SERBIAN BRAND, WORLD QUALITY! CORPORATE OVERVIEW CONTENT

0.0 * Content - Energoprojekt INTRODUCTION 11.. SUSTAINABLE DEVELOPMENT, GROWTH AND PROFITABILITY

A BRIEF HISTORY 22.. ENERGOPROJEKT WAS FOUNDED IN , IN 1951 AS A STATE OWNED COMPANY AIMED TO PROVIDE DESIGNING AND CONSULTING SERVICES WITHIN POWER GENERATION, WATER MANAGEMENT AND IRRIGATION SECTOR ORGANISATION STRUCTURE SUBSIDIARIES IN SERBIA, FOREIGN COMPANIES, 33.. REPRESENTATIVE AND BRANCH OFFICES

MAIN BUSINESS ACTIVITIES 44.. WIDE RANGE OF ACTIVITIES ORGANIZED TROUGH SPECIALIZED SUBSIDIARIES WITHIN THE GROUP

MARKETS 55.. CURRENTLY ACTIVE IN MORE THAN 30 COUNTRIES ACROSS FOUR CONTINENTS …

KEY REFERENCES 66.. HYDRO POWER PLANTS, THERMAL POWER PLANTS, INDUSTRIAL PLANTS, ARCHITECTURE, INFRASTRUCTURE

KEY FINANCIAL DATA 77.. PERMANENT GROWTH …

OWNERSHIP STRUCTURE 88.. ENERGOPROJEKT IS A PUBLIC LIMITED COMPANY

* Content - Energoprojekt 0.1 1. INTRODUCTION

Since 1951 when founded Through a period of over 67 years it has developed a large spectrum of activities, as a consulting company, always off ering the highest quality and Energoprojekt has grown standards, in the following fi elds: into a complex business energy generation, transmission and distribution, urban planning, architecture, system, integrating 9 inter- building engineering and construction, nationally active compa- infrastructure, water management and environmental protection, industry, nies with its headquarters information technologies and insurance. Serbia as well as 22 foreign companies, representative and branch offi ces abroad.

* In the course of its successful development into one of the leading world-wide companies in the fi elds of consulting and contracting activities, Energoprojekt has been engaged in implementation of various projects and facilities in over 70 countries so far, all over the world.

1. INTRODUCTION

The name of Energoprojekt can be found on the lists of Top International Design Firms and International Con- tractors published every year by the renowned American magazine “Engineering News Record”.

Projects successfully completed by Energoprojekt are the best reference for acquiring new jobs. As a reliable, effi cient and highly committed partner with wide international experience easily adapted to various market requirements, Energoprojekt successfully cooperates with both domestic and foreign clients in realization of important investment projects. ...foreword

1.0 * Introduction - Sixty-sixth anniversary INTRODUCTION 67 years of 1. SUSTAINABLE DEVELOPMENT, GROWTH AND PROFITABILITY excellence

Energoprojekt is committed to attaining success and benefi t for our customers, employees, shareholders and the communities we serve.

‘Implementation through expertise’ is the Energoprojekt’s mantra and through this policy the fi rm achieves the highest levels of confi dence and satisfaction of its clients, together with recommendations from them, both domestically and world-wide.

Aiming to contribute positively to the world’s business environment, Energoprojekt will:

Ensure sustainable development, growth and profi tability Strengthen the company’s reputation on all markets, by anticipating and fulfi lling the requirements of its clients Uphold its integrity in all business activities Conduct its business relations in the spirit of cooperation and partnership Assure the realization of business endeavors in accordance with the planned performances, and Develop human resources and upgrade the work environment.

This decidedly constructive business contribution will enable the fulfi llment of our mission with a high degree of suc- cess - in accordance with Energoprojekt’s established tradition. The vision of Energoprojekt is to be one of the foremost international leaders in the fi elds of engineering, construction and project management, enabling investors, partners and clients to recognize us as an integral part of their own success, thus satisfying clients, employees and shareholders alike, and sharing in the responsibility towards society as a whole.

Since 2001, Energoprojekt stocks has been traded on . As of July 19, 2007, Energoprojekt was listed on the A List of Belgrade Stock Exchange.

* Introduction - Our core values 1.1 2. A BRIEF HISTORY

Energoprojekt was found- Its structured expansion has resulted in the formation, under ENERGOPROJEKT GROUP, ed in Belgrade, the capi- of nine diversifi ed, internationally active tal of former SFRY, as state and sophisticated companies covering the full range of contracting and consulting owned company aimed engineering activities. to provide designing and ENERGOPROJEKT GROUP is presently consulting services within operating in more then 30 countries around hydro and thermal power the world, with an average annual turnover of around EUR 300 million and contracts generation and irrigation exceeding EUR 200 million. systems. With 67 years of operation, ENERGOPROJEKT GROUP has developed into an organization Over our long and suc- competent to undertake large and complex projects, ranging from studies cessful history, Energo- and investigations, through design and projekt extended its supervision to construction and full scale fi elds of activity to in- implementation. clude industrial plants, Today the ENERGOPROJEKT GROUP is the largest Serbian contractor for water management sys- complex projects including construction tems, public and residen- management, full engineering and turn-key tial complexes, telecom- projects. munication systems and data processing systems.

… a brief history

2.0 * … a brief history A BRIEF HISTORY 67 years of 2 . ENERGOPROJEKT BECAME A WORLD-RENOWN COMPANY excellence

The following is a brief summary of relevant projects designed or developed by the ENERGOPROJEKT GROUP of companies during the last 67 years in more than 70 countries all over the world:

• 50 hydro power plants of various types and capacities; • 34 thermal power plants (oil, gas or lignite fi red) of various types and capacities (with a unit capacity up to 600 MW); • 15 industrial power plants; • 20 heating plants and 34 district heating systems; • Over 200 power transformation stations (voltage levels up to 400 kV); • Several thousand kilometers of overhead transmission and cable lines (voltage levels up to 400 kV); • Over 50 projects of rural electrifi cation; • 50 water processing plants; • 40 complex land improvement systems; • Over 30 water management and river fl ood control projects; • About 50 municipal and industrial water supply and sewage systems; • Multiple infrastructure projects (underground facilities, tunnels, highways, regional roads, runways, railroads and metro stations); • Over 1,300 complex projects in diff erent industrial fi elds (oil and coal processing, ferrous and non-ferrous metal- lurgy, metalwork’s, chemical and pharmaceutical industry, building materials, textile and leather, wood and paper, food etc.); • 100 public buildings; • 10 conference centers; • 1,000,000 m2 commercial premises, over 750,000 m2 residential buildings, great number of hospitals, health centres, schools, administrative buildings, tourist and sport facilities; Heating, cooling and air-conditioning installations for a/m projects; Interior design and furnishing for a/m projects; Information systems and technologies for a/m projects.

The ENERGOPROJEKT GROUP workforce of 2,100 represents its basic creative force. The renowned professional- ism of its 800 fully qualifi ed, skilled and experienced engineers and other highly specialized experts, enable the ENERGOPROJEKT GROUP to retain its position as one of the most prominent and trusted groups around the world.

