kadawatha 8+900 LHS K.A.Lowrance, 7 No. 606, Heiyanthuduwa North, 12+300 RHS Compensation for paddy damage due to siltation 24.03.2015 9,044.00 Kadawatha W.K.Nimal Kularathne, 8 No. 705/B, Mankada road, Makola Compensation for paddy damage due to siltation 23.03.2015 4,522.00 North, Kadawatha 9+750 LHS K.A.Dharmadasa, 9 No.606, Heiyanthuduwa North, 12+300 RHS Compensation for paddy damage due to siltation 23.03.2015 6,004.00 Kadawatha Payment for sub contractors placing sand bags for 10 Central Farmers Assosiation 9+700 reinstating damages along lead away canal through Ihala 27.04.2015 110,683.00 Biyanwila paddy lands Mahinda Alahakoon, 11 11+200 LHS Damages occurred to boundary wall due to an accident 26.05.2015 15,000.00 Galwala junction, Makola Mr. P. Thilakaratne, 12 9+900 LHS Compensation for paddy damage due to siltation 26.05.2015 3,950.00 337, Ihala Biyanwila, Kadawatha Mrs. N.P. Amara Piyaseeli, 13 228/1, Vihara Mw; Hewagama, 17+450 RHS Compensation for crop damages 03.11.2015 180,000.00 Kaduwela Mr. K.G. Freddy Subasingha, 14 Bandaranayaka Mw; Eldeniya, 1+700 RHS Compensation for crop damages 09.11.2015 71,750.00 Kadawatha Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure H

Final Status of Disposal Sites

No Serial No. Chainage/Location Image

Pahala Bomiriya Operated under Environment 1 8 clearance Ref.No. WPO/08/06/81/2012 Dated 20.04.2012/29.07.2013

Wathurapatha - 1 Operated under Environment clearance Ref.No. 2 16 WPO/08/06/295/2012 Dated 31/10/2012

Wathurapatha - 2 Operated under Environment clearance Ref.No. 3 19 WPO/08/06/247/2012 Dated 13/09/2012

Mahara Operated under Environment clearance Ref.No. 4 27 WPO/08/06/370/2012 Dated 24/12/2012

Mahara(Neligama) Environment clearance Ref.No. WPO/08/06/15/2013 5 34 Port Authority Land- Not Operated Dated 24/12/2012 No Serial No. Chainage/Location Image

Mabima (Rakgahawatta) Operated under Environment clearance Ref.No. 6 41 WPO/08/06/139/2013 Dated 26.06.2013

Wathurapatha - 3 Operated under Environment clearance Ref.No. 7 43 WPO/08/06/66/2013 Dated 27.02.2013

Wathurapatha - 4 Environment clearance Ref.No. 8 51 WPO/08/06/219/2013 Not Operated Dated 20.12.2013

Bambaragahawatta Operated under Environment clearance 9 54 Ref.No. WPO/08/06/27/2014 Dated 06.05.2014

Godaparagahawatta Operated under Environment clearance 10 55 Ref.No. WPO/08/06/81/2014 Dated 28.05.2014 No Serial No. Chainage/Location Image

Kuruduwatta (Gonawala) Operated under Environment 11 58 clearance Ref.No. WPO/08/06/209/2014 Dated 24.10.2014

Siyambalape Operated under Environment clearance Ref.No. 12 62 WPO/08/06/115/2014 Dated 06.08.2014

Manelwatta Operated under Environment clearance Ref.No. 13 63 WPO/08/06/206/2015 Dated 24.04.2015

Kaduwela - II Operated under Environment clearance 14 65 Ref.No. WPO/08/06/111/2014 Dated

Mabima - II Operated under Environment clearance 15 67 Ref.No. WPO/08/06/37/2015 Dated 23.07.2015 Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure I

SLLRDC Clearance for Removing Pilot Roads

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure J

Noise & Vibration Analysis

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Introduction

During the construction period of OCH NS-1 Phase II, Noise and Vibration levels were measured by Industrial Technology Institute randomly and on complain basis. All the data, which were collected throughout the construction period were utilized for this study.

Main purpose of this study is to identify the nature of the relationship between Noise/Vibration and Distance.

The highest vibration measurement, which was recorded during each month and its corresponding distance from the source to monitoring location, is used to plot the graphs. Both, highest and lowest measurements are manipulated to establish a reliable correlation for noise since noise is a mutually inclusive variable. This means while different types of construction activities are being executed at a same time, noise level cannot be determined for each construction activity separately. It gives collective output. Therefore, not only highest noise level but also lowest value, which was recorded in each month, is used to enhance the accuracy of the graph.

