MONTHLY STATUS REPORT OF 6 (SIX) IDENTIFIED RIVER STRETCHES OF THE MONTH AUGUST, 2020 FOR THE STATE OF

 In pursuance to the Report of the CPCB and in compliance of the directions of the Hon’ble NGT, Principal Bench, New Delhi, vide its Order dated 20.09.2018 in O.A. 673 of 2018, the State Government constituted a River Rejuvenation Committee (RRC), vide its Memorandum dated 01.11.2018. The Committee is also functioning as the Monitoring Committee for the Action Plans already prepared for rejuvenation of 6 (six) identified river stretches. The Committee comprises the following officers of the State Government: 1. Director, Science, Technology & Environment Chairman 2. Director, Urban Development Member 3. Director, Industries & Commerce Member 4. Member Secretary, TSPCB Member Secretary The Committee is working under overall supervision of the Secretary, Science, Technology and Environment.

 Besides the above, as per directions of the Hon’ble NGT, Principal Bench, New Delhi, the State Government has also constituted District-level Special Environment Surveillance Task Force (SESTF) for each District.

 The River Rejuvenation Committee has prepared the Action Plans for individual river stretches as suggested by the CPCB. The Action Plans were sent to CPCB on 28.06.2019. The said Action Plans have been uploaded in the TSPCB website.

 The 4th meeting of River Rejuvenation Committee (RRC) Tripura was held on 25-08- 2020 under the chairmanship of the Chairman, RRC to review the progress of the implementation of action plan. (Minutes of the meeting is annexed as Annexure 1)

 Tripura State Pollution Control Board (TSPCB) is conducting water quality monitoring on monthly basis under National Water Quality Monitoring Programme (NWMP) of Central Pollution Control Board for the following six identified polluted river stretches in the State:

Tripura RRC Page 1

River River Stretch Burigaon Along Bishalgarh Gumti Telkajila To Amarpur Haora To Bishramganj Juri Along Dharmanagar Along Teliamura Manu Along Kailashahar  From the analytical report for all the monitoring locations of six rivers entered in EWQDES portal of CPCB by TSPCB since June, 2016, it has been observed that the BOD values for the six identified polluted river stretches were within prescribed standard limit (3 mg/l) except for some specific months in respect of Gumati river (June, July, August & September, 2016 at Sonamura location), (June & July, 2016 at Chandrapur location; June to August, 2016 at Dashamighat location) (June to November, 2016 at Krishnapur location) (June to August, 2016 at Kailasahar location). It is relevant to mention that for all the monitoring locations of , the BOD value was within prescribed standard limit (3 mg/l) since June, 2016. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at (ANNEXURE-2).  All concerned Departments / Organizations have been directed to take necessary steps for effective implementation of the Action Plans so that the water quality of the 6 (six) identified river stretches remains within prescribed standards.  The River Rejuvenation Committee, Tripura review the action taken on implementation of the Action Plans for rejuvenation of the six identified river stretched on regular basis. The minutes are being uploaded in TSPCB website.  The Chief Secretary, Tripura also monitored the action taken on implementation of the Action Plans for rejuvenation of the six identified river stretched every month in the State Level Committee meeting through video conferencing with all DMs.  As per the decision of the 2nd meeting of Central Monitoring Committee held on 19.02.2020, the state of Tripura has nominated the Member Secretary, Tripura State Pollution Control Board as the Nodal Officer for submission of Monthly Progress Report to Concerned Authorities. The Memorandum is annexed as (Annexure–3).

Tripura RRC Page 2

I. Details of Industry and ETP/CETP:  Total number of industries/industrial estates: A total of 179 industries are present within 500 meter of the catchment areas of the Six identified river.  Total existing CETPs : 1 CETP of 500 KLD at Budhjungnagar Industrial Estate, Agartala.

v. Solid waste management

 Total MSW generation (TPD): 337.3 TPD Municipal Solid Wastes are being generated from the Municipal areas of the catchment areas of six identified river stretches.  Existing facilities : A 250 TPD capacity Solid Waste Processing Plant (composting) have already been set up at Devendra Chandra Nagar which is operational. This Plant is also catering the processing of solid waste from nearby 4 smaller urban local bodies, i.e., Bishalgarh Municipal Council, Mohanpur Municipal Council, Municipal Council & Nagar Panchayat. These 4 urban local bodies are located within 10-15 Kms. from the periphery of Agartala city and it is economical for them to transport their solid waste on daily basis to the 250 TPD SWM plant at Agartala rather than to operate and maintain their individual solid waste processing plant.  In addition, door to door waste collection, source segregation and processing etc are being done by other ULBs.