* … a brief history 2.1 ORGANIZATION STRUCTURE 3 . ENERGOPROJEKT GROUP - ORGANIZATION STRUCTURE

ENERGOPROJEKT GROUP

ENERGOPROJEKT HOLDING

Subsidiaries in which Companies in which COMPANIES, REPRESENTATIVE & Energoprojekt Holding Companies from BRANCH OFFICES IN THE WORLD has majority ownership Energoprojekt Group have signifi cant • ENCOM GmbH Consulting, Engineering & ownership Trading • I.N.E.C. ENGINEERING COMPANY LIMITED Energoprojekt Hidroinženjering ENERGO-PET • ENERGOPROJEKT D.O.O. HERCEG NOVI Montenegro Energoprojekt • ENERGOPROJEKT ENERGODATA MONTENEGRO D.O.O. PODGORICA Urbanizam i arhitektura ENERGOPLAST Montenegro • D.O.O. ENERGOPROJEKT OPREMA CRNA GORA PODGORICA Energoprojekt Montenegro Entel • OOO EPO BELGRADE ENJUB Belarus • ENERGO KAZ D.O.O. Energoprojekt • ENERGOPROJEKT RUS D.O.O. Industrija Russia Fima SEE Activist • ENHISA S.A. Peru Energoprojekt • ENLISA S.A. Visokogradnja Peru • Energoprojekt ENTEL LLC Energoprojekt • Energoprojekt Entel LTD (Offi ce) Niskogradnja • Energo Consult LLC Energoprojekt • ENERGOPROJEKT ENTEL Oprema Bahrein • ENERGO () LIMITED Nigeria • ENGINEERING AND CONTRACTING Energoprojekt COMPANY LIMITED Energodata Zambia • ENERGOPROJEKT ZAMBIJA LTD Zambia Energoprojekt • ENERGO () COMPANY LIMITED Sunnyville Uganda • ENERGOPROJEKT HOLDING GUINEE S.A. Energoprojekt • ENERGO (PRIVATE) LIMITED Park 11 • ENERGOPROJEKT LIMITED Ghana • DOM 12 S.A.L. Lebanon

3.0 * Charts - Organization structure ORGANIZATION STRUCTURE 67 years of 3 . ENERGOPROJEKT HOLDING - ORGANIZATION STRUCTURE excellence

SHAREHOLDERS ASSEMBLY

SUPERVISORY BOARD AUDITING COMMISSION SECRETARY Energoprojekt Holding plc. INNER SUPERVISION

ADVISORS TO CEO CEO IMS COORDINATION BODY Executive Board of EP HOLDING

DIRECTORS’ EXECUTIVE BOARD OF EP GROUP COLEGIUM CEO, ED of EP Holding plc. CEO and Directors and Directors of Subsidiaries of Subsidiaries

CHIEF CHIEF CHIEF REGIONS FINANCIAL LEGAL OPERATING Subsidiaries OFFICER OFFICER OFFICER and Affiliates Abroad

Line of management Line of communication

* Charts - Organization structure 3.1 4. Main business activities

Energoprojekt developed it’s As a reliable, effi cient and creative partner, Energoprojekt combines an business activities simultane- extensive understanding of specifi c ously with the development of technologies and local conditions with international operational basic activities which include: experience. This gives a solid base for a studies, analyses, research comprehensive set of consultancy and and development, consulting engineering services to be provided to our clients. and engineering, designing various projects, executing all types of works, equipping and erecting facilities, start- ing up facilities and complete systems, including complete “turn-key” services.

**

…business activities

4.0 * Main business activities MAIN BUSINESS ACTIVITIES 67 years of 4. ENERGOPROJEKT GROUP MAIN BUSINESS ACTIVITIES ARE AS FOLLOW: excellence

Name Services Field of Activity

Subsidiaries: 4 design companies (Hidroinzenjering, Corporate legal, fi nance, develop- Energoprojekt Urbanizam i arhitektura, Entel and Industrija) 3 construction ment, marketing and internal auditing Holding companies (Visokogradnja, Niskogradnja and Oprema), services. Energodata, Sunnyville and Park 11

Energy: hydropower generation systems, facilities and plants. Field investigation works, design, Energoprojekt Water management and environmental protection: wa- consulting, engineering, development Hidroinženjering ter management and irrigation systems, water production and project management and processing plants, water supply systems and sewage systems

Energoprojekt Design, consulting, engineering, Buildings design: public, administrative and commercial Urbanizam i project development and project buildings, conference centers, hospitals and health centers, arhitektura management tourist and sport centers and facilities, residential buildings

Power: Thermal power generation, power generation from Design, consulting, strategic planning, renewable energy sources, power transmission and distri- Energoprojekt engineering, project development bution, telecommunication facilities and systems Entel and project management Water: Water production and processing, water transmis- sion and distribution

Industry: industrial plants and facilities (chemical, petro- Design, consulting and engineering, Energoprojekt chemical, pharmaceutical, tobacco, wood, food etc.), indus- project development and project Industrija trial power plants, industrial and thermal technologies, gas management transport and handling

Building engineering and construction: buildings (ad- Engineering, construction, procure- ministrative, commercial and residential buildings, business Energoprojekt ment, delivery, erection of equipment and conference centers, hospitals and health centers, tourist Visokogradnja and installations, commissioning and sports centers, industrial, thermal-energy and special purpose facilities)

Energy: hydropower structures and plants Infrastructure and water management: dams, aqueducts, Civil engineering construction works, water tunnels, irrigation systems, water supply and sewage Energoprojekt engineering, procurement and erec- systems, highways and roads, railroads, bridges, tunnels, un- Niskogradnja tion of equipment, commissioning dergorund works, railroad and subway stations, communal infrastructure, industrial and hydro-mechanical equipment and plants Power: thermal power facilities and plants, transmission and distribution of electricity, hydropower plants Engineering, construction, equipment Water - environmental protection: potable and waste Energoprojekt and plant procurement and installa- water processing, water and sewage systems, Oprema tion, commissioning, project manage- Industry: industrial facilities and plants, ment MEP instalations and control systems for various types of facilities

Development, design, engineering, Information technologies: multidisciplinary information Energoprojekt implementation, commissioning and systems, software and hardware solutions Energodata maintenance Graphic engineering, video production

* Main business activities 4.1 5. MARKETS Currently, Energoprojekt is present and active in more than 30 countries across four continents. By generated revenues, apart from the local market, the most important markets are African countries (Nigeria, Uganda, , Ghana, Ethiopia, Zambia, Rwanda), Kazakhstan, Russia and Belarus, followed closely by countries (Qatar, UAE, Oman, ) and (Peru).

RUSSIA UZBEKISTAN KAZAKHSTAN

BELARUS

ICELAND

ENGLAND IRELAND

GERMANY

MONTENEGRO

CYPRUS

ALGERIA

LIBYA BAHRAIN GUINEA OMAN GHANA NIGERIA ABU DHABI QATAR IRAN JORDAN ETHIOPIA PERU UGANDA * RWANDA ZAMBIA ZIMBABWE BOTSWANA

LEGEND ARGENTINA - COMPANIES ABROAD - PROJECTS - REPRESENTATIVE OFFICES - BRANCH OFFICES ...human resources Markets: Current and Passed

5.0 * Markets MARKETS 67 years of 5 . OUR CLIENTS TRADITIONALLY INCLUDE MINISTRIES, LOCAL GOVERNMENT AGENCIES... excellence

*

…markets

Market position

Kazakhstan, as a rapidly developing country thanks to its oil reserves, represents the most important market for Energoprojekt. In the projects performed by Niskogradnja, which are most commonly fi nanced by the European or the World Bank, competitors are generally from the Western European and Islamic countries. Visokogradnja is delegated most of the projects on the merit of its reputation in Kazakhstan.

