ANNEXURE-I POINT WISE INITIAL COMPLIANCE REPORT

POINTWISE INITIAL COMPLIANCE REPORT

“BAANI CITY CENTRE”

(COMMERCIAL COMPLEX NAMELY)

SECTOR-63, VILLAGE MEDAWAS, DIST. ,

Developed by M/s Aaliyah Real Estate Pvt. Ltd. Regd. Office 271, Udyog Vihar, Phase II Gurgaon, Haryana.

Prepared by M/s Perfact Services (ISO9001:2008& ISO14001:2004 Certified) 501-507, 5th Floor, NNMall, Mangalam Palace, Sector 3 Rohini, New Delhi Ph No. 47528467, Fax No. 47528434

1. INTRODUCTION: Name of the project Commercial Colony “Baani City Centre”

Site address Sector-63, Village Medawas, Dist. Gurgaon, Haryana.

Developed By M/s Aaliyah Real Estates Pvt. Ltd.

Environment Clearance Letter No. SEIAA/HR/2013/631 Dated 04.09.2013.

Period of Compliance Initial Compliance.

Project Description Project involves the construction of commercial colony at plot area of 14795.2836 Sqm. and proposed built up area is 52537.193 Sqm.

Construction status Construction Not yet Started.

Year of Commencement 2013

Proposed year of completion 2016

2. Project Details: Proposed commercial colony “ Baani City Centre” is located at Sec-63, Village Medawas, Dist Gurgaon, Haryana Total Plot area of the project is 1479.2836 Sqm. Commercial Colony will have following salient features:

Particulars Details

Item No. in the list of 8(b) Schedule/Category Total Plot Area 14795.2836 Sqm.

Built-up Area 52537.193 sqm.

Landscape Area 30% of Project Area (20% Tree plantation + 10% landscaping) RWH pits 04 Nos.

No. of Floors 3B+GF+11 F

Max Height of Building 49.5 m.

Total Water requirement 392 KLD Fresh water requirement 266 KLD Waste water generation 132 KLD STP capacity 160 KLD Total Solid waste generation 302 Kg/day Power requirement 3978.2 KW by DHBVN

3. Point – wise compliance of the stipulated environmental Conditions/ safeguards Construction Phase:

Sr. EC conditions/safeguards Replies No. 1 “Consent for Establishment” shall be obtained We have obtained “Consent for Establishment” from Haryana State Pollution Control Board from HSPCB vide consent order no. under Air and Water Act and a copy shall be HSPCB/Consent/:2821214GUNOCTE379203 submitted to the SEIAA, Haryana before the Dated 1.03.2014. start of any construction work at site. 2 A first Aid Room as proposed in the project Well maintained First Aid facility shall be report shall be provided both during construction provided at site during construction and same and operational phase of the project. will be provided during operation also.

3 Adequate drinking water & sanitary facilities Adequate drinking water & sanitary facilities should be provided for construction workers at shall be provided for Construction workers at the site. Provision should be made for mobile site. Safe disposal of wastewater & solid waste toilets. Open defecation by the laboures is shall be done. Temporary wash areas shall be strictly prohibited. The safe disposal of constructed for laborers and good hygienic wastewater and solid wastes generated during conditions shall be maintained. the construction phase should be ensured. 4. All the top soil excavated during construction Top fertile soil excavated during construction activities should be stored for use in horticulture activities shall be stored for the use in /landscape development within the project site. horticulture /landscape development within the project site. 5. The project proponent shall ensure that the Disposal of muck during construction phase building material required during construction shall not be creating any adverse effects on the phase is properly stored within the project area neighboring communities and shall be disposed and disposal of construction waste should not off taking the necessary precautions for general create any adverse effect on the neighboring safety and health aspects. communities and should be disposed of after taking necessary precautions for general safety and health aspects of people, only in approved sites with the approval of competent authority. 6. Construction spoils including bituminous Construction spoils including bituminous material and other hazardous material must not material shall be properly stacked to avoid any be allowed to contaminate water courses and the contamination to the ground water. dump sites for such must be secured so that they should be not leach into the ground water and any hazardous waste generated during Only hazardous waste generated during construction phase, should be disposed off as per construction phase shall be used oil from DG applicable rules and norms with necessary sets, which will be given to approve recycler of approval of the Haryana State Pollution Control HSPCB. Board. 7. The diesel generator sets to be used during Acoustically enclosed D.G sets shall be installed construction phase should be of ultra low at the project site which conform to the rules sulphur diesel type and should conform to made under E (P) A 1986 prescribed for air & Environment (Protection) Rules prescribed for noise emissions standards. air and noise emission standards. 8. The diesel required for operating DG sets shall Diesel required for the DG set shall be stored in be stored in underground tanks and if required, leak proof containers in an isolated area. clearance from Chief Controller of Explosives Necessary permission shall be obtained if shall be taken. required. 9. Ambient noise levels should conform to the To reduce noise level, movement of construction residential standards both during day and night. vehicles shall be carried during non peak hours Incremental pollution loads on the ambient air and construction machinery with lesser noise and noise quality should be closely monitored and vibration parameters shall be used. during construction phase. Adequate measure should be taken to reduce ambient air and noise Incremental pollution loads on the ambient air level during construction phase, so as to confirm quality shall be closely monitored. to the stipulated residential standards. 10 Fly ash should be used as building material in We will be using fly ash based material as per the construction as per the provisions of Fly Ash the provisions of Fly Ash Notification of Notification of September, 1999 and amended as September, 1999 and amended as on 27th on 27th August, 2003. August,2003.

11. Storm water control and its reuse as per CGWB We shall have the provision for Storm water and BIS standards for various applications control and its reuse inside our complex as per should be ensured. BIS Standards. 12. Water demand during construction should be We shall be using pre mixed concrete curing reduce by use of pre mixed concrete, curing and agent and other best practices to reduce the other best practices. water demand during construction phase. 13. In view of severe constrains in water supply During construction phase, tanker water supply augmentation in the region and sustainability of shall be used. No ground water shall be water resources, the developer will submit the withdrawn. NOC from CGWA specifying water resources, water extraction quantities and assurance from HUDA/ utility provider indicating source of water supply and quantity of water with details of intended use of water – potable and non potable. Assurance is required for both construction and operation stages separately. It shall be submitted to the SEIAA and RO, MoEF, before the start of construction. 14. Roof should meet prescribed requirement as per Roofs shall be constructed by using thermal Energy Conservation Building Code by using insulation material. appropriate thermal insulation material. 15. Opaque wall should meet prescribed Opaque walls will be made as per Energy requirement as per Energy Conservation Conservation Building Code, as required. Building Code which is proposed to be mandatory for all air conditioned spaces while it is desirable for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement. 16. The approval of the competent authority shall be The approval of the competent authority shall obtained for structural safety of the building due be obtained for the structural safety of the to earthquake, adequacy of fire fighting building due to earthquake, adequacy of the equipments, etc. as per National Building Code firefighting. including protection measures from lighting etc. If any forest land is involved in the proposed No Forest land is involved in the project, site, clearance under Forest Conservation Act clearance from Forest Department has been shall be taken from the competent Authority. obtained and submitted. 17. Overexploited groundwater and impending We shall not be extracting ground water for severe shortage of water supply in the region construction purpose. requires the developer to redraw the water and energy conservation plan. Developer shall As far as water requirement during operational reduce the footprint of proposed development. phase is concerned, water balance has already Project proponent shall incorporate water been submitted. Water saving techniques shall efficiency/savings measures as well as water be adopted during construction phase and reuse/recycling within 3 months and before start operational phase. Detailed water balance with of construction to the SEIAA, Haryana and R.O, the quantity and source has been submitted MOEF, GOI, Chandigarh. already to the Concerned authorities. 18. The project proponent as stated in Proposal shall 04 no. of rain water harvesting pits shall be construction 04 nos. rain water harvesting pits provided as per the proposal submitted and for recharging the ground water within the proper maintenance will be provided for the all project premises. Rain Water Harvesting pits RWH pits. Care will be taken in order to avoid shall be designed to make provisions for silting entry of contaminated water in any of RWH pit. chamber and removal of floating matter before entering harvesting pit. Maintenance budget and persons responsible for maintenance must be provided. Care shall be taken that contaminated water do not enter any RWH pit. 19. The project proponent shall provide for adequate Adequate fire safety measures and equipments fire safety measures and equipments as required as required by Haryana Fire Service Act, 2009 by Haryana Fire Service Act, 2009 and shall be provided within the complex. Necessary instructions issued by the local Authority permission regarding fire safety scheme/NOC /Directorate of Fire from time to time. Further from Competent Authority as required shall be the project proponent shall take necessary obtained. permission regarding fire safety scheme/NOC from Competent Authority as required. 20. The Project Proponent shall obtain assurance Necessary assurance from the DHBVN for from the DHBVN for supply of 3978.2 KW of supply of 3978.2 KW of power supply shall be power supply before the start of construction. In obtained and to be submitted to the concerned no case project will be operational solely on department. generators without any power supply from any external power utility. 21. Detail calculation of Power load and ultimate Details already been submitted already. power load of the project shall be submitted to DHBVN under intimation to SEIAA Haryana before the start of construction. Provision shall be made for electrical infrastructure in the Project area. 22. The project proponent shall not raise any No natural land depression/ nallah/ water course construction in the natural land depression/ exists within the project. No natural flow will be nallah/ water Course and shall ensure that the obstructed. natural flow from the Nallah/water course is not obstructed. 23. The project proponent shall keep the plinth level Noted. We will comply with the condition. of the building blocks sufficiently above the level of the approach road to the Project as per prescribed by laws. Levels of the other areas in the Project shall also be kept suitably so as to avoid flooding. 24. Construction shall be carried out so that density Approval from Town and Country Department of population does not exceed norms as has been obtained and construction shall be approved by Director General Town and done accordingly. Country Department Haryana. 25. The project proponent shall submit an affidavit We shall not be using groundwater during with the declaration that ground water will not construction phase. Affidavit in this regard has be used for construction and only treated water already submitted to the SEAC. should be used for construction. 26. The project proponent shall not cut any existing Noted. tree and project landscaping plan should be modified to include those trees in green area. 27 The project proponent shall provide 3 meter high Barricading around the project area shall be barricade around the project area, dust screens provided. We will provide dust screens for every for every floor above the ground, proper floor above the ground. Water sprinkling shall sprinkling and covering of stored material to be done to avoid dust emission. restrict dust and air pollution during construction. 28. The project proponent shall construct a Sedimentation basin shall be provided to trap sedimentation basin in the lower level of the pollutant and other wastes during rains. project site to trap pollutant and other wastes during rains. 29. The project proponent shall provide proper We will comply and proper rasta shall be Rasta of proper width and proper strength for provided. each project before the start of construction. 30 Vertical fenestration shall not exceed 40% of total wall area.

