Ardmore Phosphate Rock Project Newsletter Ardmore Phosphate Rock Project Newsletter Aug 2019

Total Page:16

File Type:pdf, Size:1020Kb

Ardmore Phosphate Rock Project Newsletter Ardmore Phosphate Rock Project Newsletter Aug 2019 Edition 03 Ardmore Phosphate Rock Project Newsletter Ardmore Phosphate Rock Project Newsletter Aug 2019 Ardmore Phosphate Rock Project Recent Developments Our project is focused on the development of the 1. Optimisation work on the Feasibility Study has Ardmore phosphate deposit which is located 23km resulted in an improvement in the project’s west of Dajarra in NW Queensland and is one of the financial metrics including a 56% increase in few remaining undeveloped high-grade phosphate pre-tax Net Present Value to A$296m and a rock deposits in the world. The deposit was discovered reduced payback period of 1.8 years. by Broken Hill South in 1966 and subsequently purchased https://www.asx.com.au/asxpdf/20190228/pdf/44324whvq94dq6.pdf by Centrex from Incitec Pivot Limited in 2017. 2. Commenced site works at Ardmore for the Start-up operation (see below) Centrex intends to develop Ardmore into a mining 3. Two contracts to provide 5,000 tonnes of product and processing operation producing approximately (10,000 tonnes collectively) from the Start-up 800,000 tonnes per annum of phosphate rock concentrate operation have been executed with leading New for export to regional markets, as well as supplying the Zealand fertiliser groups. domestic market. 4. Qld government announcements in recent state The project has a life of approximately 10 years based budget included: on current reserves. $20 million/year rail access subsidy for next four years on the Mount Isa to Townsville rail line which will support the project through reduced below rail access charges; $30 million contribution towards construction of a new container terminal at the Port of Townsville which will deliver further port Figure 1: Ardmore Project location options for Centrex; These are in addition to the previous announcement of $380 million in funding over five years to improve the rail line. CENTREX METALS LIMITED Phosphate Market Current phosphate rock price forecasts sourced from market research specialist CRU indicate positive real term growth in the global market over the life of project, with increasing premiums for high-grade product due to limited supply in the segment. CRU has forecast phosphate rock prices to continue rising until 2023 as supply begins to tighten and production costs increase Figure 2: CEO Simon Slesarewich addressing the media at the Port of Townsville with (L to R) Deputy Premier and Treasurer, the Hon Jackie in China due to implementation of new environmental Trad; Minister for Communities, Disability Services and Seniors and Member for Mundingburra, the Hon Coralee O’Rourke; Mr Scott Stewart, management practices. Centrex believes the upside in Member for Townsville; the Hon Mark Bailey, Minister for Transport and Main Roads; and Mr Aaron Harper, Member for Thuringowa premium grade phosphate rock supply is supported, Start-up Operation Progress with customers ceasing to purchase Morocco’s premium The modular wet processing plant has been delivered grade rock from its mines in the disputed Western Sahara to site and construction of the site roads, pads, region. Supply from the region is the dominant source concrete works and plant has been underway since of premium grade rock to the local markets. late May. Construction of the processing plant is The toxic heavy metal cadmium is also becoming an almost complete. increasing focus for the industry, with the proposed The bore field for the processing plant has been tightening of allowable import limits in Europe. This drilled. Work on connecting the borefield to the is likely to spread to other markets that Centrex is plant will commence later this year. targeting for export. Ardmore has ultra-low cadmium Figure 3: Processing Plant Installation at Ardmore CENTREX METALS Level 6, 44 Waymouth Street T +61 8 8213 3100 ABN 97 096 298 752 Adelaide, South Australia 5000 F +61 8 8231 4014 WWW.CENTREXMETALS.COM.AU CENTREX METALS LIMITED levelslevels unlike unlike competing competing premium premium grade grade rocks rocks currently currently StartStart-up- miningup mining H2 H22019 2019 beingbeing imported imported by theby the local lo calmarkets, markets, providing providing further further StartStart-up- shipmentsup shipments to customers to customers H1 H12020 2020 priceprice upside upside if industry if industry cadmium cadmium restrictions restrictions tighten. tighten. Final Investment Decision for project Final Investment Decision for project LateLate 2020 2020 go aheadgo ahead FullFull-scale-scale construction construction (12 (12months) months) 20212021 ProductionProduction to commence to commence LateLate 2021 2021 Meanwhile,Meanwhile, a major a major amendment amendment of the of the Environmental Environmental AuthorityAuthority granted granted by theby the Queensland Queensland government government in in DecemberDecember 2018 2018 is being is being prepared prepared for forthe the purpose purpose of of fullfull-scale-scale operations operations along along with with other other necessary necessary FigureFigure 4: Historical 4: Historical and andforecast forecast phosphate phosphate rock rock benchmark