On the Russian market, the main competitors are Russian companies and some well known companies from around the world.

In , depending on the country in which it does business, Energoprojekt faces diff erent levels of competition. In Ethiopia, Energoprojekt receives projects carried out mostly in cooperation with reputable companies from France, England and USA. Algeria, which is a fast growing market, has a great concentration of highly reputable companies from France, UK, Germany, Canada, and USA in recent years. Somewhat lower level of competition is present in Ugan- da, Nigeria, and Ghana.

The Middle East became very interesting market for the majority of internationally renowned companies, predomi- nantly due to the signifi cant capital investments in energy and infrastructure projects. In spite of this fact, Energopro- jekt has continual expansion of the services in Qatar, United Arab Emirates and Oman, as the most promising markets.

The market of South America (Peru), where Energoprojekt has been present for many years establishing a good reputation and solid references in the areas of civil engineering and hydro-engineering, is well defi ned despite the domination of companies from Western (Spain, Italy) and from Brazil.

In South East Europe, Energoprojekt is providing services mainly in the civil engineering and power generation sec- tor for neighboring countries (Montenegro, Macedonia and Bosnia and Herzegovina)

Within Serbia, Energoprojekt has become one of the key drivers of the Serbian economy and a growth generator in all core business areas, from architecture and civil engineering, building and infrastructure industry to power generation and transmission, water management and environmental protection.

* Markets 5.1 6. ABSTRACT FROM REFERENCES

Since its foundation Energoprojekt has developed strong references in the fi elds of:

* Energy generation, transmission and distribution * Infrastructure * Water management - environmental protection * Building engineering and construction * Industry * Information technologies

As a reliable, effi cient and creative partner, Energoprojekt combines an extensive understanding of specifi c technologies and local conditions with international operational experience. This gives a solid base for a comprehensive set of consultancy and engineering services to be provided to our clients.

6.0 * Abstract from references ABSTRACT FROM REFERENCES 67 years of 6 . SINCE ITS FOUNDATION ENERGOPROJEKT HAS DEVELOPED STRONG REFERENCES… excellence *

...references

* Abstract from references 6.1 ENERGY 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project sta- Project name Technical details Country Client Services tus / Year of completion 1 Qatar-Power Transmission System Consultancy Services for Qatar Power Qatar KAHRAMAA (Qatar General Elec- Consultancy On going Expansion, Phase XIII (C-028-QA-17) Transmission System Expansion – Phase tricity and Water Corporation) XIII projects covering installation of new: • Substations • Cables • Telecommunication system • Substation Control System 2 Qatar power transmission and distri- Consultancy Services for Qatar Power Qatar KAHRAMAA Consultancy On going bution system extension - Phase XII Transmission System Expansion – Phase (Qatar General Electricity and XII projects covering installation of new: Water Corporation)" • Substations • Cables • Telecommunication system • Substation Control System 3 Qatar power transmission and Consultancy Services for Qatar Power Qatar KAHRAMAA Consultancy On going distribution system extension - Phase Transmission System Expansion – Phase XI (Qatar General Electricity and XI (Stage 1 & Addendum) projects covering installation of new: Water Corporation)" • Substations, • Cables (33.9km of 220kV, 2500sqmm, 515 MVA and 22.4km of 132kV, 2000sqmm) • Telecommunication system, • Substation Control System 4 Three 400/220KV Grid Stations at Sohar Three grid stations: Oman OETC (Oman Electricity and Consultancy services for the On going IPP-3, Sohar FREE ZONE and She Almak- 400/220KV Transmission Company) construction arm and associated 400OHL/cable 400 kV OHL/cables 5 Bedyah Grid Station 132/33 kV TS 132/33 kV; 2x25 MVA Oman OETC (Oman Electricity and Consultancy Services for Design and On going with 2x125 MVA and upgrading of Transmission Company) Supervsion Mudhairab grid to 400 KV 6 Two 400/220 kV grid stations Izki and SS 400/132KV & associated TL 400KV Oman OETC (Oman Electricity and Consultancy services for the design On going Misfah and TL between them Transmission Company) and supervision 7 New Shakhbout City 132/11kV, Ruwdat Substations: Shakhbout City 132/11kV, United TRANSCO (Abu Dhabi Transmission Consultancy On going 132/11kV, Al Faya 132/33kV substations Ruwdat 132/11kV, Al Faya 132/33kV Arab Emir- & Despatch Company) and 132kV Cable/OHL Works and 132kV Cable/OHL Works ates 8 CS for Engineering and Site Supervision Two SS 400/132KV & associated TL United Dubai Electricity and Water Consultancy On going of Canal Gardens (CANLGRDN) & DUBAI 400KV Arab Emir- Authority (DEWA) JANOUB (DXBJANUB) 400/132kV Substa- ates tions and Associated 400kV Overhead Line (OHL) Works PO (C-007-DU-18) 9 CHP Pancevo: consulting services for the CHP Plant 160 MW Serbia Shanghai Electric Group Europa Preparation of technical documenta- On going construction of the new CHP plant within D.O.O. Beograd - Novi Beograd tion & permitting consulting services the Oil Rafi nery Pančevo (C-003-EN-18) 10 Provision of design consultancy services Energy-from-Waste Plant, with waste Serbia CNIM, France Design On going in connection with a waste to energy treatment capacity of 340.000 t/a, power plant in Belgrade (C-041-EN-17) production capacity of 30 MWel and heat production capacity of 56,5 MWth 11 Construction of new Unit B3 of TPP 350 MW Serbia PU Electric Power Industry of Consultancy services (under FIDIC) On going Kostolac B (350 MW) including TS Serbia (EPS) Rudnik 5 110/6 kV and TL 110 kV 12 Expert supervision of construction works 350 MW Serbia PU Electric Power Industry of Expert supervision of construction On going of "TPP Kostolac B3" (C-025-EN-17) Serbia (EPS) works 13 Coal mine Kolubara - A New Coal Energy Efi ciency by Ecological Coal Serbia PU Electric Power Industry of Equipment and material delivery On going Depot, packadge C2, Infrastructure Quality Management; Infrastructural Serbia (EPS) for the management of coal qulaity, buildings and plants for the new coal execution of civil, mechanical and depot in RB Kolubara, at surface mining electrical works, takeover and start; Tamnava - Zapadno polje Package C2: Infrastructure 14 Revitalisation of hydro aggregates No. 1, Installed capacity of hydro aggregates: Serbia JP EPS - Ogranak "HE Đerdap", Preparation of Detailed design On going 2, 3 and transformers No.1 on "Djerdap 3 x 194 MW 1" HPP 15 Revitalisation and modernisation of 15 small hydropower plants (SHPP) Serbia Electric Power Industry of Serbia Preparation of the technical and On going the Mini Hydro Power Plants owned Installed capacities from 0.06 MW to (EPS ) investment documentation and by EPS 6.4 MW consultancy services 16 Modernization and revitalization of the Hydro Power Plant installed capacity Montene- Elektroprivreda Crne Gore AD, Preparation of the technical and tender On going hydropower plant Perućica - Phase II 307 MW gro Nikšić documentation and consultancy services 17 Modernization and revitalization of Concrete arch dam 220 m height; Hydro Montene- Elektroprivreda Crne Gore AD, Consultancy On going the hydropower plant Piva Power Plant installed capacity 3 x 120 MW gro Nikšić 18 Construction of electrical substation SS 110/33 kV Rwanda Energy Development Corporation Construction On going 110/33 kV, Gabiro Limited (EDCL) 19 Double Circuit Transmission Line DC TL: 300kV Nigeria Power Holding Corporation of Design; Construction; Procuremant; On going 330kV, Erukan - Omotosho, lot 1 Length: 132km Nigeria (PHCN) Commissioning; on turn key basis 20 Two double circuit transmission DC TL: 300kV Nigeria Niger Delta PHCN Design; construction; procurement; On going lines 330kV, Enugu-Ikot-Ekpene and Length: 2x240km commissioning on turn-key basis pertaining SG 21 Rehabilitation of Unit B1 and con- Rehabilitation of 348.5 MW unit, Serbia EPS (Electric Power Industry of Technical support for Project 2017 struction of fl ue gas desulfarization including interventions on: Serbia) and Business Entity TPP Management plant for Units B1 and B2 in Thermal • bolier piping system replacement and and Mines Kostolac ltd Power Plant Kostolac B replacement of boiler auxiliaries • main piping replacement • ESP reconstruction • 6.3 kV switchger replacement"