31. The project proponent shall ensure that the U- We will comply. value of the glass is less than 3.177 and maximum solar gain co-efficient is 0.25 for vertical fenestration. 32. The project proponent shall adequately control Dust emission during the construction shall be construction dusts like silica dust, non-silica controlled and proper mask shall be provided to dust, and wood dust. Such dusts shall not spread the construction workers. outside project premises. The project proponent shall provide respiratory protective equipment to all construction workers. 33 The project proponent shall provide solar panel We will comply with the condition. at the rooftop of the building.

34 The project proponent shall submit NOC from NOC from AAI has been taken vide Letter no. AAI regarding height clearance before the start AAI/NOC/2011/486/3973 Dated 13.12.2011 of construction. 35. The project proponent shall provide one refuse We will comply with the condition. area till 24 meter as per National Building Code.

36. The project proponent shall provide fire control Necessary arrangements as per National room and fire officer for building above 30 Building Code shall be done. meter as per National Building Code. 37. The project proponent shall obtain permission of NOC has been taken form Dept. of Mining & Mines and Geology Department for excavation Geology vide Permit No. 1253 Dated 04.02.2013 of soil before the start of construction. 38. The project proponent shall seek specific prior Necessary approval shall be obtained. approval from concerned local Authority/HUDA regarding provision of storm drainage and sewage system including their integration with external services of HUDA/Local Authorities beside other required services before taking up any construction activity. 37. The site for solid waste management plant be Detailed layout plan has already submitted. earmarked on the layout plan and the detailed project for setting up the solid waste management plant shall be submitted to the Authority within one month. 38 The project proponent shall provide E-waste E-waste collection centre shall be provided. collection centre in the building. 39 The site for solid waste management plant be We will comply. earmarked on the layout plan and the detailed project for setting up the solid waste management plant shall be submitted to the authority within one month.

OPERATION PHASE a “Consent to Operate” shall be obtained from We will apply for Consent to Operate before the Haryana State Pollution Control Board under operation of the project. Air and Water Act and a copy shall be submitted to the SEIAA, Haryana. b The Sewage Treatment Plant (STP) shall be The Sewage Treatment Plant (STP) shall be installed for the treatment of the Sewage to the installed for the treatment of the Sewage to the prescribed standards including odour and treated prescribed standards including odour and effluent shall be recycled to achieve zero exit treated effluent shall be recycled. discharge. The installation of STP should be Tertiary treatment of waste water shall be done. certified by an independent expert and a report Discharge of treated sewage shall conform to the in this regard should be submitted to the SEIAA, norms and standards of HSPCB, . Haryana before the project is commissioned for operation. Tertiary treatment of waste water is mandatory. Discharge of treated sewage shall conform to the norms and standards of HSPCB, Panchkula. The project proponent shall implement such STP technology which does not require filter backwash. c Separation of the grey and black water should be Dual plumbing lines shall be laid down. Waste done by the use of dual Plumbing line. water generated shall be treated in STP up to Treatment of 100% grey water by decentralized prescribed standards and treated water shall be treatment should be done ensuring that the re- reused within the complex. circulated water should have BOD level less than 10 mg/liter and the recycled water will be used for flushing, gardening and DG set Cooling etc. d For disinfection of the treated wastewater ultra- Ultraviolet radiation system shall be used for violet radiation or ozonization process should be disinfection. used. e The solid waste generated should be properly We will comply. collected and segregated. Bio-degradable waste shall be decomposed at site and dry/inert solid waste should be discomposed off to approved sites for land filling after recovering recyclable material. f Diesel power generating sets proposed as source Acoustically enclosed DG Sets shall be used of back-up power for lifts, common area during construction & operation phase which illumination and for domestic use should be of conform to rules made under the Environment enclosed type and conform to rules made under (Protection) Act, 1986. The diesel used for D.G the Environment (Protection) Act, 1986. The sets shall be ultra low sulphur diesel (0.05% location of the D.G sets should be in the sulphur), instead of low sulphur diesel. basement as promised by the project proponent with appropriate stack height i.e., above the roof level as per the CPCB norms. The diesel used for D.G sets should be ultra low sulphur diesel (50ppm sulphur), instead of low sulphur diesel. g Ambient Noise level should be controlled to Ambient noise level shall be maintained as per ensure that it does not exceed the prescribed the standards. standards both within and at the boundary of the proposed Commercial complex. h The project proponent should maintain at least Adequate green area shall be developed in and 30% as green cover area for tree plantation around the project. The open spaces inside the especially all around the periphery of the project project shall be preferably landscaped and and on the road sides preferably with local covered with vegetation/grass, herbs & shrubs. species which can provide protection against Only locally available plants shall be used. noise and suspended particulate matter. The open spaces inside the project should be preferably landscaped and covered with vegetation/grass, herbs & shrubs. Only locally available plant species shall be used. i The project proponent shall strive to minimize Water saving techniques in irrigation of water in irrigation of landscape by minimizing landscaping shall be adopted. grass area, using native variety, xeriscaping and mulching, utilizing efficient irrigation system, scheduling irrigation only after checking evapo- transpiration data. j Rain water harvesting for run-off and surface Rain water harvesting for run-off and surface run-off, as per plan submitted should be run-off, shall be implemented as per plan implemented. Before recharging the surface run submitted. off, pre-treatment through sedimentation tanks Before recharging the surface run off, pre- must be done to remove suspended matter, oil treatment through sedimentation tanks shall be and grease. The bore well for rainwater provided to remove suspended matter, oil and recharging shall be kept at least 5 mts. Above grease. the highest ground water table. Care shall be The bore well for rainwater recharging shall be taken that contaminated water do not enter any kept at least 5 mts. Above the highest ground RWH pit. The project proponent shall avoid rain water table. Care shall be taken that water harvesting of first 10 minutes of rain fall. contaminated water do not enter any RWH pit. Roof top of the building shall be without any toxic material or paint which can contaminates rain water. Wire mess and filters should be used wherever required. j The ground water level and its quality should be The ground water level and its quality shall be monitored regularly in consultation with Central monitored regularly. Ground water Authority. l There should be no traffic congestion near the Provisions will be made to avoid any traffic entry and exit points from the road adjoining the congestion near the entry and exit points from proposed project site. Parking should be fully the road adjoining the proposed project site. No internalized and no public space shall be public space will be utilized. utilized. m A report on the energy conservation measures Already Submitted. conforming to energy conservation norms finalized by Bureau of energy Efficiency should be prepared incorporating details about building materials & Technology, R & U factors etc. and submitted to the SEIAA, Haryana in three months time. n Energy conservation measures like installation Energy conservation measures shall be adopted. of LED for lighting the areas outside the building should be integral part of the project design and should be in place before project commissioning. Use of solar panels must be adapted to the maximum energy conservation. o The project proponent shall use zero ozone Zero ozone depleting potential material shall be depleting potential material in insulation, used and halon free fire suppression system refrigeration, air-conditioning and adhesive. shall be used. Project proponent shall also provide halon free fire suppression system. p The solid waste generated should be properly The solid waste generated shall be properly collected and segregated as per the requirement collected and segregated as per the requirement of the MSW Rules, 2000 and as amended from of the MSW Rules, 2000 and as amended from time to time. The bio degradable waste should time to time. be treated by appropriate technology at the site ear-marked within the project area and dry/inert solid waste should be disposed off to the approved sites for land filling after recovering recyclable material. q The provision of the solar water heating system We will comply. shall be as per norms specified by HAREDA and shall be made operational in each building block. r The traffic plan and the parking plan proposed Proper parking plan has been prepared and by the PP should be meticulously adhered to traffic congestion near the entry and exit points with further scope of additional parking for from the roads adjoining the proposed project future requirement. There should be no traffic site shall be avoided. congestion near the entry and exit points from the roads adjoining the proposed project site. Parking should be full internalized and no public space should be used. s The project shall be operationalized only when Noted. HUDA/local authority will provide domestic water supply system in the area. t Operation and maintenance of STP, solid waste Operation and maintenance of facilities shall be management and electrical infrastructure, done. pollution control measures shall be ensured even after the completion of sale. u Different type of wastes should be disposed off Different type of wastes shall be disposed off as as per provisions of municipal solid waste, per provisions of municipal solid waste, biomedical waste, hazardous waste, e-waste, biomedical waste, hazardous waste, e-waste, batteries and plastic rules made under batteries and plastic rules made under Environment Protection Act,1986. Particularly Environment Protection Act,1986. E-waste and battery waste shall be disposed of as per the existing E-waste management Rules 2011 and Batteries management Rules 2001. The project proponent should maintain a collection centre for e-waste and it should be disposed of to only registered and authorized dismantle/recycler. v Standards for discharge of environmental We will comply with all the standards. pollutants as enshrined in various schedule of rule 3 of Environmental Protection Rule 1986 shall be strictly complied with. w The project proponent shall make provision for Necessary provision shall be made. guard pond and other provisions for safety against failure in the operation of waste water treatment facilities. The project proponent shall also identify acceptable outfall for treated effluent. x The project proponent shall ensure that the stack Stack height of D.G sets shall be provided as per height of D.G sets is as per the CPCB guidelines the CPCB guidelines and also emission and also ensure that the emission standards of standards of noise and air shall be maintained noise and air are within the CPCB prescribed within the CPCB prescribed limits. limits. Noise and emission level of DG sets greater than 800 KVA shall be as per CPCB latest standards for high capacity DG sets. y All electric supply exceeding 100 amp, 3 phase Noted. shall maintain the power factor between 0.98 lag to 1 at the point of connection. z The project proponent shall minimize heat island Noted. effect through shading and reflective or pervious surface instead of hard surface. aa The project proponent shall use only treated For DG Cooling STP treated water shall be water instead of fresh water for D.G cooling. used. The project proponent shall also use evaporative cooling technology and double stage cooling system for HVAC in order to reduce water consumption. Further temperature, relative humidity during summer and winter season should be kept at optimal level. Variable speed drive, best co-efficient of performance as well as optimal integrated point load value and minimum outside fresh air supply may be resorted for conservation of power and water, coil type cooling D.G sets shall be used for saving cooling water consumption for water cooled D.G sets. ab The project proponent shall ensure that the We will comply. transformer is constructed with high quality grain oriented, low loss silicon steel and virgin electrolyte grade copper. The project proponent shall obtain manufacturer’s certificate also for that. ac Water supply shall be metered among different Water flow meters shall be provided. users of utilities. ad The project proponent shall ensure that exit We will comply. velocity from the stack should be sufficiently high. Stack shall be designed in such a way that there is no stack down-water under any meteorological conditions. ae The project proponent shall provide water Noted. Necessary arrangements shall be made. sprinkling system in the project area to suppress the dust in addition to the already suggested mitigation measures in the Air Environment chapter of EMP. af The project proponent shall meet the emission Noted. standards for Hotel Industry prescribed by CPCB under schedule –I of rule 3 of Environment (protection) Rules, 1986.