Since this study deals with two-dimensional variables a “Trend Line” is determined in order to identify the tendency of the trend. One of the more accurate ways of finding the Trend Line is the Least Square Method. This analysis adheres to following steps In order to ascertain the Trend Line.

Step 1: The mean of the x-values and the mean of the y-values are calculated.

� ∑�= � ̅ =

� ∑�= � ̅ = Step 2: Slope of the trend line is determined by using following formula.

� ∑�= � − ̅� − ̅ = � Step 3: y-intercept∑�= of the� −line ̅ is calculated by using following formula.

Step 4:� The = ̅equation− ̅ of the line is formed by using the slope m and the y-intercept b.

= + �

Vibration Monitoring Data

Activity : Bored piling 2013 2014 Location May Jun Jul Aug Sep Oct Nov Jan Mar 17+500 0.43 17+400 17+300 0.48 1.12 0.47 0.43 1.31 1.31 0.29 0.43 0.23 0.32 0.26 1.56 1.33 17+200 1.34 1.36 1.37 1.48 1.54 1.56 0.23 16+600 0.34 1.36 1.65 1.11 16+400 0.67 0.61 0.63 0.68 16+200 0.86 16+100 1.69 14+200 1.58 14+100 1.42 1.21 1.23 13+300 1.01 1.11 0.61 1.13 13+200 1.10 0.73 0.73 0.83 12+900 1.22 1.21 11+100 1.56 1.56 11+000 1.49 1.41 1.13 10+900 1.30 10+600 0.96 1.34 1.14 1.31 0.91 0.88 1.40 1.40 10+400 0.13 10+100 0.27 09+900 1.37 1.37 09+600 0.32 1.86 1.14 09+500 1.58 1.25 1.33 1.32 1.35 09+400 1.27 1.35 1.37 09+300 0.13 0.12 09+100 1.52 09+000 1.40 1.01 08+900 1.01 0.92 0.99 0.98 1.56 08+800 1.62 1.05 1.48 08+600 1.55

Highest Value 1.55 1.65 1.37 1.62 1.86 1.69 1.56 1.56 0.86 Vibration (mm/Sec) Offset (m) 132 19 96 43 10 19 41 54 140

Below the limit Highest level Vibration Monitoring Data

Activity : Gravel Compaction Pile Year: 2013

Location Jan Feb Mar April May Jun Jul Aug Sep 17+200 0.51 16+800 0.48 0.21 16+600 2.04 16+500 4.69 2.64 2.61 2.54 16+100 1.11 1.11 1.01 1.21 1.60 1.70 1.6 1.02 1.45 1.41 2.07 1.98 2.50 15+800 1.25 15+100 0.87 1.29 12+700 12+200 1.56 1.46 09+600 1.04 09+500 1.64 09+400 1.58 1.58 1.58 1.56 1.58 1.35 1.40 1.55 1.61 1.03 1.50 1.32 1.32 1.67 1.44 1.50 1.36 1.47 1.45 1.17 0.93 1.62 09+300 0.82 1.02 1.80 1.32 1.32 1.67 1.47 1.54 1.71 1.95 1.47 1.51 1.62 1.44 1.50 1.47 1.54 1.71 1.82 1.37 09+100 09+000 08+900 08+800 0.39 0.33 0.31 0.41 1.82 7.31 2.38 3.22 1.63 0.97 1.56 1.41 1.83 1.31 1.88 1.88 1.25 0.32 0.37 0.63 0.40 0.99 2.17 1.56 1.74 1.62 2.15 1.12 1.25 0.55 1.87 2.59 2.27 1.02 1.43 1.32 0.65 1.57 2.77 1.52 2.59 1.45 2.44 1.58 0.65 1.72 0.92 1.40 1.43 1.62 1.76 1.40 1.45 1.76 2.08 1.99 1.35 1.28 1.75 1.50 1.62 0.89 0.78 1.68 A1 By Pass 1.60 1.65 1.89 1.49 2.31 1.43 1.47 1.49 1.17 1.66 1.56 1.99 1.87 1.65 2.32 2.31 1.61 1.57 2.24 1.70 1.60 1.67 1.53 1.42 1.46 1.39 1.09 1.62 1.56 1.57 1.77 Highest Value Vibration 4.69 1.29 1.76 7.31 2.59 1.95 1.62 2.5 1.62 (mm/Sec) Offset (m) 10 54 72 10 19 14 49 12 15