6.2 * Abstract from references - ENERGY ENERGY 67 years of 6. HYDRO POWER PLANTS excellence

Energoprojekt has participated in the design, consulting, engineering, construction, equipping and putting into operation all major hydro power projects in almost all countries of the former Yugoslavia and in all con- tinents except for Australia.

The total installed capacity of hydro power plants is over 10,000 MW.

HPP Tekeze HPP Djerdap I HPP Djerdap II Name Ethiopia Serbia Serbia 16 units of 27 MW 4 x 75 MW 12 x 175 MW Description Concrete dam on the Danube river, Dam on the Tekeze river, 185 m high Dam on the Danube river, 55 m high 32-35 m high

Client Ethiopian Electric Power Corporation Electric Power Industry of Serbia Electric Power Industry of Serbia

HPP Bajina Bašta HPP Perućica, HPP Mratinje Name Serbia Montenegro Montenegro 348 MW 364 MW 360 MW Description Concrete hollow gravity dam on Drina Earth-fi ll dams on the Zeta river, Concrete arch dam on river, 90 m high h=11, 15, 16, 22 m Piva river, 220 m high

Client Electric Power Industry of Serbia Electric Power Industry of Montenegro Electric Power Industry of Montenegro

HPP Kafue Gorge HPP Bayano HPP Bekhme Name Zambia Panama Iraq 900 MW 300 MW 1,590 MW Description Earth-fi ll dam on the Concrete gravity dam, Earth-fi ll dam on the Kafue river, height 50 m height 44 m Greater Zab, height 230 m Institute for Water Resources and State Commission for Water Manage- Client Ministry of Electricity of Zambia Electricity ment Projects of Iraq

* Abstract from references - ENERGY – Hydro Power Plants 6.3 ENERGY 6. THERMAL POWER PLANTS AND FACILITIES; ENERGY TRANSMISSION AND DISTRIBUTION SYSTEMS

Since its establishment to date, Energoprojekt has participated in rendering consulting services, design, construction, equipping, putting in operation and personnel training of majority of thermal power plants and electric power facilities in Serbia, Montenegro and many other countries in Middle East and Africa. The total installed capacity of thermal power plants is over 20,000 MW, while the total length of long distance transmission lines is more than 10,000 km.

TPP Nikola Tesla A, TPP Kostolac B2, TPP Nikola Tesla B, Name Obrenovac, Serbia Kostolac, Serbia Obrenovac, Serbia 1,650.5 MW 2 x 348.5 MW Description Thermal Power Plant, 1,290 MW Thermal Power Plant Thermal Power Plant

Client Electric Power Industry of Serbia Electric Power Industry of Serbia Electric Power Industry of Serbia

Jebel Ali Power and Desalination Name Ras Abu Fontas (RAF) C, Qatar Musandam, Oman Plant, UAE Station M – 400 kV s/s and CC with desalination Plant Gas Fired Power Station associated 400 kV OHL Description (GT-4x125 MW, ST-2x210 MW, MFE 400 kV GIS 505 MVA 400/132 kV 3 6x30 MW 4x30,000 m per day) Transformers

Ministry of Electricity and Water of Rural Areas Electricity Company Dubai Electricity and Water Authority Client Qatar (RAECO) (DEWA)

TPP “Kostolac B”, TPP Nikola Tesla A1 and A4, TPP Kolubara A, Lazarevac, Name Kostolac, Serbia Obrenovac, Serbia Serbia

Rehabilitation of Unit B2 with the re- 220 MW and 308.5 MW Ash Removal System Description construction of electrostatic precipita- Electrostatic Precipitator at - 45 t/h of ash tors (348,5MW) Units 1 and 4 - 3 km distance

Client Electric Power Industry of Serbia Electric Power Industry of Serbia Electric Power Industry of Serbia

6.4 * Abstract from references - ENERGY – Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems ENERGY 67 years of 6. THERMAL POWER PLANTS AND FACILITIES; ENERGY TRANSMISSION AND DISTRIBUTION SYSTEMS excellence

Qatar System for Electrical Energy Two transformer substations Central Name Transmission and Distribution TL (400 kV), Serbia Phases IV, VI - VII, VIII & IX, Qatar Area & Katampe, Abuja, Nigeria

Consultancy services for the Turn-key project for the construction of transmission & distrtribution system Construction of TL between SS 2 TS: Leskovac II and FYR Macedonia border Description Over 120 SS of various voltage levels 2x60MVA, 132/33kV; 2x150MVA, 330/132kV (33 kV - 400 kV), and several hundreds 400 kV; 100 km long & 2x60MVA, 132/33kV kilometers of O/H and cable lines

Kahramaa (Qatar General Electricity & Electric Power Industry of Serbia & Client NEPA (National Electric Power Authority) Water Corporation) Instalaciones Inabensa S.A.

Clinical Centre of Serbia, Niš TS Oke-Aro (Erukan), District Heating Plant , Name Clinical Centre of Serbia, Belgrade, Lagos, Nigeria Belgrade, Serbia Serbia

Combined heat and power plant total TS Oke-Aro (Erukan), SG 2x300MVA; capacity 32 MW, central monitoring system CMS (Niš); Description 330/132 kV; 2x60MVA; 132/33kV, Reconstruction combined heat and power plant Lagos 1,8MWe & 1,8MWt, central monitoring system CMS (Belgrade).