vi. Bio-medical/Hazardous/Plastic waste generation

 Total Bio-medical/Hazardous/Plastic waste generation: The generation of Bio- medical/Hazardous/Plastic waste in the catchment areas of the six identified river stretches are as follows: Type of Waste Waste Generated

Bio medical Waste 0.283 TPD

Hazardous Waste Nil

Plastic Waste 2.5 TPD

 Total no. of hospital and bio-medical waste generation/treatment A total of 11 hospitals are present in the catchment areas of the six identified river stretches.  Total units generating hazardous waste/treatment facility: Nil

Tripura RRC Page 3

Further, Detail Status on Implementation of Action Plan For Restoration of 6 (Six) Identified River Stretches of Tripura in the prescribed format are as follows: DETAIL STATUS ON IMPLEMENTATION OF ACTION PLAN FOR RESTORATION OF 6 (SIX) IDENTIFIED RIVER STRECTHES OF TRIPURA

NAME OF THE RIVER: BURIGAON RIVER

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20 approval. After approval, ULBs in Tripura. it will be submitted to Evaluation of this tender CPCB. is going on. After completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, documents for installation discharge etc.) tender of 15 Faecal Sludge will be floated by UDD Treatment Plants (FSTPs) for each ULBs for execution of in situ bio of 600 KLD capacity for remediation works. 15 ULBs including  The technical Bishalgarh Municipal specifications of Faecal Council are going on and Sludge Treatment Plants will be completed shortly. (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each

Tripura RRC Page 4

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 ULBs for setting up of FSTPs. The work will be completed by next one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation. Commencement 31.03.2022  The ULBs have identified the  Work is in progress. of setting up of drains Bio-remediation work.  As per the State Strategy and STPs and directives of Hon’ble NGT, Connecting all UDD is to adopt bio- the drains and remediation/ phyto- other sources of remediation technology only to reduce pollution. No STP generation of will be proposed to construct sewage to the for liquid waste management. STPs must be ensured 2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned plans including department. completion of setting up of STPs and their commissioning

Tripura RRC Page 5

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the mechanism at compliance. The review action plan. state level. meeting are being Specifying conducted by the Chief accountability of Secretary every months. nodal  In addition, River Authorities not Rejuvenation Committee below the (RRC) has been constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration person attached of the river stretches. The in their office for RRC met every month to this purpose. review the progress on action plan for restoration of the river stretches. The last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation

Tripura RRC Page 6

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Committee (RRC) also holding meeting regularly. 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State river stretches has been including drains Pollution Control completed. contributing to Board.  the industries in the river river pollution stretches have been and action as identified. per NGT order  Direction has been issued on in-situ to defaulting industries treatment. for compliance of the environmental norms.  Drains have been identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022 As the BOD values of the As the BOD values of the & D and river water and river river water and river sewerage stretches are within stretches are within Networks prescribed standard limit, all prescribed standard limit, the ULBs are communicated all the ULBs are for installation of FSTP. communicated for In addition, all the ULBs has installation of FSTP. been directed to adopt in-situ In addition, all the ULBs Bio-remediation and phyto has been directed to

Tripura RRC Page 7

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 remediation of sewage in adopt in-situ Bio- drains. remediation and phyto remediation of sewage in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries small amount of industries where ever required. industries and have the requirement of Though, very small complying installation of ETP. amount of industries status.  CETP: CETP is not have the requirement required in this river of installation of ETP. stretches as the water  Direction has been quality is under issued to the prescribed standard. defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site at transported to Solid Existing Devendra Chandra Nagar, waste processing site Infrastructure, Agartala. at Devendra Chandra Gap analysis, Nagar, Agartala. Proposal along  Initiatives have been with completion taken for setting up of timeline.) tertiary treatment plant. Tender process

Tripura RRC Page 8

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous process).  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity. activity. of disposal of municipal plastic, bio- medical wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs.  Approximately 11.6 TDP solid waste has been - generated under Bishalgarh Municipal Council. All most all the Wards are being engaged with women SHGs for collection and segregation of solid wastes before further disposal into

Tripura RRC Page 9

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Devendra Chandanagar solid waste disposable site. No such gap found between current status and desirable level.

5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at Annexure-2. 5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil Construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste

Tripura RRC Page 10

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 generated from done by the Health Hotels and department as well as ashrams etc. Tripura State Pollution Control Board so that no Bio medical wastes dumped into the river.  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e- Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned

Tripura RRC Page 11

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date.

5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed. Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being

Tripura RRC Page 12

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river Flood Plain Zone has been done in banks has been done (FPZ) collaboration with Forest in collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building.