Below the limit Beyond the limit Highest level Vibration Monitoring Data Activity : Compaction Year: 2013

Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 16+300 2.10 16+000 0.92 15+800 1.25 0.81 15+400 1.11 15+100 1.50 0.72 1.35 15+000 1.36 14+800 0.35 0.21 14+700 1.50 14+600 1.92 1.05 1.02 1.47 1.61 1.541.55 1.57 1.61 1.17 1.45 14+500 1.21 1.66 2.11 1.981.53 1.65 1.27 1.46 1.40 14+400 2.11 12+900 2.05 1.57 12+800 1.76 1.68 1.42 12+700 1.88 0.87 1.98 0.61 1.26 12+300 2.11 11+900 1.56 1..29 11+800 1.10 1.12 1.39 1.36 1.38 1.30 11+600 1.04 11+500 0.53 1.10 1.70 1.51 11+400 1.81 11+300 11+200 0.31 0.38 0.31 0.35 1.85 11+100 0.21 0.29 10+100 1.75 10+000 1.641.61 2.38 1.13 1.74 09+900 1.67 1.38 1.96 09+600 2.21 2.14 2.12 09+500 1.27 1.51 2.66 0.31 2.23 1.64 1.58 1.51 09+400 0.96 1.78 0.23 0.34 1.37 1.50 1.31 1.12 09+300 1.18 1.20 1.25 1.32 09+200 1.63 2.13 1.57 09+100 1.34 1.89 1.88 3.07 1.98 0.29 0.34 0.64 2.21 1.65 2.30 2.02 1.73 2.16 1.94 1.96 09+000 0.60 0.19 1.91 1.27 1.46 1.48 08+800 1.62 1.25 1.52 0.89 0.86 2.59 1.07 2.37 2.44 1.77 1.74 0.78 0.97 2.25 1.55 0.51 0.73 1.56 1.41 0.20 0.21 1.47 1.59 1.42 1.23 1.60 1.71 1.44 1.58 1.71 1.58 1.57 1.58 1.34 1.92 2.30 1.53 1.83 1.31 1.88 1.88 1.20 1.43 1.47

1.59 1.67 1.42 0.62 1.46 1.44 1.42 1.46 1.12 1.25 0.55 2.98 A1 By Pass 0.60 0.61 0.64 0.32 1.39 1.09 1.62 2.50 1.86 1.84 0.41 0.43

1.43 0.53 0.58 1.48 3.20 0.38 0.39 0.35 0.37 1.75 Highest Value Vibration 2.59 1.78 2.44 3.2 2.98 0.21 1.59 3.07 2.38 2.11 1.17 2.23 (mm/Sec) Offset (m) 10 15 12 10 9 12 14 18 35 8 89 22