Ministry of health of Serbia and Client Niger Delta PHCN Public Utility Co “Beogradske elektrane” Clinical Center of Serbia

The total installed power of thermal power plants is over 20,000 MW

* Abstract from references - ENERGY – Thermal Power Plants and Facilities; Energy Transmission and Distribution Systems 6.5 INFRASTRUCTURE 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project status / Project name Technical details Country Client Services Year of com- pletion 1 EPC Contract for design and execution of part of The new landfi ll has been designed accord- Serbia Beo čista energija doo Design and execution of part of the On going the construction works for the PPP project for ing to the scheduling of waste disposal: construction works construction, exploitation and management od Old landfi ll: 11.840.000 m3; New landfi ll: the Vinča waste dump including production of 6.202.000 m3 (interim landfi ll: 722.000 m3; energy from waste in the waste processing plant unprocessed: 4.010.000 m3; landfi ll for residues after treatment: 1.470.000 m3) 2 Construction works within the project of Length: 24 km Serbia Serbian Ministry of Construction / Construction; Construction of 4 traffi c On going highway E-763, Section V: Lajkovac-Ljig, China Shandong International lanes and 3 stopping lanes, 9 bridges, 6 from km 53+139.91 to km 77+118.23 Economic & Technical Coopera- overbridges, intersection "Ljig", tunnel tion "Brančići" comprised of 2 tunnel tubes, each 940 m long, and river fl ow regulation 3 Construction of the tram-railway over the Construction of the 2,7 km new tram- Serbia Belgrade City Government Works execution On going Ada bridge in Belgrade railway and reconstruction of a 1 km existing tram-railway 4 Rehabilitation and reconstruction of a road Length: 58 km,rehabilitation of the Peru Provias Nacional del Ministerio de Upgrading, expansion and asphalt On going section Puerto Bermudes existing and construction of 3 new Transporte y Comunicaciones paving of a 58km long road section - Ciudad Constitucion bridges and rehabilitation of the existing and construction of three new bridges 5 Preventive cleaning of the river-bed of Cleaning of the river-bed, 17km in Peru MINAGRI Ministerio de Agricul- Works execution; preventive cleaning On going Chira river length, protection of the river bank by tura y Riego of the Chira riverbed and formation of stone 20.000 m3 "Pilot" channels along riverbed 100 - 150 in width on 2 sections (from km25 to km 40 and from km 52+900 to km 53+670) 6 Railway reconstruction of South Corridor total section length: 17.7 km Serbia Serbian Railways JSC/ Works execution including the ground 2017 Section 10, from Vranjska Banja to Ristovac RŽD International formation level, drainage objects constrution, platform and connecting roads construction and relocation and protection of cables and other objects 7 Kolubara riverbed relocation and Riverbed relocation (2,6 km + 1,8 km), Serbia Business Entity Mining Basin Relocation and regulation of the Kolubara 2017 regulation, phase II, including the Peštan construction of a bridge, water intake, "Kolubara" ltd & Peštan riverbeds, construction of a tributary and accompanying infrastructural pumping station, 2,9km technical water bridge across two rivers, construction of a facilities supply pipeline and 3,4 km access road water intake, pumping station and tech- nical water supply pipeline, construction of access road and work monitoring 8 FEED for new crude oil storage tanks at KM Qatar Qatar Petroleum Preparation of preliminary design and 2017 and Jaleha in Dukhan tender documentation 9 Upgrading Mpigi-Kanoni road Length: 64 km Uganda Uganda National Roads Authority Works execution; Road upgrading 2017 (UNRA) 10 Execution of works on the reconstruction of ten city roads in length of 15,5 km Uganda Kampala Capital City Authority Works execution; on the city roads 2017 ten city roads within districts of Kawempe reconstruction and Lubanga 11 Construction of Approach Road to Radar Uganda Uganda National Roads Authority Construction; Works execution 2017 Center near City of Nakasangola (UNRA) 12 Execution of works on the reconstruction Serbia Serbian Railways JSC Works execution; Procuremant; Com- 2016 of the train reception, dispatch and rail missioning; on turn key basis traffi c management in the railway station Belgrade Center – phase I (Prokop). 13 Railway reconstruction on Corridor 10; three Total length of all sections: 65,7 km Serbia Serbian Railways JSC/ Works execution; Reconstruction of the 2016 sections: Sopot Kosmajski - Kovačevac, Mala RŽD International roadbed, construction of new culverts, Krsna - Velika Plana, Golubinci - Ruma station platforms and approach tracks, relocation and protection of cables and structures 14 Construction works on Highway E 763: Beo- Length of the tunnel: 883 m and 887m Serbia Koridori Srbije Ltd / Azvirt LLC - Construction; Construction of two 2016 grad - South Adriatic, Sector II: Ljig - Požega, Azvirt Branch Belgrade parallel tubes section 3: Takovo - Preljina; km 77+118.28 - km 117+477.02 - tunnel Šarani 15 Construction of the substructure of the second Length: 14,858 km Serbia Serbian Railways JSC/ Construction; Construction of the em- 2016 railway track, section Pancevo Bridge - Pan- RŽD International bankment, access roads crossing the cevo Main Station (km 4+742-km 19+600, railway, drainage structures, bridges, length 14.858 m), within the railway train station facilities, etc. Belgrade Center - Pancevo Main - Vrsac-State border between Serbia and Romania 16 Detail Engineering for EPC of Main Pipe Rack United Onshore Petroleum Operations Design 2016 Structural Integrity Analysis In BCDS Arab LTD (ADCO) Emirates *

...infrastructure

6.6 * Abstract from references - INFRASTRUCTURE INFRASTRUCTURE 67 years of 6. excellence

Construction of infrastructural projects with the implementation of the most modern technology and equip- ment ranks among the most signifi cant achievements of Energoprojekt’s engineers: Underground facilities Highways and regional roads Tunnels Airports Railway and metro stations Waste management and pollution control

One track railway bridge Belgrade bypass, section 5, Name Construction of Mirijevo Boulevard with Appurtenant Infrastructure Belgrade, Serbia Belgrade, Serbia

Construction; commissioning; construction of Construction of one track railway the city street, with appurtenant infrastructure: bridge (188m), reconstruction of the Construction of tunnel Straževica Description reinforced-concrete revetment and sewerage (cross-sections: 300x210 cm and 400x18cm), railway underbridge and Jurija Gaga- length 745m and fl yovers gas & water supply pipeline, sanitary sewerage, storm water drainage & 110 rina street, New Belgrade

Belgrade Land Development Public Belgrade Land Development Public Public Enterprise “Roads of Serbia” and Client Agency, Serbia Agency, Serbia “Corridor 10”, Serbia

Pionirski Park Underground Road Mityana - Fort Portal, sec- Road Almaty-Akmola Name Garage, Belgrade, Serbia tion Mityana - Mubende, Uganda Section Almaty-Guishad

Underground garage with 460 Road length 225 km Asphalted road length 166 km, Description parking places Mityana - Mubende section 8 m width, with 2 m shoulders, Total area: 13,818 m² Total length 86 km totalling 12 m

Ministry of Transport and Communica- Belgrade City Hall Ministry of Transport and Communica- Client tions of the Republic of Kazakhstan Serbia tions, Uganda Kazahstan

Two Underground Metro “Vukov Spomenik” MULTIPLE UNDER- Name Stations, Almaly and Abay, Alma Ata, Kazakhstan Belgrade, Serbia GROUND FACILITIES, One „Column“ type and Underground railway station TUNNELS, HIGHWAYS, one „Pylon“ type metro station Platform area: 2,500 m2 at the depthth of REGIONAL ROADS, Description Depth between 30 – 70 m; 40 m, oblique tunnels with 3 escalators,o Construction of 3 tunnel tubes each diameter: 7.5 m and length of 65 m RUNWAYS, RAILWAY AND (diameter 90 - 100 m²) angle: 30 degree METRO STATIONS Belgrade Railway Traffi c Co. Client AO Almatimetrokurilis Kazahstan Serbia