S.No Part –B. General Conditions

1 The project proponent shall ensure the We will comply. commitments made in Form-I, form- 1A, EIA/EMP and other documents submitted to the SEIAA for the protection of environment and proposed environmental safeguards are complied with in letter and spirit. In case of contradiction between two or more documents on any point the most environmentally friendly commitment on the point shall be taken as commitment by project proponent. 2 Six monthly monitoring reports should be Noted. We will submit the compliance reports submitted to the HSPCB and Regional Office, to the concerned department. MOEF, GOI, Northern Region , Chandigarh and a copy to the SEIAA Haryana. 3. STP outlet after stabilization and stack emissions Necessary monitoring shall be done and shall be monitored monthly. Other accordingly results shall be maintained. environmental parameters and green belt shall be monitored on quarterly basis. After every 3 months the project proponent shall conduct environmental audit and shall take corrective measures, if required, without delay. 4. The SEIAA, Haryana reserves the right to add Noted. additional safeguard measures subsequently, if found necessary, Environmental clearance granted will be revoked if it is found that false information has been given for getting approval of this project. SEIAA reserves the right to revoke the clearance if conditions stipulated are not implemented to the 10 satisfaction of SEIAA/MOEF. 5. The project proponent shall not violate any Noted. judicial orders/pronouncements issued by any Court/Tribunal. 6. All other statutory clearances such as the Necessary clearances applicable to our project approvals for storage of diesel from Chief shall be obtained. Controller of Explosives, Fire Department, Civil Aviation Department, Forest Conservation Act,1980 and Wildlife (Protection) Act 1972, PLPA 1900, Forest Act,1927 etc. shall be obtained, as applicable by project proponents from the respective authorities prior to construction of the project. The project proponent should inform the public We have complied with the requirement. 7. that the project has been accorded Environment Copy of Advertisement given in Newspaper is Clearance by the SEIAA and copies of the enclosed as Annexure – II. clearance letter are available with the State Pollution Control Board & SEIAA. This should be advertised within 7 days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region and the copy of the same should be forwarded to SEIAA Haryana. A copy of environmental Clearance conditions shall also be put on project proponent’s website for public awareness. 8. Under the provisions of Environment Noted. (Protection) Act, 1986, legal action shall be initiated against the Project Proponent if it was found that construction of the project has been started before obtaining environmental clearance. 9. Any appeal against the Environmental Clearance Noted. shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under section 16 of the National Green Tribunal Act, 2010. 10 The project proponent shall put in place We will comply. Corporate Environment Policy as mentioned in MOEF, GOI OM No. J-11013/41/2006-IAII (I) dated 26.04.2012 within 3 months period. Latest Corporate Environment Policy should be submitted to SEIAA within 3 months of issuance of this letter. 11. The fund ear-marked for environment protection Noted and shall be complied measures should be kept in separate account and should not be diverted for other purposes and year wise expenditure shall be reported to the SEIAA/RO MoEF GOI under rules prescribed for Environment Audit. 12 The project proponent shall ensure the We will comply. compliance of Forest Department, Haryana Notification no. S.O.121/PA2/1900/S.4/97 dated 28.11.1997 13 The Project Proponent shall ensure that no Vehicles operated shall have valid PUC vehicle during construction/operation phase certificates. enter the project premises without valid Pollution Under Control” certificate from competent authority. 14 The project proponent is responsible for Will be complied. compliance of all conditions in Environmental clearance letter and project proponent can not absolve himself/herself of the responsibility by shifting it to any contractor engaged by the project proponent. 15 The Project Proponent shall seek fresh Noted. Environmental Clearance if at any stage there is change in the planning of the proposed project.

ANNEXURE –II COPY OF NEWSPAPER ADVERTISEMENTOF GETTING ENVIRONMENTAL CLEARANCE

ANNEXURE III COPY OF CONSENT TO ESTABLISH

HARYANA STATE POLLUTION CONTROL BOARD C-11, SECTOR-6, PANCHKULA Website – www.hspcb.gov.in E-Mail - [email protected] ______Telephone No. – 0172-2577870-73

No. HSPCB/Consent/ : 2821214GUNOCTE379203 Dated:01/03/2014 To M/s : Aaliyah Real Estates Pvt. Ltd.(Commercial Complex) at Sec-63, Village-Medawas, District Gurgaon, Haryana GURGAON 122001

Sub. : Issue of Consent to Establish from pollution angle .

Please refer to your Consent to Establish application received in this office on the subject noted above.Under the Authority of the Haryana State Pollution Control Board vide its agenda Item No. 47.8 dated 28.04.83 sanction to the issue of “Consent to Establish” with respect to pollution control of Water and Air is hereby accorded to the unit Aaliyah Real Estates Pvt. Ltd.(Commercial Complex), for manufacturing of /Establishment of hotel more than 03 star at Killa No. 24//7 Min (3-14)-14/2(4-0)- 6/2 Min (2-8)-15/1(4-0) 25//10/1(1-17), 25//11/1/2(2-0), 24//6/1 Min (3-8) 15/2 (4-0), 25//10/2 Min (2- 15) 11/1/1(1-3) total 29 Kanal 5 Marla total land measuring 3.656 with the following terms and conditions:-

1. The industry has declared that the quantity of effluent shall be 132 KL/Day i.e 0KL/Day for Trade Effluent, 0 KL/Day for Cooling, 132 KL/Day for Domestic and the same should not exceed . 2. The above “Consent to Establish” is valid for two years from the date of its issue to be extended for another one year at the discretion of the Board or till the time the unit starts its trial production whichever is earlier. The unit will have to set up the plant and obtain consent during this period. 3. The officer/official of the Board shall have the right to access and inspection of the industry in connection with the various processes and the treatment facilities being provided simultaneously with the construction of building/machinery. The effluent should conform the effluent standards as applicable 4. That necessary arrangement shall be made by the industry for the control of Air Pollution before commissioning the plant. The emitted pollutants will meet the emission and other standards as laid/will be prescribed by the Board from time to time. 5. The applicant will obtain consent under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under section 21/22 of the Air (Prevention & Control of Pollution) Act,1981 as amended to-date-even before starting trial production 6. The above Consent to Establish is further subject to the conditions that the unit complies with all the laws/rules/decisions and competent directions of the Board/Government and its functionaries in all respects before commissioning of the operation and during its actual working strictly. 7. No in-process or post-process objectionable emission or the effluent will be allowed, if the scheme furnished by the unit turns out to be defective in any actual experience 8. The Electricity Department will give only temporary connection and permanent connection to the unit will be given after verifying the consent granted by the Board, both under Water Act and Air Act. 9. Unit will construct the proper septic tank as per Bureau of Indian Standards. 10. Unit will raise the stack height of DG Set/Boiler as per Board’s norms. 11. Unit will maintain proper logbook of Water meter/sub meter before/after commissioning. 12. That in the case of an industry or any other process the activity is located in an area approved and that in case the activity is sited in an residential or institutional or commercial or agricultural area, the necessary permission for siting such industry and process in an residential or institutional or commercial or agricultural area or controlled area under Town and Country Planning laws CLU or Municipal laws has to be obtained from the competent Authority in law permitting this deviation and be submitted in original with the request for consent to operate. 13. That there is no discharge directly or indirectly from the unit or the process into any interstate river or River or River Ghaggar. 14. That the industry or the unit concerned is not sited within any prohibited distances according to the Environmental Laws and Rules, Notification, Orders and Policies of Central Pollution control Board and Haryana State Pollution Control Board. 15. That of the unit is discharging its sewage or trade effluent into the public sewer meant to receive trade effluent from industries etc. then the permission of the Competent Authority owing and operating such public sewer giving permission letter to his unit shall be submitted at time of consent to operate. 16. That if at any time, there is adverse report from any adjoining neighbor or any other aggrieved party or Municipal Committee or Zila Parishad or any other public body against the unit’s pollution; the Consent to Establish so granted shall be revoked. 17. That all the financial dues required under the rules and policies of the Board have been deposited in full by the unit for this Consent to Establish. 18. In case of change of name from previous Consent to Establish granted, fresh Consent to Establish fee shall be levied. 19. Green belt of adequate width shall be provided by the unit before commissioning. 20. In case of unit does not comply with the above conditions within the stipulated period, Consent to Establish will be revoked. 21. Industry should adopt water conservation measures to ensure minimum consumption of water in their Process. Ground water based proposals of new industries should get clearance from Central Ground Water Authority for scientific development of previous resource. 22. This Consent to Establish would be invalid if it is established in the non-conforming area. 23. That the unit will take all other clearances from concerned agencies, whenever required. 24. That the unit will obtain consent under Water & Air Acts & authorization under HWTM Rules from the Board before coming into production. 25. That the unit will not change its process without the prior permission of the Board. 26. That the Consent to Establish so granted will be invalid, if the unit falls in Aravali Area. 27. That the unit will comply with the Hazardous Waste Management Rules and will also make the non-leachate pit for storage of Hazardous waste and will undertake not to dispose off the same except for pit in their own premises or with the authorized disposal authority. 28. That the unit will submit an affidavit that it will comply with all the specific and general conditions as imposed in the above Consent to Establish within 30 days failing which Consent to Establish will be revoked. 29. That unit will obtain EIA from MoEF, if required at any stage. Specific Conditions

Other Conditions : 1.The unit will take trial consent to operate before the occupation of the project. 2.The unit will install the project only on the land for which Town and Country Planning Department has given licenece. 3.The unit will comply all the terms and conditions of the Environmental Clearance granted by the SEIAA, Haryana. 4.Unit will obtain prior NOC/Permission from central Ground Water Authority in case under ground water resource is used. 5.The unit will achieve Zero effluent Discharge as proposed by unit. 6.The NOC is valid only for such land within this project which is under ownership of project proponent and for which report regarding Aravali area has been issued by DC, Gurgaon. 7.The unit will install adequate acoustic enclosures/chambers on their DG SETS with proper stack height as per prescribed norms to meet the prescribed standards under EP Rules, 1986. 8.The unit will install the adequate sewage treatment plant to meet the standards prescribed under EP Rules 1986. 9.The NOC will become invalid in case the project is found violating the provisions of notification no. S.O.191(E) dt. 27.01.2010 issued by MoEF Government of regarding Eco- sensitive Zone of .