Below the limit Beyond the limit Highest level Vibration Monitoring Data

Activity : Compaction Year: 2014

Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 16+600 2.12 16+500 2.19 15+500 1.31 1.631.48 1.561.58 1.62 1.51 1.27 2.12 1.30 1.48 14+900 2.12 1.20 1.59 2.50 1.61 1.49 1.34 1.56 1.12 0.85 1.10 0.98 1.18 1.71 2.16 1.85 1.44 1.30 2.03 14+700 1.12 1.11 1.18 14+600 1.41 1.57 1.16 1.54 1.52 1.60 1.55 1.58 1.31 1.63 1.49 1.45 1.21 1.40 1.01 1.65 1.80 1.78 2.06 1.61 2.12 1.12 1.14 1.49 1.56 1.34 14+500 1.47 1.82 1.51 2.01 2.19 2.11 1.55 1.64 14+400 1.47 1.26 14+200 1.50 2.09 1.58 2.12 1.78 12+900 0.96 11+600 1.67 1.6 1.58 1.57 1.85 1.22 1.55 1.72 1.78 11+500 1.74 1.63 2.70 2.21 2.09 2.31 1.63 2.09 2.18 1.91 1.65 1.56 11+400 1.48 1.48 1.89 2.21 1.42 2.23 11+300 1.6 10+900 1.40 1.46 10+400 1.67 1.68 1.60 1.67 10+300 10+200 1.89 10+100 1.61 10+000 1.56 2.08 1.78 1.60 1.34 1.81 1.402.051.521.432.05 1.441.301.10 1.56 1.52 09+900 1.75 1.12 2.31 1.40 2.06 1.48 2.07 1.20 1.58 09+800 1.25 09+600 1.49 1.45 1.26 2.21 1.44 1.42 1.641.42 2.011.65 1.60 09+500 1.57 2.32 09+400 1.26 1.321.621.431.681.50 2.051.461.42 2.20 1.33 0.91 1.30 1.32 1.33 1.32 1.20 0.53 1.16 1.23 1.32 2.09 2.21 1.461.461.811.311.571.401.421.301.58 1.23 1.51 1.45 2.36 2.13 09+300 1.34 1.23 1.20 1.29 1.75 1.80 2.31 0.74 0.71 1.12 1.52 1.161.122.19 1.10 1.96 1.10 1.89 1.78 0.92 1.52 1.41 1.32 1.65 2.10 1.37 1.62 1.32 09+200 2.23 2.05 1.65 1.65 1.67 1.43 1.38 1.57 1.121.05 2.171.55 1.52 1.50 1.41 1.37 1.40 1.42 1.21 2.31 1.71 1.87 09+100 1.84 0.86 1.67 1.57 1.71 1.41 1.40 09+000 1.42 1.10 1.46 08+900 1.48 1.34 1.36 08+800 1.38 Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 1.36 1.58 1.67 2.25 1.23 1.57 2.01 1.78 2.13 2.10 1.49 1.68 1.28 2.16 2.03 1.77 2.13 1.59 1.50 1.67 2.18 2.21 2.17 2.24 1.72 1.60 1.60 3.14 2.06 1.01 1.62 1.61 1.68 1.60 1.12 1.71 1.82 1.15 1.37 2.12 1.82 1.80 1.90 2.23 1.70 1.61 1.43 1.58 2.13 1.66 1.43 1.67 1.67 1.64 2.28 1.48 1.72 1.58 2.80 2.03 1.65 1.37 2.22 1.532.201.981.72 1.56 1.42 2.04 A1 By Pass 2.18 1.62 1.78 1.20 1.19 1.51 2.28 1.70 1.80 2.90 1.56 1.64 1.18 2.21 0.84

Highest Value 2.23 2.31 2.25 2.5 2.7 2.23 2.9 2.31 2.24 3.14 2.8 2.36 Vibration (mm/Sec) Offset (m) 12 12 17 12 3 13 7 8 15 5 12 12

Below the limit Beyond the limit Highest level Vibration Monitoring Data

Activity : Compaction Yea r: 2015

Location Jan Feb Mar 17+300 1.00 0.78 17+100 0.80 16+600 1.44 1.54 2.60 1.61 16+500 1.70 16+400 1.57 2.51 2.21 2.13 16+200 1.52 15+500 1.26 1.33 1.36 1.20 14+900 1.25 1.30 14+700 1.68 1.68 1.51 2.02 1.44 1.40 14+600 1.38 1.60 1.60 1.60 1.64 14+500 1.32 1.59 12+600 2.11 2.12 11+000 1.41 1.41 10+600 1.24 10+400 1.61 2.02 1.74 1.71 2.18 10+300 1.30 1.31 10+100 2.02 1.60 1.21 10+000 1.69 09+900 2.20 1.67 1.51 1.71 09+600 1.81 1.34 09+500 1.53 1.57 2.01 09+400 1.32 1.51 09+300 1.43 1.40 1.60 1.47 1.56 1.40 1.57 1.52 1.62 1.33 1.60 1.48 1.53 1.68 1.35 1.68 1.10 1.21 1.23 1.51 1.46 1.89 1.20 1.32 09+200 1.20 1.73 1.62 1.62 09+000 1.64 2.18 1.68 1.56 1.41 1.58 1.37 1.23 1.70 1.66 1.43 08+900 2.06 1.21 1.34 1.42 A1 By Pass 0.12 1.66 2.03 Highest Value 2.20 2.6 2.51 Vibration (mm/Sec) Offset (m) 10 20 13

Below the limit Beyond the limit Highest value Vibration Monitoring Locations – Bored Piling