Tripura RRC Page 13

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be installation. maintained monthly basis after installation. 5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river. 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches. 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis. Awareness programme is going on in every Friday during village tour headed by District Magistrate & Collector of Sipahijala

Tripura RRC Page 14

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 district and covered Nidaya GP, Killamura ADC Village, Taibandal ADC Village, Rangmala ADC Village, Ramcherra ADC Village , Purba Gakulpur GP, Dhanirampur ADC Village till date, which are situated near the river bank. School level awareness has been done through drama, science seminar and quiz competition for mass awareness generation and restoration of the river.

Name of the River: (AMARPUR TO TELKAJLA)

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20

Tripura RRC Page 15

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 approval. After approval, ULBs in Tripura. it will be submitted to Evaluation of this tender CPCB. is going on. After completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, documents for installation discharge etc.) tender of 15 Faecal Sludge will be floated by UDD Treatment Plants (FSTPs) for each ULBs for execution of in situ bio of 600 KLD capacity for remediation works. 15 ULBs are going on and  The technical will be completed shortly. specifications of Faecal Sludge Treatment Plants (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each ULBs for setting up of FSTPs. The work will be completed by next one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation.

Tripura RRC Page 16

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Commencement 31.03.2022  The ULBs have identified the  Work is in progress. of setting up of drains Bio-remediation work.  As per the State Strategy and STPs and directives of Hon’ble NGT, Connecting all UDD is to adopt bio- the drains and remediation/ phyto- other sources of remediation technology only to reduce pollution. No STP generation of will be proposed to construct sewage to the for liquid waste management. STPs must be ensured 2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned department. plans including completion of setting up of STPs and their commissioning 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the mechanism at compliance. The review action plan. state level. meeting are being Specifying conducted by the Chief accountability of Secretary every months. nodal  In addition, River Authorities not Rejuvenation Committee below the (RRC) has been constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration person attached of the river stretches. The in their office for RRC met every month to this purpose. review the progress on action plan for restoration of the river stretches. The

Tripura RRC Page 17

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation Committee (RRC) also holding meeting regularly. 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State river stretches has been including drains Pollution Control completed. contributing to Board.  All industries have been

Tripura RRC Page 18

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 river pollution identified. and action as  Direction has been issued per NGT order to defaulting industries on in-situ for compliance of the environmental norms. treatment.  Drains have been identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022  As the BOD values of the  As the BOD values of & D and river water and river the river water and sewerage stretches are within river stretches are Networks prescribed standard limit, within prescribed all the ULBs are standard limit, all the communicated for ULBs are installation of FSTP. communicated for  In addition, all the ULBs installation of FSTP. has been directed to adopt  In addition, all the in-situ Bio-remediation ULBs has been directed and phyto remediation of to adopt in-situ Bio- sewage in drains. remediation and phyto remediation of sewage in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries small amount of industries where ever required. industries and have the requirement of Though, very small complying installation of ETP. amount of industries status.  CETP: CETP is not have the requirement required for this river of installation of ETP.

Tripura RRC Page 19

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 stretches as the water  Direction has been quality is under issued to the prescribed standard. defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site. transported to Solid Existing waste processing site. Infrastructure,  Initiatives have been Gap analysis, taken for setting up of Proposal along tertiary treatment with completion plant. Tender process timeline.) is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous process).  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity.

Tripura RRC Page 20

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 activity. of disposal of municipal plastic, bio- medical - wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs. 5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at Annexure-2.

Tripura RRC Page 21

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste done by the Health generated from department as well as Hotels and Tripura State Pollution ashrams etc. Control Board so that no Bio medical wastes dumped into the river.  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e-

Tripura RRC Page 22

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date. 5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed. Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have

Tripura RRC Page 23

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river Flood Plain Zone has been done in banks has been done (FPZ) collaboration with Forest in collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost

Tripura RRC Page 24

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building. 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be installation. maintained monthly basis after installation. 5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river. 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches.

Tripura RRC Page 25

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis.