benchmark pricing pricing approvalsapprovals covering covering road road use use and and the the rail rail siding siding NextNext Steps Steps developmentdevelopment at Duchess.at Duchess. Ongoing Ongoing environmental environmental studies,studies, including including groundwater groundwater monitoring, monitoring, will will support support OverOver the the next next six sixmonths months the the establishment establishment of theof the 70 70 thethe continuing continuing approvals approvals process. process. tonnetonne per per hour hour processing processing plant plant will will be becompleted completed alongalong with with the the preparation preparation of areasof areas for forthe the start start-up- up mining,mining, temporary temporary stockpiling stockpiling of overburdenof overburden and and ore ore andand temporary temporary tailings tailings storage storage facility. facility. Mining, Mining, crushing crushing andand stockpiling stockpiling of oreof ore is scheduled is scheduled to beginto begin late late this this yearyear followed followed by processing.by processing. TheThe phosphate phosphate rock rock concentrate concentrate will will then then be betrucked trucked to Mountto Mount Isa, Isa, railed railed to the to the Port Port of Townsville of Townsville and and shipped shipped to toprospective prospective regional regional customers customers including including New New Zealand.Zealand. Favourable Favourable customer customer trial trial results results and and subsequent subsequent securingsecuring of offof -offtake-take agreements agreements will will be berequired required to to underpinunderpin project project financing financing for forfull full-scale-scale operations. operations. FigureFigure 5: Infrastructure 5: Infrastructure layout layout ML5542 ML5542 CENTREX METALS Level 6, 44 Waymouth Street T +61 8 8213 3100 ABN 97 096 298 752 Adelaide, South Australia 5000 F +61 8 8231 4014 WWW.CENTREXMETALS.COM.AU In the Community Centrex continues to hold community information sessions in Dajarra. These provide a forum for the local and regional community to hear about the latest developments and plans for the project, discuss concerns regarding potential project impacts and learn about the opportunities that the project will provide. The next session will be held on 4th September 2019 and all members of the community are invited to attend. Figure 6: Groundwater Monitoring at Ardmore CONTACT US MORE INFORMATION Periodic project community updates will be made available through the REGISTERED OFFICE Centrex website at the following link: Level 6, 44 Waymouth Street http://www.centrexmetals.com.au/community/ Adelaide, SA 5000 T +61 8 8213 3100 Regular project updates (including technical information) are also available in the form of F +61 8 8231 4014 the releases made by Centrex to the Australian Securities Exchange. If you would like to be added to the list of email subscribers please use the following link and click on “subscribe” SHARE REGISTRY http://www.centrexmetals.com.au/contact/ Boardroom Pty Ltd Level 7, 207 Kent Street EMPLOYMENT OPPORTUNITIES Sydney, NSW 2001 Employment opportunities will be limited prior to the start of full scale production. In the meantime please feel free to register your interest and resume using the link below (note: T 1300 737 760 select “Careers” for the purpose of enquiry): http://www.centrexmetals.com.au/contact/ .
Recommended publications
  • For Personal Use Only Use Personal For
    For personal use only June 2017 FORWARD LOOKING STATEMENTS These materials include forward looking economic conditions. Given these Forward looking statements include, but statements. Forward looking statements uncertainties, readers are cautioned not to are not limited to, statements concerning inherently involve subjective judgement place undue reliance on such forward Centrex’s planned exploration program, and analysis and are subject to significant looking statements. targeted resources, commencement of uncertainties, risks and contingencies, product export and other statements that many of which are outside of the control of, Forward looking statements in these are not historical facts. When used in this and may be unknown to Centrex Metals materials speak only at the date of issue. document, the words such as “could”, Limited (‘Centrex’ or the ‘Company’). Subject to any continuing obligations “target”, “plan”, “estimate”, “intend”, “may”, under applicable law or any relevant stock “aim”, “potential”, “should”, and similar Actual results and developments may vary exchange listing rules, the Company does expressions reflected in these forward- materially from those expressed in these not undertake any obligation to publicly looking statements are reasonable, such as materials. The types of uncertainties which update or revise any of the forward looking statements involving risks and are relevant to the Company may include, statements or any change in events, uncertainties and no assurance can be but are not limited to, commodity prices, conditions or circumstances on which any given that actual results be consistent with political uncertainty, changes to the such statement is based. these forward-looking statements. regulatory framework which applies to the business of the Company and general For personal use only 2 Summary .