Senior Environmental Engineer II, HQ For and on be'half of chairman Haryana State Pollution Control Board

---It is system generated certificate no signature is required---

ANNEXURE –IV COPY OF ENVIRONMENTAL CLEARANCE

ANNEXURE V COPY OF DOCUMENTS SUBMITTED FOR OBTAINING ENVIRONMENT CLEARANCE By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

FORM 1

(I) Basic Information

S. Item Details No.

1. Name of the project/s Commercial Complex

2. S. No. in the schedule 8(a)

3. Proposed capacity/ area/length/ tonnage Total plot area is 14795.2836 Sqm to be handled/ command area/ lease area/

number of wells to be drilled

4. New/ Expansion/ Modernization New

5. Existing Capacity/ Area etc. Not applicable

6. Category of Project i.e. ‘A’ or ‘B’ B [8(a) Built up area is 52537.193 Sqm]

7. Does it attract the general condition? If As it is a construction project, hence General yes, please specify. condition do not apply.

8. Does it attract the specific condition? If As it is a construction project, hence General yes, please specify. condition do not apply.

9. Location Village Madawas Tehsil, sector - 63, Gurgaon, Haryana.

Plot/ Survey/ Khasra No. Killa no.363/440,Rect No. 24, Kila no.7 min 93-4), kila no.14/2,6/2,15/1,10/1,11/1/2,6/1,10/2 .

Village Medawas

Tehsil Gurgaon

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

District Gurgaon

State Haryana

10. Nearest railway station/ airport along with Gurgaon,IGI Airport approx 18 km distance in km.

11. Nearest Town, city, District Headquarters The Project is in Municipal limit of Gurgaon along with distance in km. city .

12. Village Panchayats, Zilla Parishad, Municipal Corporation, Gurgaon Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)

13. Name of the applicant Aaliyah Real Estates Pvt. Ltd.

14. Registered Address 271,Udyog Vihar Phase II, Gurgaon(Haryana )

15. Address for correspondence: 271,Udyog Vihar Phase II, Gurgaon(Haryana )

Name Mr. Virendra Kumar Bhatia

Designation (Owner/Partner/ CEO) President

Address 271,Udyog Vihar Phase II,Gurgaon,Haryana India.

Pin Code -

E-mail [email protected]

Telephone No. +91 124 4222264

Fax No. +91 124 2348878

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

16. Details of Alternative Sites examined, if Not Applicable any. Location of these sites should be

shown on a topo sheet. 17. Interlinked Projects No

18. Whether separate application of Not Applicable interlinked project has been submitted?

19. If yes, date of submission Not Applicable

20. If no, reason No, it’s not an interlinked project.

21. Whether the proposal involves approval/clearance under: if yes, details

of the same and their status to be given. Not Applicable (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act,

1972? (c) The C.R.Z. Notification, 1991? Not Applicable in Arravali Notification

22. Whether there is any Government Order/ No. Policy relevant/ relating to the site?

23. Forest land involved (hectares) Not Applicable

24. Whether there is any litigation pending against the project and/ or land in which

the project is propose to be set up?

(a) Name of the Court (b) Case No. No (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land Land is allotted for Commercial

use, land cover or topography including Yes Colony by M/s Aaliyah Real increase in intensity of land use (with Estate Pvt. Ltd. However, license respect to local land use plan) has been granted by Town and Country Planning Department, Haryana to develop a Commercial complex on the aforesaid land. 1.2 Clearance of existing land, vegetation No No clearance required. The project and buildings? site is vacant land.

1.3 Creation of new land uses? Yes Land will be changed to Commercial Complex.

1.4 Pre-construction investigations e.g. bore Yes Pre-construction Soil Geo-technical houses, soil testing? Investigation shall be carried out.

1.5 Construction works? Yes Construction will be done as per approved Building Plan.

1.6 Demolition works? No Not Required

1.7 Temporary sites used for construction No Labour shall be hired from nearby works or housing of construction

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

workers? areas.

1.8 Above ground buildings, structures or Yes Above ground, building height will be 40 m and below ground, earthworks including linear structures, excavation shall be done upto three cut and fill or excavations basement level.

1.9 Underground works including mining or No Not applicable tunneling?

1.10 Reclamation works? No Not applicable

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing No None processes?

1.14 Facilities for storage of goods or Yes During construction, separate raw materials? material yard will be made. Cement will be separately stored

under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.

1.15 Facilities for treatment or disposal of Yes Proper Solid Waste Management solid waste or liquid effluents? plan for collection and storage of solid waste will be followed.

Details of STP given in Environment Management Plan.

1.16 Facilities for long term housing of No The workers during construction operational workers? phase will be hired from nearby areas and hence no need of housing. Only temporary shelters

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

(day) will be provided.

1.17 New road, rail or sea traffic during No Not applicable construction or operation?

1.18 New road, rail, air waterborne or other No Not applicable transport infrastructure including new or altered routes and stations, ports, airports etc?

1.19 Closure or diversion of existing transport No No such closure or diversion of routes or infrastructure leading to existing transport is required. changes in traffic movements? 1.20 New or diverted transmission lines or No No diversion of transmission lines

pipelines? or pipelines will be done.

1.21 Impoundment, damming, culverting, No No impoundment, damming, realignment or other changes to the culverting, realignment or other hydrology of watercourses or aquifers? changes to the hydrology of surface watercourse is required.

1.22 Stream crossings? No No stream crosses the project site.

1.23 Abstraction or transfers of water from No No abstraction or transfer of water ground or surface waters? from ground of surface will be done.

1.24 Changes in water bodies or the land No There will be no changes in water surface affecting drainage or run-off? bodies or the land surface effective drainage or run-off.

1.25 Transport of personnel or materials for Yes Materials during construction construction, operation or phase shall be transported by truck, decommissioning? trolley etc. Car, two – wheeler etc. will be used during operation

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

phase.

1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works?

1.27 Ongoing activity during No Not Applicable. decommissioning which could have an impact on the environment?

1.28 Influx of people to an area in either No Approx. 100-150 nos. per day local temporarily or permanently? labour from nearby area will be hired in the construction phase. Influx of People in form of Staff & Visitors is envisaged during operation phase.

1.29 Introduction of alien species? No There is no alien species at the proposed site.

1.30 Loss of native species or genetic No No loss of native species or genetic diversity? diversity.

1.31 Any other actions? No None

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2.1 Land especially undeveloped or Yes Undeveloped land of 14795.2836 agricultural land (ha) Sqm shall be developed to a commercial complex.

2.2 Water (expected source & competing Yes Source: HUDA will supply 392 users) unit: KLD KLD water to the proposed complex during operation phase.

2.3 Minerals (MT) No Not applicable

2.4 Construction material – stone, Yes The major materials required for aggregates, sand / soil (expected source construction of the project will be – MT) steel, cement, bricks, flooring tiles / stones, sanitary and hardware items, electrical fittings, etc.

2.5 Forests and timber (source – MT) No Wood for doors, windows will be used.

2.6 Energy including electricity and fuels Yes Total electric load 3978.2 KW, (source, competing users) Unit: fuel which will be supplied by (MT), energy (MW) Dakshin Haryana Vidyut Vitran Nigam Ltd. Low quantity of HSD sulphur H.S.D will be used as fuel in DG Sets.

2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

possible) with source of information data

3.1 Use of substances or materials, which are No The hazardous waste during hazardous (as per MSIHC rules) to operation phase will be used -oil & human health or the environment (flora, e-Waste. Proper management of fauna, and water supplies) Used oil & e-waste shall be taken.

3.2 Changes in occurrence of disease or No Suitable drainage and waste affect disease vectors (e.g. insect or management measures will be water borne diseases) adopted during the construction & operational phase. This will restrict stagnation of water or accumulation of water. This will effectively restrict the reproduction and growth of disease vectors.

3.3 Affect the welfare of people e.g. by Yes Socio-economic condition of the changing living conditions? people will be improved & better living style will be provided. No use, storage, treatment, handling or production of harmful materials is envisaged. Moreover this project will provide employment to about 100-150 local labours during construction phase and 150 persons as staff during operational phase. Thus the project is supposed to have major beneficial impacts.

3.4 Vulnerable groups of people who could No No, vulnerable group of people will be affected by the project e.g. hospital be affected by the project. patients, children, the elderly etc.,

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes No Not applicable

4.2 Municipal waste (domestic and or Yes Solid waste during construction commercial wastes) phase will be disposed off at Municipal solid waste site. Construction waste generated will be used to the extent possible. 95,902.54 cu. m soil approx((The excavated topsoil will be used for landscaping. The quantities of the excavated soil for backfilling in the complex will be-14,130.59 cu. m. Rest excavated soil to be transported at designated Site approved by Municipal Authority will be-81,771.95 cu. m) of solid waste shall be generated from the complex during operational phase. Detailed Solid Waste Management is given in Environment Management Plan.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

4.3 Hazardous wastes (as per Hazardous Yes Used oil from D.G. Set will be Waste Management Rules) carefully stored in HDPE drums in isolated covered facility. The used oil will be sold to vendors authorized by Central Pollution Control Board for the treatment of the same. 4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge from Yes About 3 Kg / day dried sludge will effluent treatment be generated from STP within complex and this sludge will be passed through filter press where it will be dewatered/ dried & form a cake and then will be used as manure in green areas.