Name of River : HAORA RIVER (AGARTALA To CHAMPAKNAGAR STRETCH)

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20 approval. After approval, ULBs in Tripura. it will be submitted to Evaluation of this tender CPCB. is going on. After completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, documents for installation discharge etc.) tender of 15 Faecal Sludge will be floated by UDD for each ULBs for

Tripura RRC Page 26

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Treatment Plants (FSTPs) execution of in situ bio of 600 KLD capacity for remediation works. 15 ULBs are going on and  The technical specifications of Faecal will be completed shortly. Sludge Treatment Plants (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each ULBs for setting up of FSTPs. The work will be completed by next one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation. Commencement 31.03.2022  One 8 MLD STP is being  Civil construction has of setting up of utilized at 2 MLD capacity. been started for  Work Order has been issued STPs and for another 8 MLD STP at setting up of 8 MLD Connecting all Akaura ICP. STP at Akaura ICP. the drains and  The ULBs have identified all  ASCL will flout tender other sources of drains Bio-remediation work. for Bio remediation of  As per the State Strategy and generation of directives of Hon’ble NGT, 5 drains as pilot sewage to the UDD is to adopt bio- project. STPs must be remediation/ phyto- ensured remediation technology only to reduce pollution. No STP

Tripura RRC Page 27

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 will be proposed to construct for liquid waste management.

2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned plans including department. completion of setting up of STPs and their commissioning 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the mechanism at compliance. The review action plan. state level. meeting are being Specifying conducted by the Chief accountability of Secretary every months. nodal  In addition, River Authorities not Rejuvenation Committee below the (RRC) has been constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration person attached of the river stretches. The in their office for RRC met every month to this purpose. review the progress on action plan for restoration of the river stretches. The last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for

Tripura RRC Page 28

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation Committee (RRC) also holding meeting regularly. 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State including drains river stretches has been Pollution Control completed. contributing to Board.  The industries have been river pollution identified. and action as  Direction has been issued per NGT order to defaulting industries on in-situ for compliance of the treatment. environmental norms.  18 ETPs have been

Tripura RRC Page 29

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 installed by the industries.  1 CETP along with OCEMs have been installed and it is functional.  Drains have been identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022  As the BOD values of the  As the BOD values of the & D and river water and river river water and river sewerage stretches are within stretches are within Networks prescribed standard limit, prescribed standard all the ULBs are limit, all the ULBs are communicated for communicated for installation of FSTP. installation of FSTP.  In addition, all the ULBs  In addition, all the ULBs has been directed to adopt has been directed to in-situ Bio-remediation adopt in-situ Bio- and phyto remediation of remediation and phyto sewage in drains. remediation of sewage in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries small amount of industries where ever required. industries and have the requirement of Though, very small complying installation of ETP. 18 amount of industries status. ETPs have been installed have the requirement by the industries. of installation of ETP.  CETP: 1 CETP along with 18 ETPs have been OCEMs have been installed by the

Tripura RRC Page 30

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 installed at industries. Budhjungnagar Industrial  CETP: 1 CETP along Estate and it is functional. with OCEMs have been  The waste water samples installed at from ETP and CETP are Budhjungnagar being collected on Industrial Estate and it monthly basis and the is functional. status report have been  The waste water submitted to CPCB. samples from ETP and  Direction has been issued CETP are being to the defaulting units for collected on monthly necessary compliance basis and the status report have been submitted to CPCB.  Direction has been issued to the defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site at transported to Solid Existing Devendra Chandra Nagar, waste processing site Infrastructure, Agartala. at Devendra Chandra Gap analysis, Nagar, Agartala. Proposal along  Initiatives have been with completion taken for setting up of timeline.) tertiary treatment plant. Tender process is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous process).

Tripura RRC Page 31

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity. activity. of disposal of municipal plastic, bio- medical wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs.  Approximately 250 TDP solid waste has been - generated under Agartala Municipal Corporation. All most all the Wards are being engaged with women SHGs for collection and segregation of solid wastes before further disposal into Devendra Chandanagar solid waste disposable site. No such gap found between current status and desirable level.

Tripura RRC Page 32

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at Annexure-2. 5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste done by the Health generated from department as well as Hotels and Tripura State Pollution ashrams etc. Control Board so that no Bio medical wastes dumped into the river.

Tripura RRC Page 33

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e- Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date.

Tripura RRC Page 34

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed. Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river Flood Plain Zone has been done in banks has been done

Tripura RRC Page 35

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 (FPZ) collaboration with Forest in collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building. 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be

Tripura RRC Page 36

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 installation. maintained monthly basis after installation.

5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river. 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches. 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis.