1.62

1.37 1.86

1.56

1.69

0.86

1.65

1.55

1.56

Vibration Monitoring Locations – Gravel Compaction Piling

1.76

2.59 7.31

1.62 1.62 1.95

1.95

2.5 4.69

Vibration Monitoring Locations – Gravel/Soil Compaction 2013

2.98 3.2 1.59 2.59 0.21 2.44

3.07

1.78 2.23

2.38

2.11

1.17

Vibration Monitoring Locations – Gravel/Soil Compaction 2014

2.25 2.24 2.9 3.14 2.8 2.23

2.36 2.23 2.31

2.7 2.31

2.5

Vibration Monitoring Locations – Gravel/Soil Compaction 2015

2.20

2.51 2.6

Noise Monitoring Data

Year: 2013

Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 17+500 73 70 68 64 72 65 69 50 69 58 72 69 55 55 59 57 62 60 57 66 68 59 67 67 66 56 75 71 62 68 70 67 62 77 76 58 68 61 77 67 17+400 67 62 45 17+300 64 64 72 69 47 64 56 78 46 48 17+200 71 71 67 64 61 59 46 49 51 62 46 50 17+100 45 69 69 17+000 44 61 68 16+900 65 72 89 46 68 67 16+800 73 69 53 72 65 50 49 16+700 63 71 66 84 70 84 54 50 50 61 72 73 65 72 73 65 71 71 65 62 16+600 71 77 57 69 16+500 71 82 74 80 67 73 73 72 47 54 78 76 16+400 64 64 77 71 65 79 50 48 49 16+300 69 63 75 77 79 62 66 70 67 62 79 70 78 67 66 16+200 77 68 65 74 16+100 68 58 80 82 79 77 78 78 80 79 81 83 85 71 49 80 64 16+000 76 63 83 72 79 77 78 77 67 61 67 15+900 67 67 48 56 78 78 78 15+800 67 67 77 58 15+700 69 64 71 74 75 15+600 66 68 63 74 79 77 15+500 70 66 72 72 70 79 66 76 59 79 66 67 74 63 80 15+400 72 69 72 65 78 79 66 50 78 15+300 77 67 71 63 78 78 80 68 79 15+200 74 63 82 76 79 77 79 77 79 75 75 77 77 75 75 77 69 72 49 63 75 73 70 15+100 77 72 77 78 77 78 77 78 77 77 73 67 73 77 71 15+000 78 77 78 77 78 78 65 14+900 14+800 71 14+600 66 14+500 68 68 69 70 14+400 64 85 69 74 73 63 60 14+300 64 73 63 61 64 73 14+200 66 68 79 74 78 71 70 66 73 63 77 65 63 75 67 65 62 14+100 81 77 82 78 80 65 68 79 66 14+000 76 71 77 63 71 74 76 78 59 13+900 79 78 79 78 79 64 68 13+700 64 13+600 78 76 77 65 64 67 65 78 71 13+500 65 68 69 13+400 74 66 66 79 78 78 67 13+300 62 68 69 64 79 64 67 65 13+200 63 66 50 13+100 56 77 79 77 13+000 76 12+900 74 69 76 75 76 Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 12+600 66 12+500 71 66 68 71 65 76 68 49 60 12+400 65 66 65 62 64 67 65 79 12+300 61 64 12+200 69 69 78 12+100 66 63 11+600 78 11+500 56 53 68 72 71 67 71 73 73 73 64 66 66 62 67 66 68 64 65 63 63 72 58 67 61 11+200 70 66 68 67 70 71 62 68 70 71 69 71 69 66 66 73 67 71 70 66 64 73 51 65 52 63 65 60 67 11+100 62 70 71 69 70 68 72 72 69 69 70 69 66 60 65 54 61 11+000 62 69 70 74 55 76 75 62 74 10+900 64 67 67 66 78 64 10+800 69 78 82 79 74 71 70 64 65 67 60 61 68 77 63 56 62 63 10+600 75 69 72 71 66 59 59 53 53 49 46 54 63 60 58 64 63 47 67 65 78 10+500 55 67 60 60 69 64 77 69 77 10+400 63 62 69 66 67 10+300 69 68 68 68 63 65 69 65 59 78 73 78 67 10+200 69 66 65 59 67 67 64 59 71 63 62 70 61 65 79 74 71 72 10+100 75 66 66 64 61 54 62 70 79 64 62 10+000 68 67 68 69 70 65 09+900 64 73 09+700 65 09+600 67 58 71 69 64 63 68 56 69 68 66 66 68 61 63 63 61 68 80 09+500 64 65 65 61 66 09+400 64 66 64 61 63 68 55 64 67 09+300 62 64 78 78 69 68 78 74 71 55 58 61 63 65 63 09+200 66 68 70 68 70 72 63 62 09+100 62 64 64 71 09+000 70 64 63 69 65 54 48 69 79 79 77 80 79 79 80 72 08+900 77 80 79 79 79 61 66 65 08+800 76 83 86 72 69 69 68 66 73 67 49 47 48 80 70 64 08+700 70 60 08+600 74 60 78 80 75 74 73 74 71 67 68 69 65 66 78 69 72 58 79 67 63 64 89 69 90 76 89 60 61 61 62 72 62 70 67 64 63 68 78 77 75 76 70 73 74 80 76 69 81 79 79 64 62 68 70 79 59 73 70 79 76 71 65 77 79 66 74 78 A1 By Pass 69 73 74 70 72 71 77 78 79 67 79 80 75 80 71 72 69 77 75 86 66 74 81 75 77 57 74 69 72 82 78 80 77 72 67 Highest Value 82 80 86 81 89 90 85 86 79 80 80 80 (dB)