* Abstract from references - INFRASTRUCTURE 6.7 WATER – ENVIRONMENTAL PROTECTION 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project sta- Project name Technical details Country Client Services tus / Year of completion 1 Sanation of the Dam Embankments dam with clay core Serbia Public Enterprise for water supply, Detailed design and works execution on On going Gazivode 107.5 m height and 520 m dam crest electical energy generation and "Turn Key" basis length distribution "Ibar" 2 Pambukovica Dam and irriga- Embankments dam with clay core 30 m Serbia Public Water Management Com- Preparation of basic design and preliminary On going tion system height and 245 m dam crest length pany “Srbijavode” Belgrade design with feasibility study 3 Kamenica Dam and irrigation Embankments dam with clay core 20 m Serbia Public Water Management Com- Preparation of basic designa and preliminary On going system height and 424 m dam crest length pany “Srbijavode” Belgrade design with feasibility study 4 Water security mega reser- Project 1st phase includes: construction of Qatar KAHRAMAA Consultancy; Project Management On going voirs project (1st phase) 24 concrete reservoirs with total capacity (Qatar General Electricity and of approx. 10 million m3 of water, 280 km Water Corporation) (DN 1200-1600) corridor mains and 200 km (DN 900-1600) transmission pipeline 5 Water Distribution Networks Oman PAEW (Public Authority for Consultancy services for construction On going for Wilayat Bidbid in Al Electricity & Water) supervision Dhakliya Governorate 6 Wadi El Fedan Dam Embankments dam with central clay Jordan Ministry of Water and Irrigation - Construction supervision On going core, 25 m height and 302 m dam crest Jordan Valley Authority/ENGICON length 7 Dam Kufranja Concrete face rockfi ll dam (CFRD), 80 m Jordan Ministry of Water and Irrigation - Supervision; Construction supervision On going height Jordan Valley Authority 8 Beni Slimane Dam Embankments dam with central clay Algeria ANBT Preparation of the detailed design, technical On going core, 66 m height (National Agency for Dams and assistance and supervision over construction Transfers) 9 Tabeggart Dam Earth-fi ll dam, 28 m height Algeria ANBT Preparation of the basic design and tender On going (National Agency for Dams and documentation Transfers) 10 Djedra Dam Concrete face rockfi ll dam (CFRD), 60 m Algeria ANBT Design; Supervision; Preparation of the On going height (National Agency for Dams and detailed design, technical assistance and Transfers) supervision over construction 11 Soubella Dam Embankments dam with central clay Algeria ANBT Preparation of the detailed design, technical On going core, 67 m height (National Agency for Dams and assistance and supoervision over construc- Transfers) tion 12 Tarzout Dam Earth-fi ll dam, 60 m height Algeria ANBT (National Agency for Dams Preliminary design and tender documenta- On going and Transfers) tion for the construction 13 Seklafa Dam Seklafa concrete dam (h=47m) Algeria ANBT (National Agency for Dams Detalied design, technical assistance and On going and Transfers) construction supervision 14 Sidi Naceur Dam Project Rockfi ll Dam, 33,5 m height Algeria Agence nationale des barrages et Preparation of fi nal design and tender On going transferts documents 15 Study of furnishing/securing Project area of 300.000 km2 Algeria Agence nationale des barrages et Study On going water resources for West, transferts Center and East regions 16 Exeeding the existing Embankments dam with central clay core, 48 Peru Gobierno Regional Piura, Proyeto Preparation of the detailed design and tech- 2017 Poechos Dam +3 m height and 8455 m dam crest length especial Chira Piura nical specifi cation for tender documents 17 Exeeding the Wala Dam Raising of existing combined Dam (central Jordan Ministry of Water and Irrigation - Consultancy 2016 section made of Roller Compacted Con- Jordan Valley Authority crete and two wing embankments on each side) from a height of 52 m to about 67 m **

…water

6.8 * Abstract from references - WATER – ENVIRONMENTAL PROTECTION WATER – ENVIRONMENTAL PROTECTION 67 years of 6. excellence

In 67 years of business operations, Energoprojekt designed, contstructed and commissioned numerous proj- ects including dams, irrigation and hydro melioration systems, water processing plants, water supply and sew- age systems.

Chira - Piura Irrigation System, Jebel Ali Desalination and Power Mokroluški Main Drain, Name Phases I/II/III, Peru Plant, UAE Belgrade, Serbia

Reinforced concrete main drain for rainwater services Regulation of irrigation, clay-fi lled dam Station M – 400 kV s/s and Drainage: length - 800 m; 4 overfl ow h= 48 m, associated 400 kV OHL Description structures; crest length 9.5 km 400 kV GIS 505 MVA 400/132 kV 6 3 concrete diaphragm on both sides Accumulation capacity 1,000x10 m Transformers along the whole length of the 10.5 m deep canal

Dubai Electricity and Water Authority Belgrade Land Development Agency, Client Ministry of Agriculture, Peru (DEWA), UAE Serbia

Pećina Potable Water Treatment Potable Water Treatment Plant, Dam Rovni, Name Plant, Valjevo, Serbia Limassol Serbia

Potable water treatment plant Water Treatment Plant Earth-fi ll dam, h=75 m, 2 Description Q= 600 l/s Q= 3,500 m3/h Accumulation area: 2.4 km

Water Supply System Kolubara, Rovni, Directorate for Water Supply and Client City Council of Limassol, Cyprus Serbia Sewage, Serbia

40 COMPLEX LAND IMPROVEMENT SYSTEMS 50 WATER TREATMENT PLANTS OVER 30 WATER MANAGEMENT AND RIVER FLOOD CONTROL PROJECTS 50 MUNICIPAL AND INDUSTRIAL WATER SUPPLY AND SEWAGE SYSTEMS

* Abstract from references - WATER – ENVIRONMENTAL PROTECTION 6.9 BUILDING ENGINEERING AND CONSTRUCTION 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING)