Tripura RRC Page 37

Name of River: THE JURI RIVER (ALONG DHARMANAGAR)

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20 approval. After approval, ULBs in Tripura. it will be submitted to Evaluation of this tender CPCB. is going on. After completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, documents for installation discharge etc.) tender of 15 Faecal Sludge will be floated by UDD Treatment Plants (FSTPs) for each ULBs for execution of in situ bio of 600 KLD capacity for remediation works. 15 ULBs are going on and  The technical will be completed shortly. specifications of Faecal Sludge Treatment Plants (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each ULBs for setting up of FSTPs. The work will be completed by next

Tripura RRC Page 38

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation. Commencement 31.03.2022  The ULBs have identified the  Work is in progress. of setting up of drains Bio-remediation work.  As per the State Strategy and STPs and directives of Hon’ble NGT, Connecting all UDD is to adopt bio- the drains and remediation/ phyto- other sources of remediation technology only to reduce pollution. No STP generation of will be proposed to construct sewage to the for liquid waste management. STPs must be ensured 2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned department. plans including completion of setting up of STPs and their commissioning 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the

Tripura RRC Page 39

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 mechanism at compliance. The review action plan. state level. meeting are being Specifying conducted by the Chief accountability of Secretary every months.  In addition, River nodal Rejuvenation Committee Authorities not (RRC) has been below the constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration of the river stretches. The person attached RRC met every month to in their office for review the progress on this purpose. action plan for restoration of the river stretches. The last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation Committee (RRC) also holding meeting regularly.

Tripura RRC Page 40

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State river stretches has been including drains Pollution Control completed. contributing to Board.  All industries have been river pollution identified. and action as  Direction has been issued per NGT order to defaulting industries on in-situ for compliance of the treatment. environmental norms.  Drains have been identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022  As the BOD values of the  As the BOD values of & D and river water and river the river water and sewerage stretches are within river stretches are Networks prescribed standard limit, within prescribed all the ULBs are standard limit, all the communicated for ULBs are installation of FSTP. communicated for  In addition, all the ULBs installation of FSTP. has been directed to adopt  In addition, all the in-situ Bio-remediation ULBs has been directed and phyto remediation of to adopt in-situ Bio- sewage in drains. remediation and phyto remediation of sewage

Tripura RRC Page 41

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries small amount of industries where ever required. industries and have the requirement of Though, very small complying installation of ETP. amount of industries status.  CETP: CETP is not have the requirement required for this river of installation of ETP. stretches as the water  Direction has been quality is under issued to the prescribed standard. defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site. transported to Solid Existing waste processing site. Infrastructure,  Initiatives have been Gap analysis, taken for setting up of Proposal along tertiary treatment with completion plant. Tender process timeline.) is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous

Tripura RRC Page 42

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 process).  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity. activity. of disposal of municipal plastic, bio- medical - wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs. 5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in

Tripura RRC Page 43

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 respect of BOD values for the six identified polluted river stretches are at Annexure-2.

5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste done by the Health generated from department as well as Hotels and Tripura State Pollution ashrams etc. Control Board so that no Bio medical wastes dumped into the river.  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been

Tripura RRC Page 44

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e- Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date. 5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed.

Tripura RRC Page 45

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river banks Flood Plain Zone has been done in has been done in (FPZ) collaboration with Forest collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of

Tripura RRC Page 46

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building. 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be installation. maintained monthly basis after installation. 5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river.

Tripura RRC Page 47

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches. 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis.

Name of River: THE KHOWAI RIVER (ALONG TELIAMURA)

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for

Tripura RRC Page 48

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20 ULBs in Tripura. approval. After approval, Evaluation of this tender it will be submitted to is going on. After CPCB. completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, discharge etc.) tender documents for installation will be floated by UDD of 15 Faecal Sludge for each ULBs for Treatment Plants (FSTPs) execution of in situ bio of 600 KLD capacity for remediation works. 15 ULBs are going on and  The technical will be completed shortly. specifications of Faecal Sludge Treatment Plants (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each ULBs for setting up of FSTPs. The work will be completed by next one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation.

Tripura RRC Page 49

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Commencement 31.03.2022  The ULBs have identified the  Work is in progress. of setting up of drains Bio-remediation work.  As per the State Strategy and STPs and directives of Hon’ble NGT, Connecting all UDD is to adopt bio- the drains and remediation/ phyto- other sources of remediation technology only to reduce pollution. No STP generation of will be proposed to construct sewage to the for liquid waste management. STPs must be ensured 2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned department. plans including completion of setting up of STPs and their commissioning 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the mechanism at compliance. The review action plan. state level. meeting is being Specifying conducted by the Chief accountability of Secretary every month. nodal  In addition, River Authorities not Rejuvenation Committee below the (RRC) has been constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration person attached of the river stretches. The in their office for RRC met every month to this purpose. review the progress on action plan for restoration of the river stretches. The

Tripura RRC Page 50

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation Committee (RRC) also holding meeting regularly. 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State river stretches has been including drains Pollution Control completed. contributing to Board.  All industries have been