Distance 50 52 14 15 14 17 6 43 28 13 20 9

Lowest Value 53 65 50 57 55 44 54 61 48 59 46 56 (dB) Distance 74 65 70 44 51 60 49 65 37 67 74 98

Below the limit Beyond the limit Highest level Lowest Value Noise Monitoring Data

Year: 2014

Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 17+500 62 63 17+400 74 63 65 65 64 64 47 58 16+900 59 16+800 71 62 67 57 16+700 88 71 67 16+600 72 70 64 16+500 59 66 59 59 59 16+300 61 71 69 67 73 64 67 67 62 66 68 69 69 70 68 63 74 70 68 70 65 73 75 70 60 60 63 67 66 67 66 70 64 67 67 60 62 64 72 68 71 73 68 71 68 62 63 69 72 72 69 69 68 58 58 60 59 16+200 68 69 69 66 72 67 70 71 71 70 70 70 69 74 16+100 68 69 67 72 67 85 76 70 69 69 68 74 78 74 64 16+000 68 58 68 72 69 67 69 73 74 79 69 74 72 77 70 76 77 60 61 79 63 59 76 75 76 15+900 74 63 63 60 60 62 63 62 15+800 63 62 15+600 61 15+400 77 63 15+300 63 63 65 15+200 72 64 64 62 61 62 61 64 15+100 76 74 72 61 61 15+000 68 62 68 65 64 64 53 64 14+900 77 49 60 14+800 58 62 59 14+600 64 62 71 61 60 62 46 64 14+500 61 62 60 14+400 61 81 82 84 70 72 62 62 77 63 60 72 62 14+300 72 77 74 14+200 78 76 77 85 79 80 78 81 77 78 68 14+100 75 77 79 76 62 14+000 74 68 13+900 65 72 67 13+600 65 13+500 63 56 69 13+400 66 59 67 13+300 62 59 13+000 62 65 67 12+600 68 69 68 66 67 66 63 67 68 67 66 64 60 57 56 64 78 59 63 63 64 60 60 61 60 73 62 77 78 12+500 77 78 76 78 12+400 64 62 60 12+300 61 60 61 62 62 61 12+200 64 63 59 62 12+100 60 60 11+600 62 62 62 61 61 62 62 62 11+500 61 63 59 59 65 60 62 62 62 11+300 61 71 62 59 60 57 57 56 65 63 63 62 59 61 63 60 11+200 61 64 67 70 50 63 79 58 66 61 62 60 11+100

11+000 61 61 10+900 63 59 59 62 62 57 Location Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec 10+800 63 60 66 61 62 63 66 66 70 67 64 62 63 63 64 59 58 58 55 55 58 60 61 55 62 69 70 10+600 55 58 10+500 77 57 58 59 67 61 10+400 69 66 71 68 64 64 47 64 61 60 58 58 59 10+300 70 62 66 60 61 61 60 61 57 59 58 10+200 78 65 73 64 63 55 56 60 58 61 57 61 61 60 62 59 58 10+100 65 65 65 63 63 63 65 68 67 65 65 59 73 72 77 62 62 61 59 10+000 62 60 63 61 63 62 09+900 61 09+800 60 09+700 61 62 64 59 60 67 68 66 68 58 60 59 59 59 59 59 58 60 58 60 58 09+600 63 61 58 59 59 61 60 61 60 61 09+500 60 60 58 60 09+400 63 64 59 09+300 64 63 58 64 64 65 62 62 64 62 63 65 64 65 65 64 59 61 58 57 57 57 58 60 09+200 63 60 09+100 58 09+000 61 58 59 08+900 62 62 08+800 67 63 64 58 63 66 63 68 62 61 66 61 66 68 64 49 68 63 63 78 63 64 68 63 67 62 60 63 67 61 53 52 53 50 62 63 61 61 53 61 58 61 67 59 64 59 58 08+700 67 67 66 62 58 62 58 63 78 61 58 59 62 60 59 60 61 61 64 59 71 62 65 63 60 61 65 62 66 60 63 76 64 68 63 66 61 65 60 66 63 61 64 64 65 61 62 61 62 63 62 61 61 60 64 61 65 60 59 58 60 63 60 60 60 66 64 61 60 61 63 60 60 60 61 61 62 60 59 59 60 59 58 59 60 60 A1 By Pass 60 59 61 59 60 76 59 60 60 60 58 66 Highest Value 78 88 85 79 78 79 76 73 78 76 70 78 (dB) Distance 11 7 26 16 12 16 20 10 17 17 14 14 Lowest Value 56 57 58 59 49 46 59 50 57 53 57 57 (dB) Distance 16 62 28 17 33 74 18 49 34 15 16 21