Project sta- Project name Technical details Country Client Services tus / Year of completion 1 Chinese Cultural Center, Belgrade Area: 32.020 m², Serbia EMPIRET d.o.o. Design; Consultancy; Works execution On going Floors: 2B+GF+7+1 2 BW Plot 19.1 "Belgrade Tower", Area: 65.815 m², Serbia Beograd na vodi d.o.o. Design & construction supervision On going Belgrade Floors: 2B+GF+40 consultancy services 3 Shopping Mall "Ada Mall", Belgrade Area: 94.000 m², Serbia GTC Commercial Design & construction supervision On going Floors: 3B+GF+4 Developments d.o.o. consultancy services;Parts of the Design for Construction; execution of MEP works 4 Commercial / administrative building Area: 50.000 m2, Serbia GP SEVEN d.o.o. Beograd Works execution On going “Navigator Business Center 2“, Floors: 3 underground levels + Belgrade ground fl oor + 7 fl oors + setback 5 Park 11, design and construction of Area: 29.282 m2 Serbia Energoprojekt Park 11 doo Beograd Design; Construction; Commissioning On going residential and commercial building, Floors: 2B+GF+8+Last F Block 11a, New Belgrade no. of fl ats: 134 6 Belgrade Waterfront Project, Admistra- 20 fl oors Serbia Belgrade Waterfront Ltd General Contractor On going tive and residential Building, two towers A & B 7 Aneks of the SMATSA building with the Anex of the building B+GF+3 Serbia SMATSA Serbia and Montenegro Air Design; Preparation of design On going Control Tower New tower B+GF+16, Area: Traffi c Services LLC documentation and feasibility study 7.400 m2 8 Ecobank administrative building, Accra Total area: 22.000 m2 Ghana Ecobank Ghana Ltd General contractor - construction On going Floors: B1+B2+GF+13 9 ANI - Abuja National Institute for Nigeria Julius Berger PLC MEP Systems: design, project On going Legislative studies management, works execution, procurement, commissioning 10 ANR National Assembley residences Nigeria Julius Berger PLC MEP Systems: desigm, project On going management, works execution, procuremenet, commissioning 11 Construction of Multi-modal facility, Nigeria Julius Berger FZE Turn-key On going Free trade Zone Calabar 12 Design and construction of the Total gross area 24.593 m2, Serbia Energoprojekt Holding PLC Beograd Design; Supervision; Construction; 2017 residentrial and business complex landscaping area 8.560 m2 Works execution Sunnyville, Beolgrade Floors: 2B+GF+3+Attic 13 Adaptation and reconstruction of business Serbia Banc Intesa PLC Belgrade, Serbia Deign for adaptation and 2017 premisses in Banc Intesa Belgrade offi ce reconstruction; General contractor buildings 14 Offi ce building Gazprom Transgas Total area: 27.000 m2 Russia ОOO Gazprom Transgaz Uhta Construction; Procuremant; 2017 (Russian Commissioning; Execution of Fed.) structural, fi nishing and MEP works 15 Residential appartments and Spa Appartments area: 10.500 m2 Kazakh- TOO Astana Property Management General Contractor for Fitout Works 2017 Center in „Talan Towers” (Ritz Carlton Spa center area: 1.500 m2 stan Hotel) 16 Administrative Complex (Greenwich Area: 13.500 m², Ghana OCTOGLOW GHANA Ltd. Design 2017 Centre), Tema Floors: B+ GF+ 4+1 17 Administrative complex of the AO Forte Area: 35.120 m2, Kazakh- TOO Accent Development Solutions Design; Construction; Procuremant; 2016 Bank, Astana Floors: B+GF+2 to9 stan Commissioning 18 Ghana airport cargo center and offi ce Total area: 1.300 m2 Ghana Ghana Airport Cargo Center Design; Construction; Procuremant; 2016 building on Kotoka International Floors: GF+a; GF+4 Commissioning; on turn key basis Airport, Accra **

…building

6.10 * Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION BUILDING ENGINEERING AND CONSTRUCTION 67 years of 6. excellence

Energoprojekt has designed many architectural projects in Serbia and world wide. Our projects have always demonstrated the concept that architecture is a refi ned blend of science and art, respecting both form and function of design solutions.

Energoprojekt has designed, constructed and equipped many facilities, such as:

Commercial / offi ce-space buildings, public buildings Hotels, tourist complexes, sports complexes Parliaments, residential buildings and villas Airports, railroad stations and bus terminals Hospitals and health centers Housing projects Banks

White House, Presidential Palace, Conference Centre, Name Ministry Complex, Kuwait Tashkent, Uzbekistan Accra, Ghana

President palace Offi ce space Government offi ces Description Total area: 5,746 m2 Total area: 15,000 m2 Total area: 270,000 m2

Client Government of Uzbekistan Government of the Republic of Ghana Government of Kuwait

Hotel Caspian Riviere Grand Palace, Hotel Hyatt Regency, Sheraton Hotel and Conference Name Aktau, Kazakhstan Belgrade, Serbia Centre, , Zimbabwe Five star hotel Five star hotel Five star hotel Description Conference Centre: 30,145 m2 Total area: 25,000 m2 Total area: 37,500 m2 Hotel: 30,648 m2 Client TOO “Oil Real Estate” BMP Consortium Government of Zimbabwe

Belgrade Arena, Shah Alam Sports Complex, Sports Complex Igalo, Name Belgrade, Serbia Kuala Lumpur, Malaysia Montenegro

Universal sports hall Sports complex Sports complex Description Total area: 48,000 m2 Total area: 270,000 m2 Total area: 6,000 m2 Capacity: 20,000 spectators Capacity: 80,000 spectators Capacity: 3,000 spectators The municipality of Herceg Novi, Client City of Belgrade Government of Selangor State SC Igalo

* Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION 6.11 6. BUILDING ENGINEERING AND CONSTRUCTION

Administration Building, Bank Association of Uzbekistan, Shopping Mall & Entertainment Name Belgrade, Serbia Tashkent, Uzbekistan Complex, Aktau, Kazakhstan

A class Administration Building in Offi ce space Commercial Complex Description block 26, New Belgrade, Serbia Total area: 15,000 m2 Total area: 49,000 m2 Total area: 50,700 m2

Client Bluehouse Accession Property Holding Bank Association of Uzbekistan TOO “Oil Real Estate”

International Trade YU Business Centre - Building G, AL KHULAFA Offi ce and Apart- Name Fair, Lagos, Nigeria Belgrade, Serbia ment Complex, Baghdad, Iraq

Exibition Space Residential / Offi ce Space Residential and offi ce space Description Total area: 80,000 m2 Total area: 27,500 m2 Total area: 86,000 m2 Complex area: 300 ha

Client Government of Nigeria Energoprojekt Baghdad City Council

Today, Energoprojekt’s teams of architects, engineers and town planners are achieving considerable results in various fi elds of urban and regional planning, architecture, interior design and construction of projects such as complete engineering contracts on the turn-key basis.

6.12 * Abstract from references - BUILDING ENGINEERING AND CONSTRUCTION INDUSTRY 67 years of 6. LIST OF MAJOR PROJECTS (COMPLETED IN 2017 AND ON GOING) excellence

Project status / Project name Technical details Country Client Services Year of completion 1 Modernisation of the oil process- The Delayed Coker Unit (S-5300, DCU); Serbia CB&I (Client NIS) Validation of all design; static On going ing complex in NIS Oil Refi nery in Coke Transport System (S-5600, CHS) and calculations of concrete and steel Pančevo - Construction of a new appurtenant plants/facilities are envis- structures, development of all deep oil processing plant and aged for the DCU designs of auxiliary structures; delayed Coker Unit 2000 t / day of mixed feed consulting services; checking 600 t /day petrol coke and certifi cation of designs of pipelines under pressure 2 Project for Technical Renovation 200.000 m3 Blast Furnace Gas Holder Serbia HBIS GROUP Serbia Iron&Steel / Nostrifi cation of design On going of Serbia Steel Mill of HBIS Group 250 t /h - Heating Furnace TSIC – China documentation and preparation Serbia Iron&Steel Ltd 1.782 million t/g - Sintering machine of static calculation; supervision of works execution 3 Factory for the production of 1.000.000.000 tablets per year (solid forms); Ghana Ernest Chemist Ltd, Ghana Design; General contractor - On going pharmaceutical products 1.000.000 l of syrups/ year construction 5.000.000 l solutions for infusion/year total net area of 11.000 m2 4 Construction of the Pharmaceuti- Solid forms12,8 mil. pack./year Sudan Liliam Pharmaceutical Industries Development of technical docu- On going cal factory Liliam Pharmaceuti- Semisolid forms 0,76 mil. pack. / year Co.Ltd. mentation of the detailed design, cal, Khartoum Cephalosporine 5,4 mil. pack. / year works execution and equipment Sterile liquids 3,15 mil. pack / year installation, GMP qualifi cation of critical systems and commission- 14.950 m² ing of the pharmaceutical factory with all the appurtenant technical systems on a “turn-key” basis 5 New fermenter facility within Fermenter capacity of 6 x 4000 hl Serbia Heineken Srbija d.o.o Development of design docu- 2016 Heineken brewery complex in mentation and execution of Zaječar works under “turnkey” contract 6 Construction of the New Sulfhuric Serbia CMSC Bor, Project Management; construc- 2015 Acid Plant at CMSC Bor SNC Lavalin tion works, partial delivery of equipment and materilas, com- plete erection of the mechanical and electrical equipment and installations 7 Flash smelter at CMSC Bor - Serbia CMSC Bor, Design; Project Management; 2015 construction Outotec Commissioning; procurement of MEP equipment and systems and execution of civil, electrical and mechanical works 8 Medical products and chemicals Area 1600 m2 Serbia Zorka Pharma Hemija Detailed design and works 2015 production plant, Zorka Pharma, execution at the revamping and Sabac extension of the plant 9 Ferrochrome slag crushing and Capacity: 800.000 t/year Kazakhstan AO TNK KAZHROM Detailed design, supervision of 2015 sorting complex works execution and process equipment installation, equipment proqurement, testing, commis- sioning and personnel training 10 Four Compressor Stations on the 4 compressor stations: designed capacity Kazakhstan AGP/ Engineering and Procure- Design; Detail design 2015 route C of the Asian gas pipeline HPA–30 MW ment Services LLP, (Kazakhstan – China) Compressor stations are on the route C of the Asian gas pipeline Kazakhstan – China - expected max.production: 18,7 + 6,3 billion m3 /year 11 Two water recycling blocks Water Recycling Block №1: 2x4500 m3/h Kazakhstan Oil Rafi nery Atiray/ Engineering Design; Detailed design 2015 at the Atyrau Oil Refi nery of recirculated water and Procurement Services LLP, Water Recycling Block №2: 1x 1000 m3/h Almaty of recirculated water **