4.7 Construction or demolition wastes Yes Construction waste generated will be used to the extent possible. Rest of the waste will be sent to municipal landfill site.

4.8 Redundant machinery or equipment No Not applicable

4.9 Contaminated soils or other materials No Not applicable 4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever

possible) with source of

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

information data

5.1 Emissions from combustion of fossil Yes 2 DG sets of 500 KVA & 3 DG fuels from stationary or mobile sources sets of 1010 KVA will be the only source of emission, which will meet the emission given by CPCB to manufacturer.

5.2 Emissions from production processes No Not applicable

5.3 Emissions from materials handling Yes Dust will be generated during including storage or transport construction from the movement of transport vehicles. The effect will be restricted to construction phase only. Water sprinklers will be used for dust suppression.

5.4 Emissions from construction activities No No machinery will be used. RMC including plant and equipment. will be used.

5.5 Dust or odours from handling of Yes During loading & unloading of materials including construction construction material dust is likely materials, sewage and waste to be generated during construction phase. Water will be sprinkled and tarpaulin cover will be provided over stored raw material to reduce dust emission. Waste water will be treated in STP of 160 KLD.

5.6 Emissions from incineration of waste No Not applicable

5.7 Emissions from burning of waste in No Not applicable open air (e.g. slash materials, construction debris)

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

5.8 Emissions from any other sources No Not applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines, No During construction the ventilation plant, crushers equipment such as mixer machines, bulldozers, cranes,

compactors & excavators shall be used which will be of highest standard of reputed make and

adhered to international standards. These standards itself will take care of noise pollution control / vibration control and air emission control. Hence an insignificant impact due to construction machinery is envisaged.

Apart from this, the construction activities will be restricted to daytime only.

Source of noise in the operational phase will be D.G. Set only. The D.G. Set installed shall be acoustically enclosed and will be used during Power failure only.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

They will generate noise level maximum upto 75dB (A).

6.2 From industrial or similar processes No Not applicable

6.3 From construction or demolition Yes Due to the various activities there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:

• Operation of D.G sets. • Excavation etc. It will be restricted to day time only.

6.4 From blasting or piling No No blasting or piling will be done.

6.5 From construction or operational traffic Yes Some amount of noise (70 – 75 db (A) will be generated from

vehicular movement in the construction and operational phase.

6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of No This is a Commercial complex and hazardous materials no storage of hazardous chemicals will be done, apart from used oil.

It will be stored in HDPE drums and kept in covered rooms under lock & key and will be sold to

authorize vendors only. Special care will be taken to prevent leakages and spills.

7.2 From discharge of sewage or other No Waste water shall be treated in in- effluents to water or the land (expected house STP of 160 KLD based on mode and place of discharge) MMR technology and treated water shall be reused for flushing, cooling and gardening. Excess treated water shall be discharged to public sewer.

7.3 By deposition of pollutants emitted to air No Not Applicable into the land or into water

7.4 From any other sources No None

7.5 Is there a risk of long term build up of No None pollutants in the environment from these sources?

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc No All appropriate measures will be from storage, handling, use or taken during construction phase. production of hazardous substances Proper fire fighting system will be installed at site, for operation phase.

8.2 From any other causes No None

8.3 Could the project be affected by natural No The area under study falls in Zone- disasters causing environmental damage IV, according to the Indian (e.g. Floods, earthquakes, landslides, Standard Seismic Zoning Map. cloudburst etc)? Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9.1 Lead to development of supporting. No Lities, ancillary development or

development stimulated by the project which could have impact on the environment e.g.:

Yes

• Supporting infrastructure (roads,

power supply, waste or waste water treatment, etc.)

• Housing development No Roads, power network exist in the area. For waste water treatment, • Extractive industries No STP shall be installed. • Supply industries No

9.2 Lead to after-use of the site, which No Proper care shall be taken to avoid

could have an impact on the any adverse impact on the environment environment.

9.3 Set a precedent for later developments Yes Proper and planned development of the area. 9.4 Have cumulative effects due to No No impact proximity to other existing or planned projects with similar effects

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

Environmental Sensitivity

Areas Name/ Aerial distance (within 15 km.) from S. No. Identity Proposed project location boundary 1 Areas protected under None None international conventions, national

or local legislation for their ecological, landscape, cultural or other related value

2 Areas which are important or Water Sources sensitive for ecological reasons - Nala 1.0 Km.N Wetlands, watercourses or other water bodies, coastal zone, 11.5 Km.SE biospheres, mountains, forests Sulakhari Dam 9.0 Km. SE

Forest

Rijokri PF 12.5 Km. NE

Masudpur PF 15.0 Km.NE

3 Areas used by protected, important Rijokri PF 12.5 Km. NE or sensitive species of flora or 15.0 Km.NE Masudpur PF fauna for breeding, nesting, foraging, resting, over wintering, migration

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

4 Inland, coastal, marine or None None underground waters

5 State, National boundaries State Boundary-Delhi 6.0 Km. NE

Haryana 8.0 Km. W

6 Routes or facilities used by the Indira Gandhi Inter national 17.0 Km. N public for access to recreation or Airport

other tourist, pilgrim areas NH-8 7.0 Km.NW

Sohna Road 4.0 Km. W Gurgaon Railway Station 12.0 Km.NW 7 Defence installations None

8 Densely populated or built-up area Near by area are moderately

populated area

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9 Areas occupied by sensitive man- Hospital

made land uses (hospitals, Hospital at Badshahpur schools, places of worship, 4.0 Km. W community facilities) PHC at Tigra 2.0 Km.NW

School

Central School 2.5 Km. NE

High School 3.0 Km. NE

Places of Worship

Mandir at Medawas 1.0 Km.SW Mandir at Ulhaspur 1.0 Km.N E

10 Areas containing important, high Forestry

quality or scarce resources

(Ground water resources, surface 12.5 Km. NE Rijokri PF resources, forestry, agriculture, 15.0 Km.NE fisheries, tourism, minerals) Masudpur PF

Tourism 11.5 Km. SE Damdama Lake

11 Areas already subjected to All around area is already pollution or environmental polluted area

damage. (Those where existing

legal environmental standards are exceeded)

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

12 Areas susceptible to natural hazard As the site comes under seismic which could cause the project to zone IV according to Indian present environmental problems Standard Seismic Zone.Proper earthquakes measures shall be (Earthquakes, subsidence, taken .No adverse impact of landslides, erosion, flooding or other natural hazards have been extreme or adverse climatic noted so for at the site conditions)

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 14.09.12

Place: Gurgaon

Mr. Virendra Kumar Bhatia

Director

Aaliyah Real Estates Pvt. Ltd. 271,Udyog Vihar Phase II, Gurgaon (Haryana )

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

FORM-1 A (only for construction projects listed under item 8 of the Schedule)

CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)

1. LAND ENVIRONMENT

1.1 Will the existing land use get The proposed Commercial project is Baani city Center significantly altered from the project at village Medawas, Sector-63 Gurgaon, Haryana and that is not consistent with the the land use conform to the approved master plan of the surroundings? (Proposed land use area. must conform to the approved

Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the

competent authority be submitted).

Attach Maps of The site location plan is enclosed. (i) Site location,

(ii) Surrounding features of the proposed site (within 500 meters) 500 meters surrounding map is enclosed.

(iii) The site (indicating levels & Contour plan is enclosed. contours) to appropriate scales. If

not available attach only conceptual plans.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

1.2 List out all the major project requirements in terms of the

Land area, Plot area – 14795.2836 Sqm Built up area 52537.193 Sqm Water consumption 392 KLD Power requirement

Connectivity By Road & NH 8 Community facilities, Shops, Hotel etc Parking needs etc. Parking Provisions – 713ECS

1.3 What are the likely impacts of the The entire project influenced area is developed as per proposed activity on the existing Master Plan of Gurgaon, thus no induced development

facilities adjacent to the proposed is foreseen due to the proposed project. Also the site? proposed development shall be carried out as per the defined building by-laws; hence no impact is envisaged (Such as open spaces, community due to the proposed development facilities, details of the existing

landuse, and disturbance to the local Further, the construction as well as operation phase of ecology). the project will generate direct and indirect employment opportunities for a large section of society. The

employment will have positive impact thereby increasing the quality of life. 1.4 Will there be any significant land Soil Type:

disturbance resulting in erosion, Sandy subsidence & instability? Slope Analysis: (Details of soil type, slope analysis, vulnerability to subsidence, The project area possesses fairly plain terrain. seismicity etc may be given). Erosion / Subsidence:

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

Proper greening & paving of area will not cause any soil erosion problem and subsidence.

Seismicity:

Seismic zone-IV, for which appropriate safety measures shall be taken.

1.5 Will the proposal involve alteration The proposed project activities will not cause any of natural drainage systems? alteration of natural drainage system.

(Give details on a contour map showing the natural drainage near the proposed project site)

1.6 What are the quantities of earthwork During construction phase some excavation of about involved in the construction activity 95,902.54 cu. m soil approx (The excavated topsoil will cutting, filling, reclamation etc. be used for landscaping. The quantities of the excavated soil for backfilling in the complex will be-14,130.59 cu. (Give details of the quantities of m. Rest excavated soil to be transported at designated earthwork involved, transport of fill Site approved by Municipal Authority will be-81,771.95 materials from outside the site etc.) cu. m) will be carried out in order to provide foundation and basement. This excavated soil will be properly stacked within the site under tarpaulin cover and will be reused for backfilling purpose, road construction etc. The top soil will be preserved separately and will be used for landscaping purpose only. Hence, no immediate adverse impacts on the land environment are envisaged.

1.7 Give details regarding water supply, Water Supply: waste handling etc during the During Construction stage, water will be sourced construction period. through tankers engaged by the contractor.

Waste Generation / Handling:

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

Soil excavated will be reused for backfilling and the fertile top soil will be reused for horticultural purpose.

Spillage of oil from the machinery or cement residual from concrete mixer plants will be properly collected and reused in construction site.

For construction labour, proper sanitary facilities & wash areas will be constructed and good hygienic conditions will be maintained.