Tripura RRC Page 51

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 river pollution identified. and action as  Direction has been issued per NGT order to defaulting industries on in-situ for compliance of the environmental norms. treatment.  Drains have been identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022  As the BOD values of the  As the BOD values of & D and river water and river the river water and sewerage stretches are within river stretches are Networks prescribed standard limit, within prescribed all the ULBs are standard limit, all the communicated for ULBs are installation of FSTP. communicated for  In addition, all the ULBs installation of FSTP. has been directed to adopt  In addition, all the in-situ Bio-remediation ULBs has been directed and phyto remediation of to adopt in-situ Bio- sewage in drains. remediation and phyto remediation of sewage in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries small amount of industries where ever required. industries and have the requirement of Though, very small complying installation of ETP. amount of industries status.  CETP: CETP is not have the requirement required for this river of installation of ETP.

Tripura RRC Page 52

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 stretches as the water  Direction has been quality is under issued to the prescribed standard. defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site. transported to Solid Existing waste processing site. Infrastructure,  Initiatives have been Gap analysis, taken for setting up of Proposal along tertiary treatment with completion plant. Tender process timeline.) is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous process).  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity.

Tripura RRC Page 53

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 activity. of disposal of municipal plastic, bio- medical - wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs. 5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at Annexure-2.

Tripura RRC Page 54

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste done by the Health generated from department as well as Hotels and Tripura State Pollution ashrams etc. Control Board so that no Bio medical wastes dumped into the river.  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e-

Tripura RRC Page 55

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date. 5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed. Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have

Tripura RRC Page 56

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river Flood Plain Zone has been done in banks has been done (FPZ) collaboration with Forest in collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost

Tripura RRC Page 57

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building. 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be installation. maintained monthly basis after installation. 5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river. 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches.

Tripura RRC Page 58

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis.

Name of River : THE MANU RIVER (ALONG KAILASAHAR)

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 1 Ensure 100 % 31.03.2022  All the ULBs have been  All the ULBs have treatment of directed to adopt in-situ been directed to adopt sewage at least Bio-remediation and in-situ Bio-remediation and phyto remediation in situ phyto remediation of of sewage in drains. remediation sewage in drains. All the  All the major drains major drains have been have been identified. identified. (Annexure-4).  Tender has been invited  A comprehensive action for engagement of survey plan is prepared for 100% consultants to prepare baseline information for sewage Management in pollution abatement of the state and submitted to storm drains through in concerned Authority for situ bio remediation in 20 approval. After approval, ULBs in Tripura. it will be submitted to Evaluation of this tender CPCB. is going on. After completion of base line  Finalization of technical study of each drains specifications/tender (length, widths, flow, documents for installation discharge etc.) tender

Tripura RRC Page 59

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 of 15 Faecal Sludge will be floated by UDD Treatment Plants (FSTPs) for each ULBs for of 600 KLD capacity for execution of in situ bio remediation works. 15 ULBs are going on and  The technical will be completed shortly. specifications of Faecal Sludge Treatment Plants (FSTPs) of 600 KLD capacity has been finalized and uploaded in the website of UDD. The identification of the land is going on by each ULBs for setting up of FSTPs. The work will be completed by next one month. After identification of land by ULBs the tender will be floated for its execution.  A comprehensive action plan is prepared for 100% sewage Management for the state and submitted to concerned Authority for approval. After approval, it will be submitted to CPCB and all concerned for effective implementation. Commencement 31.03.2022  The ULBs have identified the  Work is in progress. of setting up of drains Bio-remediation work.  As per the State Strategy and STPs and directives of Hon’ble NGT, Connecting all UDD is to adopt bio- the drains and remediation/ phyto- other sources of remediation technology only to reduce pollution. No STP generation of will be proposed to construct sewage to the for liquid waste management. STPs must be

Tripura RRC Page 60

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 ensured

2 Time line for 31.03.2022  All works will be  Necessary efforts are completing all completed by 31.03.2022. being taken by the steps of action concerned department. plans including completion of setting up of STPs and their commissioning 3 Chief secretaries Continuous  State level committee has  The committee’s are may set up activity been notified under the monitoring the overall appropriate chairmanship of Chief progress of Secretary to Monitor the monitoring implementation of the overall progress of the mechanism at compliance. The review action plan. state level. meeting are being Specifying conducted by the Chief accountability of Secretary every months. nodal  In addition, River Authorities not Rejuvenation Committee below the (RRC) has been constituted to look after secretary level. the progress of the Chief may have implementation of the an accountable action plan for restoration person attached of the river stretches. The in their office for RRC met every month to this purpose. review the progress on action plan for restoration of the river stretches. The last meeting was held on 25.08.2020.  A District level committee has been constituted which is also known as District Task Force for