Below the limit Beyond the limit Highest level Lowest Value Noise Monitoring Data

Year: 2015

Location Jan Feb Mar 60 59 57 67 16+200 16+100 57 58 58 12+600 76 76 78 77 74 73 12+400 73 60 64 71 60 60 11+200

61 62 60 11+100 10+600 58 55 53 52 10+400 59 10+100 63 64 61 61 62 61 61 61 61 61 60 59 60 59 61 61 61 61 10+000 66 65 64 78 76 66 64 66 58 09+600 60 58 64 61 60 59 58 59 59 09+500 58 62 59 09+300 59 56 61 61 62 62 58 59 57 60 58 57 09+000 61 60 60 59 59 08+800 60 66 62 58 59 58 60 57 60 59 58 08+700 57 08+600 58 60 60 58 60 61 60 60 57 57 59

A1 By Pass

Highest Value 78 71 73 (dB)

Distance 10 16 19

Lowest Value 52 57 57 (dB)

Distance 18 5 16

Below the limit Beyond the limit Highest level Lowest Value Noise Monitoring Locations 2013

86 81 90 89 57 86 80 48

80

61

46 54

53

59

85 80 79

56 80

82

55

65 44

Highest Noise Level of Each Month Lowest Noise Level of Each Month Noise Monitoring Locations 2014

50 53 76 78 58 57 57

78 78 57

70

73

78

56

85

49

59

79 79 59 76

88 56

46

Highest Noise Level of Each Month Lowest Noise Level of Each Month Noise Monitoring Locations 2015

57

78

52

71

73

57

Highest Noise Level of Each Month Lowest Noise Level of Each Month Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Discussion

Fundamentally, the environment can be divided into two separate parts concerning the distance between source of the impact and affected environment.

Remote Environment

Immediate Environment

Source of the impact

Prominent sources of impact, which were identified during this project, include dust, noise, vibration, floods. Intermittently some of those sources (especially noise and vibration) affect not only the immediate environment (with in10ft), but also the remote environment (beyond 10ft). As a result of this phenomenon, it was decided to declare the 50m corridor both side of the road as the impact area.

The vibrations of consequence are caused by waves of energy traveling away from particular construction activity such as Gravel Compaction piling, Bored piling, Winch piling, Soil/Gravel Compaction, Sheet piling and even heavy machinery mobilization. However, the particle velocity of the ground surface caused by these traveling waves of energy decreases with distance from the source due to geometric effects,

Following graph shows how the collective vibration effect which generated by all the construction activities of the project varies with distance away from the source.

8

7

6

5

4

3 50m Boundary Maximum Permissible Level Vibration(mm/sec) 2

1

0 0 20 40 60 80 100 120 140 160 Distance from the source(m)

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

According to the graph given above, the particle velocity reaches maximum permissible level at the 45m and continues to decline with distance from the source. Technically the repeated stressing from vibration potentially aggravates damage due to fatigue effects.

However when we consider the same correlation individually, it shows slightly deferent variations for each construction activity. Following graphs show the measured peak vibration levels during construction period from various construction activities as a function of distance away from the vibration source.

8 7

6

5 4

3 50m Boundary

Vibration(mm/sec) Maximum Permissible Level 2 1

0 0 10 20 30 40 50 60 70 80 Distance(m)

Gravel Compaction Pile

8

7

6

5

4

3

Vibration(mm/sec) Maximum Permissible Level 2

1 50m Boundary 0 0 20 40 60 80 100 Distance(m)

Soil/Gravel Compaction Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

8

7

6

5

4

3

Vibration (mm/sec) Maximum Permissible Level 2

Boundary 1

50m

0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Distance(m)

Bored Piling

The available data and experience show that unless Bored piling is occurring few feet away from a structure, it does not cause damage to the structure from vibrations. Nevertheless, there may be other consequential effects such as vibration can accelerate ground settlement.