1.8 Will the low lying areas & wetlands No low lying and wetland area are present in and get altered? around the project site.

(Provide details of how low lying and wetlands are getting modified from the proposed activity)

1.9 Whether construction debris & The construction waste generated from the project will waste during construction cause be common in nature and will not cause any health health hazard? (Give quantities of hazard to associate and nearby population. The various types of wastes generated construction debris will be used for land leveling/back during construction including the filling. Waste concrete will be reused as aggregate in construction labour and the means of construction process. disposal) Mobile toilets & drinking water for construction labour shall be provided. The sewage and waste water generated will be channelized to septic tank followed by soak pit in the complex..

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2. WATER ENVIRONMENT

2.1 Give the total quantity of water The total quantity of water requirement shall be 392 requirement for the proposed project KLD, as per the details given below:- with the breakup of requirements for Domestic Use - 91 KLD various uses. Horticulture - 10 KLD

Flushing - 39 KLD

Cooling - 250KLD

Swimming pool - 2 KLD

------

Total - 392 KLD

HUDA supply How will the water requirement met?

Water Balance Diagram is given in Environment State the sources & quantities and Management Plan. furnish a water balance statement.

2.2 What is the capacity (dependable HUDA will supply water to the complex and it is a flow or yield) of the proposed source dependable source of water. of water?

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2.3 What is the quality of water required, In case HUDA supply is not made or the supply made in case, the supply is not from a is inadequate then the water shall be arranged through municipal source? (Provide physical, tanker supplies chemical, biological characteristics with class of water quality)

2.4 How much of the water requirement The total waste water generation from the proposed can be met from the recycling of complex will be about 132 KLD. It will be treated in treated wastewater? in-house Sewage Treatment Plant of 160 KLD capacity, within the premises. 126 KLD of treated (Give the details of quantities, water from the S.T.P. will be used in horticulture, sources and usage) cooling, flushing and misc. purpose within the project premises.

Water balance is given in Environment management plan.

2.5 Will there be diversion of water from There will not be any substantial effect on water other users? demand of this region as the development will be as per the Master Plan of Gurgaon.

(Please assess the impacts of the project on other existing uses and quantities of consumption)

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2.6 What is the incremental pollution Waste water generated from the complex will be 132 load from wastewater generated from KL / Day which will be treated in S.T.P. of 160 KLD. the proposed activity? 126 KLD of treated water will be reused for flushing, cooling, gardening and misc. No Water discharge to

public sewer discharged to sewer line, thus no (Give details of the quantities and pollution load will be generated from the complex as composition of wastewater generated only treated water will be discharged to sewer line. from the proposed activity)

2.7 Give details of the water For collecting storm water, storm water drainage requirements met from water network shall be provided during the design stage. It harvesting? Furnish details of the shall be ensured that no mixing of the storm water with facilities created. waste water takes place. All the storm water will be diverted to rain water harvesting pits in the complex.

(Detail of Rain Water Harvesting is given in Environment management plan).

2.8 What would be the impact of the During the construction phase, runoff from the land use changes occurring due to construction site shall not be allowed into the roadside. the proposed project on the runoff Adequate measures shall be taken to channelise such characteristics (quantitative as well run off. After construction of the complex, the same as qualitative) of the area in the post will be used to recharge the ground through rain water construction phase on a long-term harvesting network. basis?

Would it aggravate the problems of No, it will not aggravate the problem of flooding or flooding or water logging in any water logging in any way, rather will reduce the same. way?

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2.9 What are the impacts of the proposal Ground water shall not be used thus there will be no on the ground water? impact of proposal on ground water. Rather, rain water harvesting shall be implemented to recharge the (Will there be tapping of ground ground water level. water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any)

2.10 What precautions/measures are taken During the construction phase, runoff from the to prevent the run-off from construction site shall not be allowed into the roadside. construction activities polluting land Adequate measures shall be taken to channelise such & aquifers? run off and the same shall be disposed through storm water drainage network. (Give details of quantities and the measures taken to avoid the adverse impacts)

2.11 How is the storm water from within Adequate measures shall be taken to channelise storm the site managed? water and the same shall be diverted to rain water harvesting pits in the complex (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)

2.12 Will the deployment of construction Proper sanitary facilities like temporary toilets etc. will labourers particularly in the peak be provided to labour, which will be channelized to period lead to unsanitary conditions sewer line of the area. around the project site (Justify with proper explanation)

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

2.13 What on-site facilities are provided Domestic sewage and waste water (132KLD) will be for the collection, treatment & safe discharged into the S.T.P. (160 KLD). The treated disposal of sewage? waste water will be reused for flushing, cooling, gardening and misc. purposes etc.

Detail is given in EMP. (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal)

2.14 Give details of dual plumbing system Dual Plumbing line for using treated water will be if treated waste used is used for provided in the complex. flushing of toilets or any other use.

3. VEGETATION

3.1 Is there any threat of the project to There is no threat of the project to the biodiversity. the biodiversity? Neither any rare or endangered species have been recorded in the project area.

(Give a description of the local ecosystem with it’s unique features, if any)

3.2 Will the construction involve As the project site is a vacant land, so there will be no extensive clearing or modification of clearing or modification of vegetation. vegetation?

(Provide a detailed account of the trees & vegetation affected by the project)

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

3.3 What are the measures proposed to There will not be any kind of impact of this project on be taken to minimize the likely site features. The green belt and landscaping has been impacts on important site features planned to provide a clean, healthy and beautiful green, clean, healthy and aesthetic environment that provide a (Give details of proposal for tree visual retreat and relaxation for the people to live in and plantation, landscaping, creation of work in. water bodies etc along with a layout plan to an appropriate scale) To minimize the impact, the provision of 4438.6 Sqm green area, with lawns, ornamental plants and trees shall be provided.

4. FAUNA

4.1 Is there likely to be any It is already a developed area, so in existing condition displacement of fauna- both this place is not the habitat of local fauna, There will be terrestrial and aquatic or creation of no displacement or any other effect on the local fauna barriers for their movement? Provide due to the proposed project activity. the details.

4.2 Any direct or indirect impacts on the No, there is no impact on the avifauna of the area. avifauna of the area? Provide details.

4.3 Prescribe measures such as Not Applicable corridors, fish ladders etc to mitigate adverse impacts on fauna

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

5. AIR ENVIRONMENT

5.1 Will the project increase Increased traffic generation of vehicles due to project atmospheric concentration of gases will not cause increase in atmospheric concentration of & result in heat islands? gases and will not result in heat island formation.

(Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)

5.2 What are the impacts on generation No, dust, odour will be generated at site. Smoke will be of dust, smoke, odour fumes or generated from operation of DG sets. Proper emission other hazardous gases? Give details standards will be maintained as per CPCB guidelines. in relation to all the meteorological parameters.

5.3 Will the proposal create shortage of 713 ECS of parking will be provided within the parking space for vehicles? Furnish premises. The proposed construction project would details of the present level of provide vehicle-parking facilities, both in the basement transport infrastructure and and at the surface. The parking plan for this measures proposed for improvement construction project will follow all the standards and including the traffic management at norms. the entry & exit to the project site. Detail is given in Environment Management Plan.

5.4 Provide details of the movement In the proposed project arrangement will be made for patterns with internal roads, bicycle smooth traffic movement. Adequate arrangement will tracks, pedestrian pathways, be provided covering all corners. footpaths etc., with areas under each category.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

5.5 Will there be significant increase in During construction, noise barriers shall be installed to traffic noise & vibrations? Give reduce traffic noise & vibrations and during operation details of the sources and the green belt developed within the complex will mitigate measures proposed for mitigation of the traffic noise. the above.

5.6 What will be the impact of DG sets 2D.G. Sets of 500 KVA & 3 of 1010 KVA shall be & other equipment on noise levels bought acoustically enclosed to reduce the noise from & vibration in & ambient air quality D.G. Sets with proper stack height as per C.P.C.B. around the project site? Provide norms to reduce the impact on air quality around the details. project site. The noise emissions from D.G. Sets shall meet the noise level as per C.PC.B guidelines. Low Sulphur fuel will be used to run these D.G. Sets. Vibrator pads will be used in DG sets to minimize the vibration effect

6. AESTHETICS

6.1 Will the proposed constructions in The open land does not have any scenic amenity or any way result in the obstruction of beauty. Construction of the complex will increase the a view, scenic amenity or beauty of the area by having proper landscaping. landscapes? Yes all considerations have been taken by the Are these considerations taken into proponents. account by the proponents?

6.2 Will there be any adverse impacts The project is a vacant land, no existing structure is from new constructions on the there on the site. existing structures? What are the

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

6.3 Whether there are any local None considerations of urban form &

urban design influencing the design criteria? They may be explicitly spelt out.

Are there any anthropological or No there is no anthropological or archaeological site or archaeological sites or artifacts artifacts near the site. nearby?

State if any other significant features in the vicinity of the proposed site All significant features have been considered. have been considered.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any There will be slightly change in demographic structure changes to the demographic of local population of the area. structure of local population? Provide the details.

7.2 Give details of the existing social The proposed project is surrounded by commercial & infrastructure around the proposed residential colony. project.

7.3 Will the project cause adverse The proposed Complex will be constructed within the effects on local communities, designated site as per the defined building by-laws of disturbance to sacred sites or other government authority. There is no sacred site or cultural cultural values? What are the heritage site within vicinity of proposed project, hence safeguards proposed? no adverse impacts are envisaged.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

8. BUILDING MATERIALS

8.1 May involve the use of building The major materials required for construction of the materials with high-embodied project will be steel, cement, bricks, flooring tiles / energy. stones, sanitary and hardware items, electrical fittings, etc.

Energy efficient Building material will be used. Are the construction materials produced with energy efficient processes?

(Give details of energy conservation Details given in Environment management plan. measures in the selection of building materials and their energy efficiency.

8.2 Transport and handling of materials Yes, transportation and handling of material will result during construction may result in in pollution, noise; however it will be minimized by pollution, noise & public nuisance. covering material by the tarpaulin and ensuring PUC certificate of vehicles and good condition silencers. What measures are taken to minimize the impacts?

8.3 Are recycled materials used in roads We shall utilize all the excavated earth to the extent and structures? possible. The debris of construction material will be also used in backfilling, roads etc. State the extent of savings achieved?