…industry

* Abstract from references - INDUSTRY 6.13 6. INDUSTRY

During 67 years, Energoprojekt has been successful in implementing a variety of large-scale, highlycompli- cated and technologically complex industrial projects. We off er consulting services related to building con- struction, installation and start up, providing transfer of knowledge and state of the art technologies.

Energoprojekt has designed and/or constructed over 1,300 complex projects in diff erent industrial fi elds such as:

Food processing industry Pharmaceutical industry Basic and processing chemical industries Transportation and storage of oil and gas Wood processing, cellulose and paper production industries Metal-processing industry Ore and metal processing industries and transportation systems Non-metal and construction materials industries Tobacco processing and cigarette production industries Industrial power plants, heating plants and boiler plants Gas distribution

INDUSTRIAL PLANTS AND FACILITIES

Schlumberger Oilfi eld Services Oilfi eld Services Base with Tanks, Name Paper factory, Siktivkar, Russia Facility, Aktau, Kazakhstan Pavlodar, Kazakhstan

Construction Construction, tanks capacity Description Construction 10,000 m2 50,000 tons

Client Schlumberger Logelco Inc. TOO Helios Mondi SLPK

BAT Tobacco Factory, Pharmaceutical Factory Pharmaceutical Plant Name Ibadan, Nigeria Tyumen, Russia Hemofarm, Serbia

Tobacco manufacturing and Description Pharmaceutical factory Pharmaceutical plant for sterile drugs cigarette production factory in ampoules and in lyophilized form

British American Hemofarm, Vršac Client Administration of Tyumen city Tobacco (BAT) Serbia

6.14 * Abstract from references - INDUSTRY INDUSTRY 67 years of 6. excellence

Wine producing plant and villas Diary Laktaši, Banja Luka, Dairy industry, Belgrade Name JUKO, Saryagash, Kazakhstan Republika Srpska “Imlek” Dairy, Serbia

Capacity 50,000 lit / day, Description Design and construction Dairy with capacity of Design and construction 500,000 l/daily

Client TOO Caspian Food Salford Group Imlek

Mineral Water Bottling Plant Detergent Factory Lab-Labs, Agricultural-Industrial Complex Name Vrujici, Serbia Russian Federation Kuban, Russian Federation

5 factories: dairy products factory, Detergent active components factory factory of conditor products, ice cream Water bottling plant Description Capacity: 50,000 t and 60,000 t/year production factory, fruit & vegetable freezing factory, pack factory

Si & Si Company, Kirishinjeftorgsintez AIK Kuban, Client Subotica, Serbia Russian Federation Russian Federation

OVER 1,300 DESIGNED AND/OR CONSTRUCTED COMPLEX PROJECTS IN DIFFERENT INUDSTRIAL FIELDS

* Abstract from references - INDUSTRY 6.15 6. INFORMATION TECHNOLOGIES

Energoprojekt was one of the pioneers in the field of information technologies in the region. For more than five decades, Energoprojekt has been involved in design, engineering and implementation of customized software and hardware solutions.

A long-term partnership with world leading software (CA Technologies, Oracle, Microsoft, SAP Business Ob- jects, Novell, Imperva etc) and hardware manufacturers (Dell, Lenovo…), enables Energoprojekt to design, develop and implement IT solutions such as:

Business Intelligence and Data Warehousing Project Management Security Management Service Management Infrastructure Management Backup and Recovery Management Software solutions for the large systems Software development for clients (IT outsourcing) Self-service banking solutions

Name Postal solutions Financial analysis Business Process Management

Development, maintenance and Business Process Management using Software solution OCRisc for the Description modernization of postal information Document Management system and analysis of fi nancial documents solutions Business Intelligence tools

Post of Montenegro, Partner Microcredit Foundation, Client Sberbank and Erste bank, Serbia Post of the Republic of Srpska Tuzla, BiH

Delivery of software Specialized solutions Name and IT outsourcing for the large systems ATM devices

Delivery of specialized software Implementation and integration of Sales, installation, maintenance and Description software modules as well as develop- and IT outsourcing of programmers ment of business applications service of ATMs

Komercijalna banka, Credit Agricole, Client Telenor, Enetel, Telekom Srbija Telekom Srbija and EPS NLB Bank and Direktna banka, Serbia

6.16 * Abstract from references - INFORMATION TECHNOLOGIES 7. KEY FINANCIAL DATA

TOTAL AND OPERATING REVENUES, ANNUAL CONTRACTED VALUE, 2013 - 2017 2013 - 2017 (CONSOLIDATED) 317 311 288 292 600 300 294 286 272 262 500 250 213 198 400 200

n 338 326 n o i o ll 300 276 150

R mi 152 137 R milli U 224 U 185 in E

n E 200

i 100 161 120 221 61

50 100 1886 149 1889 1004 555 1224 122 0 0 2013 2014 2015 2016 2017 2013 2014 2015 2016 2017 BACKLOG 31.03.2018

OPERATING REVENUE TOTAL REVENUE SERBIA FOREIGN

8. OWNERSHIP STRUCTURE

OWNERSHIP STRUCTURE Energoprojekt Holding is a public limited company. Capital ownership is as follows:

14.26% OTHERS

52.16% NAPRED RAZVOJ AD NOVI BEOGRAD MONTINVEST PROPERTIES DOO JOPAG AG 33.58% BOJOVIĆ DOBROSLAV REPUBLIC OF NAPRED AD BEOG R A D SERBIA

Source: www.crhov.rs, May, 2018

* KEY FINANCIAL DATA * OWNERSHIP STRUCTURE 7.0 8.0 www.energoprojekt.rs