    [Show full text]
  • Future Electricity Demand South Australia's Resources Industry
    Future Electricity Demand South Australia s Resources Industry Future Electricity Demand Sout Australia’s Resources Industry Future Electricity Demand South Australia’s Resources Industry Futur Electricity Demand South Australia’s Resources Industry Future Electricity Demand South Australia Resources Industry Future Electricity Demand South Australia’s Resources Industry Future Electricit Demand South Australia’s Resources Industry Future Electricity Demand South Australia’s Resource Industry Future Electricity Demand South Australia’s Resources Industry Future Electricity Deman South Australia’s Resources Industry Future Electricity Demand South Australia’s Resources Industr Future Electricity Demand South Australia’s Resources Industry Future Electricity Demand Sout Australia’s Resources Industry Future Electricity Demand South Australia’s Resources Industry Futur Electricity Demand South Australia’s Resources Industry Future Electricity Demand South Australia Resources Industry Future Electricity Demand South Australia’s Resources Industry Future Electricit Demand South Australia’s Resources Industry Future Electricity Demand South Australia’s Resource Industry Future Electricity Demand South Australia’s Resources Industry Future Electricity Demand Sout Australia’s Resources IndustryFuture Future Electricity Electricity Demand South Demand Australia’s Resources Industry Futur Electricity Demand South Australia’s Resources Industry Future Electricity Demand South Australia Resources IndustSouthry Future Electricit Australia’sy Demand
    [Show full text]
  • ASX Announcement September 2013
    ASX Announcement September 2013 EYRE IRON MAGNETITE JOINT VENTURE General Manager 2nd September 2013 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam CENTREX AND WISCO RESCHEDULE FUSION IN LINE WITH CHANGING MARKET CONDITIONS Highlights • MOU signed with WISCO to reschedule Fusion development in line with changing market conditions • Agreement for further magnetite exploration to expand Fusion potential resource base to reduce estimated mine production costs • Fusion to move back into Prefeasibility Study to assess expanded project • Resource Incentive Payments to be traded for funding path through to end of Bankable Feasibility Study • Formal Supplementary Deed to be executed in the coming months Summary Centrex Metals Limited (“Centrex”) has signed a Memorandum of Understanding (“MOU”) with Wuhan Iron & Steel (Group)For personal use only Co. (“WISCO”) for proposed amendments to the partners' Eyre Iron Magnetite Joint Venture of which Centrex holds a 40% interest. The MOU’s focus is the Joint Venture’s flagship Fusion project which is sought to be re-scoped and rescheduled to take into account recent changes in iron ore market conditions. 289340CJS/3793761.1 ASX Announcement — September 2013 Under the MOU WISCO and Centrex have agreed in-principle to commence an exploration program at new deposits within Fusion to allow greater mining selectivity and reduce estimated mine production costs. This will see the project move back into a Prefeasibility Study over the next 12 to 24 months to assess the expanded project. The joint venture has approximately $9M of existing funding remaining. Centrex and WISCO would jointly contribute a target of $10 million (Centrex $4 million) to fund completion of any the Prefeasibility Study after current joint venture funding is expended.
    [Show full text]
  • The Mineral Industry of Australia in 2008
    2008 Minerals Yearbook AUSTRALIA U.S. Department of the Interior August 2010 U.S. Geological Survey THE MINERAL INDUS T RY OF AUS T RALIA By Pui-Kwan Tse Australia was one of the world’s leading mineral producing and the Brockman iron project in the Pilbara region of Western countries and ranked among the top 10 countries in the world Australia (Australian Bureau of Agricultural and Resource in the production of bauxite, coal, cobalt, copper, gem and Economics, 2009a). near-gem diamond, gold, iron ore, lithium, manganese ore, tantalum, and uranium. Since mid-2008, the global financial Minerals in the National Economy crisis had sharply weakened world economic activities, and the slowdown had been particularly pronounced in the developed Australia’s mining sector contributed more than $105 billion countries in the West. Emerging Asian economies were also to the country’s gross domestic product (GDP), or 7.7% of the adversely affected by the sharply weaker demand for exports GDP during fiscal year 2007-08. In 2008, the mining sector and tighter credit conditions. After a period of strong expansion, employed 173,900 people who worked directly in mining and an Australia’s economic growth decreased by 0.5% in the final additional 200,000 who were involved in supporting the mining quarter of 2008. Overall, Australia’s economy grew at a rate activities. Expectations of sustained levels of global demand for of 2.4% during 2008. During the past several years, owing to minerals led to increased production of minerals and metals in anticipated higher prices of mineral commodities in the world Australia, and the mineral industry was expected to continue markets, Australia’s mineral commodity output capacities to be a major contributor to the Australian economy in the next expanded rapidly.