Tripura RRC Page 61

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 overall monitoring of the implementation of the action plan. The DMs are conducting meeting on regular basis. Monitoring at Fortnightly  State level committee  Continuous process. state level must commencing meeting under the take place 21.12.2019 Chairmanship of the Chief Secretary have been conducted monthly to monitor the overall progress at the state level and River Rejuvenation Committee (RRC) also holding meeting regularly. 4 Progress report Monthly  Monthly progress report  MPR are being sent to may be (Preferably (MPR) are being sent to NMCG with a copy to furnished by the before 20th NMCG with a copy to CPCB on regular basis. states/UTs to of every CPCB every month. The last MPR have been sent month)  Secretary, to NMCG on 27.08.2020. Ministry of Jal Shakti  Member Secretary, CPCB 5.1 Identification of 31.03.2021  Identification of the  Regular monitoring polluting industries located in and are being conducted sources around 500 meters of the by Tripura State including drains river stretches has been Pollution Control completed. contributing to Board.  All industries have been river pollution identified. and action as  Direction has been issued per NGT order to defaulting industries on in-situ for compliance of the treatment. environmental norms.  Drains have been

Tripura RRC Page 62

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 identified. Wire mesh has been installed in all major drains. 5.2 Status of STPs, I 31.03.2022  As the BOD values of the  As the BOD values of & D and river water and river the river water and sewerage stretches are within river stretches are Networks prescribed standard limit, within prescribed all the ULBs are standard limit, all the communicated for ULBs are installation of FSTP. communicated for  In addition, all the ULBs installation of FSTP. has been directed to adopt  In addition, all the in-situ Bio-remediation ULBs has been directed and phyto remediation of to adopt in-situ Bio- sewage in drains. remediation and phyto remediation of sewage in drains. 5.3 Status of CETPs 31.03.2022  ETP: Direction has been  ETP: Direction has issued by the Tripura been issued by the Details of State Pollution Control Tripura State Pollution existing CETP Board to all industrial Control Board to all units situated at the industrial units and ETP catchment areas of the situated at the infrastructure, river for installation of catchment areas of the gap analysis ETP. ETP has been river for installation of proposed with constructed in almost all ETP. ETP has been completion the industries where ever constructed in almost timeline, No. of required. Though, very all the industries industries and small amount of industries where ever required. have the requirement of Though, very small complying installation of ETP. amount of industries status.  CETP: CETP is not have the requirement required for this river of installation of ETP. stretches as the water  Direction has been quality is under issued to the prescribed standard. defaulting units for necessary compliance 5.4 Status of Solid 31.03.2020  Door to Door Collection  Door to Door Waste has been started Collection has been

Tripura RRC Page 63

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 Management involving women SHGs . started involving and details of The collected wastes after women SHGs . The processing source segregation are collected wastes after facilities transported to Solid source segregation are (Details of waste processing site. transported to Solid Existing waste processing site. Infrastructure,  Initiatives have been Gap analysis, taken for setting up of Proposal along tertiary treatment with completion plant. Tender process timeline.) is going on. 31.03.2021  Strengthening of Solid  Strengthening of Solid Waste Management Waste Management Disposal Site is being Disposal Site is being done. done. (Continuous process).  Initiatives have been taken for setting up of tertiary treatment plant. Tender process is going on. Continuous  Sign Board for prohibition  Continuous activity. activity. of disposal of municipal plastic, bio- medical - wastes and other wastes has been displayed at different locations within municipality area. Fitting fixing of wire mesh to protect plastic flow work at four feeder point is going on. Source segregation of different types of wastes is carried out involving women SHGs.

Tripura RRC Page 64

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.5 Latest Water Continuous  Tripura State Pollution  Tripura State Pollution Quality of activity Control Board (TSPCB) is Control Board (TSPCB) Polluted river, conducting water quality is conducting water its tributaries, monitoring on monthly quality monitoring on drains with flow basis under National monthly basis under details and Water Quality Monitoring National Water Quality ground water Programme (NWMP) of Monitoring quality in the Central Pollution Control Programme (NWMP) catchment of Board for the following of Central Pollution polluted river. six identified polluted Control Board for the river and river stretches following six identified in the State. polluted river and river stretches in the State. The month wise latest analytical report in respect of BOD values for the six identified polluted river stretches are at Annexure-2. 5.6 Preventing 31.03.2021  Dumping of solid wastes  Continuous activity. Dumping of is strictly prohibited in  Civil construction is waste and river and river stretches going on for setting up scientific waste by using bylaws. of CBWTF at Agartala. management Trainings to all healthcare including Bio workers and others, Medical waste involved in handling of and bio-medical waste have decentralizing been provided at the time waste of induction. Strict processing monitoring are being including waste done by the Health generated from department as well as Hotels and Tripura State Pollution ashrams etc. Control Board so that no Bio medical wastes dumped into the river.