8.4 Give details of the methods of This solid waste will be disposed off as per municipal collection, segregation & disposal of solid waste management and handling norms. Details the garbage generated during the given in EMP. operation phases of the project.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9. ENERGY CONSERVATION

9.1 Give details of the power Power Requirement: 3978.2 KW. requirements, source of supply, Source of Power: Dakshin Haryana Vidyut Vitran backup source etc. Nigam Ltd. What is the energy consumption Back-up Source: 2 D.G of 500 KVA & 3 DG set of assumed per square foot of built-up 1010 KVA shall be bought acoustically enclosed. area?

How have you tried to minimize energy consumption? Appropriate energy conservation measures & management plan shall be adopted in order to minimize the consumption of non-renewable fuel.

9.2 What type of, and capacity of, power 2 Diesel Generators of 500 KVA & 3 of 1010 KVA back-up to you plan to provide? capacity shall be installed to provide 50 % power backup during power failure.

9.3 What are the characteristics of the Double glazed reflective glass shall be used. glass you plan to use?

Provide specifications of its

characteristics related to both short wave and long wave radiation?

9.4 What passive solar architectural Building design and envelope will be optimized features are being used in the through selection of appropriate wall and roof building? construction and through adoption of solar measures.

Illustrate the applications made in the proposed project.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9.5 Does the layout of streets & buildings Yes, the layout of buildings maximizes the potential maximize the potential for solar for solar energy devices. energy devices?

Have you considered the use of street Yes, adequate no. of solar lights shall be installed and lighting, emergency lighting and solar solar water heaters of adequate capacity shall be hot water systems for use in the installed for hot water requirement of the complex. building complex? Substantiate with details.

9.6 Is shading effectively used to reduce Solar Measures have been adopted to provide shading cooling/heating loads? What devices for windows and roof which would effectively principles have been used to maximize reduce heating up of building envelope. Louvers and the shading of Walls on the East and sunshades will be used around windows in order to the West and the Roof? How much protect from direct sunlight. energy saving has been effected? Roofs will be painted with reflective paints with solar reflectance ranging from 0.3-0.6. This will result in less absorption of sunlight causing 40 % back reflection and less heating of building structure during summer season. This will effectively reduce the heat load of the building envelope.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9.7 Do the structures use energy-efficient Suitable energy optimization will be adopted during space conditioning, lighting and the calculation of energy load of the proposed project. mechanical systems? Provide The space heating load will be minimized using solar technical details. structure and suitable buildings envelop material. Uses of incandescent lamp and halogen lamps have

been avoided and energy efficient compact fluorescent lamps & LED have been used for all common area and basement.

The diesel generator sets shall be automatically Provide details of the transformers and controlled to optimize their usage based on the actual motor efficiencies, lighting intensity load requirements at any time. Space conditioning will and air-conditioning load be provided as per norms of National Building Code – assumptions? Part 8; Building Services Section 3–Mechanical Ventilation. Lighting intensity will be done as per the National Building Code Guidelines

Chillers shall be provided for hotel complex. Are you using CFC and HCFC free chillers? Provide specifications Details given in EMP.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9.8 What are the likely effects of the No significant effect is envisaged on the surrounding building activity in altering the micro- environment of project. Increased traffic generation climates? and use of D.G. Sets in the project will not cause significant increase in atmospheric concentration of Provide a self assessment on the likely gases and will not result in heat island formation. impacts of the proposed construction on creation of heat island & inversion effects?

9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration?

Give details of the material used and the U-values or the R values of the individual components.

9.10 What precautions & safety measures Fire Fighting will be done as per NBC 2005. The are proposed against fire hazards? following codes shall be adhered to. NBC – 2005 National Building Code 2005 - part IV Furnish details of emergency plans. NFPA : 13 Standards on Automatic Sprinkler System IS : 636 Non-percolating flexible fire fighting delivery hose. IS : 884 Specification for first aid hose reel for fire fighting. IS : 901 Specification for couplings, double male and double female, instantaneous pattern for fire fighting. IS : 902 Suction hose couplings for fire fighting purposes. IS : 903 Specification for fire hose delivery couplings, branch pipe, nozzles and nozzle spanner. IS : 904 Specification for 2-way and 3-way suction collecting heads for fire fighting purposes. IS : 907 Specification for suction strainers, cylindrical type for fire fighting purposes. IS : 908 Specification for fire hydrant, stand post type. IS : 909 Specification for underground fire hydrant, sluice valve type. IS : 910 Specification for portable chemical foam fire extinguisher.

IS : 933 Specification for portable chemical foam fire extinguisher. IS : 1648 Code of practice for fire safety of building (general) : Fire fighting equipment and its maintenance. IS : 2171 Specification for portable fire extinguishers dry powder (cartridge type) IS : 2190 Selection, installation and maintenance of first aid fire extinguishers – Code of practice. IS : 2871 Specification for branch pipe, universal, for fire fighting purposes. IS : 2878 Specification for fire extinguishers, carbon dioxide type (portable and trolley mounted). IS : 3844 Code of practice for installation and maintenance of internal fire hydrants and hose reel on premises. IS : 5290 Specification for landing valves. IS 5714 Specification for coupling, branch pipe, nozzle, used in hose reel tubing for fire fighting.

IS : 8423 Specification for controlled percolation type hose for fire fighting. IS : 10658 Specification for higher capacity dry powder fire extinguisher (trolley mounted).

IS : 11460 Code of practice for fire safety of libraries and archives buildings.

IS : 1309 External hydrant systems – Provision and maintenance – Code of practice. IS : 5514 Reciprocating internal combustion engines : Performance. (Parts 1 to 7)

IS : 15105 Code of Installation of Automatic Sprinkler System

IS : 3844 Code of Installation of Internal Fire Hydrants

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

9.11 If you are using glass as wall material 40% Glass will be used to utilize maximum sunlight. provides details and specifications

including emissive and thermal characteristics.

9.12 What is the rate of air infiltration into All the window and door will be airtight quality, the building? hence we don’t foresee any air infiltration

Provide details of how you are mitigating the effects of infiltration.

9.13 To what extent the non-conventional Solar energy shall be used as non-conventional source energy technologies are utilized in the of energy for lightning and water heating purposes. overall energy consumption?

Provide details of the renewable energy technologies used.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

10. ENVIRONMENT MANAGEMENT PLAN

10.1 The Environment Management Plan Environment Management Plan is enclosed as would consist of all mitigation Annexure-III. measures for each item wise activity

to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

About the project

The proposed project is a “Baani City Centre” (Commercial Complex) As per Amended EIA Notification, dated 1.12.2009, the proposed project has built up area 52,537.193 m2 which is less than 1,50,000 m2, therefore it falls under category 8 (a) of EIA notification 14th September 2006 under new construction projects.

The details of the project are following:

1. The total plot area is 14795.2836 m2 of the complex.

2. The Total Built up area will be 52537.193 m2 (FAR area 25882.62 m2 + total basement area 24445.517 m 2+ Non FAR area 2209.056 m2)

3. The permissible FAR area is 25891.74 m2 & proposed FAR area will be 25882.62 m2

4. Total basement area will be 24445.517 m2

5. The permissible Ground Coverage area is 5918.11 m2 and proposed Ground Coverage area will be 5916.65 m2

6. The total green area will be 4438.6 m2 which will be 30% of the plot area.

7. The total population will be 1152 persons.

8. The total water requirement will be 392 KLD from HUDA waste water discharge will be 132 KLD which will be treated in STP of 160 KLD capacity based on MMR (Moving Media Reactor) technology. The 126 KLD treated water will be reused in flushing, D.G. cooling and gardening.

9. 4 nos. of rain water harvesting pits has been proposed.

10. The total solid waste will be 302 kg/day generated out of which organic waste will be 211 kg/day and recyclable waste will be 91 kg/day.

11. The building height will be 49.5 m.

12. The total power requirement will be 3978.2 KW which will be supplied by Dakshin Haryana Bjli Vitran Nigam Limited and 2 D.G sets of 500 KVA and 3 D.G. sets of 1010 KVA shall be installed for power backup. All D.G set will be bought from the supplier and will be kept in acoustically treated room.

13. The parking requirement will be 517 ECS and parking provision will be 713 ECS.

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

The complete details of the Commercial Complex are given below:

S.N. AREA DETAILS 1. Total Plot area 14795.2836 m2 (3.656 acre) 2. Permissible FAR (1.75%) 25891.74 m2 3. Proposed FAR (1.74%) 25882.62 m2 4. Permissible Ground Coverage (40%) 5918.11 m2 5. Proposed Ground Coverage (39.9%) 5916.65 m2 6. Total Basement area 24445.517 m2 7. Non FAR area 2209.056 m2 8. Built- up area FAR + Basement + Non FAR + (25882.62 m2 + 24445.517 m2 + 2209.056 m2 ) = 52537.193 m2 9. No. of Basement 3 nos.

10. Total Green area (15.3 %) 4438.6 m2 11. Building Height 49.5 m 12. Activities Retail shopping, hotel, service apartment, hotel and swimming pool. 13. Total Population 1152 persons 14. Rain Water Harvesting 4 nos. 15. Water requirement 392 KLD 16. Water discharge 132 KLD

17. S.T.P. 160 KLD 18. STP Technology MMR Technology 19. Power Requirement 3978.2 KW 20. D.G. Sets Capacity 2 D.G. sets 500 KVA and 3 D.G. sets of 1010 KVA 21. Total Solid Waster 302 kg/day 22. Parking Requirement 517 ECS 23. Parking Provision 713 ECS 24. Cost of Project Rs. 100 Crores

By: M/s Aaliyah Real Estates Pvt. Ltd “Baani City Centre”at Sec -63, Village- Medawas, Distt-Gurgaon, Haryana

LANDSCAPE /GREEN DEVELOPMENT PLAN Shelter belt (20%) -2959 sq.m Total landscape area (water Body-5%) -739.7 sq.m Avenue plantation along the roadside (5%) - 739.7 sq.m

Total plants to be planted- 590 Nos.