    [Show full text]
  • From Mine to Farm, Integrated Fertiliser Resource
    WWW.CENTREXMETALS.COM.AU From mine to farm, ASX Code : CXM Share on issue: 315,7 million Share price (Feb 2019) 11.5c integrated fertiliser Share rights on issue 5.8 million Market cap at 11.5c A$36.3 million resource developments. Cash (Dec 2018) A$9.8 million Centrex is a fertiliser focused mine developer. The company’s flagship Ardmore project is a high-grade phosphate rock deposit in Queensland which is planned to produce trial product shipments in mid-2019 before moving into full scale development phase in 2020. Ardmore will be the only developed phosphate mine in Australia exporting product offshore. Centrex is also undertaking targeted phosphate rock exploration in Queensland and the Northern Territory to expand its resource base. Centrex has also progressed a large scale potassium nitrate mining technology project in Western Australia and is now seeking a project partner to advance to the next stage. Ardmore Phosphate Rock Project Uniquely Positioned, Strong Market, Low Risk Australia and New Zealand import approximately 1 million tonnes of phosphate rock annually. Ardmore has a significant quality and freight advantage in the supply to these and other regional markets such as Indonesia and East India in comparison to the current suppliers from North Africa, the Middle East and South America. The Ardmore deposit is shallow and suited to a low-cost Ardmore Project’s location & transport infrastructure elements strip-mining open cut operation without the need for blasting. Pilot plant trials have shown a premium grade 35% P2O5 concentrate with ultra-low cadmium can be produced via simple single stage crushing, attritioning and desliming.
    [Show full text]
  • Metals Ltd ( Metals Ltd (CXM
    –– Centrex Metals Ltd ((CXMCXMCXM)))) 5 February 2013 Andrew Shearer Well Funded Magnetite - Trading Below Cash Backing [email protected] +613 8633 9862 Key Points Recommendation Spec Buy • Centrex (CXM) is exploring and developing magnetite and Risk Rating Very High hematite iron ore assets in the Eyre Peninsula region of South Australia. Current Share Price $0.19 52 Week Price Range $0.14 – $0.31 • Key focus is on advancing the Eyre Iron and Bungalow magnetite projects. Both projects are fully funded to Market Capitalisation $61m feasibility by high quality Chinese JV partners. Cash (3 1/12 /12) $63.3 m • CXM also has an advanced DSO hematite project with a Debt (3 1/12 /12) Nil JORC Mineral Resource of 10.5Mt @ 59.8% Fe. Timing of a proposed 1-1.5Mtpa operation (7 year mine life) is dependent on Port Spencer Board of Directors & Management Two Funded Magnetite Projects + a Port Option David Klingberg (Chairman) Eyre Iron is a JV with Wuhan Iron and Steel (Group) Co Jim White (Executive Director) (WISCO), CXM retaining 40%. Current resources across the 4 Project Fusion magnetite deposits total 653Mt, with Jim Hazel (Non-Executive Director) resource increases likely. Kiat Poh (Non-Executive Director) A DFS based on a 5mtpa operation is currently well advanced, with the results due in mid 2013. John Dryver (Non-Executive Director) Funding for the DFS is coming from the original $75m that Graham Chrisp (Non-Executive Director) WISCO contributed to the project. JV funding is sufficient to Bingqiang (James) Lu (Non-Executive Director) complete the DFS.