Tripura RRC Page 65

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020  Amongst the Public Health Facilities, 03 state level hospitals namely GBP Hospital, IGM Hospital & Cancer hospital have their own incinerator. Other Public Health Facilities are managing the biomedical waste through disinfection, deep burial & sharp pits.  However, one CBWTF Operator has been selected by Health & Family Welfare Department, Govt. of Tripura through open tendering through e- Procurement for the whole State of Tripura to cater to all 126 Public Health Facilities having estimated 4319 beds. Environment Clerance (EC), CTE & BMW Authorisation Certificate has already been issued in favour of the said project. The concerned agency has been instructed to expedite the process for infrastructure development as well as setting up of the facility at an early date.

Tripura RRC Page 66

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 5.7 Ground Water Continuous  Assessment of Ground  Assessment of Ground regulation activity water in all the identified water in all the locations has been done identified locations has by the Tripura State been done by the Pollution Control Board Tripura State Pollution on a regular basis. Control Board on a  So far, there is no regular basis. contamination observed.  So far, there is no contamination observed. Continuous  Direction has been issued  Direction has been activity. to obtain the NOC from issued to obtain the Central Ground Water NOC from Central Authority to all the Ground Water Industrial units located in Authority to all the the catchment areas of said Industrial units located River. in the catchment areas  Many of the units have also of this River. submitted the declarations  Many of the units have along with the NOC from also submitted the Central Ground Water declarations along with Authority. the NOC from Central Ground Water Authority. 5.8 Adopting good Continuous  Generation of mass  Generation of mass irrigation activity awareness to conserve awareness to conserve practice water and also for good water and also for irrigation practices is good irrigation being carried out by the practices is being farmers in the catchment carried out by the areas of the River. farmers in the catchment areas of the River. 5.9 Protection and Continuous  Bamboo Plantation on  Bamboo Plantation on Management of activity sides of the river banks sides of the river Flood Plain Zone has been done in banks has been done

Tripura RRC Page 67

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 (FPZ) collaboration with Forest in collaboration with Department, Tripura. Forest Department, Target achieved 100%. Tripura. Target  Check dam has been achieved 100%. installed to maintain the E-  Check dam has been flow of the river. installed to maintain the E-flow of the river.  The status report of river bank plantation and installation of check dam has been annexed as (Annexure-5).  Regular monitoring is  Regular monitoring is going on to check illegal going on to check encroachment. illegal encroachment. 5.10 Rain Water Continuous  All the industries using in  Rain water harvesting Harvesting activity the catchment areas plant has been responsible for using constructed by almost ground water for all the concerned industrial purpose is units. directed to construct rain  A comprehensive Rain water harvesting plant and water harvesting plan the compliance has been has submitted to CPCB. ensured.  In the new Building Rules, the roof top Rain Water Harvesting system have been included for all new building. 5.11 Environmental 31.03.2022  Tender has been invited  Tender has been Flow (E-Flow) for installation of digital e- invited for installation flow meter to monitor the of digital e-flow meter minimum discharge to monitor the during lean period and minimum discharge records to be maintained during lean period monthly basis after and records to be

Tripura RRC Page 68

Sl. Activity to be Timeline Submission of Progress by the State/UTs- Compliance No. monitored Status As on July,2020 As on August, 2020 installation. maintained monthly basis after installation.

5.12 Plantation on 31.03.2020  Extensive river side  Extensive river side both sides of the plantation has been plantation has been river carried out on both sides carried out on both of the river. sides of the river. 5.13 Setting up of Bio 31.03.2022  Extensive river side  Extensive river side diversity parks plantation has been plantation has been on flood plains carried out on both sides carried out on both by removing of the river. sides of the river. encroachments.  Proper monitoring is being  Proper monitoring is done by Concerned being done by District administration to Concerned District prohibit any kind of illegal administration to encroachment in the river prohibit any kind of stretches. illegal encroachment in the river stretches. 5.14 Awareness Continuous  Extensive awareness  Continuous activity. Generation activity activities are going on involving Eco Club Schools, NGOs and representatives of Urban Local Bodies on continuous basis.

Tripura RRC Page 69