GREEN AREA

BASEMENT

BASEMENT P

ENTRY U

SETBACK LINE BASEMENT BASEMENT EXIT E

EXIT ENTRY P

O L 79 BASEMENT LINE S

78 G+2 TERRACE BELOW G+2 +10.200LVL. REAR BLOCK +14.700LVL. +14.700LVL. 77 2ND FLOOR TERRACE TERRACE +19.200LVL. +19.200LVL. 76

TERRACE AT +5.700LVL. FIRST FLOOR LEVEL 1ST FLOOR T R E E L E G E N D 75 +18.200LVL. +18.200LVL.

74 2ND FLOOR TERRACE TERRACE BELOW TERRACE 2ND FLOOR +14.700LVL. 73 TERRACE BELOW +10.200LVL. B I F U R C A T A F O X T A I L P A L M +14.700LVL. W O D E T I Y A OPEN TO SKY +10.200LVL.

72

L

L

E

E

V

V

T

E

T

E

A L

A L

71

E

R

E R

C O

C E T R E E )

O R O Y A L P O I N C I A N A ( F L A M

A

A

O

O

R L

R

L

F

R

R F

70

E

E T

T +5.700LVL. DN

T

T S

S

R

R I

I OPEN

F F 69 G+2 TO

+14.700LVL. SKY

.

. L L TERRACE G+2 V

V B A M B U S A V E N T R I C O S A

L

L

0

0

0 0

+14.700LVL. 7 7

OPEN TO SKY .

. OPEN TO SKY

5

5 + + REAR BLOCK TERRACE TERRACE BELOW +10.200LVL.

+19.200LVL. 2ND FLOOR SETBACK LINE +5.700LVL. F I C U S B E N J A M I N A

BASEMENT LINE GREEN AREA

TERRACE AT TERRACE AT TERRACE BELOW FIRST FLOOR LEVEL FIRST FLOOR LEVEL G O L D E N D U R A N T A TERRACE BELOW TERRACE +10.200LVL. +10.200LVL. +10.200LVL. 1.2M. HIGH PARAPET WALL +10.200LVL. +7.200LVL. 2ND FLOOR 2ND FLOOR G+1 G+1 GREEN AREA TERRACE DECK +48.150LVL. A 2ND FLOOR MUMTY TERRACE BELOW +48.150LVL. TERRACE PLANT MUMTY +10.200LVL. TERRACE OPEN TO SKY SERVICES AREA +49.900LVL. PLANT +49.900LVL. DECK MACHINE ROOM DECK TERRACE POOL MACHINE ROOM +45.150LVL. TERRACE TERRACE 1ST FLOOR +45.150LVL. HOTEL BLOCK 2ND FLOOR 2ND FLOOR PLANT PLANT +48.150LVL. SERVICE FLOOR OPEN SERVICE FLOOR 2ND FLOOR CHANGING ROOM G+9 TO GREEN AREA TERRACE DECK

TERRACE SKY R

+45.150LVL. 2ND FLOOR O +19.200LVL. O 2.0 M WIDE DECKING

PLANT PLANT L +19.200LVL. F

AROUND THE POOL

T S

1 TERRACE LVL. . .

L +19.200

V L

MUMTY E 0

DN C

0

A R

SLOPE DN OHT ABOVE D1 G+7 .2

8

R 1

E G+3

+ T D1 TERRACE LVL. LIFT MACHINE ROOM F I R E R E F U G E T E R R A C E POOL TERRACE LVL. AS/ISI STANDARDS +39.850 B E L O W O N E I G H T F L O O R +14.700 OPEN +18.200LVL. TO FRONT BLOCK +18.200LVL. RAMP UP

FRONT BLOCK SKY

R

O O

2ND FLOOR R

L O

F

O

L T

F

S

1

SERVICE FLOOR E

SERVICE FLOOR C 2ND FLOOR

I V

TERRACE LVL. R

E GREEN AREA S G+7 0

+39.850 1

:

1

1 2 3 4 5 6 7 8 9 10 11 12 SERVICE FLOOR E 2ND FLOOR P

O 13 L S

1ST FLOOR

E LIN 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 CK E 68 TBA LIN LOWER TERRACE SE NT 2ND FLOOR EME 67 AS 66 B T 65 EXI RY 64 ENT AREA=1008.46SQ.M. 0 63

1

CAR PARKING 6 M WIDE ROAD :

1 62 E.C.S.=1008.46/23=44 E.C.S. E 1 P 6

O 60

L

S

59

N

I

D

A

O

30 31 32 33 34 35 36 37 38 39 40 41 R NE K LI AC NE 58 SETB LI FIRE EXIT NT W=1250 E 7 T=300 M 5 R=150 SE BA 56 42 43 44 45 46 47 48 55 54 53 52 D ROA R 51 IDE OA 6 M W D 50 IN S 49 LO P E 1: 10 N

T 11 EXI

RY ENT M/s Aaliyah Real Estates Pvt. Ltd. SITE PLAN  Total Plot Area :14795.2836 Sqm (3.656 acres)

 Permissible Ground Coverage (40%) :5918.11 Sqm

 Proposed Ground Coverage (39.9%) :5916.65 Sqm

A11 100.786 A12  Permissible FAR(1.75) :25891.74 Sqm

TERRACE AT FIRST FLOOR LEVEL SETBACK LINE  Proposed FAR (1.74) :25882.62 Sqm

BASEMENT LINE P

U

E

P

O

L S TERRACE BELOW

TERRACE TERRACE 0  Non-FAR Area :2209.056 Sqm 1

+10.200LVL. :

+14.700LVL. 1

+14.700LVL. -

2ND FLOOR

E P

+19.200LVL. O L

+19.200LVL. S

3 TERRACE AT  +5.700LVL. 1ST FLOOR Area of Basement :24445.517 Sqm

6 FIRST FLOOR LEVEL

. 8 +18.200LVL. OPEN TO SKY OPEN TO SKY +18.200LVL. PLAN 4 0 TION OCA OPEN TO SKY L 2ND FLOOR TERRACE TERRACE BELOW TERRACE 2ND FLOOR +14.700LVL.  Built up Area :52537.193 Sqm +10.200LVL. +14.700LVL. TERRACE BELOW +10.200LVL. PLINTH LVL.

+1.200

L

L

E

E

V

V

T

E T

E

L A

L A

R

E  E 6

R Plantation Area (30 %) :4438.6 Sqm

C

O C O

0

A

A

O

O

R

L R

L . F

DN R

F

R 3

E

E +5.700LVL.

T

T

T 5

T

S

S

R

R 0 I

I OPEN

F F

0 TO 1 OPEN TO SKY : TERRACE

1 SKY

- +14.700LVL.

OPEN TO SKY  Height of building :49.5 m

E

.

.

P

L

L

O

V

V

L L

A10 L TERRACE

0 S

67.060 0

0

0

7

7 +14.700LVL.

. .

. 5

A9 L

5

V

+

+

L

.

0 L

H TERRACE BELOW

0 V T

2 L

N

.

I

+10.200LVL. 1

L  H

0 No. of Basement Area :3 nos.

+ P

0 T

2

N

. I

+19.200LVL. 1 2ND FLOOR

L

+ P ROAD IN SLOPE SETBACK LINE +5.700LVL.

BASEMENT LINE  No. of Floors :G+11

2

2

. 6 TERRACE BELOW TERRACE BELOW 8 +10.200LVL. +10.200LVL. +10.200LVL. +10.200LVL. 5 TERRACE AT TERRACE AT 2ND FLOOR 2ND FLOOR SECOND FLOOR LEVEL  699 ECS SECOND FLOOR LEVEL Parking Provision :

2ND FLOOR TERRACE BELOW +10.200LVL.  1ST FLOOR Activities : Retail, service OPEN TO SKY PLINTH LVL. A13 33.515 A8 +1.200 A1 1ST FLOOR 3.474 apartment, 2ND FLOOR +10.200LVL. 2ND FLOOR +10.200LVL.

+10.200 LVL A7 SERVICE FLOOR OPEN SERVICE FLOOR TO

SKY

R O

1 O +44.350LVL. 2.0 M WIDE DECKING +44.350LVL.

+44.350LVL. L

F Hotel and

AROUND THE POOL

7

T

S 1 .

1

6

4

TERRACE LVL. T E R R A C E POOL +39.850 B E L O W swimming pool. PLINTH LVL. +43.350LVL. OPEN +43.350LVL. +43.350LVL. +1.200 TO

SKY

R

O

R

O

L O F

O 2ND FLOOR

L

T S 4 F 1 SERVICE FLOOR SERVICE FLOOR E 3 C

I +10.200LVL. V

. R

9 TERRACE LVL. E S 2 4 +39.850 A 9

SERVICE FLOOR 2ND FLOOR +10.200LVL.

1ST FLOOR +5.700LVL.

AREA=518.26 SQ.M. E.C.S.=518.26/25=20 E.C.S.

2ND FLOOR E LIN +10.200LVL. ACK E ETB LIN SHOPPING S ENT AREA=1008.46SQ.M. SEM ENTRY E.C.S.=1008.46/25=40 E.C.S. BA 3 71.35

AREA=489.93 SQ.M. E.C.S.=489.93/25=19 E.C.S. A6 A3 PARKING REQUIREMENT =517 ECS E LIN ACK E ETB LIN S ENT SEM BA PARKING PROVISION :

39 .9 13 Surface Parking = Bus Parking = 2 Nos. 46 71.2 AD . RO 12M Handicapped Parking = 2 Nos. Taxi Parking = 10 Nos. HOTEL D EXIT ROA OR HOTEL CT ENTRY SE 4 IDE A5 4.878 A . W FIRST BASEMENT = 246 ECS 60M SECOND BASEMENT = 217 ECS THIRD BASEMENT = 236 ECS AD RO OAD OR D M. R ECT OA 24 TOTAL PARKING PROVISION = 699 ECS DE S . R . WI 12M 60M 9 N M/s Aaliyah Real Estates Pvt. Ltd. APPOROVED ZONING PLAN

8 M/s Aaliyah Real Estates Pvt. Ltd. TOPOGRAPHICAL MAP

Name Distance &Direction

Water Sources Badshahpur Nala 1.0 Km.N Damdama Lake 11.5 Km.SE Sulakhari Dam 9.0 Km. SE

Forest Rijokri PF 12.5 Km. NE Alahawas Masudpur PF 15.0 km NE Baharampur Naya Medawas Badshahpur Qadirpur Ramgarh

5 M/s Aaliyah Real Estates Pvt. Ltd.