    [Show full text]
  • Mining Exploration Entity Annual Reporting Requirements 14
    This page has been intentionally left blank. CENTREX METALS Contents Chairman’s Report 4 Chief Executive’s Report 6 Mining Exploration Entity Annual Reporting Requirements 14 Directors’ Report 18 Lead Auditor’s Independence Declaration 39 Consolidated Statement of Profit or Loss and Other Comprehensive Income 40 Consolidated Statement of Changes in Equity 41 Consolidated Statement of Financial Position 42 Consolidated Statement of Cash Flows 43 Notes to the Consolidated Financial Statements 44 Directors’ Declaration 69 Independent Auditor’s Report 70 ASX Additional Information 72 2015 ANNUAL REPORT - 3 CENTREX METALS Chairman’s Report From listing in 2006 Centrex set out to develop a number of iron ore assets on the Eyre Peninsula in South Australia during what was at the time a rapidly growing market for the commodity. Great progress was made in this pursuit including the completion of two major joint ventures with growing market as a water soluble fertiliser for Chinese steel mills that resulted in a strong micro-irrigation, and with lower price volatility than balance sheet and the Company’s ability to return standard potassium chloride. The high-margin low- $31 million in dividends to shareholders. volume nature of the potassium nitrate market means a significantly reduced capital entry point Centrex commenced a diversification strategy in compared to most other potash projects proposed, 2013 to lower its portfolio risk, historically weighted given the smaller scales required. solely to the iron ore market. This was shown to be a prudent strategy given the iron ore price collapse over the past 12 months, which resulted Oxley has many unique attributes that make it in asset impairments of $18.1 million and took the favourable for development, and much of our bulk commodities knowledge from iron ore can be Company’s loss before tax from $0.9 million in readily applied to it.
    [Show full text]
  • Dividends Put This Deal-Making Junior
    Dividends put this deal-making junior Centrex Metals Ltd (ASX:CXM) is a rarity. In the junior resources sector, where profits are scarce and dividends even more scarce, Centrex has delivered two special fully franked dividends to shareholders in the past 12 months. The second special dividend of 5 cents a share, delivered last month, follows an announcement by the company in late 2012 of its intention to review its capital management strategy with the aim of solving advanced project development funding requirements through dilution, in return for foreign investment. To this end, the company already has three Chinese backed joint ventures in place over iron ore and base metal projects. The strategy is a major departure from the generally accepted resources development model that often does not see significant returns to shareholders until an asset moves through the development phase and into production, an often-lengthy timeline. The Centrex development model involves the company funding projects from acquisition and through early Drilling at Centrex’s Fusion Project. exploration itself, before seeking foreign investment in return for project equity to fund advanced development toward becoming a shareholder in a selection of diversified mining through a joint venture. projects. To increase its foreign investment networks beyond China, the company has taken on the high-profile former senior trade Once feasibilities are completed, Centrex along with its commissioner AK Tareen as a strategic advisor based in India. foreign partner would take the project to market via a float for project financing, at which point Centrex becomes a Centrex has a diversified set of assets within Australia, including minority shareholder.
    [Show full text]
  • Strategic Investment Opportunity ARDMORE PHOSPHATE PROJECT
    Strategic Investment Opportunity ARDMORE PHOSPHATE PROJECT May 2020 WWW.CENTREXMETALS.COM.AU ASX:CXM Project Location Ardmore Phosphate project NORTHERN TOWNSVILLE PORT TERRITORY MOUNT ISA . 10 year mine life in Reserves1, 5 Ardmore . High grade product WESTERN AUSTRALIA . Located on granted mining lease2 QUEENSLAND SOUTH AUSTRALIA NEW SOUTH WALES PERTH SYDNEY ADELAIDE VICTORIA Note: References are in appendix 2 Forward Looking Statements This presentation has been prepared by Centrex Metals nor does it purport to contain all of the information that Each Recipient should make its own enquiries and Limited and is not intended to be and does not constitute a prospective investor may require in evaluating a investigations regarding the assumptions, an offer to sell, or a solicitation of an offer to buy or sell, possible investment in Centrex Metals or its related or uncertainties and contingencies which may affect Centrex Metals’ securities. associated entities or that would be required in a Centrex Metals’ assets or any assets of an entity related This presentation does not constitute a recommendation prospectus or a product disclosure statement prepared or associated with Centrex Metals. to invest in Centrex Metals assets, is not investment, in accordance with the Corporations Act. To the maximum extent permitted by law, each Relevant accounting, financial, legal, tax or other advice and does To the maximum extent permitted by law, none of Person makes no representation or warrant (express or not take into consideration the investment objectives, Centrex Metals and its related or associated bodies implied) as to the currency, accuracy, financial situation or particular needs of any recipient of corporate, and each of those parties’ officers, reasonableness or completeness of the information, the presentation (Recipient).