People can generally feel vibrations above 0.2 mm/sec, which means people can feel and become concerned about vibrations that are only 1/10th of those that might begin to cause damage to structures. As per the experience, once vibration levels reach and exceed 1.0-1.2 mm/sec people complained regarding inconvenient caused by vibration. People complain about vibration effects because they are much more sensitive to vibrations than are buildings. They tend to assume their personal sensitivity to vibrations to a concern about the safety of their building.

Noise from construction activities rarely if ever produces structural damage, but it causes annoyance that may reach a long distance. Following graph demonstrates measured peak noise levels from the construction activities, which was executed during this project as a function of distance away from the noise source.

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

100

90

80 Maximum Permissible Level

70 60

50m Boundary 50

Noise (dB) 40

30 20

10 0 0 10 20 30 40 50 60 70 80 Distance (m)

Sound level decreases by approximately 3 dB at every 10m. When it reaches to the boundary, of impact area (50m) noise level becomes much less than the permissible level (75dB), which had been set out in the approval granted by CEA. Usually bored pile driving has the potential to annoy a lot of people. When people become annoyed, they also become concerned. They start looking for evidence of damage to their property from the construction work. When people look for evidence to confirm their suspicions, they will usually find something and complain. Noise may be the most serious threat to the pile driving activity - not because it is causing damage but because it creates a perceived problem to those impacted. However an integrated remedial mechanism was successfully implemented with following approaches in order to overcome these controversial circumstances.

1. Indemnity The entire compensation procedure, which includes pre/post condition survey and damage valuation was carried out by an independent third party which helped to build up an assurance among local public regarding the compensation mechanism. The damage valuation took place in accordance with a rational and admissible criterion while ensuring equitability.

2. Monitoring and awareness

Throughout the construction period noise and vibration was measured at complain / key locations with assistance of recognized independent third party. Monitored data were used to demonstrate that construction work was well below the levels that cause harm and feeling vibrations and hearing noise does not equate to physical harm or damage. Whenever the permissible level was being exceeded, particular work process was altered in order to correct the problem with immediate effect.

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

3. Abatement

Appropriate actions were taken to reduce vibration and noise levels to the extent that they are economically possible. The time of potential construction activities, which might cause excessive noise and vibration, was limited to daylight hours when people are less affected by these nuisances.

Notwithstanding that, noise and vibration are considered as environment pollutants, they do not act like other pollutants such as gaseous substances, chemical substances, hazardous materials etc. The prominent characteristic of previously mentioned pollutants is “persistency”. Effect of Noise and vibration decreases with the distance and they do not accumulate in the environment. Unlike some other pollutant, noise and vibration do not diversify into subcategorized pollutant. Which means magnitude of the impact from noise and vibration is comparatively less than other environmental pollutants. Annoyance and property damage are the most notable impact respectively from noise and vibration. However, during the entire period of this project all affected parties were served with reasonable solution and none of them were neglected in any way.

Implementation of Environmental Management Action Plan for the Outer Circular Highway to the City of Colombo (Project Phase II) OCH, Northern Section 1from Kadawatha to Kaduwela

Annexure K

Public Road Rehabilitation, Frontage/access Road Provision

 Public Road Rehabilitation

Temple Road- Heiyanthuduwa Nagahamulla Road- Ihala Biyanwila

Nagahamulla Road- Ihala Biyanwila Bandaranayaka Mawatha- Kadawatha

 Frontage/ Approach Roads

FR01/26-8+800 – 9+070 LHS FR02-8+970 – 9+080 RHS

FR03-9+550 – 9+740 LHS FR04-9+945 – 10+220 LHS

FR05/23-9+915– 10+185 RHS FR06-10+200– 10+420 RHS

FR7-11+260 – 11+600 RHS FR8-12+490 – 12+520 RHS

FR9-12+580– 12+890 LHS FR10-12+520– 12+725 LHS

FR11-9+140 – 9+320 RHS FR12-11+040 – 11+240 LHS

FR13-12+400 – 12+500 RHS FR14-14+840 – 14+940 RHS

FR15-10+240 – 10+350 LHS FR16-11+300 -11+720 LHS

FR17-16+500 – 16+660 RHS FR19-0+140 – 0+310 RHS

FR21/22-14+730 – 15+095 LHS FR25/30 9+568- 9+710 RHS

FR28-9+415 LHS