    [Show full text]
  • Quarterly Activities Report Highlights
    ASX Announcement 17th July 2018 Period Ending 30th June 2018 Quarterly Activities Report Highlights Corporate A$ 14.3 million cash reserves remaining as at 30th June 2018 with no debt Ardmore Phosphate Rock ProJect, Queensland Updated Mineral Resource completed after the recent 342 resource definition drill hole program at the Ardmore Phosphate Rock ProJect Increase in total Mineral Resource to 16.2 million tonnes at 27.8% P2O5 using a 16% P2O5 cut-off Feasibility Study targeted for completion at the end of August KemWorks completed independent fertiliser conversion test work in the US showing eXcellent results for the use of Ardmore phosphate rock in both phosphoric acid and in single superphosphate production Non-binding MOU signed with GuJarat State Fertilizers & Chemicals Ltd. (“GSFC”) for negotiation of a 10 year off-take agreement of approXimately 300,000 tonnes per annum of phosphate rock from Ardmore Completion of mining, crushing and shipping of first two paid customer trials Two customers in the local region each received 400 tonnes of unprocessed run of mine phosphate rock (in shipping containers) as part of a trial for the production of single superphosphate fertiliser in the neXt quarter The unprocessed run of mine ore will provide indications of the general performance of the deposit, with a view to the customers potentially buying higher grade processed concentrate once the proJect is in production CdE Global awarded contract for 70tph modular start-up wet plant at Ardmore Modular start-up plant to produce phosphate rock concentrate for large scale trial shipments in 2019 to secure long-term off-take contracts pg.
    [Show full text]
  • Oxley Potash Project
    ASX Announcement October 2015 OXLEY POTASH PROJECT General Manager 12th October 2015 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam FURTHER POSITIVE ROAST RESULTS AT WA POTASH PROJECT Highlights Second series of bench scale static roast and leach tests indicate up to 91% leach extraction of potassium from a weathered composite of potash feldspar bearing ultrapotassic lava at Oxley New exploration licence granted adjacent to potash project over brine lake system to potentially provide low cost salt for processing An optimisation test program has been initiated which will investigate optimal roast conditions, and the effect of agitation in roasting Results of metallurgical testwork to feed into a Scoping Study with focus on initial high-value potassium nitrate operation Resource definition drilling expected to commence once drilling approvals received from WA Government (land access already in place) Summary Centrex Metals Limited (“Centrex”) has completed a second series of bench scale roast testwork on a weathered composite sample from its Oxley Potash Project (“Oxley”) near the port of Geraldton in Western Australia. Further experimentation of various combinations of salt flux mixtures, composed mainly of sodium chloride, has delivered a ASX Announcement — October 2015 maximum 91% conversion and leach extraction of potassium from the potash feldspar bearing ultrapotassic lava flow that forms the basis of the project. Drawing from these results further optimisation testing is underway. Figure: Removing roast sample from static furnace. Centrex has successfully applied for and been granted a new exploration license (E70/4729) adjacent to the existing Oxley tenements covering a potential source of brine from a playa lake system for producing salts for the process.
    [Show full text]
  • Nsw Gold Exploration
    ASX Announcement September 2014 NSW GOLD EXPLORATION General Manager 26th September 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam NSW GOLD EXLORATION UPDATE Highlights 7 line ground based dipole-dipole induced polarisation survey defines drill ready epithermal targets at Woolgarlo Gold Project Centrex formulating drill plan to test targets at Woolgarlo Reverse circulation drilling completed at Gundaroo Gold Project testing 3 targets, alteration intersected but no significant gold Centrex to further evaluate remaining targets at Gundaroo Woolgarlo Gold Project Centrex Metals Limited (“Centrex”) has completed a dipole-dipole ground induced polarisation (“IP”) survey program at its Woolgarlo Gold Project, generating drill ready epithermal gold targets. The Woolgarlo Gold Project is located in NSW, approximately 50km NW of Canberra and within the prospective East Lachlan Fold Belt. Historical exploration has demonstrated that epithermal gold mineralisation is present within DevonianFor personal use only volcanic host rocks at either end of the project at the Mt Mylora and Sugarbag prospects. Centrex completed a high-resolution air-borne magnetic survey earlier this year between the two historical prospects, as Surgarbag to the south has been interpreted to be the top of an epithermal system, and Mt Mylora in the north to be the base. ASX Announcement — September 2014 The magnetic survey results were encouraging, suggesting possible magnetic destruction along interpreted NNW trending faults thought favourable for further epithermal gold mineralisation within the target host rocks. The overall interpretation of the magnetics indicated a central north-south trending graben feature that is in line with an epithermal model. Later EW compression has produced folding of the Devonian age host volcanics and generated prospective structural traps for mineralisation.
    [Show full text]